US963159A - Process for making concrete dams, walls, bridges, conduits, sewers, &c. - Google Patents

Process for making concrete dams, walls, bridges, conduits, sewers, &c. Download PDF

Info

Publication number
US963159A
US963159A US42005608A US1908420056A US963159A US 963159 A US963159 A US 963159A US 42005608 A US42005608 A US 42005608A US 1908420056 A US1908420056 A US 1908420056A US 963159 A US963159 A US 963159A
Authority
US
United States
Prior art keywords
concrete
construction
sections
plastic
sewers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US42005608A
Inventor
Franklin S Lamson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COSMOS CONSTRUCTION Co
Original Assignee
COSMOS CONSTRUCTION Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COSMOS CONSTRUCTION Co filed Critical COSMOS CONSTRUCTION Co
Priority to US42005608A priority Critical patent/US963159A/en
Application granted granted Critical
Publication of US963159A publication Critical patent/US963159A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S264/00Plastic and nonmetallic article shaping or treating: processes
    • Y10S264/57Processes of forming layered products

Definitions

  • This discovery relates to the making of that class of the above-namedand other structures in which the concrete is made of Portland cement-as the binding materialin combination with sand, gravel, crushed stone and water; and has for its object the construction of said structures by the use of such a process and such appliances as will give to the mass formed by the mixture of the said concrete material such stiff plasticity as will enable it to receive concrete forms which can be laid in layers at an angle from the horizontal of 45, more or less, without sliding or slumping; which will retain such plasticity until the successive layers can be operated upon and compressedeach with its preceding layerbefore the setting of the cement takes place; which series of operations can be continued to any desired extent, so as to make practicable the construction of the named structures of any desired size and length, and yet each structure be a monolith, without joint; andwhich operations can be performed by the use of machines with great accuracy and rapidity; the whole forming a new system of concrete construction by means of which such structures may be progressively completed from bottom to top as the work advances, and may be constructed in as many
  • Fig. 3 a front View, Fig. "1, a side view and Fig. 5, a view in perspective, each showing a regular section, 2, of the steel-reinforce framing, as described.
  • the stifHy-plastic material is prepared and conveyed to the workmen at the site as described in the said prior applications; in the preparation for constructionbeside the necessary foundation-clearance, and the concrete-making-and-delivering-plant placement a set of prepared sectional moldforms (of wood or metal), having suitable connecting cross-bars or tie-bolts, adapted in material, size, strength and form to the work, is to be provided; between such singly-placed pairs of mold-forms (set at an angle of 45 i) the stifHy-plastic material is to be placed in consecutive sections, each of which may be rolled or compressed, and in the same operation be grooved or indented as by suitably-shaped strips or blocks attached to the faces of the rollers or compressors; as the, concrete sets and hardens to suitable strength the mold-forms at the rear are to be moved to the front, consecutively.
  • a set of prepared sectional moldforms of wood or metal
  • suitable connecting cross-bars or tie-bolts adapted
  • Metal frames provided with cross-bars may be placed and embedded between selected layers of concrete; these frames to be adapted to the triple purpose of retaining the concrete sections in place before and during compression, of sustaining the moldforming and an inclosed movable operative construction-plant, and as a metal reinforcement of the concrete structure, the said spaced cross-bars preferably crossing each other diagonally so as to form truss-braces in the frame; selected cross-bars of said frame may extend to the exterior of the structure, and thus form tie-bolts for the mold-forms, or may be provided with temporary or permanent anchors; when structures are of great width, and it is desired to construct them in sections (as to width), the inner ends of the tie-bolts of the first section may be provided with sockets into which the tie-bolts of its adjoining section may connect; each of the said cross-bar frames placed on its slope is to be provided with metal bars or links to which its succeeding angle-frame may be connected, (or, when desired, strong
  • each member of a section should be so devised as best to adapt the construction for its varied uses.
  • authorities have held that the. expansion and contraction of the steel and the concrete is practically the same, and also that the adhesion between steel and the concrete which has set around it (550 to 680 pounds per square inch) is above the safe compressive stress for the concrete, so that it may be assumed that slip between them will not occur.
  • a blockdayefls platform In the preparation for construction, also, a blockdayefls platform is to be provided, which platform should be movable on adjustable inclined ways (by rack and pinion or other devices) on a supporting frame, which frame should be movable as the work progresses (as by being supported on a series of trucks movable on tracks to be laid on the structure as the work progresses), and should also be inclosed so as to protect the workmen and the work, and enable a continuous operation from start to finish; such inclosed frame should be constructed in sections adapted to a rapid setting up, adjustment, extension, and removal; when desired two or more layers platforms may be used, as on long slopes, and rollers to follow each platform, the said rollers to be attached to said platforms, or operated separately; or platforms, and rollers, may operate side by side on wide slopes; also, when desired, stair-case platformsmovable sidewise--may be used, the lines of blocks being laid up or down the slope instead of across; or such lines may be laid
  • the structure may be begun at both ends, working toward each other, and also at one or more points between, in each case working both ways so as to meet and unite with another advancing construction; or, in some cases, the construction may begin at one side of a structure, and advance its whole lengthsimultaneously across the structure, building upward but with sloping layers and monolithic construction.
  • process and devices may be adapted to suit the circumstances and objects of any given structure: as instances-horizontal truss-brace frame-connections may connect the angleslope frames at the bottom and top of a structure, while at points between the bottom and top bars or links may connect said frames, as desired; such horizontal connections between angle-slope frames may be short or long, so as to include few or several layers of concrete in a section, as may be practicable; the placing of concrete in the spaced cross-bar frames may begin at any point or points in said frames and proceed in any direction.
  • each rail-ends joint may be central as to its adjacent side rail.
  • the covered work-inclosing frame may be of cantaliver construction, and have a part thereof projecting in front so as to protect the slope being worked on. Should the utility of the rails in any structure cease with its completion, the blocks, or other devices, which may connect said rails with the embedded framework may be disconnected and removed, any holes left to be filled with concrete.
  • plastic material of irregular form may be used in connection with similar material of regular form, as in wide structures where exterior portions might be constructed of material of regular form, which-with tied molds and framework, would serve as retaining walls for an interior portion filled in with material of irregular form, the mass uniting in monolithic construction; or, as a variation, the material of regular form may be centrally placed, and that of irregular form extend from thence to the side molds.

Description

, v F. S. LAMSON. PROGESS FOR MAKING GONGRETE DAMS, WALLS, BRIDGE$, CONDUITS, SEWERS, 6w. 7 APPLIOATIQN FILED PEB.6, 190a. RENEWED MAR.9,1908.
963,159. Patented July 5,1910.
THE umzms PETERS co. WASHINGTON, n. c.
rio.
FRANKLIN S. LAMSON, OF WASHINGTON, DISTRICT OF COLUMBIA, ASSIGNOR TO COSMOS CONSTRUCTION COMPANY, OF WASHINGTON, DISTRICT OF COLUMBIA.
PROCESS FOR MAKING CONCRETE DAMS, WALLS, BRIDGES, CONDUITS, SEWERS, 8w.
T 0 all whom it may concern:
Be it known that I, FRANKLIN S. LA1\I SON, a citizen of the United States, residing at lVashington, District of Columbia, have discovered a new and useful Improvement in Processes for Making Concrete Dams, l/Valls, Bridges, Conduits, Sewers, &c., of which the following is a specification.
This discovery relates to the making of that class of the above-namedand other structures in which the concrete is made of Portland cement-as the binding materialin combination with sand, gravel, crushed stone and water; and has for its object the construction of said structures by the use of such a process and such appliances as will give to the mass formed by the mixture of the said concrete material such stiff plasticity as will enable it to receive concrete forms which can be laid in layers at an angle from the horizontal of 45, more or less, without sliding or slumping; which will retain such plasticity until the successive layers can be operated upon and compressedeach with its preceding layerbefore the setting of the cement takes place; which series of operations can be continued to any desired extent, so as to make practicable the construction of the named structures of any desired size and length, and yet each structure be a monolith, without joint; andwhich operations can be performed by the use of machines with great accuracy and rapidity; the whole forming a new system of concrete construction by means of which such structures may be progressively completed from bottom to top as the work advances, and may be constructed in as many completing sections as may be desired but with monolithic union as a whole; thereby enabling a rapidity of construction only limited by the ability to furnish the required material.
As stated in my prior applications-Serial No. 119,673, (patented Nov. 5, 1907, No. 870,370) filed August 14, 1902, and Serial No. 163,043, (patented Nov. 30, 1909, No. 941,886) filed June 25, 1903, I have discovered that when the combination of such materials, in proper proportions and properly worked, is made with the temperature of the materials at about 39 to 32 F. it gives such stiff plasticity to the concrete mixtures as to enable the use of operative machines Specification of Letters Patent.
Application filed February 6, 1906, Serial No. 299,800. Renewed March 9, 1908.
Patented July 5, 1910.
Serial No. 420,056.
in the production of sections of doncrete of regular size which retain their form while being transferred to places of deposit. I have also discovered that when such stiffiyplastic sections, or blocks, are laid in layers at an angle from the horizontal of 45, more or less, then, in the construction of said dams, walls, bridges, conduits, sewers, and other structures to which this method may be applicable, the said layers are, each, relatively short; can be quickly laid while fresh, and by rolling or compression be united and compactedeachwith its preceding plastic layer; that the production of said concrete sections in regular sizes enables the regular introduction and einbedinent, between said layers, of metal supporting and strengthening frames, which will hold the said concrete sections in place While being rolled and grooved or indented-in one operation, will support movable inclosed 0perative construction-plants during construction, will sustain mold-forms, and also serve as a metal reinforcement in the con crete structure.
In the accompanying drawings-which illustrate the application of the described methods in the construction of a steel-reinforced concrete dam-Figure 1 is a side View of a portion of such structure nearing completion, in which 1 represents concrete surface with mold-forms removed, 1, on the right, a slope of plastic concrete being rolled 1, a series of plastic concrete blocks being conveyed en-slope for emplacement by workmen stationed on the slope platforms p, p, p; 2, indicates the completing-section of steel-reinforce framing being lowered to place by crane C; 2in dotted lines-indicates the embedded steel-reinforce framing; 3, indicates a transferable section of mold-forming connected at points 3 to the reinforce-framing and supported thereby; 4, 4, 4, construction-plant cars for preparing and delivering the plastic concrete direct from the mixers 4, 4, to structure--being supported on trackage 4", connected to and supported by the steel-reinforce framing as shown, the movable crane being also similarly supported; Fig. 2, a plan of the same, but with the position of crane O indicated by dotted lines 0, the plastic concrete blocks 1 on the level part of the conveyors beneath the crane, and the completing-section 2 of the steel-reinforce framing shown as placed in position, uniting the two advancing slope-series of sectional reinforce framing; Fig. 3, a front View, Fig. "1, a side view and Fig. 5, a view in perspective, each showing a regular section, 2, of the steel-reinforce framing, as described.
Similar characters refer to similar parts.
In the practical application of this process the stifHy-plastic material is prepared and conveyed to the workmen at the site as described in the said prior applications; in the preparation for constructionbeside the necessary foundation-clearance, and the concrete-making-and-delivering-plant placementa set of prepared sectional moldforms (of wood or metal), having suitable connecting cross-bars or tie-bolts, adapted in material, size, strength and form to the work, is to be provided; between such singly-placed pairs of mold-forms (set at an angle of 45 i) the stifHy-plastic material is to be placed in consecutive sections, each of which may be rolled or compressed, and in the same operation be grooved or indented as by suitably-shaped strips or blocks attached to the faces of the rollers or compressors; as the, concrete sets and hardens to suitable strength the mold-forms at the rear are to be moved to the front, consecutively.
Metal frames provided with cross-bars (suitably spaced to receive the concrete sections) may be placed and embedded between selected layers of concrete; these frames to be adapted to the triple purpose of retaining the concrete sections in place before and during compression, of sustaining the moldforming and an inclosed movable operative construction-plant, and as a metal reinforcement of the concrete structure, the said spaced cross-bars preferably crossing each other diagonally so as to form truss-braces in the frame; selected cross-bars of said frame may extend to the exterior of the structure, and thus form tie-bolts for the mold-forms, or may be provided with temporary or permanent anchors; when structures are of great width, and it is desired to construct them in sections (as to width), the inner ends of the tie-bolts of the first section may be provided with sockets into which the tie-bolts of its adjoining section may connect; each of the said cross-bar frames placed on its slope is to be provided with metal bars or links to which its succeeding angle-frame may be connected, (or, when desired, strong horizontal truss-frames may connect the angle-frames in lieu of bars or links), the whole series of sectional frames thus'combining with the concrete in forming a strengthened structure. In preparing and emplacing such section-assembled framing each member of a section should be so devised as best to adapt the construction for its varied uses. In such combined constructions authorities have held that the. expansion and contraction of the steel and the concrete is practically the same, and also that the adhesion between steel and the concrete which has set around it (550 to 680 pounds per square inch) is above the safe compressive stress for the concrete, so that it may be assumed that slip between them will not occur. In the preparation for construction, also, a blockdayefls platform is to be provided, which platform should be movable on adjustable inclined ways (by rack and pinion or other devices) on a supporting frame, which frame should be movable as the work progresses (as by being supported on a series of trucks movable on tracks to be laid on the structure as the work progresses), and should also be inclosed so as to protect the workmen and the work, and enable a continuous operation from start to finish; such inclosed frame should be constructed in sections adapted to a rapid setting up, adjustment, extension, and removal; when desired two or more layers platforms may be used, as on long slopes, and rollers to follow each platform, the said rollers to be attached to said platforms, or operated separately; or platforms, and rollers, may operate side by side on wide slopes; also, when desired, stair-case platformsmovable sidewise--may be used, the lines of blocks being laid up or down the slope instead of across; or such lines may be laid at any desired angle.
In arranging for the rapid construction of the above-named structures provision is .to be made for shifts of workmen to prosecute the work day and night; suitable lighting to enable sight during darkness; and competent supervision. In cases where great rapidity of construction is required the structure may be begun at both ends, working toward each other, and also at one or more points between, in each case working both ways so as to meet and unite with another advancing construction; or, in some cases, the construction may begin at one side of a structure, and advance its whole lengthsimultaneously across the structure, building upward but with sloping layers and monolithic construction.
The above general description of process and devices may be adapted to suit the circumstances and objects of any given structure: as instances-horizontal truss-brace frame-connections may connect the angleslope frames at the bottom and top of a structure, while at points between the bottom and top bars or links may connect said frames, as desired; such horizontal connections between angle-slope frames may be short or long, so as to include few or several layers of concrete in a section, as may be practicable; the placing of concrete in the spaced cross-bar frames may begin at any point or points in said frames and proceed in any direction.
As many lines of rails may be laid and connected to the embedded framework as may be required, and each rail-ends joint may be central as to its adjacent side rail. The covered work-inclosing frame may be of cantaliver construction, and have a part thereof projecting in front so as to protect the slope being worked on. Should the utility of the rails in any structure cease with its completion, the blocks, or other devices, which may connect said rails with the embedded framework may be disconnected and removed, any holes left to be filled with concrete. I
It isevident that plastic material of irregular form may be used in connection with similar material of regular form, as in wide structures where exterior portions might be constructed of material of regular form, which-with tied molds and framework, would serve as retaining walls for an interior portion filled in with material of irregular form, the mass uniting in monolithic construction; or, as a variation, the material of regular form may be centrally placed, and that of irregular form extend from thence to the side molds. It is also evident, since the freezing of freshly mixed concrete material does not injure the setting quality of the cement after the frost is withdrawn, that sustaining-or retainingblocks of frozen fresh concrete may be emplaced in a structure, and such frozen formations sur rounded by fresh material of suitably higher temperature; thefrozen material supporting the mass until its surrounding material shall have set, and the heat therefrom gradually extracting the frost, its cement will also set without injury.
By reference to the disclosure in the named prior patents it will be seen that progressive continuity of concrete mixture and emplacement, to enable rapid continuous construction of concrete structures, was a principal object to be obtained; that such continuous mixture of separate materials necessarily implies their continuity of supply for such union; and that continuous movement of materials to union and of the product of such union to structural emplacement and compaction while plastic is fully shown. In this application additional rapidity of such construction is disclosed :By providing a progressive method of structural-reinforceframing emplacement in adapted sectionswhich will also enable the supporting of progressively emplaced mold-form sections, the sustaining of construction-plants (for placement of such metal-framing sections and mold-form sections, and for mixing and delivering concrete) in advance of the deposit of concrete, and the continuous deposit and compaction of the plastic 1nixture on, in or with an advancing formation which may complete a structure from bottom to top, as it advances, and from end to end in monolithic union.
I claim.
1. In the construction of concrete dams, walls, bridges, conduits, sewers, etc., which are made of plastic material, laid in layers, to be united or compacted while fresh, the method of laying such layers of plastic material at an angle from the horizontal of 45, more or less, whereby each layer of fresh material is relatively short, and may be united or compacted with its preceding plastic layer and its succeeding fresh layer, thereby enabling the making of structures of any desired length monolithic constructions, and also the completing of structures from bot tom to top, as the work advances, without joints.
2. In the slope-angle method of placing layers of plastic concrete, substantially as described, deeply grooving or indenting each layer as it is being rolled, or compressed, whereby material of each succeeding layer is forced into such grooves, or indents, and the slipping or slumping of such layer thereby prevented.
3. In the angle method of laying plastic concrete layers, substantially as described, placing cross-bar frames on selected slopes of concrete, and connecting each frame with its preceding embedded frame, whereby each included section of layers is securely bound to its preceding sections.
4. In a system of reinforced concrete construction which consists in emplacing freshly plastic cement material in connection with a reinforcing metal frame for joint loadsupporting strength, the method of emplacing such reinforce frame in sectional progressive continuity in advance of progressive continuity of emplacement of such freshly plastic cement material; such framework serving to support, in progressive continuity, movable construction-plants for advancing structural formations.
5. In a progressive-continuity method of reinforced concrete construction, progressconnected mold-forming emplacement and construction-plant movement on such connected continuity of reinforce framing.
7. In a process of reinforced concrete construction which consists in constructing and emplacing a work-supporting metal-reinforce framing in advance of concrete emplacement, the method of assembling such work-supporting framework in adapted sections, and progressively emplacingsuch sections in connected continuity.
8. In the slopeangle method of plastic concrete construction, embedding metal frames in the concrete, connecting said frames in series, supporting a work-inclosing cover on said framework, and moving said cover forward as the work progresses; the said motion being substantially synchronous with the progress of the work, and the said framework serving to support said cover in advance of the setting of the concrete.
9. In a process of monolithic concrete con struction, substantially as described, the method of laying freshly plastic material of irregular mass-form in connection with similar material of regular form.
10. In a process of monolithic concrete construction, substantially as described, the method of inclosing frozen formations of freshly mixed concrete material in fresh material of higher temperature, the frozen material serving to sustain its inclosing material until set, and the inclosing material withdrawing the frost from its inclosed frozen material and enabling the setting of the cement therein.
11. In a process for making concrete structures which consists in embedding metal strengthening material in freshly plastic concrete, the steps of assembling such strengthening members into desired sections, and of emplacing such assembled sections units on, in or at a structural site.
12. In a process for making concrete structures which consists in embedding metal strengthening material in freshly plastic concrete, the steps of assembling such strengthening material members into desired sections; of emplacing such assembled sections as units on, in or at a structural site, and embedding such sections in the concrete.
In testimony whereof I have signed my name to this specification.
FRANKLIN S. LAMSON.
Witnesses:
C. T. LAMSON, SoLoN C. KEMON.
US42005608A 1908-03-09 1908-03-09 Process for making concrete dams, walls, bridges, conduits, sewers, &c. Expired - Lifetime US963159A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US42005608A US963159A (en) 1908-03-09 1908-03-09 Process for making concrete dams, walls, bridges, conduits, sewers, &c.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US42005608A US963159A (en) 1908-03-09 1908-03-09 Process for making concrete dams, walls, bridges, conduits, sewers, &c.

Publications (1)

Publication Number Publication Date
US963159A true US963159A (en) 1910-07-05

Family

ID=3031557

Family Applications (1)

Application Number Title Priority Date Filing Date
US42005608A Expired - Lifetime US963159A (en) 1908-03-09 1908-03-09 Process for making concrete dams, walls, bridges, conduits, sewers, &c.

Country Status (1)

Country Link
US (1) US963159A (en)

Similar Documents

Publication Publication Date Title
US10895055B1 (en) Molded concrete blocks having simulated brick or stone outer surfaces
US1474808A (en) Method of tunnel construction
CN105484403B (en) Assembly concrete two-way ribbed slab floor and its method of construction
CN107354953A (en) Concrete rib band and the reinforced Retaining wall structure of intensive aspect and construction method
CN107386246A (en) A kind of lock chamber wall Construction Through Form on Traveler method
CN206902741U (en) Concrete rib band and the reinforced Retaining wall structure of intensive aspect
US6808156B2 (en) Method and apparatus for molding concrete into a bridge or other structure
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
US20120167516A1 (en) method of forming protrusions on a masonry block
US963159A (en) Process for making concrete dams, walls, bridges, conduits, sewers, &c.
US1728265A (en) Floor construction and method of producing the same
CN107882050A (en) The manufacture method of the side plate of cap mold and cap mold
US1063672A (en) Process of constructing sewers, aqueducts, &c.
US1167159A (en) Construction of concrete sewers, aqueducts, &c.
US1856589A (en) Concrete flume structure and method of building same
US939726A (en) Composite wall and method of construction same.
US749735A (en) Temporary supporting-form for masonry structures
CN108896361A (en) With the similar instructional device of accurate prefabricated crack function in a kind of geotechnical engineering
US781820A (en) Wall construction.
SU1137145A1 (en) Metho of constructing gravity dams
US941886A (en) Process of laying concrete pavements.
US20160281356A1 (en) Machine for making interlocking and interfitting masonry units and masonry system thereof
JP2604380Y2 (en) Construction member for railway station platform and structure using the same
US1249290A (en) Process for making concrete structures, dams, walls, bridges, conduits, sewers, pavements, &c.
US1087813A (en) Wall construction for houses and other buildings.