US181498A - Improvement in subaqueous tunnels - Google Patents

Improvement in subaqueous tunnels Download PDF

Info

Publication number
US181498A
US181498A US181498DA US181498A US 181498 A US181498 A US 181498A US 181498D A US181498D A US 181498DA US 181498 A US181498 A US 181498A
Authority
US
United States
Prior art keywords
tunnel
improvement
platform
river
bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
Publication date
Application granted granted Critical
Publication of US181498A publication Critical patent/US181498A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/067Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed

Definitions

  • My invention relates to the economical construction of subaqueous tunnels for railroads or common roads; and my improvement consists iniconstructing the tunnel above water and upon a strong wooden platform, which shall serve as the base of the tunnel after the latter has been sunk and placed in its final position in the water.
  • A is a substantial platform, composed of layers of beams properly framed together
  • B is a tunnel proper, which, as shown in the drawing, is in the form of a hollow cylinder, but which may be varied in shape, as circumstances may suggest, the tunnel being qombined with suitable masonry, D, or other supporting appliances, and the whole being built on the platform A.
  • a tunnel may be permitted to project above the bed of a river-as, for instance, when the river is not adapted to navigable purposes, or where the water is so deep that the projecting tunnel will not interfere with navigation.
  • the greater portion of the tunnel is represented as projecting above the bed at w of the river, is covered with earth-work, and protected by a layer, H, of
  • the bed of the river may be dredged for the I reception of the tunnel, and piles a may 'be driven for a foundation, when the nature of' the soil requires their use.
  • the tunnel with its base may project entirely above the bed of the river, and in others it may be so arranged that the upper portion of the tunnel is level, or therepensive.
  • the approaches By arranging the tunnel so that the top is level with the bed of the river the approaches must necessarily be shortened, and still further shortened when a portion or the whole of the tunnel projects above the bed of the river.
  • the platform A may assist in floating the tunnel to its place by means of scows, pontons, or other appliances; or the platform may be used as the floor of a temporary caisson around the tunnel, thus forming a vessel in which the tunnel may be floated toits place prior to being sunk. Or the floating platform may be placed above the spot which it is finally to occupy, and the tunnel may then be built upon it in the open air, and be allowed to sink by degrees as the building goes on. The gradual sinking may be effected by lowering-screws, or by converting the platform into a caisson or box by the addition of sides and ends. In other cases the tunnel may be built 'on its permanent platform on land, and launched into itsfinal position by.
  • the tunnel may at first be constructed either in one length only, or in sections, to be placed under water separately.
  • the ends of such sections may betemporarily closed by bulk-heads, which may be removed after the junctions of said sections have been completed by drivers, or by the aid of coffer-dams or otherwise.
  • the foundation upon, which the tunnel is finally to rest must be prepared for it before the tunnel is sunk into its place, and may (according to circumstances) be either at or name to this specification in the presence of two subscribing witnesses.

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Description

J, c. TRAUTWINE.. SUB-AQUEOUS TUNNEL. No.181,498. Patented Au g.22. 1876.
JOHN o. TRAUTWINE, or PHILADELPHIA, PENNSYLVANIA.
IMPROVEMENT lN SUBAQUEOUS TUNNELS.
Specification forming part of Letters Patent No. 181,498, dated August 22, 1 876 application filed August 4, 1876.
To all whom it may concern:
Be it known that I,JoHN G. TRAUTWINE,
of Philadelphia, Pennsylvania, have invented an Improvement in Making Subaqueous Tunnels, of which the following is a specification:
My invention relates to the economical construction of subaqueous tunnels for railroads or common roads; and my improvement consists iniconstructing the tunnel above water and upon a strong wooden platform, which shall serve as the base of the tunnel after the latter has been sunk and placed in its final position in the water.
The acccompanying drawing represents a section of my improved tunnel.
A is a substantial platform, composed of layers of beams properly framed together, and B is a tunnel proper, which, as shown in the drawing, is in the form of a hollow cylinder, but which may be varied in shape, as circumstances may suggest, the tunnel being qombined with suitable masonry, D, or other supporting appliances, and the whole being built on the platform A.
There are many instances in which a tunnel may be permitted to project above the bed of a river-as, for instance, when the river is not adapted to navigable purposes, or where the water is so deep that the projecting tunnel will not interfere with navigation.
In the present instance, the greater portion of the tunnel is represented as projecting above the bed at w of the river, is covered with earth-work, and protected by a layer, H, of
- rip-rap.
The bed of the river may be dredged for the I reception of the tunnel, and piles a may 'be driven for a foundation, when the nature of' the soil requires their use.
In some cases the tunnel with its base may project entirely above the bed of the river, and in others it may be so arranged that the upper portion of the tunnel is level, or therepensive.
By arranging the tunnel so that the top is level with the bed of the river the approaches must necessarily be shortened, and still further shortened when a portion or the whole of the tunnel projects above the bed of the river.
' The platform A may assist in floating the tunnel to its place by means of scows, pontons, or other appliances; or the platform may be used as the floor of a temporary caisson around the tunnel, thus forming a vessel in which the tunnel may be floated toits place prior to being sunk. Or the floating platform may be placed above the spot which it is finally to occupy, and the tunnel may then be built upon it in the open air, and be allowed to sink by degrees as the building goes on. The gradual sinking may be effected by lowering-screws, or by converting the platform into a caisson or box by the addition of sides and ends. In other cases the tunnel may be built 'on its permanent platform on land, and launched into itsfinal position by.
wheels, rollers, or slides. According to circumstances the tunnel may at first be constructed either in one length only, or in sections, to be placed under water separately. In the latter case the ends of such sections may betemporarily closed by bulk-heads, which may be removed after the junctions of said sections have been completed by drivers, or by the aid of coffer-dams or otherwise.
The foundation upon, which the tunnel is finally to rest must be prepared for it before the tunnel is sunk into its place, and may (according to circumstances) be either at or name to this specification in the presence of two subscribing witnesses.
JOHN C. TRAUTWINE.
Witnesses:
HARRY Howson', J r., HARRY SMITH.
US181498D Improvement in subaqueous tunnels Expired - Lifetime US181498A (en)

Publications (1)

Publication Number Publication Date
US181498A true US181498A (en) 1876-08-22

Family

ID=2250904

Family Applications (1)

Application Number Title Priority Date Filing Date
US181498D Expired - Lifetime US181498A (en) Improvement in subaqueous tunnels

Country Status (1)

Country Link
US (1) US181498A (en)

Similar Documents

Publication Publication Date Title
Lutenegger Historical development of iron screw-pile foundations: 1836–1900
Kerisel The history of geotechnical engineering up until 1700
US1060271A (en) Method of building subaqueous tunnels.
US181498A (en) Improvement in subaqueous tunnels
US231957A (en) Submarine and surface wall
US483697A (en) Dry-dock
GB263997A (en) Improvements in and relating to the construction of quay walls, piers and other marine structures
Macaulay Building big
Díaz et al. Rehabilitation techniques for walls during the 18th century in Cartagena de Indias (Colombia)
RU2252300C1 (en) Method and system for shallow tunnel construction on bottom of water area
US1963351A (en) Method of constructing foundations
US46146A (en) Improvement in construction of docks
US1018578A (en) Method of tunnel construction.
US160938A (en) Improvement in the construction of piers
Crook Sir Robert Smirke: a pioneer of concrete construction
Amore et al. The Via Egnatia (Albania) project and the bridge at Topcias
US99493A (en) Improvement in tunnelling rivers
Legget The Jones Falls Dam on the Rideau Canal, Ontario, Canada
GB261943A (en) Improvements in or relating to building structures either under ground or wholly or partly under water
US262403A (en) John c
US1444622A (en) John a
US166695A (en) Improvement in canal-locks
US1088152A (en) Tunnel and method of constructing same.
Dickinson Jolliffe and Banks, Contractors
US1609812A (en) Underpinning