WO2001096771A1 - Procede d'installation d'un raccordement de pipeline entre deux points distants en mer, et arrangement de transport comprenant un raccordement de pipeline entre deux points en mer - Google Patents

Procede d'installation d'un raccordement de pipeline entre deux points distants en mer, et arrangement de transport comprenant un raccordement de pipeline entre deux points en mer Download PDF

Info

Publication number
WO2001096771A1
WO2001096771A1 PCT/NO2001/000249 NO0100249W WO0196771A1 WO 2001096771 A1 WO2001096771 A1 WO 2001096771A1 NO 0100249 W NO0100249 W NO 0100249W WO 0196771 A1 WO0196771 A1 WO 0196771A1
Authority
WO
WIPO (PCT)
Prior art keywords
points
pipeline structure
pipeline
buoy
support
Prior art date
Application number
PCT/NO2001/000249
Other languages
English (en)
Inventor
Karel Karal
Claes Olsen
Original Assignee
Abb Anchor Contracting As
Hitec Marine A/S
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abb Anchor Contracting As, Hitec Marine A/S filed Critical Abb Anchor Contracting As
Priority to AU2001264435A priority Critical patent/AU2001264435A1/en
Publication of WO2001096771A1 publication Critical patent/WO2001096771A1/fr

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • B63B22/021Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/24Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/14Laying or reclaiming pipes on or under water between the surface and the bottom

Definitions

  • the invention relates to a method for providing a pipeline connection between two spaced-apart points at sea at such a depth that wave stresses are eliminated or will be reduced to an acceptable level, the pipeline structure being suspended between two points of support at the said depth.
  • the invention also relates to a transport arrangement comprising a pipeline structure between two points at sea, which pipeline structure hangs between two anchored points of support at such a depth that wave stresses are eliminated or reduced to an acceptable level.
  • the invention has been especially developed in connection with the transfer or transport of hydrocarbons from a floating production unit to a loading buoy and then to a tankship.
  • transfer or transport it is usual to use pipelines that are laid on the seabed, when the offshore installations are in shallow waters, or to use pipelines held just above the seabed by means of supports resting on the seabed.
  • the object of the present invention is to provide a transport arrangement for fluid, as for instance hydrocarbons, between two points at sea, which transport arrangement can be positioned in a relatively simple manner with the aid of a surface vessel and involves the use of rigid pipelines, i.e., pipelines that are not of flexible construction , i.e., that ordinary and relatively inexpensive steel pipes can be used.
  • One of the objects of the invention is thus to establish a sort of subsea suspension bridge, comprising rigid transport pipelines, essentially below the so-called wave zone, so that there are no pipelines on the surface, but where they are at a depth at which they are relatively undisturbed by waves and do not obstruct the movement of any vessels on the surface.
  • the pipeline will form a definite arc-shaped curve, and a particular object of the invention is to be able to optimise the shape and curvature of this arc-shaped curve during the planning stage and obtain a desired shape, curvature and depth in the sea.
  • a particular object of the invention is to permit the suspended pipeline to be in the form of a single-curved arc, so as to avoid varying torque tensions in the pipeline.
  • the inventive idea is to establish a sort of underwater suspension bridge comprising one or more tension-loaded, rigid pipelines that are suspended under the so-called wave zone, and which in terms of load are uncoupled from the floating units where one sends and the other receives the transported fluid. Environment-induced motions of these floating units are not transferred to the "bridge" so that dynamic loads are eliminated or reduced considerably.
  • a method is therefore proposed for providing a pipeline connection between two spaced-apart points at sea at such a depth that wave stresses are eliminated or will be reduced to an acceptable level, the pipeline structure being suspended between two points of support at said depth, and what characterises the method according to the invention is that the pipeline structure is suspended from the two points of support by means of a torque-free connection to the points of support, and via these is subjected to an external tension load.
  • the method according to the invention can be carried out in a particularly advantageous manner by providing as points of support two submerged buoys that are anchored so that they will exert the said external tension load on the pipeline structure.
  • a particularly favourable method according to the invention is one where the individual buoy is anchored with a weight hanging from a cable between an adjacent one of the said points and the buoy.
  • Yet another favourable method according to the invention is one where each individual buoy is anchored with a cable that is so heavy that it assumes a catenary shape, with a sag that is sufficiently great to allow a non-coupled motion of the buoy/pipe bridge relative to the respective point in the sea to be obtained.
  • one end of a pipeline structure floating in the sea can be connected to one of the buoys on the surface, whereupon the pipeline structure is drawn towards the second buoy and connected thereto at the surface, the buoys being connected to a respective one of the two points with a respective cable, that is weight-loaded so that the buoys sink in the sea, whereupon the pipeline structure is ballasted so that it is caused to sink and remain hanging, tensioned-loaded, between the buoys.
  • a particularly advantageous way of accomplishing said ballasting is to admit water ballast at one of the ends of the pipeline structure whilst allowing air or gas to escape at the other end of the pipeline structure.
  • a particular advantage of a method of this kind is that a gentle and balanced transfer of the pipeline structure to the desired tension-loaded state in the sea and at the desired depth under the wave zone is achieved.
  • the pipeline structure includes one or more ballastable supporting pipes, by means of which the pipeline structure is suspended in a torque-free manner from the two points of support.
  • a transport arrangement comprising a pipeline structure between two points at sea, which pipeline structure hangs between two anchored points of support at such depth that wave stresses are eliminated or reduced to an acceptable level
  • the transport arrangement according to the invention is that the pipeline structure is suspended by means of a torque-free connection from the two points of support, and that these are so anchored that they exert a tension load on the pipeline structure.
  • the two points of support are a respective, submerged buoy that is anchored with a weight hanging from a cable between an adjacent one of the said points and the buoy, or the cables may be very heavy themselves.
  • the two said points may be respectively a hydrocarbon production unit and a loading buoy, a flexible pipeline or hose connecting the pipeline to the hydrocarbon production unit and the loading buoy respectively.
  • the pipeline structure may include one or more ballastable supporting pipes by means of which the pipeline structure is suspended in a torque-free manner from the two points of support.
  • Figure 1 is a side view of a transport arrangement according to the invention
  • Figure 2 is a top view of the transport arrangement in Figure 1 ;
  • Figure 3 is a cross-sectional view of an embodiment of a pipeline structure in the form of a pipeline bundle, where Figure 3 a shows the pipeline bundle whilst in tow, floating on the surface, Figure 3b shows the pipeline bundle submerged after completed installation, and Figure 3 c shows the pipeline bundle submerged and in operation.
  • Figure 4 is a cross-sectional view of an alternative embodiment of the pipeline bundle in Figure 3, Figures 4a, 4b and 4c showing the same phases as Figures 3a, 3b and 3c.
  • Figure 5 shows a second alternative embodiment of a pipeline structure, where Figures 5a, 5b and 5c show the same phases as Figures 3a, 3b and 3c respectively.
  • Figure 6 is a side view of a transport arrangement according to the invention, and shows in particular an anchoring arrangement for buoys and a production vessel or loading buoy.
  • Figure 7 is a top view of the embodiment in Figure 6.
  • Figure 8 is a side view of a particularly favourable transport arrangement according to the invention.
  • Figure 8B is a side view of a modified embodiment of the transport arrangement shown in Figure 8.
  • Figure 9 shows pre-installed anchor lines, where the left hand line is connected to a support buoy and the right-hand line is temporarily connected to a marker buoy (which in the figure is hidden behind the pipeline), and that the pipeline structure is being towed towards the right-hand buoy for connection thereto.
  • Figure 10 shows the pipeline structure connected to the permanently anchored buoy on the left.
  • Figure 11 shows a situation where one of the support vessels has fished up the anchor line in preparation for connection.
  • Figure 12 shows the connection of the pipeline structure with attached buoy to the right- hand mooring line, and connection with the mooring lines.
  • Figure 13 shows the situation after the pipeline structure has been connected to the two anchored buoys
  • Figure 14 shows the ballasting and positioning of the pipeline structure between the two buoys anchored to the seabed so as to initially obtain the position illustrated in Figure 1.
  • Figures 15-19 show in a schematic manner yet another possible positioning for providing the pipeline structure in the sea, where:
  • Fig. 15 shows the pipeline structure floating in the sea, between two towing/installation vessels;
  • Fig. 16 shows the pipeline structure connected respectively to a hydrocarbon production unit and a loading buoy;
  • Fig. 17 shows an installation phase where the two buoys at the ends of the pipeline structure are in the process of being submerged
  • Figure 18 shows the two buoys once submerged
  • Figure 19 shows ballasting and positioning of the pipeline structure between the two anchored, submerged buoys, with the pipeline structure connected to the hydrocarbon production unit and the loading buoy respectively by means of flexible hoses, so that the arrangement is ready for use.
  • Figures 1 and 2 show a pipeline structure two points at sea.
  • a pipeline structure 1 is suspended between two spaced-apart points of support 3, 4 that are submerged in the water 2. These points of support in Figures 1 and 2 are in the form of two buoys 3, 4 anchored to the seabed 5.
  • the necessary mooring lines are indicated by means of the reference numerals 6, 7, 8 and 9.
  • the pipeline structure 1, more precisely a pipeline bundle, is suspended from the two buoys 3, 4 by means of a torque-free cormection (not shown).
  • the torque-free connection may, for example, be effected using short lengths of chain.
  • the pipeline bundle 1 In its free span, the pipeline bundle 1 forms a definite arc-shaped curve whose shape and curvature may be optimised during the planning phase and obtained by maintaining the pipeline bundle 1 under specific tension load by means of the anchor lines 6 and 9. If a pipeline bundle 1 of this kind is exposed to water currents of varying directions and intensity, the pipeline bundle 1 will be able to yield and constantly maintain the desired single-curved arc shape, thereby avoiding varying torque tensions in the pipeline bundle 1.
  • the broken line in Figures 1 and 2 indicates a position the pipeline bundle 1 may take up if exposed to a sideways current.
  • a hose 10 runs from the end of the pipeline bundle at the buoy 3 to a production vessel 11.
  • a hose 12 runs from the end of the pipeline bundle at the buoy 4 to a loading buoy 13.
  • Figure 3a shows the pipeline bundle floating on the surface whilst being towed
  • Figure 3b shows the pipeline bundle submerged after completed installation
  • Figure 3 c shows the pipeline bundle submerged and in operation, i.e., that hydrocarbons are being transported.
  • the pipeline bundle 1 consists of three pipelines, namely a supporting pipe 14 and two transport pipes 15 and 16. These three pipes are gathered together as a pipe bundle in a conventional, known manner with the aid of suitable means, here merely symbolised by the encircling line 17.
  • the two transport pipes 15, 16 are equipped at their respective ends with connectors for connection to the flexible transport hoses 10 and 12 (see Fig. 1). It is possible to use, for example, two flexible transport hoses 10 and two transport hoses 12, or just one transport hose 10 and 12 respectively, which are connected in a suitable fashion to the two transport pipes 15, 16, in a manner that will be well-known to the skilled person.
  • the flexible transport hoses 10, 12 are yielding to waves and can easily be changed as required.
  • the buoys 3, 4 (Fig. 1) are placed so deep that the pipeline bundle 1 will essentially be located below the so-called wave zone.
  • the supporting pipe 14 is fastened between the buoys 3, 4 by means of the torque-free connections, for example, with the aid of lengths of chain.
  • the pipeline bundle 1 is put in place by being towed to the installation site whilst floating on the surface.
  • the supporting pipe 14 is kept full of air.
  • the buoyancy can be adjusted by ballasting the supporting pipe 14 when required by filling it partially with water. This is accomplished, for example, by dividing the supporting pipe 14 into chambers and perhaps also by its being built up of a plurality pipes which may be of different diameters, in order to allow control and adjustment of the desired buoyancy.
  • an externally positioned pipe can be used.
  • Figure 4 shows an alternative pipeline bundle 1', consisting of one supporting pipe 14 and one transport pipe 15.
  • the various phases of the installation are shown in Figures 4a, 4b and 4c, and these phases are the same as those in Figures 3a, 3b and 3c.
  • FIG. 5 shows another alternative embodiment where the pipe bundle 1" consists of two transport pipes 15 with no a supporting pipe, but with buoyancy-providing elements 23 mounted on the outside of the pipes. Whilst in tow, the transport pipes 15 are filled with ballast liquid. The weight is counterbalanced by the temporary buoyancy- providing elements 23, in this case shown as single floats. Furthermore, a reinforcing member 24 is included, e.g., a wire or stay, which transmits the weight of the structure and other stresses thereon to the points of support 3, 4 (Fig. 1).
  • the buoyancy- providing elements 23 are connected in such manner that they can easily be removed successively from one end of the pipeline bundle, whereby the same effect and distribution are achieved as if ballast liquid had been used as in the two embodiments described above.
  • a buoyancy material 25 is also arranged around the outside of the transport pipes 15 for necessary buoyancy under operating conditions.
  • Figures 6 and 7 show an embodiment of the invention which may be regarded as a variant of that shown in Figures 1 and 2.
  • the difference between the two arrangements in Figures 1, 2 and Figures 6, 7 is found primarily in the anchoring systems for the loading buoy 13 and for the two submerged buoys 3, 4, the buoys 3, 4 being anchored by means of two respective diverging anchor lines 18, 19.
  • the loading buoy 13 is anchored in a conventional known manner with the aid of a plurality of anchor lines 20.
  • the pipeline bundle 1 is tension-loaded by the anchor lines 18, 19.
  • FIG 8 shows an arrangement including submerged buoys 3, 4 as in Figures 1, 2 and 6, 7, but unlike the arrangements described above, the pipeline bundle 1 in this case is suspended from the production vessel 11 and the loading buoy 12 respectively in that each individual buoy 3, 4 is anchored by means of a respective cable 30, 31 that is weight-loaded with weights 32. 33.
  • This special suspension provides the desired tension load of the pipeline 1, whilst the suspension is such that it attenuates most of the motions/loads applied by the floating production unit 11 on the one end and by the loading buoy 13 on the other end.
  • the pipeline is in turn spared from dynamic stresses that have an impact on the lifetime of the structure. Stresses that cause material fatigue are reduced.
  • the suspension at each end comprises a cable or line 30, 31 that is made to form a respective N-shape with the aid of a weight.
  • the weight 32, 33 may be a lump weight or a hanging chain and the like as shown in Fig. 8b.
  • the depth of the buoys or the buoyancy tanks and the pipeline bundle is selected so that stresses from waves are below an acceptable level and the danger of damage from boat traffic on the water surface is eliminated.
  • the weight of the weights 32 and 33 in Fig. 8 is distributed along a certain length of the cable 30, 31. Typically: heavy chain, several pieces in parallel.
  • Fig. 8 or 8b The installation shown in Fig. 8 or 8b is very installation-friendly. It permits the pipeline to be brought to the surface in a simple way for repair, inspection, cleaning/scraping off of fouling and the like. Reference is made to a more detailed discussion of the installation method in connection with Figures 15-19.
  • Figure 9 shows pre-installed anchor lines, where one of the anchor lines 18 is connected to a buoy 3 and the other anchor line 19 is temporarily connected to a marker buoy 26 (hidden behind the pipeline 1 in Figure 9).
  • the pipeline structure 1 is being towed towards the buoy 3 for connection thereto.
  • the buoys 3, 4 and 26 are all floating on the surface of the sea.
  • Figure 10 shows the pipeline bundle 1 connected to the permanently anchored buoy 3.
  • the marker buoy 26 is shown in this figure.
  • Figure 11 shows a situation where one of the support vessels has fished up the mooring line 19 in preparation for connection.
  • the marker buoy 26 is disconnected from the mooring line 19 once this has been fished up.
  • Figure 12 shows the connection, of the pipeline bundle 1 with attached buoy 4 to the mooring line 19.
  • the pipeline bundle 1 and the buoys 3, 4 are under tension from the support vessel, which is shown on the right in Figure 12, so that the free end of the mooring line 19 reaches far enough to allow the connection to the buoy 4 to be carried out on the surface of the sea. During this operation the buoy 3 will submerge and tauten the anchor line 18.
  • FIG 13 shows the situation once the pipeline bundle 1 has been connected to the two anchored buoys 3, 4.
  • the buoys 3, 4 are now both below the surface of the sea, and the mooring lines 18, 19 are under tension.
  • the pipeline bundle 1 On the surface the pipeline bundle 1 is connected to the buoy 4, and the tow is released. The pipeline bundle 1 will then take up the position in the water 2 as shown in Figure 13. One of the ends of the air-filled pipeline is then opened, at the end that is at the buoy 3, and it ensured that air can escape from here without water entering. Water is supplied in the other end of the pipeline, so that the initially empty transport pipe is filled with water. The pipeline bundle 1 will then move as indicated by means of the successive broken lines and finally take up the position indicated by the reference numeral l a , a position that corresponds to the position shown in Figures 1 and 6.
  • the general method described here ensures a gentle and balanced transfer of the pipeline bundle 1 from the floating position on the surface, with the two submerged buoys 3, 4, to the desired suspended position in the sea, essentially below the wave zone.
  • the pipeline connection provided according to the invention is such that the arrangement, i.e., the pipeline bundle 1, is essentially only subjected to tensile loads: Such loads are easy to take up in the structure.
  • This advantageous state is achieved by suspending the pipeline bundle 1 between two points of support 3, 4 by means of a torque-free connection and under tension, the whole assembly being submerged to a depth such that wave stresses are eliminated or reduced to an acceptable level.
  • the buoys 3, 4 take up the submerged weight of the pipeline bundle and generate the necessary tension.
  • the transport arrangement is terminated with components (loading hoses 10, 12) that are flexible and thus also yielding to motions.
  • the buoy 4 may be preinstalled on the mooring line 19, whilst the other buoy 3 is secured to the pipeline structure 1.
  • This alternative method will require the buoy 4 to be constructed in such a way that the free end of the pipeline structure 1 can be pulled into the connection point on the buoy 4 without the pull wire subjecting the buoy to undesirable stresses.
  • the buoy 4 can advantageously be made of two interconnected, spaced-apart cylindrical elements (not shown) which have a passageway for the pull wire therebetween.
  • the buoy may be made in the form of a single element (not shown) with a through hole for the pull wire in the centre thereof.
  • Figure 15 shows a pipeline structure or bundle 1 being towed to an installation site, with associated buoys 3, 4.
  • Figure 16 it is shown that suspension lines or mooring cables 30, 31 are connected between the production unit 11 and the buoy 3 and between the loading buoy 13 and the buoy 4 respectively.
  • Figure 18 shows the situation after the weights have forced the buoys 3, 4 down.
  • the pipeline structure 1 is still floating on the surface of the water or has been submerged with the sags close to the surface, but of course follows the buoys 3, 4, as shown in Fig. 18.
  • Figure 19 shows lowering phases of the pipeline structure 1, carried out in the same way as described above in connection with Figure 14.
  • the pipeline structure 1 can be transferred into a floating position on the surface by carrying out the installation steps mentioned above, but in the reverse order.
  • the invention can be carried out using buoyancy elements other than those shown and described herein.
  • the buoyancy may be in the form of elements of materials that are lighter than water, i.e., that there is a "permanent" buoyancy which cannot be changed.
  • All the pipelines may also be used in temporary phases for the active adjustment of the buoyancy by, for example, filling with water.
  • a plurality of pipelines and/or combination of transport pipes and supporting pipes could also be used as shown, or in other combinations.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

L'invention concerne un procédé d'installation d'un raccordement de pipeline entre deux points en mer. Une pipeline (1) flottant dans la mer est suspendue entre deux points de support distants (3, 4) dans la mer au moyen d'un raccord exempt de couple, et maintenue accrochée à une profondeur telle que, entre ces deux points de support (3, 4), les contraintes de la houle sont éliminées ou réduites à un niveau acceptable. La pipeline (1) est mise sous tension par l'intermédiaire des points de support (3, 4). L'invention concerne en outre un arrangement de transport comprenant un raccordement de pipeline entre deux points en mer. Le raccordement de pipeline comprend une pipeline (1) suspendue sous l'effet d'un effort de tension extérieur et au moyen d'un raccord exempt de couple assuré par deux bouées distantes immergées.
PCT/NO2001/000249 2000-06-14 2001-06-13 Procede d'installation d'un raccordement de pipeline entre deux points distants en mer, et arrangement de transport comprenant un raccordement de pipeline entre deux points en mer WO2001096771A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2001264435A AU2001264435A1 (en) 2000-06-14 2001-06-13 Method for providing a pipeline connection between two spaced-apart points at sea, and a transport arrangement comprising a pipeline connection between two points at sea

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20003047A NO20003047D0 (no) 2000-06-14 2000-06-14 FremgangsmÕte ved tilveiebringelse av en rørledningsforbindelse mellom to steder i sjøen, og en transportanordning innbefattende en rørledningsforbindelse mellom to steder i sjøen
NO20003047 2000-06-14

Publications (1)

Publication Number Publication Date
WO2001096771A1 true WO2001096771A1 (fr) 2001-12-20

Family

ID=19911266

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2001/000249 WO2001096771A1 (fr) 2000-06-14 2001-06-13 Procede d'installation d'un raccordement de pipeline entre deux points distants en mer, et arrangement de transport comprenant un raccordement de pipeline entre deux points en mer

Country Status (3)

Country Link
AU (1) AU2001264435A1 (fr)
NO (1) NO20003047D0 (fr)
WO (1) WO2001096771A1 (fr)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006120351A1 (fr) 2005-05-13 2006-11-16 Saipem S.A. Dispositif de transfert de fluide entre deux supports flottants
EP2161488A1 (fr) 2008-09-09 2010-03-10 Heerema Fabrication Group B.V. Section de tuyau pour une utilisation dans un système de conduites submergées, système de conduites submergées et son utilisation
EP2474466A1 (fr) * 2011-01-07 2012-07-11 Dorincourt S.A. Procédé destiné au transport de corps tubulaires
CN102815378A (zh) * 2012-08-20 2012-12-12 上海单点海洋技术有限公司 船舶装卸或补给装置及方法
WO2019226653A1 (fr) * 2018-05-22 2019-11-28 Sullivan Ryan Lee Système de transfert de navire à navire et procédé d'allègement
WO2020092182A1 (fr) 2018-10-29 2020-05-07 Subsea 7 (Us) Llc Installation de pipelines sous-marins

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1193748B (de) * 1960-05-11 1965-05-26 Gerard Francis Wittgenstein Di Verfahren und Einrichtung zum Verlegen einer Rohrleitung im Abstand vom Grund unterhalb des Wasserspiegels
US4107933A (en) * 1976-06-04 1978-08-22 Compagnie Generale Pour Les Developpements Operationnels Des Richesses Sous-Marines "C. G. Doris" Apparatus and method for towing a pipeline in a body of water
US4110994A (en) * 1976-01-26 1978-09-05 Poseidon Marketing And Development Co. Marine pipeline
US5275510A (en) * 1992-01-16 1994-01-04 Jacob De Baan Offshore tanker loading system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1193748B (de) * 1960-05-11 1965-05-26 Gerard Francis Wittgenstein Di Verfahren und Einrichtung zum Verlegen einer Rohrleitung im Abstand vom Grund unterhalb des Wasserspiegels
US4110994A (en) * 1976-01-26 1978-09-05 Poseidon Marketing And Development Co. Marine pipeline
US4107933A (en) * 1976-06-04 1978-08-22 Compagnie Generale Pour Les Developpements Operationnels Des Richesses Sous-Marines "C. G. Doris" Apparatus and method for towing a pipeline in a body of water
US5275510A (en) * 1992-01-16 1994-01-04 Jacob De Baan Offshore tanker loading system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006120351A1 (fr) 2005-05-13 2006-11-16 Saipem S.A. Dispositif de transfert de fluide entre deux supports flottants
FR2885613A1 (fr) * 2005-05-13 2006-11-17 Saipem S A Sa Dispositif de transfert de fluide entre deux supports flottants
US7677837B2 (en) 2005-05-13 2010-03-16 Saipem S.A. Device for transferring fluid between two floating supports
EP2161488A1 (fr) 2008-09-09 2010-03-10 Heerema Fabrication Group B.V. Section de tuyau pour une utilisation dans un système de conduites submergées, système de conduites submergées et son utilisation
EP2474466A1 (fr) * 2011-01-07 2012-07-11 Dorincourt S.A. Procédé destiné au transport de corps tubulaires
CN102815378A (zh) * 2012-08-20 2012-12-12 上海单点海洋技术有限公司 船舶装卸或补给装置及方法
WO2019226653A1 (fr) * 2018-05-22 2019-11-28 Sullivan Ryan Lee Système de transfert de navire à navire et procédé d'allègement
WO2020092182A1 (fr) 2018-10-29 2020-05-07 Subsea 7 (Us) Llc Installation de pipelines sous-marins
US11796086B2 (en) 2018-10-29 2023-10-24 Subsea 7(US) LLC Installation of subsea pipelines

Also Published As

Publication number Publication date
NO20003047D0 (no) 2000-06-14
AU2001264435A1 (en) 2001-12-24

Similar Documents

Publication Publication Date Title
US4735267A (en) Flexible production riser assembly and installation method
US3355899A (en) Offshore operations
RU2147334C1 (ru) Узел подъемника для перекачивания текучего содержимого со дна моря на плавающее судно
US7434624B2 (en) Hybrid tension-leg riser
AU2009312647B2 (en) Method for assembling an operating rig for a fluid in a body of water and associated operating rig
CN103661819B (zh) 连接到水下管线结构的浮式系统及其使用方法
US20050158126A1 (en) Flexible riser system
ATE265611T1 (de) Gefesseltes schwimmfähiges auflager für steigrohre zu einem schwimmenden wasserfahrzeug
US7025533B1 (en) Concentrated buoyancy subsea pipeline apparatus and method
GB2295408A (en) Marine steel catenary riser system
US7975769B2 (en) Field development with centralised power generation unit
AU2007205290B2 (en) Mooring system
US6210075B1 (en) Spar system
GB2393980A (en) A riser and method of installing same
AU2006202167A1 (en) Transporting an elongate member through water
US20060056918A1 (en) Riser system connecting two fixed underwater installations to a floating surface unit
WO2005009842A1 (fr) Support de colonne montante en eau peu profonde
WO2001096771A1 (fr) Procede d'installation d'un raccordement de pipeline entre deux points distants en mer, et arrangement de transport comprenant un raccordement de pipeline entre deux points en mer
US5702205A (en) Steel catenary riser system for marine platform
MXPA97006375A (en) Support of a catena upper pipe
EP3874191B1 (fr) Installation de pipelines sous-marins
AU2009272589B2 (en) Underwater hydrocarbon transport apparatus
US7001234B2 (en) Marine riser system
GB2221276A (en) Towing and installing prefabricated submarine pipelines
Paulsen et al. Submerged floating pipeline in deep water

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP