US3751935A - Method and system for creating and maintaining an ice slab - Google Patents

Method and system for creating and maintaining an ice slab Download PDF

Info

Publication number
US3751935A
US3751935A US00204112A US3751935DA US3751935A US 3751935 A US3751935 A US 3751935A US 00204112 A US00204112 A US 00204112A US 3751935D A US3751935D A US 3751935DA US 3751935 A US3751935 A US 3751935A
Authority
US
United States
Prior art keywords
ice
tubing
lengths
slab
mats
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00204112A
Inventor
C Maccracken
H Schmidt
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Calmac Manufacturing Corp
Original Assignee
Calmac Manufacturing Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Calmac Manufacturing Corp filed Critical Calmac Manufacturing Corp
Application granted granted Critical
Publication of US3751935A publication Critical patent/US3751935A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C3/00Processes or apparatus specially adapted for producing ice or snow for winter sports or similar recreational purposes, e.g. for sporting installations; Producing artificial snow
    • F25C3/02Processes or apparatus specially adapted for producing ice or snow for winter sports or similar recreational purposes, e.g. for sporting installations; Producing artificial snow for ice rinks

Definitions

  • ABSTRACT Method and system for creating and maintaining an ice slab for skating purposes, or an ice chute for a toboggan slide, or for maintaing a layer of snow for skiing.
  • the system includes pluralities of small diameter flexi- [451 Aug. 14, 1973 ble plastic tubes arranged in grids in portable mats with the tubes placed close to one another and arranged with each input or supply tube portion closely adjacent to an outlet or return tube portion providing an advantageous uniform temperature effect at a small distance above the tubes.
  • a low temperature anti-freeze liquid is pumped through the tubes to provide the desired uniform cooling effect, and the portable mats each include a pair of sub-headers which can conveniently be coupled together with main headers to form a large grid the size of an ice skating rink, or a ski slope.
  • these small flexible tubes may thereafter be covered with a thin layer of sand, or other protective material, and water is then introduced into the rink and is frozen by the low temperature refrigerant passing through the various tubes.
  • ethylene glycol or other similar low temperature anti-freeze liquid which would be very expensive with conventional systems
  • the small flexible tubes are covered with a thin layer of sand or dirt, and the circulation of the low temperature refrigerant serves to maintain, i.e. to hold, a skiable layer of snow (either natural or manmade snow or a mixture of them) on the ski slope during thawing periods when the snow normally would melt away.
  • the present invention relates to a method and system for creating and maintaining an ice slab for skating purposes or for maintaining a layer of snow for skiing and in particular relates to a novel economic portable system formed by multiple interconnected mats of small diameter flexible plastic tubes arranged in grids with the tubes placed close to one another and arranged with each input or supply tube portion closely adjacent to an outlet or return tube portion providing a uniform temperature effect at a small distance above the tubes.
  • the portable mats each' include an individual supply sub-header and return sub-header for connection to main supply and return headers and the small plastic tubes are adapted to have a low temperature refrigerant pumped therethrough to provide the desired cooling effect.
  • ice skating rinks have commonly been frozen by the use of large diameter metal pipes having an internal diameter (I.D.) of approximately 1.25 inches, a wall thickness of one-eighth of an inch spaced 4.0 to 4.5 inches center-to-center spacing which have usually been embedded in concrete to provide a floor upon which the water was placed and thereafter frozen.
  • I.D. internal diameter
  • These large diameter pipes in the prior art were filled with calcium chloride (CaCl brine-as the cooling medium, and such a system involved a brine volume of about 3,200 gallons in the piping under the rink plus additional brine in the tanks and piping of the brine cooling equipment.
  • the brine was passed through the refrigeration system to bring its temperature down to approximately F to 18 F at the supply point entering the floor of the rink, and the return brine temperature was approximately 17F to 20F leaving the rink floor, depending upon the ambient temperature and the number of skaters.
  • the ASHRAE Guide and Data Book on Applications (1968 Edition) published by the American Society of Heating, Refrigerating and Air-Conditioning Engineers, in Chapter 51, on Skating Rinks at page 616, states that the brine pump should be of sufflcient capacity, so that the temperature difference between incoming and outgoing brine does not exceed 2F under design conditions.
  • the present invention is a radical departure from the prior art, an important technological jump which represents a real breakthrough in the ice skating rink field.
  • a differential from 15F up to 25F or more can be employed.
  • heavy walled metal pipes having an ID. of 1.25 inches and an CD. of 1.50 inches
  • thin-walled, flexible, small diameter plastic tubing is used having an ID. of between one-eighth and three-eighths of an inch, such tubing having a wall thickness of about one thirty-second of an inch.
  • the present invention advantageously enables the use of small diameter flexible plastic tubing which can be pre-assembled into portable mats in a factory and thereafter conveniently rolled up and carried to a site to be quickly coupled together with other mats to form the cooling grid for an ice rink.
  • Manufacturing these plastic tubing mats in a factory each with a supply and return sub-header adapted to be easily coupled together with the main supply and return header enables the initial cost of a system embodying this invention to be drastically lower than that of the prior art.
  • plastic tubing mats once they are formed at the factory, they can be rolled up so as to form a conveniently portable roll, similar to a roll of carpeting, and which can be taken by pick-up truck or station wagon from the factory to the rink site to be unrolled and laid down like strips of carpet.
  • This therefore, means that the present invention gives to the user practicable and economic portability.
  • the plastic tubing mats which can be employed in practice of the present invention are many times greater in length than they are in width.
  • the mat in a flexible plastic tubing mat adapted to extend the length of a full-size skating rink, the mat is generally 200 feet in length and four feet wide.
  • the mat In the case where the flexible plastic tubing mat is to extend transversely of such a rink, the mat is generally 85 feet long and 4 feet wide.
  • the circulation in the tubing is arranged to double back on itself such that both the supply and return sub-headers are at the same end of the 85 foot mat for all of the tubing therein.
  • the small diameter, flexible plastic tubes are arranged to run the length of the mat in closely spaced parallel relationship with the ends of the tubes being connected to supply and return sub-headers at opposite ends of the mat.
  • the direction of liquid flow is in opposite directions in closely spaced adjacent tubes to provide uniform cooling action in the ice in spite of the temperature differentials of to 25, so keeping the temperature of the ice as uniform as is possible across its face.
  • Fastening means in transverse relation to the axis of the small plastic tubes are arranged so as to form the plastic tubing into a grid-like form.
  • Supply sub-headers each having a length approximately equal to the width of the mat are arranged so as to supply each tube with cold anti-freeze liquid and similar return sub-headers are arranged so as to receive the refrigerant after it has passed through the tubes. Thereafter, the fluid is transferred from the return sub-header into cooling apparatus to be again refrigerated and, thereafter, recirculated through the system.
  • These flexible plastic tubing mats embodying the present invention can be constructed and assembled in the factory where mass production techniques can be used.
  • these mats are formed from plastic tubes of ethylene vinyl acetate (EVA).
  • EVA ethylene vinyl acetate
  • Fastening means running transverse to I the direction of the axis of the tubing forms the tubing into a grid-like form.
  • the tubing mats can be rolled into an easily portable form and transported to the location wherein the skating rink is to be assembled.
  • the ice rink is formed on a level and approximately rectangular area of ground with a layer of insulating material preferably separating the flexible tubing mat from the ground.
  • FIG. I is an overall plan view of a full size ice skating
  • FIG. 3 is an enlarged plan view of one of the flexible I tubing mats of the system shown in FIG. 1. This particular flexible tubing mat as shown in FIG. 3 is adapted to be laid lengthwise of the rink area shown in FIG. 1;
  • FIGS. 4 and 5 show in detail means for securing the plastic tubing in closely spaced parallel relationship to one another to hold the same in a grid-like assembly.
  • FIG. 4 is an enlarged partial sectional view taken across the line 44 in FIG. 3
  • FIG. 5 is a partial sectional view taken along 5-5 in FIG. 4;
  • FIG. 6 is a plan view on the same scale as FIG. 3 showing a portion of a flexible tubing mat wherein an alternate type of securing means is employed to hold the tubing of the mat in a grid-like assembly;
  • FIG. 7 is a plan view similar to FIG. 3 in which the flexible tubing mat has four sub-headers and wherein pairs of the small diameter plastic tubes are adjacent to one another with the low temperature liquid therein flowing in opposite direction;
  • FIGS. 8, 9, and 10 are cross-sectional and plan views showing means for securing the pairs of tubes adjacent to one another and for holding them in a grid assembly as is shown in FIG. 7.
  • FIG. 8 is a partial sectional view taken along the line 88 in FIG. 7;
  • FIG. 9 is a partial plan view as seen from the line 99 in FIG. 9; and
  • FIG. 10 is a sectional view similar to FIG. 8 and showing alternative securing means;
  • FIG. 11 is an overall plan view of a full size ice skating rink having the ice making system of the present invention, wherein a plurality of flexible tubing mats run the width of the rink and are interconnected in a grid covering the whole area of the rink. Only two main headers are employed in the system of FIG. 11, both extending along the same side of the rink. The small diameter flexible tubes are bent back in U-bends at the left in FIG. 12 and are connected to a pair of subheaders at the right;
  • FIGS. l2, l3, l4, and 15 are detailed plan views of embodiments of flexible tubing mats generally similar to FIG. 11 incorporating the use of two sub-headers as is shown in FIG. 11 and using different configurations of the plastic tubing and of the tubing securing means to achieve the uniform cooling effect in the ice above the mat;
  • FIGS. 16 and 17 are cross-sectional views shown in full size of the present invention disclosing the advantages over the prior art of the use of small diameter closely spaced plastic tubes;
  • FIG. 18 is a cross-sectional view of a conventional prior art ice making system using large diameter pipes embedded in concrete.
  • FIG. 1 illustrates a typical installation of the freezing system what diluted with water) which has been cooled to a temperature of no more than F and preferably of 5 about 5F or lower is pumped through headers 11 and 13 into individual supply sub-headers at opposite ends of the ice slab.
  • the individual supply sub-headers 15 are arranged to service each of the individual flexible tubing mats M.
  • Such mats M are approximately 200 feet long and 4 feet wide to extend longitudinally beneath the ice rink.
  • the low temperature anti-freeze liquid flows from the main supply header 11 into the supply subheader 15 of the flexible tubing mat M indicated at 17. Additionally, such coolant flows through the main supply header 13 into supply sub-header 16 on the opposite end of the mat 17.
  • the coolant from the sub-header l5 flows through the individual small diameter flexible plastic tubes T towards a return sub-header 21 wherein it is collected to be fed into a main. return header 23 (FIG. I) to be returned to the refrigeration station 30.
  • coolant from sub-header l6 flows downward through individual tubes T to a return sub-header 25, wherein it is collected and then returned by a main header 27 to the refrigeration station 30.
  • the temperature of the antifreeze liquid in the main return headers 23 and 27 is approximately F during typical operating conditions.
  • the refrigerant circuit for this system includes a compressor 38 which passes the compressed Freon through a condenser 39, and wherein the heat is extracted. Then the cooled compressed Freon passes intothe chiller 35, wherein it is expanded as mentioned above. Condenser 39, tank 41, and cooling tower 40 have water circulated therethrough which serves to remove heat energy from the compressed Freon and to discharge the heat energy in the cooling tower.
  • FIG. 2 discloses in detail the methodof constructing an ice rink by utilizing the present invention.
  • the flexible tubing mats M are laid upon a suitably prepared surface.
  • the base 55 upon which the mats are laid is of a suitable material such as a layer of sand which had ben placed over a layer of insulation material 57, such as a layer of foamed polyurethane.
  • a layer of sand or other suitable protective material 53 may be applied so as to cover the tubes T.
  • This sand layer 53 protects the tubes T in that should the ice 59 be penetrated by a skaters blade, it will not cut, tear or otherwise injure the tubing.
  • dashbergoard 60 serves as a splash board to protect the header assemblies from damage which are conveniently protected beneath a seat bench 51 attached to the dasherboard 60. Thereafter, fresh water is sprayed upon the sand 53 and the coolant is pumped through the network of tubes T below the water to freeze it so as to form the ice slab 59.
  • FIG. 3 shows in greater detail the sub-header assemblies and tubing T of a mat M such as is used in the system of FIG. 1.
  • the length of a rink the mat is approximately 4 feet wide and approximately 200 feet long, and each of the sub-headers l5, 16, 21 and 25 are about 4 feet long.
  • the short connection lines l2, 14, 20 and 26 are connected to the mid-points of the respective sub-headers 15, I6, 21 and 25 through T-shaped couplings 61.
  • Connections 12 and 26 extend to the main headers 11 and 27, as shown in FIG. 2, and connectsion l4 and 26 extend to the main headers 13 and 23, respectively.
  • FIGS. 3, 4 and 5 the various tubes T are kept closely spaced and parallel to one another by securing means S including the spacer strip assembly 70 which are arranged transverse to the axis of the tubing T.
  • FIGS. 4 and 5 ahow in more detail the construction of the securing means S.
  • the securing means S includes a stiffener wire 72 which runs perpenducular to the longitudinal axis of the parallel tubes. The stiffener wire 72 and the individual tubes T are held in place by means of spacer tape assembly 70 which, of course, must be unaffected by water.
  • the spacer strip assembly 70 comprises an upper woven glass fiber fabric tape 74, which is arranged so as to bend up and over to surround and embrace the tubing and a lower woven glass fiber fabric tape 75, which is beneath and encases the stiffener wire 72.
  • the upper and lower tapes 74 and 75 are placed together with the wire 72 they form a grid-securing structure as is shown in FIG. 4.
  • the exact arrangement of the upper and lower tape with respect to the tubing is best seen in FIG. 4 and the centerline relationship of the stiffener wire with respect to the tape assembly is best seen in FIG. 5.
  • the upper and lower tapes may be secured to each other by waterproof adhesive or by stitching.
  • the flexible tubing mats M provided by the present invention can be readily pre-fabricated in a factory, rolled into a roll and transported to the construction site where they are interconnected to form the grid system. This is in marked contrast to the large diameter piping of the prior art which was laboriously assembled on the job.
  • the method of construction is such that the small diameter flexible tubes are extended along the length of the mat and closely spaced from one another. Thereafter, the tubes are cut to the desired length and connected to the appropriate sub-headers. As shown in FIG. 3, the first tube 51 at the left is connected with supply sub-header I5 and return sub-header 21; the second tube, tube 52 is alternately connected with supply sub-header l6 and return sub-header 25.
  • FIG. 6 is shown an alternative flexible tubing mat embodiment M-l to the structure shown in FIG. 3.
  • the tubes T are slightly bent away and toward one another so as to form an elongated X grid web of the tubes, as shown in FIG. 6.
  • the arrangement of the tubes T with respect to the sub-headers is essentially the same as has been described in connection with FIG. 3, and therefore only the sub-headers l5 and 25 at one end of the mat M-l are shown.
  • Clips 77 of noncorrosive metal or plastic are placed at regular intervals along the lengths of the tubes T surrounding two adjacent portions of the tubes to hold them to one another to form the elongated X grid structure shown in FIG. 6.
  • the coolant flows in opposite directions through the successive tubes T.
  • FIG. 7 shows a further alternative flexible tubing mat embodiment M-2 to those which have been discussed above.
  • anti-freeze liquid from the supply sub-headers l5 and 16 flows through the tubes T and to the appropriate return sub-headers 21 and 25.
  • coolant will flow through tubes 78 and 79, for example, in a direction opposite to that of the fluid in the respective adjacent tubes 80 and 81.
  • coolant in each of the immediately adjacent pairs of tubes flows in opposite directions. As discussed above, this flow pattern produces an advantageous temperature averaging effect at a small distance above the mat.
  • tubes in the regions 68 and 69 have been bent slightly off of their center lines to allow room for the couplings 61 that are centrally located in the sub-headers l5, 16, 21 and 25, respectively.
  • spacer strip means S are used in the mat M-2. These spacer strips are placed equidistant apart, at predetermined intervals along the length of the mat M-2. The spacer strips S not only hold the tubes T to one another in pairs, but they also serve to hold the entire formation together and to keep it in a grid-like form after is has been rolled and transported to a construction site.
  • FIGS. 8, 9 and 10 more completely illustrate the configuration of the spacer strip assemblies.
  • the spacer strips include a woven glassfiber fabric tape 82 and a plurality of brass notebooktype fasteners 83 have been used to penetrate the spacer strip.
  • the two legs 84 of each fastener have been inserted between the pair of tubes T and wrapped up around them, so as to hold the tubing in place and to one another to form pairs.
  • a top view of the securing means S is shown in FIG. 9 wherein it is possible to see the tape 82 which has been penetrated by the brass fastener and which is holding the pair of tubes T in place.
  • the heads of the brass fasteners 83 are visible in FIG. 9.
  • FIG. I0 shows an alternative mat embodiment M-3 in which different securing means S are used for holding the tubes in an arrangement similar to that shown in FIG. 8.
  • the upper tape 74 and lower tape embrace the pairs of tubes T which have been placed adjacent to one another.
  • a stiffener wire 72 has been encased between the tapes extending transverse to the tubes. This wire 72 serves to give transverse stiffness to the grid-like construction of the mat M-3, to hold the pairs of tubes spaced apart, as shown while allowing the mat to be rolled up lengthwise without hindrance from the stiff wires.
  • FIG. 11 shows a system including a transverse grid configuration different from those which have been discussed above.
  • the flexible tubing mats M4 instead of running the length of the rink, run transversely across the shorter width of the rink.
  • This particular construction makes it possible for the coolant to transverse the width of the rink twice, once across and once back and thereby enables the use of only two headers, a supply and return header, instead of the four header arrangement which has been discussed previously.
  • each transverse mat has only two sub-headers.
  • FIG. 11 shows a refrigeration station 30 which is similar tothat which was described in connection with FIG. 1 It comprises a means for cooling the low temperature coolant down to a temperature of lF or lower.
  • the ice freezing system includes a pipe 85 which supplies the coolant from the refrigeration section 30 to the ice rink and a return pipe 86 which removes the coolant after it has passed through the system and returns it to the section 30 for recycling.
  • pipe 85 is connected with a main supply header 87 and supplies fluid to the various supply subheaders in the mats M-4; and the outlet pipe 86 is connected to a main return header 88.
  • FIGS. 12, 13, 14 and 15 more clearly describe the particular constructions of the transversely arranged mats which can be utilized in the system that is shown in FIG. 11.
  • supply sub-header 90 is coupled to the main supply header 87 through coupling 61 and connecting line 91.
  • the liquid enters into the subheader 90, passes into tubes T, and because of the U" bend 92 at the center of each tube, the coolant flows (in the tubes) across the full width of the ice rink and returns, as shown by the arrows.
  • This flow path thereby enables the system to have liquid flowing, in neighboring tube portions, in opposite directions so as to pro vide uniformity of effective cooling in the ice as discussed above.
  • the return sub-header 93 is connected through the coupling 61 and short connecting line 941 with the main return header 88.
  • the tube securing means S shown in FIG. 12 for the tubes T in the mat M4 is the same as the securing means S with the tape assembly 70, shown in FIGS. 3, 4 and 5.
  • the securing means S include tapes of glass-fiber fabric approximately x2 inch wide and spaced from 6 to 18 inches apart along the length of the mat.
  • FIG. 13 shows an alternative embodiment of a transverse mat M-S.
  • This mat M-5 is similar in grid configuration to the mat M-l which was discussed with respect to FIG. 6, but the mat M-5 also employs the same principles as shown in FIG. 12, wherein a U bend 92 at the center of each tube T enables the fluid to pass once across the ice and then return before it is received by the return sub-header 93 to flow back to the cooling station.
  • clips 77 have been attached at various intervals along the length of the tubing so as to join adjacent tubes into forming an elongatedX pattern or quilt-like grid.
  • FIG. 14 an alternate embodiment of a transverse mat M45 is shown similar to the mat M-2 which was disclosed in FIG. 7. This mat M-6 can be utilized with respect to the system shown in FIG. 11.
  • Both the first and second halves of each tube T are held closely adjacent to one another by securing means S shown as spacer strips 82 with fasteners 83 similar to those which were described with respect to FIGS. 8 and 9.
  • the legs of the fasteners 83 are wrapped around the tubes so as to hold the tubing in place with respect to the other tubes and to keep the two adjacent halves of each tube held closely against one another.
  • FIG. 15 shows a mat embodiment M-7 having a coolant flow configuration which is particularly adapted for use beneath very short expanses of ice.
  • Each of the tubes T shown in FIG. 15 cross beneath the width of the ice, return, recross beneath the width of the ice, return and recross and return again for several times thereafter.
  • the uniform cooling effect is enhanced by the fact that the tubes are arranged so that each pair of tubes is arranged as a set 96.
  • the two tubes in each set of tubes overlaps and alternates with the other tube in the set of tubes, and the coolant is flowing in opposite directions in the two tubes in ach st. running th flow in th tubs in opposit directions accomplishs, again, balancing of th cooling ffect, as uniformly as possibl, across th surfac of th ic.
  • this mat configuration M-7 is shown in FIG. 15 wherein the coolant is supplied through a short line 91 and a coupling 61 and through a subheader 98.
  • coolant On its first pass through the tubes 99 at the bottom of FIG. 15, coolant traverses the mat M-7 to point 101 where because of a U bend, it is re-routed across the mat on its pass in a direction opposite to the first and returns to point 102 where it is again, bcause ofa U bend, re-routed across the ice on its third pass to point 103, and from this point 103 it is again rerouted across the ice for a fourth pass to the point 104. It is re-routed across the ice as is shown in FIG.
  • the coolant in this tube 99 is moving in a direction opposite that of the coolant in a tube 1119 immediately neightboring thereto and interlaced with the tube 99.
  • This tube 109 also has seven U" bends 111-117 which are positioned adjacent to and overlapping with the respective seven U bends 107-101 of the tube 99.
  • the two tubes 99 and 1119 comprise one of the tubing sets 96.
  • any of the embodiments of the flexible tubing mats M-4, M-5, or M-tfi can be employed in the system shown in FIG. 11 in which the mats extend transversely across the full size rink.
  • the mats M 1, M-S, or M-6 are about feet long and 4 feet wide.
  • the sub-headers and 93 are about 4 feet long.
  • the flexible tubing mat M-7 is adapted for use with smaller ice rinks as indicated above.
  • the dimensions of a flexible tubing, as shown in FIG. 1 or FIG. 11 are such that the main headers 11, 13, 23, 27 or 87 or 88 have an inside diameter of approximately two inches, the sub-headers in the mats M, M-1, M-2, M-3, M-4l, M-5, M-6, and M-7 which supply and return the coolant directly to and from the tubing T in the mats themselves have an inside diameter of approximately three quarters of an inch.
  • a convenient way to make these sub-headers 15, 16, 21, 25 and 90 and 93 is to use copper pipes 4 feet long having holes punched therein and then short copper spuds having an outside diameter (O.D.) slightly larger than the inside diameter (l.D.) of the tubes T are soldered into the holes in the pipe or otherwise fastened to the main body of the subheader to serve as a connection spud between the subheader and the end of each plastic tube T.
  • These coupling spuds for example, as shown in FIG. 3 at I20, are typically one-quarter inch in outside diameter.
  • the plastic tubing of the mat has an average inside diameter of three-sixteenths of an inch.
  • the ends of the tubing When installed, the ends of the tubing is expanded from its normal threesixteenth inch inside diameter to one-quarter inch to fit onto the coupling spuds on the sub-header. Thereafter, the tubing is clamped upon the spuds by a small commercially available spring clamp I22 (sometimes called a hose clamp") which encircles the end portion of the tubing T surrounding the spud 120.
  • a small commercially available spring clamp I22 sometimes called a hose clamp
  • the flexible plastic tubes T have an inside diameter between one-eighth and three-eighths of an inch. It is to be understood that tubing having an oval shaped passage can be used. Thus, the term inside diameter" or I.D.” is to be interpreted broadly enough to include such oval tubing having an average inside dimension of between oneeighth and three-eighths of an inch.
  • ethylene vinyl acetate is the preferred material from which the tubes T for the flexible mats are made.
  • EVA ethylene vinyl acetate
  • EVA is inert to low temperature anti-freeze liquids such as ethylene glycol or methyl alcohol and has good temperature characteristics, and its elasticity remains at low temperature (down to approximately 5F to F). Moreover, this elasticity enables the tubes to be stretched over the spuds 120.
  • EVA is preferable to polyethylene because EVA has better temperature characteristics, i.e., it is not brittle and that it has a higher degree of stretchability than does polyethylene.
  • the stretchability of the tubing accommodates the expansion and contraction due to temperature changes. For example, the tubing mats may be laid down in the fall when the temperature is approximately 60F, and then the tubing is cooled to F or below by the coolant.
  • FIGS. 16 and 17 small diameter flexible tubes T are parallel to one another and equidistant apart.
  • the tubes T may be located within a protective layer of material 53 which is preferably sand.
  • the ice above the tubing is preferably of a thickness, for example, 1.25 inches, such that the thickness (X) of the ice is greater than the center-to-center distance (D) between neighboring tubes T.
  • D center-to-center distance
  • the temperature differential between a point N at the surface of the ice midway between, e.g. equidistant from, the two neighboring tubes and a point 0 directly over each tube will be substantially less than that which is experienced in the prior art system.
  • the distance shown by the dashed lines 124 from points N to the respective tubes T is not much greater than the distance 126 from the points 0 to the respective tubes T.
  • the cooling of the surface points N and O is accomplished by withdrawing heat down through the ice along the lines 124 and 126. Since these lines are almost of equal length, the effective cooling action is substantially uniform over the entire surface of the ice.
  • FIG. 17 shows the effective cooling action when the tubes are in adjacent pairs, as shown in the mats M-2 (FIG. 7) and M-6 (FIG. 14).
  • the pairs of tubes are spaced by an approximate distance 2D, and thus the average spacing per tube is about D.
  • the ice thickness X is preferably greater than D, as discussed above in connection with FIG. 16.
  • FIG. 18 A prior art system is shown in FIG. 18 where wide diameter thick-walled metal pipes 130 are embedded in concrete 132.
  • the centers of the pipes 130 have been customarily spaced approximately 4 to 4% inches apart.
  • a four inch center-to-center spacing is shown.
  • At points N midway between these pipes there will be found an eight degree differential between the temperature of the ice surface at that point N, and the temperature of the brine within the pipes. Because of this wide differential in the temperatures, it is possible for soft spots or melting to occur at the ice surface at midpoints N in the prior art system.
  • the distances I33 from the midpoints N at the ice surface to the widely spaced pipes 130 are much greater than the distance 134 from points 0 directly over the pipes. Thus, a much different effective cooling rate occurs at points N and O.
  • the system of the present invention utilizes small diameter flexible plastic tubing placed much closer together and low temperature coolant, and thus (a) the points N and O are all at almost the same temperature, and (b) the differential between the temperature at the surface of the ice and the temperature of the concrete at various points is more uniform and the cooling path lengths 124, 126, 127 and 128 are all fairly short, and this, therefore, provides a better quality of ice.
  • the prior art systems utilize calcium chloride (CaCl brine for the coolant solution on the basis of economics, i.e., it has usually been financially impractical to use any other type of coolant because of the large volumes under the rink floor of such a system (3,200 gallons).
  • the present invention can use a coolant such as an ethylene glycol mixture because of its small capacity under the rink floor (less than one-tenth that of the prior art systems), and it can operate at a much, much lower temperature than the typical prior brine solution system.
  • the small diameter plastic tubes have an ID. in the range from one-eighth to three-eighths of an inch and are spaced closer together than the ice thickness, which should be less than 2 inches.
  • the average center-tocenter tube spacing is from one-half to 1% inches, and is shown as being three-fourths inch in FIG. 16.
  • a large temperature differential of 20F to 30F is utilized between the inlet and outlet temperatures of the circulating coolant.
  • a flow rate of less than l/50 gallon per minute per square foot of ice surface can be used, as compared with the prior art systems in which usual flows are many times that fraction.
  • the coolant inlet temperature is not more than F and preferably not more than 5F, or lower.
  • the various flexible tubing mats M, M-l, M-2, M-3, M-4, M-5, M-6 and M-7 can also be utilized to hold snow on a ski slope under conditions when the snow would otherwise begin to melt.
  • the mats are laid transverse to the slope, i.e., are laid with the tubes T extending along horizontal contour lines of the slope.
  • the refrigeration station can be located off to one side of the slope near the top, middle or bottom of the slope, whatever may be convenient.
  • the present invention can be employed to advantage in creating and maintaining an ice trough or chute to be used as a toboggan slide or for similar sliding purposes.
  • a flexible mat 4 feet wide and feet long having the two headers at only one end, such as the mats M-4, M-5 and M-6, can be employed.
  • the mat is folded in half along its length to make it 100 feet long and 2 feet wide with a double layer of tubing resulting from such folding.
  • the mat can be bent around curves of the toboggan slide and inclined to create banked curves.
  • the mats are laid end-toend with the sub-headers near each other so that one mat extends down the slide from the sub-header location and the other extends up the slide from that location.
  • an icy trough can be created and maintained with curves and straight stretches, as desired.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Structures (AREA)
  • Thermotherapy And Cooling Therapy Devices (AREA)
  • Mattresses And Other Support Structures For Chairs And Beds (AREA)

Abstract

Method and system for creating and maintaining an ice slab for skating purposes, or an ice chute for a toboggan slide, or for maintaing a layer of snow for skiing. The system includes pluralities of small diameter flexible plastic tubes arranged in grids in portable mats with the tubes placed close to one another and arranged with each input or supply tube portion closely adjacent to an outlet or return tube portion providing an advantageous uniform temperature effect at a small distance above the tubes. A low temperature anti-freeze liquid is pumped through the tubes to provide the desired uniform cooling effect, and the portable mats each include a pair of sub-headers which can conveniently be coupled together with main headers to form a large grid the size of an ice skating rink, or a ski slope. For a rink these small flexible tubes may thereafter be covered with a thin layer of sand, or other protective material, and water is then introduced into the rink and is frozen by the low temperature refrigerant passing through the various tubes. By virtue of the small diameter of the tubes, ethylene glycol or other similar low temperature anti-freeze liquid (which would be very expensive with conventional systems) can economically be used to practice the invention disclosed herein. In the case of a ski slope, the small flexible tubes are covered with a thin layer of sand or dirt, and the circulation of the low temperature refrigerant serves to maintain, i.e. to ''''hold'''', a skiable layer of snow (either natural or manmade snow or a mixture of them) on the ski slope during thawing periods when the snow normally would melt away.

Description

United States Patent 1191 MacCracken et al.
Primary Examiner-William E. Wayner Attorney- Roland T. Bryan, G. Kendall Parmelee et al.
[57] ABSTRACT Method and system for creating and maintaining an ice slab for skating purposes, or an ice chute for a toboggan slide, or for maintaing a layer of snow for skiing. The system includes pluralities of small diameter flexi- [451 Aug. 14, 1973 ble plastic tubes arranged in grids in portable mats with the tubes placed close to one another and arranged with each input or supply tube portion closely adjacent to an outlet or return tube portion providing an advantageous uniform temperature effect at a small distance above the tubes. A low temperature anti-freeze liquid is pumped through the tubes to provide the desired uniform cooling effect, and the portable mats each include a pair of sub-headers which can conveniently be coupled together with main headers to form a large grid the size of an ice skating rink, or a ski slope. For a rink these small flexible tubes may thereafter be covered with a thin layer of sand, or other protective material, and water is then introduced into the rink and is frozen by the low temperature refrigerant passing through the various tubes. By virtue of the small diameter of the tubes, ethylene glycol or other similar low temperature anti-freeze liquid (which would be very expensive with conventional systems) can economically be used to practice the invention disclosed herein. In the case of a ski slope, the small flexible tubes are covered with a thin layer of sand or dirt, and the circulation of the low temperature refrigerant serves to maintain, i.e. to hold, a skiable layer of snow (either natural or manmade snow or a mixture of them) on the ski slope during thawing periods when the snow normally would melt away.
16 Claims, 18 Drawing Figures COHPAESSOR mMr 41 COOL/M6 40 comm/v55? rams? PAIENIEUAUBIMQH 3,751,935
SHiEI 5 BF 8 Edy. 11
BY WM,WKZH%EYS METHOD AND SYSTEM FOR CREATING AND MAINTAINING AN ICE SLAB I The present invention relates to a method and system for creating and maintaining an ice slab for skating purposes or for maintaining a layer of snow for skiing and in particular relates to a novel economic portable system formed by multiple interconnected mats of small diameter flexible plastic tubes arranged in grids with the tubes placed close to one another and arranged with each input or supply tube portion closely adjacent to an outlet or return tube portion providing a uniform temperature effect at a small distance above the tubes. The portable mats each' include an individual supply sub-header and return sub-header for connection to main supply and return headers and the small plastic tubes are adapted to have a low temperature refrigerant pumped therethrough to provide the desired cooling effect.
In the prior art, ice skating rinks have commonly been frozen by the use of large diameter metal pipes having an internal diameter (I.D.) of approximately 1.25 inches, a wall thickness of one-eighth of an inch spaced 4.0 to 4.5 inches center-to-center spacing which have usually been embedded in concrete to provide a floor upon which the water was placed and thereafter frozen. These large diameter pipes in the prior art were filled with calcium chloride (CaCl brine-as the cooling medium, and such a system involved a brine volume of about 3,200 gallons in the piping under the rink plus additional brine in the tanks and piping of the brine cooling equipment. In the prior art systems, the brine was passed through the refrigeration system to bring its temperature down to approximately F to 18 F at the supply point entering the floor of the rink, and the return brine temperature was approximately 17F to 20F leaving the rink floor, depending upon the ambient temperature and the number of skaters. The ASHRAE Guide and Data Book on Applications" (1968 Edition) published by the American Society of Heating, Refrigerating and Air-Conditioning Engineers, in Chapter 51, on Skating Rinks at page 616, states that the brine pump should be of sufflcient capacity, so that the temperature difference between incoming and outgoing brine does not exceed 2F under design conditions.
For many years, the prior art has assumed that the above type of under the floor cooling ice skating rink system is the final word. And the book mentioned above confirms that such a system has been long considered by those skilled in the art to be the final word. Nevertheless, such a conventional prior art system was very expensive in that the pipes must be assembled together piece-by-piece and welded, or otherwise laboriously and accurately connected and installed at the rink site by trained personnel. Thereafter, the assembled piping was usually embedded in concrete. With this prior art system, the ice rink was permanent and could not be moved from place to place. Additionally, large volumes of brine (about 3,200 gallons in the rink floor plus additional brine in the cooling system) had to be refrigerated and pumped through the pipe network in the floor to freeze the ice. A further problem which was encountered when a prior art system needed servicing was that the rusted metal pipes had to be laboriously chipped out from the concrete floor to be replaced. In addition, a large amount of pumping power was continuously consumed in a prior art system in circulating the large volume of brine at a sufflcient velocity to hold a temperature difference between the supply point at entrance to the pipe network in the floor and the return point at exit from the floor at no more than about 2F.
The present invention is a radical departure from the prior art, an important technological jump which represents a real breakthrough in the ice skating rink field. Instead of 2F differential in the supply and return temperatures, a differential from 15F up to 25F or more can be employed. Instead of heavy walled metal pipes having an ID. of 1.25 inches and an CD. of 1.50 inches, thin-walled, flexible, small diameter plastic tubing is used having an ID. of between one-eighth and three-eighths of an inch, such tubing having a wall thickness of about one thirty-second of an inch. Instead of using 3,200 gallons of brine in the rink floor, only 300 gallons of low temperature anti-freeze liquid, such as ethylene glycol, is used and operating at a supply temperature of no more than 10 and preferably no more than 5F, instead of 15F to 18 F, as required in the conventional prior art. Moreover, instead of utilizing a high level of pumping power to circulate brine, only one-third or less pump power is utilized, which represents a great saving in electricity extending into the future; typically $6,000 to $7,000 per year savings or more in a full size rink application. Instead of using large diameter headers to supply and return the brine, the present invention enables the use of headers which are only about one-tenth of the cross-sectional area of the prior art headers.
The present invention advantageously enables the use of small diameter flexible plastic tubing which can be pre-assembled into portable mats in a factory and thereafter conveniently rolled up and carried to a site to be quickly coupled together with other mats to form the cooling grid for an ice rink. Manufacturing these plastic tubing mats in a factory each with a supply and return sub-header adapted to be easily coupled together with the main supply and return header enables the initial cost of a system embodying this invention to be drastically lower than that of the prior art. Advantageously, once these plastic tubing mats are formed at the factory, they can be rolled up so as to form a conveniently portable roll, similar to a roll of carpeting, and which can be taken by pick-up truck or station wagon from the factory to the rink site to be unrolled and laid down like strips of carpet. This, therefore, means that the present invention gives to the user practicable and economic portability.
Further, by virtue of the fact that the plastic tubing has been pre-assembled in mats, servicing is much easier to perform and far less costly because one mat can be quickly and conveniently removed and exchanged for another. Additionally, the present system enables much smaller header piping and related equipment to be employed because of the smaller volume of liquid involved, thus representing a further savings because all of the valves and fittings are only about one-tenth as large as in the prior art.
The plastic tubing mats which can be employed in practice of the present invention are many times greater in length than they are in width. For example, in a flexible plastic tubing mat adapted to extend the length of a full-size skating rink, the mat is generally 200 feet in length and four feet wide. In the case where the flexible plastic tubing mat is to extend transversely of such a rink, the mat is generally 85 feet long and 4 feet wide. The circulation in the tubing is arranged to double back on itself such that both the supply and return sub-headers are at the same end of the 85 foot mat for all of the tubing therein.
For mats extending the length of a rink, the small diameter, flexible plastic tubes are arranged to run the length of the mat in closely spaced parallel relationship with the ends of the tubes being connected to supply and return sub-headers at opposite ends of the mat. The direction of liquid flow is in opposite directions in closely spaced adjacent tubes to provide uniform cooling action in the ice in spite of the temperature differentials of to 25, so keeping the temperature of the ice as uniform as is possible across its face. Fastening means in transverse relation to the axis of the small plastic tubes are arranged so as to form the plastic tubing into a grid-like form. Supply sub-headers each having a length approximately equal to the width of the mat are arranged so as to supply each tube with cold anti-freeze liquid and similar return sub-headers are arranged so as to receive the refrigerant after it has passed through the tubes. Thereafter, the fluid is transferred from the return sub-header into cooling apparatus to be again refrigerated and, thereafter, recirculated through the system.
These flexible plastic tubing mats embodying the present invention can be constructed and assembled in the factory where mass production techniques can be used. In the presently preferred embodiments, these mats are formed from plastic tubes of ethylene vinyl acetate (EVA). Fastening means running transverse to I the direction of the axis of the tubing forms the tubing into a grid-like form. After assembly with their subheaders, the tubing mats can be rolled into an easily portable form and transported to the location wherein the skating rink is to be assembled. The ice rink is formed on a level and approximately rectangular area of ground with a layer of insulating material preferably separating the flexible tubing mat from the ground. Several of these mats, each of which comprises a plurality of plastic tubes arranged in grid-like form, are arranged on the rectangular area that will form the ice rink. The sub-headers of the individual mats, thereafter, are interconnected with appropriate headers and freezing equipment so as to complete the ice freezing system. The tubing mats are usually covered with a thin layer of sand or other similar material, so as to prevent a skater's blade from penetrating the ice surface and thereby cutting, tearing, or otherwise damaging the plastic tubing. When these preparations are complete, water is sprayed onto this surface and allowed to freeze. Because of the low temperature of the antifreeze liquid passed through the tubes, the ice is quickly frozen and the ice rink formed.
The various advantages, features and objects of the present invention will become more fully understood from a consideration of the following descriptin of certain preferred embodiments of the invention in conjunction with the accompanying drawings, in which corresponding reference numbers are used to indicate parts performing corresponding functions in the various embodiments:
THE DRAWINGS FIG. I is an overall plan view of a full size ice skating FIG. 3 is an enlarged plan view of one of the flexible I tubing mats of the system shown in FIG. 1. This particular flexible tubing mat as shown in FIG. 3 is adapted to be laid lengthwise of the rink area shown in FIG. 1;
FIGS. 4 and 5 show in detail means for securing the plastic tubing in closely spaced parallel relationship to one another to hold the same in a grid-like assembly. FIG. 4 is an enlarged partial sectional view taken across the line 44 in FIG. 3, and FIG. 5 is a partial sectional view taken along 5-5 in FIG. 4;
FIG. 6 is a plan view on the same scale as FIG. 3 showing a portion of a flexible tubing mat wherein an alternate type of securing means is employed to hold the tubing of the mat in a grid-like assembly;
FIG. 7 is a plan view similar to FIG. 3 in which the flexible tubing mat has four sub-headers and wherein pairs of the small diameter plastic tubes are adjacent to one another with the low temperature liquid therein flowing in opposite direction;
FIGS. 8, 9, and 10 are cross-sectional and plan views showing means for securing the pairs of tubes adjacent to one another and for holding them in a grid assembly as is shown in FIG. 7. FIG. 8 is a partial sectional view taken along the line 88 in FIG. 7; FIG. 9 is a partial plan view as seen from the line 99 in FIG. 9; and FIG. 10 is a sectional view similar to FIG. 8 and showing alternative securing means;
FIG. 11 is an overall plan view of a full size ice skating rink having the ice making system of the present invention, wherein a plurality of flexible tubing mats run the width of the rink and are interconnected in a grid covering the whole area of the rink. Only two main headers are employed in the system of FIG. 11, both extending along the same side of the rink. The small diameter flexible tubes are bent back in U-bends at the left in FIG. 12 and are connected to a pair of subheaders at the right;
FIGS. l2, l3, l4, and 15 are detailed plan views of embodiments of flexible tubing mats generally similar to FIG. 11 incorporating the use of two sub-headers as is shown in FIG. 11 and using different configurations of the plastic tubing and of the tubing securing means to achieve the uniform cooling effect in the ice above the mat;
FIGS. 16 and 17 are cross-sectional views shown in full size of the present invention disclosing the advantages over the prior art of the use of small diameter closely spaced plastic tubes; and
FIG. 18 is a cross-sectional view of a conventional prior art ice making system using large diameter pipes embedded in concrete.
DETAILED DESCRIPTION OF PRESENTLY PREFERRED EMBODIMENTS Referring now to the drawings in greater detail, FIG. 1 illustrates a typical installation of the freezing system what diluted with water) which has been cooled to a temperature of no more than F and preferably of 5 about 5F or lower is pumped through headers 11 and 13 into individual supply sub-headers at opposite ends of the ice slab. The individual supply sub-headers 15 are arranged to service each of the individual flexible tubing mats M. Such mats M, as shown, are approximately 200 feet long and 4 feet wide to extend longitudinally beneath the ice rink. Typically, there are approximately 21 such mats laid down side by side like long strips of carpeting to cover the entire area beneath the skating surface of a full size skating rink. The low temperature anti-freeze liquid, as stated above, flows from the main supply header 11 into the supply subheader 15 of the flexible tubing mat M indicated at 17. Additionally, such coolant flows through the main supply header 13 into supply sub-header 16 on the opposite end of the mat 17.
As is shown in the drawing of FIG. 3, the coolant from the sub-header l5 flows through the individual small diameter flexible plastic tubes T towards a return sub-header 21 wherein it is collected to be fed into a main. return header 23 (FIG. I) to be returned to the refrigeration station 30. Simultaneously, coolant from sub-header l6 flows downward through individual tubes T to a return sub-header 25, wherein it is collected and then returned by a main header 27 to the refrigeration station 30. The temperature of the antifreeze liquid in the main return headers 23 and 27 is approximately F during typical operating conditions. By having the low temperature coolant run through the closely spaced tubes T of the mat M in opposite directions through successive tubes, close temperature averaging in cooling effect is obtained, i.e., the coldest liquid near the inlet end in each tube T is near the least cold liquid near the outlet end of the neighboring tubes T, and liquid at intermediate temperaturesin each tube T is near the liquid at intermediate temperatures in the neighboring tubes T. The result is to obtain substantially uniform temperature along the surface of the ice.
The liquid flow in the other flexible tubing mats l8, 19, 20, and in the others shown in FIG. I, operates in substantially the same way.
At the cooling station 30 shown in FIG. 1, the main return header 23 joins the other main header 27 to form a single outlet connection pipe 31 whose output is collected in a tank 33. From tank 33, the anti-freeze liquid is passed through a chiller 35 to reduce its temperature 'to no more than 10F and preferably to approximately 5F or lower and again is pumped back into the supply headers 11 and 13 by pump means 37 feeding. an inlet connection pipe 36 to headers 13 and 11 1. The chiller 35 is a heat exchanger wherein a primary refrigerant (such as Freon) from a refrigerant circuit is expanded, and it, therefore, absorbs the heat from the anti-freeze coolant liquid as it passes through the chiller 35. The refrigerant circuit for this system includesa compressor 38 which passes the compressed Freon through a condenser 39, and wherein the heat is extracted. Then the cooled compressed Freon passes intothe chiller 35, wherein it is expanded as mentioned above. Condenser 39, tank 41, and cooling tower 40 have water circulated therethrough which serves to remove heat energy from the compressed Freon and to discharge the heat energy in the cooling tower.
In FIG. 2 the relationship of the supply and return headers is clearly shown. The main supply header 1] is connected by a short line 12 to each of the supply subheaders which, in turn, are connected to the individual tubes T in each of the mats M. The coolant, therefore, flows from the supply header 11 into each of the supply subheaders I5 and into the various tubes T. The coolant passes the length of each tube T and is returned to the cooling station 30, as was discussed above. As was also noted, coolant passes through the supply sub-headers l6 and is removed by return subheaders 25 to return to the refrigeration station 30. This is shown above in FIG. 2, wherein a tube T, representative ofa plurality of tubes in each mat M, is joined with a return sub-header 25 and the coolant is thereafter passed through short connecting lines 26 from subheaders 25 into the main header 27 to return to the station 30.
FIG. 2 discloses in detail the methodof constructing an ice rink by utilizing the present invention. The flexible tubing mats M are laid upon a suitably prepared surface. The base 55 upon which the mats are laid is of a suitable material such as a layer of sand which had ben placed over a layer of insulation material 57, such as a layer of foamed polyurethane. Once the mats M have been positioned on the surface 55, the subheaders on each mat are connected by the short coupling lines 112 and 26 to the main supply and return headers, as dscribed. A layer of sand or other suitable protective material 53 may be applied so as to cover the tubes T. This sand layer 53 protects the tubes T in that should the ice 59 be penetrated by a skaters blade, it will not cut, tear or otherwise injure the tubing. As shown in the drawing, dashbergoard 60 serves as a splash board to protect the header assemblies from damage which are conveniently protected beneath a seat bench 51 attached to the dasherboard 60. Thereafter, fresh water is sprayed upon the sand 53 and the coolant is pumped through the network of tubes T below the water to freeze it so as to form the ice slab 59.
FIG. 3 shows in greater detail the sub-header assemblies and tubing T of a mat M such as is used in the system of FIG. 1. In this embodiment in which the flexible tubing mats extend, the length of a rink, the mat is approximately 4 feet wide and approximately 200 feet long, and each of the sub-headers l5, 16, 21 and 25 are about 4 feet long. The short connection lines l2, 14, 20 and 26 are connected to the mid-points of the respective sub-headers 15, I6, 21 and 25 through T-shaped couplings 61. Connections 12 and 26 extend to the main headers 11 and 27, as shown in FIG. 2, and connectsion l4 and 26 extend to the main headers 13 and 23, respectively.
While as is shown in FIG. 3, most of the tubes T throughout the whole area of the flexible tubing mat M are closely spaced and parallel to one another, a few of the tubes in the coupling regions 68 and 69 are displaced a small distance from their centerline at the ends thereof to make room for the respective couplings 61 at the mid-points of the sub-headers. A preferred spacing is about three-fourths of an inch center-tocenter average for tubing having an ID. of about threesixteenths of an inch.
As is shown in FIGS. 3, 4 and 5, the various tubes T are kept closely spaced and parallel to one another by securing means S including the spacer strip assembly 70 which are arranged transverse to the axis of the tubing T. FIGS. 4 and 5 ahow in more detail the construction of the securing means S. The securing means S includes a stiffener wire 72 which runs perpenducular to the longitudinal axis of the parallel tubes. The stiffener wire 72 and the individual tubes T are held in place by means of spacer tape assembly 70 which, of course, must be unaffected by water. The spacer strip assembly 70 comprises an upper woven glass fiber fabric tape 74, which is arranged so as to bend up and over to surround and embrace the tubing and a lower woven glass fiber fabric tape 75, which is beneath and encases the stiffener wire 72. When the upper and lower tapes 74 and 75 are placed together with the wire 72 they form a grid-securing structure as is shown in FIG. 4. The exact arrangement of the upper and lower tape with respect to the tubing is best seen in FIG. 4 and the centerline relationship of the stiffener wire with respect to the tape assembly is best seen in FIG. 5. The upper and lower tapes may be secured to each other by waterproof adhesive or by stitching.
The flexible tubing mats M provided by the present invention can be readily pre-fabricated in a factory, rolled into a roll and transported to the construction site where they are interconnected to form the grid system. This is in marked contrast to the large diameter piping of the prior art which was laboriously assembled on the job. The method of construction is such that the small diameter flexible tubes are extended along the length of the mat and closely spaced from one another. Thereafter, the tubes are cut to the desired length and connected to the appropriate sub-headers. As shown in FIG. 3, the first tube 51 at the left is connected with supply sub-header I5 and return sub-header 21; the second tube, tube 52 is alternately connected with supply sub-header l6 and return sub-header 25. The successive tubes shown in FIG. 3 are connected in a similar fashion 16 so that the direction of the coolant in each tube is opposite to the direction of the coolant in each immediately neighboring tube. Thereafter, the spacer strip assemblies 70, running transverse to the axis of the tubes and at predetermined intervals are installed, so as to secure the tubing into a grid-like network. When completed, the sub-headers and their tubes can be conveniently rolled into a roll and transported to the construction site.
In FIG. 6 is shown an alternative flexible tubing mat embodiment M-l to the structure shown in FIG. 3. In FIG. 6 the tubes T are slightly bent away and toward one another so as to form an elongated X grid web of the tubes, as shown in FIG. 6. The arrangement of the tubes T with respect to the sub-headers is essentially the same as has been described in connection with FIG. 3, and therefore only the sub-headers l5 and 25 at one end of the mat M-l are shown. Clips 77 of noncorrosive metal or plastic are placed at regular intervals along the lengths of the tubes T surrounding two adjacent portions of the tubes to hold them to one another to form the elongated X grid structure shown in FIG. 6. The coolant flows in opposite directions through the successive tubes T.
FIG. 7 shows a further alternative flexible tubing mat embodiment M-2 to those which have been discussed above. As noted above, anti-freeze liquid from the supply sub-headers l5 and 16 flows through the tubes T and to the appropriate return sub-headers 21 and 25. Because of the configuration of the sub-headers, coolant will flow through tubes 78 and 79, for example, in a direction opposite to that of the fluid in the respective adjacent tubes 80 and 81. Correspondingly throughout the mat M-2 coolant in each of the immediately adjacent pairs of tubes flows in opposite directions. As discussed above, this flow pattern produces an advantageous temperature averaging effect at a small distance above the mat.
It will be noted that at the beginning of its travel, the liquid within tube 79 has been freshly refrigerated and is commencing to flow through the mat while near the same point, the fluid in tube 80 has already passed through most of the mat and is at its least cold temperature. Likewise, where the liquid commences passing through the tube 80, it is immediately adjacent to the portion of tube 79 in which the liquid has traversed most of the mat and is also in its least cold condition.
Also, it can be noted in FIG. 7 that tubes in the regions 68 and 69 have been bent slightly off of their center lines to allow room for the couplings 61 that are centrally located in the sub-headers l5, 16, 21 and 25, respectively. Further, spacer strip means S are used in the mat M-2. These spacer strips are placed equidistant apart, at predetermined intervals along the length of the mat M-2. The spacer strips S not only hold the tubes T to one another in pairs, but they also serve to hold the entire formation together and to keep it in a grid-like form after is has been rolled and transported to a construction site.
FIGS. 8, 9 and 10 more completely illustrate the configuration of the spacer strip assemblies. In FIG. 8, it can be seen that the spacer strips include a woven glassfiber fabric tape 82 and a plurality of brass notebooktype fasteners 83 have been used to penetrate the spacer strip. The two legs 84 of each fastener have been inserted between the pair of tubes T and wrapped up around them, so as to hold the tubing in place and to one another to form pairs. A top view of the securing means S is shown in FIG. 9 wherein it is possible to see the tape 82 which has been penetrated by the brass fastener and which is holding the pair of tubes T in place. The heads of the brass fasteners 83 are visible in FIG. 9.
FIG. I0 shows an alternative mat embodiment M-3 in which different securing means S are used for holding the tubes in an arrangement similar to that shown in FIG. 8. In FIG. 10, the upper tape 74 and lower tape embrace the pairs of tubes T which have been placed adjacent to one another. To further strengthen the grid structure, a stiffener wire 72 has been encased between the tapes extending transverse to the tubes. This wire 72 serves to give transverse stiffness to the grid-like construction of the mat M-3, to hold the pairs of tubes spaced apart, as shown while allowing the mat to be rolled up lengthwise without hindrance from the stiff wires.
It will be understood that any of the alternative flexible tubing mat embodiments M-l, M-Z or M-3 can be used in the system of FIGS. 1 and 2 in lieu of the mats M, as shown.
FIG. 11 shows a system including a transverse grid configuration different from those which have been discussed above. In FIG. ll, while the ice rink is essentially of the same dimensions, the flexible tubing mats M4 instead of running the length of the rink, run transversely across the shorter width of the rink. This particular construction makes it possible for the coolant to transverse the width of the rink twice, once across and once back and thereby enables the use of only two headers, a supply and return header, instead of the four header arrangement which has been discussed previously. Moreover, each transverse mat has only two sub-headers.
FIG. 11 shows a refrigeration station 30 which is similar tothat which was described in connection with FIG. 1 It comprises a means for cooling the low temperature coolant down to a temperature of lF or lower.
As shown in FIG. 11, the ice freezing system includes a pipe 85 which supplies the coolant from the refrigeration section 30 to the ice rink and a return pipe 86 which removes the coolant after it has passed through the system and returns it to the section 30 for recycling. As can be noted therein, pipe 85 is connected with a main supply header 87 and supplies fluid to the various supply subheaders in the mats M-4; and the outlet pipe 86 is connected to a main return header 88.
FIGS. 12, 13, 14 and 15 more clearly describe the particular constructions of the transversely arranged mats which can be utilized in the system that is shown in FIG. 11. In FIG. 12, supply sub-header 90 is coupled to the main supply header 87 through coupling 61 and connecting line 91. The liquid enters into the subheader 90, passes into tubes T, and because of the U" bend 92 at the center of each tube, the coolant flows (in the tubes) across the full width of the ice rink and returns, as shown by the arrows. This flow path thereby enables the system to have liquid flowing, in neighboring tube portions, in opposite directions so as to pro vide uniformity of effective cooling in the ice as discussed above. The return sub-header 93 is connected through the coupling 61 and short connecting line 941 with the main return header 88.
The tube securing means S shown in FIG. 12 for the tubes T in the mat M4 is the same as the securing means S with the tape assembly 70, shown in FIGS. 3, 4 and 5. We have found that the mats can be handled conveniently and easily when the securing means S include tapes of glass-fiber fabric approximately x2 inch wide and spaced from 6 to 18 inches apart along the length of the mat.
FIG. 13 shows an alternative embodiment of a transverse mat M-S. This mat M-5 is similar in grid configuration to the mat M-l which was discussed with respect to FIG. 6, but the mat M-5 also employs the same principles as shown in FIG. 12, wherein a U bend 92 at the center of each tube T enables the fluid to pass once across the ice and then return before it is received by the return sub-header 93 to flow back to the cooling station.
As is noted with respect to FIG. 6, clips 77 have been attached at various intervals along the length of the tubing so as to join adjacent tubes into forming an elongatedX pattern or quilt-like grid.
In FIG. 14 an alternate embodiment of a transverse mat M45 is shown similar to the mat M-2 which was disclosed in FIG. 7. This mat M-6 can be utilized with respect to the system shown in FIG. 11.
Both the first and second halves of each tube T are held closely adjacent to one another by securing means S shown as spacer strips 82 with fasteners 83 similar to those which were described with respect to FIGS. 8 and 9. The legs of the fasteners 83 are wrapped around the tubes so as to hold the tubing in place with respect to the other tubes and to keep the two adjacent halves of each tube held closely against one another.
FIG. 15 shows a mat embodiment M-7 having a coolant flow configuration which is particularly adapted for use beneath very short expanses of ice. Each of the tubes T shown in FIG. 15 cross beneath the width of the ice, return, recross beneath the width of the ice, return and recross and return again for several times thereafter. The uniform cooling effect is enhanced by the fact that the tubes are arranged so that each pair of tubes is arranged as a set 96. The two tubes in each set of tubes overlaps and alternates with the other tube in the set of tubes, and the coolant is flowing in opposite directions in the two tubes in ach st. running th flow in th tubs in opposit directions accomplishs, again, balancing of th cooling ffect, as uniformly as possibl, across th surfac of th ic.
The details of this mat configuration M-7 are shown in FIG. 15 wherein the coolant is supplied through a short line 91 and a coupling 61 and through a subheader 98. On its first pass through the tubes 99 at the bottom of FIG. 15, coolant traverses the mat M-7 to point 101 where because of a U bend, it is re-routed across the mat on its pass in a direction opposite to the first and returns to point 102 where it is again, bcause ofa U bend, re-routed across the ice on its third pass to point 103, and from this point 103 it is again rerouted across the ice for a fourth pass to the point 104. It is re-routed across the ice as is shown in FIG. 15 for an additional four times by going to U bend 105, to U bend 1116, to U bend 107 to point 108 and is thereafter connected to return sub-header 1110. On each pass, the coolant in this tube 99 is moving in a direction opposite that of the coolant in a tube 1119 immediately neightboring thereto and interlaced with the tube 99. This tube 109 also has seven U" bends 111-117 which are positioned adjacent to and overlapping with the respective seven U bends 107-101 of the tube 99. Thus, the two tubes 99 and 1119 comprise one of the tubing sets 96.
It is to be understood that any of the embodiments of the flexible tubing mats M-4, M-5, or M-tfi can be employed in the system shown in FIG. 11 in which the mats extend transversely across the full size rink. In this case, the mats M 1, M-S, or M-6 are about feet long and 4 feet wide. The sub-headers and 93 are about 4 feet long.
The flexible tubing mat M-7 is adapted for use with smaller ice rinks as indicated above.
The dimensions of a flexible tubing, as shown in FIG. 1 or FIG. 11 are such that the main headers 11, 13, 23, 27 or 87 or 88 have an inside diameter of approximately two inches, the sub-headers in the mats M, M-1, M-2, M-3, M-4l, M-5, M-6, and M-7 which supply and return the coolant directly to and from the tubing T in the mats themselves have an inside diameter of approximately three quarters of an inch. A convenient way to make these sub-headers 15, 16, 21, 25 and 90 and 93 is to use copper pipes 4 feet long having holes punched therein and then short copper spuds having an outside diameter (O.D.) slightly larger than the inside diameter (l.D.) of the tubes T are soldered into the holes in the pipe or otherwise fastened to the main body of the subheader to serve as a connection spud between the subheader and the end of each plastic tube T. These coupling spuds, for example, as shown in FIG. 3 at I20, are typically one-quarter inch in outside diameter. The plastic tubing of the mat has an average inside diameter of three-sixteenths of an inch. When installed, the ends of the tubing is expanded from its normal threesixteenth inch inside diameter to one-quarter inch to fit onto the coupling spuds on the sub-header. Thereafter, the tubing is clamped upon the spuds by a small commercially available spring clamp I22 (sometimes called a hose clamp") which encircles the end portion of the tubing T surrounding the spud 120.
In practicing the present invention, the flexible plastic tubes T have an inside diameter between one-eighth and three-eighths of an inch. It is to be understood that tubing having an oval shaped passage can be used. Thus, the term inside diameter" or I.D." is to be interpreted broadly enough to include such oval tubing having an average inside dimension of between oneeighth and three-eighths of an inch.
It is not necessary that the protective layer 53 of sand or other protective material be used, providing that the operator of the rink is careful to maintain an unbroken slab of ice over the otherwise bare tubing T.
For the best results, it has been found that ethylene vinyl acetate is the preferred material from which the tubes T for the flexible mats are made. It has been noted that ethylene vinyl acetate (EVA) is inert to low temperature anti-freeze liquids such as ethylene glycol or methyl alcohol and has good temperature characteristics, and its elasticity remains at low temperature (down to approximately 5F to F). Moreover, this elasticity enables the tubes to be stretched over the spuds 120. Further, we have found that EVA is preferable to polyethylene because EVA has better temperature characteristics, i.e., it is not brittle and that it has a higher degree of stretchability than does polyethylene. Thus, advantageously, the stretchability of the tubing accommodates the expansion and contraction due to temperature changes. For example, the tubing mats may be laid down in the fall when the temperature is approximately 60F, and then the tubing is cooled to F or below by the coolant.
Generally, it has been found that the optimum results from the invention are obtained when the spacing of the tubes is such that the distance between the tubes T is less than the thickness of the ice. This is shown more clearly in FIGS. 16 and 17. In FIG. 16, small diameter flexible tubes T are parallel to one another and equidistant apart. The tubes T may be located within a protective layer of material 53 which is preferably sand. The ice above the tubing is preferably of a thickness, for example, 1.25 inches, such that the thickness (X) of the ice is greater than the center-to-center distance (D) between neighboring tubes T. The same distance (D) exists between all other tubes shown in FIG. 16, which is shown as three-fourths of an inch with the tubes T having an ID. of three-sixteenths of an inch. By virtue of the close spacing of the tubing T, the temperature differential between a point N at the surface of the ice midway between, e.g. equidistant from, the two neighboring tubes and a point 0 directly over each tube will be substantially less than that which is experienced in the prior art system. The distance shown by the dashed lines 124 from points N to the respective tubes T is not much greater than the distance 126 from the points 0 to the respective tubes T.
It is to be noted that the cooling of the surface points N and O is accomplished by withdrawing heat down through the ice along the lines 124 and 126. Since these lines are almost of equal length, the effective cooling action is substantially uniform over the entire surface of the ice.
FIG. 17 shows the effective cooling action when the tubes are in adjacent pairs, as shown in the mats M-2 (FIG. 7) and M-6 (FIG. 14). The pairs of tubes are spaced by an approximate distance 2D, and thus the average spacing per tube is about D. The ice thickness X is preferably greater than D, as discussed above in connection with FIG. 16. Once again, it is seen that the distances 127 from the points N to the respective pairs of tubes is not much greater than the distances 128 from points 0. Thus, a substantially uniform cooling action is obtained at the surface of the ice.
A prior art system is shown in FIG. 18 where wide diameter thick-walled metal pipes 130 are embedded in concrete 132. The centers of the pipes 130 have been customarily spaced approximately 4 to 4% inches apart. A four inch center-to-center spacing is shown. At points N midway between these pipes, there will be found an eight degree differential between the temperature of the ice surface at that point N, and the temperature of the brine within the pipes. Because of this wide differential in the temperatures, it is possible for soft spots or melting to occur at the ice surface at midpoints N in the prior art system. The distances I33 from the midpoints N at the ice surface to the widely spaced pipes 130 are much greater than the distance 134 from points 0 directly over the pipes. Thus, a much different effective cooling rate occurs at points N and O.
The system of the present invention utilizes small diameter flexible plastic tubing placed much closer together and low temperature coolant, and thus (a) the points N and O are all at almost the same temperature, and (b) the differential between the temperature at the surface of the ice and the temperature of the concrete at various points is more uniform and the cooling path lengths 124, 126, 127 and 128 are all fairly short, and this, therefore, provides a better quality of ice.
Thus, it has been found that even though the present system has only about one-tenth the volume of a conventional system for a rink of the same size, better cooling and a better quality of ice are provided by having a much greater number of very small diameter tubes very close together with very cold coolant. The inlet and outlet temperature of the coolant is approximately 5F and 25F, respectively. However, inlet and outlet temperatures of 5F and 25F can also be used to advantage.
As is noted in FIG. 18, because the temperature of brine being at 15F to 18F at the inlet and 17F to 20F at the outlet (an average brine temperature of approximately l7.5F), it is sometimes possible with the two pipes 130 being separated by a distance of 4 to 4% inches that the point N half way between these two pipes could be at a temperature greater than that of the melting point of fresh water. Therefore, the regions near N on the ice would be in the form of troughs or valleys of slush, causing a ripple appearance of ridges and valleys in the ice surface. In FIGS. 16 and 17, the average coolant temperature in the tubes T is approximately 15F and the heat flow paths 126 and 128 are shorter than the heat flow paths 133 (FIG. 18); thus,
surface melting is less likely to occur and significant ridges and valleys do not occur in the ice surface.
With respect to this particular layout of FIGS. 16 and 17, it has been noted the dimensions which seem best suited for this application are 1% inch for the thickness of the ice, a quarter inch of sand 53 or other material above the tops of the tubing to protect them as has been noted above, and an average center-to-center spacing D of three-fourths inch between tubes. Again, by virtue of the extremely low temperatures at which the systems of this invention operate and the extremely close placement of the tubes, better cooling and better quality ice results.
The prior art systems utilize calcium chloride (CaCl brine for the coolant solution on the basis of economics, i.e., it has usually been financially impractical to use any other type of coolant because of the large volumes under the rink floor of such a system (3,200 gallons). The present invention can use a coolant such as an ethylene glycol mixture because of its small capacity under the rink floor (less than one-tenth that of the prior art systems), and it can operate at a much, much lower temperature than the typical prior brine solution system.
The combination of very cold tubing coupled with close spacing of numerous small diameter tubes gives the invention the desired characteristics of better quality ice and better cooling results. I
The small diameter plastic tubes have an ID. in the range from one-eighth to three-eighths of an inch and are spaced closer together than the ice thickness, which should be less than 2 inches. The average center-tocenter tube spacing is from one-half to 1% inches, and is shown as being three-fourths inch in FIG. 16. A large temperature differential of 20F to 30F is utilized between the inlet and outlet temperatures of the circulating coolant. A flow rate of less than l/50 gallon per minute per square foot of ice surface can be used, as compared with the prior art systems in which usual flows are many times that fraction. The coolant inlet temperature is not more than F and preferably not more than 5F, or lower. The pairs of tubes T in FIGS. 7, 8, 9, l0, l4 and 17 can be extruded together as a coextruded pair, if desired. The lower flows allowed by the great temperature differential of 20F to 30F allow for smaller size fittings and lower pumping costs. By virtue of the fact that the ice temperature is not nearly as responsive to the temperature of the low temperature coolant in view of the large temperature difference, variations produced in circulation flow rate by changing the circulating pumping pressures of the pumps 37 provide an easy and reliable means of control of the overall ice freezing and maintaining system.
It is to be understood that the various flexible tubing mats M, M-l, M-2, M-3, M-4, M-5, M-6 and M-7 can also be utilized to hold snow on a ski slope under conditions when the snow would otherwise begin to melt. On a ski slope the mats are laid transverse to the slope, i.e., are laid with the tubes T extending along horizontal contour lines of the slope. It is more convenient to utilize the types of mats M-4, M-5, M-6 and M-7 as employed in the system of F [G 11, because this enables main headers to be extended along only one border of the ski slope. The refrigeration station can be located off to one side of the slope near the top, middle or bottom of the slope, whatever may be convenient.
Moreover, the present invention can be employed to advantage in creating and maintaining an ice trough or chute to be used as a toboggan slide or for similar sliding purposes. For example, in such an application, a flexible mat 4 feet wide and feet long having the two headers at only one end, such as the mats M-4, M-5 and M-6, can be employed. For a slide two feet wide, the mat is folded in half along its length to make it 100 feet long and 2 feet wide with a double layer of tubing resulting from such folding. The mat can be bent around curves of the toboggan slide and inclined to create banked curves. Typically, the mats are laid end-toend with the sub-headers near each other so that one mat extends down the slide from the sub-header location and the other extends up the slide from that location. Thus, an icy trough can be created and maintained with curves and straight stretches, as desired.
From the foregoing, it will be understood that the illustrative embodiments of the small diameter flexible plastic tubing mat system, as shown above and the methods and apparatus of making and using the same, above described, are well suited to provide the advantages set forth. And since many possible embodiments may be made of various features of the invention and as methods and systems here described may be varied in various parts, all without departing from the scope of the invention, it is to be understood that all matter here and before set forth shown in the accompanying drawings is to be interpreted as illustrative and not in a limiting sense in that certain features of these embodiments may be used without a corresponding use of other features without departing from the scope of the invention.
We claim:
1. The method of creating a uniform slab of ice for skating comprising the steps of:
a. providing a level and approximately rectangular area of ground,
b. preparing a layer of thermal insulation material over such area,
c. overlaying said insulated area with parallel lengths of small diameter flexible plastic tubing of between one-eighth and three-eighths inch inside diameter which have been preassembled into mats of multiple tube lengths by means of spacer attachments, holding the flexible parallel tube lengths in spaced relationship to one another at regular intervals along the tube lengths,
d. connecting such tube lengths at their ends at the border of said area tosupply and return header P p e. circulating low temperature anti-freeze liquid through said header pipes and tubes with flow of said liquid in adjacent parallel tube lengths being in alternate directions,
f. refrigerating said low temperature anti-freeze liquid to a temperature of no more than l0 F,
g. placing a layer of protective material over the flexible plastic tube lengths,
h. putting water over said protective material to be frozen into the slab of skating ice, and
i. freezing the slab of ice to a thickness greater than three-fourths of an inch to provide a uniform slab of ice for skating.
2. The method of creating a uniform slab of ice for skating as claimed in claim 1, including the step of placing a layer of surfacing material upon the ground before applying said layer of thermal insulation.
3. The method of creating a uniform slab of ice for skating as claimed in claim 1 in which said parallel tube lengths are spaced apart from one-half inch to 1% inches from center-to-center on average.
4. The method of creating a uniform slab of ice for skating as claimed in claim 1 in which said plastic tube lengths run lengthwise beneath the ice slab wherein every other tube length is connected to a supply header near one end of the ice slab and runs to a return header at the other end of the ice slab and each interventing tube length is connected to a supply header at said other end of the ice slab and runs to a return header at said one end of the ice slab.
5. The method of creating a uniform slab of ice for skating as claimed in claim 1 in which the plastic tube lengths run across beneath the shorter dimension of the ice slab and each pair of tube lengths are connected to each other at one side of the ice slab and one of each pair runs to a supply header at the other side of the ice slab and the other of each pair runs to a return header at said other side of the ice slab.
6. The method of creating a uniform slab of ice for skating comprising the steps of:
a. providing a level and approximately rectangular area of ground,
b. preassembling lengths of small diameter flexible plastic tubing having an inside diameter of between one-eighth and three-eighths of an inch into flexible mats wherein the lengths of tubing are secured in a grid relationship in closely spaced neighboring relationship,
c. laying said mats side by side upon said area,
d. connecting the lengths of tubing at their ends near the border of said area to supply and return headers,
e. providing anti-freeze coolant capable of being refrigerated down below 10F without freezing,
f. circulating such anti-freeze coolant through said tubing mats with the coolant flow direction being in opposite directions in successive neighboring tubes,
g. refrigerating said anti-freeze coolant to a temperature below approximately 10F,
h. pumping the anti-freeze coolant at a flow of less than l/50 gallon per minute per square foot of area of the ice surface,
i. depositing a layer of water above said tubing mats and adding subsequent layers after the previous layer has been frozen, until a slab of ice is created having a thickness exceeding the average centerto-center spacing of the lengths of tubing in said mats, whereby the large temperature difference between the anti-freeze coolant in successive neighboring tubes is averaged out within the ice slab providing substantially uniform temperaturs at the ice surface.
7. The method of creating a uniform slab of ice for skating as claimed in claim 6 wherein the thickness of the ice slab is less than 2 inches.
8. The method of creating a uniform slab of ice for skating comprising the steps of:
a. providing a level and approximately rectangular area of ground,
b. assembling parallel co-extruded pairs of plastic tubing lengths having an inside diameter between one-eighth and three-eighths of an inch for each tubing length of the pair into flexible mats in which the pairs of plastic tubing lengths are in a grid relationship,
c. overlaying such area of ground with said mats,
d. connecting said pairs of tubing lengths at their ends to supply and return header means leading to and from pumping means for circulating an antifreeze liquid through said pairs of tubing lengths with the flow of said liquid in the two tubing lengths of each co-extruded pair of tubes in opposite directions,
e. pumping the anti-freeze liquid at a flow rate of less than 1/50 gallon per minute per square foot of ice surface,
f. refrigerating said anti-freeze liquid to a temperature of no more than 10F.
g. depositing a layer of water over the tops of said pairs of tubing lengths and adding subsequent layers after the previous layer is frozen, until a slab of ice is created having a thickness greater than threefourths of an inch over the tops of said pairs of tubes, whereby the large temperature difference of the supply and return anti-freeze liquid in the two lengths of tubing in each of said pairs is averaged out partly within the ice slab and partly by heat transfer from the less cold liquid in one of the lengths of tubing of each pair into the colder liquid in the other length of tubing in each pair.
9. The method of creating a uniform slab of ice for skating according to claim 8 in which the two tubing lengths of each pair are joined together at one end of the co-extruded pair by a U-bend and are each connected to supply and return header means, respectively, at their other end.
10. The method of creating a uniform slab if ice for skating according to claim 8 wherein the two tubing lengths of one pair are connected at their ends by U- bends to tubing lengths of other pairs providing several passes for the anti-freeze liquid across and back beneath the ice slab and wherein the distance along the flow path from any point in one tubing length of a tubing pair to the return header means is equal to the distance from said point along the flow path in the other tubing length of said tubing pair to the supply header means.
11. The method of creating a uniform slab of ice for skating comprising the steps of:
a. providing a level and approximately rectangular area of ground,
b. preassembling a plurality of grids of plastic tubing having an inside diameter between one-eighth and three-eights of an inch assembled from multiple tube lengths having length sufficient to extend from one border to another border of said area, said grid being preassembled by fastening each tube length alternately at regular intervals first to the neighboring tube on one side of it and then to the neighboring tube on the other side of it, thus giving each tube a zig-zag course and producing an elongated X-shaped grid pattern of the preassembled tube lengths in each grid,
c. covering said area with said grids laid side-to-side,
d. connecting such tube lengths at their ends at the border of such area to supply and return header means leading from and to pumping means for circulating anti-freeze liquid through said headers and tubes with the flow of liquid in neighboring tubes beingin opposite directions,
e. pumping the anti-freeze liquid at a flow rate of less than 1/50 gallon per minute per square foot of said area,
f. refrigerating said anti-freeze liquid to a temperature of no more than F,
g. depositing a layer of water over said grid of plastic tubing and adding subsequent layers after the previous layer has frozen until a slab of ice is created having a thickness exceeding three-fourths of an inch, whereby the large temperature difference between the anti-freeze liquid in alternate tubes is averaged out within the ice slab, providing substantially uniform temperature at the ice surface.
12. The method of creating a uniform slab of ice for skating as claimed in claim 6 in which said small diameter flexible plastic tubing is preassembled into mats having a width of only a few feet with a length of many times said width and the ends of said lengths of tubing near said border are connected to supply and return sub-headers having a length approximately equal to the width of said mats, and in which said sub-headers in turn are respectively connected to supply and return main headers extending along said border near the ice slab.
13. The method of creating a uniform slab of ice for skating as claimed in claim 8, in which said co-extruded pairs of plastic tubing lengths are assembled into flexible mats having a width of only a few feet and having a length of many times said width and including the steps of connecting said pairs of tubing lengths at their ends to supply and return sub-headers having lengths approximately equal to the widths of the mats and in turn connecting said sub-headers, respectively, to main supply and return headers extending along said border area near the ice slab.
14. The method of creating a unifon'n slab of ice for skating as claimed in claim 6, including the step of refrigerating said anti-freeze coolant to a temperature of no more than 5F and in which the temperature of the antifreeze coolant after circulating through said tubing mats is at a temperature at least F and preferably at least F greater than the temperature to which it is refrigerated.
15. The method of creating a uniform slab of ice for skating comprising the steps of:
a. providing a level and approximately rectangular area,
b. preassembling lengths of small diameter flexible plastic tubing having an inside diameter of between one-eighth and three-eighths of an inch into flexible mats having a width of only a few feet with a length of many times said width wherein the lengths of tubing are secured in a closely spaced grid relationship with average center-to-center spacing distances of from k of an inch to 1% inches,
c. laying said mats side by side upon said area,
d. connecting the lengths of tubing at their ends to supply and return headers,
e. providing anti-freeze liquid capable of being refrigerated colder than 5F without freezing,
f. circulating such anti-freeze liquid through said tubing mats with the liquid flow direction being in opposite directions in successive neighboring tube lengths,
g. refrigerating said anti-freeze liquid to a temperature of approximately 10F,
h. depositing a layer of water above said tubing mats and adding subsequent layers after the previous layer has been frozen, until a slab of ice is created having a thickness exceeding the average centerto-center spacing of the lengths of tubing in said mats, whereby the large temperature difference between the anti-freeze coolant in successive neighboring tubes is averaged out within the ice slab providing substantially uniform temperatures at the ice surface.
16. The method of creating a sloping area of ice for sliding by toboggan, sled, ski or other sliding device comprising the steps of:
a. providing a mostly sloping area of generally smooth contour,
b. preassembling lengths of small diameter flexible plastic tubing having an inside diameter of between one-eighth and three-eighths of an inch into flexible mats having a width of only a few feet with a length of many times said width wherein the lengths of tubing are secured in a closely spaced grid relationship with average center-to-center spacing distances of from A of an inch to 1% inches,
c. laying said mats end to end upon said area,
(1. connecting the lengths of tubing at their ends near the beginning of the next mat to supply and return headers,
e. providing anti-freeze liquid capable of being refrigerated colder than 5F without freezing,
f. circulating such anti-freeze liquid through said tubing mats with the liquid flow direction being in opposite directions in successive neighboring tube lengths,
g. refrigerating said anti-freeze liquid to a temperature of approximately 10F.
h. depositing a layer of water above said tubing mats and adding subsequent layers after the previous layer has been frozen, until a slab of ice is created having a thickness exceeding the average centerto-center spacing of the lengths of tubing in said mats, whereby the large temperature difference between the anti-freeze coolant is successive neighboring tubes is averaged out within the ice slab providing substantially uniform temperatures at the ice surface.
at: i

Claims (16)

1. The method of creating a uniform slab of ice for skating comprising the steps of: a. providing a level and approximately rectangular area of ground, b. preparing a layer of thermal insulation material over such area, c. overlaying said insulated area with parallel lengths of small diameter flexible plastic tubing of between one-eighth and three-eighths inch inside diameter which have been preassembled into mats of multiple tube lengths by means of spacer attachments, holding the flexible parallel tube lengths in spaced relationship to one another at regular intervals along the tube lengths, d. connecting such tube lengths at their ends at the border of said area to supply and return header pipes, e. circulating low temperature anti-freeze liquid through said header pipes and tubes with flow of said liquid in adjacent parallel tube lengths being in alternate directions, f. refrigerating said low temperature anti-freeze liquid to a temperature of no more than 10* F, g. placing a layer of protective material over the flexible plastic tube lengths, h. putting water over said protective material to be frozen into the slab of skating ice, and i. freezing the slab of ice to a thickness greater than threefourths of an inch to provide a uniform slab of ice for skating.
2. The method of creating a uniform slab of ice for skating as claimed in claim 1, including the step of placing a layer of surfacing material upon the ground before applying said layer of thermal insulation.
3. The method of creating a uniform slab of ice for skating as claimed in claim 1 in which said parallel tube lengths are spaced apart from one-half inch to 1 1/2 inches from center-to-center on average.
4. The method of creating a uniform slab of ice for skating as claimed in claim 1 in which said plastic tube lengths run lengthwise beneath the ice slab wherein every other tube length is connected to a supply header near one end of the ice slab and runs to a return header at the other end of the ice slab and each interventing tube length is connected to a supply header at said other end of the ice slab and runs to a return header at said one end of the ice slab.
5. The method of creating a uniform slab of ice for skating as claimed in claim 1 in which the plastic tube lengths run across beneath the shorter dimension of the ice slab and each pair of tube lengths are connected to each other at one side of the ice slab and one of each pair runs to a supply header at the other side of the ice slab and the other of each pair runs to a return header at said other side of the ice slab.
6. The method of creating a uniform slab of ice for skating comprising the steps of: a. providing a level and approximately rectangular area of ground, b. preassembling lengths of small diameter flexible plastic tubing having an inside diameter of between one-eighth and three-eighths of an inch into flexible mats wherein the lengths of tubing are secured in a grid relationship in closely spaced neighboring relationship, c. laying said mats side by side upon said area, d. connecting the lengths of tubing at their ends near the border of said area to supply and return headers, e. providing anti-freeze coolant capable of being refrigerated down below 10*F without freezing, f. circulating such anti-freeze coolant through said tubing mats with the coolant flow direction being in opposite directions in successive neighboring tubes, g. refrigerating said anti-freeze coolant to a temperature below approximately 10*F, h. pumping the anti-freeze coolant at a flow of less than 1/50 gallon per minute per square foot of area of the ice surface, i. depositing a layer of water above said tubing mats and adding subsequent layers after the previous layer has been frozen, until a slab of ice is created having a thickness exceeding the average center-to-center spacing of the lengths of tubing in said mats, whereby the large temperature difference between the anti-freeze coolant in successive neighboring tubes is averaged out within the ice slab providing substantially uniform temperaturs at the ice surface.
7. The method of creating a uniform slab of ice for skating as claimed in claim 6 wherein the thickness of the ice slab is less than 2 inches.
8. The method of creating a uniform slab of ice for skating comprising the steps of: a. providing a level and approximately rectangular area of ground, b. assembling parallel co-extruded pairs of plastic tubing lengths having an inside diameter between one-eighth and three-eighths of an inch for each tubing length of the pair into flexible mats in which the pairs of plastic tubing lengths are in a grid relationship, c. overlaying such area of ground with said mats, d. connecting said pairs of tubing lengths at their ends to supply and return header means leading to and from pumping means for circulating an anti-freeze liquid through said pairs of tubing lengths with the flow of said liquid in the two tubing lengths of each co-extruded pair of tubes in opposite directions, e. pumping the anti-freeze liquid at a flow rate of less than 1/50 gallon per minute per square foot of ice surface, f. refrigerating said anti-freeze liquid to a temperature of no more than 10*F. g. depositing a layer of water over the tops of said pairs of tubing lengths and adding subsequent layers after the previous layer is frozen, until a slab of ice is created having a thickness greater than three-fourths of an inch over the tops of said pairs of tubes, whereby the large temperature difference of the supply and return anti-freeze liquid in the two lengths of tubing in each of said pairs is averaged out partly wIthin the ice slab and partly by heat transfer from the less cold liquid in one of the lengths of tubing of each pair into the colder liquid in the other length of tubing in each pair.
9. The method of creating a uniform slab of ice for skating according to claim 8 in which the two tubing lengths of each pair are joined together at one end of the co-extruded pair by a U-bend and are each connected to supply and return header means, respectively, at their other end.
10. The method of creating a uniform slab if ice for skating according to claim 8 wherein the two tubing lengths of one pair are connected at their ends by U-bends to tubing lengths of other pairs providing several passes for the anti-freeze liquid across and back beneath the ice slab and wherein the distance along the flow path from any point in one tubing length of a tubing pair to the return header means is equal to the distance from said point along the flow path in the other tubing length of said tubing pair to the supply header means.
11. The method of creating a uniform slab of ice for skating comprising the steps of: a. providing a level and approximately rectangular area of ground, b. preassembling a plurality of grids of plastic tubing having an inside diameter between one-eighth and three-eights of an inch assembled from multiple tube lengths having length sufficient to extend from one border to another border of said area, said grid being preassembled by fastening each tube length alternately at regular intervals first to the neighboring tube on one side of it and then to the neighboring tube on the other side of it, thus giving each tube a zig-zag course and producing an elongated X-shaped grid pattern of the preassembled tube lengths in each grid, c. covering said area with said grids laid side-to-side, d. connecting such tube lengths at their ends at the border of such area to supply and return header means leading from and to pumping means for circulating anti-freeze liquid through said headers and tubes with the flow of liquid in neighboring tubes being in opposite directions, e. pumping the anti-freeze liquid at a flow rate of less than 1/50 gallon per minute per square foot of said area, f. refrigerating said anti-freeze liquid to a temperature of no more than 10*F, g. depositing a layer of water over said grid of plastic tubing and adding subsequent layers after the previous layer has frozen until a slab of ice is created having a thickness exceeding three-fourths of an inch, whereby the large temperature difference between the anti-freeze liquid in alternate tubes is averaged out within the ice slab, providing substantially uniform temperature at the ice surface.
12. The method of creating a uniform slab of ice for skating as claimed in claim 6 in which said small diameter flexible plastic tubing is preassembled into mats having a width of only a few feet with a length of many times said width and the ends of said lengths of tubing near said border are connected to supply and return sub-headers having a length approximately equal to the width of said mats, and in which said sub-headers in turn are respectively connected to supply and return main headers extending along said border near the ice slab.
13. The method of creating a uniform slab of ice for skating as claimed in claim 8, in which said co-extruded pairs of plastic tubing lengths are assembled into flexible mats having a width of only a few feet and having a length of many times said width and including the steps of connecting said pairs of tubing lengths at their ends to supply and return sub-headers having lengths approximately equal to the widths of the mats and in turn connecting said sub-headers, respectively, to main supply and return headers extending along said border area near the ice slab.
14. The method of creating a uniform slab of ice for skating as claimed in claim 6, including the step of refrigerating said anti-freeze coolant to a temperAture of no more than 5*F and in which the temperature of the antifreeze coolant after circulating through said tubing mats is at a temperature at least 15*F and preferably at least 20*F greater than the temperature to which it is refrigerated.
15. The method of creating a uniform slab of ice for skating comprising the steps of: a. providing a level and approximately rectangular area, b. preassembling lengths of small diameter flexible plastic tubing having an inside diameter of between one-eighth and three-eighths of an inch into flexible mats having a width of only a few feet with a length of many times said width wherein the lengths of tubing are secured in a closely spaced grid relationship with average center-to-center spacing distances of from 1/2 of an inch to 1 1/2 inches, c. laying said mats side by side upon said area, d. connecting the lengths of tubing at their ends to supply and return headers, e. providing anti-freeze liquid capable of being refrigerated colder than 5*F without freezing, f. circulating such anti-freeze liquid through said tubing mats with the liquid flow direction being in opposite directions in successive neighboring tube lengths, g. refrigerating said anti-freeze liquid to a temperature of approximately 10*F, h. depositing a layer of water above said tubing mats and adding subsequent layers after the previous layer has been frozen, until a slab of ice is created having a thickness exceeding the average center-to-center spacing of the lengths of tubing in said mats, whereby the large temperature difference between the anti-freeze coolant in successive neighboring tubes is averaged out within the ice slab providing substantially uniform temperatures at the ice surface.
16. The method of creating a sloping area of ice for sliding by toboggan, sled, ski or other sliding device comprising the steps of: a. providing a mostly sloping area of generally smooth contour, b. preassembling lengths of small diameter flexible plastic tubing having an inside diameter of between one-eighth and three-eighths of an inch into flexible mats having a width of only a few feet with a length of many times said width wherein the lengths of tubing are secured in a closely spaced grid relationship with average center-to-center spacing distances of from 1/2 of an inch to 1 1/2 inches, c. laying said mats end to end upon said area, d. connecting the lengths of tubing at their ends near the beginning of the next mat to supply and return headers, e. providing anti-freeze liquid capable of being refrigerated colder than 5*F without freezing, f. circulating such anti-freeze liquid through said tubing mats with the liquid flow direction being in opposite directions in successive neighboring tube lengths, g. refrigerating said anti-freeze liquid to a temperature of approximately 10*F. h. depositing a layer of water above said tubing mats and adding subsequent layers after the previous layer has been frozen, until a slab of ice is created having a thickness exceeding the average center-to-center spacing of the lengths of tubing in said mats, whereby the large temperature difference between the anti-freeze coolant is successive neighboring tubes is averaged out within the ice slab providing substantially uniform temperatures at the ice surface.
US00204112A 1971-12-02 1971-12-02 Method and system for creating and maintaining an ice slab Expired - Lifetime US3751935A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US20411271A 1971-12-02 1971-12-02

Publications (1)

Publication Number Publication Date
US3751935A true US3751935A (en) 1973-08-14

Family

ID=22756675

Family Applications (1)

Application Number Title Priority Date Filing Date
US00204112A Expired - Lifetime US3751935A (en) 1971-12-02 1971-12-02 Method and system for creating and maintaining an ice slab

Country Status (5)

Country Link
US (1) US3751935A (en)
CA (1) CA953523A (en)
DE (1) DE2258157C2 (en)
GB (1) GB1416700A (en)
NL (1) NL7216356A (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3827253A (en) * 1973-04-30 1974-08-06 Burrard Refrigeration Ltd Chiller for ice rink refrigeration systems
US3986342A (en) * 1975-08-29 1976-10-19 Maccracken Calvin D Method of securing a perimeter fence around an ice rink without embedding into ground
US4394817A (en) * 1981-09-09 1983-07-26 Remillard Jean M Apparatus for making and maintaining an ice surface
US4583583A (en) * 1983-06-02 1986-04-22 Engelhard Corporation Fuel cell crimp-resistant cooling device with internal coil
US4611471A (en) * 1984-02-03 1986-09-16 Kabushiki Kaisha Patine Shokai Ice making apparatus particularly for an ice rink
US4742958A (en) * 1984-11-06 1988-05-10 Permasnow (Australasia) Limited Method for making artificial snow
US4793142A (en) * 1985-06-04 1988-12-27 Permasnow (Australasia) Limited Method for making artificial snow
US4880051A (en) * 1986-07-14 1989-11-14 Kabushiki Kaisha Patine Shokai Piping apparatus for melting snow and ice
US4979373A (en) * 1989-02-06 1990-12-25 Robert Huppee Apparatus for making and maintaining an ice surface
US5251689A (en) * 1990-01-05 1993-10-12 Solkav Solartechnik Gesellschaft M.B.H. Rollable heat exchanger
US5261245A (en) * 1991-03-01 1993-11-16 Miura Dolphins Co., Ltd. Method for making ice slab and/or artificial snow
EP0667499A1 (en) * 1992-10-30 1995-08-16 Kajima Corporation Pneumatic ice making device
US5970734A (en) * 1995-09-29 1999-10-26 Stillwell; Robert Method and system for creating and maintaining a frozen surface
US6006826A (en) * 1997-03-10 1999-12-28 Goddard; Ralph Spencer Ice rink installation having a polymer plastic heat transfer piping imbedded in a substrate
US6021646A (en) * 1998-06-26 2000-02-08 Burley's Rink Supply, Inc. Floor system for a rink
US6418733B1 (en) * 1998-05-11 2002-07-16 Ralf Morent Method and device for preserving snow
US20090025921A1 (en) * 2005-09-27 2009-01-29 Uponor Innovation Ab Capillary Tube System
EP2274060A1 (en) * 2008-03-13 2011-01-19 Oû Plan Consulting Procedure for manufacturing a winter sports arena and a winter sports arena
GR1007249B (en) * 2009-12-17 2011-04-29 Ελενη Ιωαννη Ζυγουρακη Transportable energy aluminium ice scatting platform
US20130055745A1 (en) * 2010-04-14 2013-03-07 Mayekawa Mfg. Co., Ltd. Ice rink cooling facility
US20140007603A1 (en) * 2012-01-30 2014-01-09 Serge Dube Co2 refrigeration system for ice-playing surface
DE102015010394A1 (en) * 2015-08-10 2017-02-16 Mefa Befestigungs- Und Montagesysteme Gmbh Heat transfer element
US20180353842A1 (en) * 2017-06-09 2018-12-13 Dreamsbig, Llc Liquid cooling system for outdoor surfaces
US20190195518A1 (en) * 2017-04-24 2019-06-27 Mar-Bud Spólka Z Ograniczona Odpowiedzialnoscia Device for manufacturing and storing ice
US10514204B2 (en) 2014-09-05 2019-12-24 Carrier Corporation Multiport extruded heat exchanger

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3100386A1 (en) * 1981-01-09 1982-08-12 Hölter, Heinz, Dipl.-Ing., 4390 Gladbeck Process and apparatus for the production of ice-skating or roller-skating rinks, preferably for the private sector
GB2223567B (en) * 1988-08-25 1992-04-15 Bolero Rinks Ltd Heat exchange system
DE102018127175A1 (en) 2018-10-31 2020-04-30 Klaus Scherrieble System and method for regulating and monitoring refrigeration for a unit

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2878651A (en) * 1954-12-21 1959-03-24 John A Heinzelman Ice rink construction
US3295594A (en) * 1964-09-03 1967-01-03 United Aircraft Corp Thermal garment

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2769315A (en) * 1954-04-14 1956-11-06 Clifford A Meadows Artificial ice rink
US3379031A (en) * 1966-01-24 1968-04-23 John C. Lewis Jr. Artificial ice rink employing modular units

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2878651A (en) * 1954-12-21 1959-03-24 John A Heinzelman Ice rink construction
US3295594A (en) * 1964-09-03 1967-01-03 United Aircraft Corp Thermal garment

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3827253A (en) * 1973-04-30 1974-08-06 Burrard Refrigeration Ltd Chiller for ice rink refrigeration systems
US3986342A (en) * 1975-08-29 1976-10-19 Maccracken Calvin D Method of securing a perimeter fence around an ice rink without embedding into ground
US4394817A (en) * 1981-09-09 1983-07-26 Remillard Jean M Apparatus for making and maintaining an ice surface
US4583583A (en) * 1983-06-02 1986-04-22 Engelhard Corporation Fuel cell crimp-resistant cooling device with internal coil
US4611471A (en) * 1984-02-03 1986-09-16 Kabushiki Kaisha Patine Shokai Ice making apparatus particularly for an ice rink
US4742958A (en) * 1984-11-06 1988-05-10 Permasnow (Australasia) Limited Method for making artificial snow
US4793142A (en) * 1985-06-04 1988-12-27 Permasnow (Australasia) Limited Method for making artificial snow
US4880051A (en) * 1986-07-14 1989-11-14 Kabushiki Kaisha Patine Shokai Piping apparatus for melting snow and ice
US4979373A (en) * 1989-02-06 1990-12-25 Robert Huppee Apparatus for making and maintaining an ice surface
US5251689A (en) * 1990-01-05 1993-10-12 Solkav Solartechnik Gesellschaft M.B.H. Rollable heat exchanger
US5261245A (en) * 1991-03-01 1993-11-16 Miura Dolphins Co., Ltd. Method for making ice slab and/or artificial snow
EP0667499A1 (en) * 1992-10-30 1995-08-16 Kajima Corporation Pneumatic ice making device
EP0667499A4 (en) * 1992-10-30 1995-11-15 Kajima Corp Pneumatic ice making device.
US6253558B1 (en) * 1995-09-29 2001-07-03 Robert Stillwell Method and system for creating and maintaining a frozen surface
US5970734A (en) * 1995-09-29 1999-10-26 Stillwell; Robert Method and system for creating and maintaining a frozen surface
US6006826A (en) * 1997-03-10 1999-12-28 Goddard; Ralph Spencer Ice rink installation having a polymer plastic heat transfer piping imbedded in a substrate
US6418733B1 (en) * 1998-05-11 2002-07-16 Ralf Morent Method and device for preserving snow
US6021646A (en) * 1998-06-26 2000-02-08 Burley's Rink Supply, Inc. Floor system for a rink
US20090025921A1 (en) * 2005-09-27 2009-01-29 Uponor Innovation Ab Capillary Tube System
EP2274060A4 (en) * 2008-03-13 2015-01-14 Konsulttitoimisto Iikka Hämäinen Oy Procedure for manufacturing a winter sports arena and a winter sports arena
EP2274060A1 (en) * 2008-03-13 2011-01-19 Oû Plan Consulting Procedure for manufacturing a winter sports arena and a winter sports arena
GR1007249B (en) * 2009-12-17 2011-04-29 Ελενη Ιωαννη Ζυγουρακη Transportable energy aluminium ice scatting platform
US20130055745A1 (en) * 2010-04-14 2013-03-07 Mayekawa Mfg. Co., Ltd. Ice rink cooling facility
US8720214B2 (en) * 2010-04-14 2014-05-13 Mayekawa Mfg. Co., Ltd. Ice rink cooling facility
US20140007603A1 (en) * 2012-01-30 2014-01-09 Serge Dube Co2 refrigeration system for ice-playing surface
US10514204B2 (en) 2014-09-05 2019-12-24 Carrier Corporation Multiport extruded heat exchanger
DE102015010394A1 (en) * 2015-08-10 2017-02-16 Mefa Befestigungs- Und Montagesysteme Gmbh Heat transfer element
DE102015010394B4 (en) * 2015-08-10 2020-03-12 Mefa Befestigungs- Und Montagesysteme Gmbh Heat transfer element
US20190195518A1 (en) * 2017-04-24 2019-06-27 Mar-Bud Spólka Z Ograniczona Odpowiedzialnoscia Device for manufacturing and storing ice
US20190212063A1 (en) * 2017-04-24 2019-07-11 Mar-Bud Spolka Z Ograniczona Odpowiedzialnoscia Heat exchange unit for devices with a heat pump, in particular an evaporator for manufacturing and storing ice
US20180353842A1 (en) * 2017-06-09 2018-12-13 Dreamsbig, Llc Liquid cooling system for outdoor surfaces
US10835807B2 (en) * 2017-06-09 2020-11-17 Dreamsbig, Llc Liquid cooling system for outdoor surfaces

Also Published As

Publication number Publication date
DE2258157A1 (en) 1973-06-14
CA953523A (en) 1974-08-27
DE2258157C2 (en) 1985-08-29
GB1416700A (en) 1975-12-03
NL7216356A (en) 1973-06-05

Similar Documents

Publication Publication Date Title
US3751935A (en) Method and system for creating and maintaining an ice slab
US3893507A (en) Apparatus for creating and maintaining an ice slab
US6253558B1 (en) Method and system for creating and maintaining a frozen surface
AU625226B2 (en) Snow making equipment
US3910059A (en) Method and system for providing an ice slab while preventing undue freezing penetration below
CN108411734B (en) Indoor skating rink
USRE29438E (en) Apparatus for creating and maintaining an ice slab
US4394817A (en) Apparatus for making and maintaining an ice surface
KR101456577B1 (en) Ice rink combined multi-purpose sports facility
US4979373A (en) Apparatus for making and maintaining an ice surface
CN207159754U (en) Bridge floor, road surface deicing system
US20130133858A1 (en) Construction module and a method for manufacturing said module
CA1211948A (en) Icemaker
US10835807B2 (en) Liquid cooling system for outdoor surfaces
GB2223567A (en) Heat exchange system
JPH09222290A (en) Fluid specifying and conveying means
CN108168221A (en) A kind of method of vacuum freezing drying device and vacuum freeze drying material
KR20170058037A (en) Ice rink cooling system and Ice produced by the cooling unit and Cooling control system
JPH0579919B2 (en)
KR20170058034A (en) Ice rink cooling system and construction method and ice
JPH0354382Y2 (en)
CN110184988A (en) A kind of wounded pipe anti-ice of High-cold regions concrete dam pulls out system and method
US20230228474A1 (en) Refrigeration system for an ice skating rink
AU738054B2 (en) Stadium with arena such as an ice rink and surrounding stands for spectators, and channel element for a channel system in a stadium such as an ice rink and surrounding stands for spectators
JPH0419421Y2 (en)