WO2001026010A1 - Procede et estimateur pour l'ordonnancement de la production - Google Patents

Procede et estimateur pour l'ordonnancement de la production Download PDF

Info

Publication number
WO2001026010A1
WO2001026010A1 PCT/US2000/027796 US0027796W WO0126010A1 WO 2001026010 A1 WO2001026010 A1 WO 2001026010A1 US 0027796 W US0027796 W US 0027796W WO 0126010 A1 WO0126010 A1 WO 0126010A1
Authority
WO
WIPO (PCT)
Prior art keywords
production scheduling
designing
infrastructure
task
technology infrastructure
Prior art date
Application number
PCT/US2000/027796
Other languages
English (en)
Inventor
Daryl Russell
William C. Bond
Original Assignee
Accenture Llp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Accenture Llp filed Critical Accenture Llp
Priority to AU80018/00A priority Critical patent/AU8001800A/en
Publication of WO2001026010A1 publication Critical patent/WO2001026010A1/fr

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Definitions

  • Figure 13 shows a representation of the tasks for developing learning products for production scheduling.
  • This function also maps the business operations and processes to the Production Scheduling function, updating the requirements as new systems and business activities are introduced.
  • Fixed job scheduling defines production schedules and interfaces with System Performance Management functions to validate that the infrastructure environment (network, platforms, storage subsystems, etc.) will support the throughput requirements for the regularly executed schedule of jobs.
  • Ad hoc scheduling assesses the priorities, capacities, and opportunities to add ad hoc jobs and tasks to the normal production schedule. This group prioritizes requests based on established job requirements submitted, and coordinates execution once a schedule is determined. The task is accomplished by weighing considerations, such as other processes running (backup/restoration, software distribution, etc.), before approving and sending the ad hoc order.
  • Task 2115 Analyzing Current Business Capability Task 2115 includes documentation of current activities and procedures documented to establish a performance baseline. Current performance can be measured by using the most representative indicators for volume, elapsed time, number of restarts, and error processing as well as other pertinent factors. Strengths and weaknesses of the current scheduling capability are also assessed.
  • Task 2117 Identifying Best Production Scheduling Practices
  • step 2410 the business processes, skills, and user interaction are taken into account.
  • the new production scheduling processes are designed as are the interactions of the processes with the workforce (skills), the production scheduling software (application interaction), and the physical environment.
  • the main interfaces of production scheduling include monitoring and service control.
  • Figure 4 shows a representation of the tasks for carrying out these functions, according to the presently preferred embodiment of the invention. These tasks include Designing Workflows 2411 , Defining Physical Environment Interactions 2412, Identifying Skills Requirements For Performing Scheduling Tasks 2413, Defining Application Interactions 2415, Identifying Performance Support Requirements 2416, Developing A Capability Interaction Model 2417, and Verifying and Validating
  • Task 3558 Develop Operations Architecture Component And Assembly, Test Approach and Plan Task 3558 includes definition of the approach and test conditions for the production scheduling architecture assembly, component, and component acceptance test approaches and plans. Individual definitions are provided for the following parameters: Objectives, scope, metrics, regression test approaches, and risks associated with each test; Component testing for custom and customized (reuse or package) components; Component acceptance testing for new packaged components; And assembly testing for the components and interfaces.
  • step 5550 proceeds to design and program the production scheduling components, including extensions to reused and packaged items. This is also the time to perform component and assembly testing.
  • Figure 11 shows a representation of the tasks for carrying out these functions, according to the presently preferred embodiments of the invention.. These tasks include Performing Operations Architecture Detailed Design 5551 , Revising Operations Architecture Component and Assembly
  • step 6260 a complete, finalized set of learning products are created. Though not strictly a part of project hardware building, a successful project will typically include some thought to training its users.
  • Technical training in Production scheduling software components may come from the package vendor or a third party training organization. Procedural training for an organization's procedures is often custom built or tailored for the situation.
  • Figure 13 shows a representation of the tasks for carrying out these functions, according to the presently preferred embodiment of the invention. These tasks include Developing Learning Product Standards and Development

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

L'invention concerne un procédé destiné à mettre en oeuvre une fonction de production pour une organisation de technologie de l'information. Ce procédé regroupe les tâches impliquées dans la mise en oeuvre de la fonction d'ordonnancement de la production. Les requêtes de sous-groupes ou de tâches regroupent l'ordonnancement de la production (311), la gestion d'impression de sortie (312), l'exploitation (313), la gestion de l'architecture d'exploitation (314), la gestion de l'adressage réseau (315), la gestion des stocks (316), la gestion de restauration/de secours (317), l'archivage (318), la gestion d'événements/d'erreurs (319), la gestion des performances système (3110), la gestion de la sécurité (3111), et la maintenance et le test du plan de secours (3112).
PCT/US2000/027796 1999-10-06 2000-10-06 Procede et estimateur pour l'ordonnancement de la production WO2001026010A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU80018/00A AU8001800A (en) 1999-10-06 2000-10-06 Method and estimator for production scheduling

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US15825999P 1999-10-06 1999-10-06
US60/158,259 1999-10-06

Publications (1)

Publication Number Publication Date
WO2001026010A1 true WO2001026010A1 (fr) 2001-04-12

Family

ID=22567316

Family Applications (12)

Application Number Title Priority Date Filing Date
PCT/US2000/027801 WO2001026011A1 (fr) 1999-10-06 2000-10-06 Technique et estimateur pour la planification strategique de la gestion des operations
PCT/US2000/027593 WO2001026028A1 (fr) 1999-10-06 2000-10-06 Procede et estimateur de gestion du changement
PCT/US2000/027856 WO2001025970A1 (fr) 1999-10-06 2000-10-06 Procede et estimateur pour l'evaluation de modeles de maturite d'operations
PCT/US2000/027629 WO2001026008A1 (fr) 1999-10-06 2000-10-06 Procede de surveillance d'evenements/defaillances et dispositif d'estimation associe
PCT/US2000/027803 WO2001026013A1 (fr) 1999-10-06 2000-10-06 Technique et estimateur pour gestion des niveaux de service
PCT/US2000/027802 WO2001026012A1 (fr) 1999-10-06 2000-10-06 Technique et estimateur pour la gestion des moyens de stockage
PCT/US2000/027795 WO2001025876A2 (fr) 1999-10-06 2000-10-06 Technique et estimateur pour la modelisation et la planification de la capacite
PCT/US2000/027804 WO2001026014A1 (fr) 1999-10-06 2000-10-06 Procede et estimateur destines a la mise en oeuvre d'une commande de services
PCT/US2000/027592 WO2001026007A1 (fr) 1999-10-06 2000-10-06 Methode et estimateur destines a la planification antisinistre d'une affaire
PCT/US2000/027796 WO2001026010A1 (fr) 1999-10-06 2000-10-06 Procede et estimateur pour l'ordonnancement de la production
PCT/US2000/027857 WO2001025877A2 (fr) 1999-10-06 2000-10-06 Organisation de fonctions de technologie de l'information
PCT/US2000/027518 WO2001026005A1 (fr) 1999-10-06 2000-10-06 Procede de determination du cout total de la propriete

Family Applications Before (9)

Application Number Title Priority Date Filing Date
PCT/US2000/027801 WO2001026011A1 (fr) 1999-10-06 2000-10-06 Technique et estimateur pour la planification strategique de la gestion des operations
PCT/US2000/027593 WO2001026028A1 (fr) 1999-10-06 2000-10-06 Procede et estimateur de gestion du changement
PCT/US2000/027856 WO2001025970A1 (fr) 1999-10-06 2000-10-06 Procede et estimateur pour l'evaluation de modeles de maturite d'operations
PCT/US2000/027629 WO2001026008A1 (fr) 1999-10-06 2000-10-06 Procede de surveillance d'evenements/defaillances et dispositif d'estimation associe
PCT/US2000/027803 WO2001026013A1 (fr) 1999-10-06 2000-10-06 Technique et estimateur pour gestion des niveaux de service
PCT/US2000/027802 WO2001026012A1 (fr) 1999-10-06 2000-10-06 Technique et estimateur pour la gestion des moyens de stockage
PCT/US2000/027795 WO2001025876A2 (fr) 1999-10-06 2000-10-06 Technique et estimateur pour la modelisation et la planification de la capacite
PCT/US2000/027804 WO2001026014A1 (fr) 1999-10-06 2000-10-06 Procede et estimateur destines a la mise en oeuvre d'une commande de services
PCT/US2000/027592 WO2001026007A1 (fr) 1999-10-06 2000-10-06 Methode et estimateur destines a la planification antisinistre d'une affaire

Family Applications After (2)

Application Number Title Priority Date Filing Date
PCT/US2000/027857 WO2001025877A2 (fr) 1999-10-06 2000-10-06 Organisation de fonctions de technologie de l'information
PCT/US2000/027518 WO2001026005A1 (fr) 1999-10-06 2000-10-06 Procede de determination du cout total de la propriete

Country Status (4)

Country Link
EP (2) EP1222510A4 (fr)
AU (12) AU8001700A (fr)
CA (1) CA2386788A1 (fr)
WO (12) WO2001026011A1 (fr)

Families Citing this family (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002048935A1 (fr) * 2000-12-11 2002-06-20 Skill Development Associates Ltd Systeme de gestion commerciale integre
US7937281B2 (en) 2001-12-07 2011-05-03 Accenture Global Services Limited Accelerated process improvement framework
US7035809B2 (en) * 2001-12-07 2006-04-25 Accenture Global Services Gmbh Accelerated process improvement framework
US7761316B2 (en) 2002-10-25 2010-07-20 Science Applications International Corporation System and method for determining performance level capabilities in view of predetermined model criteria
DE10331207A1 (de) 2003-07-10 2005-01-27 Daimlerchrysler Ag Verfahren und Vorrichtung zur Vorhersage einer Ausfall-Häufigkeit
US8572003B2 (en) * 2003-07-18 2013-10-29 Sap Ag Standardized computer system total cost of ownership assessments and benchmarking
US8566147B2 (en) * 2005-10-25 2013-10-22 International Business Machines Corporation Determining the progress of adoption and alignment of information technology capabilities and on-demand capabilities by an organization
EP1808803A1 (fr) * 2005-12-15 2007-07-18 International Business Machines Corporation Système et procédé de sélection automatique d'une ou plusieurs mesures pour la réalisation d'une évaluation CMMI
US8457297B2 (en) 2005-12-30 2013-06-04 Aspect Software, Inc. Distributing transactions among transaction processing systems
US8355938B2 (en) 2006-01-05 2013-01-15 Wells Fargo Bank, N.A. Capacity management index system and method
US7523082B2 (en) * 2006-05-08 2009-04-21 Aspect Software Inc Escalating online expert help
WO2008105825A1 (fr) * 2007-02-26 2008-09-04 Unisys Corporation Procédé pour des services fondés sur une technologie de diversification
WO2009053955A2 (fr) * 2007-10-25 2009-04-30 Markport Limited Modification de l'infrastructure permettant la fourniture de services dans les réseaux de télécommunication
US8326660B2 (en) 2008-01-07 2012-12-04 International Business Machines Corporation Automated derivation of response time service level objectives
US8320246B2 (en) 2009-02-19 2012-11-27 Bridgewater Systems Corp. Adaptive window size for network fair usage controls
US8200188B2 (en) * 2009-02-20 2012-06-12 Bridgewater Systems Corp. System and method for adaptive fair usage controls in wireless networks
US8577329B2 (en) 2009-05-04 2013-11-05 Bridgewater Systems Corp. System and methods for carrier-centric mobile device data communications cost monitoring and control
US9203629B2 (en) 2009-05-04 2015-12-01 Bridgewater Systems Corp. System and methods for user-centric mobile device-based data communications cost monitoring and control
US20110066476A1 (en) * 2009-09-15 2011-03-17 Joseph Fernard Lewis Business management assessment and consulting assistance system and associated method
US20110231229A1 (en) * 2010-03-22 2011-09-22 Computer Associates Think, Inc. Hybrid Software Component and Service Catalog
EP2633450A4 (fr) * 2010-10-27 2017-10-11 Hewlett-Packard Enterprise Development LP Systèmes et procédés pour programmer des changements
US11172022B2 (en) 2014-02-21 2021-11-09 Hewlett Packard Enterprise Development Lp Migrating cloud resources
WO2015126411A1 (fr) 2014-02-21 2015-08-27 Hewlett-Packard Development Company, L.P. Migration de ressources en nuage
US20170032297A1 (en) * 2014-04-03 2017-02-02 Dale Chalfant Systems and Methods for Increasing Capability of Systems of Business Through Maturity Evolution
US10044786B2 (en) 2014-11-16 2018-08-07 International Business Machines Corporation Predicting performance by analytically solving a queueing network model
US9984044B2 (en) 2014-11-16 2018-05-29 International Business Machines Corporation Predicting performance regression of a computer system with a complex queuing network model
US10460272B2 (en) * 2016-02-25 2019-10-29 Accenture Global Solutions Limited Client services reporting
CN106682385B (zh) * 2016-09-30 2020-02-11 广州英康唯尔互联网服务有限公司 健康信息交互系统
CA3097365A1 (fr) * 2018-04-16 2019-10-24 Ingram Micro Inc. Systeme et procede d'appariement de flux de revenus dans une plateforme de courtage de services en nuage
US20190369590A1 (en) 2018-06-01 2019-12-05 Walmart Apollo, Llc Automated slot adjustment tool
WO2019232434A1 (fr) * 2018-06-01 2019-12-05 Walmart Apollo, Llc Système et procédé de modification de capacité pour de nouvelles installations
US11483350B2 (en) 2019-03-29 2022-10-25 Amazon Technologies, Inc. Intent-based governance service
CN110096423A (zh) * 2019-05-14 2019-08-06 深圳供电局有限公司 一种基于大数据分析的服务器存储容量分析预测方法
US11119877B2 (en) 2019-09-16 2021-09-14 Dell Products L.P. Component life cycle test categorization and optimization
WO2021096893A1 (fr) * 2019-11-11 2021-05-20 Snapit Solutions Llc Système de production et de distribution de services et de produits de technologie de l'information
US11288150B2 (en) 2019-11-18 2022-03-29 Sungard Availability Services, Lp Recovery maturity index (RMI)-based control of disaster recovery
US20210160143A1 (en) 2019-11-27 2021-05-27 Vmware, Inc. Information technology (it) toplogy solutions according to operational goals
CN111753443B (zh) * 2020-07-29 2024-10-08 哈尔滨工业大学 一种基于能力累积的武器装备联合试验设计方法
US11501237B2 (en) 2020-08-04 2022-11-15 International Business Machines Corporation Optimized estimates for support characteristics for operational systems
US11329896B1 (en) 2021-02-11 2022-05-10 Kyndryl, Inc. Cognitive data protection and disaster recovery policy management

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4827423A (en) * 1987-01-20 1989-05-02 R. J. Reynolds Tobacco Company Computer integrated manufacturing system
US5563951A (en) * 1994-07-25 1996-10-08 Interval Research Corporation Audio interface garment and communication system for use therewith
US5646049A (en) * 1992-03-27 1997-07-08 Abbott Laboratories Scheduling operation of an automated analytical system
US5826040A (en) * 1992-03-24 1998-10-20 Texas Instruments Incorporated Method and system for production planning

Family Cites Families (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03111969A (ja) * 1989-09-27 1991-05-13 Hitachi Ltd 計画作成支援方法
US5233513A (en) * 1989-12-28 1993-08-03 Doyle William P Business modeling, software engineering and prototyping method and apparatus
WO1993012488A1 (fr) * 1991-12-13 1993-06-24 White Leonard R Systeme et procede de logiciel pour analyse de mesures
US5701419A (en) * 1992-03-06 1997-12-23 Bell Atlantic Network Services, Inc. Telecommunications service creation apparatus and method
US5978811A (en) * 1992-07-29 1999-11-02 Texas Instruments Incorporated Information repository system and method for modeling data
US5630069A (en) * 1993-01-15 1997-05-13 Action Technologies, Inc. Method and apparatus for creating workflow maps of business processes
US5819270A (en) * 1993-02-25 1998-10-06 Massachusetts Institute Of Technology Computer system for displaying representations of processes
CA2118885C (fr) * 1993-04-29 2005-05-24 Conrad K. Teran Systeme de commande de processus
WO1994029804A1 (fr) * 1993-06-16 1994-12-22 Electronic Data Systems Corporation Systeme de gestion des processus
US5485574A (en) * 1993-11-04 1996-01-16 Microsoft Corporation Operating system based performance monitoring of programs
US5724262A (en) * 1994-05-31 1998-03-03 Paradyne Corporation Method for measuring the usability of a system and for task analysis and re-engineering
US5745880A (en) * 1994-10-03 1998-04-28 The Sabre Group, Inc. System to predict optimum computer platform
JP3315844B2 (ja) * 1994-12-09 2002-08-19 株式会社東芝 スケジューリング装置及びスケジューリング方法
JPH08320855A (ja) * 1995-05-24 1996-12-03 Hitachi Ltd システム導入効果評価方法およびシステム
EP0770967A3 (fr) * 1995-10-26 1998-12-30 Koninklijke Philips Electronics N.V. Système d'aide de décision pour la gestion d'une chaíne de l'alimentation agile
US5875431A (en) * 1996-03-15 1999-02-23 Heckman; Frank Legal strategic analysis planning and evaluation control system and method
US5960417A (en) * 1996-03-19 1999-09-28 Vanguard International Semiconductor Corporation IC manufacturing costing control system and process
US5793632A (en) * 1996-03-26 1998-08-11 Lockheed Martin Corporation Cost estimating system using parametric estimating and providing a split of labor and material costs
US5960200A (en) * 1996-05-03 1999-09-28 I-Cube System to transition an enterprise to a distributed infrastructure
US5673382A (en) * 1996-05-30 1997-09-30 International Business Machines Corporation Automated management of off-site storage volumes for disaster recovery
US5864483A (en) * 1996-08-01 1999-01-26 Electronic Data Systems Corporation Monitoring of service delivery or product manufacturing
US5974395A (en) * 1996-08-21 1999-10-26 I2 Technologies, Inc. System and method for extended enterprise planning across a supply chain
US5930762A (en) * 1996-09-24 1999-07-27 Rco Software Limited Computer aided risk management in multiple-parameter physical systems
US6044354A (en) * 1996-12-19 2000-03-28 Sprint Communications Company, L.P. Computer-based product planning system
US5903478A (en) * 1997-03-10 1999-05-11 Ncr Corporation Method for displaying an IT (Information Technology) architecture visual model in a symbol-based decision rational table
US6028602A (en) * 1997-05-30 2000-02-22 Telefonaktiebolaget Lm Ericsson Method for managing contents of a hierarchical data model
US6106569A (en) * 1997-08-14 2000-08-22 International Business Machines Corporation Method of developing a software system using object oriented technology
US6092047A (en) * 1997-10-07 2000-07-18 Benefits Technologies, Inc. Apparatus and method of composing a plan of flexible benefits
US6131099A (en) * 1997-11-03 2000-10-10 Moore U.S.A. Inc. Print and mail business recovery configuration method and system
US6119097A (en) * 1997-11-26 2000-09-12 Executing The Numbers, Inc. System and method for quantification of human performance factors
US6157916A (en) * 1998-06-17 2000-12-05 The Hoffman Group Method and apparatus to control the operating speed of a papermaking facility

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4827423A (en) * 1987-01-20 1989-05-02 R. J. Reynolds Tobacco Company Computer integrated manufacturing system
US5826040A (en) * 1992-03-24 1998-10-20 Texas Instruments Incorporated Method and system for production planning
US5646049A (en) * 1992-03-27 1997-07-08 Abbott Laboratories Scheduling operation of an automated analytical system
US5563951A (en) * 1994-07-25 1996-10-08 Interval Research Corporation Audio interface garment and communication system for use therewith

Also Published As

Publication number Publication date
AU1193601A (en) 2001-05-10
WO2001025877A3 (fr) 2001-09-07
EP1226523A1 (fr) 2002-07-31
WO2001026008A1 (fr) 2001-04-12
EP1222510A4 (fr) 2007-10-31
EP1222510A2 (fr) 2002-07-17
AU7861800A (en) 2001-05-10
AU7996100A (en) 2001-05-10
AU7756600A (en) 2001-05-10
WO2001026012A1 (fr) 2001-04-12
WO2001026005A1 (fr) 2001-04-12
WO2001026014A1 (fr) 2001-04-12
AU1653901A (en) 2001-05-10
AU1431701A (en) 2001-05-10
AU1431801A (en) 2001-05-10
AU8001800A (en) 2001-05-10
WO2001025876A3 (fr) 2001-08-30
WO2001026028A1 (fr) 2001-04-12
WO2001025876A2 (fr) 2001-04-12
WO2001026011A1 (fr) 2001-04-12
CA2386788A1 (fr) 2001-04-12
WO2001026007A1 (fr) 2001-04-12
EP1226523A4 (fr) 2003-02-19
AU7866600A (en) 2001-05-10
WO2001025877A2 (fr) 2001-04-12
AU1193801A (en) 2001-05-10
WO2001026013A1 (fr) 2001-04-12
WO2001026028A8 (fr) 2001-07-26
AU8001700A (en) 2001-05-10
WO2001025970A8 (fr) 2001-09-27
WO2001025970A1 (fr) 2001-04-12
AU7996000A (en) 2001-05-10

Similar Documents

Publication Publication Date Title
WO2001026010A1 (fr) Procede et estimateur pour l'ordonnancement de la production
US6738736B1 (en) Method and estimator for providing capacacity modeling and planning
US7810067B2 (en) Development processes representation and management
Laporte et al. Software quality assurance
US8200527B1 (en) Method for prioritizing and presenting recommendations regarding organizaion's customer care capabilities
US7930201B1 (en) EDP portal cross-process integrated view
Chemuturi et al. Mastering software project management: Best practices, tools and techniques
US10423913B2 (en) System and method for process-based analysis
Alhayek Implementation Common Failure Reasons for an Enterprise Resource Planning and how to avoid
CISM Managing Software Deliverables: A Software Development Management Methodology
Singh downloaded from the King’s Research Portal at https://kclpure. kcl. ac. uk/portal
Pilorget et al. IT Portfolio and Project Management
Razer Jr et al. A DESIGN OF WEB-BASED DENTAL INFORMATION MANAGEMENT SYSTEM WITH SMS NOTIFICATION AND DECISION SUPPORT SYSTEM FOR IDAGDAG TOOTH CARE CLINIC
Nicoletti et al. Revenues and Agile Procurement
Ma Assessing capability maturity tools for process management improvement: A case study
Enterprise et al. Request for Proposal (RFP) Proc Main
Clapp et al. A guide to conducting independent technical assessments
Buttle et al. A hitchhiker's guide to project management
Kuster et al. Project Planning
Barracliffe et al. Systems Development Life Cycle (SDLC) Methodology
Topsholm CHARM Transformation: A case study on change and release management Catella Bank
Dilawer Practical Guide of Software Development Project Management in Practice
Melvin et al. VA IT MANAGEMENT: Organization Is Largely Centralized; Additional Actions Could Improve Human Capital Practices and Systems Development Processes
Houston Systems Selection, Implementation, Support and Maintenance
Babcock et al. Industry Best Practices for the Software Development Life Cycle

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP