US714204A - Tunnel construction. - Google Patents

Tunnel construction. Download PDF

Info

Publication number
US714204A
US714204A US9110602A US1902091106A US714204A US 714204 A US714204 A US 714204A US 9110602 A US9110602 A US 9110602A US 1902091106 A US1902091106 A US 1902091106A US 714204 A US714204 A US 714204A
Authority
US
United States
Prior art keywords
tunnel
piles
casing
load
roadway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US9110602A
Inventor
Gustav Lindenthal
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US9110602A priority Critical patent/US714204A/en
Application granted granted Critical
Publication of US714204A publication Critical patent/US714204A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/077Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling

Definitions

  • This invention relates to improvements in submarine or subaqueous tunnels, and more particularly to that class of tunnelsin which a tubular metallic shell forms the casing of the tunnel; but the invention may be capable of use in tunnels of other forms.
  • the object of the invention is to provide a tunnel which can be built through a soft foundation without the sagging,which usually results from the weight of concentrated loads passing through the tunnels.
  • My tunnel in its preferable embodiment is formed of cast-iron segments joined in the usual manner and after being driven through the bottom below the water with the aid of the ordinary shields has a suitable number of piles sunk into the soil under it, the piles being preferably of tubular form and forced through suitable openings left or formed in the skin or casing ofthe tunnel. I prefer to drive these piles so as to forma regular continuous pile formation under the tunnel rather than in the form of piers and to drive them from within the tunnel, so that the load may be partially or entirely supported by the said piles.
  • Figure 1 is a view of a portion of a river-bottom, showing my invention in vertical section.
  • Fig. 2 is a side elevation of the tunnel and pile formation shown at right angles to that shown in Fig. 1.
  • Fig. 3 is a cross-section, on a much larger scale, of a tunnel with my improvement thereon; and
  • Fig. 4 is a side elevation of the same.
  • 1 represents a series of metallic segments which are joined to form the skin or casing of the tunnel.
  • the tunnel is driven through the river-bottom below the water with compressed air, using any of the well-known shields or any other suitable apparatus.
  • the operation of these shields is so familiar that it is unnecessary to describe it here further than to state that the tunnel is built on in rings section after section as the shield, with its telescopic tube, is driven forward by means of hydraulic jacks or any other convenient means.
  • the piles may be spaced as closely as needed, both lengthwise and crosswise of the tunnel; but I prefer that they should be closely driven into the soft river-bottom in the form of a regular continuous pile formation, and while I I have represented them as being perpendicular to the axis of the tunnel in Figs. 1 and 2 they maybe driven so as to diverge, as shown in Fig. 3. I therefore wish it to be distinctly understood that my invention is not to be limited to the manner in which the piles are spaced, as the spacing will be determined by the character of the river-bottom and by the loads which the pile formation will be likely to carry.
  • the joints between them and the bottom section of the tunnel may be made water-tight by calking or in any suitable way to prevent the intrusion of water through the openings; but as the methodof calking forms no part of my present invention it is unnecessary to further mention it.
  • caps 4 preferably formed of cast-iron
  • caps 4 are fastened to them in any desired manner.
  • iron beams 45 which are disposed crosswise of the tunnel, as clearly shown in Fig. 3, and these beams 5 in turn have secured to them, by riveting or otherwise, a series of longitudinal I-beams 6,which form a firm foundation for the tie 7, upon which rests the rails 8.
  • the tops of the iron piles are leveled off and may support a cement or asphalt concrete or other roadway to present a suitable surface for the road traffic.
  • the length of the piles will of course depend to some extent upon the nature of the soil through which the tunnel passes, and while I have hereinbefore stated that the piles are of a length somewhat shorter than the diameter of the tunnel I have shown them in some of the figures as being of much greater length. Of course when the piles are of greater length than the diameter of the tunnel they must be spliced.
  • the splicing may be done in any of the usual ways and the spliced piles sunk with the water-jet in the usual manner.
  • piles like those illustrated at the left-hand side of Fig. 3, in which a hollow pile is shown with a number of lateral holes in its sides. These piles are filled with cement, concrete, or other suitable material, which oozes outinto the material surrounding the piles, and thus increases its frictional resistance and bearing capacity.
  • a tunnel comprising an inclosing casing and means for directly supporting the load or roadway, said means comprising piles passingfinto the material beneath the said inclosing casing, substantially as described.
  • a tunnel comprising a water-tight inclosing casing, a roadway therein, andy piles directly supporting said roadway, said piles passing into the material beneath the inclosing casing, substantially as described.
  • a tunnel comprising an inclosing casing, a roadway within the same, and piles on which said roadway is directly supported, said piles projecting through the tunnel-casing into the material beneath said casing, substantially as described.
  • a tunnel comprising an inclosing casing and having as a foundation piles which have their ends protruding through said casing, and a roadway resting directly on said piles, substantially as described.
  • a tunnel-foundation comprising a number of piles having their upper ends protruding through the casing of the tunnel and carrying the load thereon, substantially as described.
  • Atunnel-foundation comprising a number of hollow metallic piles having their upper ends protruding through the casing ot the tunnel and supporting or partially supporting the load, the said hollow piles having a series of lateral passages leading from its center, and a binding material inserted in said hollow piles and projecting through the lateral openings and increasing the frictional resistance and bearing capacity of the pile, substantially as described.
  • a tunnel comprising a casing, a foundation therefor consisting of piles having their upper ends inserted in openings in said casing, and a road supported on said upper ends, substantially as described.

Description

No. 7,|4,2`04.A4 Patented Nov. 25, |902.
G. LINDENTHAL.l TUNNELv CONSTRUCTION.
('Applicgeion med Jan. 24, 1902 i Il', l LLI l @nvm/dion vn: Nonms PETERS co.4 pHoro-Luna., WASHINGTON. o c
N0. 74,204. Patented NOV. 25, |902.
. G. LINDEN-[HAL TUNNEL CNSTUC'TN. (Application me@ im 24, 12502.)
2 Sheets-She. 2.
1H: Nouns Evans co, PHoTuLITHa. wAsNmoroN, D. c
y UNITED STATES ATENT OFFICE.
GUSTAV LINDENTHAL, OF NEW YORK, N. Y.
TUNNEL CONSTRUCTION.
SPECIFICATION formingpart of Letters Patent No. 714,204, dated November 25, 1902.
Application led January 24, 1902. Serial No. 91,106. (No model.)
T0 all whom it may concern.-
Be it known that I, GUsTAv LINDENTHAL, a citizen of the United States of America, and a resident-of New York, in the county of New York and State of New York, have invented certain new and useful Improvements in Tunnel Construction, of which the following is a specification.
This invention relates to improvements in submarine or subaqueous tunnels, and more particularly to that class of tunnelsin which a tubular metallic shell forms the casing of the tunnel; but the invention may be capable of use in tunnels of other forms.
The object of the invention is to provide a tunnel which can be built through a soft foundation without the sagging,which usually results from the weight of concentrated loads passing through the tunnels.Y
My tunnel in its preferable embodiment is formed of cast-iron segments joined in the usual manner and after being driven through the bottom below the water with the aid of the ordinary shields has a suitable number of piles sunk into the soil under it, the piles being preferably of tubular form and forced through suitable openings left or formed in the skin or casing ofthe tunnel. I prefer to drive these piles so as to forma regular continuous pile formation under the tunnel rather than in the form of piers and to drive them from within the tunnel, so that the load may be partially or entirely supported by the said piles.
With the aforesaid object in view my invention consists in the tunnel, as will be hereinafter more particularly described and then set forth by the claims at the end hereof.
In the drawings which accompany and form part of this application and which represent the preferable form of my invention, Figure 1 is a view of a portion of a river-bottom, showing my invention in vertical section. Fig. 2 is a side elevation of the tunnel and pile formation shown at right angles to that shown in Fig. 1. Fig. 3 is a cross-section, on a much larger scale, of a tunnel with my improvement thereon; and Fig. 4: is a side elevation of the same.
Referring now to the details of the drawings by numerals, 1 represents a series of metallic segments which are joined to form the skin or casing of the tunnel. The tunnel is driven through the river-bottom below the water with compressed air, using any of the well-known shields or any other suitable apparatus. The operation of these shields is so familiar that it is unnecessary to describe it here further than to state that the tunnel is built on in rings section after section as the shield, with its telescopic tube, is driven forward by means of hydraulic jacks or any other convenient means. It has been heretofore proposed to build tunnels of this character; but when they are built through a soft foundation they are apt to sag under the weight of the concentrated loads which pass through the tunnels when the latter are used for railways, and this sagging necessarily causes the joints of the tunnel to open and leak, allowing water to enter the joints', which of course must be avoided. The means which I use to prevent this sagging will now be described. Through suitable openings 2, left or formed in the bottom segmental plates, I sink hollow iron piles 3. These piles, which may be of a length shorter than the diameter of tunnel, are inserted through the aforesaid holes 2 from the inside of the tunnel. By the application of a waterjet in the usual way through a pipe centrally inserted and by the use of hydraulic or other jacks resting on the tops of the piles and exerting pressure against the top of the tunnel the piles may be forced down to the desired depth. Instead of the hollow piles herein described I nse the well-known screw-piles, (see 3 in Figs. 1 and 3,) which are driven by turning and screwing the piles down into the soft material.
' The piles may be spaced as closely as needed, both lengthwise and crosswise of the tunnel; but I prefer that they should be closely driven into the soft river-bottom in the form of a regular continuous pile formation, and while I I have represented them as being perpendicular to the axis of the tunnel in Figs. 1 and 2 they maybe driven so as to diverge, as shown in Fig. 3. I therefore wish it to be distinctly understood that my invention is not to be limited to the manner in which the piles are spaced, as the spacing will be determined by the character of the river-bottom and by the loads which the pile formation will be likely to carry.
IOO
Vadapted to the piles.
After the piles have been driven in position the joints between them and the bottom section of the tunnel may be made water-tight by calking or in any suitable way to prevent the intrusion of water through the openings; but as the methodof calking forms no part of my present invention it is unnecessary to further mention it.
When t-he piles 3 are in the positions determined upon, the top of each one is sawed or dressed off by suitable tools and adjusted to a level and caps 4 (preferably formed of cast-iron) are fastened to them in any desired manner. On the tops of these caps are secured iron beams 45, which are disposed crosswise of the tunnel, as clearly shown in Fig. 3, and these beams 5 in turn have secured to them, by riveting or otherwise, a series of longitudinal I-beams 6,which form a firm foundation for the tie 7, upon which rests the rails 8. This is one of the constructions which I prefer to use when the tunnel is intended for railway purposes; but other constructions for the support of the rails may be If the tunnel is used for other purposes, the tops of the iron piles are leveled off and may support a cement or asphalt concrete or other roadway to present a suitable surface for the road traffic.
The length of the piles will of course depend to some extent upon the nature of the soil through which the tunnel passes, and while I have hereinbefore stated that the piles are of a length somewhat shorter than the diameter of the tunnel I have shown them in some of the figures as being of much greater length. Of course when the piles are of greater length than the diameter of the tunnel they must be spliced. The splicing may be done in any of the usual ways and the spliced piles sunk with the water-jet in the usual manner.
In some instances I prefer to use piles like those illustrated at the left-hand side of Fig. 3, in which a hollow pile is shown with a number of lateral holes in its sides. These piles are filled with cement, concrete, or other suitable material, which oozes outinto the material surrounding the piles, and thus increases its frictional resistance and bearing capacity.
From the foregoing description and accompanying drawings it will be seen that I have invented a pile formation which provides a reliable support for a railway or road-bed, and as the piles are driven from the interior of the tunnel the driving may be done under the protection of the sections of the tunnel. Furthermore, as the piles are shown in my drawings the load is supported directly by them and the tunnel itself does not have to support the load, but merely acts as a watertight inclosure for the same.
I am aware that it is a very common engineering practice to sink piles for a foundation for a tunnel to rest upon, and hence do not attempt to claim this broadly. I am also familiar with United States Patent No.
101,174 to LSpear, granted over thirty years ago, and was familiar with it before I filed my application; but I regard my invention as essentially dierent therefrom, as Spears idea was to float a tunnel or other marine work to its destination, sink it to place, and anchor or fasten it by spikes or screws, and these spikes or screws were not intended to support or assist in supporting the load or the roadway carrying the load, but merely to anchor the tunnel and overcome any tendency to float. My invention is radically different from this, as it involves an outer casing or shell for protecting a road- .way and means for directly supporting or assisting in supporting the load or the roadway carrying the load. Therefore no claim is made herein to a tunnel which is provided with spikes or screws which do not form a support or partial support for the load, as I regard it as very important that the pilesor other means shall carry or partially support the load or the roadway, as by this construction the tunnel itself does not have to entirely support the load, as in Spears patent, but merely acts as a water-tight inclosure for the same, as set forth in the preceding paragraph. I believe I am the first to invent a tunnel where the load (which is inclosed within a shell or casing) is borne or even partially supported directly by piles, which pass into the material beneath the inclosing casing of the tunnel. I intend to cover this feature broadly, and therefore changes may be made without departing from the spirit of my invention. For example, I have referred to theuse of hollow iron piles and screw-piles; but it is obvious that in some cases wooden piles may be substituted. This and other changes may be made without'departing from the lines of my invention.
What I claim as new is- 1. A tunnel comprising an inclosing casing and means for directly supporting the load or roadway, said means comprising piles passingfinto the material beneath the said inclosing casing, substantially as described.
2. A tunnel comprising a water-tight inclosing casing, a roadway therein, andy piles directly supporting said roadway, said piles passing into the material beneath the inclosing casing, substantially as described.
3. A tunnel comprising an inclosing casing, a roadway within the same, and piles on which said roadway is directly supported, said piles projecting through the tunnel-casing into the material beneath said casing, substantially as described. t
4:. Atunnel, a roadway therethrough, acontiuuous pile foundation for supporting or partially supporting directly the said roadway, substantially as described.
5. A tunnel comprising an inclosing casing and having as a foundation piles which have their ends protruding through said casing, and a roadway resting directly on said piles, substantially as described.
IOO
IIO
6. A tunnel-foundation comprising a number of piles having their upper ends protruding through the casing of the tunnel and carrying the load thereon, substantially as described.
7. Atunnel-foundation comprising a number of hollow metallic piles having their upper ends protruding through the casing ot the tunnel and supporting or partially supporting the load, the said hollow piles having a series of lateral passages leading from its center, and a binding material inserted in said hollow piles and projecting through the lateral openings and increasing the frictional resistance and bearing capacity of the pile, substantially as described.
8. A tunnel comprising a casing, a foundation therefor consisting of piles having their upper ends inserted in openings in said casing, and a road supported on said upper ends, substantially as described.
Signed by me at 45 Cedar street, New York,
this 22d day of January, 1902.
GUSTAV LINDENTHAL.
Witnesses:
M. B. SANFORD, C. V. HOWARD.
US9110602A 1902-01-24 1902-01-24 Tunnel construction. Expired - Lifetime US714204A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US9110602A US714204A (en) 1902-01-24 1902-01-24 Tunnel construction.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US9110602A US714204A (en) 1902-01-24 1902-01-24 Tunnel construction.

Publications (1)

Publication Number Publication Date
US714204A true US714204A (en) 1902-11-25

Family

ID=2782726

Family Applications (1)

Application Number Title Priority Date Filing Date
US9110602A Expired - Lifetime US714204A (en) 1902-01-24 1902-01-24 Tunnel construction.

Country Status (1)

Country Link
US (1) US714204A (en)

Similar Documents

Publication Publication Date Title
US131322A (en) Improvement in subaqueous tunnels
US714204A (en) Tunnel construction.
US483697A (en) Dry-dock
US584865A (en) Photo-litho
US786382A (en) Method of subway construction.
US629133A (en) Subaqueous tunnel and method of constructing same.
US620101A (en) Art of constructing tunnels
US546245A (en) parker
US1525740A (en) Substructure construction
US440576A (en) Robert d
US784413A (en) Subaqueous tunnel construction.
US725029A (en) Subaqueous tunnel.
US817657A (en) Art or process of lowering river-tunnels.
US620102A (en) Tunneling device
US192171A (en) Improvement in bulk-heads and piers
US859330A (en) Track construction for underground railways and tunnels.
US777619A (en) Device for use in hydraulic engineering.
US754807A (en) Tunnel construction.
US679867A (en) Railroad-bed.
US714205A (en) Method of laying tunnels.
US1111979A (en) Reinforced bulkhead or retaining-wall.
US468282A (en) Street-railway tunnel and method of constructing the same
US181498A (en) Improvement in subaqueous tunnels
US715406A (en) Tunnel-roof.
US690960A (en) Tunnel.