US2301760A - Method for making hollow elongated bodies - Google Patents
Method for making hollow elongated bodies Download PDFInfo
- Publication number
- US2301760A US2301760A US342906A US34290640A US2301760A US 2301760 A US2301760 A US 2301760A US 342906 A US342906 A US 342906A US 34290640 A US34290640 A US 34290640A US 2301760 A US2301760 A US 2301760A
- Authority
- US
- United States
- Prior art keywords
- former
- core
- interior
- sand
- rods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/42—Methods or machines specially adapted for the production of tubular articles by shaping on or against mandrels or like moulding surfaces
- B28B21/44—Methods or machines specially adapted for the production of tubular articles by shaping on or against mandrels or like moulding surfaces by projecting, e.g. spraying
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/56—Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10S—TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10S425/00—Plastic article or earthenware shaping or treating: apparatus
- Y10S425/121—Projection
Definitions
- This invention relates to the manufacture of hollow elongated tubular bodies such for ex-- ample, as hollow telegraph poles, hollow tele phone poles, pipes, columns and other supporting structures, and more particularly to ahollow reenforced' structure of the character designated embodying. a non-porous. cementitious material, as a mixture of sand; cement and water or their equivalents capable of being applied to the reenforcing. elements of the pole, etc, under considerable force by the employment of suitable device; such for instance, as asuitable gun;
- An object of the present invention is, to provide a new and improved method of making or forming hollow elongated bodies of the types above specified by a simple and economical procedure requiring the employment of only very simple and inexpensive devices forthe practice of my invention.
- Fig. 1 is a top plan. view of a structure embodying my invention and showing former sections and reenforcing rods thereon;
- Fig. 2 a side elevational view
- Fig. 3 a detailperspective view showing a portion of the framing
- Fig. 4 an elevational view of a collapsible core
- FIG. 5 an enlarged end elevational view of the core and its operating means
- Fig. 6 a top plan view of the framing with former sections positioned thereon and a pressure gun associated therewith;
- Fig. 7 a cross sectional view of a finished tubular member
- Fig. 8 a cross-sectional view of a partially formed tubular member particularly showing one of the spaced apart projecting portions formed in applying the cementitious material to the former section or sections;
- Fig. 8a a similar view showing the section rolled over to rest upon the projecting portion
- FIG. 9 an enlarged perspective view showing the interior and exterior of a finished product.
- Fig. 10 an elevational View of a finishedpole.
- skids In the manufacture of the products contemplated by my invention I employ a simple frame structure comprising longitudinally extending sidem'ernbers 5 and 8 and a series of laterally extending skids or supports 1. These skids are spaced one from the other at suitable distances and, as illustrated and as preferred; are notched on their upper edges as indicated at 8 for the purposes of acting as templates for spacing rods that may be employed for reenforcing purposes as hereinafter described.
- a suitable device or gun designated generally 9, particularly designed for shooting with considerable force the cementitious material entering into the formation of the product being made.
- a former or backing made of reticulated material or wire mesh designated Hi This reticulated material is a commercial article and can be pur chased in a flat state and then rolled to any desired diameter into sections of various lengths. As illustrated, these former sections iii are slightly tapered so that an end of one section may telescope within an adjoining section.
- Each section H] is preferably provided with an inner collapsible core H made of wire mesh or other suitable material encased or covered by a relative thin material such as paper, thin metal, or other suitable material l2.
- This covering is provided for the purpose of acting as a backing or stop for the cementitious material when the latter is forced onto the former.
- a selfsustained core of the desired size may be employed.
- a core ll together with its covering i2 is inserted into each former section It and is spaced from the interior of the former member by means of spacing blocks l3.
- spacing blocks l3 By utilizing a core of this construction it will be understood that when the cementitious material is applied, part of the material will pass through the interstices of the former for a distance equal to the distance between the covering of the core and the internal diameter of the former. It will be noted that by employing spacing blocks l3 of different thicknesses any desired thickness of cementitious material may be obtained between the interior of the former and the covering of the core.
- I employ, in addition to the reticulated element of the former, a series of longitudinally extending rods I4 positioned on the said element in spaced relation.
- the reenforcing means employed should be of a character that will add considerable strength to the pole or the like and that there should be a strong bond between said means and the cementitious material. Further, that the reenforcing elements, while possessing the desired strength, should not be of much bulk. I have found that a wire mesh or a suitable reticulated material, rolled up into tubular form, of non-spiral configuration provides a very strong and eificient former and reenforcing element. A strong bond between the cementitious element is eflected by imbedding the former within the said material as herein described.
- a very convenient manner of applying the longitudinal extending rods to the exterior of the mesh former element is to first position the rods on the skids or templates in the predetermined spaced notched portions thereof, and tie them together by wire threads l5. It will be noted that the notches on the several skids are alined to position the rods on the former in a tapered relationship.
- any number of former sections In may be employed, depending on the length of the sections employed and the length of the pole or the like.
- the former sections are tapered to produce the desired effective taper in the finished article and when reenforcing rods M are employed these rods are positioned on the respective former sections to enter into the tapered configuration.
- the desired number of sections are placed upon the skids I, with the ends of the sections telescoped one within another.
- the assembled sections are then forced against adjustable members l6 arranged along a side of the frame or at the ends of the skids for the purpose of straightening the former prior to the application of the cementitious material thereto.
- the cementitious material is forced by a suitable gun device around the former in such a manner as to completely imbed the former, and if the reenforcing rods M are employed, said former and rods, within the cementitious material.
- a layer of the material may be applied and the section or sections to which it is applied may be left on the skids until the layer of material sets.
- the desired thickness of the cementitious material may be applied without applying it in layers and having the layers set before the application of further layers.
- a projecting portion a may be formed at a point directly over each skid and after the material has set the partially completed pole or the like is rolled over on the skids and rests upon the projection a as particularly shown by Figs. 8 and 8a.
- This projecting portion may be utilized as a guide for applying a following layer of material thus producing the desired wall thickness.
- the collapsible core After a section or sections have had the cementitious material applied thereto and the material has set, the collapsible core, if a collapsible core is employed, in each section, is removed.
- the collapsible cores illustrated are of a character embodying a structure that may be collapsed by pulling a cord or rope I! associated with the core. Where paper is employed for the core covering this paper will remain within the pipe or the like. This is also true in the event that other material is used for the covering.
- the sheet mesh entering into the formation of the former may be rolled into tubular form by any suitable rolling device.
- I8 designates rings that may be employed for determining the desired circumference of the former sections.
- the herein described method of forming reenforced sand-cement elongated tubular bodies which consists in making a reticulated tubular former having a diameter greater than the bore of the body to be formed, positioning the former approximately horizontally and non-rotatably and exteriorly in engagement with a support with one end of the former open and eXteriorly unobstructed for utilization of the former as the primary support for sand-cement material during formation of the body, inserting a core into the former through said end in spaced relation with the interior of the former while theformer is supported as aforesaid to provide a space between said interior and the outer surface of the core for the sand-cement material, forcing a 1 quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former in the said material and provide approximately the sole reinforcement.
- the former functioning as a primary reinforcement for the sand-cement material and carrying inwardly extending spacing blocks inserting a core into the former through said end and position:- ing the core by means of said blocks in spaced relation with the interior of the former while the former is supported as aforesaid to provide a.
- bodies which consists in disposing a reticulated tubular former having a diameter greater than the bore of the body to be formed in exterior engagement with a support, inserting a core into the former in spaced relation with the interior of the former to provide a space between said interior and the outer surface of the core for the sand-cement material, forcing a quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former in the said material and form a projection means of the material on the exterior of the former, allowing the material to set, then rolling the former and engaging said projection means in supporting relation with the support, and then forcing an additional quantity of the material under pressure against the partially formed wall-body utilizing the projections as thickness guides to complete the wall of the body.
- the herein described method of forming reenforced sand-cement elongated tubular bodies which consists in positioning a reticulated tubular former having a diameter greater than the bore of the body to be formed, approximately horizontally and exteriorly in resting engagement on a support with one end and the interior of the former open and exteriorly unobstructed for utilization of the former as the primary support for sand-cement material during formation of the body, inserting a collapsible removable core having a covering into the former through said end in spaced relation with the interior of the former while the former is supported as aforesaid to provide a space between said interior and the outer surface of the core for the sandcement material, forcing a desired quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former in the said material, allowing the material to set, and then collapsing and removing the core.
- the herein described method of forming reenforced sand-cement elongated tubular bodies which consists in positioning a reticulated tubular former having a diameter greater than the bore of the body to be formed, approximately horizontally and exteriorly in resting engagement on a support with one end and the interior of the former open and exteriorly unobstructed for utilization of the former as the primary support for sand-cement material during formation of the body,.attaching longitudinally extending flexibly'connected' rods to the exterior of the former, rollingthe former to dispose said rods circumferentially about the former; inserting aremovable core into the former in spaced relation with the interior of the former to provide a space between said interior and the outer surface of the core for the sand-cement material, forcing a desired quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former and the rods in the said material, allowing the material to set, and then removing the core;
- the herein described method of forming a reenforced sand-cement elongated tubular body which consists in providing a reticulated tubular former to constitute a primary reinforcement in the body, the former having a diameter greater than the bore of the body to be formed and carrying spacing blocks terminating inwardly of the inner surface of the former; attaching longitudinally extending flexibly connected rods to the exterior of the former and rolling the former to space the rods circumferentially about the exterior of the former, positioning the former approximately horizontally and exteriorly in resting engagement on a support with one end open and exteriorly unobstructed and the interior of the former open for utilization of the former as the primary support for sand-cement material during formation of the body, inserting a core means through said open end into the former and positioning the core means through the aid of said blocks in spaced relation with the interior surface of the former while the former is supported as aforesaid to provide a space between said interior surface and the outer surface of the core for the sand-cement material,
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Description
Nov.'10, 1942. A. L. SUTTON ,3
METHOD FOR MAKING HOLLOW-ELONGA'I'ED BODIES Filed June 28, 1940 2 Sheets-Sheet l A. L. SUTTON Nov; 10, 1 942.
' METHOD FOR MAKING HOLLOW ELONGATED BODIES 2 Sheets-Sheet 2 Filed June 28, 1940 E QNGH I NVENTOR Patented Nov. 10, 1942 UNITED STATES PATENT OFFICE METHODFOR MAKING HOLLOl/V ELONGATED BODIES Albert L. Sutton, Pittsburgh, Pa., assignor of onehalf to Thomas B. Sturges, Pittsburgh, Pa.
9 Claims.
This invention relates to the manufacture of hollow elongated tubular bodies such for ex-- ample, as hollow telegraph poles, hollow tele phone poles, pipes, columns and other supporting structures, and more particularly to ahollow reenforced' structure of the character designated embodying. a non-porous. cementitious material, as a mixture of sand; cement and water or their equivalents capable of being applied to the reenforcing. elements of the pole, etc, under considerable force by the employment of suitable device; such for instance, as asuitable gun;
I am awarethat attempts have been made to produce poles, etc., somewhat similar to the hollow elongated-bodies contemplated by my invention, such attempts however, have failed to produce a satisfactory body and have evolved in their production expensive and complicated devices for forming the hollow poles, etc.
An object of the present invention is, to provide a new and improved method of making or forming hollow elongated bodies of the types above specified by a simple and economical procedure requiring the employment of only very simple and inexpensive devices forthe practice of my invention.
In carrying out my method of manufacture I contemplate the use of apparatus and devices that may be readily transported and set up to practice my method at or near the place'or places where the poles, etc., are tobe utilized; thus eliminating the expensive transportation costs for articles of this character.
In the accompanying drawings which illustrate new and improved apparatus and apparatus capable of being utilized in carrying out my new andimproved method:
Fig. 1 is a top plan. view of a structure embodying my invention and showing former sections and reenforcing rods thereon;
Fig. 2, a side elevational view;
Fig. 3, a detailperspective view showing a portion of the framing;
Fig. 4, an elevational view of a collapsible core;
Fig. 5, an enlarged end elevational view of the core and its operating means;
Fig. 6, a top plan view of the framing with former sections positioned thereon and a pressure gun associated therewith;
Fig. 7, a cross sectional view of a finished tubular member;
Fig. 8, a cross-sectional view of a partially formed tubular member particularly showing one of the spaced apart projecting portions formed in applying the cementitious material to the former section or sections;
Fig. 8a, a similar view showing the section rolled over to rest upon the projecting portion;
Fig. 9, an enlarged perspective view showing the interior and exterior of a finished product; and
Fig. 10, an elevational View of a finishedpole.
In the manufacture of the products contemplated by my invention I employ a simple frame structure comprising longitudinally extending sidem'ernbers 5 and 8 and a series of laterally extending skids or supports 1. These skids are spaced one from the other at suitable distances and, as illustrated and as preferred; are notched on their upper edges as indicated at 8 for the purposes of acting as templates for spacing rods that may be employed for reenforcing purposes as hereinafter described.
Associated with the framing and shown diagrammatically is a suitable device or gun designated generally 9, particularly designed for shooting with considerable force the cementitious material entering into the formation of the product being made.
In following my method of manufacture it is unnecessary to employ a mold; I simply employ a former or backing made of reticulated material or wire mesh designated Hi. This reticulated material is a commercial article and can be pur chased in a flat state and then rolled to any desired diameter into sections of various lengths. As illustrated, these former sections iii are slightly tapered so that an end of one section may telescope within an adjoining section.
Each section H] is preferably provided with an inner collapsible core H made of wire mesh or other suitable material encased or covered by a relative thin material such as paper, thin metal, or other suitable material l2. This covering is provided for the purpose of acting as a backing or stop for the cementitious material when the latter is forced onto the former. In lieu of the collapsible core and its covering a selfsustained core of the desired size may be employed.
A core ll together with its covering i2 is inserted into each former section It and is spaced from the interior of the former member by means of spacing blocks l3. By utilizing a core of this construction it will be understood that when the cementitious material is applied, part of the material will pass through the interstices of the former for a distance equal to the distance between the covering of the core and the internal diameter of the former. It will be noted that by employing spacing blocks l3 of different thicknesses any desired thickness of cementitious material may be obtained between the interior of the former and the covering of the core.
In some instances I employ, in addition to the reticulated element of the former, a series of longitudinally extending rods I4 positioned on the said element in spaced relation.
It is of great importance that the reenforcing means employed should be of a character that will add considerable strength to the pole or the like and that there should be a strong bond between said means and the cementitious material. Further, that the reenforcing elements, while possessing the desired strength, should not be of much bulk. I have found that a wire mesh or a suitable reticulated material, rolled up into tubular form, of non-spiral configuration provides a very strong and eificient former and reenforcing element. A strong bond between the cementitious element is eflected by imbedding the former within the said material as herein described.
In the event it is necessary to use the longitudinally extending reenforcing rods as a part of the former, a strong bond is likewise made between the cementitious material and the reenforcing elements. This is accomplished, whether the said material is shot on by first applying a sufficient quantity of the said material to form a layer covering the exterior and the interior of the former and then allowed to set, or whether the desired quantity or thickness of cementitious material is applied to form the finished wall of the product by a continuous application.
A very convenient manner of applying the longitudinal extending rods to the exterior of the mesh former element is to first position the rods on the skids or templates in the predetermined spaced notched portions thereof, and tie them together by wire threads l5. It will be noted that the notches on the several skids are alined to position the rods on the former in a tapered relationship.
After the rods are thus positioned an end rod is secured to the mesh element and this tubular element is then rolled on and over the rods picking them up as it rolls and locating them in the desired spaced apart positions. her of positioning the rods on the former element is accomplished speedily and at slight cost.
In the manufacture of poles and the like in accordance with my method any number of former sections In may be employed, depending on the length of the sections employed and the length of the pole or the like. As the poles or the like are usually of a tapered configuration the former sections are tapered to produce the desired effective taper in the finished article and when reenforcing rods M are employed these rods are positioned on the respective former sections to enter into the tapered configuration.
After the formation of the former sections together with their cores is eifected the desired number of sections are placed upon the skids I, with the ends of the sections telescoped one within another. The assembled sections are then forced against adjustable members l6 arranged along a side of the frame or at the ends of the skids for the purpose of straightening the former prior to the application of the cementitious material thereto.
After the sections have been straightened and while the section or sections are disposed in a This manhorizontal plane on the skids the cementitious material is forced by a suitable gun device around the former in such a manner as to completely imbed the former, and if the reenforcing rods M are employed, said former and rods, within the cementitious material.
In practice, a layer of the material may be applied and the section or sections to which it is applied may be left on the skids until the layer of material sets. In some instances, however, the desired thickness of the cementitious material may be applied without applying it in layers and having the layers set before the application of further layers.
In cases where the material is applied to the former in layers a projecting portion amay be formed at a point directly over each skid and after the material has set the partially completed pole or the like is rolled over on the skids and rests upon the projection a as particularly shown by Figs. 8 and 8a. This projecting portion may be utilized as a guide for applying a following layer of material thus producing the desired wall thickness.
Attention is called to the fact that the sections to be covered by the material being positioned on the skids in a horizontal position are accessible so that the gun or device for applying the material to the structure may be readily manipu' lated to cover the Whole section or sections in a comparatively easy manner.
After a section or sections have had the cementitious material applied thereto and the material has set, the collapsible core, if a collapsible core is employed, in each section, is removed.
The collapsible cores illustrated are of a character embodying a structure that may be collapsed by pulling a cord or rope I! associated with the core. Where paper is employed for the core covering this paper will remain within the pipe or the like. This is also true in the event that other material is used for the covering.
The sheet mesh entering into the formation of the former may be rolled into tubular form by any suitable rolling device. I8 designates rings that may be employed for determining the desired circumference of the former sections.
What I claim is:
l. The herein described method of forming reenforced sand-cement elongated tubular bodies which consists in making a reticulated tubular former having a diameter greater than the bore of the body to be formed, positioning the former approximately horizontally and non-rotatably and exteriorly in engagement with a support with one end of the former open and eXteriorly unobstructed for utilization of the former as the primary support for sand-cement material during formation of the body, inserting a core into the former through said end in spaced relation with the interior of the former while theformer is supported as aforesaid to provide a space between said interior and the outer surface of the core for the sand-cement material, forcing a 1 quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former in the said material and provide approximately the sole reinforcement.
2. The herein described method of forming reenforced sand-cement elongated tubular bodies which consists in positioning a reticulated tubular former having a diameter greater than the bore of the body to be formed, approximately horizontally and exteriorly'in engagementwith a.
support with one end and the interior of the former open and exteriorly unobstructed, the former functioning as a primary reinforcement for the sand-cement material and carrying inwardly extending spacing blocks inserting a core into the former through said end and position:- ing the core by means of said blocks in spaced relation with the interior of the former while the former is supported as aforesaid to provide a.
space between said interior and the outer sur face of the core for the sand-cement material, forcing a quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former in the said material, and' then applying an additional quantity of material after the imbedding of the reenforcing means to complete the Wall of the body.
3. Theherein described method of forming reenforced sand-cement elongated tubular: bodies which consists in disposing a reticulated tubular former having a diameter greater than the bore of the body to be formed in exterior engagement with a support, inserting a core into the former in spaced relation with the interior of the former to provide a space between said interior and the outer surface of the core for the sand-cement material, forcing a quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former in the said material and form a projection means of the material on the exterior of the former, allowing the material to set, then rolling the former and engaging said projection means in supporting relation with the support, and then forcing an additional quantity of the material under pressure against the partially formed wall-body utilizing the projections as thickness guides to complete the wall of the body.
4. The herein described method of forming reenforced sand-cement elongated tubular bodies which consists in positioning a reticulated tubular former having a diameter greater than the bore of the body to be formed, approximately horizontally and exteriorly in resting engagement on a support with one end and the interior of the former open and exteriorly unobstructed for utilization of the former as the primary support for sand-cement material during formation of the body, inserting a collapsible removable core having a covering into the former through said end in spaced relation with the interior of the former while the former is supported as aforesaid to provide a space between said interior and the outer surface of the core for the sandcement material, forcing a desired quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former in the said material, allowing the material to set, and then collapsing and removing the core.
5. The herein described method of forming reenforced sand-cement elongated tubular bodies which consists in positioning a reticulated tubular former having a diameter greater than the bore of the body to be formed, approximately horizontally and exteriorly in resting engagement on a support with one end and the interior of the former open and exteriorly unobstructed for utilization of the former as the primary support for sand-cement material during formation of the body,.attaching longitudinally extending flexibly'connected' rods to the exterior of the former, rollingthe former to dispose said rods circumferentially about the former; inserting aremovable core into the former in spaced relation with the interior of the former to provide a space between said interior and the outer surface of the core for the sand-cement material, forcing a desired quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former and the rods in the said material, allowing the material to set, and then removing the core;
6. The hereindescribed method of forming reenforced sand-cement elongated tubular bodies which consists in making a non-spiral reticulated tubular form'er having a diameter greater than the bore of the body to be formed, inserting a collapsible removable core having a covering into the former in spaced relation with the interior of the former to provide a space between said interior and the outer surface of the core for the sand-cement material, supporting the former and its core in a horizontal non-rotatable position with the former exteriorly in resting engagement on a support with one end and the interior of the former open and exteriorly unobstructed accessible for an application of the sand-cement material thereto, forcing a desired quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former in the said material, allowing the material to set, and then removing the core through said end.
7. The herein described method of forming reenforced sand-cement elongated tubular bodies which consists in making a non-spiral reticulated tubular former having a diameter greater than the bore of the body to be formed, attaching longitudinally extending flexibly connected rods to the exterior of the former and rolling the former to space the rods about the exterior of the former circumferentially, inserting a collapsible removable core having a covering into the former in spaced relation with the interior of the former to provide a space between said interior and the outer surface of the core for the sand-cement material, supporting the former and rods in a horizontal non-rotatable position with the former exteriorly in resting engagement on a support with one end and the interior of the former open and exteriorly unobstructed accessible for an application of the sand-cement material thereto, forcing a desired quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and the core whereby to imbed the former and rods in the said material, allowing the material to set, and then removing the core.
8. The herein described method of forming reenforced sand-cement elongated tubular bodies which consists in making a sectional reticulated tubular former to form a primary reinforcement in the body, each section being tapered and having a diameter greater than the bore of the body to be formed, positioning the former approximately horizontally and exteriorly in resting engagement on a support with one end and the interior of the former open and exteriorly unobstructed for utilization of the former as the primary support for sand cement material during formation of the body, inserting a core through said end into each former section in spaced relation with the interior of the former while the former is supported as aforesaid to provide a space between said interior and the outer surface of the core for the sand-cement material, forcing a quantity of the material under pressure against the exterior of each section of the former and into the space between the interior of the former section and its core whereby to imbed the former section in said material.
9. The herein described method of forming a reenforced sand-cement elongated tubular body which consists in providing a reticulated tubular former to constitute a primary reinforcement in the body, the former having a diameter greater than the bore of the body to be formed and carrying spacing blocks terminating inwardly of the inner surface of the former; attaching longitudinally extending flexibly connected rods to the exterior of the former and rolling the former to space the rods circumferentially about the exterior of the former, positioning the former approximately horizontally and exteriorly in resting engagement on a support with one end open and exteriorly unobstructed and the interior of the former open for utilization of the former as the primary support for sand-cement material during formation of the body, inserting a core means through said open end into the former and positioning the core means through the aid of said blocks in spaced relation with the interior surface of the former while the former is supported as aforesaid to provide a space between said interior surface and the outer surface of the core for the sand-cement material, forcing a quantity of the material under pressure against the exterior of the former and into the space between the interior of the former and core whereby to imbed the former in said material and form projections on the material at the outer surface thereof, allowing said material to set, then rolling the former and engaging said projections in supporting relation with the support, and then forcing an additional quantity of material under pressure against the partially formed
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US342906A US2301760A (en) | 1940-06-28 | 1940-06-28 | Method for making hollow elongated bodies |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US342906A US2301760A (en) | 1940-06-28 | 1940-06-28 | Method for making hollow elongated bodies |
Publications (1)
Publication Number | Publication Date |
---|---|
US2301760A true US2301760A (en) | 1942-11-10 |
Family
ID=23343799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US342906A Expired - Lifetime US2301760A (en) | 1940-06-28 | 1940-06-28 | Method for making hollow elongated bodies |
Country Status (1)
Country | Link |
---|---|
US (1) | US2301760A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2425079A (en) * | 1943-05-27 | 1947-08-05 | Billig Kurt | Reinforced concrete shell construction and method of manufacture therefor |
US2701905A (en) * | 1950-04-10 | 1955-02-15 | Steam Cote Corp | Method of manufacturing concrete pipe |
US2729873A (en) * | 1951-01-09 | 1956-01-10 | Concrete Conduit Company | Method of manufacturing a concrete pipe joint |
US3622656A (en) * | 1969-05-26 | 1971-11-23 | Gen Dynamics Corp | Method of manufacturing reinforced wall structure |
US4184520A (en) * | 1977-12-07 | 1980-01-22 | Tolliver Wilbur E | Manually formable stirrup mat reinforcement and pipe reinforcing method based thereon |
EP0340185A2 (en) * | 1988-04-28 | 1989-11-02 | Betemi Oy | Production method for a concrete pillar or beam |
FR2635712A1 (en) * | 1988-08-26 | 1990-03-02 | Isolation Fournit Usines Ste I | Method and device for coating tubes using reinforced concrete |
-
1940
- 1940-06-28 US US342906A patent/US2301760A/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2425079A (en) * | 1943-05-27 | 1947-08-05 | Billig Kurt | Reinforced concrete shell construction and method of manufacture therefor |
US2701905A (en) * | 1950-04-10 | 1955-02-15 | Steam Cote Corp | Method of manufacturing concrete pipe |
US2729873A (en) * | 1951-01-09 | 1956-01-10 | Concrete Conduit Company | Method of manufacturing a concrete pipe joint |
US3622656A (en) * | 1969-05-26 | 1971-11-23 | Gen Dynamics Corp | Method of manufacturing reinforced wall structure |
US4184520A (en) * | 1977-12-07 | 1980-01-22 | Tolliver Wilbur E | Manually formable stirrup mat reinforcement and pipe reinforcing method based thereon |
EP0340185A2 (en) * | 1988-04-28 | 1989-11-02 | Betemi Oy | Production method for a concrete pillar or beam |
EP0340185A3 (en) * | 1988-04-28 | 1991-07-03 | Betemi Oy | Production method for a concrete pillar or beam |
FR2635712A1 (en) * | 1988-08-26 | 1990-03-02 | Isolation Fournit Usines Ste I | Method and device for coating tubes using reinforced concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2234784A (en) | Device for forming passages in concrete | |
US3813837A (en) | Fiberglass pole and method and apparatus for fabricating same | |
US4007075A (en) | Method of making a fiberglass pole | |
US2301760A (en) | Method for making hollow elongated bodies | |
US1858512A (en) | Reenforced column | |
ES365245A1 (en) | Lattice for the reinforcement of tubular concrete elements having a socket method for producing said lattice and the products obtained | |
DE1584682C3 (en) | Process for the manufacture of reinforced concrete pipes | |
US2435052A (en) | Apparatus and method for molding circular concrete tanks | |
US2809415A (en) | Molding of building elements of elongated shape | |
US2323713A (en) | Method of making screens | |
US1638515A (en) | Hollow pole | |
US2948042A (en) | Apparatus for making hollow reinforced concrete bodies | |
US2052126A (en) | Core for molding devices | |
DE1659020A1 (en) | Rust protection and spacer device for concrete reinforcements | |
AT159837B (en) | Heat insulating cladding body. | |
DE914695C (en) | Socket connection for concrete pipes and process for their manufacture | |
US1591991A (en) | Means for making conduits | |
SU1669748A1 (en) | Mandrel for manufacturing compound material pipe | |
DE2426593A1 (en) | Large construction blocks for building walls - jacket of resin-bonded sand used as mould for reinforced concrete core | |
US3151870A (en) | Concrete pipe with improved bell reinforcement | |
SU1699777A1 (en) | Method for making tubular articles | |
CH237823A (en) | Process and device for the production of flexible corrugated hoses and hose produced according to this process for internal and external pressure. | |
US1984073A (en) | Process and machinery for the manufacture of asbestos-cement pipes of a small diameter and of little thickness | |
US2685128A (en) | Stretching reinforcements of concrete structures | |
DE1784782C3 (en) | Method and device for manufacturing reinforced concrete pipes |