WO2001069751A1 - Verfahren zur projektierung einer elektrischen anlage und projektierungsvorrichtung - Google Patents
Verfahren zur projektierung einer elektrischen anlage und projektierungsvorrichtung Download PDFInfo
- Publication number
- WO2001069751A1 WO2001069751A1 PCT/DE2001/000795 DE0100795W WO0169751A1 WO 2001069751 A1 WO2001069751 A1 WO 2001069751A1 DE 0100795 W DE0100795 W DE 0100795W WO 0169751 A1 WO0169751 A1 WO 0169751A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- circuit
- devices
- load
- protective
- protective devices
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/16—Cables, cable trees or wire harnesses
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/06—Power analysis or power optimisation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/20—Information technology specific aspects, e.g. CAD, simulation, modelling, system security
Definitions
- the invention relates to a method for designing an electrical system with a network that extends from a supply side to a consumer side.
- the invention further relates to a project planning device for carrying out the method.
- Planning and the position of the automation device related steps include designing, Paramet ⁇ réelle, creating Do ⁇ kumentationsunterlagen, the parameterization of Fernwirkstel- le, the generation of operating data for the automation device and the creation of technical docu ⁇ gen, circuit planning, screen layouts, random lists, prices, and other technical Data.
- a model of the system to be configured is created based on a data pool of information relating to standard circuits and standard devices .
- the integration of the switchgear or primary system to be controlled is not taken into account.
- the invention has for its object to provide an automated method that allows the determination and visualization of a network image taking into account all the computation rules necessary for the project planning, and even unversed people can carry out the project planning. Furthermore, a facility for carrying out the method is to be provided.
- the task is solved with a method for projecting an electrical system with a network that extends from an input side to a consumer side, a network image being determined either by
- the method is advantageously carried out in such a way that for each circuit, also for parallel branches in the feed circuit and / or in the consumer circuit, the sum of the loads up to the circuit in question is carried out:
- a) The determination of facilities and / or protective measures for gaining overload safety on the basis of the total load and predetermined tables and algorithms as well as on the basis of selection tables for determining suitable devices; b) - the determination of devices and / or protective measures ⁇ men for obtaining short-circuit protection to short-circuit currents, which are obtained according to a) using algorithms; c) - the identification of facilities and / or measures to
- the setting parameters of the protective devices can be made available at an interface for output to the respective protective devices. This enables direct data exchange, so that additional parameterizations or settings are not necessary.
- the network image in the manner of a tree structure is vi ⁇ sualformat which is generally known from file representations on PCs. This provides the user with a well-known representation that he is already used to and that simplifies familiarization.
- the process is advantageously carried out in such a way that, in order to obtain housings, sub-distributions for receiving determined devices and devices are divided into the space for
- Accessories for every usable device, essentially consisting of an installation kit to be able to install a special device, of clamps and, if necessary, of intermediate rails and - for the housing.
- the devices and equipment determined can advantageously be divided into so-called fields in the form of distributions or control cabinets.
- a project planning device for carrying out the above-mentioned method, with a computer, a screen, a keyboard and possibly an interface, and a memory in which a large number of virtual devices, devices and protective devices are listed in tables with their characteristic data and a generator, which generates the network image from the determined devices, devices and protective devices.
- FIG. 5 shows a representation for the housing determination and FIG. 6 and 7 screen representations for release characteristics.
- the aim of the project planning procedure is to carry out the project planning of the electrical energy supply for buildings continuously, from the building feed-in to the end consumer, according to the currently applicable standards and regulations, country-specific, quickly and automatically (with the help of a PC) without special technical and device knowledge.
- specific deliverable products are used.
- the method can be implemented as software or as a program and a PC or workstation, with the Bedie ⁇ voltage with the usual display and operating funds are: monitor, keyboard and mouse. Possibly. there are also other usual additional devices, for example a printer or a plotter for outputting information.
- the generally applicable calculation rules for short-circuit, load flow, voltage drop are stored as a calculation kernel in the sense of standard calculations or form.
- the configuration rules are stored as methods depending on the circuit types and the configuration conditions.
- the parameters for the methods as well as for the computation kernel can be adapted to country-specific or user-specific requirements via default settings. Thanks to the country or user-dependent basic settings, an expert system can be used for economical project planning, adapted to the requirements of the user or the type of building, without the user having to have any specialist knowledge.
- the project planning takes place automatically in the shortest possible time.
- changing the default values or changing individual equipment means that the project planning procedure meets the special requirements of specialists or types of building customizable.
- the user can configure both top-down, ie starting from the supply hm to the individual consumers, and bottom-up, ie creating an energy balance starting from the consumers towards the supply.
- FIG. 2 Structure of the user interface (FIG 2 ' The surface is divided into several areas.
- the process can be operated from all three windows of the image structure.
- the Circuit dialog box contains the most important properties of the device for viewing and changing for each device in the circuit. e.g. Connection type
- Type of protection device - Level 3 Properties detail dialog device (see example FIG 4)
- the detail dialog box device contains all properties that describe the device. All values can be changed.
- Insulating material Number of parallel systems Cross section of outer conductor Cross section of pen conductor - arrangement of the conductors
- An essential advantage of the project planning procedure lies in the structuring of the procedure and the operation, in the preparation of the structure of the properties of the equipment used in the building technology as well as in the development of a suitable software structure for the operation of the dimensioning tool in order as possible to come to a result in a short time.
- the project planning procedure with a software component or soft building elements should ensure the following: - Dimensioning of the necessary equipment for the electrical power supply in buildings such as
- the power supply network of a building is divided into classes, subclasses and related properties and methods.
- Sub-class transformer feed e.g.
- the individual project planning steps are based on the currently valid, recognized rule of technology. Country-specific settings allow national footnotes to be taken into account in the project planning rules. Type of calculation
- the individual circuit classes are dimensioned according to the recognized rules of technology such as national and international regulations, provisions and installation regulations.
- the necessary equipment such as switching devices,
- the power requirement for a building is basically carried out according to the "bottom-up" method, ie from the end user to the feed-in of a building.
- the supply structure of a building can be used the data important for the energy balance such as active power, reactive power, number of poles, rated voltage, simultaneity factor (distributor) or utilization factor (consumer) are entered or the default values are changed.
- the energy balance is then carried out in real time during the program runtime when changes and entries are made. Switching and protective functions or the transmission links are not entered or supplemented. This can be reconfigured at a later time (see point b or c)
- Automatic dimensioning The default value is the program on "automatic dimensioning.” This means, after entering the United ⁇ sorgungsaufgabe the program dimensioned independently the benot costumen switching and protection devices, which benot costumen cable or bar connections according to the "top-down" (From the feed to the consumer.) The equipment is selected from the database using the selection method that depends on the circuit and its properties.
- this device is automatically switched from "automatic dimensioning" to "dimensioning by hand” (blue hand at the corresponding distributor node, consumer feed in the Tree structure or in the circuit dialogue field for the equipment). In this case, no new equipment is determined but performs the calculation and verification with the zer the groove ⁇ set equipment according to the method top-down (from the infeed to the consumer) Runaway ⁇ .
- the result display - all conditions fulfilled or not fulfilled - is shown in the tree structure as in point b.
- the task of the program is to automatically dimension an economical system in the shortest possible time and to select the required equipment. For this reason, manufacturer information that leads to more economical dimensioning of equipment is evaluated in the calculation process. For this, e.g. the current-limiting effect of current-limiting circuit breakers, miniature circuit breakers and fuses in the event of short-circuit currents. For this purpose, the forward energy characteristics and the forward current characteristics of these devices were digitized and stored in the database using a special procedure.
- the voltage drop on the individual circuits is calculated according to the currently applicable rule of technology. For one practical adjustment of the calculation results, it is possible to adjust the operating temperature to the actual conditions.
- a further advantage of the present idea lies in the development of suitable software algorithms for mapping the individual circuit classes, equipment classes, their properties, the calculation and design methods for string-shaped energy supply systems and their combination depending on the existing standards and installation regulations. Furthermore, the type of data storage for the equipment, the preparation or digitization of the tripping characteristics, the forward energy characteristics, the forward current characteristics of the switching and protection devices, such as open circuit breakers, current-limiting circuit breakers, circuit breakers, fuses , Fuse switch disconnectors, circuit breakers, etc. and the preparation of the current capacity tables and impedance tables can be regarded as an inventive step. Only the special form of data processing and the developed software algorithms ensure a. a separation of data management and program b. an economically viable solution
- the program automatically specifies the circuit tree with the switching and protection devices used. It takes the relevant network data for determining the correct protection setting from the circuit dimensioning and displays it in a current-time diagram (see examples according to FIGS. 6 and 7).
- the program Based on the setting data of the individual characteristic curve sections (overload, short-time delayed and non-delayed) as well as the upper and lower tolerance bands (from the database) specified by the manufacturer, the program automatically compiles the tolerance band of the protective trigger of the respective protective device. Intersection of the characteristic curves of upstream or downstream switching and protection devices automatically calculated by the program determine the selectivity limit. If the selectivity limit lies in the "not delayed" area (short-circuit quick release), the selectivity Manufacturer's vitamin limit tables are used to determine the selectivity limits.
- the setting values determined by the program can be changed by the user.
- the actual setting levels of the individual switching and protection devices are stored in the database.
- the setting is then made in the middle part of the picture with so-called soft buttons.
- setting data are selected that result in the equipment being used being subjected to an impermissibly high load either when the circuit is at maximum load or in the event of a short circuit, or that false triggers are to be expected, they are immediately displayed "RED" at runtime.
- the planner of electrical energy systems for buildings must provide information on the space required for distributors, transformers, generators and energy transmission lines at a very early planning stage. It lacks in the re ⁇ gel the special knowledge for the construction of distribution systems to warming problems in certain distributors, etc.
- the equipment from the dimensioning of the circuits, including their properties, are adopted in the housing definition.
- the function blocks are used for the A ⁇ the switching and protective devices construction determined from the data bank distributor. All distributors that have a function block for the switching and protection devices are automatically made available for selection with their properties.
- the distributors that can be selected can be restricted. The user is thus given a tool that allows him to quickly determine the distributor that meets his requirements based on general distributor properties.
- a front and top view of the distributor is generated automatically and is available for further use, for example in
- the determination takes into account that the switching and protection ridges only have a reduced current carrying capacity after installation in a distributor. This leads to a sufficient determination of the switching and protection devices.
- the main advantage of the new method with regard to the determination of the housing lies in the development of classes, subclasses etc., which can be described by properties that a planner or a switchgear designer understands. Added to this is the use of selection algorithms that assign the switching and protection devices determined by the dimensioning tool of the process via their properties such as rated current, load current, number of poles, short-circuit making capacity, short-circuit switching capacity, drive type, installation type, etc. to a specific field and system type.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Selective Calling Equipment (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Semiconductor Integrated Circuits (AREA)
- Design And Manufacture Of Integrated Circuits (AREA)
- Cash Registers Or Receiving Machines (AREA)
- Silver Salt Photography Or Processing Solution Therefor (AREA)
- Input Circuits Of Receivers And Coupling Of Receivers And Audio Equipment (AREA)
Abstract
Description
Claims
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE50112739T DE50112739D1 (de) | 2000-03-17 | 2001-03-02 | Verfahren zur projektierung einer elektrischen anlage und projektierungsvorrichtung |
US10/130,216 US7096165B2 (en) | 2000-03-17 | 2001-03-02 | Method for configuring an electrical installation and corresponding configuration device |
EP01919162A EP1277266B1 (de) | 2000-03-17 | 2001-03-02 | Verfahren zur projektierung einer elektrischen anlage und projektierungsvorrichtung |
AU46365/01A AU772536B2 (en) | 2000-03-17 | 2001-03-02 | Method for configuring an electrical installation and corresponding configuration device |
NO20022274A NO20022274L (no) | 2000-03-17 | 2002-05-13 | Fremgangsmåte og anordning for prosjektering av et elektrisk anlegg |
HK03102226.9A HK1050083B (zh) | 2000-03-17 | 2003-03-27 | 用於構造電氣安裝的方法和相應的構造裝置 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10013037.2 | 2000-03-17 | ||
DE10013037A DE10013037A1 (de) | 2000-03-17 | 2000-03-17 | Verfahren zur Projektierung einer elektrischen Anlage und Projektierungsvorrichtung |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2001069751A1 true WO2001069751A1 (de) | 2001-09-20 |
Family
ID=7635107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/DE2001/000795 WO2001069751A1 (de) | 2000-03-17 | 2001-03-02 | Verfahren zur projektierung einer elektrischen anlage und projektierungsvorrichtung |
Country Status (9)
Country | Link |
---|---|
US (1) | US7096165B2 (de) |
EP (1) | EP1277266B1 (de) |
AT (1) | ATE367674T1 (de) |
AU (1) | AU772536B2 (de) |
DE (2) | DE10013037A1 (de) |
ES (1) | ES2288936T3 (de) |
HK (1) | HK1050083B (de) |
NO (1) | NO20022274L (de) |
WO (1) | WO2001069751A1 (de) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1464972A3 (de) * | 2003-04-03 | 2008-11-12 | Siemens Aktiengesellschaft | Rechnergestütztes Prüfverfahren für eine Anordnung elektrischer Geräte |
EP2110724A1 (de) * | 2008-04-14 | 2009-10-21 | Siemens Aktiengesellschaft | Verfahren und Computerprogramm zur Planung einer Auswahl und Anordnung von Komponenten eines Automatisierungssystems |
WO2012130566A1 (de) * | 2011-03-25 | 2012-10-04 | Siemens Aktiengesellschaft | Verfahren zum erstellen einer diskreten ausprägung der konfiguration einer anlage |
CN103309252A (zh) * | 2012-03-05 | 2013-09-18 | 施耐德电器工业公司 | 用于控制电气装备的选择性的方法和设备 |
WO2021047791A1 (de) * | 2019-09-12 | 2021-03-18 | Gs Licence Pool Ug | Verfahren zum erstellen von anforderungen zur beschreibung eines technischen prozesses |
CN113378509A (zh) * | 2021-06-16 | 2021-09-10 | 中国化学赛鼎宁波工程有限公司 | 电缆选型方法、装置及存储介质 |
Families Citing this family (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1019653C2 (nl) * | 2001-12-24 | 2003-06-30 | Holec Holland Nv | Werkwijze voor het inrichten van een schakelinstallatie geschikt voor de distributie van elektrische energie en elektrische voeding naar een stelsel van elektrische verbruikers. |
CA2400580A1 (en) * | 2002-09-03 | 2004-03-03 | Sureshchandra B. Patel | Systems of advanced super decoupled load-flow computation for electrical power system |
US20040080520A1 (en) * | 2002-10-29 | 2004-04-29 | Joseph Reghetti | Methods and apparatus for generating a data structure indicative of an alarm system circuit |
US20070041041A1 (en) * | 2004-12-08 | 2007-02-22 | Werner Engbrocks | Method and computer program product for conversion of an input document data stream with one or more documents into a structured data file, and computer program product as well as method for generation of a rule set for such a method |
US20090039407A1 (en) * | 2005-03-17 | 2009-02-12 | Vora Madhukar B | Vertically integrated flash EPROM for greater density and lower cost |
DE102006013778A1 (de) * | 2006-03-24 | 2007-10-04 | Siemens Ag | Verfahren zum Entwurf eines technischen Systems und Computerprogrammprodukt |
US8150660B2 (en) * | 2007-05-01 | 2012-04-03 | M.E.P. Cad, Inc. | Methods and apparatuses for automatically selecting a pipe in a CAD drawing |
US8441502B2 (en) * | 2007-05-01 | 2013-05-14 | M.E.P. Cad, Inc. | Methods and apparatuses for resolving a CAD drawing conflict with an arm around |
US20090273598A1 (en) * | 2008-05-01 | 2009-11-05 | M.E.P. Cad, Inc. | Methods and apparatuses for automatically converting objects in CAD drawing from two-dimensions to three-dimensions |
US8773425B2 (en) | 2007-05-01 | 2014-07-08 | M.E.P. CAD Inc. | Methods and apparatuses for proposing resolutions to conflicts in a CAD drawing with reflections |
US8224628B2 (en) * | 2007-05-01 | 2012-07-17 | M.E.P. Cad, Inc. | Methods and apparatuses for placing a flexible drop in a CAD drawing |
WO2008137023A1 (en) | 2007-05-01 | 2008-11-13 | M.E.P. Cad, Inc. | Methods and apparatuses for handling a conflict in a cad drawing |
WO2008137018A1 (en) | 2007-05-01 | 2008-11-13 | M.E.P. Cad, Inc. | Methods and apparatuses for preprocessing a cad drawing |
US8600706B2 (en) * | 2007-05-01 | 2013-12-03 | Auto Prep, Llc | Systems and methods for identifying crash sources in a CAD environment |
US8554520B2 (en) | 2007-05-01 | 2013-10-08 | Auto Prep, Llc | Systems and methods for differentiating and associating multiple drawings in a CAD environment |
US9112985B2 (en) * | 2007-12-19 | 2015-08-18 | Core Wireless Licensing S.A.R.L | Methods, apparatus and computer program product for altering device functionality |
CN102713772B (zh) * | 2009-08-14 | 2016-06-29 | Abb技术有限公司 | 用于变电站自动化系统的工程的方法和系统 |
TWI465951B (zh) * | 2010-03-23 | 2014-12-21 | Hon Hai Prec Ind Co Ltd | 過流保護電路設計系統和方法 |
US9358411B2 (en) | 2011-05-27 | 2016-06-07 | Victaulic Company | Flexible dry sprinkler |
PL3504889T3 (pl) | 2016-08-29 | 2021-12-20 | 3M Innovative Properties Company | Elektroniczny ochronnik słuchu z przełączalnymi stykami elektrycznymi |
US11233387B2 (en) * | 2019-02-08 | 2022-01-25 | Rockwell Automation Technologies, Inc. | Power system performance based on updated performance characteristics of a protection device |
EP4227798A1 (de) | 2022-02-11 | 2023-08-16 | Siemens Aktiengesellschaft | Verwaltung und speicherung von informationen |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4209168A1 (de) * | 1992-03-20 | 1993-09-23 | Siemens Ag | Verfahren zum verarbeiten von parametern einer automatisierungseinrichtung fuer eine industrieanlage |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4747061A (en) * | 1986-03-17 | 1988-05-24 | Westinghouse Electric Corp. | Automatic transfer switch for a wide range of source voltage |
US5218307A (en) * | 1990-11-02 | 1993-06-08 | Alcan Aluminum Corporation | Fault detection circuit and method for testing a multiple conductor cable having a shield |
US5351165A (en) * | 1992-12-31 | 1994-09-27 | Siemens Energy & Automation, Inc. | Main circuit breaker or other circuit protective device connector installation kit for panelboards |
DE19519755B4 (de) | 1994-10-14 | 2007-09-20 | Siemens Ag | Verfahren zum Festlegen der geometrischen Lage einer Oberleitungsanlage |
GB2294340A (en) | 1994-10-21 | 1996-04-24 | Northern Telecom Ltd | Communications system design. |
WO1997012301A1 (de) | 1995-09-25 | 1997-04-03 | Siemens Aktiengesellschaft | Entwurfsverfahren für die anlagentechnik und rechnergestütztes projektierungssystem zur verwendung bei diesem verfahren |
EP0859987A2 (de) | 1995-10-27 | 1998-08-26 | Siemens Aktiengesellschaft | Computergestütztes arbeits- und informationssystem und zugehöriger baustein |
US5675194A (en) * | 1996-06-07 | 1997-10-07 | Walker Systems, Inc. | Modular power distribution system |
US5872722A (en) * | 1996-09-04 | 1999-02-16 | Eaton Corporation | Apparatus and method for adjustment and coordination of circuit breaker trip curves through graphical manipulation |
US6044062A (en) * | 1996-12-06 | 2000-03-28 | Communique, Llc | Wireless network system and method for providing same |
US6058262A (en) | 1997-04-18 | 2000-05-02 | Geargarage.Com Inc. | Computer-aided-design method and apparatus for networks |
US6901439B1 (en) * | 1999-01-22 | 2005-05-31 | Leviton Manufacturing Co., Inc. | Method of adding a device to a network |
-
2000
- 2000-03-17 DE DE10013037A patent/DE10013037A1/de not_active Withdrawn
-
2001
- 2001-03-02 ES ES01919162T patent/ES2288936T3/es not_active Expired - Lifetime
- 2001-03-02 US US10/130,216 patent/US7096165B2/en not_active Expired - Fee Related
- 2001-03-02 AU AU46365/01A patent/AU772536B2/en not_active Ceased
- 2001-03-02 WO PCT/DE2001/000795 patent/WO2001069751A1/de active IP Right Grant
- 2001-03-02 EP EP01919162A patent/EP1277266B1/de not_active Expired - Lifetime
- 2001-03-02 DE DE50112739T patent/DE50112739D1/de not_active Expired - Lifetime
- 2001-03-02 AT AT01919162T patent/ATE367674T1/de not_active IP Right Cessation
-
2002
- 2002-05-13 NO NO20022274A patent/NO20022274L/no unknown
-
2003
- 2003-03-27 HK HK03102226.9A patent/HK1050083B/zh not_active IP Right Cessation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4209168A1 (de) * | 1992-03-20 | 1993-09-23 | Siemens Ag | Verfahren zum verarbeiten von parametern einer automatisierungseinrichtung fuer eine industrieanlage |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1464972A3 (de) * | 2003-04-03 | 2008-11-12 | Siemens Aktiengesellschaft | Rechnergestütztes Prüfverfahren für eine Anordnung elektrischer Geräte |
EP2110724A1 (de) * | 2008-04-14 | 2009-10-21 | Siemens Aktiengesellschaft | Verfahren und Computerprogramm zur Planung einer Auswahl und Anordnung von Komponenten eines Automatisierungssystems |
WO2012130566A1 (de) * | 2011-03-25 | 2012-10-04 | Siemens Aktiengesellschaft | Verfahren zum erstellen einer diskreten ausprägung der konfiguration einer anlage |
CN103309252A (zh) * | 2012-03-05 | 2013-09-18 | 施耐德电器工业公司 | 用于控制电气装备的选择性的方法和设备 |
WO2021047791A1 (de) * | 2019-09-12 | 2021-03-18 | Gs Licence Pool Ug | Verfahren zum erstellen von anforderungen zur beschreibung eines technischen prozesses |
CN113378509A (zh) * | 2021-06-16 | 2021-09-10 | 中国化学赛鼎宁波工程有限公司 | 电缆选型方法、装置及存储介质 |
Also Published As
Publication number | Publication date |
---|---|
HK1050083B (zh) | 2007-11-23 |
NO20022274D0 (no) | 2002-05-13 |
HK1050083A1 (en) | 2003-06-06 |
NO20022274L (no) | 2002-09-17 |
DE10013037A1 (de) | 2001-10-18 |
DE50112739D1 (de) | 2007-08-30 |
ATE367674T1 (de) | 2007-08-15 |
AU4636501A (en) | 2001-09-24 |
EP1277266A1 (de) | 2003-01-22 |
ES2288936T3 (es) | 2008-02-01 |
EP1277266B1 (de) | 2007-07-18 |
US7096165B2 (en) | 2006-08-22 |
AU772536B2 (en) | 2004-04-29 |
US20040049772A1 (en) | 2004-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1277266B1 (de) | Verfahren zur projektierung einer elektrischen anlage und projektierungsvorrichtung | |
EP1265333B1 (de) | Konfiguration eines Teils eines elektrischen Energieverteilnetzes | |
EP0904549B1 (de) | Verfahren zur prüfung von differentialschutzrelais/-systemen | |
EP3125397B1 (de) | Verfahren, datenverarbeitungsanordnung und computerprogrammprodukt zur nachrüstung eines elektrischen energienetzes | |
DE69626183T2 (de) | Verfahren und Vorrichtung zum Ferntesten von Koordination von Überstromschutzvorrichtungen in einem elektrischen Versorgungssystem | |
EP1096348A1 (de) | Integration eines Feldleitgerätes in ein Anlagenleitsystem | |
EP3086428B1 (de) | Verfahren und anordnung zur parametrierung von feldleitgeräten und/oder schutzgeräten einer schaltanordnung | |
EP2461459A2 (de) | Kontrollsystem | |
EP3701607B1 (de) | Verfahren und system zur ermittlung eines gefährdungspotentials einer elektrischen anlage | |
EP1069518A1 (de) | Visuelle Darstellung von Spannungszuständen auf einem elektrischen Schaltschema | |
EP1069517A1 (de) | Visuelle Darstellung von Spannungszuständen auf einem elektrischen Schaltschema | |
EP1275185B1 (de) | Rechnergestütztes prüfverfahren für ein leitungssystem | |
EP2186178B1 (de) | Schutzgerät zum schutz einer elektrotechnischen anlage und verfahren zu dessen betrieb | |
EP3764311A1 (de) | Verfahren zur planung eines elektrischen energieübertragungsnetzes, planungsanordnung und computerprogrammprodukt | |
EP3981053B1 (de) | Verfahren und steuereinrichtung zum betreiben einer umrichterbasierten netzeinheit | |
EP3599689B1 (de) | Verfahren zum betreiben eines elektrischen netzes | |
US6947812B2 (en) | Computer-assisted support method for projecting an electric line system | |
EP3702859A1 (de) | Verfahren zur anlagenauslegung eines elektrischen automatisierungssystems | |
DE102021004783A1 (de) | Verfahren zur Regelung einer Einspeiseleistung | |
DE19811384B4 (de) | Verfahren zur Prüfung einer Generatorschutzeinrichtung | |
CH718943A1 (de) | Messvorrichtung und Verfahren zur Überwachung von Niederspannungs-Stromnetzen. | |
CH711365A2 (de) | Ausfallsicherheit von Stromnetzen. | |
DE10313869A1 (de) | Verfahren zum Projektieren einer Niederspannungs-Energieanlage | |
EP1464972A2 (de) | Rechnergestütztes Prüfverfahren für eine Anordnung elektrischer Geräte | |
DE102005062349A1 (de) | Verfahren und System zur automatischen Bestimmung des Abschaltverhaltens eines Lastabschaltsystems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AU NO US |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2001919162 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 10130216 Country of ref document: US |
|
WWE | Wipo information: entry into national phase |
Ref document number: 46365/01 Country of ref document: AU |
|
WWP | Wipo information: published in national office |
Ref document number: 2001919162 Country of ref document: EP |
|
WWG | Wipo information: grant in national office |
Ref document number: 46365/01 Country of ref document: AU |
|
WWG | Wipo information: grant in national office |
Ref document number: 2001919162 Country of ref document: EP |