US4424668A - Combined gas turbine and steam turbine power station - Google Patents

Combined gas turbine and steam turbine power station Download PDF

Info

Publication number
US4424668A
US4424668A US06/356,728 US35672882A US4424668A US 4424668 A US4424668 A US 4424668A US 35672882 A US35672882 A US 35672882A US 4424668 A US4424668 A US 4424668A
Authority
US
United States
Prior art keywords
steam
gas turbine
turbine
cooling
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US06/356,728
Inventor
Dilip Mukherjee
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alstom SA
Original Assignee
BBC Brown Boveri AG Switzerland
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BBC Brown Boveri AG Switzerland filed Critical BBC Brown Boveri AG Switzerland
Assigned to BBC BROWN BOVERI & COMPANY LIMITED CH 5410 BADEN SWITZERLAND reassignment BBC BROWN BOVERI & COMPANY LIMITED CH 5410 BADEN SWITZERLAND ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: MUKHERJEE, DILIP
Application granted granted Critical
Publication of US4424668A publication Critical patent/US4424668A/en
Assigned to BBC BROWN BOVERI AG reassignment BBC BROWN BOVERI AG CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: BBC BROWN, BOVERI & COMPANY LIMITED
Assigned to ABB PARTICIPATION AG reassignment ABB PARTICIPATION AG CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: BBC BROWN BOVERI AG
Assigned to ALSTOM reassignment ALSTOM ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ABB PARTICIPATION AG
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C7/00Features, components parts, details or accessories, not provided for in, or of interest apart form groups F02C1/00 - F02C6/00; Air intakes for jet-propulsion plants
    • F02C7/12Cooling of plants
    • F02C7/16Cooling of plants characterised by cooling medium
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/106Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with water evaporated or preheated at different pressures in exhaust boiler
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2260/00Function
    • F05D2260/20Heat transfer, e.g. cooling
    • F05D2260/232Heat transfer, e.g. cooling characterized by the cooling medium
    • F05D2260/2322Heat transfer, e.g. cooling characterized by the cooling medium steam
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]

Definitions

  • the present invention relates to a combined gas turbine and steam turbine power station with steam-cooled gas turbine components, in which power station the cooling steam is generated outside the gas turbine, in a waste heat boiler.
  • Power plants have already been disclosed, in which steam is used for cooling the gas turbine, this steam being generated by heat-exchange with the exhaust gases from the gas turbine, and being fed to the turbine blading in a manner such that the cooling steam in the working-substance channel flows around the turbine blading and thereby screens the rotor, with the blade-roots, and the casing from the hot gases.
  • the cooling steam is collected, separately from the working gas, and is fed to a steam turbine (Swiss Patent Specification No. 364,656).
  • the non-uniform cooling of the root portion of the rotor blades must be regarded as one disadvantage of this arrangement, while a second disadvantage resides in the fact that it is very difficult to achieve a clean separation of the working medium from the cooling steam after both have passed through the turbine.
  • the non-uniform cooling must be attributed, in particular, to the fact that the cooling steam, which is considerably cooler than the working substance, is fed in within the inner annular zone of the inflow channel, while the considerably hotter working substance flows at the outer annular zone.
  • the object of the present invention is to produce a combined gas turbine and steam turbine plant, in which the gas turbine is operated at a high inlet temperature, and the parts which are situated in the hot gas stream of the turbine are steam-cooled, the cooling steam being further expanded in a steam turbine, and it being possible to obtain a high plant efficieny by using an intermediate superheating stage in the steam-generator.
  • the advantage of the arrangement according to the invention is to be seen, in particular, in the fact that the use of two-pressure waste heat boiler, with intermediate superheating, enables the waste heat from the gas turbine to be utilized in a particularly effective manner, the cooling steam, thus obtained, being fed to the gas turbine, where, after having been forced to flow through the casing and the hollow guide vanes, and in a flow through the rotor and the hollow rotor blades, separated from the casing and guide-vane flow, it cools these parts, while these gas turbine components simultaneously serve as a superheater for a portion of the steam flowing through the system.
  • At least 40% of the total quantity of working substance is used for purposes relating to the cooling of the gas turbine.
  • barrier-air passages separated from the steam flow, enables air, taken from the compressor, to be fed in, from the inlet side of the turbine, parallel to the steam flow. Since a slight overpressure, relative to the hot gas duct, preferably prevails in these barrier air passages, air can flow over into this duct, at a low rate, as a result of which a barrier effect is obtained.
  • a special advantage of this arrangement is also to be seen in the fact that, due to the comparatively low rates at which the barrier air need flow in order to exclude the hot gas from the rotor and bladecarrier, the high cooling air flow-rate, which would otherwise be required, is unnecessary, so that the elimination of the additional compressor capacity, needed for this purpose, results in a higher gas turbine output being available as useful power.
  • FIG. 1 shows a diagrammatic representation of a combi-plant
  • FIG. 2 shows a diagram of the steam and barrier air passages in the gas turbine
  • FIG. 3 shows a partial cross-section through a portion of a rotor, in the plane of a row of rotor blades with air passages and steam passages, and
  • FIG. 4 shows a partial cross-section through a portion of a rotor, with steam passages which are arranged between two thermal-barrier segments.
  • a waste heat boiler 7 is connected, in a combined gas turbine and steam turbine plant, according to the invention, downstream of a gas turbine which comprises a compressor 1, a combustion chamber 2, and a turbine 3, and which drives a generator 4, this waste heat boiler 7 possessing a high-pressure section 7' and a low-pressure section 7".
  • the gas turbine 1, 2, 3 is operated at a high inlet temperature, of approximately 1200° C., on account of which the rotor, stator and blading of the turbine 3 are cooled by means of steam.
  • the exhaust gases from the tubine flow through the high-pressure and low-pressure sections (7' and 7"), located therein, one behind the other in the direction of flow, and leave the waste heat boiler 7 at a temperature of approximately 170° C.
  • the high-pressure section 7' of the waste heat boiler 7 includes (in the direction in which the exhaust gases flow in) a high-pressure superheater 12, a high-pressure evaporator 14, a high-pressure preheater 11, and an intermediate superheater 13.
  • the low-pressure section 7" of the waste heat boiler 7 there are arranged, again in the flow direction of the exhaust gases, a cooling steam superheater 10, a low-pressure evaporator 9, and a low-pressure preheater 8.
  • the live steam which has been superheated in the high-pressure superheater 12, passes, via a live steam line 25, which is provided with a valve 24, through a high-pressure turbine 26 and, via the intermediate superheater 13, into a low-pressure turbine 29 of a steam turbine 27, which drives a generator 28 having an output of approximately 325 MW.
  • the steam is expanded in the steam turbine 27, bleed steam being taken from the low-pressure stage 29, and being supplied, via a bleed line 30, to a feed-water reservoir 23, in order to heat this reservoir.
  • the completely expanded steam leaving the steam turbine 27 passes, via a condenser 31 and a condensate pump 32, into a preheater 33, which is heated by bleed steam from the steam turbine 27, via a bleed line 34, and passes, via a return line 35, into the feed-water reservoir 23.
  • boiler feed-water is fed, by a feed pump 22, to the low-pressure economizer 8, where it is preheated, and is then led into a low-pressure drum 15.
  • a portion of the contents of the drum passes, via the circulating pump 16, into the low-pressure evaporator 9 of the waste heat boiler 7, and is led back into the drum 15 in the form of steam.
  • This portion of steam is slightly superheated, according to the invention, in the cooling steam superheater 10, which is located, on the exhaust gas side, between the high-pressure preheater 11 and the low-pressure evaporator 9, and is then fed to the gas turbine for cooling purposes.
  • the other portion of the contents of the drum is conveyed, by means of a high-pressure pump 17 and via the high-pressure economizer 11, into a high-pressure drum 18.
  • the working substance enters the high-pressure evaporator 14, via a circulating pump 19, and passes back into the high-pressure drum 18. From the drum 18, the high-pressure steam passes to the steam turbine 27, via the high-pressure superheater 12 and the live steam line 25.
  • the cooling steam slightly superheated in the cooling steam superheater, passes, via a cooling steam line 20, into the gas turbine 3, where it is heated up to approximately 450° C. as it flows through the parts around which the hot gas is flowing so that it has approximately the same temperature as the steam in a steam supply line 38, coming from the intermediate superheater 13, to which steam the cooling steam is fed, upstream of the low-pressure turbine 29 of the steam turbine 27, via a common line 36 and a regulating valve 37.
  • An additional valve 39 can be installed in the steam supply line 38, for the purpose of pressure-matching.
  • the cooling steam Before the cooling steam enters the high-pressure side of the turbine 3, via the cooling steam line 20, a portion of the cooling steam is led away, via a branch line 21, in order to cool the blading and the rotor of the turbine 3, while the other portion is directed to cool the blades and the stator of the turbine 3.
  • the steam After having flowed through, and cooled the blades, the rotor, and the stator, the steam, which is now strongly overheated, enters, via the lines 40, 41 and the common line 36, the steam supply line 38, which leads into an intermediate stage of the steam turbine 27.
  • the fall in temperature between the intermediate superheater steam from the intermediate superheater 13 and the cooling steam is compensated by the heating of the cooling steam in the turbine 3.
  • the routeing of the two streams of cooling steam is marked in FIG. 2, namely the routeing of the steam for cooling the rotor, marked with dash-dotted lines, and of the steam for cooling the stator, marked with dashed lines, and the routeing of the barrier air, marked with a continuous line.
  • the barrier air is bled off in the compressor 1, from a point at which an appropriate pressure prevails, and is fed to the turbine 3 via a barrier-air line 5 (FIG. 1).
  • the cooling steam for the rotor blades 42, and for the rotor enters the turbine via the branch line 21, and the cooling steam for the guide vanes 43, and for the stator, enters the turbine via the line 20.
  • barrier air is fed, in a known manner, according to the arrows 6, into air passages 44 from the inlet side of the turbine, these passages being separate from the steam flows 20, 21, and this air is then led away into the flow duct.
  • the turbine 3 After flowing through, and cooling, the turbine 3, the steam for cooling the inlet vanes 43 and the stator is led away via the line 41, and the steam for cooling the rotor blades 42 and the rotor is led away via the line 40.
  • the hollow rotor blades 42 and the thermal-barrier segments 46 are anchored in the rotor 49.
  • Steam passages 45 lead to the hollow blade-roots, and to the thermal-barrier segments 46, which are located between the individual rows of blades (FIG. 4).
  • the air passages 44 are arranged separately from the steam passages.
  • Sealing strips 48 are fitted between successively adjacent rotorblade root-plates 47. As a result of the slight overpressure prevailing in the air passages 44, leakage-air can flow, through air outlets 50, into the hot-gas duct of the turbine, at a low flow-rate, and thereby generate the barrier effect.
  • Sealing elements 51 are fitted between the rotor 49 and the steam passages 45.
  • the inlet vanes, which are not shown, are cooled in the same manner.
  • the resulting thermal efficiency of the combined plant is significantly higher than that of plants in which the gas turbine is cooled by air alone.
  • the multi-pressure boiler enables a pressure to be selected, for cooling the gas turbine, which is significantly lower than the pressure at which the live steam is supplied to the steam turbine.
  • the gas turbine serves as an intermediate superheater, and the steam, superheated in the intermediate superheater stage 13, can be mixed with the cooling steam which has passed through the gas turbine, and can then be fed to the low-pressure steam turbine 29.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

In order to operate a gas turbine and steam turbine plant with a high temperature at the inlet to the gas turbine plant, the parts located in the hot-gas stream of the gas turbine being steam-cooled, and the cooling steam, thereby raised to a higher temperature, being fed to the steam turbine for further expansion, it is proposed that the waste heat from the gas turbine (3) be led through a two-pressure waste heat boiler (7), and that the steam, generated in this boiler, be slightly superheated in a cooling-steam superheater (10), and fed to the hollow inlet vanes (43) and to the rotor blades (42), which are likewise hollow, the steam, strongly superheated during this cooling process, then being admixed to the steam coming from the intermediate superheater (13), and being fed to the low-pressure section of the steam turbine (27).

Description

The present invention relates to a combined gas turbine and steam turbine power station with steam-cooled gas turbine components, in which power station the cooling steam is generated outside the gas turbine, in a waste heat boiler.
Power plants have already been disclosed, in which steam is used for cooling the gas turbine, this steam being generated by heat-exchange with the exhaust gases from the gas turbine, and being fed to the turbine blading in a manner such that the cooling steam in the working-substance channel flows around the turbine blading and thereby screens the rotor, with the blade-roots, and the casing from the hot gases. After flowing through the turbine, the cooling steam is collected, separately from the working gas, and is fed to a steam turbine (Swiss Patent Specification No. 364,656).
The non-uniform cooling of the root portion of the rotor blades must be regarded as one disadvantage of this arrangement, while a second disadvantage resides in the fact that it is very difficult to achieve a clean separation of the working medium from the cooling steam after both have passed through the turbine. The non-uniform cooling must be attributed, in particular, to the fact that the cooling steam, which is considerably cooler than the working substance, is fed in within the inner annular zone of the inflow channel, while the considerably hotter working substance flows at the outer annular zone.
The object of the present invention is to produce a combined gas turbine and steam turbine plant, in which the gas turbine is operated at a high inlet temperature, and the parts which are situated in the hot gas stream of the turbine are steam-cooled, the cooling steam being further expanded in a steam turbine, and it being possible to obtain a high plant efficieny by using an intermediate superheating stage in the steam-generator.
The abovementioned object is achieved, according to the invention, by means of the characterizing features of claim 1.
The advantage of the arrangement according to the invention is to be seen, in particular, in the fact that the use of two-pressure waste heat boiler, with intermediate superheating, enables the waste heat from the gas turbine to be utilized in a particularly effective manner, the cooling steam, thus obtained, being fed to the gas turbine, where, after having been forced to flow through the casing and the hollow guide vanes, and in a flow through the rotor and the hollow rotor blades, separated from the casing and guide-vane flow, it cools these parts, while these gas turbine components simultaneously serve as a superheater for a portion of the steam flowing through the system. As a result of this, it is possible to admix this stream of steam leaving the gas turbine, to the steam which has been partially expanded in the high-pressure section of the steam turbine and reheated in the intermediate superheater, and for this stream of steam to be led into the low-pressure section of the steam turbine, without any need for further reheating in the intermediate superheater. This procedure results in an optimum utilization value.
In accordance with claim 2, at least 40% of the total quantity of working substance is used for purposes relating to the cooling of the gas turbine.
Since, after being heated up in the gas turbine, this quantity of cooling steam is available for useful work in the low-pressure section of the steam turbine, virtually no loss, of power and/or of steam, occurs.
Further embodiments of the subject of the invention are evident from claims 3 to 6.
The arrangement of barrier-air passages, separated from the steam flow, enables air, taken from the compressor, to be fed in, from the inlet side of the turbine, parallel to the steam flow. Since a slight overpressure, relative to the hot gas duct, preferably prevails in these barrier air passages, air can flow over into this duct, at a low rate, as a result of which a barrier effect is obtained. A special advantage of this arrangement is also to be seen in the fact that, due to the comparatively low rates at which the barrier air need flow in order to exclude the hot gas from the rotor and bladecarrier, the high cooling air flow-rate, which would otherwise be required, is unnecessary, so that the elimination of the additional compressor capacity, needed for this purpose, results in a higher gas turbine output being available as useful power.
The arrangement of steam passages in the rotor and stator, which communicate with the cooling steam passages in the blades, and in the thermal-barrier segments, results in uniform cooling of all the parts around which the hot working substance flows.
An illustrative embodiment of a combi-plant, according to the invention, is represented in the drawing, in which:
FIG. 1 shows a diagrammatic representation of a combi-plant,
FIG. 2 shows a diagram of the steam and barrier air passages in the gas turbine,
FIG. 3 shows a partial cross-section through a portion of a rotor, in the plane of a row of rotor blades with air passages and steam passages, and
FIG. 4 shows a partial cross-section through a portion of a rotor, with steam passages which are arranged between two thermal-barrier segments.
According to FIG. 1, a waste heat boiler 7 is connected, in a combined gas turbine and steam turbine plant, according to the invention, downstream of a gas turbine which comprises a compressor 1, a combustion chamber 2, and a turbine 3, and which drives a generator 4, this waste heat boiler 7 possessing a high-pressure section 7' and a low-pressure section 7". The gas turbine 1, 2, 3 is operated at a high inlet temperature, of approximately 1200° C., on account of which the rotor, stator and blading of the turbine 3 are cooled by means of steam. In the waste heat boiler 7, the exhaust gases from the tubine flow through the high-pressure and low-pressure sections (7' and 7"), located therein, one behind the other in the direction of flow, and leave the waste heat boiler 7 at a temperature of approximately 170° C. The high-pressure section 7' of the waste heat boiler 7 includes (in the direction in which the exhaust gases flow in) a high-pressure superheater 12, a high-pressure evaporator 14, a high-pressure preheater 11, and an intermediate superheater 13. In the low-pressure section 7" of the waste heat boiler 7, there are arranged, again in the flow direction of the exhaust gases, a cooling steam superheater 10, a low-pressure evaporator 9, and a low-pressure preheater 8.
The live steam, which has been superheated in the high-pressure superheater 12, passes, via a live steam line 25, which is provided with a valve 24, through a high-pressure turbine 26 and, via the intermediate superheater 13, into a low-pressure turbine 29 of a steam turbine 27, which drives a generator 28 having an output of approximately 325 MW. The steam is expanded in the steam turbine 27, bleed steam being taken from the low-pressure stage 29, and being supplied, via a bleed line 30, to a feed-water reservoir 23, in order to heat this reservoir. The completely expanded steam leaving the steam turbine 27 passes, via a condenser 31 and a condensate pump 32, into a preheater 33, which is heated by bleed steam from the steam turbine 27, via a bleed line 34, and passes, via a return line 35, into the feed-water reservoir 23.
From the feed-water reservoir 23, boiler feed-water is fed, by a feed pump 22, to the low-pressure economizer 8, where it is preheated, and is then led into a low-pressure drum 15. A portion of the contents of the drum passes, via the circulating pump 16, into the low-pressure evaporator 9 of the waste heat boiler 7, and is led back into the drum 15 in the form of steam. This portion of steam is slightly superheated, according to the invention, in the cooling steam superheater 10, which is located, on the exhaust gas side, between the high-pressure preheater 11 and the low-pressure evaporator 9, and is then fed to the gas turbine for cooling purposes. The other portion of the contents of the drum is conveyed, by means of a high-pressure pump 17 and via the high-pressure economizer 11, into a high-pressure drum 18. The working substance enters the high-pressure evaporator 14, via a circulating pump 19, and passes back into the high-pressure drum 18. From the drum 18, the high-pressure steam passes to the steam turbine 27, via the high-pressure superheater 12 and the live steam line 25.
The cooling steam, slightly superheated in the cooling steam superheater, passes, via a cooling steam line 20, into the gas turbine 3, where it is heated up to approximately 450° C. as it flows through the parts around which the hot gas is flowing so that it has approximately the same temperature as the steam in a steam supply line 38, coming from the intermediate superheater 13, to which steam the cooling steam is fed, upstream of the low-pressure turbine 29 of the steam turbine 27, via a common line 36 and a regulating valve 37. An additional valve 39 can be installed in the steam supply line 38, for the purpose of pressure-matching.
Before the cooling steam enters the high-pressure side of the turbine 3, via the cooling steam line 20, a portion of the cooling steam is led away, via a branch line 21, in order to cool the blading and the rotor of the turbine 3, while the other portion is directed to cool the blades and the stator of the turbine 3. After having flowed through, and cooled the blades, the rotor, and the stator, the steam, which is now strongly overheated, enters, via the lines 40, 41 and the common line 36, the steam supply line 38, which leads into an intermediate stage of the steam turbine 27. The fall in temperature between the intermediate superheater steam from the intermediate superheater 13 and the cooling steam is compensated by the heating of the cooling steam in the turbine 3.
The routeing of the two streams of cooling steam is marked in FIG. 2, namely the routeing of the steam for cooling the rotor, marked with dash-dotted lines, and of the steam for cooling the stator, marked with dashed lines, and the routeing of the barrier air, marked with a continuous line. The barrier air is bled off in the compressor 1, from a point at which an appropriate pressure prevails, and is fed to the turbine 3 via a barrier-air line 5 (FIG. 1). The cooling steam for the rotor blades 42, and for the rotor, enters the turbine via the branch line 21, and the cooling steam for the guide vanes 43, and for the stator, enters the turbine via the line 20. Concurrently with the steam flows 20, 21, barrier air is fed, in a known manner, according to the arrows 6, into air passages 44 from the inlet side of the turbine, these passages being separate from the steam flows 20, 21, and this air is then led away into the flow duct. After flowing through, and cooling, the turbine 3, the steam for cooling the inlet vanes 43 and the stator is led away via the line 41, and the steam for cooling the rotor blades 42 and the rotor is led away via the line 40.
As illustrated in FIGS. 3 and 4, the hollow rotor blades 42 and the thermal-barrier segments 46 are anchored in the rotor 49. Steam passages 45 lead to the hollow blade-roots, and to the thermal-barrier segments 46, which are located between the individual rows of blades (FIG. 4). The air passages 44 are arranged separately from the steam passages. Sealing strips 48 are fitted between successively adjacent rotorblade root-plates 47. As a result of the slight overpressure prevailing in the air passages 44, leakage-air can flow, through air outlets 50, into the hot-gas duct of the turbine, at a low flow-rate, and thereby generate the barrier effect. Sealing elements 51 are fitted between the rotor 49 and the steam passages 45. The inlet vanes, which are not shown, are cooled in the same manner.
As a result of the steam-cooling of the gas turbine, according to the invention, and as described above, the resulting thermal efficiency of the combined plant is significantly higher than that of plants in which the gas turbine is cooled by air alone. In addition, the multi-pressure boiler enables a pressure to be selected, for cooling the gas turbine, which is significantly lower than the pressure at which the live steam is supplied to the steam turbine. At the same time, the gas turbine serves as an intermediate superheater, and the steam, superheated in the intermediate superheater stage 13, can be mixed with the cooling steam which has passed through the gas turbine, and can then be fed to the low-pressure steam turbine 29.

Claims (6)

I claim:
1. Combined gas turbine and steam turbine power station with steam-cooled gas turbine components, in which power station the cooling steam is generated outside the gas turbine (1, 2, 3), in a waste heat boiler (7), and wherein the following features are combined:
(a) the waste heat from the gas turbine is utilized in a two-pressure waste heat boiler (7), which comprises a low-pressure section (7") and a high-pressure section (7');
(b) the steam which is generated in the low-pressure evaporator (9) of the waste heat boiler (7), is slightly superheated in a cooling-steam superheater (10), which is located, on the exhaust gas side, between the intermediate superheater (13) and the low-pressure evaporator (9);
(c) this cooling steam is forcibly led, on the one hand, in the gas turbine casing and hollow inlet vanes (43) and, on the other hand and separated therefrom, in the rotor (49) and hollow rotor blades (42), this steam cooling the components through which it flows, and being strongly superheated on being bled off;
(d) the steam, which is partially expanded in the high-pressure section (26) of the steam turbine (27), is heated up, in the waste heat boiler (7), in an intermediate superheater (13) which is located, on the exhaust gas side, between the high-pressure preheater (11) and the cooling steam superheater (10), and is led, together with the steam which has been bled from the gas turbine (3), into the correspondingly enlarged low-pressure section of the steam turbine (27) in order to be further expanded.
2. Combined gas turbine and steam turbine power station as claimed in claim 2, wherein at least 40% of the total quantity of working substance is used for cooling purposes.
3. Combined gas turbine and steam turbine power station as claimed in claim 1, wherein barrier air from the compressor (1) is fed, parallel to the cooling steam for the gas turbine (3), into the inlet vanes (43) and into the rotor blades (42), via passages (44) at the inlet side of the gas turbine, which are separated from the steam flow, and via the casing and the rotor.
4. Combined gas turbine and steam turbine power station as claimed in claim 3, wherein steam passages (45) and air passages (44) are located in the rotor (49) of the gas turbine (3).
5. Combined gas turbine and steam turbine power station as claimed in claim 3, wherein steam passages (45) and air passages (44) are located in the stator of the gas turbine (3).
6. Combined gas turbine and steam turbine power station as claimed in claim 4 or 5, wherein the steam passages (45) and the air passages (44) pass through the roots of the stator vanes (43) and through the roots of the rotor blades (42), as well as passing between the thermal-barrier segments (46) which are located between the individual rows of blades.
US06/356,728 1981-04-03 1982-03-10 Combined gas turbine and steam turbine power station Expired - Lifetime US4424668A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH2271/81 1981-04-03
CH227181 1981-04-03

Publications (1)

Publication Number Publication Date
US4424668A true US4424668A (en) 1984-01-10

Family

ID=4229862

Family Applications (1)

Application Number Title Priority Date Filing Date
US06/356,728 Expired - Lifetime US4424668A (en) 1981-04-03 1982-03-10 Combined gas turbine and steam turbine power station

Country Status (4)

Country Link
US (1) US4424668A (en)
EP (1) EP0062932B1 (en)
JP (1) JPS57176309A (en)
DE (1) DE3261410D1 (en)

Cited By (76)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3435382A1 (en) * 1984-09-27 1986-04-03 Hermann Dipl.-Ing. 5401 Kobern-Gondorf Bongers Gas-steam compound turbine with raised temperature level
US4891937A (en) * 1982-10-13 1990-01-09 Hitachi, Ltd. Heat recovery system
US4907405A (en) * 1989-01-24 1990-03-13 Union Carbide Corporation Process to cool gas
US4989405A (en) * 1983-04-08 1991-02-05 Solar Turbines Incorporated Combined cycle power plant
US4991391A (en) * 1989-01-27 1991-02-12 Westinghouse Electric Corp. System for cooling in a gas turbine
US5233826A (en) * 1991-04-02 1993-08-10 Cheng Dah Y Method for starting and operating an advanced regenerative parallel compound dual fluid heat engine-advanced cheng cycle (ACC)
US5251432A (en) * 1991-07-17 1993-10-12 Siemens Aktiengesellschaft Method for operating a gas and steam turbine plant
US5285627A (en) * 1991-07-17 1994-02-15 Siemens Aktiengesellschaft Method for operating a gas and steam turbine plant and a plant for performing the method
US5320483A (en) * 1992-12-30 1994-06-14 General Electric Company Steam and air cooling for stator stage of a turbine
US5340274A (en) * 1991-11-19 1994-08-23 General Electric Company Integrated steam/air cooling system for gas turbines
US5379588A (en) * 1990-11-20 1995-01-10 General Electric Company Reheat steam cycle for a steam and gas turbine combined cycle system
US5412937A (en) * 1993-11-04 1995-05-09 General Electric Company Steam cycle for combined cycle with steam cooled gas turbine
US5428950A (en) * 1993-11-04 1995-07-04 General Electric Co. Steam cycle for combined cycle with steam cooled gas turbine
US5431007A (en) * 1994-03-04 1995-07-11 Westinghouse Elec Corp Thermochemically recuperated and steam cooled gas turbine system
US5471832A (en) * 1993-03-11 1995-12-05 Hitachi, Ltd. Combined cycle power plant
US5491971A (en) * 1993-12-23 1996-02-20 General Electric Co. Closed circuit air cooled gas turbine combined cycle
US5493854A (en) * 1993-12-29 1996-02-27 Abb Management Ag Method for operating a gas turbine in a simple cycle and in a cycle combined with a steam turbine
US5536143A (en) * 1995-03-31 1996-07-16 General Electric Co. Closed circuit steam cooled bucket
US5577377A (en) * 1993-11-04 1996-11-26 General Electric Co. Combined cycle with steam cooled gas turbine
US5593274A (en) * 1995-03-31 1997-01-14 General Electric Co. Closed or open circuit cooling of turbine rotor components
US5613356A (en) * 1994-03-21 1997-03-25 Abb Management Ag Method of cooling thermally loaded components of a gas turbine group
DE19547803C1 (en) * 1995-12-20 1997-04-10 Siemens Ag Steam-turbine assembly for electricity power station
US5628179A (en) * 1993-11-04 1997-05-13 General Electric Co. Steam attemperation circuit for a combined cycle steam cooled gas turbine
US5649416A (en) * 1995-10-10 1997-07-22 General Electric Company Combined cycle power plant
US5661968A (en) * 1993-09-30 1997-09-02 Siemens Aktiengesellschaft Apparatus for cooling a gas turbine in a gas and steam turbine plant
US5768893A (en) * 1994-01-25 1998-06-23 Hoshino; Kenzo Turbine with internal heating passages
US5775091A (en) * 1996-10-21 1998-07-07 Westinghouse Electric Corporation Hydrogen fueled power plant
US5778657A (en) * 1995-09-22 1998-07-14 Kabushiki Kaisha Toshiba Combined cycle power plant
US5839269A (en) * 1995-10-02 1998-11-24 Asea Brown Boveri Ag Method of operating a combined gas and power steam plant
US5839267A (en) * 1995-03-31 1998-11-24 General Electric Co. Cycle for steam cooled gas turbines
US5873238A (en) * 1996-12-23 1999-02-23 Siemens Westinghouse Power Corporation Startup cooling steam generator for combustion turbine
US5906095A (en) * 1996-03-14 1999-05-25 Asea Brown Boveri Ag Method of operating a power station plant with steam cooling
US5953900A (en) * 1996-09-19 1999-09-21 Siemens Westinghouse Power Corporation Closed loop steam cooled steam turbine
US5979156A (en) * 1996-10-29 1999-11-09 Mitsubishi Heavy Industries, Ltd. Cooling steam system for steam cooled gas turbine
USRE36497E (en) * 1993-11-04 2000-01-18 General Electric Co. Combined cycle with steam cooled gas turbine
USRE36524E (en) * 1993-11-04 2000-01-25 General Electric Co. Steam attemperation circuit for a combined cycle steam cooled gas turbine
US6089012A (en) * 1996-10-29 2000-07-18 Mitsubishi Heavy Industries, Inc. Steam cooled gas turbine system
US6094905A (en) * 1996-09-25 2000-08-01 Kabushiki Kaisha Toshiba Cooling apparatus for gas turbine moving blade and gas turbine equipped with same
US6105362A (en) * 1995-09-22 2000-08-22 Kabushiki Kaisha Toshiba Combined cycle power plant with gas turbine cooling system
US6109019A (en) * 1996-11-29 2000-08-29 Mitsubishi Heavy Industries, Ltd. Steam cooled gas turbine system
US6116017A (en) * 1996-10-29 2000-09-12 Mitsubishi Heavy Industries, Ltd. Combined cycle power plant with steam cooled gas turbine
US6125623A (en) * 1998-03-03 2000-10-03 Siemens Westinghouse Power Corporation Heat exchanger for operating with a combustion turbine in either a simple cycle or a combined cycle
US6164056A (en) * 1996-07-24 2000-12-26 Mitsubishi Heavy Industries, Ltd. Combined cycle electric power plant
US6223520B1 (en) * 1998-02-25 2001-05-01 Mitsubishi Heavy Industries, Ltd. Gas turbine combined plant, method of operating the same, and steam-cooling system for gas turbine hot section
US6261063B1 (en) 1997-06-04 2001-07-17 Mitsubishi Heavy Industries, Ltd. Seal structure between gas turbine discs
US6279311B1 (en) * 1998-01-23 2001-08-28 Mitsubishi Heavy Industries, Ltd. Combined cycle power plant
US6286297B1 (en) * 1997-07-02 2001-09-11 Mitsubishi Heavy Industries, Ltd. Steam cooled type combined cycle power generation plant and operation method thereof
US6298657B1 (en) 1997-07-04 2001-10-09 Masahito Kataoka Combined cycle power plant generation plant with steam cooling
US6301874B1 (en) * 1998-01-23 2001-10-16 Mitsubishi Heavy Industries, Ltd. Combined cycle power plant with steam-cooled gas turbine
US6334295B1 (en) 1999-01-29 2002-01-01 General Electric Company Rotating diffuser for pressure recovery in a steam cooling circuit of a gas turbine
US6397575B2 (en) * 2000-03-23 2002-06-04 General Electric Company Apparatus and methods of reheating gas turbine cooling steam and high pressure steam turbine exhaust in a combined cycle power generating system
US6442927B1 (en) * 1996-08-27 2002-09-03 Mitsubishi Heavy Industries, Ltd. Gas turbine for combined cycle power plant
US6546713B1 (en) * 1997-12-15 2003-04-15 Hitachi, Ltd. Gas turbine for power generation, and combined power generation system
US6560966B1 (en) * 1999-08-25 2003-05-13 Alstom Method for operating a power plant having turbine cooling
US6574966B2 (en) 2000-06-08 2003-06-10 Hitachi, Ltd. Gas turbine for power generation
US20040025503A1 (en) * 2002-08-09 2004-02-12 Youichi Hattori Combined cycle plant
WO2004053300A2 (en) * 2002-12-09 2004-06-24 Siemens Aktiengesellschaft Method for operation of a gas and steam power station and gas and steam power station for carrying out said method
WO2004069381A1 (en) * 2003-01-28 2004-08-19 Fluor Corporation Configuration and process for carbonyl removal
KR100470771B1 (en) * 1995-03-31 2005-06-16 제너럴 일렉트릭 캄파니 Operation method of combined cycle gas turbine
US20100263605A1 (en) * 2009-04-17 2010-10-21 Ajit Singh Sengar Method and system for operating a steam generation facility
US20110072827A1 (en) * 2009-09-25 2011-03-31 Maurizio Ciofini Cooling system for a gas turbine and corresponding operation method
US20110085888A1 (en) * 2009-10-14 2011-04-14 Kawasaki Jukogyo Kabushiki Kaisha Sealing arrangement for use with gas turbine engine
US20110232298A1 (en) * 2010-03-23 2011-09-29 General Electric Company System and method for cooling gas turbine components
US20110304159A1 (en) * 2008-12-16 2011-12-15 Uwe Juretzek Method for stabilization of the network frequency of an electrical power network
CN102678332A (en) * 2011-03-15 2012-09-19 杜臣 Reheating vortex combined-type heat engine
CN102797565A (en) * 2011-05-26 2012-11-28 杜臣 Vortex composite heat engine
WO2012162922A1 (en) * 2011-06-02 2012-12-06 马鞍山科达洁能股份有限公司 Gas and steam turbine system
US20130091856A1 (en) * 2011-10-12 2013-04-18 Nathan Stafford Race Control system and methods for controlling the operation of power generation systems
RU2520762C1 (en) * 2012-12-17 2014-06-27 Владимир Леонидович Письменный Combined cycle plant
RU2523087C1 (en) * 2013-03-22 2014-07-20 Владимир Леонидович Письменный Steam and gas turbine plant
US8997498B2 (en) 2011-10-12 2015-04-07 General Electric Company System for use in controlling the operation of power generation systems
WO2015179907A1 (en) * 2014-05-30 2015-12-03 Leartek Pty Ltd Exhaust heat recovery system control method and device
RU2620610C1 (en) * 2016-02-15 2017-05-29 федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" Work method of combined cycle gas turbine power plant
RU2693567C1 (en) * 2018-07-31 2019-07-03 федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" Method of operation of steam-gas plant of power plant
US20190301310A1 (en) * 2018-03-29 2019-10-03 Volvo Car Corporation Vehicle with system for recovering waste heat
US11418077B2 (en) * 2018-07-27 2022-08-16 Valeo Siemens Eautomotive Germany Gmbh Rotor assembly with magnets and cooling channels and cooling channel separation element in the shaft

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3142850B2 (en) * 1989-03-13 2001-03-07 株式会社東芝 Turbine cooling blades and combined power plants
DE4029991A1 (en) * 1990-09-21 1992-03-26 Siemens Ag COMBINED GAS AND STEAM TURBINE SYSTEM
DE4237665A1 (en) * 1992-11-07 1994-05-11 Asea Brown Boveri Method for operating a combination system
DE4446862C2 (en) * 1994-12-27 1998-01-29 Siemens Ag Method for cooling the coolant of a gas turbine and device for carrying out the method
WO1997007323A1 (en) * 1995-08-18 1997-02-27 Siemens Aktiengesellschaft Gas and steam turbine plant and process for operating such a plant, also waste heat steam generator for a gas and steam turbine plant
DE19702830C1 (en) * 1997-01-27 1998-05-14 Siemens Ag Combined gas and steam turbine plant
DE19943782C5 (en) * 1999-09-13 2015-12-17 Siemens Aktiengesellschaft Gas and steam turbine plant
US6640550B2 (en) 2001-11-02 2003-11-04 Alstom (Switzerland) Ltd Gas turbo-group with cooling air system
US6644012B2 (en) 2001-11-02 2003-11-11 Alston (Switzerland) Ltd Gas turbine set
EP1998013A3 (en) * 2007-04-16 2009-05-06 Turboden S.r.l. Apparatus for generating electric energy using high temperature fumes
RU2467187C2 (en) * 2010-11-03 2012-11-20 ООО "Центр КОРТЭС" Method of operating gas turbine unit
RU2466285C2 (en) * 2010-11-09 2012-11-10 Федеральное государственное унитарное предприятие "Центральный институт авиационного моторостроения имени П.И. Баранова" Steam generating plant
KR20140139603A (en) 2012-03-30 2014-12-05 알스톰 테크놀러지 리미티드 Gas turbine with adjustable cooling air system
WO2014020115A1 (en) 2012-08-03 2014-02-06 Shell Internationale Research Maatschappij B.V. Process for recovering power
RU2545115C2 (en) * 2013-04-23 2015-03-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Казанский национальный исследовательский технический университет им. А.Н. Туполева-КАИ" (КНИТУ-КАИ) Power plant

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH286635A (en) * 1948-08-24 1952-10-31 Kluge Friedrich Ing Dr Method for operating a power plant.
NL75236C (en) * 1950-03-13
FR1318433A (en) * 1961-03-30 1963-02-15 Bbc Brown Boveri & Cie Combined installation of a gas turbine and a steam engine group
US3150487A (en) * 1963-04-08 1964-09-29 Gen Electric Steam turbine-gas turbine power plant

Cited By (96)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4891937A (en) * 1982-10-13 1990-01-09 Hitachi, Ltd. Heat recovery system
US4989405A (en) * 1983-04-08 1991-02-05 Solar Turbines Incorporated Combined cycle power plant
DE3435382A1 (en) * 1984-09-27 1986-04-03 Hermann Dipl.-Ing. 5401 Kobern-Gondorf Bongers Gas-steam compound turbine with raised temperature level
US4907405A (en) * 1989-01-24 1990-03-13 Union Carbide Corporation Process to cool gas
US4991391A (en) * 1989-01-27 1991-02-12 Westinghouse Electric Corp. System for cooling in a gas turbine
US5379588A (en) * 1990-11-20 1995-01-10 General Electric Company Reheat steam cycle for a steam and gas turbine combined cycle system
US5233826A (en) * 1991-04-02 1993-08-10 Cheng Dah Y Method for starting and operating an advanced regenerative parallel compound dual fluid heat engine-advanced cheng cycle (ACC)
US5251432A (en) * 1991-07-17 1993-10-12 Siemens Aktiengesellschaft Method for operating a gas and steam turbine plant
US5345755A (en) * 1991-07-17 1994-09-13 Siemens Aktiengesellschaft Steam turbine plant
US5369949A (en) * 1991-07-17 1994-12-06 Siemens Aktiengensellschaft Method for operating a gas and steam turbine plant and a plant for performing the method
US5285627A (en) * 1991-07-17 1994-02-15 Siemens Aktiengesellschaft Method for operating a gas and steam turbine plant and a plant for performing the method
US5340274A (en) * 1991-11-19 1994-08-23 General Electric Company Integrated steam/air cooling system for gas turbines
US5320483A (en) * 1992-12-30 1994-06-14 General Electric Company Steam and air cooling for stator stage of a turbine
US5471832A (en) * 1993-03-11 1995-12-05 Hitachi, Ltd. Combined cycle power plant
US5661968A (en) * 1993-09-30 1997-09-02 Siemens Aktiengesellschaft Apparatus for cooling a gas turbine in a gas and steam turbine plant
US5628179A (en) * 1993-11-04 1997-05-13 General Electric Co. Steam attemperation circuit for a combined cycle steam cooled gas turbine
USRE36497E (en) * 1993-11-04 2000-01-18 General Electric Co. Combined cycle with steam cooled gas turbine
USRE36524E (en) * 1993-11-04 2000-01-25 General Electric Co. Steam attemperation circuit for a combined cycle steam cooled gas turbine
US5577377A (en) * 1993-11-04 1996-11-26 General Electric Co. Combined cycle with steam cooled gas turbine
US5412937A (en) * 1993-11-04 1995-05-09 General Electric Company Steam cycle for combined cycle with steam cooled gas turbine
US5428950A (en) * 1993-11-04 1995-07-04 General Electric Co. Steam cycle for combined cycle with steam cooled gas turbine
US5491971A (en) * 1993-12-23 1996-02-20 General Electric Co. Closed circuit air cooled gas turbine combined cycle
US5493854A (en) * 1993-12-29 1996-02-27 Abb Management Ag Method for operating a gas turbine in a simple cycle and in a cycle combined with a steam turbine
US5609019A (en) * 1993-12-29 1997-03-11 Abb Management Ag Apparatus for operating a gas turbine in a simple cycle and in a cycle combined with a steam turbine
US5768893A (en) * 1994-01-25 1998-06-23 Hoshino; Kenzo Turbine with internal heating passages
US5431007A (en) * 1994-03-04 1995-07-11 Westinghouse Elec Corp Thermochemically recuperated and steam cooled gas turbine system
US5613356A (en) * 1994-03-21 1997-03-25 Abb Management Ag Method of cooling thermally loaded components of a gas turbine group
US5536143A (en) * 1995-03-31 1996-07-16 General Electric Co. Closed circuit steam cooled bucket
US5593274A (en) * 1995-03-31 1997-01-14 General Electric Co. Closed or open circuit cooling of turbine rotor components
KR100470771B1 (en) * 1995-03-31 2005-06-16 제너럴 일렉트릭 캄파니 Operation method of combined cycle gas turbine
US5839267A (en) * 1995-03-31 1998-11-24 General Electric Co. Cycle for steam cooled gas turbines
US5778657A (en) * 1995-09-22 1998-07-14 Kabushiki Kaisha Toshiba Combined cycle power plant
US6105362A (en) * 1995-09-22 2000-08-22 Kabushiki Kaisha Toshiba Combined cycle power plant with gas turbine cooling system
US6000213A (en) * 1995-09-22 1999-12-14 Kabushiki Kaisha Toshiba Combined cycle power plant
US5839269A (en) * 1995-10-02 1998-11-24 Asea Brown Boveri Ag Method of operating a combined gas and power steam plant
US5649416A (en) * 1995-10-10 1997-07-22 General Electric Company Combined cycle power plant
DE19547803C1 (en) * 1995-12-20 1997-04-10 Siemens Ag Steam-turbine assembly for electricity power station
US5906095A (en) * 1996-03-14 1999-05-25 Asea Brown Boveri Ag Method of operating a power station plant with steam cooling
US6164056A (en) * 1996-07-24 2000-12-26 Mitsubishi Heavy Industries, Ltd. Combined cycle electric power plant
US6442927B1 (en) * 1996-08-27 2002-09-03 Mitsubishi Heavy Industries, Ltd. Gas turbine for combined cycle power plant
US5953900A (en) * 1996-09-19 1999-09-21 Siemens Westinghouse Power Corporation Closed loop steam cooled steam turbine
US6094905A (en) * 1996-09-25 2000-08-01 Kabushiki Kaisha Toshiba Cooling apparatus for gas turbine moving blade and gas turbine equipped with same
US6195979B1 (en) * 1996-09-25 2001-03-06 Kabushiki Kaisha Toshiba Cooling apparatus for gas turbine moving blade and gas turbine equipped with same
US5775091A (en) * 1996-10-21 1998-07-07 Westinghouse Electric Corporation Hydrogen fueled power plant
US5979156A (en) * 1996-10-29 1999-11-09 Mitsubishi Heavy Industries, Ltd. Cooling steam system for steam cooled gas turbine
US6089012A (en) * 1996-10-29 2000-07-18 Mitsubishi Heavy Industries, Inc. Steam cooled gas turbine system
US6116017A (en) * 1996-10-29 2000-09-12 Mitsubishi Heavy Industries, Ltd. Combined cycle power plant with steam cooled gas turbine
US6109019A (en) * 1996-11-29 2000-08-29 Mitsubishi Heavy Industries, Ltd. Steam cooled gas turbine system
US5873238A (en) * 1996-12-23 1999-02-23 Siemens Westinghouse Power Corporation Startup cooling steam generator for combustion turbine
US6261063B1 (en) 1997-06-04 2001-07-17 Mitsubishi Heavy Industries, Ltd. Seal structure between gas turbine discs
US6286297B1 (en) * 1997-07-02 2001-09-11 Mitsubishi Heavy Industries, Ltd. Steam cooled type combined cycle power generation plant and operation method thereof
US6298657B1 (en) 1997-07-04 2001-10-09 Masahito Kataoka Combined cycle power plant generation plant with steam cooling
US6546713B1 (en) * 1997-12-15 2003-04-15 Hitachi, Ltd. Gas turbine for power generation, and combined power generation system
US6301874B1 (en) * 1998-01-23 2001-10-16 Mitsubishi Heavy Industries, Ltd. Combined cycle power plant with steam-cooled gas turbine
US6279311B1 (en) * 1998-01-23 2001-08-28 Mitsubishi Heavy Industries, Ltd. Combined cycle power plant
US6223520B1 (en) * 1998-02-25 2001-05-01 Mitsubishi Heavy Industries, Ltd. Gas turbine combined plant, method of operating the same, and steam-cooling system for gas turbine hot section
US6125623A (en) * 1998-03-03 2000-10-03 Siemens Westinghouse Power Corporation Heat exchanger for operating with a combustion turbine in either a simple cycle or a combined cycle
US6334295B1 (en) 1999-01-29 2002-01-01 General Electric Company Rotating diffuser for pressure recovery in a steam cooling circuit of a gas turbine
US6560966B1 (en) * 1999-08-25 2003-05-13 Alstom Method for operating a power plant having turbine cooling
US6397575B2 (en) * 2000-03-23 2002-06-04 General Electric Company Apparatus and methods of reheating gas turbine cooling steam and high pressure steam turbine exhaust in a combined cycle power generating system
US6574966B2 (en) 2000-06-08 2003-06-10 Hitachi, Ltd. Gas turbine for power generation
US7367192B2 (en) 2002-08-09 2008-05-06 Hitachi, Ltd. Combined cycle plant
US20050198939A1 (en) * 2002-08-09 2005-09-15 Youichi Hattori Combined cycle plant
US6983585B2 (en) * 2002-08-09 2006-01-10 Hitachi, Ltd. Combined cycle plant
US20040025503A1 (en) * 2002-08-09 2004-02-12 Youichi Hattori Combined cycle plant
WO2004053300A3 (en) * 2002-12-09 2004-08-26 Siemens Ag Method for operation of a gas and steam power station and gas and steam power station for carrying out said method
WO2004053300A2 (en) * 2002-12-09 2004-06-24 Siemens Aktiengesellschaft Method for operation of a gas and steam power station and gas and steam power station for carrying out said method
WO2004069381A1 (en) * 2003-01-28 2004-08-19 Fluor Corporation Configuration and process for carbonyl removal
AU2003210732B2 (en) * 2003-01-28 2007-03-29 Fluor Technologies Corporation Configuration and process for carbonyl removal
CN100408146C (en) * 2003-01-28 2008-08-06 弗劳尔公司 Configuration and process for carbonyl removal
EA011426B1 (en) * 2003-01-28 2009-02-27 Флуор Корпорейшн Process for carbon removal and a plant therefor
US20110304159A1 (en) * 2008-12-16 2011-12-15 Uwe Juretzek Method for stabilization of the network frequency of an electrical power network
US8981583B2 (en) * 2008-12-16 2015-03-17 Siemens Aktiengesellschaft Method for stabilization of the network frequency of an electrical power network
US20100263605A1 (en) * 2009-04-17 2010-10-21 Ajit Singh Sengar Method and system for operating a steam generation facility
US20110072827A1 (en) * 2009-09-25 2011-03-31 Maurizio Ciofini Cooling system for a gas turbine and corresponding operation method
US8726672B2 (en) 2009-09-25 2014-05-20 Nuovo Pignone S.P.A. Cooling system for a gas turbine and corresponding operation method
US20110085888A1 (en) * 2009-10-14 2011-04-14 Kawasaki Jukogyo Kabushiki Kaisha Sealing arrangement for use with gas turbine engine
US8562294B2 (en) * 2009-10-14 2013-10-22 Kawasaki Jukogyo Kabushiki Kaisha Sealing arrangement for use with gas turbine engine
US20110232298A1 (en) * 2010-03-23 2011-09-29 General Electric Company System and method for cooling gas turbine components
CN102678332A (en) * 2011-03-15 2012-09-19 杜臣 Reheating vortex combined-type heat engine
CN102678332B (en) * 2011-03-15 2016-02-17 杜臣 Reheating vortex combined type heat engine
CN102797565A (en) * 2011-05-26 2012-11-28 杜臣 Vortex composite heat engine
CN102797565B (en) * 2011-05-26 2016-02-17 杜臣 Vortex combined type heat engine
WO2012162922A1 (en) * 2011-06-02 2012-12-06 马鞍山科达洁能股份有限公司 Gas and steam turbine system
US8997498B2 (en) 2011-10-12 2015-04-07 General Electric Company System for use in controlling the operation of power generation systems
US20130091856A1 (en) * 2011-10-12 2013-04-18 Nathan Stafford Race Control system and methods for controlling the operation of power generation systems
US9334753B2 (en) * 2011-10-12 2016-05-10 General Electric Company Control system and methods for controlling the operation of power generation systems
RU2520762C1 (en) * 2012-12-17 2014-06-27 Владимир Леонидович Письменный Combined cycle plant
RU2523087C1 (en) * 2013-03-22 2014-07-20 Владимир Леонидович Письменный Steam and gas turbine plant
WO2015179907A1 (en) * 2014-05-30 2015-12-03 Leartek Pty Ltd Exhaust heat recovery system control method and device
CN106661964A (en) * 2014-05-30 2017-05-10 利尔泰克有限公司 Exhaust heat recovery system control method and device
US20170201158A1 (en) * 2014-05-30 2017-07-13 Leartek Pty Ltd Exhaust heat recovery system control method and device
RU2620610C1 (en) * 2016-02-15 2017-05-29 федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" Work method of combined cycle gas turbine power plant
US20190301310A1 (en) * 2018-03-29 2019-10-03 Volvo Car Corporation Vehicle with system for recovering waste heat
US11418077B2 (en) * 2018-07-27 2022-08-16 Valeo Siemens Eautomotive Germany Gmbh Rotor assembly with magnets and cooling channels and cooling channel separation element in the shaft
RU2693567C1 (en) * 2018-07-31 2019-07-03 федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" Method of operation of steam-gas plant of power plant

Also Published As

Publication number Publication date
DE3261410D1 (en) 1985-01-17
JPS57176309A (en) 1982-10-29
JPS6340244B2 (en) 1988-08-10
EP0062932A1 (en) 1982-10-20
EP0062932B1 (en) 1984-12-05

Similar Documents

Publication Publication Date Title
US4424668A (en) Combined gas turbine and steam turbine power station
US7003956B2 (en) Steam turbine, steam turbine plant and method of operating a steam turbine in a steam turbine plant
AU668781B2 (en) Combined combustion and steam turbine power plant
US5640840A (en) Recuperative steam cooled gas turbine method and apparatus
US5953900A (en) Closed loop steam cooled steam turbine
EP0020594B1 (en) Reheat gas turbine
US6499302B1 (en) Method and apparatus for fuel gas heating in combined cycle power plants
KR100598447B1 (en) Compressed air steam generator for use in cooling a combustion turbine transition section
US20060254280A1 (en) Combined cycle power plant using compressor air extraction
EP1752617A2 (en) Combined cycle power plant
CA2324162C (en) Gas turbine combined cycle system
JPH07301127A (en) Gas turbine power plant, and cooling method for gas turbine power plant
CN109653875B (en) Fuel preheating system for combustion turbine engine
US8424281B2 (en) Method and apparatus for facilitating cooling of a steam turbine component
EP1007823A1 (en) Hydrogen fueled power plant
US11408339B2 (en) Steam turbine system and combined cycle plant
US20150192036A1 (en) Preheating arrangement for a combined cycle plant
US6116017A (en) Combined cycle power plant with steam cooled gas turbine
EP0908603A4 (en) Single shaft combined cycle plant and method for operating the same
US5727377A (en) Method of operating a gas turbine power plant with steam injection
JPH0388902A (en) Gas.steam turbine complex equipment with coal-gasification apparatus
US10287922B2 (en) Steam turbine plant, combined cycle plant provided with same, and method of operating steam turbine plant
JPH0425415B2 (en)
JP3586542B2 (en) Multi-shaft combined cycle power plant
JP3389019B2 (en) Steam cooled gas turbine

Legal Events

Date Code Title Description
AS Assignment

Owner name: BBC BROWN BOVERI & COMPANY LIMITED CH 5410 BADEN S

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:MUKHERJEE, DILIP;REEL/FRAME:004169/0765

Effective date: 19830708

STCF Information on status: patent grant

Free format text: PATENTED CASE

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, PL 96-517 (ORIGINAL EVENT CODE: M170); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, PL 96-517 (ORIGINAL EVENT CODE: M171); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 8

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Free format text: PAYER NUMBER DE-ASSIGNED (ORIGINAL EVENT CODE: RMPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M185); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 12

AS Assignment

Owner name: ABB PARTICIPATION AG, SWITZERLAND

Free format text: CHANGE OF NAME;ASSIGNOR:BBC BROWN BOVERI AG;REEL/FRAME:012252/0242

Effective date: 19990318

Owner name: BBC BROWN BOVERI AG, SWITZERLAND

Free format text: CHANGE OF NAME;ASSIGNOR:BBC BROWN, BOVERI & COMPANY LIMITED;REEL/FRAME:012252/0305

Effective date: 19900918

AS Assignment

Owner name: ALSTOM, FRANCE

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:ABB PARTICIPATION AG;REEL/FRAME:012506/0124

Effective date: 20010712