US736308A - Method of freezing the ground. - Google Patents

Method of freezing the ground. Download PDF

Info

Publication number
US736308A
US736308A US13372202A US1902133722A US736308A US 736308 A US736308 A US 736308A US 13372202 A US13372202 A US 13372202A US 1902133722 A US1902133722 A US 1902133722A US 736308 A US736308 A US 736308A
Authority
US
United States
Prior art keywords
freezing
tunnel
lining
pilot
agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US13372202A
Inventor
Charles Sooysmith
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US13372202A priority Critical patent/US736308A/en
Application granted granted Critical
Publication of US736308A publication Critical patent/US736308A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/11Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means
    • E02D3/115Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means by freezing

Definitions

  • nvvauron BY OM filafelkq ATTORNEY "ms NORRIS PETERS co. Pam-ammo" WASHINGYON, 04 r.
  • My invention relates to the process of freezing the ground preparatory to and as a part ofthe processes of excavation and construction of undergroundand submarine tunnels,
  • the object of my invention is to provide an economical, easy, expeditious, safe, and convenient as well as practical, method of freezing or solidifying the material surrounding or adjoining that which is to'be excavated in such away, to such an extent, and
  • My object is also to provide such a method. of and means for accomplishing this function that it will not interfere with the simulta: neous advance and performance of the processes preliminary to the main work of excavating and the freezing itself-as,forinstance, the testing the temperature and the extent or thickness of the frozen wall, making repairs, removing material, permitting inspection, 850. i
  • Figure l is a longitudinal sectional elevationof one form of device employed in applyingmy method to the freezingof soft soilin advance, for instance, of a tunnel.
  • Fig. 2 is an end elevation, also in section.
  • Fig.3 is aperspective of one of the elements.
  • Fig. 4 is a perspective showing hollow elements adapted to be secured together and forming the hollow shell of the pilot-tunnel.
  • Fig. 5 is a sectional view on the line X YZ, Fig. 3, showing pipes or hose connection between the elements.
  • Fig. 6 is a view in perspective showing a modification of my invention.
  • Figs. 7 and 8 are crosssectional elevations showing still different arrangement.
  • Fig. 9 is an end elevation showing a construction in which pipes form the arch or frame of the pilot-tunnel or chamber.
  • Fig; 10 is a plan, partlyin section, in plane XY. V
  • I may use parallel pipes longitudinally arranged, so as to form alone or in combination with other material the walls of the same. I may arrange parallel pipes curved so as to form the wall and lying in planes perpendicular to the axis of the tunnel and either closely spaced or with intervening spaces filled in with other material. I may utilize metal or other hollow sections bolted together and connected by pipes or of such shapes as to form by themselves the wall, as will be more fully described hereinafter, and other ways.
  • FIG. 2 A A are partitions separating the freezing-space 5 into two parts, one for the incoming and the other the outgoing freezing 9 9 are flanges by which sections may be bolted together, 10 being bolt-holes.
  • FIG. 4 12 12-are the nipples to which the connecting hose or pipe 14, Fig. 5, is clamped. 13 13 are pockets in the casting to permit the screwing up of connecting bolts and nuts.
  • 14 represents connecting hose or pipe.
  • 15 is a stiffening-rib to strengthen the casting.
  • 16 16 are parallel longitudinal pipes containing a freezingagent in circulation and forming the wall of the pilottunnel in combination with boards or like material 17, the whole supported by and resting upon frames or ribs 18, which may be steel angle-bars.
  • FIG. 7, 19 19 are timbersforming the main shell of the pilot-tunnel, outside of which the pipes 16 are placed and against which hydraulic jacks used in advancing the shield may be operated.
  • FIG. 8 23 23 is a temporary inside lining or partition or interior wall which I may employ instead of making the tunnel-lining hollow or employing pipes, the function being the same-t. e., the confining the freezing agent to the perimeter or wall of the pilot-tunnel.
  • This temporary lining may be made of canvas or boards or other material Y and of any shape and secured in position by any effective means which result in providing a passage for the freezing agent and confining the latter to the outside wall or lining of the pilot-tunnel.
  • 2O 20 are curved pipes forming the frame of the pilot-tunnel and spaced as required, the spacing being filled in with planking or other suitable material to exclude the soil or leakage. These pipes lie in parallel planes and perpendicular to the axis of the pilot-tunnel. 21 21 are the conduits for the freezing agent.
  • 24 24 is the brick or wood filling between pipes.
  • the lining which is sometimes constructed of two portions 6 and 7, consisting of flanged sections adapted to be secured together and separated by suitable means, so as to leave an annular space between the same for the freezing agent.
  • the partition A assists at once to support the inside lining and serves to separate the incoming and out-going currents of the freezing agent.
  • the lining may be constructed of parallel pipes 16, supported on rings or ribs or frames 18 19, and so connected that the freezing agent may be circulated through the series. These pipes preferably have material behind, in front of, or between to complete the lining and exclude the soft material or the water contained therein, as shown by 17 19 24 in Figs. 6 and 7. Where the pilot-tunnel is advanced by means of a shield, the hydraulic jacks or other means may be operated against these timbers or brick, which constitute a firm base or resistance.
  • I may form the tunnel-lining of pipes arranged in parallel planes perpendicular to the axis and suitably connected to the supply of the freezing agent, as 20, Fig. 9, and in such case I fill in bet-ween these pipes with timber, planking, brick, or other suitable material, as indicated in Fig. 10.
  • I may not construct my hollow lining of this permanent nature, but may instead insert a thin metal outside lining sufiicient to exclude the surrounding material and then hang or place a temporary inside lining 23 as of wood or even canvas, susside lining, so as to leave a sufficient space for the circulation of the freezing medium between the two linings, thus confining it to this space and constituting, in effect, a complete hollow lining for the performance of this method.
  • the method of freezing the soil which consists in, first, excavating therein a freezing-chamber, second, constructing a cellular lining therein, third, circulating a freezing agent in said lining, substantially as described.
  • the method of freezing the soil which consists in, first, excavating therein a chamber, second, constructing a hollow lining to the chamber, third, circulating a freezing agent in said hollow lining, substantially as described.
  • the method of freezing the soil which consists in, first, excavating therein a chamber, second, circulating a freezing agent in a confined space located in proximity to the interior surface of the excavation, substantially as described.
  • the method of freezing the soil which consists in, first, excavating a freezing-chamber therein, second, constructing a lining with double walls, third, introducingafreezing agent between said double walls at one part of said chamber and exhausting it from another, substantially as described.
  • the method of freezing the soil which consists in, first, constructing therein a freezing-chamber, second, applying a freezing agent to the interior surface of the said chamher through conduits located in proximity thereto, substantially as described.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

Nm 736,368, PATBNTED AUG. I1, 1903'.
0. sowsmm. METHOD or FREEZING THE. GROUND. APPLICATION FIRED D110. 3, 1902.
no noun. 4 SHEETS-SHEET 1.
A TTVOHNEY N0. 73 ,308.- 'PATBNTED AUG. 11, 1903;
0. SOOYSMITH.
METHOD OF FREEZING THE GROUND. APPLICATION FILED 111:0. a, 1902.
K0 MODEL. 4 SHEETS-SHEET .2.
W/TNESSES. I VENTO/ v V Amw-w M No. 736,308. PATENTBD AUG. 11, 1903. c. SOOYSMITH.
METHOD OF FREEZING THE GROUND. V urmomron rum) 1320.3, 1902.
no 1101321.. Burs-sum 4.
nvvauron BY OM (filafelkq ATTORNEY "ms NORRIS PETERS co. Pam-ammo" WASHINGYON, 04 r.
UNIT D STATES Patented August 11, 1903.
PATENT FEIcE.
METHOD OF FREEZING THE GROUND.
SPECIFICATION forming part of Letters Patent N 0. 736,308, dated August 11, 1903. Application filed December 3,1902. Serial No. 133,722. (No specimens.)
T at whom it may concern; Beit known that I, OHAnLEs SooYsMITH, a citizen of the United States, and a resident of New York, in the county of New'York and State of New York, have invented certain new and useful Improvements ,in -Methods of Freezing the Ground, of which'the following is a specification.
- My invention relates to the process of freezing the ground preparatory to and as a part ofthe processes of excavation and construction of undergroundand submarine tunnels,
shafts, or other similar devices, and especially when employed in soft or yielding or water-bearing materialsas in the yielding mud, ooze, quicksand, or other unstable bed of a river or like situation.
The object of my invention is to provide an economical, easy, expeditious, safe, and convenient as well as practical, method of freezing or solidifying the material surrounding or adjoining that which is to'be excavated in such away, to such an extent, and
in such relation as to present a firm barrier or obstacle to the inflow of the soft, plastic material or the liquid contained therein to the excavation as the work proceeds.
My object is also to provide such a method. of and means for accomplishing this function that it will not interfere with the simulta: neous advance and performance of the processes preliminary to the main work of excavating and the freezing itself-as,forinstance, the testing the temperature and the extent or thickness of the frozen wall, making repairs, removing material, permitting inspection, 850. i
Iattain these objects by the use of the processes and the means illustrated in the ac companying drawings, described in the following specificatiomand claimed hereinafter.
In the drawings like letters of reference refer to like parts throughout the respective views. 1
Figure lis a longitudinal sectional elevationof one form of device employed in applyingmy method to the freezingof soft soilin advance, for instance, of a tunnel. Fig. 2 is an end elevation, also in section. Fig.3 is aperspective of one of the elements. Fig. 4 is a perspective showing hollow elements adapted to be secured together and forming the hollow shell of the pilot-tunnel. Fig. 5 is a sectional view on the line X YZ, Fig. 3, showing pipes or hose connection between the elements. Fig. 6 is a view in perspective showing a modification of my invention. Figs. 7 and 8 are crosssectional elevations showing still different arrangement. Fig. 9 is an end elevation showing a construction in which pipes form the arch or frame of the pilot-tunnel or chamber. Fig; 10is a plan, partlyin section, in plane XY. V
In my PatentNo. 713,519, issued November 11, 1902, for a method of building tunnels, &c., I have described my method of constructing apilot-tunuel in advance of the main tunnel and freezing the surrounding material by means of devices contained within the pilot-tunnel or the circulation of freezing agents within the same, and in my Patent No. 711,012, issued October 14,1902, for a method of excavating andconstructing to nnels I have described the construction of a plurality of pilot-tunnels by which I avoid the difficulty caused by the possible obstruction of one or two of the pilot-tunnels by the freezing apparatus when that is contained in the interior space of the pilot-tunnel. l have not, however, heretofore, and so far as I know no one else has heretofore, shown or devised a method of freezing the material surrounding the pilot-tunnel except by an agent or apparatus contained in the pilot-tunnel itself. While the latter method is entirely practicable and in many cases desirable, it is often to be preferred that the interior of the pilottunnel be entirely unobstructed for convenience of access and egress in excavating and removing the material from the heading for making repairs or test borings, &c. I therefore have devised the plan of making the i stance or agent by which the, freezing effectis producedmy invention not lying in the agent but in the method. of and means for permitting the effect of that agent to be produced onthe surrounding material.-
It is obvious that there are many ways in which I may construct the walls of the pilot-tunnel agent.
to further this end. I may use parallel pipes longitudinally arranged, so as to form alone or in combination with other material the walls of the same. I may arrange parallel pipes curved so as to form the wall and lying in planes perpendicular to the axis of the tunnel and either closely spaced or with intervening spaces filled in with other material. I may utilize metal or other hollow sections bolted together and connected by pipes or of such shapes as to form by themselves the wall, as will be more fully described hereinafter, and other ways.
Referring to the figures, in Fig. 1, 1 is the lining of the completed tunnel; 2 is the final line of excavation of the frozen material before placing the lining; 3 is the surrounding mud, ooze, or quicksand; 4, the pilot-tunnel; 5, the space between the inside wall 6 and outside wall 7 of the pilot-tunnel lining, in which space the freezing agent is circulated; 8, the pipes leading to and away from this space and conveying the freezing agent; 11, the frozen soil.
In Fig. 2 A A are partitions separating the freezing-space 5 into two parts, one for the incoming and the other the outgoing freezing 9 9 are flanges by which sections may be bolted together, 10 being bolt-holes.
Referring to Fig. 4, 12 12-are the nipples to which the connecting hose or pipe 14, Fig. 5, is clamped. 13 13 are pockets in the casting to permit the screwing up of connecting bolts and nuts.
Referring to Fig. 5, 14 represents connecting hose or pipe. 15 is a stiffening-rib to strengthen the casting.
Referring to Fig. 6, 16 16 are parallel longitudinal pipes containing a freezingagent in circulation and forming the wall of the pilottunnel in combination with boards or like material 17, the whole supported by and resting upon frames or ribs 18, which may be steel angle-bars.
Referring to Fig. 7, 19 19 are timbersforming the main shell of the pilot-tunnel, outside of which the pipes 16 are placed and against which hydraulic jacks used in advancing the shield may be operated.
Referring to Fig. 8, 23 23 is a temporary inside lining or partition or interior wall which I may employ instead of making the tunnel-lining hollow or employing pipes, the function being the same-t. e., the confining the freezing agent to the perimeter or wall of the pilot-tunnel. This temporary lining may be made of canvas or boards or other material Y and of any shape and secured in position by any effective means which result in providing a passage for the freezing agent and confining the latter to the outside wall or lining of the pilot-tunnel.
Referring to Fig. 9, 2O 20 are curved pipes forming the frame of the pilot-tunnel and spaced as required, the spacing being filled in with planking or other suitable material to exclude the soil or leakage. These pipes lie in parallel planes and perpendicular to the axis of the pilot-tunnel. 21 21 are the conduits for the freezing agent.
In Fig. 10, 24 24 is the brick or wood filling between pipes.
I wish it to be understood that the devices here shown are onlya few of many practical means, to which I do not strictly confine myself. For example, I may employ a continuous pipe extending in a spiral along the perimeter of the f reezing-cham ber,as the exact shape, location, proportion, and arrangement of the parts may be varied or departed from without departing from the essential features of my invention, the operation of which is as follows: Where it is desired to freeze or solidify the ground, as in amine, in the constructiontof a tunnel, or under any circumstances, I construct a chamber or pilot-tunnel in the approximate center of the spot to be frozen. For the purpose of explaining my method herein I have chosen the construction of a tunnel as most clearly illustrating it. After advancing the excavation of my freezing-chamber, as I will hereinafter call it, a sufficient distance I place the lining, which is sometimes constructed of two portions 6 and 7, consisting of flanged sections adapted to be secured together and separated by suitable means, so as to leave an annular space between the same for the freezing agent, The partition A assists at once to support the inside lining and serves to separate the incoming and out-going currents of the freezing agent. I sometimes construct the lining of hollow sections adapted to be self-supporting by their shape or to be secured together and provided with communicating ducts, whereby there is uninterrupted passage for liquids, gas, or similar. medium from one to the other. (See Figs. 4 and 5.) The lining may be constructed of parallel pipes 16, supported on rings or ribs or frames 18 19, and so connected that the freezing agent may be circulated through the series. These pipes preferably have material behind, in front of, or between to complete the lining and exclude the soft material or the water contained therein, as shown by 17 19 24 in Figs. 6 and 7. Where the pilot-tunnel is advanced by means of a shield, the hydraulic jacks or other means may be operated against these timbers or brick, which constitute a firm base or resistance.
I may form the tunnel-lining of pipes arranged in parallel planes perpendicular to the axis and suitably connected to the supply of the freezing agent, as 20, Fig. 9, and in such case I fill in bet-ween these pipes with timber, planking, brick, or other suitable material, as indicated in Fig. 10. As I have intimated, I may not construct my hollow lining of this permanent nature, but may instead insert a thin metal outside lining sufiicient to exclude the surrounding material and then hang or place a temporary inside lining 23 as of wood or even canvas, susside lining, so as to leave a sufficient space for the circulation of the freezing medium between the two linings, thus confining it to this space and constituting, in effect, a complete hollow lining for the performance of this method.
It is to be understood that this invention is not confined to any particular purpose, as to tunneling, or to any particular direction, as the horizontal, nor to any particular location, as under water.
I make no claim herein to the apparatus or appliances here shown in themselves, as they are shown to more clearly illustrate the easiest and most practical means for carrying my method into effect and do not constitute my invention described herein, which is a method of freezing and may be carried out independently of any particular one of the devices here shown.
What I claim, and desire to protect by Letters Patent, isi 1. The method of freezing the soil which consists in, first, excavating therein a chamber of sufficient size to permit excavation from within'; second, lining said excavation with hollow communicating sections; third,
circulating a freezing agent in said sections, substantially as described.
2. The method of freezing the soil which consists in, first, excavating therein a chamber of sufficient size to work in, second, placing a plurality of hollow elements in the excavation" in proximity to the soil leaving the interior space substantially unobstructed,
third, circulating a freezing agent in said elements, substantially as described.
3. The method of freezing the soil which consists in, first, excavating therein a pilottunnel of sufficient size to work in, second, circulating a freezing agent in a confined space in contact with the walls thereof, third,
extending the pilot-tunnel, fourth, continuing the freezing in the extended portion, substantially as described.
The method of freezing the soil which consists in, first, excavating therein a freezing-chamber, second, constructing a cellular lining therein, third, circulating a freezing agent in said lining, substantially as described.
5. The method of freezing the soil which consists in, first, excavating therein a chamber, second, constructing a hollow lining to the chamber, third, circulating a freezing agent in said hollow lining, substantially as described.
6. The method of freezing the soil which consists in, first, excavating therein achamher, second, erecting a partition substantially parallel to the outside wall of the chamber, third, circulating in the space between the partition and the outside wall a freezing agent, substantially as described.
7. The method of freezing the soil, which consists in, first, excavating therein a chamber, second, circulating a freezing agent in a confined space located in proximity to the interior surface of the excavation, substantially as described.
8. The method of freezing the soil which consists in, first," excavating therein a freezing-chamber, second, constructing a-lining to the said chamber with an annular space within its walls, third, circulating a freezing agent in said annular space, substantially as described.
9. The method of freezing the soil which consists in, first, excavating therein a freezing-chamber, second, providing said chamber with hollow walls, third, 'circulatinga freezing agent in said walls, fourth, extending the freezing-chamber, fifth, continuing the freezing in the extended portion,-substantially as described.
, 10. The method of freezing the soil which consists in, first, excavating a freezing-chamber therein, second, constructing a lining with double walls, third, introducingafreezing agent between said double walls at one part of said chamber and exhausting it from another, substantially as described.
11. The method of freezing the soil which consists in, first, constructing therein a freezing-chamber, second, applying a freezing agent to the interior surface of the said chamher through conduits located in proximity thereto, substantially as described.
12. The method of freezing the soil which consists in, first, excavating a chamber therein, second, separating a space adjacent to the CHARLES SOOYSMITH.
Witnesses:
Z. ROSENFIELD, A. GUNDERSHEIMER.
US13372202A 1902-12-03 1902-12-03 Method of freezing the ground. Expired - Lifetime US736308A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13372202A US736308A (en) 1902-12-03 1902-12-03 Method of freezing the ground.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US13372202A US736308A (en) 1902-12-03 1902-12-03 Method of freezing the ground.

Publications (1)

Publication Number Publication Date
US736308A true US736308A (en) 1903-08-11

Family

ID=2804816

Family Applications (1)

Application Number Title Priority Date Filing Date
US13372202A Expired - Lifetime US736308A (en) 1902-12-03 1902-12-03 Method of freezing the ground.

Country Status (1)

Country Link
US (1) US736308A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4516878A (en) * 1981-10-13 1985-05-14 Linde Aktiengesellschaft Tunnel constructing
US4815894A (en) * 1986-03-12 1989-03-28 Consolidated Environmental Technologies Limited Construction and use of subsea bore holes
US5380127A (en) * 1993-03-15 1995-01-10 Cigar Lake Mining Corporation Non-entry method of underground excavation in weak or water bearing grounds

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4516878A (en) * 1981-10-13 1985-05-14 Linde Aktiengesellschaft Tunnel constructing
US4815894A (en) * 1986-03-12 1989-03-28 Consolidated Environmental Technologies Limited Construction and use of subsea bore holes
US5380127A (en) * 1993-03-15 1995-01-10 Cigar Lake Mining Corporation Non-entry method of underground excavation in weak or water bearing grounds

Similar Documents

Publication Publication Date Title
US363419A (en) Friedrich hermann poetscii
US736308A (en) Method of freezing the ground.
JP2006263557A (en) Excavation method of unneeded buried items
US1265494A (en) Gang-drill for subaqueous excavation.
US1372856A (en) Method of building sewers and tunnels
US629133A (en) Subaqueous tunnel and method of constructing same.
US721830A (en) Method of freezing the ground and excavating or tunneling.
US715768A (en) Method of constructing and laying subaqueous tunnels.
US745453A (en) Pilot-sheeting.
US2596788A (en) Cofferdam
US755956A (en) Method of constructing tunnels, shafts, or other excavations.
US713165A (en) Method of solidifying and excavating the soil and constructing tunnels.
US3074237A (en) Apparatus for lining mine shafts
US460545A (en) Method of driving tunnels oe sinking shafts
US751287A (en) Tunnel construction
US1010559A (en) Submarine operating apparatus.
US4440524A (en) Process for bringing a body of water into communication with a tunnel
US300469A (en) De witt c
US1350556A (en) Tunnel-lining
US340162A (en) Charles sooysmith
US736507A (en) Tunnel-section.
JP2755801B2 (en) Repairing method by support in piping
JP2632722B2 (en) How to build a submarine tunnel
US755955A (en) Method of constructing foundations, tunnels, &c.
US713519A (en) Method of building tunnels, shafts, &c.