US742221A - Tunnel construction. - Google Patents
Tunnel construction. Download PDFInfo
- Publication number
- US742221A US742221A US13956103A US1903139561A US742221A US 742221 A US742221 A US 742221A US 13956103 A US13956103 A US 13956103A US 1903139561 A US1903139561 A US 1903139561A US 742221 A US742221 A US 742221A
- Authority
- US
- United States
- Prior art keywords
- tunnel
- chamber
- air
- pressure
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
- E21D9/0875—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket
- E21D9/0879—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket the shield being provided with devices for lining the tunnel, e.g. shuttering
Definitions
- FIG. 2 is a transverse section on the plane indicated by the line 2 2 of Fig. 1.
- Fig. 3 is a horizontal section on the plane indicated .by the line 3 30f Fig. 1.
- Fig. at is a horizontal section on the plane indicated by the line at 4 of'Fig. 1.
- the auxiliary air-chamber a of suitable dimensions may be formed ashore of any suitable material which will permitthe desired pressure to be maintained within and will also resist the pressure fromwithout. It is tightly closed on all sides and is so constructed as to form, at least temporarily, a portion or section of the tunnel structure. Its diameters, however, are 7 preferably somewhat greater than the diameters of the tunnel structure, so that the tunnel from the airchamber can be accurately placed without requiring the chamber itself to be placed in exact position. 4 g
- the air-chamber a may be placed by any convenient method.
- beneath itsfloor b may be formed working chambers 0, while above its roof cl may be erected a crib or caisson e, which is sunk by being filled in whole or in part with pig-iron or other material.
- the chamber may be carried on through the shafts f of the caisson and at the sides of the auxiliary chamber, or if air-pressure is necessary the air-shafts 9 may be carried through the chamber a into the working chamber beneath the same, as indicated by dotted lines in Figs. 1 and 2, and the work of excavating be carried on in the working chamber under airpressure, as usual.
- the working chamber is eventually filled in with concrete or other suitable material, and the portions of the airshafts g within the chamber aware removed to permit the operations Within the air-chamber to be carried on.
- the roof cl of the airchamber is preferably stayed to resist pressure from above by long bolts or stay-rods carried up into the crib or caisson above, as indicated at h in Fig. 1.
- the exact position of the tunnel-walls is determined and the end walls, either one or both, of the chamber are broken through, the necessary air-pressure being first established within the chamber.
- shields are formed within the air-chamber, as shown at t' in Fig. 1, are placed in position against the end walls, respectively, and are projected through the end walls and are carried forward in the usual manner as the excavation of the tunnel progresses, as shown at 7t at the right of Fig. 1.
- the lining Z which follows the shield, is also carried through the Wall of the air-chamber, the joint between the lining and the wall being made tight in any suitable manner.
- the tunnel is usually carried upward at a slight inclination, so that water at the heading drains back toward the air chamber. ⁇ Vhen the tunnel has been carried forward a suitable distance, bulkheads 'm 772 may be erected in the tunnel and an air-lock a provided, so that the air-pressure above atmospheric need be maintained only between the heading and the air-lock, while the pressure in the chamber a is relieved.
- the method of constructing tunnels which consists in forming a structure adapted to serve as a portion or section of the tunnel, sinking said structure bodily to perma nent position and carrying forward the work of excavation laterally from said structure; substantially as described.
- tunnels which consists in forming a structure adapted to serve as a portion or section of the tunnel, sinking said structure bodily to permanent position, maintaining airpressure in said structure and carrying forward the work of excavation laterally from said structure; substantially as described.
- tunnels which consists in forming a structure adapted to serve as a portion or section of the tunnel, having its ends closed, sinking said structure bodily to permanent position, maintaining air-pressure in said structure, driving a shield through the closed end of said structure and carrying forward the shield and the excavation of the tunnel laterally from said structure; substantially as described.
Description
PATENTED OCT. 27, 1903.
J. P. OROURKE.
TUNNEL CONSTRUCTION.
APPLICATION FILED JAN. 19, 1903.
N0 MODEL THE nonm vsTEasmmPnnm-uma. wAsHmm'cN, u. c.
No. 742,221. PATENTED OCT. 27, 1903.
J. F. OROURKE.
TUNNEL CONSTRUCTION,
APPLICATION rum JAN. 19, 1903.
Ill/I UNlTED STATES Patented October 27, 1903.
PATENT OFFICE.
JOHN OROURKE, on NEW YORK, N. Y.
TUNNEL CONSTRUCTION.
SPECIFICATION forming part of Letters Patent No. 742,221, dated October 27, 1 903.
Application filed January l9 1903. Serial No. 139,561. (No model.)
To all whom it may concern:
Be it known that I, JOHN F. OROURKE, a citizen of the United States, residing in the borough of Manhattan, in the city of New York, in the State of New York, have invented certain new and useful Improvements in Tunnel Construction, of which the following is a specification, reference being had to the accompanying drawings, forming a part hereof.
Heretofore when a tunnel was to be constructed beneath thebed of a body ofwvater it was usual to excavate the tunnel from the shore ends toward the middle, the work freconsumed. in the work will necessarily be considerable, since it can be carried on at only two headings. Furthermore, when the tunnel, asis usually the case, dips toward the middle it is a matter of considerable trouble and expense to keep, the headings, where the work is carried on, free from water, it being necessary to pump the water constantly from the heading back to the shaft, where it can be raised and discharged. It is proposed by the present invention to overcome these difficulties and objections and. to carry on the work from the middle or lowest pointof the tunnel, while it may also be carried on, if desired, from the shore ends, as heretofore. It is impracticable in ordinary cases to begin the work at the middle or lowest point from an ordinary open shaft, and to make it possible to begin the work at this point an airpressure chamber, in which the pressure above atmospheric necessary to'prevent the entrance of water can .be maintained, is formed or placed at the lowest point or other point at which the'work is to be commenced and from this auxiliary air-pressure chamber the work is carried forward in both directions, if desired, until it has progressed far enough topermit the air-pressure to be maintained within the tunnel itself as far as constructed and the pressure within the auxiliary chamber to be relieved. It thus becomes possible to carry on the work from four headings instead of two, reducing proportionately the time necessary for the completion of the work.
A further advantage lies in the fact that through the upward inclination of thetunnel beneath the bed of the body of Water in one direction, a shield being shown in readiness to be carried through the wall of the chamber in the opposite direction. Fig. 2 is a transverse section on the plane indicated by the line 2 2 of Fig. 1. Fig. 3 is a horizontal section on the plane indicated .by the line 3 30f Fig. 1. Fig. at is a horizontal section on the plane indicated by the line at 4 of'Fig. 1.
The auxiliary air-chamber a of suitable dimensions may be formed ashore of any suitable material which will permitthe desired pressure to be maintained within and will also resist the pressure fromwithout. It is tightly closed on all sides and is so constructed as to form, at least temporarily, a portion or section of the tunnel structure. Its diameters, however, are 7 preferably somewhat greater than the diameters of the tunnel structure, so that the tunnel from the airchamber can be accurately placed without requiring the chamber itself to be placed in exact position. 4 g
The air-chamber a may be placed by any convenient method. Thus beneath itsfloor b may be formed working chambers 0, while above its roof cl may be erected a crib or caisson e, which is sunk by being filled in whole or in part with pig-iron or other material.
The excavation of material beneath the air-.
chamber may be carried on through the shafts f of the caisson and at the sides of the auxiliary chamber, or if air-pressure is necessary the air-shafts 9 may be carried through the chamber a into the working chamber beneath the same, as indicated by dotted lines in Figs. 1 and 2, and the work of excavating be carried on in the working chamber under airpressure, as usual. The working chamber is eventually filled in with concrete or other suitable material, and the portions of the airshafts g within the chamber aware removed to permit the operations Within the air-chamber to be carried on. The roof cl of the airchamber is preferably stayed to resist pressure from above by long bolts or stay-rods carried up into the crib or caisson above, as indicated at h in Fig. 1. When the chamber a has been placed, the exact position of the tunnel-walls is determined and the end walls, either one or both, of the chamber are broken through, the necessary air-pressure being first established within the chamber. If the character of the material through which the tunnel is to be driven is such as to require it, shields are formed within the air-chamber, as shown at t' in Fig. 1, are placed in position against the end walls, respectively, and are projected through the end walls and are carried forward in the usual manner as the excavation of the tunnel progresses, as shown at 7t at the right of Fig. 1. The lining Z,which follows the shield, is also carried through the Wall of the air-chamber, the joint between the lining and the wall being made tight in any suitable manner. It will be understood that the tunnel is usually carried upward at a slight inclination, so that water at the heading drains back toward the air chamber. \Vhen the tunnel has been carried forward a suitable distance, bulkheads 'm 772 may be erected in the tunnel and an air-lock a provided, so that the air-pressure above atmospheric need be maintained only between the heading and the air-lock, while the pressure in the chamber a is relieved.
It will be understood thatthe improvements in tunnel construction herein described may be practiced in structures differing more or less in detail from what is shown and described herein and that the invention is not to be restricted to any particular structure.
I claim as my invention- 1. The method of constructing tunnels, which consists in forming a structure adapted to serve as a portion or section of the tunnel, sinking said structure bodily to perma nent position and carrying forward the work of excavation laterally from said structure; substantially as described.
2. The method of constructing tunnels, which consists in forming a structure adapted to serve as a portion or section of the tunnel, sinking said structure bodily to permanent position, maintaining airpressure in said structure and carrying forward the work of excavation laterally from said structure; substantially as described.
3. The method of constructing tunnels, which consists in forming a structure adapted to serve as a portion or section of the tunnel, having its ends closed, sinking said structure bodily to permanent position, maintaining air-pressure in said structure, driving a shield through the closed end of said structure and carrying forward the shield and the excavation of the tunnel laterally from said structure; substantially as described.
4. The method of constructing tunnels, which consists in forming a structure adapted to serve as a portion or section of the tunnel, sinking said structure bodily to permanent position, maintaining air-pressure in said structure, carrying forward the excavation of the tunnel from said structure under the pressure maintained therein, constructing bulkheads in the tunnel so excavated,
producing air -pressure between the bulkheads and the heading and relieving the airpressure in the structure; substantially as described.
5. The method of constructing tunnels which consists in forming an air-chamber at a low point of the tunnel and carrying forward the work of excavation through the wall of said chamber under air-pressure at an upward inclination; substantially as described.
6. The method of constructing tunnels ICO
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13956103A US742221A (en) | 1903-01-19 | 1903-01-19 | Tunnel construction. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13956103A US742221A (en) | 1903-01-19 | 1903-01-19 | Tunnel construction. |
Publications (1)
Publication Number | Publication Date |
---|---|
US742221A true US742221A (en) | 1903-10-27 |
Family
ID=2810719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13956103A Expired - Lifetime US742221A (en) | 1903-01-19 | 1903-01-19 | Tunnel construction. |
Country Status (1)
Country | Link |
---|---|
US (1) | US742221A (en) |
-
1903
- 1903-01-19 US US13956103A patent/US742221A/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US1060271A (en) | Method of building subaqueous tunnels. | |
US742221A (en) | Tunnel construction. | |
US786382A (en) | Method of subway construction. | |
JP3135188B2 (en) | Construction method of underground cavity | |
US413384A (en) | Tunneling-ram | |
US794633A (en) | Tunneling-shield. | |
US938265A (en) | Subaqueous tunnel. | |
US742222A (en) | Tunnel construction. | |
US706380A (en) | Method of constructing tunnels. | |
Konda | Shield tunneling method | |
US715768A (en) | Method of constructing and laying subaqueous tunnels. | |
US1272479A (en) | Method of building foundations for subaqueous tunnels. | |
US1896439A (en) | Method and apparatus for tunnel construction and the like | |
US300469A (en) | De witt c | |
US764798A (en) | Apparatus for building tunnels or the like. | |
US1151958A (en) | Tunnel construction. | |
US764797A (en) | Tunnel or like construction. | |
US832120A (en) | Tunnel and means for constructing the same. | |
US1320720A (en) | Foundations | |
US708249A (en) | Subaqueous-tunnel construction. | |
US1338030A (en) | Tunnel and method of excavating | |
US1839888A (en) | Method of and means for tunneling | |
US933776A (en) | Sinking shafts and the like. | |
GB1403033A (en) | Tunnelling method | |
US884990A (en) | Method of construction. |