US6305881B1 - Barge stabilization method - Google Patents
Barge stabilization method Download PDFInfo
- Publication number
- US6305881B1 US6305881B1 US09/316,068 US31606899A US6305881B1 US 6305881 B1 US6305881 B1 US 6305881B1 US 31606899 A US31606899 A US 31606899A US 6305881 B1 US6305881 B1 US 6305881B1
- Authority
- US
- United States
- Prior art keywords
- tubes
- barge
- piles
- water
- array
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0052—Removal or dismantling of offshore structures from their offshore location
Definitions
- the present invention relates to systems and methods for stabilizing barges used for drilling for undersea oil. More specifically, the invention is directed to stabilizing such barges despite a variety of harsh environmental conditions.
- the inventive oil drilling barge stabilization system and method provide that an array of piles is formed in the sea bed to a depth beneath the sea bed that finds solid support. A barge is towed into position over the array of piles, and the barge is partially flooded with ballast to lower it in the water so that a set of cylindrical tubes is positioned to surround top ends of at least some of the piles. Air is then forced into the tubes to force the water out the bottom of the tubes, to create a dry environment for workers. Workers weld the tubes to the piles. The air pressure is removed from the interior of the tubes so that water may again flood the bottom of the tubes.
- the joints between the tubes and piles secure the barge to the array of piles, even in the face of varying tides, currents, and ice flow conditions.
- the barge may be used to support oil rigs and a variety of other support facilities.
- FIG. 1 is a plan view of an oil drilling site at which the present invention may be used.
- FIG. 2 is a side view, taken along section 2 — 2 in FIG. 1, showing features of a breakwater.
- FIG. 3A is a side view of a lower barge that may be used in conjunction with the present invention.
- FIG. 3B is a side view of the lower barge, supporting an oil rig and various support facilities.
- FIG. 4A illustrates an example of an array of piles formed in a sea bed to anchor barges according to the present invention
- FIG. 4B shows a cross-sectional view of one such exemplary pile.
- FIG. 5 is a side view showing a pile with guide plates, that may be used to attach to the barge when a tube is not used to extend downward from the barge.
- FIG. 6 shows a tube attached to a pile by attachment plates in accordance with the present invention.
- FIG. 1 is a plan view of an oil drilling site at which the present invention may be used.
- a generally U-shaped breakwater 110 that substantially surrounds a protected area 112 from current and ice flows moving in the direction of arrow 113 .
- the breakwater may carry a heliport 114 and an abandonment platform 116 , as well as a bridge network 118 leading to various structures in the protected area 112 .
- a drilling and production unit vessel 120 which will be the focus of the present invention, is illustrated at the end of one branch of the bridge network.
- the drilling and production unit vessel 120 may contain a heliport, crew quarters, as well as production and power facilities that are illustrated in the side view of FIG. 3 B.
- Two work boats 122 A, 122 B are illustrated alongside vessel 120 .
- At another end of the bridge network are two crude oil transportation barges 124 A, 124 B.
- FIG. 2 illustrates is a side view, taken along section 2 — 2 in FIG. 1, showing features of the FIG. 1 breakwater 110 .
- the breakwater is generally inverse-V in cross section, with a first surface 210 having a 1/3 rise-to-run ratio, a second surface 212 having a 1/4 rise-to-run ratio, a flat top surface 214 on which the heliport and abandonment platform are situated, and a fourth surface 216 having a 1/3 rise-to-run ratio.
- the breakwater is preferably made of boulders or the like, arranged in a U-shaped configuration that serves to break up and deflect sheets of ice that would otherwise endanger the structures in protected area 112 (FIG. 1 ).
- FIGS. 1 and 2 are provided for the sake of illustration and not to limit the invention:
- Atop the upper platform 330 may be a variety of units, such as the following non-limiting examples: a quarters package 340 with a topside heliport, a production/power package 350 (including waste heat recovery and fuel handling, electric generators, storage, supplies, metering, separator and heat treater, water treatment and chemical injection, separators), a self-contained drilling rig 360 , and a substructure 370 .
- a quarters package 340 with a topside heliport such as the following non-limiting examples: a quarters package 340 with a topside heliport, a production/power package 350 (including waste heat recovery and fuel handling, electric generators, storage, supplies, metering, separator and heat treater, water treatment and chemical injection, separators), a self-contained drilling rig 360 , and a substructure 370 .
- FIG. 3A Dimensions of the embodiment illustrated in FIG. 3A are provided for the sake of illustration and not to limit the invention:
- FIG. 4A illustrates an example of an array of piles formed in a sea bed to anchor barges according to the present invention
- FIG. 4B shows a cross-sectional view of one such exemplary pile.
- the piles may be arranged in a five-row by sixteen-column array of eighty piles.
- the center-to-center distances between rows are 17.5 feet, 22.5 feet, 22.5 feet, and 17.5 feet.
- the center-to-center distances are (from left to right in the FIG. 4A example) 17.5 feet, 17.5 feet, 35 feet, 35 feet, 35 feet, 35 feet, 35 feet, 35 feet, 21 feet, 21 feet, 21 feet, 14 feet, 18.92 feet, and 16.08 feet.
- FIG. 4B shows a pile 400 to have a circular cross-section fifty-four inches in diameter.
- a one-inch thick steel circular cylinder 410 contains concrete 420 in its interior.
- longitudinally-extending steel reinforcement bars (rebars) 430 are embedded at regular circumferential angles in the concrete.
- rebars are situated at 45° intervals around the pile, about four-fifths of the distance from the axis of the pile to the pile's outer periphery.
- the dimensions and constitution of the pile may be varied while still remaining within the scope of the invention.
- a set of tubes slightly larger in diameter than the piles is provided in the bottom portion of the lower barge.
- not all eighty piles are matched to tubes, but a suitable smaller number (for example, twenty) of the eighty piles are matched with tubes for attachment as described below.
- the particular piles that are designated for attachment to the barge's tubes may be chosen to be evenly distributed throughout the array of piles so as to stabilize the barge on the piles.
- FIG. 5 is a side view showing a pile 400 with guide plates, that may be used to attach a particular pile to the barge 310 when a tube is not used to extend downward from the barge.
- the pile 400 projects upward from the sea floor 500 through a fill layer 501 into water (or mud) 502 to contact a bottom plate 510 of the barge.
- the barge is provided with an interior sheet of angle framing material 520 that generally parallels the bottom plate 510 . Isolation material 530 extending around the top of the pile cushions the area of contact between the pile and the barge's bottom plate.
- a gusset plate 540 extending axially from the pile's interior, extends upwardly through the angle framing 520 .
- the gusset plate 540 is attached through a bulkhead 550 in the interior of the barge.
- An annular guiding and stabilization portion formed by a guide plate 560 and a stiffener 570 are provided around the circumference of the point at which the pile contacts the bottom plate 510 .
- FIG. 5 does not possess the advantages provided by an arrangement in which a tube extends downwardly from the barge to encompass and be attached to a pile.
- FIG. 6 shows a tube attached to a pile by plates in accordance with the present invention.
- the pile 400 , sea bed 500 , fill 501 , barge bottom plate 510 , barge angle framing 520 , guide plate 560 and stiffener 570 , illustrated in FIG. 6, are substantially the same as shown and described above with reference to FIG. 5 .
- the inventive embodiment of FIG. 6 additionally provides a tube 600 that extends downwardly from the barge to surround the top of the pile.
- the tubes are part of, or are arranged directly below, pillars 312 (FIG. 3 A), so as to provide solid support for the structural units 340 , 350 , 360 , 370 that are situated atop upper platform 330 (FIG. 3 B).
- the diameter of the tube is larger than the diameter of the pile (example: fifty-four inches).
- the inner surface of the tube is connected to the outer surface of the pile by a set of attachment plates 610 .
- the attachment plates 610 are preferably shaped as 5 ⁇ 8-inch-thick trapezoids, with the longer (sixty inches) parallel end being attached to the tube and the shorter parallel end being attached to the pile.
- the attachment plates are welded to the tube and pile, being arranged at regular circumferential intervals. In a particular embodiment, there are eight attachment plates arranged at regular 45° intervals.
- the angle GG (example: 45°) of the guide plate 560 serves to guide the pile into position in the tube.
- the angled sides of the trapezoidal attachment plates 610 also serve to center the pile in the tube.
- FIGS. 5 and 6 are provided for the sake of illustration and not to limit the invention:
- AA 130 feet (varies, based on subsurface conditions)
- BB 7.167 feet
- CC 5.5 feet
- DD 2.0 inches
- EE 5.0 inches
- FF 1.167 feet
- GG 45° HH (FIG. 6 only): 1.667 feet
- the array of piles (for example, as shown in FIG. 4A) is formed in the sea bed to a depth beneath the sea bed that finds solid support.
- the barge is towed into position over the array of piles, and the barge is partially flooded with ballast water to lower the barge in the water so that a set of cylindrical tubes is positioned to surround top ends of at least some of the piles.
- the angled guide plates 560 and the angled (non-parallel) sides of the trapezoidal attachment plates 610 serve to guide and center the pile in the tube.
- the top of the pile is provided with a shock-absorbing material to avoid damage when it contacts the barge.
- the shock absorbing material may be similar to isolation material 530 (FIG. 5 ).
- Air is then forced into the tubes to force the water out the bottom of the tubes, to create a dry environment for workers. Workers enter the dry environment in the interior of the tubes, and weld the tubes to the piles by the attachment plates 610 . Afterwards, the air pressure is removed from the interior of the tubes so that water may again flood the bottom of the tubes. The ballast water in the partially-flooded barge is pumped out to make way for the crude oil that is pumped from beneath the sea bed.
- the joints between the tubes and piles secure the barge to the array of piles, even in the face of varying tides, currents, and ice flow and earthquake conditions.
- the ballast water is no longer needed to maintain the barge's position.
- the barge may be used to support oil rigs and a variety of other support facilities, not merely those shown in FIG. 3 B.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
An oil drilling barge stabilization system and method provide that an array of substantially vertically-oriented piles is formed in the sea bed to a depth beneath the sea bed that finds solid support. A barge is towed into position over the array of piles, and the barge is partially flooded with ballast to lower it in the water so that a set of cylindrical tubes is positioned to surround top ends of at least some of the piles. Air is then forced into the tubes to force the water out the bottom of the tubes, to create a dry environment for workers. Workers weld the tubes to the piles. The air pressure is removed from the interior of the tubes so that water may again flood the bottom of the tubes. The joints between the tubes and piles secure the barge to the array of piles, even in the face of varying tides, currents, and ice flow conditions. The barge may be used to support oil rigs and a variety of other support facilities. When work at a given site is complete, air is forced into the tubes again to force the water out so that welders can disconnect the joints between the tubes and the piles. Disconnecting the joints allows the barge to rise in the water, permitting the barge to be towed to a different location.
Description
This application claims benefit of Prov. No. 60/086,618 filed May 22, 1998.
1. Field of the Invention
The present invention relates to systems and methods for stabilizing barges used for drilling for undersea oil. More specifically, the invention is directed to stabilizing such barges despite a variety of harsh environmental conditions.
2. Related Art
In the field of continental shelf oil drilling, various techniques have been employed to attempt to stabilize oil drilling platforms. However, conventional stabilization systems have not efficiently dealt with extreme conditions, such as soft sea bottoms, earthquake survivability, high winds, ice flows, and substantial differences between high tide and low tide. The damage to or loss of a drilling platform is extremely costly in both monetary and human terms. With the ongoing depletion of fossil fuel reserves in readily-accessible and friendlier environments, there is a growing need to provide systems and methods for stabilizing and protecting oil drilling platforms, despite extreme environmental conditions.
The invention described hereinafter fulfills this need. Conventional arrangements are not believed to disclose the combination of features, or provide the advantages, that are provided by the invention. U.S. Pat. No. 3,859,806 and Re. 30,823 (Guy et al.) disclose pumping water out of tubes so that workers can weld parts of a leg together (see FIG. 13 and bottom half of column 6 of the text). FIGS. 100-102 and the text bridging columns 33 and 34 of U.S. Pat. No. 3,874,180 (Sumner) disclose how water is forced out of a chamber using forced air, to allow a worker to apply sealant between a piling 185 and a lower guide member 186. More generally, U.S. Pat. No. 4,257,720 (Ostgaard) and Ostgaard shows the general concept of welding sections of legs together. U.S. Pat. No. 4,575,282 (Pardue, Sr. et aL) discloses a system of driving a pile that involves forcing compressed air into a hollow pile that has already penetrated the marine floor, and then venting the air to allow resulting hydrostatic pressure to further drive the pile.
Despite these disparate teachings, no conventional arrangement is believed to provide a practical, comprehensive system and method of stabilizing an oil drilling platform in a variety of hostile environmental conditions.
The inventive oil drilling barge stabilization system and method provide that an array of piles is formed in the sea bed to a depth beneath the sea bed that finds solid support. A barge is towed into position over the array of piles, and the barge is partially flooded with ballast to lower it in the water so that a set of cylindrical tubes is positioned to surround top ends of at least some of the piles. Air is then forced into the tubes to force the water out the bottom of the tubes, to create a dry environment for workers. Workers weld the tubes to the piles. The air pressure is removed from the interior of the tubes so that water may again flood the bottom of the tubes.
The joints between the tubes and piles secure the barge to the array of piles, even in the face of varying tides, currents, and ice flow conditions. The barge may be used to support oil rigs and a variety of other support facilities.
When work at a given site is complete, air may be forced into the tubes again to force the water out so that welders can disconnect the joints between the tubes and the piles. Disconnecting the joints allows the barge to rise in the water, permitting the barge to be towed to a different location.
Other objects, features and advantages of the present invention will be apparent to those skilled in the art upon a reading of this specification including the accompanying drawings.
The invention is better understood by reading the following Detailed Description of the Preferred Embodiments with reference to the accompanying drawing figures, in which like reference numerals refer to like elements throughout, and in which:
FIG. 1 is a plan view of an oil drilling site at which the present invention may be used.
FIG. 2 is a side view, taken along section 2—2 in FIG. 1, showing features of a breakwater.
FIG. 3A is a side view of a lower barge that may be used in conjunction with the present invention. FIG. 3B is a side view of the lower barge, supporting an oil rig and various support facilities.
FIG. 4A illustrates an example of an array of piles formed in a sea bed to anchor barges according to the present invention, and FIG. 4B shows a cross-sectional view of one such exemplary pile.
FIG. 5 is a side view showing a pile with guide plates, that may be used to attach to the barge when a tube is not used to extend downward from the barge.
FIG. 6 shows a tube attached to a pile by attachment plates in accordance with the present invention.
In describing preferred embodiments of the present invention illustrated in the drawings, specific terminology is employed for the sake of clarity. However, the invention is not intended to be limited to the specific terminology so selected, and it is to be understood that each specific element includes all technical equivalents that operate in a similar manner to accomplish a similar purpose.
FIG. 1 is a plan view of an oil drilling site at which the present invention may be used. A generally U-shaped breakwater 110 that substantially surrounds a protected area 112 from current and ice flows moving in the direction of arrow 113. The breakwater may carry a heliport 114 and an abandonment platform 116, as well as a bridge network 118 leading to various structures in the protected area 112.
A drilling and production unit vessel 120, which will be the focus of the present invention, is illustrated at the end of one branch of the bridge network. In addition to a drilling and production unit, the drilling and production unit vessel 120 may contain a heliport, crew quarters, as well as production and power facilities that are illustrated in the side view of FIG. 3B. Two work boats 122A, 122B are illustrated alongside vessel 120. At another end of the bridge network are two crude oil transportation barges 124A, 124B.
FIG. 2 illustrates is a side view, taken along section 2—2 in FIG. 1, showing features of the FIG. 1 breakwater 110. The breakwater is generally inverse-V in cross section, with a first surface 210 having a 1/3 rise-to-run ratio, a second surface 212 having a 1/4 rise-to-run ratio, a flat top surface 214 on which the heliport and abandonment platform are situated, and a fourth surface 216 having a 1/3 rise-to-run ratio. The breakwater is preferably made of boulders or the like, arranged in a U-shaped configuration that serves to break up and deflect sheets of ice that would otherwise endanger the structures in protected area 112 (FIG. 1).
Dimensions of the embodiment illustrated in FIGS. 1 and 2 are provided for the sake of illustration and not to limit the invention:
A: 514 feet
B: 563 feet
C: 63 feet
D: 53 feet
E: 20 feet
F: 500 feet
G: 250 feet
H: 60 feet
I: 49 feet
J: 136 feet
K: 21 feet
L: 20 feet
FIG. 3A is a side view of a lower barge that may be used in conjunction with the present invention. FIG. 3B is a side view of the lower barge, supporting an oil rig and various support facilities. The lower barge 310 is preferably a double-skin vessel capable of carrying a large capacity (for example, 72,800 barrels) of oil. The lower barge 310 has a network of pillars 312 (typical diameter: 42 inches) that form an air gap 320 and support an upper platform 330. The air gap 320 allows surface waves and ice flows to pass through the vessel rather than impacting it.
Atop the upper platform 330 may be a variety of units, such as the following non-limiting examples: a quarters package 340 with a topside heliport, a production/power package 350 (including waste heat recovery and fuel handling, electric generators, storage, supplies, metering, separator and heat treater, water treatment and chemical injection, separators), a self-contained drilling rig 360, and a substructure 370.
Dimensions of the embodiment illustrated in FIG. 3A are provided for the sake of illustration and not to limit the invention:
M: 396 feet
N: 22 feet
O: 23 feet
FIG. 4A illustrates an example of an array of piles formed in a sea bed to anchor barges according to the present invention, and FIG. 4B shows a cross-sectional view of one such exemplary pile.
As shown in FIG. 4A, the piles may be arranged in a five-row by sixteen-column array of eighty piles. In the illustrated example to which the invention should not be limited, the center-to-center distances between rows are 17.5 feet, 22.5 feet, 22.5 feet, and 17.5 feet. Within the rows, the center-to-center distances are (from left to right in the FIG. 4A example) 17.5 feet, 17.5 feet, 35 feet, 35 feet, 35 feet, 35 feet, 35 feet, 21 feet, 21 feet, 21 feet, 14 feet, 18.92 feet, and 16.08 feet.
FIG. 4B shows a pile 400 to have a circular cross-section fifty-four inches in diameter. A one-inch thick steel circular cylinder 410 contains concrete 420 in its interior. Preferably, longitudinally-extending steel reinforcement bars (rebars) 430 are embedded at regular circumferential angles in the concrete. In the illustrated example, eight rebars are situated at 45° intervals around the pile, about four-fifths of the distance from the axis of the pile to the pile's outer periphery. Of course, the dimensions and constitution of the pile may be varied while still remaining within the scope of the invention.
A set of tubes slightly larger in diameter than the piles is provided in the bottom portion of the lower barge. In a preferred embodiment, not all eighty piles are matched to tubes, but a suitable smaller number (for example, twenty) of the eighty piles are matched with tubes for attachment as described below. The particular piles that are designated for attachment to the barge's tubes may be chosen to be evenly distributed throughout the array of piles so as to stabilize the barge on the piles.
FIG. 5 is a side view showing a pile 400 with guide plates, that may be used to attach a particular pile to the barge 310 when a tube is not used to extend downward from the barge. The pile 400 projects upward from the sea floor 500 through a fill layer 501 into water (or mud) 502 to contact a bottom plate 510 of the barge. The barge is provided with an interior sheet of angle framing material 520 that generally parallels the bottom plate 510. Isolation material 530 extending around the top of the pile cushions the area of contact between the pile and the barge's bottom plate.
A gusset plate 540, extending axially from the pile's interior, extends upwardly through the angle framing 520. The gusset plate 540 is attached through a bulkhead 550 in the interior of the barge. An annular guiding and stabilization portion formed by a guide plate 560 and a stiffener 570 are provided around the circumference of the point at which the pile contacts the bottom plate 510. When installed, collectively, the gusset plate 540, the guide plate 560, and the stiffener 570 stabilize the barge to the pile.
The arrangement shown in FIG. 5 does not possess the advantages provided by an arrangement in which a tube extends downwardly from the barge to encompass and be attached to a pile. FIG. 6 shows a tube attached to a pile by plates in accordance with the present invention.
The pile 400, sea bed 500, fill 501, barge bottom plate 510, barge angle framing 520, guide plate 560 and stiffener 570, illustrated in FIG. 6, are substantially the same as shown and described above with reference to FIG. 5. However, the inventive embodiment of FIG. 6 additionally provides a tube 600 that extends downwardly from the barge to surround the top of the pile. Although not specifically illustrated in FIG. 6, it is preferred that the tubes are part of, or are arranged directly below, pillars 312 (FIG. 3A), so as to provide solid support for the structural units 340, 350, 360, 370 that are situated atop upper platform 330 (FIG. 3B). In a preferred embodiment, the diameter of the tube (example: sixty inches) is larger than the diameter of the pile (example: fifty-four inches).
Significantly, the inner surface of the tube is connected to the outer surface of the pile by a set of attachment plates 610. The attachment plates 610 are preferably shaped as ⅝-inch-thick trapezoids, with the longer (sixty inches) parallel end being attached to the tube and the shorter parallel end being attached to the pile. The attachment plates are welded to the tube and pile, being arranged at regular circumferential intervals. In a particular embodiment, there are eight attachment plates arranged at regular 45° intervals.
When the barge is being loaded with ballast water during site set-up, the angle GG (example: 45°) of the guide plate 560 serves to guide the pile into position in the tube. The angled sides of the trapezoidal attachment plates 610 also serve to center the pile in the tube.
Dimensions of the illustrated embodiment of FIGS. 5 and 6 are provided for the sake of illustration and not to limit the invention:
AA: | 130 | feet (varies, based on subsurface conditions) |
BB: | 7.167 | feet |
CC: | 5.5 | feet |
DD: | 2.0 | inches |
EE: | 5.0 | inches |
FF: | 1.167 | feet |
GG: | 45° | |
HH (FIG. 6 only): | 1.667 | feet |
The inventive structure of an embodiment of the barge stabilization system having been described above, an inventive method of stabilizing the barge is now described in greater detail.
The array of piles (for example, as shown in FIG. 4A) is formed in the sea bed to a depth beneath the sea bed that finds solid support. The barge is towed into position over the array of piles, and the barge is partially flooded with ballast water to lower the barge in the water so that a set of cylindrical tubes is positioned to surround top ends of at least some of the piles. The angled guide plates 560 and the angled (non-parallel) sides of the trapezoidal attachment plates 610 serve to guide and center the pile in the tube.
In a particular embodiment, the top of the pile is provided with a shock-absorbing material to avoid damage when it contacts the barge. The shock absorbing material may be similar to isolation material 530 (FIG. 5).
Air is then forced into the tubes to force the water out the bottom of the tubes, to create a dry environment for workers. Workers enter the dry environment in the interior of the tubes, and weld the tubes to the piles by the attachment plates 610. Afterwards, the air pressure is removed from the interior of the tubes so that water may again flood the bottom of the tubes. The ballast water in the partially-flooded barge is pumped out to make way for the crude oil that is pumped from beneath the sea bed.
The joints between the tubes and piles secure the barge to the array of piles, even in the face of varying tides, currents, and ice flow and earthquake conditions. The ballast water is no longer needed to maintain the barge's position. The barge may be used to support oil rigs and a variety of other support facilities, not merely those shown in FIG. 3B.
When work at a given site is complete, air may be forced into the tubes again to force the water out so that welders can disconnect the attachment plates between the tubes and the piles. Disconnecting the attachment plates allows the barge to rise in the water, permitting the barge to be towed to a different location.
Modifications and variations of the above-described embodiments of the present invention are possible, as appreciated by those skilled in the art in light of the above teachings. For example, the configuration of the array of piles, the choice of which piles are matched with tubes for attachment, and the physical dimensions of the elements described above may be varied while not departing from the scope of the invention. It is therefore to be understood that, within the scope of the appended claims and their equivalents, the invention may be practiced otherwise than as specifically described.
Claims (8)
1. A method of stabilizing a barge above a sea bed, the barge having plural hollow tubes extending downwardly therefrom, the method comprising:
placing an array of piles extending upward from the sea bed;
moving the barge into position over the array of piles;
at least partially flooding the barge to lower it in the water so that the tubes are positioned to surround top ends of respective piles;
forcing air into the tubes to force water out the bottom of the tubes and create an air environment inside the tubes;
attaching the tubes to the piles in the air environment; and
removing forced air pressure from the interior of the tubes so that water may again flood the bottom of the tubes.
2. The method of claim 1, further comprising:
forcing air into the tubes to force the water out of the tubes; and
disconnecting joints between the tubes and the piles to allow the barge to rise in the water, unconnected to the piles.
3. The method of claim 1, further comprising:
providing a generally U-shaped breakwater upstream from the barge to protect the barge from ice flows.
4. The method of claim 1, wherein the placing of the array of piles includes:
placing piles that include a steel tube having an interior containing steel reinforced concrete.
5. The method of claim 1, wherein:
less than all the piles are connected to tubes.
6. The method of claim 1, wherein the attaching step includes:
welding plural attachment plates to connect and extend radially between an outer surface of the pile and an inner surface of the tube.
7. The method of claim 1, wherein the attaching includes:
welding eight trapezoidal attachment plates to connect and extend radially between an outer surface of the pile and an inner surface of the tube, at regular circumferential intervals of about forty-five degrees.
8. The method of claim 1, wherein:
the tubes have diameters that are greater than diameters of respective piles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/316,068 US6305881B1 (en) | 1998-05-22 | 1999-05-21 | Barge stabilization method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US8661898P | 1998-05-22 | 1998-05-22 | |
US09/316,068 US6305881B1 (en) | 1998-05-22 | 1999-05-21 | Barge stabilization method |
Publications (1)
Publication Number | Publication Date |
---|---|
US6305881B1 true US6305881B1 (en) | 2001-10-23 |
Family
ID=26774953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/316,068 Expired - Lifetime US6305881B1 (en) | 1998-05-22 | 1999-05-21 | Barge stabilization method |
Country Status (1)
Country | Link |
---|---|
US (1) | US6305881B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107938694A (en) * | 2017-11-10 | 2018-04-20 | 中交二航局第四工程有限公司 | Gravity type water jetting at high pressure percussion mechanism and its help heavy method |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3001370A (en) * | 1954-09-23 | 1961-09-26 | John B Templeton | Marine drilling methods and apparatus |
US3593529A (en) * | 1967-10-11 | 1971-07-20 | Ind Nv | Method and apparatus for installing drilling platforms |
US3605669A (en) * | 1969-12-01 | 1971-09-20 | Kerr Mc Gee Chem Corp | Floating self-elevating platform |
US3859806A (en) | 1972-09-05 | 1975-01-14 | Exxon Production Research Co | Offshore platform |
US3872679A (en) * | 1973-12-21 | 1975-03-25 | Chevron Res | Apparatus and method for reducing the forces on extendible legs of a floating vessel |
US3874180A (en) | 1971-01-18 | 1975-04-01 | Maurice N Sumner | Modular offshore structure system |
US4069680A (en) * | 1976-03-10 | 1978-01-24 | Hochtief Ag Fur Hoch-Und Tiefbauten Vorm. Gebr. Helfmann | Method of and apparatus for the anchoring of drilling and production platforms on a structure sunk on a sea bottom |
US4257720A (en) | 1979-01-15 | 1981-03-24 | Pipe Technology Systems, Inc. | Apparatus and method for driving members into the ocean floor |
USRE30823E (en) | 1973-10-01 | 1981-12-15 | Exxon Production Research Company | Offshore platform |
US4417664A (en) * | 1981-07-31 | 1983-11-29 | Nautilus Crane & Equipment Corporation | Method and apparatus for mounting lift crane on offshore structures |
US4456404A (en) * | 1982-02-17 | 1984-06-26 | Atlantic Pacific Marine Corporation | Method and apparatus for positioning a working barge above a sea surface |
US4575282A (en) | 1984-06-04 | 1986-03-11 | Pardue Sr James H | System for driving open end pipe piles on the ocean floor using pneumatic evacuation and existing hydrostatic pressure |
US4611953A (en) * | 1985-11-01 | 1986-09-16 | Vetco Offshore Industries, Inc. | TLP tendon bottom connector |
US4907912A (en) * | 1988-10-05 | 1990-03-13 | Jfp Energy, Inc. | Submersible production storage barge and method for transporting and installing a jack-up rig in a body of water |
US4973200A (en) * | 1987-01-14 | 1990-11-27 | Allseas Engineering B.V. | Method for manoeuvering a superstructure element relative to a fixed construction arranged in water, method for constructing a building structure and building structure constructed according to such a method |
US5219451A (en) * | 1992-04-24 | 1993-06-15 | Atlantic Richfield Company | Offshore deck to substructure mating system and method |
US5241572A (en) * | 1991-05-31 | 1993-08-31 | British Nuclear Fuels Plc | Apparatus for locating a floatable platform |
US5522680A (en) * | 1993-10-29 | 1996-06-04 | Etpm, Societe Anonyme | Method of installing the deck of an offshore platform on a support structure at sea |
US5855455A (en) * | 1997-07-09 | 1999-01-05 | Ensco International, Inc. | Submersible and semi-submersible dry lift carrier and method of operation for carrying a drilling rig and platform |
-
1999
- 1999-05-21 US US09/316,068 patent/US6305881B1/en not_active Expired - Lifetime
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3001370A (en) * | 1954-09-23 | 1961-09-26 | John B Templeton | Marine drilling methods and apparatus |
US3593529A (en) * | 1967-10-11 | 1971-07-20 | Ind Nv | Method and apparatus for installing drilling platforms |
US3605669A (en) * | 1969-12-01 | 1971-09-20 | Kerr Mc Gee Chem Corp | Floating self-elevating platform |
US3874180A (en) | 1971-01-18 | 1975-04-01 | Maurice N Sumner | Modular offshore structure system |
US3859806A (en) | 1972-09-05 | 1975-01-14 | Exxon Production Research Co | Offshore platform |
USRE30823E (en) | 1973-10-01 | 1981-12-15 | Exxon Production Research Company | Offshore platform |
US3872679A (en) * | 1973-12-21 | 1975-03-25 | Chevron Res | Apparatus and method for reducing the forces on extendible legs of a floating vessel |
US4069680A (en) * | 1976-03-10 | 1978-01-24 | Hochtief Ag Fur Hoch-Und Tiefbauten Vorm. Gebr. Helfmann | Method of and apparatus for the anchoring of drilling and production platforms on a structure sunk on a sea bottom |
US4257720A (en) | 1979-01-15 | 1981-03-24 | Pipe Technology Systems, Inc. | Apparatus and method for driving members into the ocean floor |
US4417664A (en) * | 1981-07-31 | 1983-11-29 | Nautilus Crane & Equipment Corporation | Method and apparatus for mounting lift crane on offshore structures |
US4456404A (en) * | 1982-02-17 | 1984-06-26 | Atlantic Pacific Marine Corporation | Method and apparatus for positioning a working barge above a sea surface |
US4575282A (en) | 1984-06-04 | 1986-03-11 | Pardue Sr James H | System for driving open end pipe piles on the ocean floor using pneumatic evacuation and existing hydrostatic pressure |
US4611953A (en) * | 1985-11-01 | 1986-09-16 | Vetco Offshore Industries, Inc. | TLP tendon bottom connector |
US4973200A (en) * | 1987-01-14 | 1990-11-27 | Allseas Engineering B.V. | Method for manoeuvering a superstructure element relative to a fixed construction arranged in water, method for constructing a building structure and building structure constructed according to such a method |
US4907912A (en) * | 1988-10-05 | 1990-03-13 | Jfp Energy, Inc. | Submersible production storage barge and method for transporting and installing a jack-up rig in a body of water |
US5241572A (en) * | 1991-05-31 | 1993-08-31 | British Nuclear Fuels Plc | Apparatus for locating a floatable platform |
US5219451A (en) * | 1992-04-24 | 1993-06-15 | Atlantic Richfield Company | Offshore deck to substructure mating system and method |
US5522680A (en) * | 1993-10-29 | 1996-06-04 | Etpm, Societe Anonyme | Method of installing the deck of an offshore platform on a support structure at sea |
US5855455A (en) * | 1997-07-09 | 1999-01-05 | Ensco International, Inc. | Submersible and semi-submersible dry lift carrier and method of operation for carrying a drilling rig and platform |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107938694A (en) * | 2017-11-10 | 2018-04-20 | 中交二航局第四工程有限公司 | Gravity type water jetting at high pressure percussion mechanism and its help heavy method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2939291A (en) | Anchoring system for floating drill structure | |
US2927435A (en) | Offshore platforms | |
KR102252117B1 (en) | Submarine base structure and its installation method | |
US4566824A (en) | System for drilling from a water surface, which is insensitive to the swell | |
US3466878A (en) | Rig for work at sea,in lakes,lagoons | |
US3191388A (en) | Slender column support for offshore platforms | |
US6299385B1 (en) | Mini-jacket and method for installation using caisson | |
OA10211A (en) | Deep water platform with buoyant flexible piles | |
US8444348B2 (en) | Modular offshore platforms and associated methods of use and manufacture | |
TWI826763B (en) | Method for providing a load structure, support for supporting a load structure and installing method thereof and pile and jacket for use in the installing method, and pile guiding frame for installing a support | |
US3668876A (en) | Offshore tower apparatus and method | |
CA1231542A (en) | Arctic offshore production platform | |
US3803855A (en) | Submerged oil storage tank | |
US4721416A (en) | Submersible offshore drilling and production platform jacket | |
CN110735394B (en) | Cable tower structure and construction method thereof | |
JP2001071991A (en) | Semi-submersible type floating body structure, large offshore structure, and constructing method of large offshore structure | |
US4187038A (en) | Equipment for extracting oil or gas from under the sea bed and method of installing such equipment | |
US6305881B1 (en) | Barge stabilization method | |
CN203284800U (en) | Deep sea elevated tunnel | |
US3815371A (en) | Offshore tower apparatus and method | |
US3645104A (en) | Tower structure | |
US20150037103A1 (en) | Cellular tendons for tlp | |
KR101117927B1 (en) | Construction method of marine structure | |
CN112609695B (en) | Large-tonnage underwater steel pipe pile removing device and construction method | |
US3348382A (en) | Offshore platform for ice conditions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: HERMAN J. SCHELLSTEDE & ASSOCIATES, INC., LOUISIAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SCHELLSTEDE, HERMAN J.;REEL/FRAME:010047/0516 Effective date: 19990608 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
REMI | Maintenance fee reminder mailed | ||
FPAY | Fee payment |
Year of fee payment: 8 |
|
SULP | Surcharge for late payment |
Year of fee payment: 7 |
|
REMI | Maintenance fee reminder mailed | ||
FPAY | Fee payment |
Year of fee payment: 12 |
|
SULP | Surcharge for late payment |
Year of fee payment: 11 |