US3340693A - Method and apparatus for inducing hardening or cementing in a mass of back-fill in a mine opening - Google Patents

Method and apparatus for inducing hardening or cementing in a mass of back-fill in a mine opening Download PDF

Info

Publication number
US3340693A
US3340693A US444531A US44453165A US3340693A US 3340693 A US3340693 A US 3340693A US 444531 A US444531 A US 444531A US 44453165 A US44453165 A US 44453165A US 3340693 A US3340693 A US 3340693A
Authority
US
United States
Prior art keywords
fill
mass
air
cementing
stope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US444531A
Inventor
William S Row
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3340693A publication Critical patent/US3340693A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Definitions

  • the present invention relates generally to the filling of subterranean cavities and more particularly to a method and apparatus for strengthening back-fill materials used in closing mine openings.
  • a back-fill which is desired in mining operations is one which may easily be placed in mine openings or cavities and which will set into a rigid mass sufiicient to fill the mined-out area.
  • the preferred mass or back-fill should be able to support the filled opening in approximately its original dimensions and able to later support such weight which may come upon it when further mining is carried out adjacent or near the area.
  • the present invention employs back-fill comprising in part materials which may be reacted with a suitable reagent to form a rigid mass of back-fill when the fill has settled and the reaction completed.
  • backfill sand containing amounts of sulphide materials developedthrough the desliming of milled tailings may be oxidized by the passage therethrough of air to provide a strong and rigid back-fill structure.
  • a method of forming a rigid mass in a subterranean cavity which comprises charging said cavity with fill material and passing a reactive agent through the material whereby hardening or self-cementing of the material is induced.
  • FIG. 1 is a diagrammatic longitudinal section of the bulkhead with a cross-section portion of the scram drift
  • FIG. 2 is a schematic cross-section of the scram drift and lower portion of the stope area
  • FIG. 3 is a plan view of the lower stope area showing one arrangement of the gas outlets.
  • FIG. 4 is a schematic cross-sectional View of the overall stope area.
  • a scram drift 1 as shown in FIG. 1, and stope cavity generally indicated at 2 are sealed off by concrete bulkheads 3.
  • Drainage units 4 are installed along the scram drift 1 to drain any surplus water from the area through pipes 8 which pass through the bulkhead 3.
  • Pipes 8 may be connected to the main pumping system of the mine (not shown) or discharge to a gravity flow ditch and may be closed by drain valve 9 as indicated later in the description.
  • a main air line 5, controlled by a flow valve 10 and meter 11, also passes through the bulkhead 3.
  • the air line 5 extends the length of the scram drift and is branched to form a plurality of lines 12.
  • the air lines 12 extend upwardly entering the draw points 13 of the stope.
  • the lines 12 terminate in valve 14 which is a one-way valve allowing air to pass through into the stope area.
  • the piping system 5 and 12 is so laid as to provide a system of air outlet points 14 a few feet higher in elevation than the drainage units 4 and in a grid pattern over the plan area of the stope to provide a substantially uniform air flow over the stope area.
  • the branched air line 12 may be of any desired length and may extend just into the draw point 13 or may be extended to form additional branches 16 and 17 as indicated in FIG. 2 or branches 18, 19, 20 and 21 as indicated in FIG. 3.
  • Each of the lines terminate in a oneway air valve 14 so designed that the back-fill material cannot enter through the valve when the system is not pressurized.
  • Flow rates may be controlled in accordance with previously made calculations in which factors such as per-. centage of voids in the fill, plan area of the stope, percentage of sulphides in the fill material and the reactive characteristics of the sulphides, particularly as to their afiinity for oxygen would be taken into account.
  • factors such as per-. centage of voids in the fill, plan area of the stope, percentage of sulphides in the fill material and the reactive characteristics of the sulphides, particularly as to their afiinity for oxygen would be taken into account.
  • the means of determining these factors is well known to the skilled engineer and therefore need not be discussed in detail here.
  • thermocouples may be located during the filling of the stope cavity or later if desired.
  • thermocouples or other apparatus which may be located at a point .a few feet from the bulkhead or even at the centre of the mass will be effective to keep the operator informed of temperatures within the mass during the gradual reaction of the fill. It is considered that the present method will be elfectiv'e on back-fill having a sulphide content as low as about 5% and indeed as low as 2% sulphide content has been tested and is known to be practical.
  • the upper range of sulphide content may be as high as
  • the reaction may of course be greater with a higher sulphide content but by controlling the air flow the reaction in the mass may be maintained and controlled. In controlling the reaction within the mass it is not necessary for the flow of air to be continuous. Indeed in certain situations it may be found desirable to shut off the air supply completely and add Water to the stope from the top thereof. The presence of some water in the mass is essential to the successful operation of the method, and this water addition may be relied on if the reaction conditions in the mass so dictate.
  • the sulphide minerals react with the oxygen in the air and residual water in the back-fill and may be assisted by the presence of a bacteria such as Thio-baccillus Ferro-oxidans which may be incorporated either with the fill material at the time of placing or introduced in an aqueous solution through the air line 5 or by pumping the solution back through the drain line and through the drainage devices into the backfill. This reaction results in the formation of various sulphates, sulfites, oxides and associated compounds.
  • the air flow may be so controlled that the reaction will not be rapid enough as to generate undesirable quantities of heat or gas.
  • the rate of reaction will be indicated by the temperature changes shown by the thermocouples T. Gas or air is allowed to emerge freely from the top of the stope 23 and escapes into the exhaust air system 24 of the mine openings.
  • the air can then be alternatively introduced through the drainage system after equipping the water drainage pipe with valves, flow metre, and like apparatus. This is an important alternative method of achieving the introduction of air (or oxygen) and hence the hardening or cementing of the backfill mass.
  • the exhausted gases may be checked for temperature and analyzed for oxygen, S0 and other gas content in the usual manner.
  • a feature of this invention of inducing hardening or cementing in back-fill material is accomplished by the introduction of a reagent into and within the material in such a way that it is able to work its way completely through the fill thereby causing oxidation and producing compounds from the minerals contained in .the fill which act as cementing agents.
  • a reagent into and within the material in such a way that it is able to work its way completely through the fill thereby causing oxidation and producing compounds from the minerals contained in .the fill which act as cementing agents.
  • oxygen and a sulphide containing fill has been used in the example herein, it is clear that the concept taught may be applied to fill containing material other than sulphides.
  • liquid reagent is used instead of a gas
  • dilute sulphuric acid may be used as a liquid reagent in the application of the present method to a sulphide-containing mass of back-fill.
  • the reagent would, of course, be diluted to the point found most satisfactory for the mass being treated.
  • the piping used will be selected on the basis of the most desirable type and material of piping to carry any specific reagent and careful regard must be had to the choice of pipe in the case of the use of a reagent such as dilute sulphuric acid.
  • a reagent such as dilute sulphuric acid.
  • the piping should not be deleteriously affected by contact with the reagent transported therethrough.
  • Other types of gas or reactive solutions may be applied to masses of back-fill to induce hardening of selfcementing and likewise would be introduced by the same method.
  • the type of gas or solution employed would, of course, depend upon the nature of the back-fill material used. The suitability of a particular reagent to a particular mass may be determined by tests within the knowledge of the man skilled in the mining art.
  • the use of air is proposed where the back-fill materials contain sufiicient amounts of sulphides that the desired cementing action will be effected. Where the fill may be more inert a more chemically active gas
  • a method of forming a substantially rigid mass in a mine opening which comprises:
  • the reactive fluid is air which is passed through said material by introducing the air to the base of said mass;
  • the reactive fluid is an oxygen-containing gas 4.
  • the sulphide materials are deslimed milled tailings.
  • backfill material contains reactive material in the proportions of between 2% and of said fill material.
  • a method as claimed in claim 1 including the steps of:
  • Apparatus for hardening and cementing a mass of a fill material in a mine opening such as rock or gravel and which contains a reactive substance comprising:
  • control means is adapted to control the flow into said mass in a substantially uniform manner.
  • Apparatus as claimed in claim 12 including means for quickly determining the temperature within the back- 5 fill material.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

Sept. 12, 1967 w w. s. ROW 3,340,693
METHOD AND APPARATUS FOR INDUCING HARDENING OR CEMENTING IN A MASS 0F BACK-FILL IN A MINE OPENING Filed April 1, 1965 3 Sheets-Sheet 1 FIG. I
w wa lm Sept. 12, 1967 w. s. ROW 3,340,693
METHOD AND APPARATUS FOR INDUCING HARDENING OR CEMENTING IN Filed April 1, 1965 A MASS OF BACK-FILL IN A MINE OPENING 5 Sheets-Sheet 2 FIG. 3
Sept. 12, 1967 w. s. ROW 3,340,693
METHOD AND APPARATUS FOR INDUCING HARDENING 0R CEMEN'IING IN A MASS OF BACK-FILL IN A MINE OPENING Filed April 1, 1965 3 Sheets-Sheet 5 MW 1M 11 WW T T MM FIG 4 United States Patent 3,340,693 METHOD AND APPARATUS FOR INDUCING I-IARDENING OR CEMENTING IN A MASS OF BACK-FILL IN A MINE OPENING William S. Row, 168 Forest Hill Road, Toronto 7, Ontario, Canada Filed Apr. 1, 1965, Ser. No. 444,531 Claims priority, application Canada, Feb. 15, 1965,
23,323 16 Claims. (Cl. 6136) ABSTRACT OF THE DISCLOSURE In mining, back-fill is reacted wits a suitable reagent passed therethrough to harden or self-cement the material and form a rigid mass of back-fill.
The present invention relates generally to the filling of subterranean cavities and more particularly to a method and apparatus for strengthening back-fill materials used in closing mine openings.
According to present practices in an underground mining operation after a large area or stope has been mined out it is often necessary to refill this opening to provide support for the walls and roof of the cavity and to allow mining in adjacent areas. The materials used for backfilling operations are frequently sand, often produced by desliming mill tailings, which may be mixed with gangue materials from the normal crushing operation. The material is packed into the open stope area and the area closed off. These materials are not bound together to form a solid mass and may in rare instances partially be eroded by underground streams, thus lessening the support for the walls and roof of the cavity. The disadvantages of this procedure involving the use of unconsolidated material are readily apparent to a mining engineer.
There is a great need in the mining industry for an economical firmly-set back-fill of considerable strength for these stope cavities. A back-fill which is desired in mining operations is one which may easily be placed in mine openings or cavities and which will set into a rigid mass sufiicient to fill the mined-out area. The preferred mass or back-fill should be able to support the filled opening in approximately its original dimensions and able to later support such weight which may come upon it when further mining is carried out adjacent or near the area.
Broadly speaking, in order to fill the need mentioned above, the present invention employs back-fill comprising in part materials which may be reacted with a suitable reagent to form a rigid mass of back-fill when the fill has settled and the reaction completed. For example, backfill sand containing amounts of sulphide materials, developedthrough the desliming of milled tailings may be oxidized by the passage therethrough of air to provide a strong and rigid back-fill structure.
Thus, by one aspect of the present invention there is provided a method of forming a rigid mass in a subterranean cavity which comprises charging said cavity with fill material and passing a reactive agent through the material whereby hardening or self-cementing of the material is induced.
This and other aspects of the invention will become apparent from the following detailed description and drawings wherein:
FIG. 1 is a diagrammatic longitudinal section of the bulkhead with a cross-section portion of the scram drift;
FIG. 2 is a schematic cross-section of the scram drift and lower portion of the stope area;
FIG. 3 is a plan view of the lower stope area showing one arrangement of the gas outlets; and
"ice
FIG. 4 is a schematic cross-sectional View of the overall stope area.
To prepare the mined-out area for back-filling in accordance with the invention, a scram drift 1, as shown in FIG. 1, and stope cavity generally indicated at 2 are sealed off by concrete bulkheads 3. Drainage units 4 are installed along the scram drift 1 to drain any surplus water from the area through pipes 8 which pass through the bulkhead 3. Pipes 8 may be connected to the main pumping system of the mine (not shown) or discharge to a gravity flow ditch and may be closed by drain valve 9 as indicated later in the description. A main air line 5, controlled by a flow valve 10 and meter 11, also passes through the bulkhead 3. The air line 5 extends the length of the scram drift and is branched to form a plurality of lines 12. The air lines 12 extend upwardly entering the draw points 13 of the stope. The lines 12 terminate in valve 14 which is a one-way valve allowing air to pass through into the stope area.
As indicated in FIGS. 2 and 3, the piping system 5 and 12 is so laid as to provide a system of air outlet points 14 a few feet higher in elevation than the drainage units 4 and in a grid pattern over the plan area of the stope to provide a substantially uniform air flow over the stope area. The branched air line 12 may be of any desired length and may extend just into the draw point 13 or may be extended to form additional branches 16 and 17 as indicated in FIG. 2 or branches 18, 19, 20 and 21 as indicated in FIG. 3. Each of the lines terminate in a oneway air valve 14 so designed that the back-fill material cannot enter through the valve when the system is not pressurized.
When the bulkheads 3 have firmly set, filling of the stope cavity 2 will commence. After the stope has been back-filled, for example with deslimed mill tailings containing sulphide, any water from the mass of the fill will be removed through drainage units 4. When the flow of draining eflluent has become relatively negligible, the drain valve 9 is closed. Compressed air is introduced through the air line system 5 and 12 by opening of valves 10 and 15. Suitable instruments installed on the air line 5 will meter the flow at 11 and indicate the air pressure at air outlet points 14. A pressure gauge 22 installed will indicate the air pressure build-up in the fill behind the bulkhead 3.
Flow rates may be controlled in accordance with previously made calculations in which factors such as per-. centage of voids in the fill, plan area of the stope, percentage of sulphides in the fill material and the reactive characteristics of the sulphides, particularly as to their afiinity for oxygen would be taken into account. The means of determining these factors is well known to the skilled engineer and therefore need not be discussed in detail here.
Provision is also made to determine temperatures with. in the fill material. For example, at a suitable distance behind each bulkhead and if desired at other predetermined points within the mass of the fill thermocouples as indicated at T, FIG. 4, or other apparatus for indicating or determining temperatures, may be located during the filling of the stope cavity or later if desired. These thermocouples or other apparatus which may be located at a point .a few feet from the bulkhead or even at the centre of the mass will be effective to keep the operator informed of temperatures within the mass during the gradual reaction of the fill. It is considered that the present method will be elfectiv'e on back-fill having a sulphide content as low as about 5% and indeed as low as 2% sulphide content has been tested and is known to be practical. The upper range of sulphide content may be as high as The reaction may of course be greater with a higher sulphide content but by controlling the air flow the reaction in the mass may be maintained and controlled. In controlling the reaction within the mass it is not necessary for the flow of air to be continuous. Indeed in certain situations it may be found desirable to shut off the air supply completely and add Water to the stope from the top thereof. The presence of some water in the mass is essential to the successful operation of the method, and this water addition may be relied on if the reaction conditions in the mass so dictate.
Air introduced under adequate pressure through the air line system 5 and 12 and valves 14 travels upwardly through the fill material as indicated generally by the arrows in FIG. 4. It would be desirable to obtain the most uniform air flow pattern throughout the mass to efiect a uniform reaction therethrough. The sulphide minerals react with the oxygen in the air and residual water in the back-fill and may be assisted by the presence of a bacteria such as Thio-baccillus Ferro-oxidans which may be incorporated either with the fill material at the time of placing or introduced in an aqueous solution through the air line 5 or by pumping the solution back through the drain line and through the drainage devices into the backfill. This reaction results in the formation of various sulphates, sulfites, oxides and associated compounds.
As indicated the air flow may be so controlled that the reaction will not be rapid enough as to generate undesirable quantities of heat or gas. The rate of reaction will be indicated by the temperature changes shown by the thermocouples T. Gas or air is allowed to emerge freely from the top of the stope 23 and escapes into the exhaust air system 24 of the mine openings.
In any case where a filled stope had not be equipped prior to filling with the air-introduction equipment or in any case where the air system had been rendered nonoperative through accident or failure, the air can then be alternatively introduced through the drainage system after equipping the water drainage pipe with valves, flow metre, and like apparatus. This is an important alternative method of achieving the introduction of air (or oxygen) and hence the hardening or cementing of the backfill mass.
The exhausted gases may be checked for temperature and analyzed for oxygen, S0 and other gas content in the usual manner.
When the reaction has proceeded to the point where through core drill tests or experience it is believed a suflicient degree of cementing has taken place within the mass, the flow of air may be turned off and conditions within the fill material will, in due course, become relatively stabilized. In some instances sufficient cemcntation and rigidity of mass may be obtained prior to completion of reaction within the mass. It is expected that the gradual oxidation envisaged in this method may take several months to complete depending on the volume of mass involved. The cemented mass of the fill constitutes a firm support for the walls of the back of the stope and it will, in these circumstances, be possible to mine pillars of ore on any side of such fill.
Therefore a feature of this invention of inducing hardening or cementing in back-fill material is accomplished by the introduction of a reagent into and within the material in such a way that it is able to work its way completely through the fill thereby causing oxidation and producing compounds from the minerals contained in .the fill which act as cementing agents. However, although the use of oxygen and a sulphide containing fill has been used in the example herein, it is clear that the concept taught may be applied to fill containing material other than sulphides. Where a liquid reagent is used instead of a gas, this would be hydraulically pumped into and form below the mass through a system consisting of flowmeter, valves, pipes and one-way valves, all of which are conventional items and require no explanation as to purpose and function and which is similar in most respects to the system for air introduction. By way of exam-pie dilute sulphuric acid may be used as a liquid reagent in the application of the present method to a sulphide-containing mass of back-fill. The reagent would, of course, be diluted to the point found most satisfactory for the mass being treated. It will be apparent that the piping used will be selected on the basis of the most desirable type and material of piping to carry any specific reagent and careful regard must be had to the choice of pipe in the case of the use of a reagent such as dilute sulphuric acid. In other words, the piping should not be deleteriously affected by contact with the reagent transported therethrough. Other types of gas or reactive solutions may be applied to masses of back-fill to induce hardening of selfcementing and likewise would be introduced by the same method. The type of gas or solution employed would, of course, depend upon the nature of the back-fill material used. The suitability of a particular reagent to a particular mass may be determined by tests within the knowledge of the man skilled in the mining art. The use of air is proposed where the back-fill materials contain sufiicient amounts of sulphides that the desired cementing action will be effected. Where the fill may be more inert a more chemically active gas or solution may be employed to induce hardening.
It is clear that the foregoing development will fill a definite need in the field of mining.
I claim:
1. A method of forming a substantially rigid mass in a mine opening which comprises:
(a) charging said opening with a fill material such as rock or gravel and which contains a reactive substance; and
(b) passing a reactive fluid upwardly through said material which is capable of reacting with the substance in said material in a volume suificient to induce hardening and cementing of the material.
2. A method as claimed in claim 1 in which:
(a) the reactive fluid is air which is passed through said material by introducing the air to the base of said mass;
(b) permitting the air to percolate upwardly therethrough; and
(c) said air being introduced in a volume suflicient to induce hardening and cementing of the material.
3. A method as claimed in claim 1 wherein:
(a) said opening is charged with sulphide containing materials; and
(b) the reactive fluid is an oxygen-containing gas 4. A method in accordance with claim 3 wherein the sulphide materials are deslimed milled tailings.
5. A method in accordance with claim 3 wherein an additive is introduced into the back-fill to increase the oxidation in the mass.
6. A method in accordance with claim 3 wherein Thiobacillus Ferro-oxidans are introduced into the back-fill to enhance the oxidation therein.
7. A method as claimed in claim 1 wherein the backfill material contains reactive material in the proportions of between 2% and of said fill material.
8. A method as claimed in claim 3 wherein the sulphide content of said back-fill material is between 2% and 100% of said material.
9. A method as claimed in claim 1 including the steps of:
(a) removing excess water from said mass While retaining sufficient moisture therein to eflect oxidation of said back-fill material;
(b) passing a reactive fluid through said material sutficient to induce hardening and cementing of the material; and
(c) wherein the sulphide content of said back-fill material is between 2% and 100% of said material.
10. A method as claimed in claim 1 wherein said fluid is .a liquid which is pumped hydraulically through said mass.
11. A method as claimed in claim 1 wherein said reactive fluid is dilute sulfuric acid.
12. Apparatus for hardening and cementing a mass of a fill material in a mine opening such as rock or gravel and which contains a reactive substance comprising:
(a) means for sealing the lower area of said opening; (b) means for draining said opening; (c) means for passing a reactive fluid through the material within said opening; (d) said fiuid being capable of reacting with the substance in said material; (e) said fluid being present in a volume sulficient to induce hardening and cementing of the material; and (f) means for exhausting gases from said opening. 13. Apparatus as claimed in claim 12 including means for controlling the flow of said reactive fluid to and through said mass.
14. Apparatus as claimed in claim 13 wherein said control means is adapted to control the flow into said mass in a substantially uniform manner.
15. Apparatus as claimed in claim 12 including means for quickly determining the temperature within the back- 5 fill material.
References Cited UNITED STATES PATENTS Mitchell 6136 X Zemlin 6136 J=oosten 61-36 Lang 29911 Hemwall 6136 2 ERNEST R. PURSER, Primary Examiner.

Claims (1)

1. A METHOD OF FORMING A SUBSTANTIALLY RIGID MASS IN A MINE OPENING WHICH COMPRISES: (A) CHARGING SAID OPENING WITH A FILL MATERIAL SUCH AS ROCK OR GRAVEL AND WHICH CONTAINS A REACTIVE SUBSTANCE; AND (B) PASSING A REACTIVE FLUID UPWARDLY THROUGH SAID MATERIAL WHICH IS CAPABLE OF REACTING WITH THE SUBSTANCE
US444531A 1965-02-15 1965-04-01 Method and apparatus for inducing hardening or cementing in a mass of back-fill in a mine opening Expired - Lifetime US3340693A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA923323 1965-02-15

Publications (1)

Publication Number Publication Date
US3340693A true US3340693A (en) 1967-09-12

Family

ID=4142182

Family Applications (1)

Application Number Title Priority Date Filing Date
US444531A Expired - Lifetime US3340693A (en) 1965-02-15 1965-04-01 Method and apparatus for inducing hardening or cementing in a mass of back-fill in a mine opening

Country Status (3)

Country Link
US (1) US3340693A (en)
FI (1) FI41007B (en)
GB (1) GB1048704A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3459003A (en) * 1967-11-21 1969-08-05 Exxon Research Engineering Co Disposal of waste spent shale
US3469405A (en) * 1968-08-14 1969-09-30 Layne New York Co Inc Mine water barrier
US3478520A (en) * 1967-11-16 1969-11-18 Albert Andy Method for filling abandoned mines
US3508407A (en) * 1968-03-04 1970-04-28 American Cyanamid Co Mine backfill process
US3957305A (en) * 1974-02-11 1976-05-18 Rapidex, Inc. In situ values extraction
US4019327A (en) * 1971-09-20 1977-04-26 Thyssen (Great Britain) Limited Mining
US4412760A (en) * 1980-02-13 1983-11-01 Henri Vidal Method for producing a structure having cohesion by means of a material comprising non-coherent solid particles
US6086289A (en) * 1998-08-11 2000-07-11 Mueller Industries, Inc. Mini drainage immobilization system and method
US6428107B1 (en) 2000-11-28 2002-08-06 Inco Limited Heat added to underground cemented fill to obtain both early and long term strength increases
KR100565866B1 (en) * 2003-08-20 2006-04-04 최춘식 Inside hollow of abandoned structure filling method of construction using filling system and this
US9441474B2 (en) 2010-12-17 2016-09-13 Exxonmobil Upstream Research Company Systems and methods for injecting a particulate mixture

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035769B (en) * 2017-11-29 2019-04-02 中国矿业大学 A kind of modified filling coal mining method of microorganism

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US508523A (en) * 1893-11-14 Method of recovering lost coal from mines
US1820722A (en) * 1929-04-17 1931-08-25 Siemens Bauunion G M B H Komma Process of solidifying layers of ground and similar masses
US1827238A (en) * 1928-11-14 1931-10-13 Tiefbau Und Kalteindustrie Ag Process of solidifying permeable rock, loosely spread masses or building structures
US2634960A (en) * 1948-02-06 1953-04-14 Walter B Lang Method of mining and apparatus therefor
US3077740A (en) * 1962-01-02 1963-02-19 Dow Chemical Co Stabilization of clay soils and aggregates-so4-po4

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US508523A (en) * 1893-11-14 Method of recovering lost coal from mines
US1827238A (en) * 1928-11-14 1931-10-13 Tiefbau Und Kalteindustrie Ag Process of solidifying permeable rock, loosely spread masses or building structures
US1820722A (en) * 1929-04-17 1931-08-25 Siemens Bauunion G M B H Komma Process of solidifying layers of ground and similar masses
US2634960A (en) * 1948-02-06 1953-04-14 Walter B Lang Method of mining and apparatus therefor
US3077740A (en) * 1962-01-02 1963-02-19 Dow Chemical Co Stabilization of clay soils and aggregates-so4-po4

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3478520A (en) * 1967-11-16 1969-11-18 Albert Andy Method for filling abandoned mines
US3459003A (en) * 1967-11-21 1969-08-05 Exxon Research Engineering Co Disposal of waste spent shale
US3508407A (en) * 1968-03-04 1970-04-28 American Cyanamid Co Mine backfill process
US3469405A (en) * 1968-08-14 1969-09-30 Layne New York Co Inc Mine water barrier
US4019327A (en) * 1971-09-20 1977-04-26 Thyssen (Great Britain) Limited Mining
US3957305A (en) * 1974-02-11 1976-05-18 Rapidex, Inc. In situ values extraction
US4412760A (en) * 1980-02-13 1983-11-01 Henri Vidal Method for producing a structure having cohesion by means of a material comprising non-coherent solid particles
US6086289A (en) * 1998-08-11 2000-07-11 Mueller Industries, Inc. Mini drainage immobilization system and method
US6428107B1 (en) 2000-11-28 2002-08-06 Inco Limited Heat added to underground cemented fill to obtain both early and long term strength increases
KR100565866B1 (en) * 2003-08-20 2006-04-04 최춘식 Inside hollow of abandoned structure filling method of construction using filling system and this
US9441474B2 (en) 2010-12-17 2016-09-13 Exxonmobil Upstream Research Company Systems and methods for injecting a particulate mixture

Also Published As

Publication number Publication date
FI41007B (en) 1969-04-30
GB1048704A (en) 1966-11-16

Similar Documents

Publication Publication Date Title
US3340693A (en) Method and apparatus for inducing hardening or cementing in a mass of back-fill in a mine opening
EP1809817B1 (en) Method for saturating cavities present in a mass of soil or in a body in general
CN110617069B (en) Full-circle excavation construction method
CA1077068A (en) Method of mine backfilling and material therefor
US3094846A (en) Treatement of earth strata containing acid forming chemicals
US4072018A (en) Tunnel support structure and method
RU2733255C1 (en) Method for mine development of deposits, separation of rocks, filling of mined space and other type of mining work (x)
Shimada et al. Small diameter tunnel excavation method using slurry pipe-jacking
US4285548A (en) Underground in situ leaching of ore
US3440824A (en) Method and apparatus for backfilling and underpinning an underground coal or ore mine
GB1444068A (en) Method of blasting and reinforcing rock cavities
Rose Revising Terzaghi's tunnel rock load coefficients
CS257761B2 (en) Mining process for mineral deposits mining
US3064436A (en) Sealing underground cavities
AU2017207962A2 (en) Method and apparatus for paste backfill
US4155491A (en) Arrangement for transporting solid materials from the bottom of basins
US3809430A (en) Slope cave leaching of exposed or near-surface mineralized deposits
US3756179A (en) Immersion process for heavy underwater structures with particular applications for underwater oil tanks
Zubkov et al. Problems and solutions in underground mining of non-ferrous and precious metal deposits in Yakutia
US4440448A (en) Method for opening mineral deposit and subsequent mining thereof
RU2747275C1 (en) Method for underground leaching of metals from sulfide-containing mineral raw materials
Stout et al. Testing and Placement of High-Modulus Fills in Steeply Dipping Underground Veins
SU771348A1 (en) Arrangement for providing compensation area in hardening filled-in mass
Campbell et al. In-place leaching of uranium at Denison Mines Limited
RU2184235C1 (en) Process of tailing dump exploitation