US4597444A - Method for excavating a large diameter shaft into the earth and at least partially through an oil-bearing formation - Google Patents

Method for excavating a large diameter shaft into the earth and at least partially through an oil-bearing formation Download PDF

Info

Publication number
US4597444A
US4597444A US06/653,103 US65310384A US4597444A US 4597444 A US4597444 A US 4597444A US 65310384 A US65310384 A US 65310384A US 4597444 A US4597444 A US 4597444A
Authority
US
United States
Prior art keywords
wells
oil
bearing formation
shaft
fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
US06/653,103
Inventor
Thomas S. Hutchinson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Atlantic Richfield Co
Original Assignee
Atlantic Richfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Atlantic Richfield Co filed Critical Atlantic Richfield Co
Priority to US06/653,103 priority Critical patent/US4597444A/en
Assigned to ATLANTIC RICHFIELD COMPANY, A CORP. OF PA. reassignment ATLANTIC RICHFIELD COMPANY, A CORP. OF PA. ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: HUTCHINSON, THOMAS S.
Application granted granted Critical
Publication of US4597444A publication Critical patent/US4597444A/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
    • E21B36/001Cooling arrangements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • E21D1/03Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • E21D1/10Preparation of the ground
    • E21D1/12Preparation of the ground by freezing

Definitions

  • This invention relates to methods for positioning large diameter shafts into the earth.
  • This invention further relates to methods for positioning large diameter shafts into the earth using freezing techniques.
  • a large diameter shaft is readily positioned from the surface into the earth and at least partially through a subterrean oil-bearing formation by a method comprising
  • FIG. 1 is a topographic view of a well layout adapted to freezing a subterranean formation about a zone selected for the excavation of a large diameter shaft;
  • FIG. 2 is a topographic view of an alternate well layout adapted to freezing a subterranean formation about a zone selected for the excavation of a large diameter shaft;
  • FIG. 3 is a schematic view of the well layout in FIG. 1 taken at line 3.3;
  • FIG. 4 is a schematic view of the well layout shown FIG. 3 after formation of a frozen zone surrounding a large shaft evacuation zone;
  • FIG. 5 is a schematic view of the well layout shown in FIG. 2 taken at line 5.5;
  • FIG. 6 is a schematic view of the wells in FIG. 5 after the formation of a freeze zone surrounding a large diameter shaft evacuation zone.
  • a selected large diameter shaft evacuation zone is shown as a shaft diameter 10.
  • Shaft diameter 10 represents the location chosen for the subsequent evacuation of a large diameter shaft into the earth.
  • a central well 12 is drilled and cased generally near the center of shaft diameter 10 and a plurality of wells 14 are drilled outside shaft diameter 10 in a generally circular pattern about shaft diameter 10.
  • Wells 14 may be located at a distance from about 5 to about 20 feet outside shaft diameter 10. More commonly wells 14 are from about 10 to about 15 feet outside shaft diameter 10.
  • Wells 14 are located at a spacing suitable for the formation of a frozen zone 50' outlined by lines 50.
  • Frozen zone 50' will extend downwardly into the earth about wells 14 and typically to some depth beyond the bottom of wells 14 as a result of the circulation of a heat transfer fluid in wells 14.
  • frozen zone 50' surrounds but does not completely fill diameter 10 where the large diameter shaft is to be evacuated. It is desirable that the wall areas of the large diameter shaft be frozen during excavation but it is not necessary that the central portion of the large diameter shaft, which typically may have a diameter up to and in some instances even larger than 20 feet, be frozen.
  • the structural support desired in the wall areas can be achieved without freezing the entire center of the area to be evacuated to form the large diameter shaft.
  • FIG. 2 a similar arrangement is shown.
  • an outer plurality of wells 16 is used to form a larger freeze zone and for other purposes as will be more fully discussed hereinafter.
  • a subterranean oil-bearing formation 20 is shown positioned beneath an overburden 18 which may comprise a plurality of subterranean formations (not shown) between oil-bearing formation 20 and the surface 56.
  • An underlying formation 36 is also shown.
  • Central well 12 is shown as a drilled, cased well which extends to near the bottom of oil-bearing formation 20.
  • a casing 12' is cemented in place by cement 22.
  • a plurality of perforations 24 in the portion of casing 12' positioned in oil-bearing formation 20 permits fluid communication between the annulus of casing 12' and oil-bearing formation 20.
  • Wells 14 are shown as cased wells extending through oil-bearing formation 20.
  • a casing 14' is cemented in place by cement 22 in each of wells 14 and includes a plurality of perforations 24 to permit fluid communication between the annulus of casings 14' and oil-bearing formation 20.
  • a suitable fluid is injected through wells 14 and into oil-bearing formation 20 to remove oil from formation 20.
  • the flow of fluids from wells 14 is as shown by arrows 26 outwardly from diameter 10 to push oil away from the area where the large diameter shaft is to be excavated.
  • the large diameter shaft excavation area is shown in FIG. 3 by dotted line 10 and generally corresponds to diameter 10 in FIG. 1. Fluid also flows inwardly from wells 14 toward central well 12 as shown by arrows 28.
  • Fluids comprising oil and in some instances the injected fluid and water, flow into well 12 as shown by arrows 30 and are recovered from central well 12.
  • the net result is the removal of oil from oil-bearing formation 20 between wells 14 and central well 12 and the removal of oil from oil-bearing formation 20 outside wells 14 by moving the oil outwardly from diameter 10 as shown by arrows 26.
  • water is injected in a similar manner and serves to push the injected fluid and oil outwardly from wells 14 and inwardly toward central well 12 from which such fluids may be produced.
  • oil contained in oil-bearing formation 20 outside wells 14 is pushed outward to a zone beyond a line shown in FIG. 3 as line 32 with the injected fluids having been pushed outwardly from wells 14 by the water injection to a zone beyond a line shown generally in FIG. 3 as line 34.
  • the injected water then occupies the area between central well 12 and wells 14 and out to line 34.
  • Formation 20 may then be frozen to produce a frozen zone having suitable strength.
  • wells 14 may be converted to wells suitable for the circulation of heat transfer fluids to freeze a zone around diameter 10.
  • Such a conversion can be made by closing perforations 24 in wells 14 by a conventional cement squeeze treatment wherein packers are placed below and above the perforated zone with cement then being forced under pressure into the perforations to close the perforations.
  • the perforations in central well 12 may also be closed in a similar fashion if desired.
  • Such well treatments are considered to be known to those skilled in the art.
  • FIG. 4 a similar well arrangement where the perforations have been closed and a tubing 42 positioned in casing 14' is shown.
  • a heat transfer solution is injected downwardly into wells 14 through tubing 42 as shown by arrows 54 and circulated back upwardly through the annulus between tubing 42 and casing 14' for recovery as shown by arrows 46.
  • the heat transfer fluid is then passed to cooling and optionally recycled back through tubing 42.
  • Heat exchange fluids are selected which can be chilled to a temperature sufficiently low to freeze the water in the formations surrounding wells 14.
  • a freeze zone 50' shown by lines 50 is formed which generally surrounds diameter 10. At this point, the large diameter shaft can be excavated in the area shown by dotted line 10.
  • the width of the freeze zone, the spacing of wells 14 and the like are readily determined by means known to those skilled in the art based upon the strength required in freeze zone 50', the depth to which the large diameter shaft is to be excavated and the like.
  • a strong frozen zone is provided even through an oil-bearing formation. Such is not accomplished by simply freezing such oil-bearing formations since the oil contained in such formations frequently does not freeze at temperatures as high as the freezing point of water. Even though the viscosity of the oil contained in such formations may be increased by chilling, it is usually not frozen at temperatures as high as the freezing point of water.
  • brines which may be present in oil-bearing formations in some instances are also removed by the use of the method of the present invention so that strong freeze zones may be formed in zones which may have been at least partially brine saturated in their natural state.
  • FIG. 5 a similar well arrangement is shown except that a plurality of outer wells 16 is also used. Such an arrangement may be used when it is desired to form a thicker freeze zone around diameter 10 or when more efficient removal of the oil from zone 20 is desired.
  • wells 14 are used in the same way as discussed in conjunction with FIG. 3.
  • Outer wells 16 are positioned outside wells 14 and are cased wells having a casing 16' extending through formation 20 and cemented in place by cement 22.
  • Outer wells 16 include a plurality of perforations 24 through casing 16' in zone 20 to permit fluid communication between formation 20 and the annulus of casing 16'.
  • a first interval of fluid injection is accomplished through wells 14 to remove oil from the portions of formation 20 between wells 14 and center well 12 and between wells 14 and outer wells 16.
  • a further period of fluid injection is initiated through outer wells 16 with continued production through central well 12.
  • a period of concurrent fluid injection through both wells 14 and outer wells 16 could be used if desired with continued fluid production from central well 12.
  • a final period of fluid injection through outer wells 16 with production of fluids from central well 12 is used to remove as much oil as practical from formation 20.
  • outer wells 16 and wells 14 are converted into heat exchange fluid circulation wells as shown in FIG. 6.
  • a heat exchange fluid is then injected into at least a portion of wells 14 and outer wells 16 as shown by arrows 54 downwardly through tubing 42 in wells 14 and tubing 52 in outer wells 16 to the bottom of the respective tubing and then upwardly through the annulus of casings 14' and 16' for recovery as shown by arrows 46.
  • the recovered heat exchange fluid is then passed to chilling and optional recirculation back into wells 14 and 16.
  • a freeze zone 50' shown by lines 50 is formed. Thereafter, excavation of the large diameter shaft is accomplished in the zone shown by dotted line 10.
  • outer wells 16 are arranged in a generally circular pattern from about 5 to about 20 feet outside wells 14. Preferably, outer wells 16 are from about 8 to about 12 feet outside wells 14.
  • the spacing of outer wells 16 to accomplish the desired freezing is well within the skill of those in the art since such techniques have been used previously with aqueous formations.
  • the use of the present method is particularly effective when formations are to be frozen which in their natural state contain materials such as oil which are not readily frozen at temperatures as high as the freezing point of water.
  • Suitable injection fluids are materials such as steam, heated water, carbon dioxide, aqueous surfactant solutions, and alcohols which are miscible with both water and the formation oil and the like.
  • suitable fluids which are effective to remove oil from subterranean oil bearing formations are known to those skilled in the art and such fluids in general are considered suitable so long as they are readily removed from the formation by water.
  • the heat exchange fluid may be any suitable fluid which is sufficiently fluid for ready circulation in the respective wells and which has a freezing point sufficiently low that it can be used to cool the subterranean formation to a temperature below the freezing point of water.
  • suitable heat transfer fluids are aqueous brines of calcium chloride, sodium chloride, lithium chloride, liquid nitrogen, and the like.
  • the excavation of the large diameter shaft after the freezing has been accomplished may be accomplished by conventional excavation practices known to those skilled in the art. Freezing has been used in the excavation of large diameter shafts previously, however, the present method has been found to be particularly effective when it is desired to position large diameter shafts through zones such as oil-bearing formations which are not readily frozen by standard techniques.
  • the shafts are normally progressively cased to a distance slightly above the bottom of the excavation during excavation and to the substantially full depth after excavation is complete so that once excavation has been accomplished the circulation of heat transfer fluid in wells 14 and outer wells 16 can be stopped.
  • Central well 12 may be removed in any suitable fashion. For instance, if it is possible, the casing may be removed from central well 12 before beginning excavation of the large diameter shaft or the casing can simply be removed in sections as excavation proceeds.
  • the selection of the number of wells, the number of rings of wells to be used and the like is dependent upon a multitude of factors known to those skilled in the art, such as the amount of freezing required to adequately consolidate the subterranean formation, the thickness of the freeze zone required to provide adequate strength to maintain the integrity of the surrounding formations during the excavation of the large diameter shaft and the like. Such variations are considered to be known to those skilled in the art and will not be discussed further.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A method for positioning a large diameter shaft from the surface into the earth and at least partially through a subterranean oil-bearing formation, said method comprising
(a) Positioning a central well near the center of a selected shaft location, said central well extending at least partially through said oil-bearing formation;
(b) Positioning a plurality of wells at a selected distance outside the diameter of said shaft and about said shaft, said wells extending at least partially through said oil-bearing formation;
(c) Injecting a fluid through at least a portion of said wells into said oil-bearing formation to remove oil from said oil-bearing formation;
(d) Producing fluids from said central well;
(e) Injecting water into said oil-bearing formation through said portion of said wells after the injection of said fluid through said portion of the said wells;
(f) Freezing a zone about said location; and,
(g) Excavating said shaft.

Description

This invention relates to methods for positioning large diameter shafts into the earth.
This invention further relates to methods for positioning large diameter shafts into the earth using freezing techniques.
In the excavation of large diameter shafts into the earth for the recovery of minerals or other materials from the earth, problems are frequently encountered as the result of the nature of the subterranean formations through which the shaft is excavated. When weakly consolidated or unconsolidated formations are encountered, problems can result from the collapse of the sides of the shaft, from the flow of unconsolidated material into the shaft and the like. One method for overcoming such problems has been the positioning of wells about the outer diameter of the large diameter shaft and freezing the formation surrounding the shaft prior to excavating the shaft by circulating a heat transfer fluid in the wells surrounding the large diameter shaft. Such freezing techniques have been effective in many water-bearing formations. However, when oil-bearing formations are encountered there may be little or no water in the oil-bearing formation to freeze. While the viscosity of the oil contained in the oil-bearing formation can be increased by reducing the temperature in such formations, the resulting formation strength after chilling is considerably less than that obtained by freezing water-bearing formations.
In recent years there has been considerable interest in obtaining hydrocarbonaceous materials from subterranean formations which have not been previously produced as a result of the nature of the hydrocarbonaceous material, the location of the formation and the like. One approach proposed recently and described in U.S. Ser. No. 524,261 entitled "A Method For Recovering Mineral Values From A Subterranean Formation Through Wellbores Penetrating the Formation From Tunnels" filed Aug. 18, 1983 by Thomas S. Hutchinson and Robert M. Miller, Jr. involves the use of large diameter shafts and tunnels for the production of oils from a subterranean oil-bearing formation. In the positioning of such shafts which may extend at least partially through subterranean oil-bearing formations, it is desirable that some method be available for increasing the strength of the formation surrounding the large diameter shaft during excavation of the shaft.
According to the present invention, a large diameter shaft is readily positioned from the surface into the earth and at least partially through a subterrean oil-bearing formation by a method comprising
(a) Positioning a central well near the center of a selected shaft location, the central well extending at least partially through the oil-bearing formation;
(b) Positioning a plurality of wells at a selected distance outside the diameter of the shaft and about the shaft, the wells extending at least partially through the oil-bearing formation;
(c) Injecting a fluid through at least a portion of the wells into the oil-bearing formation to remove oil from the oil-bearing formation;
(d) Producing fluids from the central well;
(e) Injecting water into the oil-bearing formation through the wells after the injection of the fluid through the portion of the wells;
(f) Freezing a zone about the location; and,
(g) Excavating the shaft.
FIG. 1 is a topographic view of a well layout adapted to freezing a subterranean formation about a zone selected for the excavation of a large diameter shaft;
FIG. 2 is a topographic view of an alternate well layout adapted to freezing a subterranean formation about a zone selected for the excavation of a large diameter shaft;
FIG. 3 is a schematic view of the well layout in FIG. 1 taken at line 3.3;
FIG. 4 is a schematic view of the well layout shown FIG. 3 after formation of a frozen zone surrounding a large shaft evacuation zone; and,
FIG. 5 is a schematic view of the well layout shown in FIG. 2 taken at line 5.5;
FIG. 6 is a schematic view of the wells in FIG. 5 after the formation of a freeze zone surrounding a large diameter shaft evacuation zone.
In the discussion of the Figures, the same numbers will be used throughout to refer to the same or similar components.
In FIG. 1, a selected large diameter shaft evacuation zone is shown as a shaft diameter 10. Shaft diameter 10 represents the location chosen for the subsequent evacuation of a large diameter shaft into the earth. A central well 12 is drilled and cased generally near the center of shaft diameter 10 and a plurality of wells 14 are drilled outside shaft diameter 10 in a generally circular pattern about shaft diameter 10. Wells 14 may be located at a distance from about 5 to about 20 feet outside shaft diameter 10. More commonly wells 14 are from about 10 to about 15 feet outside shaft diameter 10. Wells 14 are located at a spacing suitable for the formation of a frozen zone 50' outlined by lines 50. Frozen zone 50' will extend downwardly into the earth about wells 14 and typically to some depth beyond the bottom of wells 14 as a result of the circulation of a heat transfer fluid in wells 14. Frequently frozen zone 50' surrounds but does not completely fill diameter 10 where the large diameter shaft is to be evacuated. It is desirable that the wall areas of the large diameter shaft be frozen during excavation but it is not necessary that the central portion of the large diameter shaft, which typically may have a diameter up to and in some instances even larger than 20 feet, be frozen. Clearly, the structural support desired in the wall areas can be achieved without freezing the entire center of the area to be evacuated to form the large diameter shaft.
In FIG. 2, a similar arrangement is shown. In addition to wells 14, an outer plurality of wells 16 is used to form a larger freeze zone and for other purposes as will be more fully discussed hereinafter.
In FIG. 3, a subterranean oil-bearing formation 20 is shown positioned beneath an overburden 18 which may comprise a plurality of subterranean formations (not shown) between oil-bearing formation 20 and the surface 56. An underlying formation 36 is also shown. Central well 12 is shown as a drilled, cased well which extends to near the bottom of oil-bearing formation 20. A casing 12' is cemented in place by cement 22. A plurality of perforations 24 in the portion of casing 12' positioned in oil-bearing formation 20 permits fluid communication between the annulus of casing 12' and oil-bearing formation 20. Wells 14 are shown as cased wells extending through oil-bearing formation 20. A casing 14' is cemented in place by cement 22 in each of wells 14 and includes a plurality of perforations 24 to permit fluid communication between the annulus of casings 14' and oil-bearing formation 20. In the practice of the present invention, a suitable fluid is injected through wells 14 and into oil-bearing formation 20 to remove oil from formation 20. The flow of fluids from wells 14 is as shown by arrows 26 outwardly from diameter 10 to push oil away from the area where the large diameter shaft is to be excavated. The large diameter shaft excavation area is shown in FIG. 3 by dotted line 10 and generally corresponds to diameter 10 in FIG. 1. Fluid also flows inwardly from wells 14 toward central well 12 as shown by arrows 28. Fluids comprising oil and in some instances the injected fluid and water, flow into well 12 as shown by arrows 30 and are recovered from central well 12. The net result is the removal of oil from oil-bearing formation 20 between wells 14 and central well 12 and the removal of oil from oil-bearing formation 20 outside wells 14 by moving the oil outwardly from diameter 10 as shown by arrows 26. After a major portion of the oil has been removed from oil-bearing formation 20 in this fashion, water is injected in a similar manner and serves to push the injected fluid and oil outwardly from wells 14 and inwardly toward central well 12 from which such fluids may be produced. As the result of this sequence of operations, oil contained in oil-bearing formation 20 outside wells 14 is pushed outward to a zone beyond a line shown in FIG. 3 as line 32 with the injected fluids having been pushed outwardly from wells 14 by the water injection to a zone beyond a line shown generally in FIG. 3 as line 34. The injected water then occupies the area between central well 12 and wells 14 and out to line 34. Formation 20 may then be frozen to produce a frozen zone having suitable strength. After formation 20 has been so treated, wells 14 may be converted to wells suitable for the circulation of heat transfer fluids to freeze a zone around diameter 10. Such a conversion can be made by closing perforations 24 in wells 14 by a conventional cement squeeze treatment wherein packers are placed below and above the perforated zone with cement then being forced under pressure into the perforations to close the perforations. The perforations in central well 12 may also be closed in a similar fashion if desired. Such well treatments are considered to be known to those skilled in the art.
In FIG. 4, a similar well arrangement where the perforations have been closed and a tubing 42 positioned in casing 14' is shown. After positioning tubing 42 in wells 14, a heat transfer solution is injected downwardly into wells 14 through tubing 42 as shown by arrows 54 and circulated back upwardly through the annulus between tubing 42 and casing 14' for recovery as shown by arrows 46. The heat transfer fluid is then passed to cooling and optionally recycled back through tubing 42. Heat exchange fluids are selected which can be chilled to a temperature sufficiently low to freeze the water in the formations surrounding wells 14. After a suitable period of circulation, a freeze zone 50' shown by lines 50 is formed which generally surrounds diameter 10. At this point, the large diameter shaft can be excavated in the area shown by dotted line 10. The width of the freeze zone, the spacing of wells 14 and the like are readily determined by means known to those skilled in the art based upon the strength required in freeze zone 50', the depth to which the large diameter shaft is to be excavated and the like. By the method of the present invention, a strong frozen zone is provided even through an oil-bearing formation. Such is not accomplished by simply freezing such oil-bearing formations since the oil contained in such formations frequently does not freeze at temperatures as high as the freezing point of water. Even though the viscosity of the oil contained in such formations may be increased by chilling, it is usually not frozen at temperatures as high as the freezing point of water. Similarly, brines which may be present in oil-bearing formations in some instances are also removed by the use of the method of the present invention so that strong freeze zones may be formed in zones which may have been at least partially brine saturated in their natural state.
In FIG. 5, a similar well arrangement is shown except that a plurality of outer wells 16 is also used. Such an arrangement may be used when it is desired to form a thicker freeze zone around diameter 10 or when more efficient removal of the oil from zone 20 is desired. In the use of the arrangement shown in FIG. 5, wells 14 are used in the same way as discussed in conjunction with FIG. 3. Outer wells 16 are positioned outside wells 14 and are cased wells having a casing 16' extending through formation 20 and cemented in place by cement 22. Outer wells 16 include a plurality of perforations 24 through casing 16' in zone 20 to permit fluid communication between formation 20 and the annulus of casing 16'. In the use of outer wells 16, desirably a first interval of fluid injection is accomplished through wells 14 to remove oil from the portions of formation 20 between wells 14 and center well 12 and between wells 14 and outer wells 16. After this initial period of fluid injection, during which production is desirably accomplished from central well 12 a further period of fluid injection is initiated through outer wells 16 with continued production through central well 12. A period of concurrent fluid injection through both wells 14 and outer wells 16 could be used if desired with continued fluid production from central well 12. Desirably a final period of fluid injection through outer wells 16 with production of fluids from central well 12 is used to remove as much oil as practical from formation 20. After such injection of fluids through outer wells 16 with the flow of fluids outwardly from outer wells 16 as shown by arrows 38 and inwardly from outer wells 16 as shown by arrows 40 at least a major portion of the oil is removed from formation 20 between outer wells 16 and central well 12 with oil outside outer wells 16 in formation 20 being pushed outwardly away from outer wells 16. Water is then injected to push the injected fluid outwardly beyond outer wells 16 and beyond line 34 with oil in formation 20 being pushed outwardly beyond line 32. Water, injected through either outer wells 16 or wells 14 and outer wells 16, then fills formation 20 out to line 34.
After formation 20 has been filled with water, outer wells 16 and wells 14 are converted into heat exchange fluid circulation wells as shown in FIG. 6. A heat exchange fluid is then injected into at least a portion of wells 14 and outer wells 16 as shown by arrows 54 downwardly through tubing 42 in wells 14 and tubing 52 in outer wells 16 to the bottom of the respective tubing and then upwardly through the annulus of casings 14' and 16' for recovery as shown by arrows 46. The recovered heat exchange fluid is then passed to chilling and optional recirculation back into wells 14 and 16. After a continued period of heat exchange fluid circulation, a freeze zone 50' shown by lines 50 is formed. Thereafter, excavation of the large diameter shaft is accomplished in the zone shown by dotted line 10.
Typically, outer wells 16 are arranged in a generally circular pattern from about 5 to about 20 feet outside wells 14. Preferably, outer wells 16 are from about 8 to about 12 feet outside wells 14. The spacing of outer wells 16 to accomplish the desired freezing is well within the skill of those in the art since such techniques have been used previously with aqueous formations. The use of the present method is particularly effective when formations are to be frozen which in their natural state contain materials such as oil which are not readily frozen at temperatures as high as the freezing point of water.
Suitable injection fluids are materials such as steam, heated water, carbon dioxide, aqueous surfactant solutions, and alcohols which are miscible with both water and the formation oil and the like. A wide variety of suitable fluids which are effective to remove oil from subterranean oil bearing formations are known to those skilled in the art and such fluids in general are considered suitable so long as they are readily removed from the formation by water.
The heat exchange fluid may be any suitable fluid which is sufficiently fluid for ready circulation in the respective wells and which has a freezing point sufficiently low that it can be used to cool the subterranean formation to a temperature below the freezing point of water. Some suitable heat transfer fluids are aqueous brines of calcium chloride, sodium chloride, lithium chloride, liquid nitrogen, and the like.
The excavation of the large diameter shaft after the freezing has been accomplished may be accomplished by conventional excavation practices known to those skilled in the art. Freezing has been used in the excavation of large diameter shafts previously, however, the present method has been found to be particularly effective when it is desired to position large diameter shafts through zones such as oil-bearing formations which are not readily frozen by standard techniques. In the excavation of such shafts, the shafts are normally progressively cased to a distance slightly above the bottom of the excavation during excavation and to the substantially full depth after excavation is complete so that once excavation has been accomplished the circulation of heat transfer fluid in wells 14 and outer wells 16 can be stopped.
Central well 12 may be removed in any suitable fashion. For instance, if it is possible, the casing may be removed from central well 12 before beginning excavation of the large diameter shaft or the casing can simply be removed in sections as excavation proceeds.
The selection of the number of wells, the number of rings of wells to be used and the like is dependent upon a multitude of factors known to those skilled in the art, such as the amount of freezing required to adequately consolidate the subterranean formation, the thickness of the freeze zone required to provide adequate strength to maintain the integrity of the surrounding formations during the excavation of the large diameter shaft and the like. Such variations are considered to be known to those skilled in the art and will not be discussed further.
Having discussed the present invention by reference to its preferred embodiments, it is pointed out that the embodiments discussed are illustrative rather than limiting in nature and that many variations and modifications are possible within the scope of the present invention. Such variations and modifications may appear obvious and desirable to those skilled in the art upon a review of the foregoing description of preferred embodiments.

Claims (11)

Having thus described the invention, I claim:
1. A method for positioning a large diameter shaft from the surface into the earth and at least partially through a subterranean oil-bearing formation, said method comprising
(a) Positioning a central well near the center of a selected shaft location, said central well extending at least partially through said oil-bearing formation;
(b) Positioning a plurality of wells at a selected distance outside the diameter of said shaft and about said shaft, said wells extending at least partially through said oil-bearing formation;
(c) Injecting a fluid through at least a portion of said wells into said oil-bearing formation to remove oil from said oil-bearing formation;
(d) Producing fluids from said central well;
(e) Injecting water into said oil-bearing formation through said portion of said wells after the injection of said fluid through said portion of the said wells;
(f) Freezing a zone about said location; and,
(g) Excavating said shaft.
2. The method of claim 1 wherein said fluid is selected from the group consisting of steam, heated water, carbon dioxide, aqueous surfactant solutions and alcohols miscible with both water and the formation oil.
3. The method of claim 1 wherein said wells are arranged in a generally circular pattern from about 5 to about 20 feet outside said shaft diameter.
4. The method of claim 3 wherein said wells are from about 10 to about 15 feet outside said shaft diameter.
5. The method of claim 1 wherein a plurality of outer wells is positioned at a selected distance outside said wells and about said shaft, said outer wells extending at least partially through said oil-bearing formation and wherein a fluid is injected through at least a portion of said outer wells into said oil-bearing formation.
6. The method of claim 5 wherein water is injected into said oil-bearing formation through said portion of said outer wells after the injection of said fluid through said portion of said outer wells.
7. The method of claim 6 wherein a heat transfer fluid is circulated in at least a portion of said outer wells.
8. The method of claim 5 wherein said outer wells are arranged in a generally circular pattern from about 5 to about 20 feet outside said wells.
9. The method of claim 8 wherein said outer wells are from about 8 to about 12 feet outside said wells.
10. The method of claim 1 wherein said zone is frozen by circulating a heat transfer fluid in at least a portion of said wells.
11. The method of claim 10 wherein said heat transfer fluid is selected from the group consisting of aqueous brines of calcium chloride, aqueous brines of lithium chloride, aqueous brines of sodium chloride, and liquid nitrogen.
US06/653,103 1984-09-21 1984-09-21 Method for excavating a large diameter shaft into the earth and at least partially through an oil-bearing formation Expired - Fee Related US4597444A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US06/653,103 US4597444A (en) 1984-09-21 1984-09-21 Method for excavating a large diameter shaft into the earth and at least partially through an oil-bearing formation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US06/653,103 US4597444A (en) 1984-09-21 1984-09-21 Method for excavating a large diameter shaft into the earth and at least partially through an oil-bearing formation

Publications (1)

Publication Number Publication Date
US4597444A true US4597444A (en) 1986-07-01

Family

ID=24619516

Family Applications (1)

Application Number Title Priority Date Filing Date
US06/653,103 Expired - Fee Related US4597444A (en) 1984-09-21 1984-09-21 Method for excavating a large diameter shaft into the earth and at least partially through an oil-bearing formation

Country Status (1)

Country Link
US (1) US4597444A (en)

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4776425A (en) * 1985-02-28 1988-10-11 Institut Francais Du Petrole Method for improving coupling with the ground of land based seismic sources
US4815894A (en) * 1986-03-12 1989-03-28 Consolidated Environmental Technologies Limited Construction and use of subsea bore holes
US4836716A (en) * 1986-02-25 1989-06-06 Chevron Research Company Method and apparatus for piled foundation improvement through freezing using surface mounted refrigeration units
US4860544A (en) * 1988-12-08 1989-08-29 Concept R.K.K. Limited Closed cryogenic barrier for containment of hazardous material migration in the earth
US4974425A (en) * 1988-12-08 1990-12-04 Concept Rkk, Limited Closed cryogenic barrier for containment of hazardous material migration in the earth
US4998848A (en) * 1989-03-27 1991-03-12 R. G. Hansen & Associates Method and apparatus for removing ground contaminants
US5050386A (en) * 1989-08-16 1991-09-24 Rkk, Limited Method and apparatus for containment of hazardous material migration in the earth
US5066166A (en) * 1989-03-27 1991-11-19 R. G. Hansen & Associates Apparatus for removing ground contaminants
US5106232A (en) * 1990-08-10 1992-04-21 Roy F. Weston, Inc. Method of in situ decontamination
US5160217A (en) * 1990-08-10 1992-11-03 Roy F. Weston, Inc. Method of in situ decontamination
US5416257A (en) * 1994-02-18 1995-05-16 Westinghouse Electric Corporation Open frozen barrier flow control and remediation of hazardous soil
US5918674A (en) * 1996-03-20 1999-07-06 Head; Philip Casing and method of installing the casing in a well
US20030080604A1 (en) * 2001-04-24 2003-05-01 Vinegar Harold J. In situ thermal processing and inhibiting migration of fluids into or out of an in situ oil shale formation
WO2003035987A3 (en) * 2001-10-24 2003-07-31 Shell Oil Co Isolation of soil with a frozen barrier prior to conductive thermal treatment of the soil
US20030196801A1 (en) * 2001-10-24 2003-10-23 Vinegar Harold J. In situ thermal processing of a hydrocarbon containing formation via backproducing through a heater well
US20070137857A1 (en) * 2005-04-22 2007-06-21 Vinegar Harold J Low temperature monitoring system for subsurface barriers
US20090272526A1 (en) * 2008-04-18 2009-11-05 David Booth Burns Electrical current flow between tunnels for use in heating subsurface hydrocarbon containing formations
US7644765B2 (en) 2006-10-20 2010-01-12 Shell Oil Company Heating tar sands formations while controlling pressure
US7673786B2 (en) 2006-04-21 2010-03-09 Shell Oil Company Welding shield for coupling heaters
US20100108310A1 (en) * 2008-10-13 2010-05-06 Thomas David Fowler Offset barrier wells in subsurface formations
US7798220B2 (en) 2007-04-20 2010-09-21 Shell Oil Company In situ heat treatment of a tar sands formation after drive process treatment
US7866388B2 (en) 2007-10-19 2011-01-11 Shell Oil Company High temperature methods for forming oxidizer fuel
US7942203B2 (en) 2003-04-24 2011-05-17 Shell Oil Company Thermal processes for subsurface formations
US8151880B2 (en) 2005-10-24 2012-04-10 Shell Oil Company Methods of making transportation fuel
US8224163B2 (en) 2002-10-24 2012-07-17 Shell Oil Company Variable frequency temperature limited heaters
US8225866B2 (en) 2000-04-24 2012-07-24 Shell Oil Company In situ recovery from a hydrocarbon containing formation
US8327932B2 (en) 2009-04-10 2012-12-11 Shell Oil Company Recovering energy from a subsurface formation
US8355623B2 (en) 2004-04-23 2013-01-15 Shell Oil Company Temperature limited heaters with high power factors
US8631866B2 (en) 2010-04-09 2014-01-21 Shell Oil Company Leak detection in circulated fluid systems for heating subsurface formations
US8701769B2 (en) 2010-04-09 2014-04-22 Shell Oil Company Methods for treating hydrocarbon formations based on geology
US8820406B2 (en) 2010-04-09 2014-09-02 Shell Oil Company Electrodes for electrical current flow heating of subsurface formations with conductive material in wellbore
US9016370B2 (en) 2011-04-08 2015-04-28 Shell Oil Company Partial solution mining of hydrocarbon containing layers prior to in situ heat treatment
US9033042B2 (en) 2010-04-09 2015-05-19 Shell Oil Company Forming bitumen barriers in subsurface hydrocarbon formations
US9309755B2 (en) 2011-10-07 2016-04-12 Shell Oil Company Thermal expansion accommodation for circulated fluid systems used to heat subsurface formations
US10047594B2 (en) 2012-01-23 2018-08-14 Genie Ip B.V. Heater pattern for in situ thermal processing of a subsurface hydrocarbon containing formation

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2777679A (en) * 1952-03-07 1957-01-15 Svenska Skifferolje Ab Recovering sub-surface bituminous deposits by creating a frozen barrier and heating in situ
US2862558A (en) * 1955-12-28 1958-12-02 Phillips Petroleum Co Recovering oils from formations
US2897894A (en) * 1956-06-29 1959-08-04 Jersey Prod Res Co Recovery of oil from subterranean reservoirs
US3183675A (en) * 1961-11-02 1965-05-18 Conch Int Methane Ltd Method of freezing an earth formation
US3267680A (en) * 1963-04-18 1966-08-23 Conch Int Methane Ltd Constructing a frozen wall within the ground
US3271962A (en) * 1964-07-16 1966-09-13 Pittsburgh Plate Glass Co Mining process
US3279538A (en) * 1963-02-28 1966-10-18 Shell Oil Co Oil recovery
US3344607A (en) * 1964-11-30 1967-10-03 Phillips Petroleum Co Insulated frozen earth storage pit and method of constructing same
US3354654A (en) * 1965-06-18 1967-11-28 Phillips Petroleum Co Reservoir and method of forming the same
US4474238A (en) * 1982-11-30 1984-10-02 Phillips Petroleum Company Method and apparatus for treatment of subsurface formations

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2777679A (en) * 1952-03-07 1957-01-15 Svenska Skifferolje Ab Recovering sub-surface bituminous deposits by creating a frozen barrier and heating in situ
US2862558A (en) * 1955-12-28 1958-12-02 Phillips Petroleum Co Recovering oils from formations
US2897894A (en) * 1956-06-29 1959-08-04 Jersey Prod Res Co Recovery of oil from subterranean reservoirs
US3183675A (en) * 1961-11-02 1965-05-18 Conch Int Methane Ltd Method of freezing an earth formation
US3279538A (en) * 1963-02-28 1966-10-18 Shell Oil Co Oil recovery
US3267680A (en) * 1963-04-18 1966-08-23 Conch Int Methane Ltd Constructing a frozen wall within the ground
US3271962A (en) * 1964-07-16 1966-09-13 Pittsburgh Plate Glass Co Mining process
US3344607A (en) * 1964-11-30 1967-10-03 Phillips Petroleum Co Insulated frozen earth storage pit and method of constructing same
US3354654A (en) * 1965-06-18 1967-11-28 Phillips Petroleum Co Reservoir and method of forming the same
US4474238A (en) * 1982-11-30 1984-10-02 Phillips Petroleum Company Method and apparatus for treatment of subsurface formations

Cited By (130)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4776425A (en) * 1985-02-28 1988-10-11 Institut Francais Du Petrole Method for improving coupling with the ground of land based seismic sources
US4836716A (en) * 1986-02-25 1989-06-06 Chevron Research Company Method and apparatus for piled foundation improvement through freezing using surface mounted refrigeration units
US4815894A (en) * 1986-03-12 1989-03-28 Consolidated Environmental Technologies Limited Construction and use of subsea bore holes
US4860544A (en) * 1988-12-08 1989-08-29 Concept R.K.K. Limited Closed cryogenic barrier for containment of hazardous material migration in the earth
US4974425A (en) * 1988-12-08 1990-12-04 Concept Rkk, Limited Closed cryogenic barrier for containment of hazardous material migration in the earth
US4998848A (en) * 1989-03-27 1991-03-12 R. G. Hansen & Associates Method and apparatus for removing ground contaminants
US5066166A (en) * 1989-03-27 1991-11-19 R. G. Hansen & Associates Apparatus for removing ground contaminants
US5050386A (en) * 1989-08-16 1991-09-24 Rkk, Limited Method and apparatus for containment of hazardous material migration in the earth
US5106232A (en) * 1990-08-10 1992-04-21 Roy F. Weston, Inc. Method of in situ decontamination
US5160217A (en) * 1990-08-10 1992-11-03 Roy F. Weston, Inc. Method of in situ decontamination
US5416257A (en) * 1994-02-18 1995-05-16 Westinghouse Electric Corporation Open frozen barrier flow control and remediation of hazardous soil
US5918674A (en) * 1996-03-20 1999-07-06 Head; Philip Casing and method of installing the casing in a well
US8225866B2 (en) 2000-04-24 2012-07-24 Shell Oil Company In situ recovery from a hydrocarbon containing formation
US8485252B2 (en) 2000-04-24 2013-07-16 Shell Oil Company In situ recovery from a hydrocarbon containing formation
US8789586B2 (en) 2000-04-24 2014-07-29 Shell Oil Company In situ recovery from a hydrocarbon containing formation
US8608249B2 (en) 2001-04-24 2013-12-17 Shell Oil Company In situ thermal processing of an oil shale formation
US7032660B2 (en) * 2001-04-24 2006-04-25 Shell Oil Company In situ thermal processing and inhibiting migration of fluids into or out of an in situ oil shale formation
US20030080604A1 (en) * 2001-04-24 2003-05-01 Vinegar Harold J. In situ thermal processing and inhibiting migration of fluids into or out of an in situ oil shale formation
US7735935B2 (en) 2001-04-24 2010-06-15 Shell Oil Company In situ thermal processing of an oil shale formation containing carbonate minerals
US20030196801A1 (en) * 2001-10-24 2003-10-23 Vinegar Harold J. In situ thermal processing of a hydrocarbon containing formation via backproducing through a heater well
US7077198B2 (en) * 2001-10-24 2006-07-18 Shell Oil Company In situ recovery from a hydrocarbon containing formation using barriers
WO2003035987A3 (en) * 2001-10-24 2003-07-31 Shell Oil Co Isolation of soil with a frozen barrier prior to conductive thermal treatment of the soil
US8627887B2 (en) 2001-10-24 2014-01-14 Shell Oil Company In situ recovery from a hydrocarbon containing formation
US8238730B2 (en) 2002-10-24 2012-08-07 Shell Oil Company High voltage temperature limited heaters
US8224164B2 (en) 2002-10-24 2012-07-17 Shell Oil Company Insulated conductor temperature limited heaters
US8224163B2 (en) 2002-10-24 2012-07-17 Shell Oil Company Variable frequency temperature limited heaters
US7942203B2 (en) 2003-04-24 2011-05-17 Shell Oil Company Thermal processes for subsurface formations
US8579031B2 (en) 2003-04-24 2013-11-12 Shell Oil Company Thermal processes for subsurface formations
US8355623B2 (en) 2004-04-23 2013-01-15 Shell Oil Company Temperature limited heaters with high power factors
US7831134B2 (en) 2005-04-22 2010-11-09 Shell Oil Company Grouped exposed metal heaters
US8070840B2 (en) 2005-04-22 2011-12-06 Shell Oil Company Treatment of gas from an in situ conversion process
US8233782B2 (en) 2005-04-22 2012-07-31 Shell Oil Company Grouped exposed metal heaters
US8230927B2 (en) 2005-04-22 2012-07-31 Shell Oil Company Methods and systems for producing fluid from an in situ conversion process
US7942197B2 (en) 2005-04-22 2011-05-17 Shell Oil Company Methods and systems for producing fluid from an in situ conversion process
US7986869B2 (en) 2005-04-22 2011-07-26 Shell Oil Company Varying properties along lengths of temperature limited heaters
US8027571B2 (en) 2005-04-22 2011-09-27 Shell Oil Company In situ conversion process systems utilizing wellbores in at least two regions of a formation
US7860377B2 (en) 2005-04-22 2010-12-28 Shell Oil Company Subsurface connection methods for subsurface heaters
US8224165B2 (en) 2005-04-22 2012-07-17 Shell Oil Company Temperature limited heater utilizing non-ferromagnetic conductor
US7575053B2 (en) * 2005-04-22 2009-08-18 Shell Oil Company Low temperature monitoring system for subsurface barriers
US20070137857A1 (en) * 2005-04-22 2007-06-21 Vinegar Harold J Low temperature monitoring system for subsurface barriers
US8151880B2 (en) 2005-10-24 2012-04-10 Shell Oil Company Methods of making transportation fuel
US8606091B2 (en) 2005-10-24 2013-12-10 Shell Oil Company Subsurface heaters with low sulfidation rates
US8857506B2 (en) 2006-04-21 2014-10-14 Shell Oil Company Alternate energy source usage methods for in situ heat treatment processes
US8192682B2 (en) 2006-04-21 2012-06-05 Shell Oil Company High strength alloys
US8083813B2 (en) 2006-04-21 2011-12-27 Shell Oil Company Methods of producing transportation fuel
US7673786B2 (en) 2006-04-21 2010-03-09 Shell Oil Company Welding shield for coupling heaters
US7683296B2 (en) 2006-04-21 2010-03-23 Shell Oil Company Adjusting alloy compositions for selected properties in temperature limited heaters
US7793722B2 (en) 2006-04-21 2010-09-14 Shell Oil Company Non-ferromagnetic overburden casing
US7866385B2 (en) 2006-04-21 2011-01-11 Shell Oil Company Power systems utilizing the heat of produced formation fluid
US7912358B2 (en) 2006-04-21 2011-03-22 Shell Oil Company Alternate energy source usage for in situ heat treatment processes
US7785427B2 (en) 2006-04-21 2010-08-31 Shell Oil Company High strength alloys
US8555971B2 (en) 2006-10-20 2013-10-15 Shell Oil Company Treating tar sands formations with dolomite
US8191630B2 (en) 2006-10-20 2012-06-05 Shell Oil Company Creating fluid injectivity in tar sands formations
US7644765B2 (en) 2006-10-20 2010-01-12 Shell Oil Company Heating tar sands formations while controlling pressure
US7673681B2 (en) 2006-10-20 2010-03-09 Shell Oil Company Treating tar sands formations with karsted zones
US7677314B2 (en) 2006-10-20 2010-03-16 Shell Oil Company Method of condensing vaporized water in situ to treat tar sands formations
US7677310B2 (en) 2006-10-20 2010-03-16 Shell Oil Company Creating and maintaining a gas cap in tar sands formations
US7681647B2 (en) 2006-10-20 2010-03-23 Shell Oil Company Method of producing drive fluid in situ in tar sands formations
US7703513B2 (en) 2006-10-20 2010-04-27 Shell Oil Company Wax barrier for use with in situ processes for treating formations
US7717171B2 (en) 2006-10-20 2010-05-18 Shell Oil Company Moving hydrocarbons through portions of tar sands formations with a fluid
US7730947B2 (en) 2006-10-20 2010-06-08 Shell Oil Company Creating fluid injectivity in tar sands formations
US7730946B2 (en) 2006-10-20 2010-06-08 Shell Oil Company Treating tar sands formations with dolomite
US7730945B2 (en) 2006-10-20 2010-06-08 Shell Oil Company Using geothermal energy to heat a portion of a formation for an in situ heat treatment process
US7845411B2 (en) 2006-10-20 2010-12-07 Shell Oil Company In situ heat treatment process utilizing a closed loop heating system
US7841401B2 (en) 2006-10-20 2010-11-30 Shell Oil Company Gas injection to inhibit migration during an in situ heat treatment process
US8381815B2 (en) 2007-04-20 2013-02-26 Shell Oil Company Production from multiple zones of a tar sands formation
US7931086B2 (en) 2007-04-20 2011-04-26 Shell Oil Company Heating systems for heating subsurface formations
US8662175B2 (en) 2007-04-20 2014-03-04 Shell Oil Company Varying properties of in situ heat treatment of a tar sands formation based on assessed viscosities
US7841425B2 (en) 2007-04-20 2010-11-30 Shell Oil Company Drilling subsurface wellbores with cutting structures
US7849922B2 (en) 2007-04-20 2010-12-14 Shell Oil Company In situ recovery from residually heated sections in a hydrocarbon containing formation
US8327681B2 (en) 2007-04-20 2012-12-11 Shell Oil Company Wellbore manufacturing processes for in situ heat treatment processes
US7841408B2 (en) 2007-04-20 2010-11-30 Shell Oil Company In situ heat treatment from multiple layers of a tar sands formation
US9181780B2 (en) 2007-04-20 2015-11-10 Shell Oil Company Controlling and assessing pressure conditions during treatment of tar sands formations
US7832484B2 (en) 2007-04-20 2010-11-16 Shell Oil Company Molten salt as a heat transfer fluid for heating a subsurface formation
US8042610B2 (en) 2007-04-20 2011-10-25 Shell Oil Company Parallel heater system for subsurface formations
US7798220B2 (en) 2007-04-20 2010-09-21 Shell Oil Company In situ heat treatment of a tar sands formation after drive process treatment
US8791396B2 (en) 2007-04-20 2014-07-29 Shell Oil Company Floating insulated conductors for heating subsurface formations
US8459359B2 (en) 2007-04-20 2013-06-11 Shell Oil Company Treating nahcolite containing formations and saline zones
US7950453B2 (en) 2007-04-20 2011-05-31 Shell Oil Company Downhole burner systems and methods for heating subsurface formations
US8146661B2 (en) 2007-10-19 2012-04-03 Shell Oil Company Cryogenic treatment of gas
US8240774B2 (en) 2007-10-19 2012-08-14 Shell Oil Company Solution mining and in situ treatment of nahcolite beds
US7866386B2 (en) 2007-10-19 2011-01-11 Shell Oil Company In situ oxidation of subsurface formations
US8146669B2 (en) 2007-10-19 2012-04-03 Shell Oil Company Multi-step heater deployment in a subsurface formation
US8536497B2 (en) 2007-10-19 2013-09-17 Shell Oil Company Methods for forming long subsurface heaters
US8272455B2 (en) 2007-10-19 2012-09-25 Shell Oil Company Methods for forming wellbores in heated formations
US8276661B2 (en) 2007-10-19 2012-10-02 Shell Oil Company Heating subsurface formations by oxidizing fuel on a fuel carrier
US8162059B2 (en) 2007-10-19 2012-04-24 Shell Oil Company Induction heaters used to heat subsurface formations
US8011451B2 (en) 2007-10-19 2011-09-06 Shell Oil Company Ranging methods for developing wellbores in subsurface formations
US8196658B2 (en) 2007-10-19 2012-06-12 Shell Oil Company Irregular spacing of heat sources for treating hydrocarbon containing formations
US8113272B2 (en) 2007-10-19 2012-02-14 Shell Oil Company Three-phase heaters with common overburden sections for heating subsurface formations
US7866388B2 (en) 2007-10-19 2011-01-11 Shell Oil Company High temperature methods for forming oxidizer fuel
US9528322B2 (en) 2008-04-18 2016-12-27 Shell Oil Company Dual motor systems and non-rotating sensors for use in developing wellbores in subsurface formations
US8636323B2 (en) 2008-04-18 2014-01-28 Shell Oil Company Mines and tunnels for use in treating subsurface hydrocarbon containing formations
US8752904B2 (en) 2008-04-18 2014-06-17 Shell Oil Company Heated fluid flow in mines and tunnels used in heating subsurface hydrocarbon containing formations
US8172335B2 (en) 2008-04-18 2012-05-08 Shell Oil Company Electrical current flow between tunnels for use in heating subsurface hydrocarbon containing formations
US20090272526A1 (en) * 2008-04-18 2009-11-05 David Booth Burns Electrical current flow between tunnels for use in heating subsurface hydrocarbon containing formations
US8151907B2 (en) 2008-04-18 2012-04-10 Shell Oil Company Dual motor systems and non-rotating sensors for use in developing wellbores in subsurface formations
US8162405B2 (en) 2008-04-18 2012-04-24 Shell Oil Company Using tunnels for treating subsurface hydrocarbon containing formations
US8562078B2 (en) 2008-04-18 2013-10-22 Shell Oil Company Hydrocarbon production from mines and tunnels used in treating subsurface hydrocarbon containing formations
US8177305B2 (en) 2008-04-18 2012-05-15 Shell Oil Company Heater connections in mines and tunnels for use in treating subsurface hydrocarbon containing formations
US8267185B2 (en) 2008-10-13 2012-09-18 Shell Oil Company Circulated heated transfer fluid systems used to treat a subsurface formation
US8281861B2 (en) 2008-10-13 2012-10-09 Shell Oil Company Circulated heated transfer fluid heating of subsurface hydrocarbon formations
US8261832B2 (en) 2008-10-13 2012-09-11 Shell Oil Company Heating subsurface formations with fluids
US8220539B2 (en) 2008-10-13 2012-07-17 Shell Oil Company Controlling hydrogen pressure in self-regulating nuclear reactors used to treat a subsurface formation
US9022118B2 (en) 2008-10-13 2015-05-05 Shell Oil Company Double insulated heaters for treating subsurface formations
US8353347B2 (en) 2008-10-13 2013-01-15 Shell Oil Company Deployment of insulated conductors for treating subsurface formations
US8256512B2 (en) 2008-10-13 2012-09-04 Shell Oil Company Movable heaters for treating subsurface hydrocarbon containing formations
US9129728B2 (en) 2008-10-13 2015-09-08 Shell Oil Company Systems and methods of forming subsurface wellbores
US20100108310A1 (en) * 2008-10-13 2010-05-06 Thomas David Fowler Offset barrier wells in subsurface formations
US9051829B2 (en) 2008-10-13 2015-06-09 Shell Oil Company Perforated electrical conductors for treating subsurface formations
US8881806B2 (en) 2008-10-13 2014-11-11 Shell Oil Company Systems and methods for treating a subsurface formation with electrical conductors
US8267170B2 (en) * 2008-10-13 2012-09-18 Shell Oil Company Offset barrier wells in subsurface formations
US8327932B2 (en) 2009-04-10 2012-12-11 Shell Oil Company Recovering energy from a subsurface formation
US8434555B2 (en) 2009-04-10 2013-05-07 Shell Oil Company Irregular pattern treatment of a subsurface formation
US8851170B2 (en) 2009-04-10 2014-10-07 Shell Oil Company Heater assisted fluid treatment of a subsurface formation
US8448707B2 (en) 2009-04-10 2013-05-28 Shell Oil Company Non-conducting heater casings
US8739874B2 (en) 2010-04-09 2014-06-03 Shell Oil Company Methods for heating with slots in hydrocarbon formations
US9127523B2 (en) 2010-04-09 2015-09-08 Shell Oil Company Barrier methods for use in subsurface hydrocarbon formations
US9022109B2 (en) 2010-04-09 2015-05-05 Shell Oil Company Leak detection in circulated fluid systems for heating subsurface formations
US8833453B2 (en) 2010-04-09 2014-09-16 Shell Oil Company Electrodes for electrical current flow heating of subsurface formations with tapered copper thickness
US9033042B2 (en) 2010-04-09 2015-05-19 Shell Oil Company Forming bitumen barriers in subsurface hydrocarbon formations
US8820406B2 (en) 2010-04-09 2014-09-02 Shell Oil Company Electrodes for electrical current flow heating of subsurface formations with conductive material in wellbore
US9127538B2 (en) 2010-04-09 2015-09-08 Shell Oil Company Methodologies for treatment of hydrocarbon formations using staged pyrolyzation
US8631866B2 (en) 2010-04-09 2014-01-21 Shell Oil Company Leak detection in circulated fluid systems for heating subsurface formations
US8701768B2 (en) 2010-04-09 2014-04-22 Shell Oil Company Methods for treating hydrocarbon formations
US8701769B2 (en) 2010-04-09 2014-04-22 Shell Oil Company Methods for treating hydrocarbon formations based on geology
US9399905B2 (en) 2010-04-09 2016-07-26 Shell Oil Company Leak detection in circulated fluid systems for heating subsurface formations
US9016370B2 (en) 2011-04-08 2015-04-28 Shell Oil Company Partial solution mining of hydrocarbon containing layers prior to in situ heat treatment
US9309755B2 (en) 2011-10-07 2016-04-12 Shell Oil Company Thermal expansion accommodation for circulated fluid systems used to heat subsurface formations
US10047594B2 (en) 2012-01-23 2018-08-14 Genie Ip B.V. Heater pattern for in situ thermal processing of a subsurface hydrocarbon containing formation

Similar Documents

Publication Publication Date Title
US4597444A (en) Method for excavating a large diameter shaft into the earth and at least partially through an oil-bearing formation
US4344485A (en) Method for continuously producing viscous hydrocarbons by gravity drainage while injecting heated fluids
US5318124A (en) Recovering hydrocarbons from tar sand or heavy oil reservoirs
US5215146A (en) Method for reducing startup time during a steam assisted gravity drainage process in parallel horizontal wells
US5085276A (en) Production of oil from low permeability formations by sequential steam fracturing
US3501201A (en) Method of producing shale oil from a subterranean oil shale formation
US3759328A (en) Laterally expanding oil shale permeabilization
US3967853A (en) Producing shale oil from a cavity-surrounded central well
CA2021150C (en) Use of c02/steam to enhance steam floods in horizontal wellbores
US5931230A (en) Visicous oil recovery using steam in horizontal well
US5036918A (en) Method for improving sustained solids-free production from heavy oil reservoirs
US3878884A (en) Formation fracturing method
US5415231A (en) Method for producing low permeability reservoirs using steam
US3739852A (en) Thermal process for recovering oil
US3602310A (en) Method of increasing the permeability of a subterranean hydrocarbon bearing formation
US5147111A (en) Cavity induced stimulation method of coal degasification wells
US3439744A (en) Selective formation plugging
US4705113A (en) Method of cold water enhanced hydraulic fracturing
US3692111A (en) Stair-step thermal recovery of oil
US5141054A (en) Limited entry steam heating method for uniform heat distribution
CA1240263A (en) Combined replacement drive process for oil recovery
US3960213A (en) Production of bitumen by steam injection
DE2924493A1 (en) CRUSHING PREHEATING OIL PRODUCTION METHOD
US3303883A (en) Thermal notching technique
US4390068A (en) Carbon dioxide stimulated oil recovery process

Legal Events

Date Code Title Description
AS Assignment

Owner name: ATLANTIC RICHFIELD COMPANY, LOS ANGELES, CA., A CO

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:HUTCHINSON, THOMAS S.;REEL/FRAME:004531/0827

Effective date: 19840914

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
FP Lapsed due to failure to pay maintenance fee

Effective date: 19940706

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362