US2245554A - Hydraulic disruption of solids - Google Patents

Hydraulic disruption of solids Download PDF

Info

Publication number
US2245554A
US2245554A US191685A US19168538A US2245554A US 2245554 A US2245554 A US 2245554A US 191685 A US191685 A US 191685A US 19168538 A US19168538 A US 19168538A US 2245554 A US2245554 A US 2245554A
Authority
US
United States
Prior art keywords
coke
water
chamber
nozzle
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US191685A
Inventor
Court William Frederick
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Development Co
Original Assignee
Shell Development Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Development Co filed Critical Shell Development Co
Priority to US191685A priority Critical patent/US2245554A/en
Application granted granted Critical
Publication of US2245554A publication Critical patent/US2245554A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B33/00Discharging devices; Coke guides
    • C10B33/006Decoking tools, e.g. hydraulic coke removing tools with boring or cutting nozzles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L2101/00Uses or applications of pigs or moles
    • F16L2101/10Treating the inside of pipes
    • F16L2101/12Cleaning

Definitions

  • FIG 9 Cour+ El lnveni'or WIH'IQnjDF. 15g his AH'OFDGH'.
  • This invention relates to the cleaning of vessels which contain solids, like carbonaceous material,
  • I particularly deposits of coke produced by the carbonization of hydrocarbon oils, such as reaction and coking chambers employed in petroleum cracking plants and the like and asphaltic material, especially the solid, brittle kind. While the process may be applied to the removal of various types of carbonaceous material from diverse forms of apparatus, it is particularly useful for the removal of porous coke of the type produced by heat contained within the body 01. the oil.
  • the conventional method of removing petroleum coke from cracking plant reaction or coking chambers involves hanging a steel cable in a series of spirals inside the chamber before the unit is placed in operation, and the withdrawal of the cable after the termination of a run by means of a steam hoist.
  • Thewithdrawal of the cable breaks up the body of coke, discharging the same through a manhole.
  • several men enter the chamber and remove the coke adhering to the chamber walls with pickaxes.
  • Such a method is objectionable in that it is time consuming, since the chamber must be cooled to a point at which men can work within it; it is hazardous to workmen; and iron wire used to suspend the steel cable is withdrawntogether with the coke, rendering it useless for many purposes without subsequent operations for separating pieces of metal.
  • Figure 1 is a perspective view of a cylindrical reaction chamber showing the general layout of the de-cok-ing system
  • Figure 2 is an enlarged perspective view of the water feed pipe guide
  • Figure 3 is a perspective view of the posit, of carbonaceous material.
  • FIGS 4,5 and 6 are vertical sectional views of the reaction chamber illustrating successive stages or steps according to one embodiment of the process;
  • Figure 7 is a vertical sectional view of the spear jet nozzle;
  • Figure 8 is a perspective view of the reaming nozzle head;
  • Figure 9 is a longitudinal sectional view of a nozzle tip used on the nozzle head of Figure 8;
  • Figure 10 is a perspective view of the main nozzle head;
  • Figure 11 is a longitudinal sectional view of the nozzle employed with the nozzle headaccording to Figure 10;
  • Figure 12 is a perspective view of the blind flange adapted to be bolted to the upper sectionof the nozzle head of Figure 10; and
  • Figure 13 is an elevation View of a modified form of nozzle head suitable for effecting the first two steps of the process.
  • the present process is based on the discovery that carbonaceous materials of the type described above can be eflicaciously broken up and removed from containers by the action of a jet of water directed so as toliave a cutting action on the de- This is efl ected by directing the water by means of a suitably designed nozzle so as to cause a great impact or'reaction on the body of the solid to be removed over as small an area as possible. In this manner the primary action of the water is to cut the solid material into lumps, and erosion is minimized.
  • I mean jets which do not substantially break up or spread prior to impact. I It is, moreover, desirable to employ jets of sumcient size to cause an impact of more than lbs., best results being obtained with jets having impacts of between 200 and 300 lbs. or greater. When lower velocities are employed, or when the design or the nozzle is suchas its own axis.
  • the method according to the present invention comprises the steps of cannulating the body of the material to be removed, either by means of a jet of water or of a drill to provide a well or tubular opening, and disrupting the material by a radially outwardly directed cutting jet of the type described above from the opening.
  • the cannulating operation may be carried out in two steps, a
  • the process may be applied to any solid material (not soluble in water) which can be disrupted or cut by a jet of water producing impacts up to 250 pounds against the solid, and is not restricted to the cutting of carbonaceous deposits.
  • the invention may be better understood from the following detailed description.
  • I represents a coke chamber of an usual cracking installation supported by a foundation or pedestal 2 and provided with an upper chamber head manhole 3 and a lower manhole 3a (see Figure 4)
  • the tower 4 is mounted on top of'th coke chamber and is provided with a pair of vertical tracks 5 in the form of channel bars.
  • a pipe guide 6 is mounted to have a vertical sliding movement along the tracks, supported by a cable passing through a block I, and wound about a drum 8 operable by a suitable source of power.
  • the pipe guide 6 carries a vertical water feed pipe 9 concentrically with respect to the coke chamber.
  • the water may be supplied thereto from surge tank l0, via pump ll, riser pipe l2, hinged connection l3, pipe l4, and a pair of pipes l5 and I6.
  • the pipes l5 and I6 are hinged about a horizontal axis with respect to the pipe l4, as shown at H, and are similarly hinged with respect to the cross fitting I8. This permitsthe pipes l5 and Hi to swing towards and away. from the pipe 9 when the pipe guide 8 is moved vertically, allowing the pipe I4 to swing aboutits hinged connection l3.
  • a swivel connection lBa permits the pipe 9 to rotate about
  • a water feed pipe guide comprising a plate l9 adapted to be bolted to the chamber head manhole.
  • Plate I9 is apertured to avoid pressure, and carries brackets 20 supporting a guide plate 2
  • are centrally perforated to permit the water feed pipe 9' to extend downwardly into the chamber, and. to guide the pipe'in its vertical movement.
  • a foot brake lever 22 carrying a brakeshoe 23, engageable with the water feed pipe 9 is attached to the brackets 20.
  • the pedestal 2 carries an angle bar 24 having holes 25 to receive pipe guides (not shown) for guiding an upwardly convex apron used as a con- 7 necting piece between coke cars to prevent spillage of coke on the tracks during loading operations, when the cars move into position.
  • a water shedding shield 21 (see Figure 3) is adapted to be fastened to the bottom of the lower chamber manhole 311 by hooks 26; Rims a medial slot 28,
  • a trough 29 located below the pedestal 2 is provided to lead off water into a settling basin 30.
  • is located across the settling basin 3!] which is connected to the surge tank In via conduits 32.
  • a pair of concrete aprons 33 direct water into the trough 29.
  • Rails 34 for the side dump coke cars pass beneath the coke chamber l.
  • a piercing or spear nozzle 35 (see Figure 7) provided with a constricted throat 36 and a flaring orifice 31 is adapted to be secured to the water feed pipe by means of an externally threaded boss 38, and is shaped to have a small external diameter, co-extensive with the exterior of the water feed pipe 9.
  • the reaming nozzle head (see Figures 8 and 9) comprises a hollow body portion 39 rotatably mounted by means of roller bearings, on a central pipe havinga threaded boss 40 adapted for connection to the water feed pipe.
  • are attached to the body 39 in communication therewith and with the feed pip 9, and carry nozzle tips 42 directed so as to cause water issuing therefrom to rotate the nozzle head to the nozzle head.
  • One pair of oppositely disposed nozzles. is directed downwardly at an-angle of about 30 with the horizontal and of the other pair is directed upwardly at an angle of about 45 horizontal.
  • a pair of scrapers 43 provided with sharp points is secured to the top of. the body 39.
  • the main nozzle head which carries the cutting nozzles comprises an upper and a lower section and is preferably non-rotatably connected to the feed pipe 9.
  • the upper sec tion comprises a pipe 44, adapted to be threadedly connected at its upper end to the water feed pipe 9, and carries a flange plate 45, threadedly se cured at its lower end.
  • Two curved pipes 46 in communication with the interior thereof, carry nozzles 41, and are shaped to direct a stream of water downwardly therefrom at an angle of about 30 with the horizontal, nozzle axes being skew with respect to the axis of the pipe 44, whereby the reaction of the water imparts a turning force
  • the nozzle 41 as shown in Figure 11, comprises a tapering body portion 48 and an externally threaded coupling portion rearwardly thereof, having a cylindrical recess 49 shaped to retain a bushing 50 carrying axially extending straightening vanes 5
  • the lower section comprises the vertical pipe 52 surmounted by a flange plate 53 providedwith bolts 54 for attachment to the flange plate 45.
  • a -pair of nozzles 41a constructed like nozzles 41, is connected to the lower end of the pipe 52 so as to swing upwardly about swivels 55. Chains 56 to two hours.
  • an overflow outlet pipe 59 providedwith a gate valve 58, may be connected to the coke chamber near the top.
  • the nozzles, particularly the spear nozzle 35, are preferably made of case hardened steel since they are subjected to considerable handling abuse.
  • a -modifled form of nozzle head suitable for combining the piercing and reaming operations comprises a central pipe 60, provided with a threaded boss 6
  • An annular rotating head 62 is secured to the pipe 60 by means of roller bearings, and carries a plurality of nozzle tips 42a, similar to the tip 42 shown in Figure 9.
  • the nozzle tips are inclined downwardly about 30 below the horizon-- tal, and supplied with water from the pipe-9 and through curved conduits 53, supported by cross flanges 64 which are attached to and rotatable with the head 62.
  • a drill 65 is mounted beneath the cross flange 64.
  • the cross flanges 64 are downwardly convex and their outer edges are shaped as cutting edges, preferably made of stellite alloy and ground.
  • the coke chamber is first cooled in any suitable manner, as by the introduction of steam for a period of from 15 to 30 minutes followed by the introduction of water over a period of 30 minutes This may be introduced through the regular connection or pressure conduits provided for this purpose. It is not necessary in this process to cool the coke chamber to the extent necessary in the cable method.
  • the method of operation according to the preferred embodiment then comprises the following three steps:
  • First step (illustrated in Figure 4)
  • the chamber is unheaded at the top and bottom and the water feed pipe guide secured to the upper manhole head 3.
  • the pipe guide 6 is raised to the top of the tower and the spear nozzle 35 attached to the lower end of the pipe 9.
  • This assembly is then lowered into the chamber and water under high pressure such as, for example, 1200 lbs. gauge measured at the pump, suppliedthereto,causing a high velocity jet of water to be directed downwardly.
  • the rate of discharge may, for example, be 400 to 750 gallons per minute or higher, using a spear nozzle 8 inches long with a or V inch throat and a. or one inch orifice;
  • the water pierces a verticalv hole through the coke of sufficient diameter to permit free movement of the feed pipe.
  • the *ieed pipe 8 may comprise twoor more seetions,'successive sections being added when the pipe line 6 has reached its lowermost position at the bottom of the tracks 5.
  • the first step may also be effected by drilling, water being preferably introduced to wash out the loosened material.
  • a hollow pipe may be mounted in the coke chamber prior to coking, and this may be withdrawn by means of a hoist, leaving a central hole.
  • Second step (illustrated in Figure 5)
  • the object ofv the second step is to increase the size of the initial hole' toabout '18 to 24 inches in diameter in order that the nozzle head may be used in the last step without fouling the coke bed and may be regarded as a continuation of the cannulating operation described in the first step.
  • the nozzle 35 extends through the lower manhole 3a and below the coke chamber.
  • the water shedding shield 21 is placed beneath the coke chamber so as to cause the pipe 9 to extend through the slot 28 and the reaming nozzle head Zl is removed, and the pipe and nozzle are then raised through the chamber and full water pressure is applied, causing the nozzle head to rotate at a high speed, such as 1000 revolutions per'
  • the second step may be carried out simultaneously with the first step, as by mounting the piercing nozzle on the reaming nozzle head to discharge in the direction of the scrapers 43, the water feed pipe 9 being in this arrangement attached to the opposite end of the body 39.
  • the nozzle head shown in Figure 13 may be mounted on the feed pipe 9 from a position above the coke bed, and the water turned The fine,
  • Third step (illustrated in. Figure 6) This is the final step during which the main I hoist cable and power driven drum 8, or an auxis attached in place of the nozzle 35.
  • the shield either or both, as by attaching the main nozzle head to the bottom of the reaming nozzle head.
  • the reaming nozzle head is lowered to extend beneath the coke chamber, and the water sheddingeshield 21 is reattached.
  • the main nozzle head is then attached to the water feed pipe in place of the reaming nozzle head.
  • the lower section of the main nozzle head is disconnected and the blind flange 51 is attached to the flange plate 45, thereby closing the lower end of the pipe 44.
  • the shield 21 is removed, the upper half of the assembly is raised into the chamber and jetting is started immediately after the nozzle is in position above the manhole neck. Due to the angular disposition of the nozzle, the assembly, including the water feed pipe, rotates under its own power, the rate of turning being preferably regulated by means of the foot brake 22-23 not to exceed about 2-4 revolutions per minute, whereby the jets assume a plurality of successive orientations.
  • the rate of turning depends upon the size of the chamber being cleaned, it being desirable to regulate the rotation so that one rotation will make a complete circular cut into the coke body. With the water pressure still the coke have been settled the partially clarified on, the assembly is raised about 6 or 7 inches and rotation continues.
  • the total pumping time for the three steps in removing coke from a chamber forty feet high and ten feet in' diameter, using the rates of fiow and nozzle sizes given above. is usuallybetween one and two and a half hours.
  • a dump car is water passes through a screen 3! which retains the finer particles of coke.
  • a method of removing a body of coke from a vertical cylindrical reaction chamber which is open at the top and at the bottom comprising the steps of cannulating the body of the coke substantially at the center thereof, enlarging the opening thus formed by means of a jet of.
  • a method for removing. a body of solid carbonaceous material from a reaction chamber comprising the steps of cannulating the body of said material, enlarging the opening thus formed and thereafter conducting a substantially confined stream of water outwardly from said en larged opening against said body, said stream striking said body at a velocity sufflcient to effect cutting the body to lumps, and removing said lumps.
  • a method for removing a body of solid carbonaceous material from a reaction chamber comprising cannulating the body of said material, conducting a first substantially confined stream of liquid outwardly from a source within said cannular opening and conducting a second stream of liquid from a second source within said cannular opening and spaced from said first source, said streams converging and striking said body with *a velocity suflicient to effect cutting the body into lumps, and removing said lumps.
  • a method for 'removing a body of solid carbonaceous material from a reaction chamber comprising conducting at least two converging streams of liquid against said body, said streams striking said body at velocities suflicient to effect cutting said body to lumps, and the direction of said streams relative to each other being such that upon removal of said body from said chamber they meet on the chamber wall.

Description

June 17, 1941. w. F. COURT HYDRAULIC DISRUPTION OF SOLIDS Filed Feb. 21, 1938 2 Sheets-Sheet 1 Fig. 5
FIG 9 Cour+ El lnveni'or WIH'IQnjDF. 15g his AH'OFDGH'.
2 Sheets-Sheet 2 lnven+orz WiHiom F. I ouri' I Bg has Afiorneg W. F. COURT HYDRAULIC DISRUPTION 0F SOLIDS Filed Feb. 21, 1938 June I Patented June 17, 1941 HYDRAULIC DISRUPTION F SOLIDS William Frederick Court, Webster Groves, Mo., assignor to Shell Development Company, San Francisco, Calii'., a corporation 01' Delaware Application February 21, 1938, Serial No. 191,685
Claims.
This invention relates to the cleaning of vessels which contain solids, like carbonaceous material,
I particularly deposits of coke produced by the carbonization of hydrocarbon oils, such as reaction and coking chambers employed in petroleum cracking plants and the like and asphaltic material, especially the solid, brittle kind. While the process may be applied to the removal of various types of carbonaceous material from diverse forms of apparatus, it is particularly useful for the removal of porous coke of the type produced by heat contained within the body 01. the oil. For convenience, in the following description the application of the process to the cleaning of a vertical reaction or coking chamber of the type used in connection with a Dubbs cracking unit will be described, it being understood that the process may be applied as well to a horizontal reaction chamber, and to containers of other shapes, as well as to the removal 01 similar types of porous coke or asphaltic materials from containers or I conduits in which coke has been deposited due to the carbonization of oil by external as well as internal heat. a
The conventional method of removing petroleum coke from cracking plant reaction or coking chambers involves hanging a steel cable in a series of spirals inside the chamber before the unit is placed in operation, and the withdrawal of the cable after the termination of a run by means of a steam hoist. Thewithdrawal of the cable breaks up the body of coke, discharging the same through a manhole. Following this, several men enter the chamber and remove the coke adhering to the chamber walls with pickaxes. Such a method is objectionable in that it is time consuming, since the chamber must be cooled to a point at which men can work within it; it is hazardous to workmen; and iron wire used to suspend the steel cable is withdrawntogether with the coke, rendering it useless for many purposes without subsequent operations for separating pieces of metal. 7
It is the purpose ofthe present invention to provide an improved method and apparatus for removing carbonaceous materials, such as coke and the like from containers, which is less laborious than those heretofore employed, consumes less time, is more economical andis less hazardous than methods now employed.
It is a further object to provide a hydraulic method of removing coke and the like in which objects of the invention will become apparent from the following specification, taken together with the drawings forming a part thereof, in which a representative embodiment of the process is illustrated, it being understood that the process is not limited to the specific steps illustrated, nor to the cleaning of chambers of the particular type or shape shown.
In the drawings, Figure 1 is a perspective view of a cylindrical reaction chamber showing the general layout of the de-cok-ing system; Figure 2 is an enlarged perspective view of the water feed pipe guide; Figure 3 is a perspective view of the posit, of carbonaceous material.
the coke will be free frommetallic bodies. Still another object is to provide a novel apparatus for carrying out the process hereindescribed. Other water shed shield; Figures 4,5 and 6 are vertical sectional views of the reaction chamber illustrating successive stages or steps according to one embodiment of the process; Figure 7 is a vertical sectional view of the spear jet nozzle; Figure 8 is a perspective view of the reaming nozzle head; Figure 9 is a longitudinal sectional view of a nozzle tip used on the nozzle head of Figure 8; Figure 10 is a perspective view of the main nozzle head; Figure 11 is a longitudinal sectional view of the nozzle employed with the nozzle headaccording to Figure 10; Figure 12 is a perspective view of the blind flange adapted to be bolted to the upper sectionof the nozzle head of Figure 10; and
Figure 13 is an elevation View of a modified form of nozzle head suitable for effecting the first two steps of the process.
The present process is based on the discovery that carbonaceous materials of the type described above can be eflicaciously broken up and removed from containers by the action of a jet of water directed so as toliave a cutting action on the de- This is efl ected by directing the water by means of a suitably designed nozzle so as to cause a great impact or'reaction on the body of the solid to be removed over as small an area as possible. In this manner the primary action of the water is to cut the solid material into lumps, and erosion is minimized. For the main cutting or disruptingoperation, I prefer to employ water jets which have velocities of more than about 200 feet per second, best results being obtained with velocities of about 300 to500 feet per second and higher, and which are confined. By confined jets, I mean jets which do not substantially break up or spread prior to impact. I It is, moreover, desirable to employ jets of sumcient size to cause an impact of more than lbs., best results being obtained with jets having impacts of between 200 and 300 lbs. or greater. When lower velocities are employed, or when the design or the nozzle is suchas its own axis.
to cause the jet to break up the cutting action is materially reduced and erosion is increased. This materially increases the time required for the removal of the solid and is, moreover, often undesirable, since it is frequently advantageous to proabout 212 lbs. over an area only slightly larger than 0.11 sq. in., the opening of the nozzle. I am, however, not restricted to the. specific examples herein disclosed.
The method according to the present invention, according to the preferred mode of operation, comprises the steps of cannulating the body of the material to be removed, either by means of a jet of water or of a drill to provide a well or tubular opening, and disrupting the material by a radially outwardly directed cutting jet of the type described above from the opening. To permit the apparatus required to direct the cutting jets to be introduced into the opening, the cannulating operation may be carried out in two steps, a
small opening being made in the first step, and the opening being enlarged or reamed in the second step.
The process may be applied to any solid material (not soluble in water) which can be disrupted or cut by a jet of water producing impacts up to 250 pounds against the solid, and is not restricted to the cutting of carbonaceous deposits. The invention may be better understood from the following detailed description.
Referring to the drawings, I represents a coke chamber of an usual cracking installation supported by a foundation or pedestal 2 and provided with an upper chamber head manhole 3 and a lower manhole 3a (see Figure 4) The tower 4 is mounted on top of'th coke chamber and is provided with a pair of vertical tracks 5 in the form of channel bars. A pipe guide 6 is mounted to have a vertical sliding movement along the tracks, supported by a cable passing through a block I, and wound about a drum 8 operable by a suitable source of power. The pipe guide 6 carries a vertical water feed pipe 9 concentrically with respect to the coke chamber. The water may be supplied thereto from surge tank l0, via pump ll, riser pipe l2, hinged connection l3, pipe l4, and a pair of pipes l5 and I6. The pipes l5 and I6 are hinged about a horizontal axis with respect to the pipe l4, as shown at H, and are similarly hinged with respect to the cross fitting I8. This permitsthe pipes l5 and Hi to swing towards and away. from the pipe 9 when the pipe guide 8 is moved vertically, allowing the pipe I4 to swing aboutits hinged connection l3. A swivel connection lBa permits the pipe 9 to rotate about For removing coke from the chamber the upper manhole cover is removed and replaced by a water feed pipe guide comprising a plate l9 adapted to be bolted to the chamber head manhole. Plate I9 is apertured to avoid pressure, and carries brackets 20 supporting a guide plate 2|. Plates l9 and 2| are centrally perforated to permit the water feed pipe 9' to extend downwardly into the chamber, and. to guide the pipe'in its vertical movement. A foot brake lever 22 carrying a brakeshoe 23, engageable with the water feed pipe 9 is attached to the brackets 20.
The pedestal 2 carries an angle bar 24 having holes 25 to receive pipe guides (not shown) for guiding an upwardly convex apron used as a con- 7 necting piece between coke cars to prevent spillage of coke on the tracks during loading operations, when the cars move into position. A water shedding shield 21 (see Figure 3) is adapted to be fastened to the bottom of the lower chamber manhole 311 by hooks 26; Rims a medial slot 28,
adapted to permit the water feed pipe to extend below it, as described below, and upturned flanges at its periphery and along the slot 28.
A trough 29 located below the pedestal 2 is provided to lead off water into a settling basin 30. A screen 3| is located across the settling basin 3!] which is connected to the surge tank In via conduits 32. A pair of concrete aprons 33 direct water into the trough 29. Rails 34 for the side dump coke cars pass beneath the coke chamber l.
A piercing or spear nozzle 35 (see Figure 7) provided with a constricted throat 36 and a flaring orifice 31 is adapted to be secured to the water feed pipe by means of an externally threaded boss 38, and is shaped to have a small external diameter, co-extensive with the exterior of the water feed pipe 9.
The reaming nozzle head (see Figures 8 and 9) comprises a hollow body portion 39 rotatably mounted by means of roller bearings, on a central pipe havinga threaded boss 40 adapted for connection to the water feed pipe. A plurality of elbows 4| are attached to the body 39 in communication therewith and with the feed pip 9, and carry nozzle tips 42 directed so as to cause water issuing therefrom to rotate the nozzle head to the nozzle head.
by the reaction of the water-on the elbows. One pair of oppositely disposed nozzles. is directed downwardly at an-angle of about 30 with the horizontal and of the other pair is directed upwardly at an angle of about 45 horizontal. A pair of scrapers 43 provided with sharp points is secured to the top of. the body 39.
The main nozzle head which carries the cutting nozzles (see Figures 10 to 12) comprises an upper and a lower section and is preferably non-rotatably connected to the feed pipe 9. The upper sec tion comprises a pipe 44, adapted to be threadedly connected at its upper end to the water feed pipe 9, and carries a flange plate 45, threadedly se cured at its lower end. Two curved pipes 46, in communication with the interior thereof, carry nozzles 41, and are shaped to direct a stream of water downwardly therefrom at an angle of about 30 with the horizontal, nozzle axes being skew with respect to the axis of the pipe 44, whereby the reaction of the water imparts a turning force The nozzle 41 as shown in Figure 11, comprises a tapering body portion 48 and an externally threaded coupling portion rearwardly thereof, having a cylindrical recess 49 shaped to retain a bushing 50 carrying axially extending straightening vanes 5|. It is important to design these nozzles and the nozzles 41a so as to produce a jet which will not substantially break up before striking the body of the coke, whereby the cutting action will be at a maximum, since my process is essentially one of cutting the coke, as distinguished from erosion.
It is also desirable to design the nozzle tips 42 and the nozzle 35 to avoid breaking up and scattering of the jet as much as possible.
The lower section comprises the vertical pipe 52 surmounted by a flange plate 53 providedwith bolts 54 for attachment to the flange plate 45. A -pair of nozzles 41a, constructed like nozzles 41, is connected to the lower end of the pipe 52 so as to swing upwardly about swivels 55. Chains 56 to two hours.
r .be used to carry off the water.
however, by shutting oi the water' supply r If desired, an overflow outlet pipe 59, providedwith a gate valve 58, may be connected to the coke chamber near the top. I
The nozzles, particularly the spear nozzle 35, are preferably made of case hardened steel since they are subjected to considerable handling abuse.
.Referring to Figure 13, a -modifled form of nozzle head suitable for combining the piercing and reaming operations is shown. It comprises a central pipe 60, provided with a threaded boss 6| adapted for attachment to the water feed pipe 9. An annular rotating head 62 is secured to the pipe 60 by means of roller bearings, and carries a plurality of nozzle tips 42a, similar to the tip 42 shown in Figure 9. The nozzle tips are inclined downwardly about 30 below the horizon-- tal, and supplied with water from the pipe-9 and through curved conduits 53, supported by cross flanges 64 which are attached to and rotatable with the head 62. A drill 65 is mounted beneath the cross flange 64. The cross flanges 64 are downwardly convex and their outer edges are shaped as cutting edges, preferably made of stellite alloy and ground.
The operation of removing coke according to this invention proceeds as follows:
The coke chamber is first cooled in any suitable manner, as by the introduction of steam for a period of from 15 to 30 minutes followed by the introduction of water over a period of 30 minutes This may be introduced through the regular connection or pressure conduits provided for this purpose. It is not necessary in this process to cool the coke chamber to the extent necessary in the cable method. The method of operation according to the preferred embodiment then comprises the following three steps:
First step (illustrated in Figure 4) The chamber is unheaded at the top and bottom and the water feed pipe guide secured to the upper manhole head 3. The pipe guide 6 is raised to the top of the tower and the spear nozzle 35 attached to the lower end of the pipe 9. This assembly is then lowered into the chamber and water under high pressure such as, for example, 1200 lbs. gauge measured at the pump, suppliedthereto,causing a high velocity jet of water to be directed downwardly. The rate of discharge may, for example, be 400 to 750 gallons per minute or higher, using a spear nozzle 8 inches long with a or V inch throat and a. or one inch orifice; The water pierces a verticalv hole through the coke of sufficient diameter to permit free movement of the feed pipe. During this operation the pipe is gradually lowered, being guided by plates l9 and 2|. In most cases, although the hole is pierced through-from the top, the water escapes through the lower manhole without flooding the chamber. particles of coke displaced by this operation are difiused into the main body of the coke bed. When extremely hard or asphaltic layers of coke are encountered and the flow of water therethrough is insufficient the overflow pipe 59 may In most cases,
momentarily the chamber may 'be drained out through the bottom. I When such abnormal strata of asphaltic or extremely hard coke are encountered it also may be necessary to raise the assembly a foot or two above the obstruction and permit it to drop, repeating this operation until the strata have been broken through, using the iliary hand operated hoist for this purpose.
To reduce the required height of the tower 4 the *ieed pipe 8 may comprise twoor more seetions,'successive sections being added when the pipe line 6 has reached its lowermost position at the bottom of the tracks 5.
The first step may also be effected by drilling, water being preferably introduced to wash out the loosened material. Alternatively, a hollow pipe may be mounted in the coke chamber prior to coking, and this may be withdrawn by means of a hoist, leaving a central hole.
7 Second step (illustrated in Figure 5) The object ofv the second step, which may sometimes be omitted, is to increase the size of the initial hole' toabout '18 to 24 inches in diameter in order that the nozzle head may be used in the last step without fouling the coke bed and may be regarded as a continuation of the cannulating operation described in the first step. Following the completion of the first step, the nozzle 35 extends through the lower manhole 3a and below the coke chamber. The water shedding shield 21 is placed beneath the coke chamber so as to cause the pipe 9 to extend through the slot 28 and the reaming nozzle head Zl is removed, and the pipe and nozzle are then raised through the chamber and full water pressure is applied, causing the nozzle head to rotate at a high speed, such as 1000 revolutions per' The second step may be carried out simultaneously with the first step, as by mounting the piercing nozzle on the reaming nozzle head to discharge in the direction of the scrapers 43, the water feed pipe 9 being in this arrangement attached to the opposite end of the body 39. Alternatively, the nozzle head shown in Figure 13 may be mounted on the feed pipe 9 from a position above the coke bed, and the water turned The fine,
on. The reaction ofthe water on the nozzle tips 42a will cause the head 62- to rotate at a high velocity, thereby causing the drill 65 and the edges of the flanges 64 to cut the coke. The water will wash away the disintegrated-coke, as described above. Since the flanges 64 extend radially beyond the termini of the nozzle tips 42a, the latter will move downwardly into the hole, and
enlarge it to the dimension required for the third step.
Third step (illustrated in. Figure 6) This is the final step during which the main I hoist cable and power driven drum 8, or an auxis attached in place of the nozzle 35. The shield either or both, as by attaching the main nozzle head to the bottom of the reaming nozzle head. In the preferred mode of operation, following the completion of the second step the reaming nozzle head is lowered to extend beneath the coke chamber, and the water sheddingeshield 21 is reattached. The main nozzle head is then attached to the water feed pipe in place of the reaming nozzle head. For the initial cutting, the lower section of the main nozzle head is disconnected and the blind flange 51 is attached to the flange plate 45, thereby closing the lower end of the pipe 44. The shield 21 is removed, the upper half of the assembly is raised into the chamber and jetting is started immediately after the nozzle is in position above the manhole neck. Due to the angular disposition of the nozzle, the assembly, including the water feed pipe, rotates under its own power, the rate of turning being preferably regulated by means of the foot brake 22-23 not to exceed about 2-4 revolutions per minute, whereby the jets assume a plurality of successive orientations. The rate of turning, however, depends upon the size of the chamber being cleaned, it being desirable to regulate the rotation so that one rotation will make a complete circular cut into the coke body. With the water pressure still the coke have been settled the partially clarified on, the assembly is raised about 6 or 7 inches and rotation continues. This procedure is followed until approximately 5 feet of coke have been removed from the bottom of the chamber. The water is then shut off, the assembly is lowered, water shedding shield reattached, theblind flange 51' is disconnectedand the lower section of the main nozzle head is coupled to the vertical pipe 44 by means of bolts 54. The shield 21 is removed,
, and complete assembly is then raised into the bot-. tom of the coke body, the nozzle 4111 being folded upwardly to permit passage through the manhole neck, and assuming the position shown in Figure 10 after having entered the coke chamber. The complete assembly is raised into the coke chamber to a position at which the frustro-conical surface of revolution defined by the axes of the nozzle 41' is just below the frusto-conical bottom of the coke body, as shown in Figure 6, full water pressure is applied and jetting restarted. The rate of water discharge may, for example, be 450 to 750 gallons per minute using nozzles 41 and 41a having inch orifices. The nozzles "a direct jets of water upwardly to impact on the chamber wall at the same height and preferably at. 90
' from the points of impact of the downwardly directed jets from the nozzles 41, although the jets from the nozzles 41a may be directed somewhat lower and to difierent orientations. The pro cedure from this point on is similar to that described in the second step, the water feed pipe and nozzle head being procedure. raised until all coke has/been completely removed from the coke chamber, and the rate of turning being regulated to about 2 to 4 revolutions per minute.
By way of example, it may be stated that the total pumping time for the three steps in removing coke from a chamber forty feet high and ten feet in' diameter, using the rates of fiow and nozzle sizes given above. is usuallybetween one and two and a half hours.
During the jetting operations, a dump car is water passes through a screen 3! which retains the finer particles of coke.
The nozzles disclosed in this specification are claimed in my continuation-impart application Serial No. 208,711. filed May 18, 1938, now Patent No. 2,217,360.
I claim as my invention:
1. A method of removing a body of coke from a vertical cylindrical reaction chamber which is open at the top and at the bottom, comprising the steps of cannulating the body of the coke substantially at the center thereof, enlarging the opening thus formed by means of a jet of. water directed outwardly therefrom in a plurality of successive orientations and at progressively difierent levels and disrupting the body of the coke by directing aasu-bstantially confined jet outwardly and a second jet upwardly and outwardly from an origin which is below the origin of the first jet, said disr'upting jets having a velocity sufficient to cut the body of coke to produce lumps, said'jets being directed in a plurality of successive orientations and a1; progressively higher levels.
2. A method for removing. a body of solid carbonaceous material from a reaction chamber comprising the steps of cannulating the body of said material, enlarging the opening thus formed and thereafter conducting a substantially confined stream of water outwardly from said en larged opening against said body, said stream striking said body at a velocity sufflcient to effect cutting the body to lumps, and removing said lumps.
3. A method for removing a body of solid carbonaceous material from a reaction chamber comprising cannulating the body of said material, conducting a first substantially confined stream of liquid outwardly from a source within said cannular opening and conducting a second stream of liquid from a second source within said cannular opening and spaced from said first source, said streams converging and striking said body with *a velocity suflicient to effect cutting the body into lumps, and removing said lumps.
4. A method for 'removing a body of solid carbonaceous material from a reaction chamber comprising conducting at least two converging streams of liquid against said body, said streams striking said body at velocities suflicient to effect cutting said body to lumps, and the direction of said streams relative to each other being such that upon removal of said body from said chamber they meet on the chamber wall.
5. The method of claim 4 in which the direction of said streams is. such that they meet on the chamber wall at an angle of about WILLIAM FREDERICK COURT.
US191685A 1938-02-21 1938-02-21 Hydraulic disruption of solids Expired - Lifetime US2245554A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US191685A US2245554A (en) 1938-02-21 1938-02-21 Hydraulic disruption of solids

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US191685A US2245554A (en) 1938-02-21 1938-02-21 Hydraulic disruption of solids

Publications (1)

Publication Number Publication Date
US2245554A true US2245554A (en) 1941-06-17

Family

ID=22706515

Family Applications (1)

Application Number Title Priority Date Filing Date
US191685A Expired - Lifetime US2245554A (en) 1938-02-21 1938-02-21 Hydraulic disruption of solids

Country Status (1)

Country Link
US (1) US2245554A (en)

Cited By (46)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2669531A (en) * 1947-12-22 1954-02-16 Universal Oil Prod Co Removal of spent polymerization catalyst
US2735794A (en) * 1956-02-21 fletcher
US2761160A (en) * 1952-08-16 1956-09-04 Standard Oil Co Coke removal drilling rig
US3190449A (en) * 1956-06-11 1965-06-22 Hans Mueller Filter apparatus
US3358935A (en) * 1965-06-03 1967-12-19 Byron Jackson Inc Apparatus for removing caked material from a container
US3412012A (en) * 1967-02-17 1968-11-19 Union Oil Co Process for decoking a delayed coker
US3440096A (en) * 1962-07-16 1969-04-22 Byron Jackson Inc Method of removing solid propellant
US3535161A (en) * 1969-01-27 1970-10-20 Robert J Gutrich Clearing sewer lines and the like
US3542593A (en) * 1968-04-12 1970-11-24 Sicks Rainier Brewing Co Method and apparatus for cleaning a bedded residue from the floor of a tank
US3690730A (en) * 1971-02-17 1972-09-12 Mitsui Shipbuilding Eng Apparatus for unloading pulverized material in tank
US3836434A (en) * 1972-03-27 1974-09-17 Great Lakes Carbon Corp Process for decoking a delayed coker
US3880359A (en) * 1972-03-27 1975-04-29 Great Lakes Carbon Corp Apparatus for decoking a delayed coker
US4343656A (en) * 1979-04-24 1982-08-10 Tuchenhagen Otto A P Process for monitoring tank inside cleaners driven by cleansers
US4626320A (en) * 1984-02-22 1986-12-02 Conoco Inc. Method for automated de-coking
US4738399A (en) * 1985-11-25 1988-04-19 Dresser Industries, Inc. Decoking tool
US4828651A (en) * 1987-10-29 1989-05-09 Institut Francais Du Petrole Decoking process and device
US4902403A (en) * 1987-10-30 1990-02-20 Ashland Oil, Inc. Heat treatment of exchangers to remove coke
US4904368A (en) * 1987-10-30 1990-02-27 Ashland Oil, Inc. Method for removal of furfural coke from metal surfaces
US4923021A (en) * 1988-12-30 1990-05-08 Conoco Inc. Combination bit for coking oven
US4959126A (en) * 1987-05-25 1990-09-25 Luoyang Petrochemical Engineering Corporation Sinopec (Lpec) Process for decoking a delayed coker
US5092963A (en) * 1989-02-21 1992-03-03 Atlantic Richfield Company Automated top head and stem guide assembly for coking drums
US5259930A (en) * 1989-02-21 1993-11-09 Atlantic Richfield Company Method for operation of automated top head and stem guide assembly for coking drums
US6619571B1 (en) * 1995-06-30 2003-09-16 Henkel Kommanditgesellschaft Auf Aktien Method for emptying fixed-bed reactors
US6652714B1 (en) 1999-05-14 2003-11-25 Foster Wheeler Corporation Drill stem stabilizer
US20050092592A1 (en) * 2002-09-05 2005-05-05 Lah Ruben F. Systems and methods for deheading a coke drum
US20050236188A1 (en) * 2004-04-22 2005-10-27 Lah Ruben F Systems and methods for remotely determining and changing cutting modes during decoking
US20060081456A1 (en) * 2004-04-22 2006-04-20 Lah Ruben F Remotely controlled decoking tool used in coke cutting operations
US20070034496A1 (en) * 2001-03-12 2007-02-15 Lah Ruben F Delayed coker isolation valve systems
US20070084714A1 (en) * 2001-03-12 2007-04-19 Lah Ruben F Valve system and method for unheading a coke drum
US20070251576A1 (en) * 2006-03-09 2007-11-01 Lah Ruben F Valve Body and Condensate Holding Tank Flushing Systems and Methods
US7530574B2 (en) 2003-04-11 2009-05-12 Curtiss-Wright Flow Control Corporation Dynamic flange seal and sealing system
US20090183980A1 (en) * 2008-01-23 2009-07-23 Lah Ruben F Coke Drum Skirt
US20090200152A1 (en) * 2004-04-22 2009-08-13 Lah Ruben F Remotely Controlled Decoking Tool Used in Coke Cutting Operations
US20090214394A1 (en) * 2003-02-21 2009-08-27 Lah Ruben F Center feed system
US20090236212A1 (en) * 2008-01-23 2009-09-24 Lah Ruben F Linked coke drum support
US7632381B2 (en) 2001-03-12 2009-12-15 Curtiss-Wright Flow Control Corporation Systems for providing continuous containment of delayed coker unit operations
US20100058813A1 (en) * 2008-03-26 2010-03-11 Lg Electronics Inc. Laundry treating apparatus
US20100111625A1 (en) * 2007-04-25 2010-05-06 Ruhrpumpen Gmbh Arrangement for guiding a drill stem of a decoking tool
US7819009B2 (en) 2006-02-28 2010-10-26 Frederic Borah Vibration Monitoring System
US20110036381A1 (en) * 2009-08-13 2011-02-17 Michael Shawn Zilai Articulating and rotary cleaning nozzle spray system and method
US8123197B2 (en) 2001-03-12 2012-02-28 Curtiss-Wright Flow Control Corporation Ethylene production isolation valve systems
US8459608B2 (en) 2009-07-31 2013-06-11 Curtiss-Wright Flow Control Corporation Seat and valve systems for use in delayed coker system
US8545680B2 (en) 2009-02-11 2013-10-01 Curtiss-Wright Flow Control Corporation Center feed system
US8679299B2 (en) 2001-03-12 2014-03-25 Curtiss-Wright Flow Control Corporation Coke drum bottom de-heading system
US8851451B2 (en) 2009-03-23 2014-10-07 Curtiss-Wright Flow Control Corporation Non-rising electric actuated valve operator
WO2017112799A1 (en) 2015-12-22 2017-06-29 Bay Worx Laboratories, Llc Multi-axis articulating and rotary spray system and method

Cited By (71)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2735794A (en) * 1956-02-21 fletcher
US2669531A (en) * 1947-12-22 1954-02-16 Universal Oil Prod Co Removal of spent polymerization catalyst
US2761160A (en) * 1952-08-16 1956-09-04 Standard Oil Co Coke removal drilling rig
US3190449A (en) * 1956-06-11 1965-06-22 Hans Mueller Filter apparatus
US3440096A (en) * 1962-07-16 1969-04-22 Byron Jackson Inc Method of removing solid propellant
US3358935A (en) * 1965-06-03 1967-12-19 Byron Jackson Inc Apparatus for removing caked material from a container
US3412012A (en) * 1967-02-17 1968-11-19 Union Oil Co Process for decoking a delayed coker
US3542593A (en) * 1968-04-12 1970-11-24 Sicks Rainier Brewing Co Method and apparatus for cleaning a bedded residue from the floor of a tank
US3535161A (en) * 1969-01-27 1970-10-20 Robert J Gutrich Clearing sewer lines and the like
US3690730A (en) * 1971-02-17 1972-09-12 Mitsui Shipbuilding Eng Apparatus for unloading pulverized material in tank
US3836434A (en) * 1972-03-27 1974-09-17 Great Lakes Carbon Corp Process for decoking a delayed coker
US3880359A (en) * 1972-03-27 1975-04-29 Great Lakes Carbon Corp Apparatus for decoking a delayed coker
US4343656A (en) * 1979-04-24 1982-08-10 Tuchenhagen Otto A P Process for monitoring tank inside cleaners driven by cleansers
US4626320A (en) * 1984-02-22 1986-12-02 Conoco Inc. Method for automated de-coking
US4738399A (en) * 1985-11-25 1988-04-19 Dresser Industries, Inc. Decoking tool
US4959126A (en) * 1987-05-25 1990-09-25 Luoyang Petrochemical Engineering Corporation Sinopec (Lpec) Process for decoking a delayed coker
US5076893A (en) * 1987-05-25 1991-12-31 Luoyang Petrochemical Engineering Corporation Sinopec (Lpec) Apparatus for decoking a delayed coker using a flexible pipe
US4828651A (en) * 1987-10-29 1989-05-09 Institut Francais Du Petrole Decoking process and device
US4902403A (en) * 1987-10-30 1990-02-20 Ashland Oil, Inc. Heat treatment of exchangers to remove coke
US4904368A (en) * 1987-10-30 1990-02-27 Ashland Oil, Inc. Method for removal of furfural coke from metal surfaces
US4923021A (en) * 1988-12-30 1990-05-08 Conoco Inc. Combination bit for coking oven
US5092963A (en) * 1989-02-21 1992-03-03 Atlantic Richfield Company Automated top head and stem guide assembly for coking drums
US5259930A (en) * 1989-02-21 1993-11-09 Atlantic Richfield Company Method for operation of automated top head and stem guide assembly for coking drums
US6619571B1 (en) * 1995-06-30 2003-09-16 Henkel Kommanditgesellschaft Auf Aktien Method for emptying fixed-bed reactors
US6652714B1 (en) 1999-05-14 2003-11-25 Foster Wheeler Corporation Drill stem stabilizer
US8679299B2 (en) 2001-03-12 2014-03-25 Curtiss-Wright Flow Control Corporation Coke drum bottom de-heading system
US8512525B2 (en) 2001-03-12 2013-08-20 Curtiss-Wright Flow Control Corporation Valve system and method for unheading a coke drum
US8282074B2 (en) 2001-03-12 2012-10-09 Curtiss-Wright Flow Control Corporation Delayed coker isolation valve systems
US8123197B2 (en) 2001-03-12 2012-02-28 Curtiss-Wright Flow Control Corporation Ethylene production isolation valve systems
US7632381B2 (en) 2001-03-12 2009-12-15 Curtiss-Wright Flow Control Corporation Systems for providing continuous containment of delayed coker unit operations
US20070034496A1 (en) * 2001-03-12 2007-02-15 Lah Ruben F Delayed coker isolation valve systems
US20070084714A1 (en) * 2001-03-12 2007-04-19 Lah Ruben F Valve system and method for unheading a coke drum
US7578907B2 (en) 2001-03-12 2009-08-25 Curtiss-Wright Flow Control Corporation Valve system for unheading a coke drum
US7459063B2 (en) 2002-09-05 2008-12-02 Curtiss-Wright Flow Control Corporation Systems and methods for deheading a coke drum
US20050092592A1 (en) * 2002-09-05 2005-05-05 Lah Ruben F. Systems and methods for deheading a coke drum
US7399384B2 (en) 2002-09-05 2008-07-15 Curtiss-Wright Flow Control Corporation Coke drum bottom throttling valve and system
US20060175188A1 (en) * 2002-09-05 2006-08-10 Lah Ruben F Coke drum bottom throttling valve and system
US20090214394A1 (en) * 2003-02-21 2009-08-27 Lah Ruben F Center feed system
US8702911B2 (en) 2003-02-21 2014-04-22 Curtiss-Wright Flow Control Corporation Center feed system
US7530574B2 (en) 2003-04-11 2009-05-12 Curtiss-Wright Flow Control Corporation Dynamic flange seal and sealing system
US7682490B2 (en) 2003-04-11 2010-03-23 Curtiss-Wright Flow Control Corporation Dynamic flange seal and sealing system
US20050236188A1 (en) * 2004-04-22 2005-10-27 Lah Ruben F Systems and methods for remotely determining and changing cutting modes during decoking
US8679298B2 (en) 2004-04-22 2014-03-25 Curtiss-Wright Flow Control Corporation Remotely controlled decoking tool used in coke cutting operations
US7117959B2 (en) 2004-04-22 2006-10-10 Curtiss-Wright Flow Control Corporation Systems and methods for remotely determining and changing cutting modes during decoking
US7473337B2 (en) 2004-04-22 2009-01-06 Curtiss-Wright Flow Control Corporation Remotely controlled decoking tool used in coke cutting operations
US20070215518A1 (en) * 2004-04-22 2007-09-20 Lah Ruben F Systems and Methods for Remotely Determining and Changing Cutting Modes During Decoking
US20060081456A1 (en) * 2004-04-22 2006-04-20 Lah Ruben F Remotely controlled decoking tool used in coke cutting operations
US8197644B2 (en) 2004-04-22 2012-06-12 Curtiss-Wright Flow Control Corporation Remotely controlled decoking tool used in coke cutting operations
US7820014B2 (en) 2004-04-22 2010-10-26 Lah Ruben F Systems and methods for remotely determining and changing cutting modes during decoking
US20090200152A1 (en) * 2004-04-22 2009-08-13 Lah Ruben F Remotely Controlled Decoking Tool Used in Coke Cutting Operations
US7819009B2 (en) 2006-02-28 2010-10-26 Frederic Borah Vibration Monitoring System
US20070251576A1 (en) * 2006-03-09 2007-11-01 Lah Ruben F Valve Body and Condensate Holding Tank Flushing Systems and Methods
US7931044B2 (en) 2006-03-09 2011-04-26 Curtiss-Wright Flow Control Corporation Valve body and condensate holding tank flushing systems and methods
US8382960B2 (en) * 2007-04-25 2013-02-26 Ruhrpumpen Gmbh Arrangement for guiding a drill stem of a decoking tool
US20100111625A1 (en) * 2007-04-25 2010-05-06 Ruhrpumpen Gmbh Arrangement for guiding a drill stem of a decoking tool
US7871500B2 (en) 2008-01-23 2011-01-18 Curtiss-Wright Flow Control Corporation Coke drum skirt
US20090236212A1 (en) * 2008-01-23 2009-09-24 Lah Ruben F Linked coke drum support
US8440057B2 (en) 2008-01-23 2013-05-14 Curtiss-Wright Flow Control Corporation Linked coke drum support
US20090183980A1 (en) * 2008-01-23 2009-07-23 Lah Ruben F Coke Drum Skirt
US8146390B2 (en) * 2008-03-26 2012-04-03 Lg Electronics Inc. Laundry treating apparatus
US20100058813A1 (en) * 2008-03-26 2010-03-11 Lg Electronics Inc. Laundry treating apparatus
US8545680B2 (en) 2009-02-11 2013-10-01 Curtiss-Wright Flow Control Corporation Center feed system
US8851451B2 (en) 2009-03-23 2014-10-07 Curtiss-Wright Flow Control Corporation Non-rising electric actuated valve operator
US8459608B2 (en) 2009-07-31 2013-06-11 Curtiss-Wright Flow Control Corporation Seat and valve systems for use in delayed coker system
US20110036381A1 (en) * 2009-08-13 2011-02-17 Michael Shawn Zilai Articulating and rotary cleaning nozzle spray system and method
US8181890B2 (en) 2009-08-13 2012-05-22 Nanoworx, LLC Articulating and rotary cleaning nozzle spray system and method
WO2011019492A1 (en) 2009-08-13 2011-02-17 Michael Shawn Zilai Articulating and rotary cleaning nozzle spray system and method
WO2017112799A1 (en) 2015-12-22 2017-06-29 Bay Worx Laboratories, Llc Multi-axis articulating and rotary spray system and method
US10449563B2 (en) 2015-12-22 2019-10-22 Bay Worx Laboratories, Llc Multi-axis articulating and rotary spray system and method
EP3738679A1 (en) 2015-12-22 2020-11-18 Bay Worx Laboratories, LLC Multi-axis articulating and rotary spray system
US11648578B2 (en) 2015-12-22 2023-05-16 Trinity Bay Worx, Llc Multi-axis articulating and rotary spray system and method

Similar Documents

Publication Publication Date Title
US2245554A (en) Hydraulic disruption of solids
US2218130A (en) Hydraulic disruption of solids
US3081828A (en) Method and apparatus for producing cuts within a bore hole
US2396290A (en) Sludge pump
US2245575A (en) Hydraulic disruption of solids
US4828625A (en) Apparatus and method for removal of sludge from tanks
US2786651A (en) Apparatus for circulating drilling fluid in rotary drill
JPH08230B2 (en) Method for recovering crude oil or refined product from sludge-enriched densely precipitated crude oil or refined product and apparatus for carrying out the method
US3416614A (en) Hydraulic jet drilling method using ferrous abrasives
US20120312539A1 (en) Apparatus and method for water well cleaning
US4140346A (en) Cavity mining minerals from subsurface deposit
US2217360A (en) Hydraulic disruption of solids
US2306926A (en) Material handling method and apparatus
US1975162A (en) Method for placing divided materials at relatively inaccessible points
US2294719A (en) Hydraulic disruption of solids
JP2001518837A (en) Method and apparatus for cleaning a conduit having a descending series
US4642138A (en) Method of preventing deposition of sludge in liquid tank and of removing deposited sludge
US2236895A (en) Hydraulic disruption of solids
US2302299A (en) Hydraulic disruption of solids
US2096174A (en) Mud conditioning apparatus
US1676389A (en) Method of cleaning soaking drums
JP3338960B2 (en) Well drilling water recovery method and equipment
EP1516672B1 (en) Method and apparatus for separating of organic from inorganic material
JP2534970B2 (en) Ground improvement method by high-pressure jet stirring
US5473793A (en) Method and apparatus for rejuvenating a drainfield or dry well