US3464212A - Method of building concrete structures in water bottoms - Google Patents
Method of building concrete structures in water bottoms Download PDFInfo
- Publication number
- US3464212A US3464212A US622192A US3464212DA US3464212A US 3464212 A US3464212 A US 3464212A US 622192 A US622192 A US 622192A US 3464212D A US3464212D A US 3464212DA US 3464212 A US3464212 A US 3464212A
- Authority
- US
- United States
- Prior art keywords
- water
- dock
- concrete structure
- floating
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title description 78
- 238000000034 method Methods 0.000 title description 24
- 238000010276 construction Methods 0.000 description 6
- 238000007599 discharging Methods 0.000 description 4
- 230000002093 peripheral effect Effects 0.000 description 4
- 238000005086 pumping Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 238000005336 cracking Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Definitions
- the partially submerged dock is then refloated by pumping out the water and towed to deep water where it is again submerged by filling in water so that the dock sinks below and separates from the complete or incomplete concrete structure which remains floating.
- the latter is then sunk at the intended site by filling in water, and the dock is then refloated by pumping out the water and towed back to the original shallow water location for reuse.
- This invention relates to improvements of a method of building breakwaters and other concrete structures in water bottoms.
- the present invention is suggested to eliminate such defects as are mentioned above.
- An object of the present invention is to provide a method of building concrete structures in water bottoms wherein the equipment cost can be saved, the time for the construction can be reduced and the safety in the operation of the equipment and the building of the structure is high.
- a floatable dock is partially submerged and stably grounded on a water bed in shallow water by filling water into the dock, and at least the base part of the concrete structure is then constructed on this stable support.
- the partially submerged dock is then refloated by pumping out the water and towed to deeper water where it is again submerged by filling in water so that the dock sinks below and separates from the complete or 3,464,212 Patented Sept. 2, 1969 ice incomplete concrete structure which remains floating. If incomplete at this stage, the floating concrete structure is then completed to its final form, and is then sunk at the intended site.
- the dock is then refloated by pumping out the water and is towed back to the original shallow water location for re-use. If only the base part of the concrete structure is constructed when the dock is stably grounded in shallow water and is not self-floating, the concrete structure is either fully completed or at least partially completed to render it self-floating after the dock is refloated and towed to deeper water.
- FIG. 1 is a partly sectioned plan view of a simple floating dock to be used in the method of the present invention and a concrete structure built in said floating dock;
- FIG. 2 is a vertically sectioned view of the same.
- FIGS. 3(A) to (G) are sketches showing the steps of the method of the present invention.
- a is a simple floating dock to be used in the method of the present invention.
- Said floating dock a is made by fixing a watertight bottom plate 2 made of a steel plate to the bottom surface of a square surrounding hollow float 1 made of steel plates, providing stands 3 for making concrete structures on said bottom plate 2 to form a working place 4 for making such concrete structure b and further providing a water inlet and outlet valve 5 in each of the four corners on the upper surface of the above mentioned surrounding hollow float 1.
- the floating dock a illustrated in FIGS. 1 and 2 is floated on the surface of water in a comparatively shallow place d selected or artificially made near the shore of a sea, river or lake, is then partially submerged in the shallow water to such degree that its upper end edge is not immersed in water by pouring water 2 into the working place 4 and is thus fixed in a stable state on the water bottom ground 1 in said shallow place d. Then, a concrete pouring operation for the concrete structure b which is, for example, to be the lowest part of a breakwater is carried out in said working place 4.
- the floating dock a is in such stable state in contact with the water bottom ground that said concrete pouring operation can be carried out in the same stable state as on the land and therefore there will be no fear of cracking at all in the concrete structure b when it is cured and set.
- said floating dock a is re-fioated to a level above the ground by discharging water e in the working place 4 in the floating dock at as shown in (B) in FIG. 3 and is then quietly towed together with the concrete structure b to a comparatively deep place d and is fixed there with a proper anchor g so as not to be moved or made unstable by wind and waves as shown in (C) in FIG. 3.
- water e" is put into the entire working place 4 in the floating dock or and then some water e (of a weight larger than the weight of the floating dock) is put into the surrounding float 1 of the floating clock a by opening the water inlet and outlet valves 5 of the float 1 all at once so that the floating dock a may be sunk in water and the 3 above mentioned combined concrete structure b may be perfectly separated from the floating dock a.
- the partially submerged dock a will be in a stable state perfectly in contact with the water bottom ground f when concrete is poured in to form the concrete structure b which is to be the lowest part of a structure to be built as explained above, there will be no fear at all of cracking in the concrete structure b formed on the floating dock when it is cured and set.
- the floating dock a will be so unstable that the concrete structure will be likely to crack within when it is cured and set.
- the method of the present invention it is not necessary to construct such large slipway or dock as in a conventional method of this kind and therefore the equipment cost and maintenance cost can be greatly reduced and the time for the construction can be remarkably reduced to be less than in the conventional method.
- the method of the present invention is not only higher in the safety of the operation but also can be carried out more easily without being influenced by the weather than in a method wherein a concrete structure is completed to be of a fixed size, is then towed to a sitting place and is installed there.
- step of sinking the re-floated dock in said deeper water to separate it from the concrete structure which remains floating is accomplished by initially filling water into the dock within the confines established by said peripheral float chamber until said concrete structure floats by virtue of its own buoyancy, and thereafter filling water into said peripheral float chamber to further sink said dock to a depth sufficient to clear the underside of said concrete structure.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Description
Sep 1969 KAZUMI YAMAGATA ETAL 3,464,212 METHOD OF BUILDING CONCRETE STRUCTURES IN WATER BOTTOMS I Filed March 10, 1967 (A) (B) (C) United States Patent 3,464,212 METHOD OF BUILDING CONCRETE STRUCTURES IN WATER BO'I'IOMS Kazumi Yamagata and Kazuo Kamisaka, Chuo-ku, Tokyo,
Japan, assignors to Daiho Construction Company, Limited, Tokyo, Japan, a corporation of Japan Filed Mar. 10, 1967, Ser. No. 622,192 Claims priority, application Japan, May 13, 1966, 41/ 30,432 Int. Cl. E02d 5/00; B63c 1/06; B63b 35/44 US. Cl. 61-46 7 Claims ABSTRACT OF THE DISCLOSURE A method of building a concrete structure in one place and sitting it at another place in water wherein at least a base part of the structure is constructed in a floatable dock which is partially submerged and stably grounded on a water bed in shallow water by filling water into the dock so that the construction will be carried out under the same favorable stable conditions as would exist were the construction to be performed on land. The partially submerged dock is then refloated by pumping out the water and towed to deep water where it is again submerged by filling in water so that the dock sinks below and separates from the complete or incomplete concrete structure which remains floating. The latter is then sunk at the intended site by filling in water, and the dock is then refloated by pumping out the water and towed back to the original shallow water location for reuse.
This invention relates to improvements of a method of building breakwaters and other concrete structures in water bottoms.
There has been already suggested a method of building breakwaters and other similar structures in water bottoms wherein a hollow concrete structure is built on the land, is moved onto the water along a slipway of a length reaching to the water from the land in essentially the same manner as if a ship were launched, is floated on the surface of the water by its own buoyancy, is then towed to a destination and is sunk there down to the bottom with water introduced into it. According to another known method, a hollow concrete structure is built in a large dock formed on the shore, is then floated on the surface of water by its own buoyancy by introducing water into the dock, is towed to a destination by opening the gate of the dock and is sunk there down to the bottom by its own weight by being filled with Water. However, in such mehod, a high equipment cost will be required to form the above mentioned slipway or clock, the time for the construction will be long and will be influenced by the weather and the safety in the operation will be diflicult.
The present invention is suggested to eliminate such defects as are mentioned above.
An object of the present invention is to provide a method of building concrete structures in water bottoms wherein the equipment cost can be saved, the time for the construction can be reduced and the safety in the operation of the equipment and the building of the structure is high.
Summary of the invention In accordance with the improved method provided by the present invention, a floatable dock is partially submerged and stably grounded on a water bed in shallow water by filling water into the dock, and at least the base part of the concrete structure is then constructed on this stable support. The partially submerged dock is then refloated by pumping out the water and towed to deeper water where it is again submerged by filling in water so that the dock sinks below and separates from the complete or 3,464,212 Patented Sept. 2, 1969 ice incomplete concrete structure which remains floating. If incomplete at this stage, the floating concrete structure is then completed to its final form, and is then sunk at the intended site. The dock is then refloated by pumping out the water and is towed back to the original shallow water location for re-use. If only the base part of the concrete structure is constructed when the dock is stably grounded in shallow water and is not self-floating, the concrete structure is either fully completed or at least partially completed to render it self-floating after the dock is refloated and towed to deeper water.
An embodiment of the present invention shall be explained in the following with reference to the drawings in which:
FIG. 1 is a partly sectioned plan view of a simple floating dock to be used in the method of the present invention and a concrete structure built in said floating dock;
FIG. 2 is a vertically sectioned view of the same; and
FIGS. 3(A) to (G) are sketches showing the steps of the method of the present invention.
In FIGS. 1 and 2, a is a simple floating dock to be used in the method of the present invention. Said floating dock a is made by fixing a watertight bottom plate 2 made of a steel plate to the bottom surface of a square surrounding hollow float 1 made of steel plates, providing stands 3 for making concrete structures on said bottom plate 2 to form a working place 4 for making such concrete structure b and further providing a water inlet and outlet valve 5 in each of the four corners on the upper surface of the above mentioned surrounding hollow float 1.
In working the method of the present invention, as shown in (A) in FIG. 3, the floating dock a illustrated in FIGS. 1 and 2 is floated on the surface of water in a comparatively shallow place d selected or artificially made near the shore of a sea, river or lake, is then partially submerged in the shallow water to such degree that its upper end edge is not immersed in water by pouring water 2 into the working place 4 and is thus fixed in a stable state on the water bottom ground 1 in said shallow place d. Then, a concrete pouring operation for the concrete structure b which is, for example, to be the lowest part of a breakwater is carried out in said working place 4. The floating dock a is in such stable state in contact with the water bottom ground that said concrete pouring operation can be carried out in the same stable state as on the land and therefore there will be no fear of cracking at all in the concrete structure b when it is cured and set. After the concrete structure b, is built in this manner, said floating dock a is re-fioated to a level above the ground by discharging water e in the working place 4 in the floating dock at as shown in (B) in FIG. 3 and is then quietly towed together with the concrete structure b to a comparatively deep place d and is fixed there with a proper anchor g so as not to be moved or made unstable by wind and waves as shown in (C) in FIG. 3. Then another concrete structure b; is added and jointed on the concrete structure b to form a combined concrete structure b It is needless to say that such addition should be made by so considering in advance that the floating dock a may not be sunk under the weight of the concrete structures b and [1 After the thus added and jointed concrete structure b has been completely cured and set, as shown in (D) in FIG. 3, water e" is put into the entire working place 4 in the floating dock or and then some water e (of a weight larger than the weight of the floating dock) is put into the surrounding float 1 of the floating clock a by opening the water inlet and outlet valves 5 of the float 1 all at once so that the floating dock a may be sunk in water and the 3 above mentioned combined concrete structure b may be perfectly separated from the floating dock a.
After lateral separation as between the now floating concrete structure b and the submerged dock, the water e" in the surrounding float 1 of the submerged dock a is discharged through the water inlet and outlet valves so that the floating dock a may again rise up to the surface of the water. Then, the water e in the working place 4 of the floating dock a is discharged so that the floating dock a may be perfectly floated on the water surface as shown in (E) in FIG. 3. Thus the floating dock a is then returned to the position in (A) in the drawing and is prepared for the sound building of the concrete structure. At the same time, a further concrete structure b.; is added and jointed on the concrete structure b floating along on the water surface as shown in (F) in FIG. 3. When the entire height of the combined concrete structure b thus formed has become a fixed height as shown in (G) in the drawing, water is poured into said structure b so that the structure may sink down to the water bottom ground. By repeating such steps as are described above, many concrete structures b are made and are sunk and arranged on the water bottom ground to build such concrete structure as a breakwater.
In the method of the present invention, as the partially submerged dock a will be in a stable state perfectly in contact with the water bottom ground f when concrete is poured in to form the concrete structure b which is to be the lowest part of a structure to be built as explained above, there will be no fear at all of cracking in the concrete structure b formed on the floating dock when it is cured and set. (If concrete is poured in to form the concrete structure b in the dock a as floated on the water surface, the floating dock a will be so unstable that the concrete structure will be likely to crack within when it is cured and set.) Further, in the method of the present invention, it is not necessary to construct such large slipway or dock as in a conventional method of this kind and therefore the equipment cost and maintenance cost can be greatly reduced and the time for the construction can be remarkably reduced to be less than in the conventional method. Further, the method of the present invention is not only higher in the safety of the operation but also can be carried out more easily without being influenced by the weather than in a method wherein a concrete structure is completed to be of a fixed size, is then towed to a sitting place and is installed there.
What is claimed is:
1. The method of building a concrete structure at one location and sitting it at another location in water which comprises the steps of:
(a) stable grounding an initially floating dock on a water bed in shallow water by filling water into the dock, the depth of the bed below the surface of the water being less than the height of the dock,
(b) constructing at least a base part of the concrete structure within the partially submerged and grounded dock,
(c) discharging the water from inside the dock to refloat the dock and the concrete structure,
(d) towing said re-floated dock and the concrete structure to deeper water,
(e) sinking the re-floated dock in said deeper water by again filling water into the dock thereby to separate it from the concrete structure which remains floating,
(f) sinking the floated concrete structure at its final resting place on the bottom at said site and (g) re-floating the dock by discharging the water from ihside the dock thereby enabling said dock to be towed back to said shallow water bed for re-use.
2. The method as defined in claim 1 of building a concrete structure and sitting it in water wherein only a base part of said concrete structure is constructed while said dock is stably grounded, and which includes the further step of adding at least one further portion to the base part after said dock has been towed to deeper water.
3. The method as defined in claim 2 wherein the base part of said concrete structure is by itself incapable of floating and the addition of said further portion renders the structure capable of floating by its own buoyancy.
4. The method as defined in claim 1 of building a concrete structure and sitting it in water wherein only a lower portion of said concrete structure is constructed while said dock is stably grounded, and which includes the further step of adding at least one further portion to the lower portion after said dock has been sunk in the deeper water but before the concrete structure is sunk.
'5. The method as defined in claim 1 of building a concrete structure and sitting it in water wherein said floating dock comprises peripherally extending double walls establishing therebetween a peripheral float chamber, a water inlet and outlet valve means for introducing water into said float chamber and thereafter discharging it, and a plate-like bottom secured in a water-tight manner to said peripheral float chamber structure.
6. The method as defined in claim 5 wherein said initially floating dock is stably grounded by filling water into the plate-like bottom of the dock.
7. The method as defined in claim 5 wherein the step of sinking the re-floated dock in said deeper water to separate it from the concrete structure which remains floating is accomplished by initially filling water into the dock within the confines established by said peripheral float chamber until said concrete structure floats by virtue of its own buoyancy, and thereafter filling water into said peripheral float chamber to further sink said dock to a depth sufficient to clear the underside of said concrete structure.
References Cited UNITED STATES PATENTS 1,310,461 7/1919 Williams 61-46 X 1,560, 880 11/ 1925 Tromanhauser 61-63 X 2,029,004 1/ 1936 Varni 61-46 X 2,050,727 8/ 1936 MiSz 61-63 X 3,249,664 5/ 1966 Georgii 61-46 X JACOB SHAPIRO, Primary Examiner US. Cl. X.R.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3043266 | 1966-05-13 |
Publications (1)
Publication Number | Publication Date |
---|---|
US3464212A true US3464212A (en) | 1969-09-02 |
Family
ID=12303767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US622192A Expired - Lifetime US3464212A (en) | 1966-05-13 | 1967-03-10 | Method of building concrete structures in water bottoms |
Country Status (5)
Country | Link |
---|---|
US (1) | US3464212A (en) |
DE (1) | DE1634044B2 (en) |
FR (1) | FR1522905A (en) |
GB (1) | GB1189886A (en) |
NL (1) | NL144354B (en) |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3675606A (en) * | 1969-06-05 | 1972-07-11 | Mitsubishi Heavy Ind Ltd | Method of constructing marine float structures |
US3765359A (en) * | 1972-07-06 | 1973-10-16 | Mitsubishi Heavy Ind Ltd | Apparatus and method of constructing marine float structures |
US3906735A (en) * | 1972-05-02 | 1975-09-23 | Olav Mo | Foundation method for caissons |
US3977346A (en) * | 1973-07-05 | 1976-08-31 | A/S Akers Mek. Verksted | Deck structure and method for building same |
US4054034A (en) * | 1976-07-01 | 1977-10-18 | Robert Warren Hyre | Method for casting concrete tanks in water |
US4056942A (en) * | 1975-05-13 | 1977-11-08 | Kawasaki Jukogyo Kabushiki Kaisha | Method for moving built structures by flotation |
US4112697A (en) * | 1975-05-02 | 1978-09-12 | Lin Offshore Engineering, Inc. | Method of producing and installing offshore structures |
US4202647A (en) * | 1976-03-22 | 1980-05-13 | Lamy Jacques E | Buoyant base for marine platforms |
US4293240A (en) * | 1978-10-05 | 1981-10-06 | Tokyo Shibaura Denki Kabushiki Kaisha | Method for installing an electric power plant |
US4293239A (en) * | 1979-04-02 | 1981-10-06 | Odeco Engineers Inc. | Method of erecting a very large diameter offshore column |
US4481899A (en) * | 1981-10-07 | 1984-11-13 | Ingenior F. Selmer A/S | Floating platform structure |
US4575281A (en) * | 1983-08-23 | 1986-03-11 | Mobil Oil Corporation | Method and structure for forming an offshore facility |
US4767238A (en) * | 1986-01-15 | 1988-08-30 | Gtm-Entrepose | Method of accurately positioning a prefabricated structure on the sea bed or on a river bed by grounding, and a sea or a river construction obtained by said method |
US4869620A (en) * | 1988-09-30 | 1989-09-26 | Dow John M | Method and apparatus for constructing seawalls and docks |
US5049004A (en) * | 1989-01-20 | 1991-09-17 | Masateru Niimura | Underwater building and constructing method thereof |
US5284402A (en) * | 1991-06-12 | 1994-02-08 | Del Villar Antonio C | System for the manufacture and installation of selective intake towers in reservoirs |
US6082931A (en) * | 1998-04-20 | 2000-07-04 | Valuequest, Inc. | Modular maritime dock design |
US6485230B2 (en) * | 2000-08-01 | 2002-11-26 | Robert A. Robinson | Submersible modular dike and method for segregating body of water |
WO2004083031A1 (en) * | 2003-03-17 | 2004-09-30 | Harry Edward Dempster | Technique and platform for fabricating a variable-buoyancy structure |
US6935808B1 (en) | 2003-03-17 | 2005-08-30 | Harry Edward Dempster | Breakwater |
WO2006097841A1 (en) * | 2005-03-18 | 2006-09-21 | Francesco Sposito | Method for the realization of artificial islands, embankments, piers, breakwaters, platforms, or similar structures in bodies of water and structures obtained |
US20160096682A1 (en) * | 2013-05-23 | 2016-04-07 | Gdf Suez | Harbour Storage Facility for Liquid Fuel |
US9389012B2 (en) | 2013-06-05 | 2016-07-12 | Electrolux Home Products, Inc. | Rail door bin system |
WO2018222553A1 (en) | 2017-05-27 | 2018-12-06 | Place Daniel William | Additively manufactured object fabrication vessel |
US10451338B2 (en) | 2017-12-08 | 2019-10-22 | Electrolux Home Products, Inc. | Door storage bin assembly for a refrigerator |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5147709B2 (en) * | 1973-02-05 | 1976-12-16 | ||
NL163585C (en) * | 1976-07-16 | 1980-09-15 | Hollandsche Betongroep Nv | METHOD FOR MANUFACTURING A CONTINUOUS CONTAINER, SUCH AS A TUNNEL, SEWAGE TUBE OR THE LIKE. |
US4290716A (en) * | 1979-04-06 | 1981-09-22 | Compagnie Generale Pour Les Developpements Operationnels Des Richesses Sous Marines "C. G. Doris" | Platform resting on the bottom of a body of water, and method of manufacturing the same |
DE4431081C1 (en) * | 1994-09-01 | 1996-04-25 | Awu Consult Ingenieurgesellsch | Buoyant, anchored breakwater element |
RU2494191C1 (en) * | 2012-04-02 | 2013-09-27 | Алексей Владимирович Баранов | Method to manufacture float-on elements of hydraulic engineering structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1310461A (en) * | 1919-07-22 | Floatable concrete construction | ||
US1560880A (en) * | 1924-11-14 | 1925-11-10 | Jesse H Tromanhauser | Method of constructing concrete cribs |
US2029004A (en) * | 1933-01-03 | 1936-01-28 | Varni Alfredo | Method of and apparatus for molding concrete |
US2050727A (en) * | 1934-09-19 | 1936-08-11 | Misz Oliver Benjamin | Caisson belt apparatus and method |
US3249664A (en) * | 1961-12-21 | 1966-05-03 | Georgii Hans Christer | Method of making an elongated hollow concrete body |
-
1967
- 1967-03-10 US US622192A patent/US3464212A/en not_active Expired - Lifetime
- 1967-05-05 DE DE1967D0053013 patent/DE1634044B2/en active Granted
- 1967-05-11 NL NL676706574A patent/NL144354B/en unknown
- 1967-05-12 GB GB22165/67A patent/GB1189886A/en not_active Expired
- 1967-05-12 FR FR106386A patent/FR1522905A/en not_active Expired
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1310461A (en) * | 1919-07-22 | Floatable concrete construction | ||
US1560880A (en) * | 1924-11-14 | 1925-11-10 | Jesse H Tromanhauser | Method of constructing concrete cribs |
US2029004A (en) * | 1933-01-03 | 1936-01-28 | Varni Alfredo | Method of and apparatus for molding concrete |
US2050727A (en) * | 1934-09-19 | 1936-08-11 | Misz Oliver Benjamin | Caisson belt apparatus and method |
US3249664A (en) * | 1961-12-21 | 1966-05-03 | Georgii Hans Christer | Method of making an elongated hollow concrete body |
Cited By (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3675606A (en) * | 1969-06-05 | 1972-07-11 | Mitsubishi Heavy Ind Ltd | Method of constructing marine float structures |
US3906735A (en) * | 1972-05-02 | 1975-09-23 | Olav Mo | Foundation method for caissons |
US3765359A (en) * | 1972-07-06 | 1973-10-16 | Mitsubishi Heavy Ind Ltd | Apparatus and method of constructing marine float structures |
US3977346A (en) * | 1973-07-05 | 1976-08-31 | A/S Akers Mek. Verksted | Deck structure and method for building same |
US4112697A (en) * | 1975-05-02 | 1978-09-12 | Lin Offshore Engineering, Inc. | Method of producing and installing offshore structures |
US4056942A (en) * | 1975-05-13 | 1977-11-08 | Kawasaki Jukogyo Kabushiki Kaisha | Method for moving built structures by flotation |
US4202647A (en) * | 1976-03-22 | 1980-05-13 | Lamy Jacques E | Buoyant base for marine platforms |
US4054034A (en) * | 1976-07-01 | 1977-10-18 | Robert Warren Hyre | Method for casting concrete tanks in water |
US4293240A (en) * | 1978-10-05 | 1981-10-06 | Tokyo Shibaura Denki Kabushiki Kaisha | Method for installing an electric power plant |
US4293239A (en) * | 1979-04-02 | 1981-10-06 | Odeco Engineers Inc. | Method of erecting a very large diameter offshore column |
US4481899A (en) * | 1981-10-07 | 1984-11-13 | Ingenior F. Selmer A/S | Floating platform structure |
US4575281A (en) * | 1983-08-23 | 1986-03-11 | Mobil Oil Corporation | Method and structure for forming an offshore facility |
US4767238A (en) * | 1986-01-15 | 1988-08-30 | Gtm-Entrepose | Method of accurately positioning a prefabricated structure on the sea bed or on a river bed by grounding, and a sea or a river construction obtained by said method |
US4869620A (en) * | 1988-09-30 | 1989-09-26 | Dow John M | Method and apparatus for constructing seawalls and docks |
US5049004A (en) * | 1989-01-20 | 1991-09-17 | Masateru Niimura | Underwater building and constructing method thereof |
US5284402A (en) * | 1991-06-12 | 1994-02-08 | Del Villar Antonio C | System for the manufacture and installation of selective intake towers in reservoirs |
US6082931A (en) * | 1998-04-20 | 2000-07-04 | Valuequest, Inc. | Modular maritime dock design |
US6485230B2 (en) * | 2000-08-01 | 2002-11-26 | Robert A. Robinson | Submersible modular dike and method for segregating body of water |
WO2004083031A1 (en) * | 2003-03-17 | 2004-09-30 | Harry Edward Dempster | Technique and platform for fabricating a variable-buoyancy structure |
US6860219B1 (en) * | 2003-03-17 | 2005-03-01 | Harry Edward Dempster | Technique and platform for fabricating a variable-buoyancy structure |
US6935808B1 (en) | 2003-03-17 | 2005-08-30 | Harry Edward Dempster | Breakwater |
US7242107B1 (en) | 2003-03-17 | 2007-07-10 | Harry Edward Dempster | Water-based wind-driven power generation using a submerged platform |
WO2006097841A1 (en) * | 2005-03-18 | 2006-09-21 | Francesco Sposito | Method for the realization of artificial islands, embankments, piers, breakwaters, platforms, or similar structures in bodies of water and structures obtained |
US20080008530A1 (en) * | 2005-03-18 | 2008-01-10 | Francesco Sposito | Method for the Realization of Artificial Islands, Embankments, Piers, Breakwaters, Platforms, or Similar Structures in Bodies of Water and Structures Obtained |
US9815621B2 (en) * | 2013-05-23 | 2017-11-14 | Engie | Harbour storage facility for liquid fuel |
US20160096682A1 (en) * | 2013-05-23 | 2016-04-07 | Gdf Suez | Harbour Storage Facility for Liquid Fuel |
US9389012B2 (en) | 2013-06-05 | 2016-07-12 | Electrolux Home Products, Inc. | Rail door bin system |
US9874393B2 (en) | 2013-06-05 | 2018-01-23 | Electrolux Home Products, Inc. | Rail door bin system |
WO2018222553A1 (en) | 2017-05-27 | 2018-12-06 | Place Daniel William | Additively manufactured object fabrication vessel |
CN111132837A (en) * | 2017-05-27 | 2020-05-08 | 孤鸥控股有限公司 | Sectional assembly vessel for additive manufactured objects |
JP2020521672A (en) * | 2017-05-27 | 2020-07-27 | ローン ガル ホールディングス,リミテッド | Additional manufacturing object production ship |
EP3630489A4 (en) * | 2017-05-27 | 2021-03-03 | Place, Daniel William | Additively manufactured object fabrication vessel |
US10451338B2 (en) | 2017-12-08 | 2019-10-22 | Electrolux Home Products, Inc. | Door storage bin assembly for a refrigerator |
Also Published As
Publication number | Publication date |
---|---|
DE1634044B2 (en) | 1976-09-16 |
NL144354B (en) | 1974-12-16 |
FR1522905A (en) | 1968-04-26 |
DE1634044A1 (en) | 1971-12-02 |
GB1189886A (en) | 1970-04-29 |
NL6706574A (en) | 1967-11-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3464212A (en) | Method of building concrete structures in water bottoms | |
US2938353A (en) | Submersible drilling barge | |
US3896628A (en) | Marine structures | |
US3528254A (en) | Offshore platform structure and construction method | |
US3969900A (en) | Breakwater construction | |
US2699042A (en) | Portable marine foundation for drilling rigs and method of operation | |
US2657540A (en) | Method of erecting and positioning marine structures | |
KR102389280B1 (en) | Method of constructing concrete block structure | |
KR102401212B1 (en) | Method of constructing concrete block structure | |
KR102353849B1 (en) | Method of manufacturing concrete block and method of constructing concrete block structure | |
US3657895A (en) | Offshore platform | |
GB1287000A (en) | Apparatus for the manufacture of floating concrete structures in a body of water | |
US2050727A (en) | Caisson belt apparatus and method | |
US4158516A (en) | Platforms resting on an underwater structure | |
US2966778A (en) | Caissons for wharf construction and method of installing same | |
JP2606799B2 (en) | Installation method of marine platform | |
JPH11336059A (en) | Floating lift device | |
US3965688A (en) | Underwater structures, in particular for underwater drilling operations | |
JP4776694B2 (en) | Harbor structure and method for constructing such a structure | |
US3906735A (en) | Foundation method for caissons | |
US4662780A (en) | Method for docking of a floating structure | |
JP2514902B2 (en) | Cason launching method and work pontoons | |
JP2815492B2 (en) | How to build an underwater foundation | |
RU2699462C1 (en) | Method of making water displacement concrete articles | |
JPS6319337A (en) | Floating dock for production and installation of caisson |