US3791094A - Method and apparatus for mounting building panels - Google Patents

Method and apparatus for mounting building panels Download PDF

Info

Publication number
US3791094A
US3791094A US00297996A US3791094DA US3791094A US 3791094 A US3791094 A US 3791094A US 00297996 A US00297996 A US 00297996A US 3791094D A US3791094D A US 3791094DA US 3791094 A US3791094 A US 3791094A
Authority
US
United States
Prior art keywords
panels
panel
building structure
carrier
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00297996A
Inventor
J Shannon
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3791094A publication Critical patent/US3791094A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Definitions

  • a plurality of building panels may be raised 52/748 122 126 alongside: a building structure and then separately mounted on the structure to form a wall thereof,
  • Building panels are relatively heavy and cumbersome to handle and install on a building framework or other structure.
  • conventional scaffolding suspended by ropes from the building structure has been employed, the panels were left on the ground and manually lifted one at a time by a rope and a well wheel pulley mounted on the building. The pulley had to be moved frequently and a man was required at that point.
  • two men were required on the ground as well as two men on the scaffolding.
  • FIG. 1 is an elevation, partly in section illustrating the method and apparatus of this invention, with the apparatus supported at an elevation for the mounting of panels on a building structure;
  • FIG. 2 is a plan view of the apparatus of FIG. I, with certain portions omitted for illustration;
  • FIG. 3 is a view similar to FIG. 1, but illustrating the apparatus with one of the panels in position for mounting on the building structure;
  • FIG. 4 is a view illustrating the substantially complete mounting of one of the panels on the building structure.
  • the letter A designates generally the apparatus of this invention which is adapted to be elevated and moved horizontally with a conventional mobile hoisting device, a portion of which is illustrated and is designated with the letter M.
  • the apparatus A is adapted to lift a plurality of building panels to an elevation alongside a framework or building structure B for the mounting of such panels P separately by a man C who is also raised with the apparatus A.
  • such apparatus includes a platform F for receiving the man C and the panels P thereon.
  • the platform F may be made in a suitable manner so long as it has adequate strength for hoisting same with the mobile hoisting mechanism M and for supporting the load thereon.
  • the platform F includes longitudinally extending channel members 10 and end channel members 11, all of which are welded together or otherwise secured to form a rectangular base for a platform grill 12 made of expanded metal, screen or other suitable supporting material.
  • the grill 12 is welded or otherwise secured to the rectangular base provided by the longitudinal platform members 10 and end members 11.
  • the fingers 15 are adapted to be inserted and removed from the open ends of the openings 14a as illustrated in FIGS. 1 and 2.
  • Such fingers 15 are illustrated as attached to a supporting plate l7-and operating arms 18, a portion of which is illustrated, which extend to a vehicle of known construction which has wheels for rolling movement on the ground and which have several power means for moving the vehicle on the ground and for also raising and lowering the plate 17 with the fingers 15 to thereby raise and lower the apparatus A with respect to building structure B and the ground level therebelow, as will be more evident hereinafter.
  • a plurality of locking bolts 20 are mounted, each with a nut 21 that is welded or otherwise secured to the side of the tube 14 so that the bolts 20 can be threaded through each nut therewith and a suitable opening in the wall of the tube 14 for engagement with one of the fingers 15.
  • a plurality of such bolts 20 are tightened so that they clamp each of the fingers 15 in the tubes 14, it will be appreciated that the entire apparatus A is prevented from shifting off of the fingers 15 until such bolts 20 have been unthreaded and released from engagement with the fingers 15.
  • the platform F is provided with safety rails 25 at the outer longitudinal side of the platform and at a height sufficient to prevent the man C from inadvertently falling from the platform when the apparatus A is in an elevated position above ground level.
  • similar safety rails 26 are provided at each end of the platform F at a height which is substantially the same as the height of the rails 25 so that the man or men C are protected from falling from the platform F on at least the three sides of the platform F.
  • the inner side of the platform which is adjacent to the building structure B does not need a permanent safety rail since it is disposed very close to the building structure B, although a safety rail may be utilized in some instances, or a temporary safety line may be extended from the end rails 26 out of an abundance of caution in some situations.
  • the safety rails 25 and 26 are preferably supported by vertical angle iron members 27 at each of the corners, each of which is welded to the platform F in the preferred form of the invention.
  • a plurality of toe plates and 31 are welded or otherwise secured to the platform F by any suitable connecting means so as to provide a stop or a warning for the man or men C so that they will know that they are at the edge of the platform F in the event they are working and not looking downwardly as they move around on the platform.
  • the apparatus A also includes a vertical support post or column which is preferably made in two or more sections and is releasably joined together by a coupling 41 so that the post 40 can be disassembled into relatively small lengths for transportation to and from each job site.
  • the lower end of the column 40 is preferably rotatably mounted in a tubular support 42 which is welded or is otherwise secured to and forms a part of platform F.
  • the bottom of 42a of the tubular support 42 is closed so that the lower end of column or post 40 rests thereon or on any other suitable base within the column supporting member 42.
  • a substantially horizontal boom 45 which is formed with at least one lower rail 45a is preferably releasably mounted to the upper end of the post or column 40 by means of releasable bolts 45b which extend through a plate 450 which is a part of the boom 45 and another plate 40a which is welded or is otherwise secured to the post 40 near its upper end.
  • the boom track 45a is adapted to receive wheels on a trolley 51 so that the trolley 51 may move horizontally on such boom 45.
  • the wheels 50 are confined by any suitable means (not shown) so that they cannot shift off of the track 45a as they move along the boom 45.
  • a slight lip on the track 45a will provide such restriction to movement of the wheels 50 laterally off of the track 45a, or the trolley 51 may be provided with a corresponding set of wheels 50 to those shown but on the opposite side of the boom 45 so that they are not visible in FIG. 1 and they would move on a track similar to 450, thereby preventing any lateral shifting of the trolley 51.
  • the trolley 51 has an upper pulley 52 mounted therewith and it carries an operating line or cable 53 over it and such line or cable 53 is connected to a travelling block or pulley 54 in the preferred form of the invention.
  • the end of the line 53 indicated at 53a is preferably free so that it may be grasped by the man C to effect a raising and lifting of one of the panels P.
  • the other end of the line 53b has a hook 55 or other suitable means (FIG. 1) for engaging the lower edge of the panel P which is to be moved.
  • the operator C preferably has a special tool T which has a long handle having its lower end 60a which is grasped by the operator C and its upper end 60b which is welded or is otherwise secured to a pipe or tubular member 61.
  • the pipe or tubular member 61 is formed with a notch 61a sufficiently large to slide over the upper end of the panel P.
  • the line 53 passes through a portion of the pipe 61 or to one side of it.
  • the building structure B may be formed in any suitable manner so long as it is capable of receiving the panels P, as illustrated in the drawings, the building structure B includes a plurality of horizontally extending angle iron members of known construction which are mounted to a vertically extending member 71, a portion of which is schematically illustrated in the drawings. It will be understood that the invention is not limited to the mounting of the panels P upon any particular kind of building structure, and the invention is described herein with respect to the building structure B solely for illustrative purposes. It should also be understood that the panels P are preferably and are normally of the asbestos cement type which are extremely heavy and difficult for one man to handle. A suitable support block is preferably provided on the platform grill 12 for supporting the panels P so that they are not damaged and may be more readily engaged by the hook 55 to pick them up for moving same into position adjacent the building B.
  • the apparatus A is lowered to ground level, or near ground level, by lowering the fingers 15 of the hoisting unit M.
  • a plurality of the panels P are then loaded onto the platform and are disposed on the support 75, assuming such support is utilized on the platform F.
  • the panels P are positioned substantially vertically to the outside of the platform F and they are preferably disposed at an angle so that they lean against the column or support post 40 as best seen in FIGS. 1 and 3.
  • the apparatus A has been raised to a point above a tier of panels P which have already been attached to the building structure P.
  • the operator engages the hook 55 below the panel P which is closest to him, and he positions the special handling tool T with the knot 61a over the upper end of the panel P.
  • the operator thus has control of the panel P at the upper and lower ends and he may raise the panel P by pulling downwardly on the end 53a of the cable or line 53.
  • the operator After the panel P has been raised upwardly by the operator pulling downwardly on the line 53 at the end 53a, the operator turns the panel P 180 so as to position the panel between him and the building structure B so that it assumes the position generally shown in FIG. 3.
  • the movement of the panel P horizontally or laterally is accomplished by the trolley 51 moving laterally on the boom 45.
  • Such urging is accomplished by the operator pulling on the tool T and also on the line 53.
  • an additional operator is used on the apparatus A, he may assist in handling the panel P as it is moved from its stacked position to the position for attaching to the building structure B.
  • the apparatus A may be raised to facilitate the inserting of the fasteners 80 at the various heights which might not otherwise be reached conveniently by the men C in the apparatus A.
  • the boom 45 extends inwardly past the vertical member 71, so it is assumed that the vertical member 71 is positioned with vertical spaces therebetween, which is usually the case. In other words, there is ample room for the boom 45 to extend into the building structure as illustrated in FIGS. 1 and 3.
  • the boom structure can be shorter in length and can terminate at the edge of the building structure B if the building structure B is so made that the boom 45 cannot extend into the space between the vertical support 71.
  • the apparatus A is moved horizontally by moving the mobile support and hoisting means M horizontally when it is desired to move the apparatus A for the positioning of the next panel P on the building structure B.
  • several panels P may be installed on the building structure B without horizontally or laterally moving the apparatus A, but when that does become necessary, the entire apparatus A may be moved without lowering it back to the ground level, or if more convenient, the apparatus A may be lowered back to the ground level and then moved horizontally to locate the apparatus A for the positioning of the next panel P in the same manner as heretofore described with the first panel P. All of the panels P are thus mounted on the building structure B and when the supply panels P on the apparatus A has thus been exhausted, the apparatus A is lowered back to the ground level and another group of panels P are mounted on the platform F and the procedure is repeated.
  • the invention is not limited thereto.
  • the operator C may engage the tool T so that the handle 60 is outwardly of the particular panel P which is to be moved.
  • This normally requires two operators C so that one of the operators can hold the panel P spaced from the other stacked panels P so as to provide a space outwardly of the panel P which is to be picked up for thereby receiving the handle 60 of the tool T.
  • the handle 60 When the handle 60 is thus outwardly disposed with respect to the panel P, the operator simply moves the panel P inwardly without turning or rotating same so that the too] T ends up in the same position as shown in FIG. 3 of 6 the drawings.
  • the hook 55 is also preferably disposed so that it faces inwardly as shown in FIG. 3, when initially engaged in the position of FIG. 1 so as to facilitate the removal of the book 55 after the panel P has been fastened to the building structure B.
  • a method of mounting building panels on a building structure comprising the steps of:

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A method and apparatus for mounting building panels, wherein a plurality of building panels may be raised alongside a building structure and then separately mounted on the structure to form a wall thereof, which method and apparatus requires a reduced number of men and a much safer operation.

Description

3,791,094 Feb. 12, 1974 3,315,426 4/1967 Rolland.................................52/235 FOREIGN PATENTS 0R APPLICATIONS METHOD AND APPARATUS FOR MOUNTING BUILDING PANELS Joseph R. Shannon, Jr., PO. Box 40006, Houston, Tex. 77040 Oct. 16, 1972 [76] Inventor:
8/1928 Great Britain Primary ExaminerJohn E. Murtagh [22] Filed:
[21 App] 297 99 Attorney, Agent, or FirmPravel, Wilson & Matthews ABSTRACT A method and apparatus for mounting building panels.
214/1 H, 214/1 SW Int. Cl... E04g 21/00 Field of Search..... 52/745, 235, 741, 746, 747,
wherein a plurality of building panels may be raised 52/748 122 126 alongside: a building structure and then separately mounted on the structure to form a wall thereof,
which method and apparatus requires a reduced number of men and a much safer operation.
References Cited UNITED STATES PATENTS 3,245,192 4/1966 52/748 5 Claims, 4 Drawing Figures METHOD AND APPARATUS FOR MOUNTING BUILDING PANELS BACKGROUND OF THE INVENTION The field of this invention is methods and apparatus for mounting building panels.
Building panels, particularly corrugated asbestos cement sheets or panels, are relatively heavy and cumbersome to handle and install on a building framework or other structure. When making a large commercial or industrial building it is usually necessary to lift such panels off the ground level and install them at second, third or even higher tiers to form the complete walls. Heretofore, conventional scaffolding suspended by ropes from the building structure has been employed, the panels were left on the ground and manually lifted one at a time by a rope and a well wheel pulley mounted on the building. The pulley had to be moved frequently and a man was required at that point. Also, for lifting each panel from the ground to the scaffolding, two men were required on the ground as well as two men on the scaffolding. Because each panel was raised on the outside of the scaffolding, the scaffolding had to be left open to receive each panel,.so that there was no safety rail to keep the men on the scaffolding from falling, and of course, as the scaffolding was raised to higher elevations for the upper tiers of panels, the danger to the men on the scaffolding increased.
SUMMARY OF. THE INVENTION BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an elevation, partly in section illustrating the method and apparatus of this invention, with the apparatus supported at an elevation for the mounting of panels on a building structure;
FIG. 2 is a plan view of the apparatus of FIG. I, with certain portions omitted for illustration;
FIG. 3 is a view similar to FIG. 1, but illustrating the apparatus with one of the panels in position for mounting on the building structure; and
FIG. 4 is a view illustrating the substantially complete mounting of one of the panels on the building structure.
DESCRIPTION OF THE PREFERRED EMBODIMENT In the drawings, the letter A designates generally the apparatus of this invention which is adapted to be elevated and moved horizontally with a conventional mobile hoisting device, a portion of which is illustrated and is designated with the letter M. As will be explained in detail, the apparatus A is adapted to lift a plurality of building panels to an elevation alongside a framework or building structure B for the mounting of such panels P separately by a man C who is also raised with the apparatus A.
Considering the apparatus A more in detail, such apparatus includes a platform F for receiving the man C and the panels P thereon. The platform F may be made in a suitable manner so long as it has adequate strength for hoisting same with the mobile hoisting mechanism M and for supporting the load thereon.
As illustrated in the drawings, the platform F includes longitudinally extending channel members 10 and end channel members 11, all of which are welded together or otherwise secured to form a rectangular base for a platform grill 12 made of expanded metal, screen or other suitable supporting material. The grill 12 is welded or otherwise secured to the rectangular base provided by the longitudinal platform members 10 and end members 11.
A pair of hollow tubes 14, each of which is preferably rectangular in shape and is provided with a rectangular shaped internal opening 14a, are welded or are otherwise secured to the longitudinal platform members 10 and they are spaced apart a distance equal to the spacing of the fork lift fingers 15 or similar lifting members which are a part of the hoisting and moving mechanism M. The fingers 15 are adapted to be inserted and removed from the open ends of the openings 14a as illustrated in FIGS. 1 and 2.
Such fingers 15 are illustrated as attached to a supporting plate l7-and operating arms 18, a portion of which is illustrated, which extend to a vehicle of known construction which has wheels for rolling movement on the ground and which have several power means for moving the vehicle on the ground and for also raising and lowering the plate 17 with the fingers 15 to thereby raise and lower the apparatus A with respect to building structure B and the ground level therebelow, as will be more evident hereinafter.
To lock each of the fingers 15 in each of the fingerreceiving tubes 14, a plurality of locking bolts 20 are mounted, each with a nut 21 that is welded or otherwise secured to the side of the tube 14 so that the bolts 20 can be threaded through each nut therewith and a suitable opening in the wall of the tube 14 for engagement with one of the fingers 15. When a plurality of such bolts 20 are tightened so that they clamp each of the fingers 15 in the tubes 14, it will be appreciated that the entire apparatus A is prevented from shifting off of the fingers 15 until such bolts 20 have been unthreaded and released from engagement with the fingers 15.
The platform F is provided with safety rails 25 at the outer longitudinal side of the platform and at a height sufficient to prevent the man C from inadvertently falling from the platform when the apparatus A is in an elevated position above ground level. Also, similar safety rails 26 are provided at each end of the platform F at a height which is substantially the same as the height of the rails 25 so that the man or men C are protected from falling from the platform F on at least the three sides of the platform F. The inner side of the platform which is adjacent to the building structure B does not need a permanent safety rail since it is disposed very close to the building structure B, although a safety rail may be utilized in some instances, or a temporary safety line may be extended from the end rails 26 out of an abundance of caution in some situations. The safety rails 25 and 26 are preferably supported by vertical angle iron members 27 at each of the corners, each of which is welded to the platform F in the preferred form of the invention.
Also, a plurality of toe plates and 31 are welded or otherwise secured to the platform F by any suitable connecting means so as to provide a stop or a warning for the man or men C so that they will know that they are at the edge of the platform F in the event they are working and not looking downwardly as they move around on the platform.
The apparatus A also includes a vertical support post or column which is preferably made in two or more sections and is releasably joined together by a coupling 41 so that the post 40 can be disassembled into relatively small lengths for transportation to and from each job site. The lower end of the column 40 is preferably rotatably mounted in a tubular support 42 which is welded or is otherwise secured to and forms a part of platform F. The bottom of 42a of the tubular support 42 is closed so that the lower end of column or post 40 rests thereon or on any other suitable base within the column supporting member 42.
A substantially horizontal boom 45 which is formed with at least one lower rail 45a is preferably releasably mounted to the upper end of the post or column 40 by means of releasable bolts 45b which extend through a plate 450 which is a part of the boom 45 and another plate 40a which is welded or is otherwise secured to the post 40 near its upper end.
The boom track 45a is adapted to receive wheels on a trolley 51 so that the trolley 51 may move horizontally on such boom 45. The wheels 50 are confined by any suitable means (not shown) so that they cannot shift off of the track 45a as they move along the boom 45. A slight lip on the track 45a will provide such restriction to movement of the wheels 50 laterally off of the track 45a, or the trolley 51 may be provided with a corresponding set of wheels 50 to those shown but on the opposite side of the boom 45 so that they are not visible in FIG. 1 and they would move on a track similar to 450, thereby preventing any lateral shifting of the trolley 51.
The trolley 51 has an upper pulley 52 mounted therewith and it carries an operating line or cable 53 over it and such line or cable 53 is connected to a travelling block or pulley 54 in the preferred form of the invention. The end of the line 53 indicated at 53a is preferably free so that it may be grasped by the man C to effect a raising and lifting of one of the panels P. The other end of the line 53b has a hook 55 or other suitable means (FIG. 1) for engaging the lower edge of the panel P which is to be moved.
To facilitate the handling of each panel P as it is moved from a stacked position on the platform F to a position for mounting on the building structure P, the operator C preferably has a special tool T which has a long handle having its lower end 60a which is grasped by the operator C and its upper end 60b which is welded or is otherwise secured to a pipe or tubular member 61. The pipe or tubular member 61 is formed with a notch 61a sufficiently large to slide over the upper end of the panel P. The line 53 passes through a portion of the pipe 61 or to one side of it.
Although the building structure B may be formed in any suitable manner so long as it is capable of receiving the panels P, as illustrated in the drawings, the building structure B includes a plurality of horizontally extending angle iron members of known construction which are mounted to a vertically extending member 71, a portion of which is schematically illustrated in the drawings. It will be understood that the invention is not limited to the mounting of the panels P upon any particular kind of building structure, and the invention is described herein with respect to the building structure B solely for illustrative purposes. It should also be understood that the panels P are preferably and are normally of the asbestos cement type which are extremely heavy and difficult for one man to handle. A suitable support block is preferably provided on the platform grill 12 for supporting the panels P so that they are not damaged and may be more readily engaged by the hook 55 to pick them up for moving same into position adjacent the building B.
In carrying out the method of this invention, the apparatus A is lowered to ground level, or near ground level, by lowering the fingers 15 of the hoisting unit M. A plurality of the panels P are then loaded onto the platform and are disposed on the support 75, assuming such support is utilized on the platform F. The panels P are positioned substantially vertically to the outside of the platform F and they are preferably disposed at an angle so that they lean against the column or support post 40 as best seen in FIGS. 1 and 3.
Usually there are two men or operators C which then ride up with the apparatus A and they may steady the panels P during the lifting or hoisting of the apparatus A to the desired elevation for the beginning of the mounting of the panels P to the building structure B. As illustrated in FIG. 1, the apparatus A has been raised to a point above a tier of panels P which have already been attached to the building structure P. The operator then engages the hook 55 below the panel P which is closest to him, and he positions the special handling tool T with the knot 61a over the upper end of the panel P. The operator thus has control of the panel P at the upper and lower ends and he may raise the panel P by pulling downwardly on the end 53a of the cable or line 53.
After the panel P has been raised upwardly by the operator pulling downwardly on the line 53 at the end 53a, the operator turns the panel P 180 so as to position the panel between him and the building structure B so that it assumes the position generally shown in FIG. 3. The movement of the panel P horizontally or laterally is accomplished by the trolley 51 moving laterally on the boom 45. Such urging is accomplished by the operator pulling on the tool T and also on the line 53. Also, if an additional operator is used on the apparatus A, he may assist in handling the panel P as it is moved from its stacked position to the position for attaching to the building structure B.
When the panel P has been moved to the position shown in FIG. 3, a fastener of known construction is forced through the panel P or a previously drilled hole therein and into one of the angle iron members 70 of the building structure B so as to initially attach the panel P to the building structure B. Thereafter, the hook 55 may be released and also the tool T may be released and additional fasteners 80 such as shown in FIG. 4 may then be inserted at the appropriate locations for connecting the panel P to the building structure members 70. The last or uppermost part of the panel P is not normally fastened to the member 70 adjacent thereto until the next panel thereabove has been positioned over it so that there is an overlapping connection such as shown at the bottom of panel P at the connector or fastener 80' in FIG. 4.
During the fastening of the panel P, the apparatus A may be raised to facilitate the inserting of the fasteners 80 at the various heights which might not otherwise be reached conveniently by the men C in the apparatus A. It isto be noted that the boom 45 extends inwardly past the vertical member 71, so it is assumed that the vertical member 71 is positioned with vertical spaces therebetween, which is usually the case. In other words, there is ample room for the boom 45 to extend into the building structure as illustrated in FIGS. 1 and 3. However, the boom structure can be shorter in length and can terminate at the edge of the building structure B if the building structure B is so made that the boom 45 cannot extend into the space between the vertical support 71.
The apparatus A is moved horizontally by moving the mobile support and hoisting means M horizontally when it is desired to move the apparatus A for the positioning of the next panel P on the building structure B. In some instances, several panels P may be installed on the building structure B without horizontally or laterally moving the apparatus A, but when that does become necessary, the entire apparatus A may be moved without lowering it back to the ground level, or if more convenient, the apparatus A may be lowered back to the ground level and then moved horizontally to locate the apparatus A for the positioning of the next panel P in the same manner as heretofore described with the first panel P. All of the panels P are thus mounted on the building structure B and when the supply panels P on the apparatus A has thus been exhausted, the apparatus A is lowered back to the ground level and another group of panels P are mounted on the platform F and the procedure is repeated.
Although the method of this invention has been heretofore described and illustrated in the drawings with each panel P being rotated 180 when picked-up from the stacked position and moved to the mounting position, the invention is not limited thereto. Thus, instead of engaging the tool T with the handle 60 thereof inwardly of the panel P as shown in FIG. 1, the operator C may engage the tool T so that the handle 60 is outwardly of the particular panel P which is to be moved. This normally requires two operators C so that one of the operators can hold the panel P spaced from the other stacked panels P so as to provide a space outwardly of the panel P which is to be picked up for thereby receiving the handle 60 of the tool T. When the handle 60 is thus outwardly disposed with respect to the panel P, the operator simply moves the panel P inwardly without turning or rotating same so that the too] T ends up in the same position as shown in FIG. 3 of 6 the drawings. It should be noted that the hook 55 is also preferably disposed so that it faces inwardly as shown in FIG. 3, when initially engaged in the position of FIG. 1 so as to facilitate the removal of the book 55 after the panel P has been fastened to the building structure B.
The foregoing disclosure and description of the invention are illustrative and explanatory thereof, and various changes in the size, shape, and materials as well as in the details of the illustrated construction may be made without departing from the spirit of the invention.
I claim: I
1. A method of mounting building panels on a building structure, comprising the steps of:
positioning a plurality of building panels in a panel carrier at substantially ground level;
hoisting the building panels in the panel carrier to an elevation above ground level and approximately at the elevation for mounting the panels on the building structure; thereafter separately transferring each of said panels from said panel carrier to a position on the building structure at which the panel is to be mounted;
thereafter fastening said panel to the building structure; and
repeating said steps of transferring and fastening for each of said panels until all of said panels in said panel carrier have been mounted on the building structure.
2. The method set forth in claim 1, including the step of:
moving said panel carrier horizontally while elevated above ground level to reposition said panel carrier to facilitate the mounting of subsequent panels on the building structure from the carrier.
3. The method set forth in claim 1, wherein said separate transfer of each of said panels in the carrier includes:
lifting each of said panels to a raised position off the platform of said carrier;
supporting each panel in said raised position; and
moving each panel in a direction towards the building structure while supporting same in a raised position.
4. The method set forth in claim 1, wherein: said panels are stacked substantially vertically on the outer portion of the panel carrier prior to being transferred therefrom for mounting on the building structure.
5. The method set forth in claim 1, including: raising the panel carrier by means which is located at the ground level and is unsupported by the building structure.

Claims (5)

1. A method of mounting building panels on a building structure, comprising the steps of: positioning a plurality of building panels in a panel carrier at substantially ground level; hoisting the building panels in the panel carrier to an elevation above ground level and approximately at the elevation for mounting the panels on the building structure; thereafter separately transferring each of said panels from said panel carrier to a position on the building structure at which the panel is to be mounted; thereafter fastening said panel to the building structure; and repeating said steps of transferring and fastening for each of said panels until all of said panels in said panel carrier have been mounted on the building structure.
2. The method set forth in claim 1, including the step of: moving said panel carrier horizontally while elevated above ground level to reposition said panel carrier to facilitate the mounting of subsequent panels on the building structure from the carrier.
3. The method set forth in claim 1, wherein said separate transfer of each of said panels in the carrier includes: lifting each of said panels to a raised position off the platform of said carrier; supporting each panel in said raised position; and moving each panel in a direction towards the building structure while supporting same in a raised position.
4. The method set forth in claim 1, wherein: said panels are stacked substantially vertically on the outer portion of the panel carrier prior to being transferred therefrom for mounting on the building structure.
5. The method set forth in claim 1, including: raising the panel carrier by means which is located at the ground level and is unsupported by the building structure.
US00297996A 1972-10-16 1972-10-16 Method and apparatus for mounting building panels Expired - Lifetime US3791094A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US29799672A 1972-10-16 1972-10-16

Publications (1)

Publication Number Publication Date
US3791094A true US3791094A (en) 1974-02-12

Family

ID=23148554

Family Applications (1)

Application Number Title Priority Date Filing Date
US00297996A Expired - Lifetime US3791094A (en) 1972-10-16 1972-10-16 Method and apparatus for mounting building panels

Country Status (1)

Country Link
US (1) US3791094A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4022330A (en) * 1975-05-16 1977-05-10 Shannon Jr Joseph R Apparatus for mounting building panels
DE3141047A1 (en) * 1981-10-15 1983-05-05 Josef Gartner & Co, 8883 Gundelfingen METHOD FOR ASSEMBLING CURTAIN WALLS AND DEVICE FOR CARRYING OUT THE METHOD
US4416095A (en) * 1981-09-01 1983-11-22 Donovan Truluck Support hanger kit for suspension ceilings and method of installation
US4591308A (en) * 1983-07-29 1986-05-27 Yoshida Kogyo K. K. Guide jig for lifting an outer wall member of a curtain wall
US5054985A (en) * 1988-09-07 1991-10-08 Yoshida Kogyo K.K. Method for mounting wall constituent members and a guide jig to be used in the same method
EP0893555A3 (en) * 1997-07-23 1999-03-24 Waagner-Biro Aktiengesellschaft Method for mounting wall-panels and arrangement for applying such method
US20040218997A1 (en) * 2003-04-30 2004-11-04 Jlg Industries, Inc. Panel installation apparatus and method
US20120031036A1 (en) * 2008-12-19 2012-02-09 Jon Henrik Falk Method for mountaing façade elements on a multi-storey building
US20140161567A1 (en) * 2012-12-07 2014-06-12 Illinois Tool Works Inc. Curtain wall panel installation system
US20190211552A1 (en) * 2018-01-09 2019-07-11 Advanced Building Systems, Inc. Advanced Curtain Wall Top-Down Renovation
US20200102762A1 (en) * 2018-09-27 2020-04-02 Terex South Dakota, Inc. Positioner for mobile work platforms
SE2230128A1 (en) * 2022-04-29 2023-10-30 Brunkeberg Systems Ab A lifting unit for installing structural elements for a building

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB275262A (en) * 1926-07-31 1928-08-23 Otto Hardt
US3245192A (en) * 1963-06-04 1966-04-12 Eugene R Hilson Method of roofing
US3315426A (en) * 1963-04-09 1967-04-25 Robert C Rolland Prefabricated wall structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB275262A (en) * 1926-07-31 1928-08-23 Otto Hardt
US3315426A (en) * 1963-04-09 1967-04-25 Robert C Rolland Prefabricated wall structure
US3245192A (en) * 1963-06-04 1966-04-12 Eugene R Hilson Method of roofing

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4022330A (en) * 1975-05-16 1977-05-10 Shannon Jr Joseph R Apparatus for mounting building panels
US4416095A (en) * 1981-09-01 1983-11-22 Donovan Truluck Support hanger kit for suspension ceilings and method of installation
DE3141047A1 (en) * 1981-10-15 1983-05-05 Josef Gartner & Co, 8883 Gundelfingen METHOD FOR ASSEMBLING CURTAIN WALLS AND DEVICE FOR CARRYING OUT THE METHOD
US4555890A (en) * 1981-10-15 1985-12-03 Josef Gartner & Co. Process for the installation of curtain walls and apparatus for the execution of the process
US4591308A (en) * 1983-07-29 1986-05-27 Yoshida Kogyo K. K. Guide jig for lifting an outer wall member of a curtain wall
US5054985A (en) * 1988-09-07 1991-10-08 Yoshida Kogyo K.K. Method for mounting wall constituent members and a guide jig to be used in the same method
EP0893555A3 (en) * 1997-07-23 1999-03-24 Waagner-Biro Aktiengesellschaft Method for mounting wall-panels and arrangement for applying such method
US7600959B2 (en) * 2003-04-30 2009-10-13 Jlg Industries, Inc. Panel installation apparatus and method
US20040218997A1 (en) * 2003-04-30 2004-11-04 Jlg Industries, Inc. Panel installation apparatus and method
US20120031036A1 (en) * 2008-12-19 2012-02-09 Jon Henrik Falk Method for mountaing façade elements on a multi-storey building
US8695308B2 (en) * 2008-12-19 2014-04-15 Brunkeberg Systems Ab Method for mounting façade elements on a multi-storey building
US20140161567A1 (en) * 2012-12-07 2014-06-12 Illinois Tool Works Inc. Curtain wall panel installation system
US9663961B2 (en) * 2012-12-07 2017-05-30 Illinois Tool Works Inc. Curtain wall panel installation system
US20190211552A1 (en) * 2018-01-09 2019-07-11 Advanced Building Systems, Inc. Advanced Curtain Wall Top-Down Renovation
US10443235B2 (en) * 2018-01-09 2019-10-15 Advanced Building Systems, Inc. Advanced curtain wall top-down renovation
US20200102762A1 (en) * 2018-09-27 2020-04-02 Terex South Dakota, Inc. Positioner for mobile work platforms
US10738491B2 (en) * 2018-09-27 2020-08-11 Terex South Dakota, Inc. Positioner for mobile work platforms
SE2230128A1 (en) * 2022-04-29 2023-10-30 Brunkeberg Systems Ab A lifting unit for installing structural elements for a building

Similar Documents

Publication Publication Date Title
US3791094A (en) Method and apparatus for mounting building panels
US4809814A (en) Scaffolding
US5159993A (en) Self-raising work platform assembly
JP5912828B2 (en) Vertical excavation and excavation method and vertical excavation and excavation equipment
US4542804A (en) Bosun chair support apparatus
US4022330A (en) Apparatus for mounting building panels
US3857497A (en) Apparatus for mounting building panels
JP4284225B2 (en) Mobile scaffolding system
CA1037236A (en) Method and means for supporting an elevated concrete wall panel form
US5058708A (en) Scaffold and hoist structure
JP3220397B2 (en) Elevating scaffold
JP3142741B2 (en) Heavy equipment
US3877582A (en) Panel positioning apparatus
US3782771A (en) Panel positioning apparatus and method
JPS6131117Y2 (en)
US20020042981A1 (en) System for lifting and assembling re-bar cages
JPH05113026A (en) Temporary scaffold structure
JPH0437168Y2 (en)
JPS63181860A (en) Floor panel building construction method and floor panel
JP2771909B2 (en) How to attach the exterior wall plate
JPS62366Y2 (en)
JP2544273B2 (en) Heavy lifting equipment
JP3602623B2 (en) Transport equipment
JP6953655B1 (en) A set of boxes that make up the scaffold
JP2022075070A (en) Lifting device and lifting method