US2585446A - Process for the production of tubular objects of prestressed concrete - Google Patents
Process for the production of tubular objects of prestressed concrete Download PDFInfo
- Publication number
- US2585446A US2585446A US663774A US66377446A US2585446A US 2585446 A US2585446 A US 2585446A US 663774 A US663774 A US 663774A US 66377446 A US66377446 A US 66377446A US 2585446 A US2585446 A US 2585446A
- Authority
- US
- United States
- Prior art keywords
- tube
- concrete
- pressure
- production
- exterior
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/02—Methods or machines specially adapted for the production of tubular articles by casting into moulds
- B28B21/10—Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
- B28B21/18—Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using expansible or retractable mould or core elements
- B28B21/20—Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using expansible or retractable mould or core elements using inflatable cores, e.g. having a frame inside the inflatable part of the core
- B28B21/205—Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using expansible or retractable mould or core elements using inflatable cores, e.g. having a frame inside the inflatable part of the core having a rigid frame inside the inflatable part of the core
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/56—Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
- B28B21/60—Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
- B28B21/62—Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements circumferential laterally tensioned
Definitions
- Difierent arrangements have been proposed for producing prestressedtubes with homogeneous conditions, as regards stresses including those in which the prestress is obtained by means of pressure or in other manner, while the concrete is still in a semi-plastic or semi-solid condition.
- the present inventoin is based on the principle above named to provide a concrete tube unreinforced beforehand with a winding, and then by the special process characterising the invention to place an exterior concrete tube cast around the first one in such a way that after the hardening the tube as regards the stress condition becomes homogeneous and the prestress becomes the same in the exterior and the interior tube.
- Figure 1 shows a diametrical section through aprimary concrete tube and the means tor-applying outward radial. pressure thereon.
- Fig, 2 shows a top plan view," of a cylindrical casting mold? plate for the outer or cast on. concrete; tube.
- Fig. 2a is a sideel'evation of the mold'jplate shown in Fig, 2'.
- Fig- 3 shows an axial section of the primary tube with; the reinforcing wires in position thereagainst.
- Fig. 4 shows the moldi'arrangelments for imparting pressure to boththe, interior and the exterior of the composite molded con crete tube.
- the drawing shows a mould arrangement for imparting pressure to both the interior and the exterior of the composite mould concrete tube.
- the finished cast primary concrete tube orccre l' which preferably is made of concrete of high quality is tightened in one way or anotherso that a certain inside pressure pr may be maintained.
- the tightening is obtained by placing a lid 2 on each end of the tube core, through the axis of which an inlet 2a for pressure water or pressure gas is found.
- This primary tube is now wound with a suitable reinforcement wire 4a in such a way that the tension in the wire during the winding is maintained constant substantially at its maximum (for piano wire up to 20,000 kg./cm.
- the diameter of the wire and the number of windings per meter are determined in such a way that a high peripheric compressive stress 0'1 for instance kg/cm. results in the primary concrete tube core I.
- the finished wound concrete primary tube I is then surrounded by a casting-mould, which preferably is made in a way to yield somewhat when subjected to pressure for instance by the overlapping of an elastic steel-plate 3.
- the characteristic feature of the invention consists in, that before the exterior tube or covering 5 is cast around tube I, the latter is subjected to the pressure 321 above named from the inside.
- This pressure is regulated in such a manner that the stress '01 in the concrete beapproximately 0, or in case a strongly shrinking concrete mass for the exterior tube is used, 121 is chosen so high that m will be slightly negative, i. e. the tube 1 is subjected to a small peripheric tension corresponding to that engendered in the exterior tube after hardening. It is a matter of course that this peripheric tension must be less than the tensile strength of the concrete mass used.
- the exterior concrete'rnass or covering 5 is now cast into the mould provided by the exterior of the primary tube core I and the plate 3 by ramming or vibration and the hardening takes place in a natural way or is eventually accelerated by heating.
- the pressure p; is maintained constant.
- the pressure in the composite tube is released and a homogeneous stress of where s1 is the thickness of the tube, s2 is the thickness of the tube 5 and 0'2 is the average peripheric stress in the composite tube in the finished state.
- a process for imparting peripheric, compressive prestress to a tubular object of concrete which comprises imparting compressive stress to a. prehardened concrete tube by winding therearound a highly prestressed wire in direct ,con-
- each of the tubular elements of the composite tubular object will be under a peripheric compressive prestress which is substantially homogeneous throughout the composite wall of the tubular object.
- a process for imparting peripheric, compressive prestress to a tubular object of concrete which comprises imparting compressive stress to a prehardened concrete tube c'ore' by wlnding therearound a highly prestressed wire in direct contact with the concrete tube, casting around said wire-stressed tube core and in contact therewith a tube covering of concrete adhering to the core and subjecting and maintaining during the hardening oi the covering, the bore of the inner.
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
Description
Feb. 12, 1952 E. EDWIN ETAL 2,585,446
PROCESS FOR CTION OF TUBULAR I THE PRODU OBJECTS OF FIRE T ESSED CONCRETE Filed Ap 22, 1946 6 8 F1- Q14- I W M, W
I I I [III ['IHI $5 rj x 5 4a f 3% x \i 74 Q; 5 N! X 2 Jgb .lflx.
Patented Feb. 12, 1952 PROCESS FOR THE PRODUCTION OF TUBULAR OBJECTS OF PRESTRESSE CONCRETE EmillEdwin andNils Darre Nilsen, Oslo, Norway Application April 2-2, 1946, Serial No. 663,774 In Norway November 24, 1943 Section. 1, Bublic Law 690,: August 8; 1946= Batentexpires November 24,1963- In the production of prestressed concrete, i. e. concrete to which...by means of a highly prestressed reinforcement a certain internal compressive stress, is imparted. heiorehand, one meets, whendealing with curved, for instance tubular objects, with considerable practical difficulties 2 Claims; (Cl. --1-5'4T stressing in the longitudinal direction of thectube is easily obtained by simply imparting thenecessary prestress to the wire before casting the concrete round it. On the other hand the question as to the much more important peripheric transverse stress is rather more diflicult to deal with. Here the peripheric reinforcement in the concrete cannot be given any prestress before casting. In such case a finished concrete tube had first to be cast and then the wire wound round it with high tension, but if the concrete were cast round the wound tube, then this part of the concrete would still be unstressed after hardening, while the tube first cast would be highly prestressed and receive the total tension of the wire. on account of shrinkage the exterior tube would probably be filled with fissures. Apart from the fact that a quick corrosion of the comparatively thin reinforcement in such tube must be taken into account, such a tube with a large stress difference between the outer and inner material would constitute a building element quite unfit for technical purposes.
Difierent arrangements have been proposed for producing prestressedtubes with homogeneous conditions, as regards stresses including those in which the prestress is obtained by means of pressure or in other manner, while the concrete is still in a semi-plastic or semi-solid condition. However, the present inventoin is based on the principle above named to provide a concrete tube unreinforced beforehand with a winding, and then by the special process characterising the invention to place an exterior concrete tube cast around the first one in such a way that after the hardening the tube as regards the stress condition becomes homogeneous and the prestress becomes the same in the exterior and the interior tube.
In the drawings:
Figure 1 shows a diametrical section through aprimary concrete tube and the means tor-applying outward radial. pressure thereon. Fig, 2 shows a top plan view," of a cylindrical casting mold? plate for the outer or cast on. concrete; tube. Fig. 2a is a sideel'evation of the mold'jplate shown in Fig, 2'. Fig- 3 shows an axial section of the primary tube with; the reinforcing wires in position thereagainst. Fig. 4 shows the moldi'arrangelments for imparting pressure to boththe, interior and the exterior of the composite molded con crete tube.
' The drawing; shows a mould arrangement for imparting pressure to both the interior and the exterior of the composite mould concrete tube. The finished cast primary concrete tube orccre l' which preferably is made of concrete of high quality is tightened in one way or anotherso that a certain inside pressure pr may be maintained. In the figure the tightening is obtained by placing a lid 2 on each end of the tube core, through the axis of which an inlet 2a for pressure water or pressure gas is found. This primary tube is now wound with a suitable reinforcement wire 4a in such a way that the tension in the wire during the winding is maintained constant substantially at its maximum (for piano wire up to 20,000 kg./cm. The diameter of the wire and the number of windings per meter are determined in such a way that a high peripheric compressive stress 0'1 for instance kg/cm. results in the primary concrete tube core I.
The finished wound concrete primary tube I is then surrounded by a casting-mould, which preferably is made in a way to yield somewhat when subjected to pressure for instance by the overlapping of an elastic steel-plate 3.
The characteristic feature of the invention consists in, that before the exterior tube or covering 5 is cast around tube I, the latter is subjected to the pressure 321 above named from the inside. This pressure is regulated in such a manner that the stress '01 in the concrete beapproximately 0, or in case a strongly shrinking concrete mass for the exterior tube is used, 121 is chosen so high that m will be slightly negative, i. e. the tube 1 is subjected to a small peripheric tension corresponding to that engendered in the exterior tube after hardening. It is a matter of course that this peripheric tension must be less than the tensile strength of the concrete mass used. The inside pressure p1-and for this preferably water is used-may be applied directly, but it will be suitable to arrange a waterproof bag 1 inside the tube, so that the bag, when subjected to water pressure, will adhere tightly to the concrete wall. Hereby it can be prevented that water penetrates into the primary concrete tube and eventually presses the still unhardened concrete mass of the outer tube away from the tube core I.
The exterior concrete'rnass or covering 5 is now cast into the mould provided by the exterior of the primary tube core I and the plate 3 by ramming or vibration and the hardening takes place in a natural way or is eventually accelerated by heating. Hereby the pressure p; is maintained constant. When the hardening is finished the pressure in the composite tube is released and a homogeneous stress of where s1 is the thickness of the tube, s2 is the thickness of the tube 5 and 0'2 is the average peripheric stress in the composite tube in the finished state.
.We claim:
l. A process for imparting peripheric, compressive prestress to a tubular object of concrete which comprises imparting compressive stress to a. prehardened concrete tube by winding therearound a highly prestressed wire in direct ,con-
tact with the concrete tube, casting around said wire-stressed tube a second tube of concrete and, during the hardening of said latter tube, subjecting'the bore of the inner tube to a controlled,
outwardly-directed pressure of a magnitude such that after hardening of the exterior tube and releasing the outwardly-directed pressure from the interior tube, each of the tubular elements of the composite tubular object will be under a peripheric compressive prestress which is substantially homogeneous throughout the composite wall of the tubular object.
2. A process for imparting peripheric, compressive prestress to a tubular object of concrete which comprises imparting compressive stress to a prehardened concrete tube c'ore' by wlnding therearound a highly prestressed wire in direct contact with the concrete tube, casting around said wire-stressed tube core and in contact therewith a tube covering of concrete adhering to the core and subjecting and maintaining during the hardening oi the covering, the bore of the inner.
REFERENCES CITED The following references are of record inthe file of this patent:
UNITED STATES PATENTS Number Name Date 1,413,405 Hewett Apr. 18, 1922 1,471,990 Wert Oct. 23, 1923 1,570,794 Stubbs Jan. 26, 1926 1,965,748 Mitchell July 10, 1934 2,048,253 Freyssinet July 21, 1936 2,153,741 Cobi Apr. 11, 1939 2,191,025 Mitchell Feb. 20, 1940 2,236,107 Miller et a1 Mar. 25, 1941
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO2585446X | 1943-11-24 |
Publications (1)
Publication Number | Publication Date |
---|---|
US2585446A true US2585446A (en) | 1952-02-12 |
Family
ID=19915080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US663774A Expired - Lifetime US2585446A (en) | 1943-11-24 | 1946-04-22 | Process for the production of tubular objects of prestressed concrete |
Country Status (3)
Country | Link |
---|---|
US (1) | US2585446A (en) |
DE (1) | DE809168C (en) |
FR (1) | FR931739A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2683914A (en) * | 1948-08-11 | 1954-07-20 | Tangerois Ets | Method of making reinforced concrete tanks |
US2709845A (en) * | 1951-06-29 | 1955-06-07 | Rocla Pipes Ltd | Method of applying pressure to the surface of newly formed concrete or like cementitious products |
US2771655A (en) * | 1951-11-27 | 1956-11-27 | Nervi Pier Luigi | Process of manufacture of forced pipings made of precompressed concrete, and relative equipment |
US2892239A (en) * | 1952-06-19 | 1959-06-30 | Neff Wallace | Improved method of erecting shellform concrete structures |
US3056183A (en) * | 1958-12-17 | 1962-10-02 | Entpr S Campenon Bernard | Process for the production of lined prestressed concrete hollow bodies |
US3950465A (en) * | 1972-07-27 | 1976-04-13 | Amey Roadstone Corporation Limited | Concrete pipes |
US4771530A (en) * | 1987-04-08 | 1988-09-20 | General Atomics | Application of inwardly directed prestressing pressure to concrete members |
US4840200A (en) * | 1983-06-21 | 1989-06-20 | General Atomics | Prestressed tube |
US4936006A (en) * | 1989-03-01 | 1990-06-26 | General Atomics | Method of making prestressed concrete articles |
US5065795A (en) * | 1989-03-01 | 1991-11-19 | General Atomics | Prestressed concrete articles |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1413405A (en) * | 1921-06-27 | 1922-04-18 | William S Hewett | Reenforced-concrete pipe |
US1471990A (en) * | 1921-08-31 | 1923-10-23 | Cyrus S Wert | Method of forming faced concrete blocks |
US1570794A (en) * | 1922-02-20 | 1926-01-26 | Robert C Stubbs | Process of bonding new concrete formations to old concrete formations |
US1965748A (en) * | 1933-02-04 | 1934-07-10 | Robert W Mitchell | Composite pipe and method of making same |
US2048253A (en) * | 1933-02-10 | 1936-07-21 | Freyssinet Eugene | Method and apparatus for the manufacture of hollow bodies of reenforced concrete |
US2153741A (en) * | 1936-12-14 | 1939-04-11 | Walter H Cobi | Process of making reinforced hollow slabs |
US2191025A (en) * | 1934-12-22 | 1940-02-20 | Robert W Mitchell | Method of making composite pipes |
US2236107A (en) * | 1938-03-04 | 1941-03-25 | Joseph E Miller | Concrete pipe |
-
1946
- 1946-04-22 US US663774A patent/US2585446A/en not_active Expired - Lifetime
- 1946-08-01 FR FR931739D patent/FR931739A/en not_active Expired
-
1949
- 1949-03-06 DE DEP35912D patent/DE809168C/en not_active Expired
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1413405A (en) * | 1921-06-27 | 1922-04-18 | William S Hewett | Reenforced-concrete pipe |
US1471990A (en) * | 1921-08-31 | 1923-10-23 | Cyrus S Wert | Method of forming faced concrete blocks |
US1570794A (en) * | 1922-02-20 | 1926-01-26 | Robert C Stubbs | Process of bonding new concrete formations to old concrete formations |
US1965748A (en) * | 1933-02-04 | 1934-07-10 | Robert W Mitchell | Composite pipe and method of making same |
US2048253A (en) * | 1933-02-10 | 1936-07-21 | Freyssinet Eugene | Method and apparatus for the manufacture of hollow bodies of reenforced concrete |
US2191025A (en) * | 1934-12-22 | 1940-02-20 | Robert W Mitchell | Method of making composite pipes |
US2153741A (en) * | 1936-12-14 | 1939-04-11 | Walter H Cobi | Process of making reinforced hollow slabs |
US2236107A (en) * | 1938-03-04 | 1941-03-25 | Joseph E Miller | Concrete pipe |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2683914A (en) * | 1948-08-11 | 1954-07-20 | Tangerois Ets | Method of making reinforced concrete tanks |
US2709845A (en) * | 1951-06-29 | 1955-06-07 | Rocla Pipes Ltd | Method of applying pressure to the surface of newly formed concrete or like cementitious products |
US2771655A (en) * | 1951-11-27 | 1956-11-27 | Nervi Pier Luigi | Process of manufacture of forced pipings made of precompressed concrete, and relative equipment |
US2892239A (en) * | 1952-06-19 | 1959-06-30 | Neff Wallace | Improved method of erecting shellform concrete structures |
US3056183A (en) * | 1958-12-17 | 1962-10-02 | Entpr S Campenon Bernard | Process for the production of lined prestressed concrete hollow bodies |
US3950465A (en) * | 1972-07-27 | 1976-04-13 | Amey Roadstone Corporation Limited | Concrete pipes |
US4840200A (en) * | 1983-06-21 | 1989-06-20 | General Atomics | Prestressed tube |
US4771530A (en) * | 1987-04-08 | 1988-09-20 | General Atomics | Application of inwardly directed prestressing pressure to concrete members |
WO1988007934A1 (en) * | 1987-04-08 | 1988-10-20 | General Atomics | Prestressed concrete articles and methods for manufacturing such articles |
US4936006A (en) * | 1989-03-01 | 1990-06-26 | General Atomics | Method of making prestressed concrete articles |
US5065795A (en) * | 1989-03-01 | 1991-11-19 | General Atomics | Prestressed concrete articles |
Also Published As
Publication number | Publication date |
---|---|
DE809168C (en) | 1951-07-23 |
FR931739A (en) | 1948-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2585446A (en) | Process for the production of tubular objects of prestressed concrete | |
US3136831A (en) | Casting method | |
US3056183A (en) | Process for the production of lined prestressed concrete hollow bodies | |
US2474660A (en) | Manufacture of prestressed concrete pipe and the like | |
US1633219A (en) | Method of forming pipe | |
US1965748A (en) | Composite pipe and method of making same | |
IE38532L (en) | Tubular concrete bodies. | |
US3060640A (en) | Cables for prestressing concrete | |
WO1988007934A1 (en) | Prestressed concrete articles and methods for manufacturing such articles | |
US2535100A (en) | Process for prestressing cement products | |
US2808851A (en) | Double wrapped prestressed concrete pipe | |
US2702424A (en) | Process of manufacturing prestressed concrete | |
US4044088A (en) | Stressed hollow concrete cylinders | |
US3111965A (en) | Prestressed concrete structure and method of making the same | |
US2035662A (en) | Structure for transmitting loads | |
US2470009A (en) | Pipe | |
US3046631A (en) | Apparatus and method for making prestressed concrete tubular members | |
US3278128A (en) | Method of prestressing concrete pipe | |
US2602979A (en) | Method and apparatus for casting concrete bodies with cavities therein | |
SE460408B (en) | MADE TO MANUFACTURE PRETTY MACHINES OF CONCRETE, SEPARATELY CRAFT CONCRETE GROUPS, ACCORDING TO THIS MADE MANUFACTURED MAIL, PARTS AND SPECIFICATIONS FOR APPLICATION OF SAET | |
JPS6049731B2 (en) | Manufacturing method of steel pipe concrete pile | |
US3234619A (en) | Apparatus for making longitudinally prestressed concrete pipes | |
US3151870A (en) | Concrete pipe with improved bell reinforcement | |
GB653769A (en) | Improvements in the manufacture of hollow reinforced concrete products | |
JPH10140560A (en) | Composite knotted pile and manufacture thereof |