WO2001026010A1 - Procede et estimateur pour l'ordonnancement de la production - Google Patents
Procede et estimateur pour l'ordonnancement de la production Download PDFInfo
- Publication number
- WO2001026010A1 WO2001026010A1 PCT/US2000/027796 US0027796W WO0126010A1 WO 2001026010 A1 WO2001026010 A1 WO 2001026010A1 US 0027796 W US0027796 W US 0027796W WO 0126010 A1 WO0126010 A1 WO 0126010A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- production scheduling
- designing
- infrastructure
- task
- technology infrastructure
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Definitions
- Figure 13 shows a representation of the tasks for developing learning products for production scheduling.
- This function also maps the business operations and processes to the Production Scheduling function, updating the requirements as new systems and business activities are introduced.
- Fixed job scheduling defines production schedules and interfaces with System Performance Management functions to validate that the infrastructure environment (network, platforms, storage subsystems, etc.) will support the throughput requirements for the regularly executed schedule of jobs.
- Ad hoc scheduling assesses the priorities, capacities, and opportunities to add ad hoc jobs and tasks to the normal production schedule. This group prioritizes requests based on established job requirements submitted, and coordinates execution once a schedule is determined. The task is accomplished by weighing considerations, such as other processes running (backup/restoration, software distribution, etc.), before approving and sending the ad hoc order.
- Task 2115 Analyzing Current Business Capability Task 2115 includes documentation of current activities and procedures documented to establish a performance baseline. Current performance can be measured by using the most representative indicators for volume, elapsed time, number of restarts, and error processing as well as other pertinent factors. Strengths and weaknesses of the current scheduling capability are also assessed.
- Task 2117 Identifying Best Production Scheduling Practices
- step 2410 the business processes, skills, and user interaction are taken into account.
- the new production scheduling processes are designed as are the interactions of the processes with the workforce (skills), the production scheduling software (application interaction), and the physical environment.
- the main interfaces of production scheduling include monitoring and service control.
- Figure 4 shows a representation of the tasks for carrying out these functions, according to the presently preferred embodiment of the invention. These tasks include Designing Workflows 2411 , Defining Physical Environment Interactions 2412, Identifying Skills Requirements For Performing Scheduling Tasks 2413, Defining Application Interactions 2415, Identifying Performance Support Requirements 2416, Developing A Capability Interaction Model 2417, and Verifying and Validating
- Task 3558 Develop Operations Architecture Component And Assembly, Test Approach and Plan Task 3558 includes definition of the approach and test conditions for the production scheduling architecture assembly, component, and component acceptance test approaches and plans. Individual definitions are provided for the following parameters: Objectives, scope, metrics, regression test approaches, and risks associated with each test; Component testing for custom and customized (reuse or package) components; Component acceptance testing for new packaged components; And assembly testing for the components and interfaces.
- step 5550 proceeds to design and program the production scheduling components, including extensions to reused and packaged items. This is also the time to perform component and assembly testing.
- Figure 11 shows a representation of the tasks for carrying out these functions, according to the presently preferred embodiments of the invention.. These tasks include Performing Operations Architecture Detailed Design 5551 , Revising Operations Architecture Component and Assembly
- step 6260 a complete, finalized set of learning products are created. Though not strictly a part of project hardware building, a successful project will typically include some thought to training its users.
- Technical training in Production scheduling software components may come from the package vendor or a third party training organization. Procedural training for an organization's procedures is often custom built or tailored for the situation.
- Figure 13 shows a representation of the tasks for carrying out these functions, according to the presently preferred embodiment of the invention. These tasks include Developing Learning Product Standards and Development
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU80018/00A AU8001800A (en) | 1999-10-06 | 2000-10-06 | Method and estimator for production scheduling |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15825999P | 1999-10-06 | 1999-10-06 | |
US60/158,259 | 1999-10-06 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2001026010A1 true WO2001026010A1 (fr) | 2001-04-12 |
Family
ID=22567316
Family Applications (12)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2000/027801 WO2001026011A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la planification strategique de la gestion des operations |
PCT/US2000/027593 WO2001026028A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur de gestion du changement |
PCT/US2000/027856 WO2001025970A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur pour l'evaluation de modeles de maturite d'operations |
PCT/US2000/027629 WO2001026008A1 (fr) | 1999-10-06 | 2000-10-06 | Procede de surveillance d'evenements/defaillances et dispositif d'estimation associe |
PCT/US2000/027803 WO2001026013A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour gestion des niveaux de service |
PCT/US2000/027802 WO2001026012A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la gestion des moyens de stockage |
PCT/US2000/027795 WO2001025876A2 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la modelisation et la planification de la capacite |
PCT/US2000/027804 WO2001026014A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur destines a la mise en oeuvre d'une commande de services |
PCT/US2000/027592 WO2001026007A1 (fr) | 1999-10-06 | 2000-10-06 | Methode et estimateur destines a la planification antisinistre d'une affaire |
PCT/US2000/027796 WO2001026010A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur pour l'ordonnancement de la production |
PCT/US2000/027857 WO2001025877A2 (fr) | 1999-10-06 | 2000-10-06 | Organisation de fonctions de technologie de l'information |
PCT/US2000/027518 WO2001026005A1 (fr) | 1999-10-06 | 2000-10-06 | Procede de determination du cout total de la propriete |
Family Applications Before (9)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2000/027801 WO2001026011A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la planification strategique de la gestion des operations |
PCT/US2000/027593 WO2001026028A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur de gestion du changement |
PCT/US2000/027856 WO2001025970A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur pour l'evaluation de modeles de maturite d'operations |
PCT/US2000/027629 WO2001026008A1 (fr) | 1999-10-06 | 2000-10-06 | Procede de surveillance d'evenements/defaillances et dispositif d'estimation associe |
PCT/US2000/027803 WO2001026013A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour gestion des niveaux de service |
PCT/US2000/027802 WO2001026012A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la gestion des moyens de stockage |
PCT/US2000/027795 WO2001025876A2 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la modelisation et la planification de la capacite |
PCT/US2000/027804 WO2001026014A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur destines a la mise en oeuvre d'une commande de services |
PCT/US2000/027592 WO2001026007A1 (fr) | 1999-10-06 | 2000-10-06 | Methode et estimateur destines a la planification antisinistre d'une affaire |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2000/027857 WO2001025877A2 (fr) | 1999-10-06 | 2000-10-06 | Organisation de fonctions de technologie de l'information |
PCT/US2000/027518 WO2001026005A1 (fr) | 1999-10-06 | 2000-10-06 | Procede de determination du cout total de la propriete |
Country Status (4)
Country | Link |
---|---|
EP (2) | EP1222510A4 (fr) |
AU (12) | AU8001700A (fr) |
CA (1) | CA2386788A1 (fr) |
WO (12) | WO2001026011A1 (fr) |
Families Citing this family (40)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002048935A1 (fr) * | 2000-12-11 | 2002-06-20 | Skill Development Associates Ltd | Systeme de gestion commerciale integre |
US7937281B2 (en) | 2001-12-07 | 2011-05-03 | Accenture Global Services Limited | Accelerated process improvement framework |
US7035809B2 (en) * | 2001-12-07 | 2006-04-25 | Accenture Global Services Gmbh | Accelerated process improvement framework |
US7761316B2 (en) | 2002-10-25 | 2010-07-20 | Science Applications International Corporation | System and method for determining performance level capabilities in view of predetermined model criteria |
DE10331207A1 (de) | 2003-07-10 | 2005-01-27 | Daimlerchrysler Ag | Verfahren und Vorrichtung zur Vorhersage einer Ausfall-Häufigkeit |
US8572003B2 (en) * | 2003-07-18 | 2013-10-29 | Sap Ag | Standardized computer system total cost of ownership assessments and benchmarking |
US8566147B2 (en) * | 2005-10-25 | 2013-10-22 | International Business Machines Corporation | Determining the progress of adoption and alignment of information technology capabilities and on-demand capabilities by an organization |
EP1808803A1 (fr) * | 2005-12-15 | 2007-07-18 | International Business Machines Corporation | Système et procédé de sélection automatique d'une ou plusieurs mesures pour la réalisation d'une évaluation CMMI |
US8457297B2 (en) | 2005-12-30 | 2013-06-04 | Aspect Software, Inc. | Distributing transactions among transaction processing systems |
US8355938B2 (en) | 2006-01-05 | 2013-01-15 | Wells Fargo Bank, N.A. | Capacity management index system and method |
US7523082B2 (en) * | 2006-05-08 | 2009-04-21 | Aspect Software Inc | Escalating online expert help |
WO2008105825A1 (fr) * | 2007-02-26 | 2008-09-04 | Unisys Corporation | Procédé pour des services fondés sur une technologie de diversification |
WO2009053955A2 (fr) * | 2007-10-25 | 2009-04-30 | Markport Limited | Modification de l'infrastructure permettant la fourniture de services dans les réseaux de télécommunication |
US8326660B2 (en) | 2008-01-07 | 2012-12-04 | International Business Machines Corporation | Automated derivation of response time service level objectives |
US8320246B2 (en) | 2009-02-19 | 2012-11-27 | Bridgewater Systems Corp. | Adaptive window size for network fair usage controls |
US8200188B2 (en) * | 2009-02-20 | 2012-06-12 | Bridgewater Systems Corp. | System and method for adaptive fair usage controls in wireless networks |
US8577329B2 (en) | 2009-05-04 | 2013-11-05 | Bridgewater Systems Corp. | System and methods for carrier-centric mobile device data communications cost monitoring and control |
US9203629B2 (en) | 2009-05-04 | 2015-12-01 | Bridgewater Systems Corp. | System and methods for user-centric mobile device-based data communications cost monitoring and control |
US20110066476A1 (en) * | 2009-09-15 | 2011-03-17 | Joseph Fernard Lewis | Business management assessment and consulting assistance system and associated method |
US20110231229A1 (en) * | 2010-03-22 | 2011-09-22 | Computer Associates Think, Inc. | Hybrid Software Component and Service Catalog |
EP2633450A4 (fr) * | 2010-10-27 | 2017-10-11 | Hewlett-Packard Enterprise Development LP | Systèmes et procédés pour programmer des changements |
US11172022B2 (en) | 2014-02-21 | 2021-11-09 | Hewlett Packard Enterprise Development Lp | Migrating cloud resources |
WO2015126411A1 (fr) | 2014-02-21 | 2015-08-27 | Hewlett-Packard Development Company, L.P. | Migration de ressources en nuage |
US20170032297A1 (en) * | 2014-04-03 | 2017-02-02 | Dale Chalfant | Systems and Methods for Increasing Capability of Systems of Business Through Maturity Evolution |
US10044786B2 (en) | 2014-11-16 | 2018-08-07 | International Business Machines Corporation | Predicting performance by analytically solving a queueing network model |
US9984044B2 (en) | 2014-11-16 | 2018-05-29 | International Business Machines Corporation | Predicting performance regression of a computer system with a complex queuing network model |
US10460272B2 (en) * | 2016-02-25 | 2019-10-29 | Accenture Global Solutions Limited | Client services reporting |
CN106682385B (zh) * | 2016-09-30 | 2020-02-11 | 广州英康唯尔互联网服务有限公司 | 健康信息交互系统 |
CA3097365A1 (fr) * | 2018-04-16 | 2019-10-24 | Ingram Micro Inc. | Systeme et procede d'appariement de flux de revenus dans une plateforme de courtage de services en nuage |
US20190369590A1 (en) | 2018-06-01 | 2019-12-05 | Walmart Apollo, Llc | Automated slot adjustment tool |
WO2019232434A1 (fr) * | 2018-06-01 | 2019-12-05 | Walmart Apollo, Llc | Système et procédé de modification de capacité pour de nouvelles installations |
US11483350B2 (en) | 2019-03-29 | 2022-10-25 | Amazon Technologies, Inc. | Intent-based governance service |
CN110096423A (zh) * | 2019-05-14 | 2019-08-06 | 深圳供电局有限公司 | 一种基于大数据分析的服务器存储容量分析预测方法 |
US11119877B2 (en) | 2019-09-16 | 2021-09-14 | Dell Products L.P. | Component life cycle test categorization and optimization |
WO2021096893A1 (fr) * | 2019-11-11 | 2021-05-20 | Snapit Solutions Llc | Système de production et de distribution de services et de produits de technologie de l'information |
US11288150B2 (en) | 2019-11-18 | 2022-03-29 | Sungard Availability Services, Lp | Recovery maturity index (RMI)-based control of disaster recovery |
US20210160143A1 (en) | 2019-11-27 | 2021-05-27 | Vmware, Inc. | Information technology (it) toplogy solutions according to operational goals |
CN111753443B (zh) * | 2020-07-29 | 2024-10-08 | 哈尔滨工业大学 | 一种基于能力累积的武器装备联合试验设计方法 |
US11501237B2 (en) | 2020-08-04 | 2022-11-15 | International Business Machines Corporation | Optimized estimates for support characteristics for operational systems |
US11329896B1 (en) | 2021-02-11 | 2022-05-10 | Kyndryl, Inc. | Cognitive data protection and disaster recovery policy management |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4827423A (en) * | 1987-01-20 | 1989-05-02 | R. J. Reynolds Tobacco Company | Computer integrated manufacturing system |
US5563951A (en) * | 1994-07-25 | 1996-10-08 | Interval Research Corporation | Audio interface garment and communication system for use therewith |
US5646049A (en) * | 1992-03-27 | 1997-07-08 | Abbott Laboratories | Scheduling operation of an automated analytical system |
US5826040A (en) * | 1992-03-24 | 1998-10-20 | Texas Instruments Incorporated | Method and system for production planning |
Family Cites Families (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03111969A (ja) * | 1989-09-27 | 1991-05-13 | Hitachi Ltd | 計画作成支援方法 |
US5233513A (en) * | 1989-12-28 | 1993-08-03 | Doyle William P | Business modeling, software engineering and prototyping method and apparatus |
WO1993012488A1 (fr) * | 1991-12-13 | 1993-06-24 | White Leonard R | Systeme et procede de logiciel pour analyse de mesures |
US5701419A (en) * | 1992-03-06 | 1997-12-23 | Bell Atlantic Network Services, Inc. | Telecommunications service creation apparatus and method |
US5978811A (en) * | 1992-07-29 | 1999-11-02 | Texas Instruments Incorporated | Information repository system and method for modeling data |
US5630069A (en) * | 1993-01-15 | 1997-05-13 | Action Technologies, Inc. | Method and apparatus for creating workflow maps of business processes |
US5819270A (en) * | 1993-02-25 | 1998-10-06 | Massachusetts Institute Of Technology | Computer system for displaying representations of processes |
CA2118885C (fr) * | 1993-04-29 | 2005-05-24 | Conrad K. Teran | Systeme de commande de processus |
WO1994029804A1 (fr) * | 1993-06-16 | 1994-12-22 | Electronic Data Systems Corporation | Systeme de gestion des processus |
US5485574A (en) * | 1993-11-04 | 1996-01-16 | Microsoft Corporation | Operating system based performance monitoring of programs |
US5724262A (en) * | 1994-05-31 | 1998-03-03 | Paradyne Corporation | Method for measuring the usability of a system and for task analysis and re-engineering |
US5745880A (en) * | 1994-10-03 | 1998-04-28 | The Sabre Group, Inc. | System to predict optimum computer platform |
JP3315844B2 (ja) * | 1994-12-09 | 2002-08-19 | 株式会社東芝 | スケジューリング装置及びスケジューリング方法 |
JPH08320855A (ja) * | 1995-05-24 | 1996-12-03 | Hitachi Ltd | システム導入効果評価方法およびシステム |
EP0770967A3 (fr) * | 1995-10-26 | 1998-12-30 | Koninklijke Philips Electronics N.V. | Système d'aide de décision pour la gestion d'une chaíne de l'alimentation agile |
US5875431A (en) * | 1996-03-15 | 1999-02-23 | Heckman; Frank | Legal strategic analysis planning and evaluation control system and method |
US5960417A (en) * | 1996-03-19 | 1999-09-28 | Vanguard International Semiconductor Corporation | IC manufacturing costing control system and process |
US5793632A (en) * | 1996-03-26 | 1998-08-11 | Lockheed Martin Corporation | Cost estimating system using parametric estimating and providing a split of labor and material costs |
US5960200A (en) * | 1996-05-03 | 1999-09-28 | I-Cube | System to transition an enterprise to a distributed infrastructure |
US5673382A (en) * | 1996-05-30 | 1997-09-30 | International Business Machines Corporation | Automated management of off-site storage volumes for disaster recovery |
US5864483A (en) * | 1996-08-01 | 1999-01-26 | Electronic Data Systems Corporation | Monitoring of service delivery or product manufacturing |
US5974395A (en) * | 1996-08-21 | 1999-10-26 | I2 Technologies, Inc. | System and method for extended enterprise planning across a supply chain |
US5930762A (en) * | 1996-09-24 | 1999-07-27 | Rco Software Limited | Computer aided risk management in multiple-parameter physical systems |
US6044354A (en) * | 1996-12-19 | 2000-03-28 | Sprint Communications Company, L.P. | Computer-based product planning system |
US5903478A (en) * | 1997-03-10 | 1999-05-11 | Ncr Corporation | Method for displaying an IT (Information Technology) architecture visual model in a symbol-based decision rational table |
US6028602A (en) * | 1997-05-30 | 2000-02-22 | Telefonaktiebolaget Lm Ericsson | Method for managing contents of a hierarchical data model |
US6106569A (en) * | 1997-08-14 | 2000-08-22 | International Business Machines Corporation | Method of developing a software system using object oriented technology |
US6092047A (en) * | 1997-10-07 | 2000-07-18 | Benefits Technologies, Inc. | Apparatus and method of composing a plan of flexible benefits |
US6131099A (en) * | 1997-11-03 | 2000-10-10 | Moore U.S.A. Inc. | Print and mail business recovery configuration method and system |
US6119097A (en) * | 1997-11-26 | 2000-09-12 | Executing The Numbers, Inc. | System and method for quantification of human performance factors |
US6157916A (en) * | 1998-06-17 | 2000-12-05 | The Hoffman Group | Method and apparatus to control the operating speed of a papermaking facility |
-
2000
- 2000-10-06 WO PCT/US2000/027801 patent/WO2001026011A1/fr active Application Filing
- 2000-10-06 WO PCT/US2000/027593 patent/WO2001026028A1/fr active Application Filing
- 2000-10-06 AU AU80017/00A patent/AU8001700A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027856 patent/WO2001025970A1/fr active Search and Examination
- 2000-10-06 AU AU80018/00A patent/AU8001800A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027629 patent/WO2001026008A1/fr active Application Filing
- 2000-10-06 AU AU79960/00A patent/AU7996000A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027803 patent/WO2001026013A1/fr active Application Filing
- 2000-10-06 WO PCT/US2000/027802 patent/WO2001026012A1/fr active Application Filing
- 2000-10-06 AU AU14317/01A patent/AU1431701A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027795 patent/WO2001025876A2/fr active Application Filing
- 2000-10-06 AU AU78618/00A patent/AU7861800A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027804 patent/WO2001026014A1/fr active Application Filing
- 2000-10-06 AU AU14318/01A patent/AU1431801A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027592 patent/WO2001026007A1/fr active Application Filing
- 2000-10-06 WO PCT/US2000/027796 patent/WO2001026010A1/fr active Application Filing
- 2000-10-06 CA CA002386788A patent/CA2386788A1/fr not_active Abandoned
- 2000-10-06 AU AU79961/00A patent/AU7996100A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027857 patent/WO2001025877A2/fr not_active Application Discontinuation
- 2000-10-06 AU AU16539/01A patent/AU1653901A/en not_active Abandoned
- 2000-10-06 EP EP00979124A patent/EP1222510A4/fr not_active Withdrawn
- 2000-10-06 WO PCT/US2000/027518 patent/WO2001026005A1/fr active Application Filing
- 2000-10-06 AU AU11936/01A patent/AU1193601A/en not_active Abandoned
- 2000-10-06 AU AU77566/00A patent/AU7756600A/en not_active Abandoned
- 2000-10-06 AU AU78666/00A patent/AU7866600A/en not_active Abandoned
- 2000-10-06 AU AU11938/01A patent/AU1193801A/en not_active Abandoned
- 2000-10-06 EP EP00973433A patent/EP1226523A4/fr not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4827423A (en) * | 1987-01-20 | 1989-05-02 | R. J. Reynolds Tobacco Company | Computer integrated manufacturing system |
US5826040A (en) * | 1992-03-24 | 1998-10-20 | Texas Instruments Incorporated | Method and system for production planning |
US5646049A (en) * | 1992-03-27 | 1997-07-08 | Abbott Laboratories | Scheduling operation of an automated analytical system |
US5563951A (en) * | 1994-07-25 | 1996-10-08 | Interval Research Corporation | Audio interface garment and communication system for use therewith |
Also Published As
Publication number | Publication date |
---|---|
AU1193601A (en) | 2001-05-10 |
WO2001025877A3 (fr) | 2001-09-07 |
EP1226523A1 (fr) | 2002-07-31 |
WO2001026008A1 (fr) | 2001-04-12 |
EP1222510A4 (fr) | 2007-10-31 |
EP1222510A2 (fr) | 2002-07-17 |
AU7861800A (en) | 2001-05-10 |
AU7996100A (en) | 2001-05-10 |
AU7756600A (en) | 2001-05-10 |
WO2001026012A1 (fr) | 2001-04-12 |
WO2001026005A1 (fr) | 2001-04-12 |
WO2001026014A1 (fr) | 2001-04-12 |
AU1653901A (en) | 2001-05-10 |
AU1431701A (en) | 2001-05-10 |
AU1431801A (en) | 2001-05-10 |
AU8001800A (en) | 2001-05-10 |
WO2001025876A3 (fr) | 2001-08-30 |
WO2001026028A1 (fr) | 2001-04-12 |
WO2001025876A2 (fr) | 2001-04-12 |
WO2001026011A1 (fr) | 2001-04-12 |
CA2386788A1 (fr) | 2001-04-12 |
WO2001026007A1 (fr) | 2001-04-12 |
EP1226523A4 (fr) | 2003-02-19 |
AU7866600A (en) | 2001-05-10 |
WO2001025877A2 (fr) | 2001-04-12 |
AU1193801A (en) | 2001-05-10 |
WO2001026013A1 (fr) | 2001-04-12 |
WO2001026028A8 (fr) | 2001-07-26 |
AU8001700A (en) | 2001-05-10 |
WO2001025970A8 (fr) | 2001-09-27 |
WO2001025970A1 (fr) | 2001-04-12 |
AU7996000A (en) | 2001-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2001026010A1 (fr) | Procede et estimateur pour l'ordonnancement de la production | |
US6738736B1 (en) | Method and estimator for providing capacacity modeling and planning | |
US7810067B2 (en) | Development processes representation and management | |
Laporte et al. | Software quality assurance | |
US8200527B1 (en) | Method for prioritizing and presenting recommendations regarding organizaion's customer care capabilities | |
US7930201B1 (en) | EDP portal cross-process integrated view | |
Chemuturi et al. | Mastering software project management: Best practices, tools and techniques | |
US10423913B2 (en) | System and method for process-based analysis | |
Alhayek | Implementation Common Failure Reasons for an Enterprise Resource Planning and how to avoid | |
CISM | Managing Software Deliverables: A Software Development Management Methodology | |
Singh | downloaded from the King’s Research Portal at https://kclpure. kcl. ac. uk/portal | |
Pilorget et al. | IT Portfolio and Project Management | |
Razer Jr et al. | A DESIGN OF WEB-BASED DENTAL INFORMATION MANAGEMENT SYSTEM WITH SMS NOTIFICATION AND DECISION SUPPORT SYSTEM FOR IDAGDAG TOOTH CARE CLINIC | |
Nicoletti et al. | Revenues and Agile Procurement | |
Ma | Assessing capability maturity tools for process management improvement: A case study | |
Enterprise et al. | Request for Proposal (RFP) Proc Main | |
Clapp et al. | A guide to conducting independent technical assessments | |
Buttle et al. | A hitchhiker's guide to project management | |
Kuster et al. | Project Planning | |
Barracliffe et al. | Systems Development Life Cycle (SDLC) Methodology | |
Topsholm | CHARM Transformation: A case study on change and release management Catella Bank | |
Dilawer | Practical Guide of Software Development Project Management in Practice | |
Melvin et al. | VA IT MANAGEMENT: Organization Is Largely Centralized; Additional Actions Could Improve Human Capital Practices and Systems Development Processes | |
Houston | Systems Selection, Implementation, Support and Maintenance | |
Babcock et al. | Industry Best Practices for the Software Development Life Cycle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
122 | Ep: pct application non-entry in european phase | ||
NENP | Non-entry into the national phase |
Ref country code: JP |