US3012764A - Method for reviving brine fields - Google Patents
Method for reviving brine fields Download PDFInfo
- Publication number
- US3012764A US3012764A US831120A US83112059A US3012764A US 3012764 A US3012764 A US 3012764A US 831120 A US831120 A US 831120A US 83112059 A US83112059 A US 83112059A US 3012764 A US3012764 A US 3012764A
- Authority
- US
- United States
- Prior art keywords
- salt
- cavity
- new well
- brine
- mining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims description 17
- 239000012267 brine Substances 0.000 title description 12
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 title description 12
- 150000003839 salts Chemical class 0.000 claims description 48
- 238000005065 mining Methods 0.000 claims description 16
- 239000012530 fluid Substances 0.000 claims description 11
- 239000002904 solvent Substances 0.000 claims description 9
- 229920006395 saturated elastomer Polymers 0.000 claims description 5
- 239000000243 solution Substances 0.000 description 10
- 240000001549 Ipomoea eriocarpa Species 0.000 description 7
- 235000005146 Ipomoea eriocarpa Nutrition 0.000 description 7
- 239000011435 rock Substances 0.000 description 6
- 238000005553 drilling Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 229910052500 inorganic mineral Inorganic materials 0.000 description 3
- 239000011707 mineral Substances 0.000 description 3
- 238000005406 washing Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000013505 freshwater Substances 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 230000035508 accumulation Effects 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 238000009937 brining Methods 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/28—Dissolving minerals other than hydrocarbons, e.g. by an alkaline or acid leaching agent
- E21B43/283—Dissolving minerals other than hydrocarbons, e.g. by an alkaline or acid leaching agent in association with a fracturing process
Definitions
- This invention relates to the mining of liquid-soluble minerals from underground strata, and more particularly to the solution mining of salt.
- a number of salt fields have been mined by drilling into the salt deposits, pumping a dissolving fluid, such as water, into the hole to dissolve the salt, and pumping the resulting brine out of the hole to recover the salt.
- a more recent and more efiicient method of mining soluble mineral deposits known as the gallery system, has been developed wherein two or more wells are driven into the salt strata, the strata is split, usually hydraulically,
- the primary object of the present invention is to provide an improved method for reviving an old brine field previously mined by the method discussed and recovering the large percentage of salt in a given deposit not recoverable under the prior system of mining.
- a new hole may be drilled far enough from an old cavity so that the rock formation immediately surrounding and above the old cavity will not be disturbed.
- the location of the new well is determined by the known geology of the area and the estimated outline of the old cavity, and the new well is drilled and completed in accordance with known methods, preferably those outlined in my oo-pending application referred to hereinabove.
- the new well will be completed for the fracturing or splitting step at a level somewhat above the lowest point of the existing cavity to assure connection between the two wells but at the lowest point possible.
- the high pressure fracturing or splitting fluid will then be applied from the new well until the crevice reaches the target cavity, and dissolving fluid will then be circulated from the new well to the old cavity to wash through the crevice thereby enlarging it to the extent necessary to assure keeping the crevice open.
- FIG. 1 is a cross section of a salt deposit showing an old morning glory" cavity 10 which has been connected with a newly drilled well 12 by hydraulic fracturing.
- the old morning glory cavity is shown as being interconnected with the new well by a crevice 14 which has been produced by hydraulic splitting of the salt deposit.
- the rate of brine withdrawal from the gallery is then adjusted to assure maximum salt withdrawal from the area of the old cavity.
- the brine making capacity of the area surrounding the old cavity will be known from the previous mining operation, and by limiting the wn'thdrawal rate to known production of the old area, only saturated fluid will be pulled through the new channel and well area. Therefore little or no salt will be removed from the new areas, except as the old cavity enlarges to include more of the channel area and eventually the area around the newer well.
- reversing the direction of flow and regulating the rate of brine withdrawal limits the amount of salt which is dissolved from around the new well, and thereby preserves the structural stability around the new well area while recovering all of the salt possible from the area of the old cavity. This will assure progressive enlargement of the old cavity and because the fluid outlet therefrom is at a low point thereof, a large percentage of the salt bed previously untapped may thus be recovered.
- a method for solution mining of underground deposits of salts in areas containing existing morning glory shaped cavities comprising, drilling a new well at a point removed from the base of an existing cavity, applying a salt deposit splitting force from the new well to open a crevice to the base of the existing cavity, washing a dissolving fluid through said crevice to create a permanent channel in the salt deposit, and then mining said salt bed by circulating a solvent through the existing cavity to the new well at such rate of solvent flow that the solvent becomes saturated with salt while still in the zone of the existing cavity, whereby salt in solution is withdrawn through the new well.
- a method for solution mining of underground deposits of salts in areas containing abandoned morning glory shaped cavities comprising, drilling a new well to a point removed from an existing cavity, applying a salt deposit splitting force from the new well to open a crevice to the lower portion of the existing cavity while washing a dissolving fluid through said crevice under pressure to create a permanent channel, and then mining said salt bed by circulating a solvent from the upper portion of the existing cavity through the channel to the new well, whereby salt in solution is withdrawn through the new well, the rate of withdrawal of salt in solution through the new well being limited to a rate at which the circulated solvent will become saturated with salt while still in the old cavity.
- a method for solution mining of underground deposits of salts in areas containing abandoned morning glory shaped cavities comprising, drilling a new well to a point removed from an existing cavity, applying a salt deposit splitting force from the new well to open a 15 2,880,587
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Description
Dec. 12, 1961 c. H. JACOBY 3,012,764
METHOD FOR REVIVING BRINE FIELDS Filed Aug. 3, 1959 DOLOM I TE IN V EN TOR.
Q C HARL ES H. JACOB) BY.
A TT'ORNEYS.
United States Patent Ofitice 3,012,764 Patented Dec. 12, 1961 3,012,764 METHOD FOR REVIVING BRINE FIELDS Charles H. .lacoby, Dearbom, Mich, assignor to International Salt Company, Inc., Scranton, Pa. Filed Aug. 3, 1959, Ser. No. 831,120 3 Claims. (Cl. 262-3) This invention relates to the mining of liquid-soluble minerals from underground strata, and more particularly to the solution mining of salt. A number of salt fields have been mined by drilling into the salt deposits, pumping a dissolving fluid, such as water, into the hole to dissolve the salt, and pumping the resulting brine out of the hole to recover the salt. It is well known in the art that the solution mining of salt from a single cavity has particular difliculties due primarily to the fact that when water is pumped into a well drilled into a salt formation, the fresh water will tend to rise and the brine saturated water remains near the bottom of the cavity. Because of this, most of the dissolving action takes place in the upper section of the hole and as a result the cavity develops primarily upwardly and only secondarily laterally until it reaches over-lying insoluble rock, at which point the cavity spreads only laterally at the top. This condition is enhanced by reason of the insoluble impurities in the salt deposit falling out of the brine solution and forming a semi-porous insoluble blanket on the floor and to some degree, the walls of the cavity. The result of these conditions is a morning glory" shaped cavity, and as the petals develop further and further outwardly, stoping of the unsupported roof rock results in accumulations of rock fragments around the well casing which impedes circulation of the brining fluid to the point that ultimately the well must be abandoned. This leaves a very large percentage of the salt bed untouched beneath the petals" of the cavity.
Attempts to mine a salt area efliciently by drilling and mining a series of such cavities in close proximity to one another have been generally unsuccessful because of the collapse of roof rock and the general unstable rock stress condition adjacent a developed cavity.
A more recent and more efiicient method of mining soluble mineral deposits, known as the gallery system, has been developed wherein two or more wells are driven into the salt strata, the strata is split, usually hydraulically,
,to open a passageway from one well to another, and a mineral solvent is circulated through the opened underground system. This method of mining is more fully described in my co-pending application Serial No. 807,449, filed April 20, 1959. In developing this method it has been found feasible to open passages in salt beds for distances of over 1000 feet between wells by hydraulic fracturing along the bedding planes of the salt.
Now I have developed a method for reviving previously abandoned salt fields, which includes using the old morning glory cavities and incorporating them into a gallery, and have found that by using my method the old field may be reworked with nearly the sameefiiciency now obtained by the newer methods of salt field development.
Thus, the primary object of the present invention is to provide an improved method for reviving an old brine field previously mined by the method discussed and recovering the large percentage of salt in a given deposit not recoverable under the prior system of mining.
By using hydraulic fracturing to split the salt along a bedding plane, a new hole may be drilled far enough from an old cavity so that the rock formation immediately surrounding and above the old cavity will not be disturbed. The location of the new well is determined by the known geology of the area and the estimated outline of the old cavity, and the new well is drilled and completed in accordance with known methods, preferably those outlined in my oo-pending application referred to hereinabove. The new well will be completed for the fracturing or splitting step at a level somewhat above the lowest point of the existing cavity to assure connection between the two wells but at the lowest point possible. The high pressure fracturing or splitting fluid will then be applied from the new well until the crevice reaches the target cavity, and dissolving fluid will then be circulated from the new well to the old cavity to wash through the crevice thereby enlarging it to the extent necessary to assure keeping the crevice open.
In pursuing the method of my invention, as soon as the channel opened by the fracture has been washed through to a sufi'icient degree to prevent convergence of the salt bed, the flow of dissolving fluid is reversed; and the newly established gallery is then mined by circulating fresh fluid into the old cavity and withdrawing the brine through the new well. For example in the accompanying drawing FIG. 1 is a cross section of a salt deposit showing an old morning glory" cavity 10 which has been connected with a newly drilled well 12 by hydraulic fracturing. Thus, the old morning glory cavity is shown as being interconnected with the new well by a crevice 14 which has been produced by hydraulic splitting of the salt deposit. Whereas initially, following the fracturing step, water is pumped under pressure into well 12 and thence through the fracture to the glory hole 10 so as to establish the channel 14; the fresh water is then pumped into the casing 11 of the glory hole, and the final mining operation is thus commenced by causing the water to travel in the direction of the arrows from the old cavity through the crevice 14 and out of the easing 12 as brine.
The rate of brine withdrawal from the gallery is then adjusted to assure maximum salt withdrawal from the area of the old cavity. In most cases the brine making capacity of the area surrounding the old cavity will be known from the previous mining operation, and by limiting the wn'thdrawal rate to known production of the old area, only saturated fluid will be pulled through the new channel and well area. Therefore little or no salt will be removed from the new areas, except as the old cavity enlarges to include more of the channel area and eventually the area around the newer well. Thus, reversing the direction of flow and regulating the rate of brine withdrawal limits the amount of salt which is dissolved from around the new well, and thereby preserves the structural stability around the new well area while recovering all of the salt possible from the area of the old cavity. This will assure progressive enlargement of the old cavity and because the fluid outlet therefrom is at a low point thereof, a large percentage of the salt bed previously untapped may thus be recovered.
I claim:
1. A method for solution mining of underground deposits of salts in areas containing existing morning glory shaped cavities comprising, drilling a new well at a point removed from the base of an existing cavity, applying a salt deposit splitting force from the new well to open a crevice to the base of the existing cavity, washing a dissolving fluid through said crevice to create a permanent channel in the salt deposit, and then mining said salt bed by circulating a solvent through the existing cavity to the new well at such rate of solvent flow that the solvent becomes saturated with salt while still in the zone of the existing cavity, whereby salt in solution is withdrawn through the new well.
2. A method for solution mining of underground deposits of salts in areas containing abandoned morning glory shaped cavities comprising, drilling a new well to a point removed from an existing cavity, applying a salt deposit splitting force from the new well to open a crevice to the lower portion of the existing cavity while washing a dissolving fluid through said crevice under pressure to create a permanent channel, and then mining said salt bed by circulating a solvent from the upper portion of the existing cavity through the channel to the new well, whereby salt in solution is withdrawn through the new well, the rate of withdrawal of salt in solution through the new well being limited to a rate at which the circulated solvent will become saturated with salt while still in the old cavity.
3. A method for solution mining of underground deposits of salts in areas containing abandoned morning glory shaped cavities comprising, drilling a new well to a point removed from an existing cavity, applying a salt deposit splitting force from the new well to open a 15 2,880,587
crevice to the lower portion of the existing cavity while washing a dissolving fiuid through said crevice under pressure to create a permanent channel, and then mining said salt bed by circulating a solvent from the upper portion of the existing cavity through the channel to the new well, whereby salt in solution is withdrawn through the new well, the rate of brine Withdrawal through the new well being adjusted to assure maximum salt withdrawal from the area of the old cavity.
References Cited in the file of this patent UNITED STATES PATENTS Hanson Sept. 2, 1958 Hendrix et a1. Apr. 7, 1959 l l i l
Claims (1)
1. A METHOD FOR SOLUTION MINING OF UNDERGROUND DEPOSITS OF SALTS IN AREAS CONTAINING EXISTING MORNING GLORY SHAPED CAVITIES COMPRISING, DRILLING A NEW WELL AT A POINT REMOVED FROM THE BASE OF AN EXISTING CAVITY, APPLYING A SALT DEPOSIT SPLITTING FORCE FROM THE NEW WELL TO OPEN A CREVICE TO THE BASE OF THE EXISTING CAVITY, WASHING A DISSOLVING FLUID THROUGH SAID CREVICE TO CREATE A PERMANENT CHANNEL IN THE SALT DEPOSIT, AND THEN MINING SAID SALT BED BY CIRCULATING A SOLVENT THROUGH THE EXISTING CAVITY TO THE BY CIRCULATING A SOLVENT THROUGH THE EXISTING CAVITY TO THE BECOMES SATURATED WITH SALT WHILE STILL IN THE ZONE OF THE EXISTING CAVITY, WHEREBY SALT IN SOLUTION IS WITHDRAWN THROUGH THE NEW WELL.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US831120A US3012764A (en) | 1959-08-03 | 1959-08-03 | Method for reviving brine fields |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US831120A US3012764A (en) | 1959-08-03 | 1959-08-03 | Method for reviving brine fields |
Publications (1)
Publication Number | Publication Date |
---|---|
US3012764A true US3012764A (en) | 1961-12-12 |
Family
ID=25258318
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US831120A Expired - Lifetime US3012764A (en) | 1959-08-03 | 1959-08-03 | Method for reviving brine fields |
Country Status (1)
Country | Link |
---|---|
US (1) | US3012764A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3329207A (en) * | 1965-03-12 | 1967-07-04 | Continental Oil Co | Fracturing into a cavity |
US3934650A (en) * | 1972-12-18 | 1976-01-27 | Diamond Shamrock Corporation | Recovery of natural gas during solution mining of an underground salt deposit |
US6035949A (en) * | 1998-02-03 | 2000-03-14 | Altschuler; Sidney J. | Methods for installing a well in a subterranean formation |
CN1069732C (en) * | 1999-05-15 | 2001-08-15 | 洪泽县化工(集团)总公司 | Mirabilite exploiting water-dissolution process with two wells communicated by horizontal hole |
US20150260025A1 (en) * | 2014-03-14 | 2015-09-17 | Solvay Sa | Multi-well solution mining exploitation of an evaporite mineral stratum |
US9638017B2 (en) * | 2012-10-25 | 2017-05-02 | Solvay Sa | Batch solution mining using lithological displacement of an evaporite mineral stratum and mineral dissolution with stationary solvent |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2850270A (en) * | 1956-03-19 | 1958-09-02 | Alden W Hanson | Mining soluble minerals using passageway formed by fracturing |
US2880587A (en) * | 1953-12-31 | 1959-04-07 | Phillips Petroleum Co | Hydraulic fracturing to develop underground storage caverns |
-
1959
- 1959-08-03 US US831120A patent/US3012764A/en not_active Expired - Lifetime
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2880587A (en) * | 1953-12-31 | 1959-04-07 | Phillips Petroleum Co | Hydraulic fracturing to develop underground storage caverns |
US2850270A (en) * | 1956-03-19 | 1958-09-02 | Alden W Hanson | Mining soluble minerals using passageway formed by fracturing |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3329207A (en) * | 1965-03-12 | 1967-07-04 | Continental Oil Co | Fracturing into a cavity |
US3934650A (en) * | 1972-12-18 | 1976-01-27 | Diamond Shamrock Corporation | Recovery of natural gas during solution mining of an underground salt deposit |
US6035949A (en) * | 1998-02-03 | 2000-03-14 | Altschuler; Sidney J. | Methods for installing a well in a subterranean formation |
CN1069732C (en) * | 1999-05-15 | 2001-08-15 | 洪泽县化工(集团)总公司 | Mirabilite exploiting water-dissolution process with two wells communicated by horizontal hole |
US9638017B2 (en) * | 2012-10-25 | 2017-05-02 | Solvay Sa | Batch solution mining using lithological displacement of an evaporite mineral stratum and mineral dissolution with stationary solvent |
US20150260025A1 (en) * | 2014-03-14 | 2015-09-17 | Solvay Sa | Multi-well solution mining exploitation of an evaporite mineral stratum |
US9879516B2 (en) * | 2014-03-14 | 2018-01-30 | Solvay Sa | Multi-well solution mining exploitation of an evaporite mineral stratum |
US10508528B2 (en) | 2014-03-14 | 2019-12-17 | Solvay Sa | Multi-well solution mining exploitation of an evaporite mineral stratum |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2952449A (en) | Method of forming underground communication between boreholes | |
US8991937B2 (en) | Solution mining method with horizontal fluid injection | |
US9273553B2 (en) | Mining method for gassy and low permeability coal seams | |
US4160481A (en) | Method for recovering subsurface earth substances | |
US1960932A (en) | Method of mining | |
US3271962A (en) | Mining process | |
US4398769A (en) | Method for fragmenting underground formations by hydraulic pressure | |
US3510167A (en) | Methods of solution mining | |
US3262741A (en) | Solution mining of potassium chloride | |
US2880587A (en) | Hydraulic fracturing to develop underground storage caverns | |
US2919909A (en) | Controlled caving for solution mining methods | |
CN111058847B (en) | Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body | |
US3012764A (en) | Method for reviving brine fields | |
US3086760A (en) | Method of creating an underground communication | |
US3941422A (en) | Method of interconnecting wells for solution mining | |
US4192555A (en) | Method of disposing solid sodium chloride while selectively solution mining potassium chloride | |
US3599717A (en) | Alternate flood process for recovering petroleum | |
US3018095A (en) | Method of hydraulic fracturing in underground formations | |
US3157231A (en) | Process and apparatus for extracting and recovering oil in situ | |
US3632171A (en) | Method of controlling growth of brine wells | |
US20170002658A1 (en) | In-situ leaching of ore deposits located in impermeable underground formations | |
RU2754232C1 (en) | Method for constructing an underground tunnel reservoir in a rock salt reservoir of limited capacity | |
US2122452A (en) | Acid treatment of wells | |
US2861428A (en) | Underground storage cavern having laterally spaced well and method therefor | |