- US20240287769A1 US20240287769A1 US18/572,517 US202218572517A US2024287769A1 US 20240287769 A1 US20240287769 A1 US 20240287769A1 US 202218572517 A US202218572517 A US 202218572517A US 2024287769 A1 US2024287769 A1 US 2024287769A1
- Authority
- US
- United States
- Prior art keywords
- amount
- bucket
- earth
- sand
- work machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000002159 abnormal effect Effects 0.000 claims abstract description 46
- 239000004576 sand Substances 0.000 description 107
- 238000009412 basement excavation Methods 0.000 description 26
- 238000010586 diagram Methods 0.000 description 8
- 238000004891 communication Methods 0.000 description 6
- 238000001514 detection method Methods 0.000 description 6
- 238000007599 discharging Methods 0.000 description 5
- 230000002123 temporal effect Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 230000001133 acceleration Effects 0.000 description 3
- 239000012141 concentrate Substances 0.000 description 3
- 230000007423 decrease Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000003384 imaging method Methods 0.000 description 1
- 239000002440 industrial waste Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2025—Particular purposes of control systems not otherwise provided for
- E02F9/205—Remotely operated machines, e.g. unmanned vehicles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/30—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
- E02F3/32—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom working downwardly and towards the machine, e.g. with backhoes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/36—Component parts
- E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
- E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
- E02F3/435—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/36—Component parts
- E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
- E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
- E02F3/435—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
- E02F3/437—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/26—Indicating devices
- E02F9/267—Diagnosing or detecting failure of vehicles
Definitions
- the present invention relates to a work machine system for automatic operation of a work machine.
- Patent Literature 1 discloses a work machine that calculates a load of a work object held by a tip attachment based on thrust information about an actuator and estimates whether a load has slipped during transportation of the work object.
- the amount of the work object held by the tip attachment is smaller than a target value at a time point when the tip attachment releases the work object.
- a similar situation may occur in a case where the amount of the work object held by the tip attachment is smaller than the target value when the tip attachment holds the work object, or in a case where a sufficient amount of the work object cannot be held by the tip attachment because the amount of the work object to be held by the tip attachment is not sufficient.
- Patent Literature 1 JP 2019-157362 A
- An object of the present invention is to provide a work machine system capable of specifying a factor that makes an amount of a work object held by a tip attachment smaller than a target value.
- a work machine system of the present invention includes a lower travelling body, an upper slewing body slewably attached to an upper portion of the lower travelling body, an attachment that has a tip attachment capable of holding a work object and is rotatably attached to the upper slewing body, and a controller.
- the controller controls the upper slewing body and the attachment so that the upper slewing body and the attachment perform a series of operations having a plurality of operation phases, detects an amount of the work object held by the tip attachment, sets a target amount that is a target of the amount of the work object, and specifies, as an abnormal phase, an operation phase in which an amount of the work object held by the tip attachment is smaller than the target amount.
- the upper slewing body and the attachment are controlled so that the upper slewing body and the attachment perform a series of operations having a plurality of operation phases. Then, an operation phase in which the amount of the work object held by the tip attachment is smaller than the target amount is specified as an abnormal phase. Therefore, the operation phase in which the amount of the work object held by the tip attachment is smaller than the target value can be specified from the plurality of operation phases. This makes it possible to specify a factor that makes the amount of the work object held by the tip attachment smaller than the target value.
- the slewing is specified as the abnormal phase.
- the excavation amount of the earth and sand is smaller than a target amount, the excavation is specified as the abnormal phase.
- FIG. 1 is a side view of a work machine.
- FIG. 2 is a circuit diagram of the work machine and a cockpit.
- FIG. 3 is a diagram illustrating a temporal change in an amount of earth and sand held by a bucket, and is a diagram in a case where excavation is an abnormal phase.
- FIG. 4 is a diagram illustrating a temporal change in the amount of earth and sand held by the bucket, and is a diagram in a case where slewing is an abnormal phase.
- FIG. 5 is a diagram illustrating a temporal change in the amount of earth and sand held by the bucket, and is a diagram in a case where the amount of earth and sand to be held by the bucket is not sufficient.
- a work machine system is a system for automatic operation of a work machine.
- the work machine system includes a work machine 20 and a cockpit 71 .
- the work machine 20 is a machine that performs work with an attachment 30 , and is, for example, a hydraulic excavator.
- the work machine 20 has a machine main body 24 including a lower travelling body 21 and an upper slewing body 22 , the attachment 30 , and cylinders 40 .
- the lower travelling body 21 is a portion that causes the work machine 20 to travel, and includes, for example, a crawler.
- the upper slewing body 22 is slewably attached to an upper part of the lower travelling body 21 via a slewing device 25 .
- a cab (driver's cabin) 23 is provided at a front part of the upper slewing body 22 .
- the attachment 30 is attached to the upper slewing body 22 to be rotatable about a slewing axis extending in an up-and-down direction.
- the attachment 30 includes a boom 31 , an arm 32 , and a bucket 33 .
- the boom 31 is attached to the upper slewing body 22 to be rotatable in the up-and-down direction (capable of rising and contracting).
- the arm 32 is attached to the boom 31 to be rotatable in the up-and-down direction.
- the bucket 33 is a tip attachment which is a tip portion of the attachment 30 , and can hold earth and sand (work object).
- the bucket 33 is attached to the arm 32 to be rotatable in a front-and-rear direction.
- the bucket 33 is a portion that performs work including excavation, leveling, and scooping of earth and sand.
- the work object that is held by the bucket 33 is not limited to earth and sand, and may be a stone or a waste (industrial waste or the like).
- the tip attachment is not limited to the bucket 33 , and may be a grapple, a lifting magnet, or the like.
- the cylinders 40 can hydraulically turn the attachment 30 .
- the cylinders 40 are hydraulic telescopic cylinders.
- the cylinders 40 include a boom cylinder 41 , an arm cylinder 42 , and a bucket cylinder 43 .
- the boom cylinder 41 rotationally moves the boom 31 with respect to the upper slewing body 22 .
- the boom cylinder 41 has a base end portion rotatably attached to the upper slewing body 22 .
- the boom cylinder 41 has a tip portion rotatably attached to the boom 31 .
- the arm cylinder 42 rotationally moves the arm 32 with respect to the boom 31 .
- the arm cylinder 42 has a base end portion rotatably attached to the boom 31 .
- the arm cylinder 42 has a tip portion rotatably attached to the arm 32 .
- the bucket cylinder 43 rotationally moves the bucket 33 with respect to the arm 32 .
- the bucket cylinder 43 has a base end portion rotatably attached to the arm 32 .
- the bucket cylinder 43 has a tip portion rotatably attached to a link member 34 rotatably attached to the bucket 33 .
- the work machine 20 further includes an angle sensor 52 , and inclination angle sensors 60 .
- the angle sensor 52 detects a slewing angle of the upper slewing body 22 with respect to the lower travelling body 21 .
- the angle sensor 52 is, for example, an encoder, a resolver, or a gyro sensor.
- the slewing angle of the upper slewing body 22 at a time when a front side of the upper slewing body 22 coincides with a front side of the lower travelling body 21 is 0°.
- the inclination angle sensors 60 detect an orientation of the attachment 30 .
- the inclination angle sensors 60 include a boom inclination angle sensor 61 , an arm inclination angle sensor 62 , and a bucket inclination angle sensor 63 .
- the boom inclination angle sensor 61 is attached to the boom 31 and detects an orientation of the boom 31 .
- the boom inclination angle sensor 61 is a sensor that acquires an inclination angle of the boom 31 with respect to a horizontal line, and is, for example, an inclination sensor (acceleration sensor) or the like.
- the boom inclination angle sensor 61 may be a rotation angle sensor that detects a rotation angle of a boom foot pin (a base end of the boom) or a stroke sensor that detects a stroke amount of the boom cylinder 41 .
- the arm inclination angle sensor 62 is attached to the arm 32 to detect an orientation of the arm 32 .
- the arm inclination angle sensor 62 is a sensor that acquires an inclination angle of the arm 32 with respect to the horizontal line, and is, for example, an inclination sensor (acceleration sensor) or the like.
- the arm inclination angle sensor 62 may be a rotation angle sensor that detects a rotation angle of an arm connection pin (a base end of the arm) or a stroke sensor that detects a stroke amount of the arm cylinder 42 .
- the bucket inclination angle sensor 63 is attached to the link member 34 to detect an orientation of the bucket 33 .
- the bucket inclination angle sensor 63 is a sensor that acquires an inclination angle of the bucket 33 with respect to the horizontal line, and is, for example, an inclination sensor (acceleration sensor) or the like.
- the bucket inclination angle sensor 63 may be a rotation angle sensor that detects a rotation angle of a bucket connection pin (a base end of the bucket) or a stroke sensor that detects a stroke amount of the bucket cylinder 43 .
- the work machine 20 further includes a Light Detection and Ranging or Laser Imaging Detection and Ranging (LIDAR) 55 .
- the LiDAR 55 is attached to the boom 31 , but may be attached to the upper slewing body 22 .
- the LiDAR 55 acquires point cloud data indicating the distance from the position where the LiDAR 55 is attached to the earth and sand of the bucket 33 .
- a stereo camera, a time of flight (TOF) sensor, or the like may be used instead of the LIDAR 55 .
- the operator remotely teaches an operation to such a work machine 20 from the cockpit 71 installed at a place distant from the work machine 20 .
- the work machine 20 performs automatic operation based on the taught work content.
- the work machine system includes a controller.
- the controller of the work machine system includes control means, amount detection means, target amount setting means, specifying means, and notification means.
- the controller of the work machine system includes a work machine side controller 11 included in the work machine 20 and a cockpit side controller 72 included in the cockpit 71 .
- the work machine 20 includes the work machine side controller 11 , a work machine side communication device 12 , and a storage device 13 .
- the controller 11 receives information about a slewing angle (orientation) of the upper slewing body 22 with respect to the lower travelling body 21 , the slewing angle being detected by the angle sensor 52 . Further, the controller 11 receives information about the orientation of the boom 31 , the orientation being detected by the boom inclination angle sensor 61 . The controller 11 further receives information about the orientation of the arm 32 , the orientation being detected by the arm inclination angle sensor 62 . The controller 11 further receives information about the orientation of the bucket 33 , the orientation being detected by the bucket inclination angle sensor 63 .
- controller 11 receives the point cloud data acquired by the LiDAR 55 .
- the controller 11 operates the slewing device 25 and the attachment 30 based on the work content taught from the cockpit 71 .
- the work machine side communication device 12 is communicable with a cockpit side communication device 74 , to be described later, of the cockpit 71 .
- the storage device 13 stores the work content taught remotely from the cockpit 71 .
- the cockpit 71 includes the cockpit side controller 72 , an operation device 73 , the cockpit side communication device 74 , and a display 75 .
- the operation device 73 includes a device necessary for remotely operating the work machine 20 , such as an operation lever and an operation button.
- the cockpit side communication device 74 can communicate with the work machine side communication device 12 of the work machine 20 .
- the work machine 20 When teaching is performed from the cockpit 71 , the work machine 20 is set to a teaching mode by a remote operation from the cockpit 71 .
- the operator remotely operates the work machine 20 by operating the operation device 73 .
- a landscape through a vehicle window (landscape outside the window) imaged by a camera provided in the cab 23 of the work machine 20 is displayed on the display 75 .
- the operation content by the remote operation is stored in the storage device 13 .
- the work machine 20 is set to an automatic operation mode by a remote operation from the cockpit 71 .
- the work machine 20 When the work machine 20 is set to the automatic operation mode, the work machine 20 performs an automatic operation. That is, the controller 11 of the work machine 20 controls the operations of the upper slewing body 22 and the attachment 30 based on the taught work content (the work content stored in the storage device 13 ) and automatically operates the work machine 20 .
- the content of the automatic operation performed by the work machine 20 is to repeat an operation for excavating earth and sand from an earth and sand pit (not illustrated) with the bucket 33 , slewing the upper slewing body 22 toward a dump truck (not illustrated) while holding the earth and sand, discharging the earth and sand to a loading platform (not illustrated) of the dump truck, and then slewing the upper slewing body 22 toward the earth and sand pit.
- a series of operations by the automatic operation has a plurality of operation phases.
- the plurality of operation phases includes excavation, scooping, lifting and slewing, and discharging of earth and sand.
- the controller 11 controls the upper slewing body 22 and the attachment 30 so that the upper slewing body 22 and the attachment 30 perform the series of operations having the plurality of operation phases.
- the controller 11 detects the amount of earth and sand held by the bucket 33 . Specifically, for example, the controller 11 detects the shape of the earth and sand in the bucket 33 based on the point cloud data acquired by the LiDAR 55 . The controller 11 then calculates the amount of the earth and sand in the bucket 33 based on the shape of the earth and sand in the bucket 33 .
- the method for detecting the amount of the earth and sand (the amount of the work object) by the controller 11 is not limited to the above specific example.
- the controller 11 may detect the amount of earth and sand in the bucket 33 using a measurement result by a pressure sensor, not illustrated, that measures the pressure of the boom cylinder 41 .
- the controller 11 sets a target amount that is a target of the amount of earth and sand.
- the target amount is set via the cockpit 71 during teaching.
- the set target amount is stored in the storage device 13 .
- the controller 11 specifies, as an abnormal phase, an operation phase in which an amount of earth and sand held by the bucket 33 is smaller than the target amount.
- the controller 11 specifies the abnormal phase based on whether each of the amount of earth and sand held by the bucket 33 at the start point of the operation phase and the amount of earth and sand held by the bucket 33 at the end point of the operation phase is smaller than the target amount.
- the controller 11 determines whether the amount of earth and sand held by the bucket 33 at the start point of the operation phase is smaller than the target amount, determines whether the amount of earth and sand held by the bucket 33 at the end point of the operation phase is smaller than the target amount, and specifies the abnormal phase based on these determination results.
- FIGS. 3 and 4 illustrate temporal changes in the amount of earth and sand held by the bucket 33 in each operation phase of excavation, scooping, and lifting and slewing.
- the amount of earth and sand held by the bucket 33 increases from the start point toward the end point of the operation phase of excavation.
- the amount of earth and sand held by the bucket 33 at the end point of the excavation operation phase is smaller than the target amount indicated by a broken line.
- the amounts of earth and sand held by the bucket 33 at the start point and the end point of the excavation operation phase are smaller than the target amount, presence of a problem in the excavation operation is specified.
- the amount of earth and sand held by the bucket 33 at the end point of the slewing operation phase is smaller than the target amount even if the amount of earth and sand held by the bucket 33 at the start point of the slewing operation phase is equal to or greater than the target amount indicated by a broken line. In this case, occurrence of load slippage during the slewing is specified.
- the controller 11 may determine whether not only the amount of earth and sand held by the bucket 33 at the start point of the operation phase and the amount of earth and sand held by the bucket 33 at the end point of the operation phase but also the amount of earth and sand held by the bucket 33 at an intermediate point between the start point and the end point is smaller than the target amount. That is, the controller 11 may specify the abnormal phase based on whether each of the amount of earth and sand held by the bucket 33 at the start point of the operation phase, the amount of earth and sand held by the bucket 33 at the end point of the operation phase, and the amount of earth and sand held by the bucket 33 at the intermediate point between the start point and the end point is smaller than the target amount.
- the controller 11 may determine whether the amount of earth and sand held by the bucket 33 at the start point of the operation phase is smaller than the target amount, determine whether the amount of earth and sand held by the bucket 33 at the intermediate point of the operation phase is smaller than the target amount, determine whether the amount of earth and sand held by the bucket 33 at the end point of the operation phase is smaller than the target amount, and specify the abnormal phase based on these determination results.
- FIG. 5 also illustrates a temporal change in the amount of earth and sand held by the bucket 33 in each operation phase of excavation, scooping, and lifting and slewing.
- the operation phase is excavation
- the amount of earth and sand held by the bucket 33 at the end point of the excavation operation phase is smaller than the target amount, presence of a problem in the excavation operation is specified.
- the amount of earth and sand held by the bucket 33 at the intermediate point of the excavation operation phase is smaller than the target amount, and no change occurs in the amount of earth and sand held by the bucket 33 at the intermediate point and the end point of the excavation operation phase, the amount of earth and sand to be held by the bucket 33 in the earth and sand pit is not sufficient rather than there is something wrong in the excavation operation. Therefore, it is possible to specify a factor that a sufficient amount of earth and sand cannot be held in the bucket 33 .
- the timing or position of each of the start point, the intermediate point, and the end point of the operation phase may be stored in the storage device 13 at the time of teaching, for example.
- the controller 11 may determine whether the amount of earth and sand at the stored start point of the operation phase is smaller than the target amount, determine whether the amount of earth and sand at the stored intermediate point of the operation phase is smaller than the target amount, and determine whether the amount of earth and sand at the stored end point is smaller than the target amount.
- the operator may designate the timings of the start point, the intermediate point, and the end point of the operation phase using an input device, not illustrated.
- the controller 11 may determine whether the amount of earth and sand at the designated start point of the operation phase is smaller than the target amount, determine whether the amount of earth and sand at the designated intermediate point of the operation phase is smaller than the target amount, and determine whether the amount of earth and sand at the designated end point is smaller than the target amount.
- the timing or position of each of the start point, the intermediate point, and the end point of the operation phase may be determined by a method other than the above two specific examples.
- the operation phase in which the amount of earth and sand held by the bucket 33 is smaller than the target amount is specified as the abnormal phase. Therefore, an operation phase in which the amount of earth and sand held by the bucket 33 is smaller than the target value can be specified among the plurality of operation phases. This makes it possible to specify a factor that makes the amount of earth and sand held by the bucket 33 smaller than the target value. For example, as illustrated in FIG. 4 , in a case where load slippage occurs during the slewing and the amount of earth and sand becomes smaller than the target amount, the slewing is specified as the abnormal phase. Further, as illustrated in FIG. 3 , in a case where the excavation amount of the earth and sand is smaller than the target amount, the excavation is specified as the abnormal phase.
- the abnormal phase is specified based on whether each of the amount of earth and sand held by the bucket 33 at the start point of the operation phase and the amount of earth and sand held by the bucket 33 at the end point of the operation phase is smaller than the target amount.
- This makes it possible to suitably specify a factor that makes the amount of earth and sand held by the bucket 33 smaller than the target value. For example, in a case where the amount of earth and sand held by the bucket 33 at the start point of a certain operation phase is equal to or greater than the target amount and the amount of earth and sand held by the bucket 33 at the end point of this operation phase is smaller than the target amount, occurrence of load slippage during this operation phase can be specified.
- the operation phase is an operation phase (excavation) for holding earth and sand and the amounts of earth and sand held by the bucket 33 at the start point and the end point of this operation phase are smaller than the target amount, presence of a problem in the operation for holding earth and sand can be specified.
- the abnormal phase may be specified based on whether each of the amount of earth and sand held by the bucket 33 at the start point of a certain operation phase, the amount of earth and sand held by the bucket 33 at the end point of this operation phase, and the amount of earth and sand held by the bucket 33 at the intermediate point between the start point and the end point of this operation phase is smaller than the target amount.
- This makes it possible to specifically specify a factor that makes the amount of earth and sand held by the bucket 33 smaller than the target value. For example, as illustrated in FIG. 5 , it can be specified that a sufficient amount of earth and sand cannot be held in the bucket 33 because the amount of earth and sand to be held by the bucket 33 in the earth and sand pit is not sufficient.
- the information about the abnormal phase is stored in the storage device 13 and transmitted to the cockpit 71 together with the identification number of the work machine 20 .
- the cockpit side controller 72 (notification means of the controller) sends a notification of the abnormal phase.
- the cockpit side controller 72 causes the display 75 to display the information about the abnormal phase together with the identification number of the work machine 20 .
- the operator can recognize the factor that makes the amount of earth and sand held by the bucket 33 smaller than the target value in the corresponding work machine 20 .
- the operator can correct the operations of the upper slewing body 22 and the attachment 30 so that the amount of earth and sand held by the bucket 33 becomes equal to or greater than the target value by teaching the work machine 20 again.
- the operator who operates various devices in the cockpit 71 teaches another work machine or remotely operates another work machine. Therefore, if the abnormal phase is notified every time the abnormal phase is specified, the operator cannot concentrate on other work.
- the abnormal phase specified by the controller 11 is stored in the storage device 13 .
- the predetermined period is a period longer than a period during which a series of operations is performed once.
- the information about the abnormal phase stored in the storage device 13 is transmitted to the cockpit 71 to be notified by the cockpit side controller 72 .
- the frequency of the notification can be reduced as compared with the case where the abnormal phase is notified every time the abnormal phase is specified. By reducing the frequency of the notification, the operator can concentrate on other work, and thus a decrease in the efficiency of the operator can be suppressed.
- the abnormal phase specified by the controller 11 may be continuously stored in the storage device 13 until a specific operation is performed by an operator who operates a device in the cockpit 71 , and when the operator performs the specific operation, information about all the abnormal phases stored in the storage device 13 may be notified. According to this, the notification can be performed at a timing desired by the operator.
- the upper slewing body 22 and the attachment 30 are controlled so that the upper slewing body 22 and the attachment 30 perform a series of operations having a plurality of operation phases. Thereafter, the operation phase in which the amount of earth and sand held by the bucket 33 is smaller than the target amount is specified as the abnormal phase. Therefore, an operation phase in which the amount of earth and sand held by the bucket 33 is smaller than the target value can be specified among the plurality of operation phases. This makes it possible to specify a factor that makes the amount of earth and sand held by the bucket 33 smaller than the target value.
- the slewing is specified as the abnormal phase.
- the excavation amount of the earth and sand is smaller than a target amount, the excavation is specified as the abnormal phase.
- the abnormal phase is specified based on whether each of the amount of earth and sand held by the bucket 33 at the start point of the operation phase and the amount of earth and sand held by the bucket 33 at the end point of the operation phase is smaller than the target amount.
- This makes it possible to suitably specify a factor that makes the amount of earth and sand held by the bucket 33 smaller than the target value. For example, in a case where the amount of earth and sand held by the bucket 33 at the start point of a certain operation phase is equal to or greater than the target amount and the amount of earth and sand held by the bucket 33 at the end point of this operation phase is smaller than the target amount, occurrence of load slippage during this operation phase can be specified.
- the operation phase is an operation phase for holding earth and sand and the amounts of earth and sand held by the bucket 33 at the start point and the end point of this operation phase are smaller than the target amount, presence of a problem in the operation for holding earth and sand can be specified.
- the abnormal phase is specified based on whether each of the amount of earth and sand held by the bucket 33 at the start point of a certain operation phase, the amount of earth and sand held by the bucket 33 at the end point of this operation phase, and the amount of earth and sand held by the bucket 33 at the intermediate point between the start point and the end point of this operation phase is smaller than the target amount. This makes it possible to specifically specify a factor that makes the amount of earth and sand held by the bucket 33 smaller than the target value.
- the operation phase is an operation phase for holding earth and sand
- the amount of earth and sand held by the bucket 33 increases from the start point to the intermediate point of this operation phase, but the amount of earth and sand held by the bucket 33 at the intermediate point of this operation phase is smaller than the target amount, and the amounts of earth and sand held by the bucket 33 at the intermediate point and the end point of this operation phase do not change
- the abnormal phase is notified. This makes it possible to recognize a factor that makes the amount of earth and sand held by the bucket 33 smaller than the target value. Therefore, the operations of the upper slewing body 22 and the attachment 30 can be corrected so that the amount of earth and sand held by the bucket 33 becomes equal to or greater than the target value.
- the abnormal phase stored in the storage device 13 is notified.
- the frequency of the notification can be reduced as compared with the case where the abnormal phase is notified every time the abnormal phase is specified.
- the operator often performs other work while the work machine 20 is automatically operated. By reducing the frequency of the notification, the operator can concentrate on other work, and thus a decrease in the efficiency of the operator can be suppressed.
- the work machine system includes the work machine 20 and the cockpit 71 , but the cockpit 71 is not an essential configuration in the work machine system and may be omitted.
- the cockpit side controller 72 notifies the operator of the abnormal phase by displaying the information about the abnormal phase on the display 75 of the cockpit 71 .
- the work machine system may not include the cockpit.
- the machine other than the cockpit 71 include a work machine
- examples of the device other than the cockpit 71 include information devices such as a personal computer, a server, and a portable information terminal.
- the operator remotely teaches the work content (operation) to the work machine 20 from the cockpit 71 installed at a place distant from the work machine 20 .
- the operator may teach the work content to the work machine 20 by operating the operation device in the cab 23 at the driver's seat in the cab 23 of the work machine 20 .
- the work machine system may not include the cockpit 71 .
- control means, the amount detection means, the target amount setting means, and the specifying means are included in the work machine side controller 11 , but some or all of the control means, the amount detection means, the target amount setting means, and the specifying means may be included in the cockpit side controller 72 .
- the notification means is included in the cockpit side controller 72 , but may be included in the work machine side controller 11 .
- the work machine side controller 11 and the cockpit side controller 72 may be constituted by one controller. In this case, the work machine 20 may include the one controller, and the cockpit 71 may include the one controller.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Operation Control Of Excavators (AREA)
Abstract
A work machine system includes a lower travelling body, an upper slewing body slewably attached to an upper portion of the lower travelling body, an attachment having a bucket that is capable of holding a work object and is rotatably attached to the upper slewing body, and a controller. The controller controls the upper slewing body and the attachment so that the upper slewing body and the attachment perform a series of operations having a plurality of operation phases, detects an amount of the work object held by the bucket, sets a target amount that is a target of the amount of the work object, and specifies, as an abnormal phase, an operation phase in which the amount of the work object held by the bucket is smaller than the target amount.
Description
- The present invention relates to a work machine system for automatic operation of a work machine.
- Patent Literature 1 discloses a work machine that calculates a load of a work object held by a tip attachment based on thrust information about an actuator and estimates whether a load has slipped during transportation of the work object.
- In a case where a load slips during transportation of the work object, the amount of the work object held by the tip attachment is smaller than a target value at a time point when the tip attachment releases the work object. However, a similar situation may occur in a case where the amount of the work object held by the tip attachment is smaller than the target value when the tip attachment holds the work object, or in a case where a sufficient amount of the work object cannot be held by the tip attachment because the amount of the work object to be held by the tip attachment is not sufficient.
- Patent Literature 1: JP 2019-157362 A
- An object of the present invention is to provide a work machine system capable of specifying a factor that makes an amount of a work object held by a tip attachment smaller than a target value.
- A work machine system of the present invention includes a lower travelling body, an upper slewing body slewably attached to an upper portion of the lower travelling body, an attachment that has a tip attachment capable of holding a work object and is rotatably attached to the upper slewing body, and a controller. The controller controls the upper slewing body and the attachment so that the upper slewing body and the attachment perform a series of operations having a plurality of operation phases, detects an amount of the work object held by the tip attachment, sets a target amount that is a target of the amount of the work object, and specifies, as an abnormal phase, an operation phase in which an amount of the work object held by the tip attachment is smaller than the target amount.
- According to the present invention, the upper slewing body and the attachment are controlled so that the upper slewing body and the attachment perform a series of operations having a plurality of operation phases. Then, an operation phase in which the amount of the work object held by the tip attachment is smaller than the target amount is specified as an abnormal phase. Therefore, the operation phase in which the amount of the work object held by the tip attachment is smaller than the target value can be specified from the plurality of operation phases. This makes it possible to specify a factor that makes the amount of the work object held by the tip attachment smaller than the target value. For example, in a series of operations including excavation, scooping, lifting and slewing, and discharging of earth and sand, in a case where a load slips during the slewing and the amount of earth and sand becomes smaller than the target amount, the slewing is specified as the abnormal phase. Further, in a case where the excavation amount of the earth and sand is smaller than a target amount, the excavation is specified as the abnormal phase.
-
FIG. 1 is a side view of a work machine. -
FIG. 2 is a circuit diagram of the work machine and a cockpit. -
FIG. 3 is a diagram illustrating a temporal change in an amount of earth and sand held by a bucket, and is a diagram in a case where excavation is an abnormal phase. -
FIG. 4 is a diagram illustrating a temporal change in the amount of earth and sand held by the bucket, and is a diagram in a case where slewing is an abnormal phase. -
FIG. 5 is a diagram illustrating a temporal change in the amount of earth and sand held by the bucket, and is a diagram in a case where the amount of earth and sand to be held by the bucket is not sufficient. - A preferred embodiment of the present invention will be described below with reference to the drawings.
- A work machine system according to an embodiment of the present invention is a system for automatic operation of a work machine. The work machine system includes a
work machine 20 and acockpit 71. - As illustrated in
FIG. 1 , which is a side view of thework machine 20, thework machine 20 is a machine that performs work with anattachment 30, and is, for example, a hydraulic excavator. Thework machine 20 has a machinemain body 24 including alower travelling body 21 and anupper slewing body 22, theattachment 30, andcylinders 40. - The
lower travelling body 21 is a portion that causes thework machine 20 to travel, and includes, for example, a crawler. Theupper slewing body 22 is slewably attached to an upper part of thelower travelling body 21 via aslewing device 25. A cab (driver's cabin) 23 is provided at a front part of theupper slewing body 22. - The
attachment 30 is attached to theupper slewing body 22 to be rotatable about a slewing axis extending in an up-and-down direction. Theattachment 30 includes aboom 31, anarm 32, and abucket 33. Theboom 31 is attached to theupper slewing body 22 to be rotatable in the up-and-down direction (capable of rising and contracting). Thearm 32 is attached to theboom 31 to be rotatable in the up-and-down direction. Thebucket 33 is a tip attachment which is a tip portion of theattachment 30, and can hold earth and sand (work object). Thebucket 33 is attached to thearm 32 to be rotatable in a front-and-rear direction. Thebucket 33 is a portion that performs work including excavation, leveling, and scooping of earth and sand. Note that the work object that is held by thebucket 33 is not limited to earth and sand, and may be a stone or a waste (industrial waste or the like). Further, the tip attachment is not limited to thebucket 33, and may be a grapple, a lifting magnet, or the like. - The
cylinders 40 can hydraulically turn theattachment 30. Thecylinders 40 are hydraulic telescopic cylinders. Thecylinders 40 include aboom cylinder 41, anarm cylinder 42, and abucket cylinder 43. - The
boom cylinder 41 rotationally moves theboom 31 with respect to theupper slewing body 22. Theboom cylinder 41 has a base end portion rotatably attached to theupper slewing body 22. Theboom cylinder 41 has a tip portion rotatably attached to theboom 31. - The
arm cylinder 42 rotationally moves thearm 32 with respect to theboom 31. Thearm cylinder 42 has a base end portion rotatably attached to theboom 31. Thearm cylinder 42 has a tip portion rotatably attached to thearm 32. - The
bucket cylinder 43 rotationally moves thebucket 33 with respect to thearm 32. Thebucket cylinder 43 has a base end portion rotatably attached to thearm 32. Thebucket cylinder 43 has a tip portion rotatably attached to alink member 34 rotatably attached to thebucket 33. - The
work machine 20 further includes anangle sensor 52, andinclination angle sensors 60. - The
angle sensor 52 detects a slewing angle of theupper slewing body 22 with respect to thelower travelling body 21. Theangle sensor 52 is, for example, an encoder, a resolver, or a gyro sensor. In the present embodiment, the slewing angle of theupper slewing body 22 at a time when a front side of theupper slewing body 22 coincides with a front side of thelower travelling body 21 is 0°. - The
inclination angle sensors 60 detect an orientation of theattachment 30. Theinclination angle sensors 60 include a boominclination angle sensor 61, an arminclination angle sensor 62, and a bucketinclination angle sensor 63. - The boom
inclination angle sensor 61 is attached to theboom 31 and detects an orientation of theboom 31. The boominclination angle sensor 61 is a sensor that acquires an inclination angle of theboom 31 with respect to a horizontal line, and is, for example, an inclination sensor (acceleration sensor) or the like. Note that the boominclination angle sensor 61 may be a rotation angle sensor that detects a rotation angle of a boom foot pin (a base end of the boom) or a stroke sensor that detects a stroke amount of theboom cylinder 41. - The arm
inclination angle sensor 62 is attached to thearm 32 to detect an orientation of thearm 32. The arminclination angle sensor 62 is a sensor that acquires an inclination angle of thearm 32 with respect to the horizontal line, and is, for example, an inclination sensor (acceleration sensor) or the like. Note that the arminclination angle sensor 62 may be a rotation angle sensor that detects a rotation angle of an arm connection pin (a base end of the arm) or a stroke sensor that detects a stroke amount of thearm cylinder 42. - The bucket
inclination angle sensor 63 is attached to thelink member 34 to detect an orientation of thebucket 33. The bucketinclination angle sensor 63 is a sensor that acquires an inclination angle of thebucket 33 with respect to the horizontal line, and is, for example, an inclination sensor (acceleration sensor) or the like. Note that the bucketinclination angle sensor 63 may be a rotation angle sensor that detects a rotation angle of a bucket connection pin (a base end of the bucket) or a stroke sensor that detects a stroke amount of thebucket cylinder 43. - The
work machine 20 further includes a Light Detection and Ranging or Laser Imaging Detection and Ranging (LIDAR) 55. TheLiDAR 55 is attached to theboom 31, but may be attached to theupper slewing body 22. TheLiDAR 55 acquires point cloud data indicating the distance from the position where theLiDAR 55 is attached to the earth and sand of thebucket 33. Note that a stereo camera, a time of flight (TOF) sensor, or the like may be used instead of theLIDAR 55. - The operator remotely teaches an operation to such a
work machine 20 from thecockpit 71 installed at a place distant from thework machine 20. Thework machine 20 performs automatic operation based on the taught work content. - The work machine system according to the present embodiment includes a controller. The controller of the work machine system includes control means, amount detection means, target amount setting means, specifying means, and notification means. The controller of the work machine system includes a work
machine side controller 11 included in thework machine 20 and acockpit side controller 72 included in thecockpit 71. - As illustrated in
FIG. 2 , which is a circuit diagram of thework machine 20 and thecockpit 71, thework machine 20 includes the workmachine side controller 11, a work machineside communication device 12, and astorage device 13. - The
controller 11 receives information about a slewing angle (orientation) of theupper slewing body 22 with respect to the lower travellingbody 21, the slewing angle being detected by theangle sensor 52. Further, thecontroller 11 receives information about the orientation of theboom 31, the orientation being detected by the boominclination angle sensor 61. Thecontroller 11 further receives information about the orientation of thearm 32, the orientation being detected by the arminclination angle sensor 62. Thecontroller 11 further receives information about the orientation of thebucket 33, the orientation being detected by the bucketinclination angle sensor 63. - In addition, the
controller 11 receives the point cloud data acquired by theLiDAR 55. - The
controller 11 operates theslewing device 25 and theattachment 30 based on the work content taught from thecockpit 71. - The work machine
side communication device 12 is communicable with a cockpitside communication device 74, to be described later, of thecockpit 71. Thestorage device 13 stores the work content taught remotely from thecockpit 71. - The
cockpit 71 includes thecockpit side controller 72, anoperation device 73, the cockpitside communication device 74, and adisplay 75. - The
operation device 73 includes a device necessary for remotely operating thework machine 20, such as an operation lever and an operation button. The cockpitside communication device 74 can communicate with the work machineside communication device 12 of thework machine 20. - When teaching is performed from the
cockpit 71, thework machine 20 is set to a teaching mode by a remote operation from thecockpit 71. When thework machine 20 is set to the teaching mode, the operator remotely operates thework machine 20 by operating theoperation device 73. When thework machine 20 is remotely operated, a landscape through a vehicle window (landscape outside the window) imaged by a camera provided in thecab 23 of thework machine 20 is displayed on thedisplay 75. The operation content by the remote operation is stored in thestorage device 13. Thereafter, thework machine 20 is set to an automatic operation mode by a remote operation from thecockpit 71. When thework machine 20 is set to the automatic operation mode, thework machine 20 performs an automatic operation. That is, thecontroller 11 of thework machine 20 controls the operations of theupper slewing body 22 and theattachment 30 based on the taught work content (the work content stored in the storage device 13) and automatically operates thework machine 20. - In the present embodiment, the content of the automatic operation performed by the
work machine 20 is to repeat an operation for excavating earth and sand from an earth and sand pit (not illustrated) with thebucket 33, slewing theupper slewing body 22 toward a dump truck (not illustrated) while holding the earth and sand, discharging the earth and sand to a loading platform (not illustrated) of the dump truck, and then slewing theupper slewing body 22 toward the earth and sand pit. - A series of operations by the automatic operation has a plurality of operation phases. As described above, in the series of operations including excavation to discharging of earth and sand, the plurality of operation phases includes excavation, scooping, lifting and slewing, and discharging of earth and sand. The controller 11 (control means of the controller) controls the
upper slewing body 22 and theattachment 30 so that theupper slewing body 22 and theattachment 30 perform the series of operations having the plurality of operation phases. - When the automatic operation is performed in the
work machine 20, the controller 11 (amount detection means of the controller) detects the amount of earth and sand held by thebucket 33. Specifically, for example, thecontroller 11 detects the shape of the earth and sand in thebucket 33 based on the point cloud data acquired by theLiDAR 55. Thecontroller 11 then calculates the amount of the earth and sand in thebucket 33 based on the shape of the earth and sand in thebucket 33. However, the method for detecting the amount of the earth and sand (the amount of the work object) by thecontroller 11 is not limited to the above specific example. For example, thecontroller 11 may detect the amount of earth and sand in thebucket 33 using a measurement result by a pressure sensor, not illustrated, that measures the pressure of theboom cylinder 41. - In addition, the controller 11 (target amount setting means of the controller) sets a target amount that is a target of the amount of earth and sand. The target amount is set via the
cockpit 71 during teaching. The set target amount is stored in thestorage device 13. - During the automatic operation, the controller 11 (specifying means of the controller) specifies, as an abnormal phase, an operation phase in which an amount of earth and sand held by the
bucket 33 is smaller than the target amount. Thecontroller 11 specifies the abnormal phase based on whether each of the amount of earth and sand held by thebucket 33 at the start point of the operation phase and the amount of earth and sand held by thebucket 33 at the end point of the operation phase is smaller than the target amount. That is, thecontroller 11 determines whether the amount of earth and sand held by thebucket 33 at the start point of the operation phase is smaller than the target amount, determines whether the amount of earth and sand held by thebucket 33 at the end point of the operation phase is smaller than the target amount, and specifies the abnormal phase based on these determination results. -
FIGS. 3 and 4 illustrate temporal changes in the amount of earth and sand held by thebucket 33 in each operation phase of excavation, scooping, and lifting and slewing. As illustrated inFIG. 3 , in a case where the operation phase is excavation, the amount of earth and sand held by thebucket 33 increases from the start point toward the end point of the operation phase of excavation. However, inFIG. 3 , the amount of earth and sand held by thebucket 33 at the end point of the excavation operation phase is smaller than the target amount indicated by a broken line. As described above, in a case where the amounts of earth and sand held by thebucket 33 at the start point and the end point of the excavation operation phase are smaller than the target amount, presence of a problem in the excavation operation is specified. - In addition, as illustrated in
FIG. 4 , in a case where the operation phase is slewing (lifting and slewing) and the amount of earth and sand held by thebucket 33 decreases during the slewing operation phase, the amount of earth and sand held by thebucket 33 at the end point of the slewing operation phase is smaller than the target amount even if the amount of earth and sand held by thebucket 33 at the start point of the slewing operation phase is equal to or greater than the target amount indicated by a broken line. In this case, occurrence of load slippage during the slewing is specified. - Further, the
controller 11 may determine whether not only the amount of earth and sand held by thebucket 33 at the start point of the operation phase and the amount of earth and sand held by thebucket 33 at the end point of the operation phase but also the amount of earth and sand held by thebucket 33 at an intermediate point between the start point and the end point is smaller than the target amount. That is, thecontroller 11 may specify the abnormal phase based on whether each of the amount of earth and sand held by thebucket 33 at the start point of the operation phase, the amount of earth and sand held by thebucket 33 at the end point of the operation phase, and the amount of earth and sand held by thebucket 33 at the intermediate point between the start point and the end point is smaller than the target amount. That is, thecontroller 11 may determine whether the amount of earth and sand held by thebucket 33 at the start point of the operation phase is smaller than the target amount, determine whether the amount of earth and sand held by thebucket 33 at the intermediate point of the operation phase is smaller than the target amount, determine whether the amount of earth and sand held by thebucket 33 at the end point of the operation phase is smaller than the target amount, and specify the abnormal phase based on these determination results. -
FIG. 5 also illustrates a temporal change in the amount of earth and sand held by thebucket 33 in each operation phase of excavation, scooping, and lifting and slewing. In a case where the operation phase is excavation, if the amount of earth and sand held by thebucket 33 at the end point of the excavation operation phase is smaller than the target amount, presence of a problem in the excavation operation is specified. However, in a case where the amount of earth and sand held by thebucket 33 at the intermediate point of the excavation operation phase is smaller than the target amount, and no change occurs in the amount of earth and sand held by thebucket 33 at the intermediate point and the end point of the excavation operation phase, the amount of earth and sand to be held by thebucket 33 in the earth and sand pit is not sufficient rather than there is something wrong in the excavation operation. Therefore, it is possible to specify a factor that a sufficient amount of earth and sand cannot be held in thebucket 33. - The timing or position of each of the start point, the intermediate point, and the end point of the operation phase may be stored in the
storage device 13 at the time of teaching, for example. In this case, thecontroller 11 may determine whether the amount of earth and sand at the stored start point of the operation phase is smaller than the target amount, determine whether the amount of earth and sand at the stored intermediate point of the operation phase is smaller than the target amount, and determine whether the amount of earth and sand at the stored end point is smaller than the target amount. Further, during the automatic operation, the operator may designate the timings of the start point, the intermediate point, and the end point of the operation phase using an input device, not illustrated. In this case, thecontroller 11 may determine whether the amount of earth and sand at the designated start point of the operation phase is smaller than the target amount, determine whether the amount of earth and sand at the designated intermediate point of the operation phase is smaller than the target amount, and determine whether the amount of earth and sand at the designated end point is smaller than the target amount. However, the timing or position of each of the start point, the intermediate point, and the end point of the operation phase may be determined by a method other than the above two specific examples. - As described above, the operation phase in which the amount of earth and sand held by the
bucket 33 is smaller than the target amount is specified as the abnormal phase. Therefore, an operation phase in which the amount of earth and sand held by thebucket 33 is smaller than the target value can be specified among the plurality of operation phases. This makes it possible to specify a factor that makes the amount of earth and sand held by thebucket 33 smaller than the target value. For example, as illustrated inFIG. 4 , in a case where load slippage occurs during the slewing and the amount of earth and sand becomes smaller than the target amount, the slewing is specified as the abnormal phase. Further, as illustrated inFIG. 3 , in a case where the excavation amount of the earth and sand is smaller than the target amount, the excavation is specified as the abnormal phase. - Further, the abnormal phase is specified based on whether each of the amount of earth and sand held by the
bucket 33 at the start point of the operation phase and the amount of earth and sand held by thebucket 33 at the end point of the operation phase is smaller than the target amount. This makes it possible to suitably specify a factor that makes the amount of earth and sand held by thebucket 33 smaller than the target value. For example, in a case where the amount of earth and sand held by thebucket 33 at the start point of a certain operation phase is equal to or greater than the target amount and the amount of earth and sand held by thebucket 33 at the end point of this operation phase is smaller than the target amount, occurrence of load slippage during this operation phase can be specified. In addition, in a case where the operation phase is an operation phase (excavation) for holding earth and sand and the amounts of earth and sand held by thebucket 33 at the start point and the end point of this operation phase are smaller than the target amount, presence of a problem in the operation for holding earth and sand can be specified. - Further, the abnormal phase may be specified based on whether each of the amount of earth and sand held by the
bucket 33 at the start point of a certain operation phase, the amount of earth and sand held by thebucket 33 at the end point of this operation phase, and the amount of earth and sand held by thebucket 33 at the intermediate point between the start point and the end point of this operation phase is smaller than the target amount. This makes it possible to specifically specify a factor that makes the amount of earth and sand held by thebucket 33 smaller than the target value. For example, as illustrated inFIG. 5 , it can be specified that a sufficient amount of earth and sand cannot be held in thebucket 33 because the amount of earth and sand to be held by thebucket 33 in the earth and sand pit is not sufficient. - Returning to
FIG. 2 , the information about the abnormal phase is stored in thestorage device 13 and transmitted to thecockpit 71 together with the identification number of thework machine 20. The cockpit side controller 72 (notification means of the controller) sends a notification of the abnormal phase. Specifically, thecockpit side controller 72 causes thedisplay 75 to display the information about the abnormal phase together with the identification number of thework machine 20. As a result, the operator can recognize the factor that makes the amount of earth and sand held by thebucket 33 smaller than the target value in thecorresponding work machine 20. As a result, the operator can correct the operations of theupper slewing body 22 and theattachment 30 so that the amount of earth and sand held by thebucket 33 becomes equal to or greater than the target value by teaching thework machine 20 again. - Here, while the
work machine 20 performs the automatic operation, the operator who operates various devices in thecockpit 71 teaches another work machine or remotely operates another work machine. Therefore, if the abnormal phase is notified every time the abnormal phase is specified, the operator cannot concentrate on other work. - Therefore, during a predetermined period, the abnormal phase specified by the
controller 11 is stored in thestorage device 13. Here, the predetermined period is a period longer than a period during which a series of operations is performed once. When the predetermined period has elapsed, the information about the abnormal phase stored in thestorage device 13 is transmitted to thecockpit 71 to be notified by thecockpit side controller 72. As a result, the frequency of the notification can be reduced as compared with the case where the abnormal phase is notified every time the abnormal phase is specified. By reducing the frequency of the notification, the operator can concentrate on other work, and thus a decrease in the efficiency of the operator can be suppressed. - Note that the abnormal phase specified by the
controller 11 may be continuously stored in thestorage device 13 until a specific operation is performed by an operator who operates a device in thecockpit 71, and when the operator performs the specific operation, information about all the abnormal phases stored in thestorage device 13 may be notified. According to this, the notification can be performed at a timing desired by the operator. - As described above, according to the
work machine 20 according to the present embodiment, theupper slewing body 22 and theattachment 30 are controlled so that theupper slewing body 22 and theattachment 30 perform a series of operations having a plurality of operation phases. Thereafter, the operation phase in which the amount of earth and sand held by thebucket 33 is smaller than the target amount is specified as the abnormal phase. Therefore, an operation phase in which the amount of earth and sand held by thebucket 33 is smaller than the target value can be specified among the plurality of operation phases. This makes it possible to specify a factor that makes the amount of earth and sand held by thebucket 33 smaller than the target value. For example, in a series of operations including excavation, scooping, lifting and slewing, and discharging of earth and sand, in a case where a load slips during the slewing and the amount of earth and sand becomes smaller than the target amount, the slewing is specified as the abnormal phase. Further, in a case where the excavation amount of the earth and sand is smaller than a target amount, the excavation is specified as the abnormal phase. - Further, the abnormal phase is specified based on whether each of the amount of earth and sand held by the
bucket 33 at the start point of the operation phase and the amount of earth and sand held by thebucket 33 at the end point of the operation phase is smaller than the target amount. This makes it possible to suitably specify a factor that makes the amount of earth and sand held by thebucket 33 smaller than the target value. For example, in a case where the amount of earth and sand held by thebucket 33 at the start point of a certain operation phase is equal to or greater than the target amount and the amount of earth and sand held by thebucket 33 at the end point of this operation phase is smaller than the target amount, occurrence of load slippage during this operation phase can be specified. Further, in a case where the operation phase is an operation phase for holding earth and sand and the amounts of earth and sand held by thebucket 33 at the start point and the end point of this operation phase are smaller than the target amount, presence of a problem in the operation for holding earth and sand can be specified. - Further, the abnormal phase is specified based on whether each of the amount of earth and sand held by the
bucket 33 at the start point of a certain operation phase, the amount of earth and sand held by thebucket 33 at the end point of this operation phase, and the amount of earth and sand held by thebucket 33 at the intermediate point between the start point and the end point of this operation phase is smaller than the target amount. This makes it possible to specifically specify a factor that makes the amount of earth and sand held by thebucket 33 smaller than the target value. For example, in a case where the operation phase is an operation phase for holding earth and sand, and the amount of earth and sand held by thebucket 33 increases from the start point to the intermediate point of this operation phase, but the amount of earth and sand held by thebucket 33 at the intermediate point of this operation phase is smaller than the target amount, and the amounts of earth and sand held by thebucket 33 at the intermediate point and the end point of this operation phase do not change, it can be specified that a sufficient amount of earth and sand cannot be held in thebucket 33 because the amount of earth and sand to be held by thebucket 33 is not sufficient. - In addition, the abnormal phase is notified. This makes it possible to recognize a factor that makes the amount of earth and sand held by the
bucket 33 smaller than the target value. Therefore, the operations of theupper slewing body 22 and theattachment 30 can be corrected so that the amount of earth and sand held by thebucket 33 becomes equal to or greater than the target value. - Further, when a predetermined period, which is a longer period than a period during which a series of operations is performed once, has elapsed, the abnormal phase stored in the
storage device 13 is notified. As a result, the frequency of the notification can be reduced as compared with the case where the abnormal phase is notified every time the abnormal phase is specified. The operator often performs other work while thework machine 20 is automatically operated. By reducing the frequency of the notification, the operator can concentrate on other work, and thus a decrease in the efficiency of the operator can be suppressed. - Although the embodiment of the present invention has been described above, only specific example has been described, and the present invention is not particularly limited to the embodiment. Therefore, a specific configuration and the like can be modified in design as appropriate. Further, the actions and effects described in the embodiment of the present invention merely recite the most suitable actions and effects resulting from the present invention, and the actions and effects according to the present invention are not limited to those described in the embodiment of the present invention.
- In the above embodiment, the work machine system includes the
work machine 20 and thecockpit 71, but thecockpit 71 is not an essential configuration in the work machine system and may be omitted. Specifically, in the above embodiment, thecockpit side controller 72 notifies the operator of the abnormal phase by displaying the information about the abnormal phase on thedisplay 75 of thecockpit 71. However, in a case where the controller of the work machine system notifies the operator of the abnormal phase in a machine or a device other than thecockpit 71, the work machine system may not include the cockpit. Examples of the machine other than thecockpit 71 include a work machine, and examples of the device other than thecockpit 71 include information devices such as a personal computer, a server, and a portable information terminal. Further, in the above embodiment, the operator remotely teaches the work content (operation) to thework machine 20 from thecockpit 71 installed at a place distant from thework machine 20. However, for example, the operator may teach the work content to thework machine 20 by operating the operation device in thecab 23 at the driver's seat in thecab 23 of thework machine 20. In this case, the work machine system may not include thecockpit 71. - In the above embodiment, the control means, the amount detection means, the target amount setting means, and the specifying means are included in the work
machine side controller 11, but some or all of the control means, the amount detection means, the target amount setting means, and the specifying means may be included in thecockpit side controller 72. Further, in the above embodiment, the notification means is included in thecockpit side controller 72, but may be included in the workmachine side controller 11. Further, the workmachine side controller 11 and thecockpit side controller 72 may be constituted by one controller. In this case, thework machine 20 may include the one controller, and thecockpit 71 may include the one controller.
Claims (5)
1. A work machine system comprising:
a lower travelling body;
an upper slewing body slewably attached to an upper portion of the lower travelling body;
an attachment that has a tip attachment capable of holding a work object and is rotatably attached to the upper slewing body; and
a controller,
wherein the controller
controls the upper slewing body and the attachment so that the upper slewing body and the attachment perform a series of operations having a plurality of operation phases,
detects an amount of the work object held by the tip attachment,
sets a target amount that is a target of the amount of the work object, and
specifies, as an abnormal phase, an operation phase in which the amount of the work object held by the tip attachment is smaller than the target amount.
2. The work machine system according to claim 1 , wherein the controller specifies the abnormal phase based on whether each of an amount of the work object held by the tip attachment at a start point of the operation phase and an amount of the work object held by the tip attachment at an end point of the operation phase is smaller than the target amount.
3. The work machine system according to claim 2 , wherein the controller further specifies the abnormal phase based on whether an amount of the work object held by the tip attachment at an intermediate point between the start point and the end point is smaller than the target amount.
4. The work machine system according to claim 1 , wherein the controller sends a notification of the abnormal phase.
5. The work machine system according to claim 4 , further comprising
a storage device that stores the abnormal phase specified by the controller while a predetermined period longer than a period during which the series of operations is performed once elapses,
wherein the controller sends the notification of the abnormal phase stored in the storage device when the predetermined period elapses.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2021113918A JP2023010087A (en) | 2021-07-09 | 2021-07-09 | Work machine |
JP2021-113918 | 2021-07-09 | ||
PCT/JP2022/023601 WO2023281988A1 (en) | 2021-07-09 | 2022-06-13 | Work machine system |
Publications (1)
Publication Number | Publication Date |
---|---|
US20240287769A1 true US20240287769A1 (en) | 2024-08-29 |
Family
ID=84800564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US18/572,517 Pending US20240287769A1 (en) | 2021-07-09 | 2022-06-13 | Work machine system |
Country Status (5)
Country | Link |
---|---|
US (1) | US20240287769A1 (en) |
EP (1) | EP4345218A1 (en) |
JP (1) | JP2023010087A (en) |
CN (1) | CN117561358A (en) |
WO (1) | WO2023281988A1 (en) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1265065C (en) * | 2001-10-18 | 2006-07-19 | 日立建机株式会社 | Hydraulic shovel work amount detection apparatus, work amount detection method, work amount detection result display apparatus |
US8977445B2 (en) * | 2013-06-18 | 2015-03-10 | Caterpillar Inc. | System and method for dig detection |
JP6849623B2 (en) | 2018-03-07 | 2021-03-24 | 日立建機株式会社 | Work machine |
WO2020203851A1 (en) * | 2019-03-29 | 2020-10-08 | 住友重機械工業株式会社 | Shovel |
JP7276056B2 (en) * | 2019-09-30 | 2023-05-18 | コベルコ建機株式会社 | working machine |
JP7355624B2 (en) * | 2019-12-02 | 2023-10-03 | 株式会社小松製作所 | Work machines and work machine control methods |
-
2021
- 2021-07-09 JP JP2021113918A patent/JP2023010087A/en active Pending
-
2022
- 2022-06-13 US US18/572,517 patent/US20240287769A1/en active Pending
- 2022-06-13 WO PCT/JP2022/023601 patent/WO2023281988A1/en active Application Filing
- 2022-06-13 CN CN202280044955.XA patent/CN117561358A/en active Pending
- 2022-06-13 EP EP22837406.2A patent/EP4345218A1/en active Pending
Also Published As
Publication number | Publication date |
---|---|
CN117561358A (en) | 2024-02-13 |
JP2023010087A (en) | 2023-01-20 |
EP4345218A1 (en) | 2024-04-03 |
WO2023281988A1 (en) | 2023-01-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6716358B2 (en) | Work vehicle, work management system, and work vehicle control method | |
CN112639210B (en) | Control device and control method for loading machine | |
US11195351B2 (en) | Work machine measurement system, work machine, and measuring method for work machine | |
EP3739131B1 (en) | Construction machine | |
CN111757963A (en) | System and method for controlling a work machine | |
CN111771034B (en) | System and method for controlling a work machine | |
JP2023106587A (en) | Excavation system, control device, and excavation method | |
CN111801293A (en) | Remote operation terminal and work vehicle provided with same | |
CN114207220B (en) | Motion teaching system | |
CN111757961A (en) | System and method for controlling a work machine | |
US20240287769A1 (en) | Work machine system | |
EP4407104A1 (en) | Management system | |
WO2022064813A1 (en) | Work area setting system and work object detection system | |
JP2022056134A (en) | Loading point determination system | |
EP4092201B1 (en) | Work machine | |
EP4411688A1 (en) | Management system | |
WO2022064969A1 (en) | Automatic loading system | |
JP2024118622A (en) | Attachment target route evaluation system | |
JP2024107540A (en) | Work Support System | |
JP2022055296A (en) | Work area setting system, and work object detection system | |
CN117561359A (en) | Work site monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: KOBELCO CONSTRUCTION MACHINERY CO., LTD., JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:FUKUO, NOBUHIRO;YAMASHITA, KOJI;NODA, DAISUKE;REEL/FRAME:065921/0728 Effective date: 20231121 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |