US20240093579A1 - High-efficiency yield-increasing exploitation method for natural gas hydrates - Google Patents

High-efficiency yield-increasing exploitation method for natural gas hydrates Download PDF

Info

Publication number
US20240093579A1
US20240093579A1 US18/341,816 US202318341816A US2024093579A1 US 20240093579 A1 US20240093579 A1 US 20240093579A1 US 202318341816 A US202318341816 A US 202318341816A US 2024093579 A1 US2024093579 A1 US 2024093579A1
Authority
US
United States
Prior art keywords
natural gas
horizontal well
reservoirs
cement slurry
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US18/341,816
Other versions
US11952869B1 (en
Inventor
Jianbo Zhang
Zhiyuan WANG
Yuting Wang
Baojiang Sun
Jie Zhong
Jihao Pei
Nan Ma
Xueqi Liu
Junjie Hu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Pengbo Safety And Environmental Protection Service Co Ltd
China University of Petroleum East China
Original Assignee
Shandong Pengbo Safety And Environmental Protection Service Co Ltd
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Pengbo Safety And Environmental Protection Service Co Ltd, China University of Petroleum East China filed Critical Shandong Pengbo Safety And Environmental Protection Service Co Ltd
Assigned to CHINA UNIVERSITY OF PETROLEUM (EAST CHINA), SHANDONG PENGBO SAFETY AND ENVIRONMENTAL PROTECTION SERVICE CO., LTD. reassignment CHINA UNIVERSITY OF PETROLEUM (EAST CHINA) ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HU, Junjie, LIU, XUEQI, MA, NAN, PEI, Jihao, SUN, Baojiang, WANG, YUTING, WANG, ZHIYUQN, ZHANG, JIANBO, ZHANG, JIE
Publication of US20240093579A1 publication Critical patent/US20240093579A1/en
Application granted granted Critical
Publication of US11952869B1 publication Critical patent/US11952869B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0099Equipment or details not covered by groups E21B15/00 - E21B40/00 specially adapted for drilling for or production of natural hydrate or clathrate gas reservoirs; Drilling through or monitoring of formations containing gas hydrates or clathrates
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • E21B33/138Plastering the borehole wall; Injecting into the formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling

Definitions

  • the present invention relates to a high-efficiency yield-increasing exploitation method for natural gas hydrates, and belongs to the technical field of the exploitation of the natural gas hydrates.
  • Natural gas hydrates are anew clean and efficient energy with huge reserves. According to incomplete statistics, organic carbon reserves in natural gas hydrates are twice as large as those of fossil energy, such as oil gases, around the world. Due to the shallow depth of burying storage, poor cementation, poor permeability, non-stratified rock properties, and other characteristics in the majority of natural gas hydrate reservoirs, the conventional exploitation method of oil gases is unable to be suitable for the exploitation of the natural gas hydrate reservoirs.
  • the depressurization method is such a method that the pressure in the reservoirs is reduced via control over the bottom pore pressure of exploitation wellholes, the original exploitation condition of the natural gas hydrates therein is destroyed, and the natural gas hydrates are forcedly decomposed into methane gases and water for the recovery of the methane gases.
  • the heat injection method is such a method that heat is injected into the reservoirs to elevate the temperature of the reservoirs, the original exploitation condition of the natural gas hydrates therein is destroyed, and the natural gas hydrates are forcedly decomposed into methane gases and water for the recovery of the methane gases.
  • the inhibitor injection method is such a method that the temperature at which the hydrates are stabilized is reduced by injecting thermodynamic inhibitors of the hydrates into the reservoirs, or the original equilibrium condition in the reservoirs is destroyed under the increased pressure.
  • the carbon dioxide replacement method is such a method that methane in methane hydrates is replaced by injecting carbon dioxide which is prone to produce hydrates into the reservoirs to recover the methane gases therefrom.
  • the solid-fluidization method is such a method that hydrate-containing non-stratified rock deposit sediments are crushed into fine granules via seabed exploitation, and mixed with seawater, and the mixture is lifted to a platform for further processing along a closed pipeline.
  • the depressurization method has the advantages of high gas recovery rate, easiness in operation, low costs, and the like, which is called a preferred method for most possibly achieving the commercial exploitation of the natural gas hydrates in the future.
  • the decomposition of the natural gas hydrates in the reservoirs will further weaken the cementation of the reservoirs, and the reservoirs are compacted under the action of overburden pressure to reduce the permeability, which severely affects the high-efficiency exploitation of the natural gas hydrates.
  • the current exploitation method still has the defect of low yield, and the commercial exploitation condition of the natural gas hydrates hasn't been reached yet.
  • the present invention provides a high-efficiency yield-increasing exploitation method of natural gas hydrates, in which the seepage capability and stability of reservoirs are improved by fracturing of horizontal wells for fracture forming and the injection of foam cement slurry, and the exploitation yield of the natural gas hydrates is improved by an exploitation method of depressurization+heat injection, which provides a guarantee for achieving the commercial exploitation of the natural gas hydrate reservoirs across the sea area in the future.
  • a high-efficiency yield-increasing exploitation method for natural gas hydrates includes the following steps:
  • fracturing for fracture forming at the horizontal well section of the first horizontal well is implemented, a seawater fracturing fluid is injected into the first horizontal well, and flows into the natural gas hydrate reservoirs along the horizontal well section, so that fractures are formed in the hydrate reservoirs between the first horizontal well and the second horizontal well, and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs,
  • foam cement slurry is injected into the horizontal well section of the first horizontal well, is distributed all over the natural gas hydrate reservoirs, and is cured for forming for a period of time, thereby improving the stability of the hydrate reservoirs, and finally, a resin or oligomer chemical sand control agent which is commonly used in the art is injected into a periphery of the well to reduce or avoid a sand production rate during an exploitation of the natural gas hydrates at the later period and improve the safety of the natural gas hydrates in exploitation; and in this step, the first horizontal well is designed as a fracturing well; the horizontal well section of the first horizontal well is fractured only in order to maintain the stability of the wellhole; seawater which is convenient to obtain, sufficient in supply, and low in costs serves as the fracturing fluid, with a fracturing pressure thereof being larger than a fracture forming pressure of the hydrate reservoirs, and the seawater fracturing fluid flows into the hydrate reservoirs along the horizontal well section of the
  • the exploitation yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection; and in order to reduce the exploitation costs of the natural gas hydrates, seawater is injected into the natural gas hydrate reservoirs along the first horizontal well at a temperature of more than 60° C. to elevate the temperature of the reservoirs, and meanwhile, a bottom pore pressure of the second horizontal well and the third horizontal well is reduced; and a decomposition rate of the natural gas hydrates in the reservoirs is improved under the collaborative action of the two operations.
  • drilling time is shortened by rapid drilling along the horizontal well
  • the permeability of the reservoirs may be effectively improved by fracturing for fracture forming
  • the stability of the reservoirs may be improved by injecting foam cement slurry into the reservoirs
  • the yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection.
  • the method has the advantages of reducing drilling costs, improving the permeability of the reservoirs, enhancing the stability of the reservoirs, improving the gas recovery efficiency and the like.
  • an exploratory trench cycle drilling manner is available, that is, a wellhole of the drilled well at a seawater section is not provided with a water-proofing pipe, and a drilling fluid returning from an annular space of a wellhole of the drilled well at a stratum section and rock debris carried thereby are discharged to a seabed at a mud line; and by the exploratory trench cycle drilling manner, a drilling rate may be improved significantly, a drilling cycle may be shortened, drilling costs may be reduced, and safety risks arising from closed cycle drilling may be avoided.
  • the drilled well is designed as the horizontal well, and as a wellhole of the horizontal well may be obviously longer than that of a vertical well, a contact area between the exploitation wellbore and the reservoirs may be increased to lay a foundation for improving the yield of the natural gas hydrate during exploitation at the later period.
  • a total of 3 horizontal wells are provided, which constitute a well array.
  • multiple well arrays may be used for combined exploitation; and if the site condition (smaller hydrate enrichment regions, and farther disperse distance) does not satisfy the condition, single-well exploitation may also be implemented, that is, the exploitation of one well array is completed before the exploitation of the next well array.
  • a distance among multiple well arrays may be calculated with formulas (1)-(4).
  • an interval among different horizontal wells may be determined by the following method:
  • a pressure distribution in the natural gas hydrate reservoirs may be as follows:
  • P 1 is a bottom pore pressure of the horizontal wells, MPa
  • P 2 is a pressure in the natural gas hydrate reservoirs, MPa
  • Q is a flow in pores of the natural gas hydrate reservoirs, m 3 /s
  • is a fluid viscosity in the reservoirs, mPa ⁇ s
  • L is a seepage radius of a fluid in the reservoirs, m
  • K is an absolute permeability of the natural gas hydrate reservoirs, mD
  • A is a sectional area of seepage flow of the natural gas hydrate reservoirs, m 2 ;
  • the pressure P 2 in the reservoirs needs to conform to the following criteria:
  • T is a reservoir temperature, K
  • ⁇ T d is a temperature at which a decline in a hydrate equilibrium is caused by a thermodynamic hydrate inhibitor, K
  • ⁇ T d may be obtained by the following formula through calculation:
  • ⁇ ⁇ T d ⁇ ⁇ T d , r ⁇ ln ⁇ ( 1 - x ) ln ⁇ ( 1 - x r ) ( 4 )
  • x is a molar fraction of the thermodynamic hydrate inhibitor in a water phase, which is dimensionless
  • x r is a reference molar fraction of the thermodynamic hydrate inhibitor in the water phase, which is dimensionless
  • ⁇ T d,r is a temperature at which the decline in the hydrate equilibrium is caused under the molar fraction of the thermodynamic hydrate inhibitor as x r , K;
  • thermodynamic hydrate inhibitor is the seawater, and the seawater, containing salinity, belongs to a salt-based thermodynamic hydrate inhibitor.
  • a fracturing pressure is larger than a fracture forming pressure of the natural gas hydrate reservoirs.
  • step (2) a preparation process of the foam cement slurry is as follows:
  • a certain mass of cement is mixed with water to form cement slurry, and a certain mass of foaming agent and foam stabilizer are added to the cement slurry with stirring until fine and stable bubbles which are independent of each other are formed, and the foam cement slurry with low density and high permeability may be formed, with a density thereof being less than 1.0 g/cm 3 , which needs, however, to be determined according to actual design and requirements on site, that is, ⁇ gfc in the formula (5).
  • the construction method is readily available, without arranging any additional equipment, and the formed foam cement slurry has the advantages of stable properties, high compressive strength, low costs, and the like. What there will be to adopt in the construction method is thinner foam cement slurry. This may improve the liquidity of the foam cement slurry in the reservoirs, making it distributed all over the pores of the reservoirs better.
  • the using amount of the cement is as follows:
  • M sn is the using amount of the cement, kg
  • ⁇ gfc is the design dry density of the foam cement, kg/m 3
  • V gfc is the volume of the dry foam cement, m 3
  • S a is a mass coefficient, which is dimensionless, wherein it is 1.2 for ordinary Portland cement, and 1.4 for sulfate cement
  • M w is the water supply volume
  • a is a basic ratio of water to materials, which is dimensionless
  • M p is the mass of the foaming agent in the foam cement slurry, kg
  • V py is the volume of a foam concentrate formed from the foaming agent, m 3
  • ⁇ py is the density of the foam concentrate formed from the foaming agent, kg/m 3
  • b is the times of foaming of the foaming agent, which is dimensionless
  • the using amount of the foam stabilizer is half of that of the foaming agent.
  • an injection rate of the foam cement slurry is as follows:
  • V fc is a volume of the foam cement slurry to be injected into the natural gas hydrate reservoirs, m 3 ;
  • L 2 is a length of the horizontal well section, m;
  • H is a thickness of the natural gas hydrate reservoirs, m; and
  • S f is a porosity of the natural gas hydrate reservoirs subjected to fracturing for fracture forming, which is dimensionless.
  • the foaming agent is preferably sodium dodecyl sulfate, and the foam stabilizer is preferably laurinol.
  • step (2) during the injection of the foam cement slurry into the horizontal well section of the first horizontal well, when it is found that there is the foam cement slurry in the second horizontal well and the third horizontal well, the injection of the foam cement slurry may be stopped, and meanwhile, the foam cement slurry is removed rapidly from the second horizontal well and the third horizontal well, that is, clear water may be injected into drill stems in the second horizontal well and the third horizontal well, the foam cement slurry carried thereby returns upwards from an annular space between the drill stems and drivepipes to fulfill the objective of cleaning; and then, each of the horizontal wells is shut in for 48 h, until the foam cement slurry injected into the natural gas hydrate reservoirs is cured for forming, which may improve the stability of the reservoirs during the exploitation of the natural gas hydrates and reduce risks of the collapse and sand production of the natural gas hydrate reservoirs.
  • the pressure distributed in the reservoirs is reduced by controlling a pressure decay amplitude at the bottoms of the second horizontal well and the third horizontal well, so that the natural gas hydrates in the reservoirs are decomposed into gases and water, and meanwhile, and the gases flow into the second horizontal well and the third horizontal well under a differential pressure for recovery.
  • a relationship between absorption of heat from the decomposition of the hydrates and a heat transfer around the reservoirs is coordinated by controlling the bottom pore pressure of the second horizontal well and the third horizontal well with a multi-stage step-by-step depressurization strategy, that is, the pressure decay amplitude at the bottoms of the wells is reduced slowly after the bottom pore pressure is reduced to a hydrate phase equilibrium condition in decomposition, and with every 0.5 MPa of the bottom pore pressure declining, a bottom pore pressure value is maintained until a gas recovery rate declines significantly before the depressurization of the next step, thereby fulfilling the objective of reducing or avoiding the secondary generation risk of the hydrates in the reservoirs.
  • a method for reducing the bottom pore pressure is as follows:
  • the wellhole Before the exploitation of the hydrates, the wellhole is filled with water, at which the bottom pore pressure is equal to a gravity pressure of water; and after exploitation starts, the water will be pumped to a platform from the wellhole, and with a decrease in the water volume in the wellhole, the bottom pore pressure will decline gradually, thereby reducing the pressure in the reservoirs.
  • the pressure decay amplitude at the bottoms of the wells ranges from 0.1 to 0.2 Mpa/h, and significant reduction in gas production refers to reduction of gas production to 1000 cubic meters/day below.
  • seawater temperature at a sea level is higher, seawater can be supplied sufficiently and contains a certain salinity, and after being heated on the platform, the pumped seawater with the higher temperature is injected into the natural gas hydrate reservoirs along the first horizontal well; if the seawater temperature is lower, the measure of heating before injecting on the platform can be taken; the objective of heating the reservoirs can be fulfilled in a process that the injected seawater flows in fractures and pores of the natural gas hydrate reservoirs, and the temperature of the reservoirs is effectively maintained and elevated by making up heat absorbed from the decomposition of the natural gas hydrates in the reservoirs, and thus the gas recovery efficiency from the decomposition of the natural gas hydrates is further improved; and finally, the natural gas hydrates are decomposed into water and natural gases with the seawater injected into the reservoirs, which are recovered from the second horizontal well and the third horizontal well. According to the combined exploitation method of depressurization of the horizontal
  • FIG. 1 is a schematic diagram of a horizontal well of natural gas hydrate reservoirs according to the present invention.
  • FIG. 2 is a schematic top view of an exploitation of natural gas hydrate reservoirs.
  • a high-efficiency yield-increasing exploitation method for natural gas hydrates includes the following steps:
  • drilling well arrays are drilled in an exploratory trench cycle drilling manner, each of which includes three horizontal wells: a first horizontal well 6 , and a second horizontal well 8 and a third horizontal well 9 positioned on two sides of the first horizontal well 6 , and each of the horizontal wells includes a vertical well section 3 , an inclined well section 4 , and a horizontal well section 5 ;
  • the drilling efficiency of single wells may be improved, and the drilling operation along the horizontal wells may increase a contact area between an exploitation wellhole and the reservoirs to improve the exploitation yield of the natural gas hydrates.
  • fracturing is implemented for fracture forming at the horizontal well section 5 of the first horizontal well 6 , a seawater fracturing fluid is injected into the first horizontal well and flows into the natural gas hydrate reservoirs along the horizontal well section, so that fractures 7 are formed in the hydrate reservoirs between the first horizontal well and the second horizontal well, and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs,
  • foam cement slurry is injected into the horizontal well section of the first horizontal well, is distributed all over the natural gas hydrate reservoirs, and is cured for forming for a period of time, thereby improving the stability of the hydrate reservoirs,
  • a resin or oligomer chemical sand control agent which is commonly used in the art is injected into a periphery of the well to reduce or avoid a sand production rate during an exploitation of the natural gas hydrates at the later period and improve the safety of the natural gas hydrates in exploitation;
  • the first horizontal well is designed as a fracturing well; the horizontal well section of the first horizontal well is fractured only in order to maintain the stability of the wellhole; seawater which is convenient to obtain, sufficient in supply, and low in costs serves as the fracturing fluid, with a fracturing pressure thereof being larger than a fracture forming pressure of the hydrate reservoirs, and the seawater fracturing fluid flows into the hydrate reservoirs along the horizontal well section of the first horizontal well, forming the fractures in the hydrate reservoirs between the first horizontal well and the second horizontal well and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs.
  • the exploitation yield of the natural gas hydrates may be improved via the combined exploitation of depressurization of the horizontal well and heat injection, and in order to reduce the exploitation costs of the natural gas hydrates, seawater is injected into the natural gas hydrate reservoirs along the first horizontal well 6 at a temperature of more than 60° C. to elevate the reservoir temperature; and meanwhile, a pressure at bottoms of the second horizontal well 8 and the third horizontal well 9 is reduced, so as to improve a decomposition rate of the natural gas hydrates in the reservoirs under the collaborative action of the two operations.
  • drilling time is shortened by rapid drilling along the horizontal well
  • the permeability of the reservoirs may be effectively improved by fracturing for fracture forming
  • the stability of the reservoirs may be improved by injecting foam cement slurry into the reservoirs
  • the yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection.
  • the method has the advantages of reducing drilling costs, improving the permeability of the reservoirs, enhancing the stability of the reservoirs, improving the gas recovery efficiency and the like.
  • a high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 1 in that in step (1), an interval among different horizontal wells is determined by the following method:
  • a pressure distribution in natural gas hydrate reservoirs may be as follows:
  • P 1 is a bottom pore pressure of the horizontal wells, MPa
  • P 2 is a pressure in the natural gas hydrate reservoirs, MPa
  • Q is a flow in pores of the natural gas hydrate reservoirs, m 3 /s
  • is a fluid viscosity in the reservoirs, mPa ⁇ s
  • L is a seepage radius of a fluid in the reservoirs, m
  • K is an absolute permeability of the natural gas hydrate reservoirs, mD
  • A is a sectional area of seepage flow of the natural gas hydrate reservoirs, m 2 ;
  • the pressure P 2 in the reservoirs needs to conform to the following criteria:
  • T is a reservoir temperature, K
  • ⁇ T d is a temperature at which a decline in a hydrate equilibrium is caused by a thermodynamic hydrate inhibitor, K
  • ⁇ T d may be obtained by the following formula through calculation:
  • ⁇ ⁇ T d ⁇ ⁇ T d , r ⁇ ln ⁇ ( 1 - x ) ln ⁇ ( 1 - x r ) ( 4 )
  • x is a molar fraction of the thermodynamic hydrate inhibitor in a water phase, which is dimensionless
  • x r is a reference molar fraction of the thermodynamic hydrate inhibitor in the water phase, which is dimensionless
  • ⁇ T d,r is a temperature at which the decline in the hydrate equilibrium is caused under the molar fraction of the thermodynamic hydrate inhibitor as x r , K;
  • a high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 2 in that in step (2), during fracturing, a fracturing pressure is larger than a fracture forming pressure of the natural gas hydrate reservoirs.
  • step (2) a preparation process of foam cement slurry is as follows:
  • a certain mass of cement is mixed with water to form cement slurry, and a certain mass of foaming agent (sodium dodecyl sulfate) and foam stabilizer (laurinol) are added to the cement slurry with stirring until fine and stable bubbles which are independent of each other are formed, and the foam cement slurry with low density and high permeability may be formed, with a density thereof being less than 1.0 g/cm 3 , which needs, however, to be determined according to actual design and requirements on site, that is, ⁇ gfc in the formula (5).
  • the construction method is readily available, without arranging any additional equipment, and the formed foam cement slurry has the advantages of stable properties, high compressive strength, low costs, and the like. What there will be to adopt in the construction method is thinner foam cement slurry. This may improve the liquidity of the foam cement slurry in the reservoirs, making it distributed all over the pores of the reservoirs better.
  • the using amount of the cement is as follows:
  • M sn is the using amount of the cement, kg
  • ⁇ gfc is the design dry density of the foam cement, kg/m 3
  • V gfc is the volume of the dry foam cement, m 3
  • S a is a mass coefficient, which is dimensionless, wherein it is 1.2 for ordinary Portland cement, and 1.4 for sulfate cement
  • M w is the water supply volume
  • a is a basic ratio of water to materials, which is dimensionless
  • M p is the mass of the foaming agent in the foam cement slurry, kg
  • V py is the volume of a foam concentrate formed from the foaming agent, m 3
  • ⁇ py is the density of the foam concentrate formed from the foaming agent, kg/m 3
  • b is the times of foaming of the foaming agent, which is dimensionless
  • the using amount of the foam stabilizer is half of that of the foaming agent.
  • the injection rate of the foam cement slurry is as follows:
  • V fc is a volume of the foam cement slurry to be injected into the natural gas hydrate reservoirs, m 3 ;
  • L 2 is a length of the horizontal well section, m;
  • H is a thickness of the natural gas hydrate reservoirs, m; and
  • S f is a porosity of the natural gas hydrate reservoirs subjected to fracturing for fracture forming, which is dimensionless.
  • a high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 3 in that in step (2), during the injection of foam cement slurry into the horizontal well section of the first horizontal well, when it is found that there is the foam cement slurry in the second horizontal well and the third horizontal well, the injection of the foam cement slurry may be stopped, and meanwhile, the foam cement slurry is removed rapidly from the second horizontal well and the third horizontal well, that is, clear water may be injected into drill stems in the second horizontal well and the third horizontal well, the foam cement slurry carried thereby returns upwards from an annular space between the drill stems and drivepipes to fulfill the objective of cleaning; and then, each of the horizontal wells is shut in for 48 h, until the foam cement slurry injected into the natural gas hydrate reservoirs is cured for forming, which may improve the stability of the reservoirs during the exploitation of the natural gas hydrates and reduce risks of the collapse and sand production of the natural gas hydrate reservoirs.
  • a high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 4 in that, in step (3), the pressure distributed in the reservoirs is reduced by controlling a pressure decay amplitude at the bottoms of the second horizontal well and the third horizontal well, so that the natural gas hydrates in the reservoirs are decomposed into gases and water, and meanwhile, and the gases flow into the second horizontal well and the third horizontal well under a differential pressure for recovery
  • a relationship between absorption of heat from the decomposition of the hydrates and a heat transfer around the reservoirs is coordinated by controlling the bottom hole pressure of the second horizontal well and the third horizontal well with a multi-stage step-by-step depressurization strategy, that is, the pressure decay amplitude at the bottoms of the wells is reduced slowly after the bottom hole pressure is reduced to a hydrate phase equilibrium condition in decomposition, ranging from 0.1 to 0.2 MPa, and with every 0.5 MPa of the bottom hole pressure declining, a bottom hole pressure value is maintained until a gas recovery rate declines significantly (i.e., declining to 1000 cubic meters/day below) before the depressurization of the next step, thereby fulfilling the objective of reducing or avoiding the secondary generation risk of the hydrates in the reservoirs.
  • a method for reducing the bottom pore pressure is as follows:
  • the wellhole Before the exploitation of the hydrates, the wellhole is filled with water, at which the bottom pore pressure is equal to a gravity pressure of water; and after exploitation starts, the water will be pumped to a platform from the wellhole, and with a decrease in the water volume in the wellhole, the bottom pore pressure will decline gradually, thereby reducing the pressure in the reservoirs.

Abstract

A high-efficiency yield-increasing exploitation method for natural gas hydrates includes steps of drilling of natural gas hydrate reservoirs along horizontal wells, seepage increasing by fracturing for fracture forming and stability improvement by grouting in the natural gas hydrate reservoirs, and yield improvement by combined exploitation of depressurization of the horizontal wells and heat injection; according to the present invention, drilling time is shortened by rapid drilling along the horizontal wells, the permeability of the reservoirs can be effectively improved by fracturing for fracture forming, the stability of the reservoirs can be improved by injecting by the combined exploitation method of depressurization of the horizontal wells and heat injection.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims priority to Chinese Patent Application Ser. No. CN2022111066505 filed on 13 Sep. 2022.
  • FIELD OF THE INVENTION
  • The present invention relates to a high-efficiency yield-increasing exploitation method for natural gas hydrates, and belongs to the technical field of the exploitation of the natural gas hydrates.
  • BACKGROUND OF THE INVENTION
  • Natural gas hydrates are anew clean and efficient energy with huge reserves. According to incomplete statistics, organic carbon reserves in natural gas hydrates are twice as large as those of fossil energy, such as oil gases, around the world. Due to the shallow depth of burying storage, poor cementation, poor permeability, non-stratified rock properties, and other characteristics in the majority of natural gas hydrate reservoirs, the conventional exploitation method of oil gases is unable to be suitable for the exploitation of the natural gas hydrate reservoirs. In order to more efficiently exploit the natural gas hydrates in the reservoirs, researchers have, in recent years, proposed a variety of different exploitation methods, including a depressurization method, a heat injection method, an inhibitor injection method, a carbon dioxide replacement method, a solid-fluidization method, and the like.
  • The depressurization method is such a method that the pressure in the reservoirs is reduced via control over the bottom pore pressure of exploitation wellholes, the original exploitation condition of the natural gas hydrates therein is destroyed, and the natural gas hydrates are forcedly decomposed into methane gases and water for the recovery of the methane gases. The heat injection method is such a method that heat is injected into the reservoirs to elevate the temperature of the reservoirs, the original exploitation condition of the natural gas hydrates therein is destroyed, and the natural gas hydrates are forcedly decomposed into methane gases and water for the recovery of the methane gases. The inhibitor injection method is such a method that the temperature at which the hydrates are stabilized is reduced by injecting thermodynamic inhibitors of the hydrates into the reservoirs, or the original equilibrium condition in the reservoirs is destroyed under the increased pressure. The carbon dioxide replacement method is such a method that methane in methane hydrates is replaced by injecting carbon dioxide which is prone to produce hydrates into the reservoirs to recover the methane gases therefrom. The solid-fluidization method is such a method that hydrate-containing non-stratified rock deposit sediments are crushed into fine granules via seabed exploitation, and mixed with seawater, and the mixture is lifted to a platform for further processing along a closed pipeline.
  • In the existing method, the depressurization method has the advantages of high gas recovery rate, easiness in operation, low costs, and the like, which is called a preferred method for most possibly achieving the commercial exploitation of the natural gas hydrates in the future. However, during the exploitation of the natural gas hydrates, the decomposition of the natural gas hydrates in the reservoirs will further weaken the cementation of the reservoirs, and the reservoirs are compacted under the action of overburden pressure to reduce the permeability, which severely affects the high-efficiency exploitation of the natural gas hydrates. Meanwhile, the current exploitation method still has the defect of low yield, and the commercial exploitation condition of the natural gas hydrates hasn't been reached yet.
  • In conclusion, the high-efficiency yield-increasing exploitation method of the natural gas hydrates hasn't been found yet, which is a key difficulty that restricts the commercial exploitation of the natural gas hydrates. Therefore, the present invention is provided.
  • SUMMARY OF THE INVENTION
  • Aiming at the defects in the prior art, and especially for difficulties of low yield, short time of duration, and poor economic efficiency during the exploitation of the natural gas hydrates, the present invention provides a high-efficiency yield-increasing exploitation method of natural gas hydrates, in which the seepage capability and stability of reservoirs are improved by fracturing of horizontal wells for fracture forming and the injection of foam cement slurry, and the exploitation yield of the natural gas hydrates is improved by an exploitation method of depressurization+heat injection, which provides a guarantee for achieving the commercial exploitation of the natural gas hydrate reservoirs across the sea area in the future.
  • In the present invention, the following technical solutions are as follow:
  • A high-efficiency yield-increasing exploitation method for natural gas hydrates includes the following steps:
      • (1) drilling of natural gas hydrate reservoirs along horizontal wells
        as for the natural gas hydrate reservoirs, well arrays are drilled in an exploratory trench drilling manner along the horizontal wells, each of which includes three horizontal wells: a first horizontal well, and a second horizontal well and a third horizontal well positioned on two sides of the first horizontal well, and each of the horizontal wells includes a vertical well section, an inclined well section, and a horizontal well section,
        by the exploratory trench drilling manner, the drilling efficiency of single wells may be improved, and the drilling operation along the horizontal wells may increase a contact area between an exploitation wellhole and the reservoirs to improve the exploitation yield of the natural gas hydrates.
      • (2) seepage increasing by fracturing for fracture forming and stability improvement by grouting in the natural gas hydrate reservoirs
  • After the drilling operation is completed, fracturing for fracture forming at the horizontal well section of the first horizontal well is implemented, a seawater fracturing fluid is injected into the first horizontal well, and flows into the natural gas hydrate reservoirs along the horizontal well section, so that fractures are formed in the hydrate reservoirs between the first horizontal well and the second horizontal well, and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs,
  • and then, foam cement slurry is injected into the horizontal well section of the first horizontal well, is distributed all over the natural gas hydrate reservoirs, and is cured for forming for a period of time, thereby improving the stability of the hydrate reservoirs, and
    finally, a resin or oligomer chemical sand control agent which is commonly used in the art is injected into a periphery of the well to reduce or avoid a sand production rate during an exploitation of the natural gas hydrates at the later period and improve the safety of the natural gas hydrates in exploitation;
    and in this step, the first horizontal well is designed as a fracturing well; the horizontal well section of the first horizontal well is fractured only in order to maintain the stability of the wellhole; seawater which is convenient to obtain, sufficient in supply, and low in costs serves as the fracturing fluid, with a fracturing pressure thereof being larger than a fracture forming pressure of the hydrate reservoirs, and the seawater fracturing fluid flows into the hydrate reservoirs along the horizontal well section of the first horizontal well, forming the fractures in the hydrate reservoirs between the first horizontal well and the second horizontal well and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs.
      • (3) Yield improvement by combined exploitation of depressurization of the horizontal well and heat injection
  • The exploitation yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection; and in order to reduce the exploitation costs of the natural gas hydrates, seawater is injected into the natural gas hydrate reservoirs along the first horizontal well at a temperature of more than 60° C. to elevate the temperature of the reservoirs, and meanwhile, a bottom pore pressure of the second horizontal well and the third horizontal well is reduced; and a decomposition rate of the natural gas hydrates in the reservoirs is improved under the collaborative action of the two operations.
  • According to the above-mentioned technical solution, drilling time is shortened by rapid drilling along the horizontal well, the permeability of the reservoirs may be effectively improved by fracturing for fracture forming, the stability of the reservoirs may be improved by injecting foam cement slurry into the reservoirs, and the yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection. The method has the advantages of reducing drilling costs, improving the permeability of the reservoirs, enhancing the stability of the reservoirs, improving the gas recovery efficiency and the like.
  • According to the present invention, preferably, in step (1), in view of an upper stratum above the deep-water natural gas hydrate reservoirs, featuring shallow depth, softness, and looseness, an exploratory trench cycle drilling manner is available, that is, a wellhole of the drilled well at a seawater section is not provided with a water-proofing pipe, and a drilling fluid returning from an annular space of a wellhole of the drilled well at a stratum section and rock debris carried thereby are discharged to a seabed at a mud line; and by the exploratory trench cycle drilling manner, a drilling rate may be improved significantly, a drilling cycle may be shortened, drilling costs may be reduced, and safety risks arising from closed cycle drilling may be avoided. Meanwhile, the drilled well is designed as the horizontal well, and as a wellhole of the horizontal well may be obviously longer than that of a vertical well, a contact area between the exploitation wellbore and the reservoirs may be increased to lay a foundation for improving the yield of the natural gas hydrate during exploitation at the later period. During drilling every time, a total of 3 horizontal wells are provided, which constitute a well array. During exploitation, if the site condition (larger hydrate enrichment regions, and closer distance among regions) satisfies the condition, multiple well arrays may be used for combined exploitation; and if the site condition (smaller hydrate enrichment regions, and farther disperse distance) does not satisfy the condition, single-well exploitation may also be implemented, that is, the exploitation of one well array is completed before the exploitation of the next well array. A distance among multiple well arrays may be calculated with formulas (1)-(4).
  • Preferable, in step (1), an interval among different horizontal wells may be determined by the following method:
  • Firstly, based on a Darcy's law, a pressure distribution in the natural gas hydrate reservoirs may be as follows:
  • P 2 = P 1 + Q · μ . L K · A ( 1 )
  • where P1 is a bottom pore pressure of the horizontal wells, MPa; P2 is a pressure in the natural gas hydrate reservoirs, MPa; Q is a flow in pores of the natural gas hydrate reservoirs, m3/s; μ is a fluid viscosity in the reservoirs, mPa·s; L is a seepage radius of a fluid in the reservoirs, m; K is an absolute permeability of the natural gas hydrate reservoirs, mD; A is a sectional area of seepage flow of the natural gas hydrate reservoirs, m2;
  • then, in order to achieve a decomposition of the natural gas hydrates during an exploitation of the natural gas hydrates under reduced pressure, the pressure P2 in the reservoirs needs to conform to the following criteria:
  • P 2 P e = 1 0 6 exp ( n = 0 5 a n ( T + Δ T d ) n ) ( 2 ) where { a 0 = - 1 . 9 4 1 3 8 5 0 4 4 6 4 5 6 0 × 1 0 5 a 1 = 3 . 3 1 0 1 8 2 1 3 3 9 7 9 2 6 × 1 0 3 a 2 = - 2 . 2 5 5 4 0 2 6 4 4 9 3 8 0 6 × 1 0 1 a 3 = 7 . 6 7 5 5 9 1 1 7 7 8 7 0 5 9 × 1 0 - 2 a 4 = - 1 . 3 0 4 6 5 8 2 9 7 8 8 7 9 1 × 1 0 - 4 a 5 = 8 . 8 6 0 6 5 3 1 6 6 8 7 5 7 1 × 1 0 - 8 ( 3 )
  • where T is a reservoir temperature, K; ΔTd is a temperature at which a decline in a hydrate equilibrium is caused by a thermodynamic hydrate inhibitor, K;
  • ΔTd may be obtained by the following formula through calculation:
  • Δ T d = Δ T d , r ln ( 1 - x ) ln ( 1 - x r ) ( 4 )
  • where x is a molar fraction of the thermodynamic hydrate inhibitor in a water phase, which is dimensionless; xr is a reference molar fraction of the thermodynamic hydrate inhibitor in the water phase, which is dimensionless; ΔTd,r is a temperature at which the decline in the hydrate equilibrium is caused under the molar fraction of the thermodynamic hydrate inhibitor as xr, K; and
  • an interval (L1=L) between every two horizontal wells is solved according to formulas (1)-(4), based on which the layout of the three horizontal wells is supported theoretically.
  • In formulas (3) and (4), the thermodynamic hydrate inhibitor is the seawater, and the seawater, containing salinity, belongs to a salt-based thermodynamic hydrate inhibitor.
  • Preferably, in step (2), during fracturing, a fracturing pressure is larger than a fracture forming pressure of the natural gas hydrate reservoirs.
  • Preferably, in step (2), a preparation process of the foam cement slurry is as follows:
  • a certain mass of cement is mixed with water to form cement slurry, and a certain mass of foaming agent and foam stabilizer are added to the cement slurry with stirring until fine and stable bubbles which are independent of each other are formed, and the foam cement slurry with low density and high permeability may be formed, with a density thereof being less than 1.0 g/cm3, which needs, however, to be determined according to actual design and requirements on site, that is, ρgfc in the formula (5). The construction method is readily available, without arranging any additional equipment, and the formed foam cement slurry has the advantages of stable properties, high compressive strength, low costs, and the like. What there will be to adopt in the construction method is thinner foam cement slurry. This may improve the liquidity of the foam cement slurry in the reservoirs, making it distributed all over the pores of the reservoirs better.
  • In the preparation of the foam cement slurry, according to the properties of the required foam cement slurry and a mix proportioning principle thereof, the using amount of the cement is as follows:
  • M s n = V gfc · ρ gfc S a ( 5 )
  • where Msn is the using amount of the cement, kg; ρgfc is the design dry density of the foam cement, kg/m3; Vgfc is the volume of the dry foam cement, m3; Sa is a mass coefficient, which is dimensionless, wherein it is 1.2 for ordinary Portland cement, and 1.4 for sulfate cement;
  • water supply volume:

  • M w =a·M sn  (6)
  • where Mw is the water supply volume; a is a basic ratio of water to materials, which is dimensionless;
  • the using amount of the foaming agent:
  • M p = V py · ρ py b + 1 ( 7 )
  • where Mp is the mass of the foaming agent in the foam cement slurry, kg; Vpy is the volume of a foam concentrate formed from the foaming agent, m3; ρpy is the density of the foam concentrate formed from the foaming agent, kg/m3; b is the times of foaming of the foaming agent, which is dimensionless; and
  • the using amount of the foam stabilizer is half of that of the foaming agent.
  • Preferably, in step (2), an injection rate of the foam cement slurry is as follows:

  • V fc≥2L 1 ·L 2 ·H·S f  (8)
  • where Vfc is a volume of the foam cement slurry to be injected into the natural gas hydrate reservoirs, m3; L2 is a length of the horizontal well section, m; H is a thickness of the natural gas hydrate reservoirs, m; and Sf is a porosity of the natural gas hydrate reservoirs subjected to fracturing for fracture forming, which is dimensionless.
  • Preferably, the foaming agent is preferably sodium dodecyl sulfate, and the foam stabilizer is preferably laurinol.
  • Preferably, in step (2), during the injection of the foam cement slurry into the horizontal well section of the first horizontal well, when it is found that there is the foam cement slurry in the second horizontal well and the third horizontal well, the injection of the foam cement slurry may be stopped, and meanwhile, the foam cement slurry is removed rapidly from the second horizontal well and the third horizontal well, that is, clear water may be injected into drill stems in the second horizontal well and the third horizontal well, the foam cement slurry carried thereby returns upwards from an annular space between the drill stems and drivepipes to fulfill the objective of cleaning; and then, each of the horizontal wells is shut in for 48 h, until the foam cement slurry injected into the natural gas hydrate reservoirs is cured for forming, which may improve the stability of the reservoirs during the exploitation of the natural gas hydrates and reduce risks of the collapse and sand production of the natural gas hydrate reservoirs.
  • Preferably, in step (3), the pressure distributed in the reservoirs is reduced by controlling a pressure decay amplitude at the bottoms of the second horizontal well and the third horizontal well, so that the natural gas hydrates in the reservoirs are decomposed into gases and water, and meanwhile, and the gases flow into the second horizontal well and the third horizontal well under a differential pressure for recovery.
  • In order to solve the problem of the secondary generation of the hydrates due to the rapid decomposition of the natural gas hydrates for a short time in the reservoirs, a relationship between absorption of heat from the decomposition of the hydrates and a heat transfer around the reservoirs is coordinated by controlling the bottom pore pressure of the second horizontal well and the third horizontal well with a multi-stage step-by-step depressurization strategy, that is, the pressure decay amplitude at the bottoms of the wells is reduced slowly after the bottom pore pressure is reduced to a hydrate phase equilibrium condition in decomposition, and with every 0.5 MPa of the bottom pore pressure declining, a bottom pore pressure value is maintained until a gas recovery rate declines significantly before the depressurization of the next step, thereby fulfilling the objective of reducing or avoiding the secondary generation risk of the hydrates in the reservoirs.
  • A method for reducing the bottom pore pressure is as follows:
  • Before the exploitation of the hydrates, the wellhole is filled with water, at which the bottom pore pressure is equal to a gravity pressure of water; and after exploitation starts, the water will be pumped to a platform from the wellhole, and with a decrease in the water volume in the wellhole, the bottom pore pressure will decline gradually, thereby reducing the pressure in the reservoirs.
  • Preferably, the pressure decay amplitude at the bottoms of the wells ranges from 0.1 to 0.2 Mpa/h, and significant reduction in gas production refers to reduction of gas production to 1000 cubic meters/day below.
  • All aspects not fully described in the present invention can be referenced to the prior art.
  • The present invention has the following beneficial effects:
  • According to the present invention, during the exploitation of the natural gas hydrates across the sea area, seawater temperature at a sea level is higher, seawater can be supplied sufficiently and contains a certain salinity, and after being heated on the platform, the pumped seawater with the higher temperature is injected into the natural gas hydrate reservoirs along the first horizontal well; if the seawater temperature is lower, the measure of heating before injecting on the platform can be taken; the objective of heating the reservoirs can be fulfilled in a process that the injected seawater flows in fractures and pores of the natural gas hydrate reservoirs, and the temperature of the reservoirs is effectively maintained and elevated by making up heat absorbed from the decomposition of the natural gas hydrates in the reservoirs, and thus the gas recovery efficiency from the decomposition of the natural gas hydrates is further improved; and finally, the natural gas hydrates are decomposed into water and natural gases with the seawater injected into the reservoirs, which are recovered from the second horizontal well and the third horizontal well. According to the combined exploitation method of depressurization of the horizontal well and heat injection, the yield of the natural gases can be maintained at a higher level during the exploitation of the natural gas hydrates to meet the requirements of the commercial exploitation of the natural gas hydrates.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic diagram of a horizontal well of natural gas hydrate reservoirs according to the present invention; and
  • FIG. 2 is a schematic top view of an exploitation of natural gas hydrate reservoirs.
  • Illustrations of all the numerals: 1—Shallow stratum, 2—Natural gas hydrate reservoir, 3—Vertical well section, 4—Inclined well section, 5—Horizontal well section, 6—Horizontal well, 7—Fracture, 8—Second horizontal well, and 9—Third horizontal well.
  • DETAILED DESCRIPTION OF THE EMBODIMENTS
  • To make a person skilled in the art better understand the technical solutions of the present specification, the following describes the technical solutions of the present specification clearly and completely, but the present invention is not limited thereto. Any content not described in details in the present invention belongs to the conventional technology in the art.
  • EXAMPLE 1
  • A high-efficiency yield-increasing exploitation method for natural gas hydrates includes the following steps:
  • drilling of natural gas hydrate reservoirs along horizontal wells
  • In view of an upper shallow stratum 1 above the deep-water natural gas hydrate reservoirs, featuring softness, and looseness, as for the natural gas hydrate reservoirs 2, drilling well arrays are drilled in an exploratory trench cycle drilling manner, each of which includes three horizontal wells: a first horizontal well 6, and a second horizontal well 8 and a third horizontal well 9 positioned on two sides of the first horizontal well 6, and each of the horizontal wells includes a vertical well section 3, an inclined well section 4, and a horizontal well section 5;
  • by the exploratory trench drilling manner, the drilling efficiency of single wells may be improved, and the drilling operation along the horizontal wells may increase a contact area between an exploitation wellhole and the reservoirs to improve the exploitation yield of the natural gas hydrates.
      • (1) seepage increasing by fracturing for fracture forming and stability improvement by grouting in the natural gas hydrate reservoirs
  • After the drilling operation is completed, fracturing is implemented for fracture forming at the horizontal well section 5 of the first horizontal well 6, a seawater fracturing fluid is injected into the first horizontal well and flows into the natural gas hydrate reservoirs along the horizontal well section, so that fractures 7 are formed in the hydrate reservoirs between the first horizontal well and the second horizontal well, and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs,
  • then, foam cement slurry is injected into the horizontal well section of the first horizontal well, is distributed all over the natural gas hydrate reservoirs, and is cured for forming for a period of time, thereby improving the stability of the hydrate reservoirs,
  • and finally, a resin or oligomer chemical sand control agent which is commonly used in the art is injected into a periphery of the well to reduce or avoid a sand production rate during an exploitation of the natural gas hydrates at the later period and improve the safety of the natural gas hydrates in exploitation;
  • and in this step, the first horizontal well is designed as a fracturing well; the horizontal well section of the first horizontal well is fractured only in order to maintain the stability of the wellhole; seawater which is convenient to obtain, sufficient in supply, and low in costs serves as the fracturing fluid, with a fracturing pressure thereof being larger than a fracture forming pressure of the hydrate reservoirs, and the seawater fracturing fluid flows into the hydrate reservoirs along the horizontal well section of the first horizontal well, forming the fractures in the hydrate reservoirs between the first horizontal well and the second horizontal well and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs.
      • (2) Yield improvement by combined exploitation of depressurization of the horizontal well and heat injection
  • The exploitation yield of the natural gas hydrates may be improved via the combined exploitation of depressurization of the horizontal well and heat injection, and in order to reduce the exploitation costs of the natural gas hydrates, seawater is injected into the natural gas hydrate reservoirs along the first horizontal well 6 at a temperature of more than 60° C. to elevate the reservoir temperature; and meanwhile, a pressure at bottoms of the second horizontal well 8 and the third horizontal well 9 is reduced, so as to improve a decomposition rate of the natural gas hydrates in the reservoirs under the collaborative action of the two operations.
  • According to the above-mentioned technical solution, drilling time is shortened by rapid drilling along the horizontal well, the permeability of the reservoirs may be effectively improved by fracturing for fracture forming, the stability of the reservoirs may be improved by injecting foam cement slurry into the reservoirs, and the yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection. The method has the advantages of reducing drilling costs, improving the permeability of the reservoirs, enhancing the stability of the reservoirs, improving the gas recovery efficiency and the like.
  • EXAMPLE 2
  • A high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 1 in that in step (1), an interval among different horizontal wells is determined by the following method:
  • Firstly, based on a Darcy's law, a pressure distribution in natural gas hydrate reservoirs may be as follows:
  • P 2 = P 1 + Q · μL K · A ( 1 )
  • where P1 is a bottom pore pressure of the horizontal wells, MPa; P2 is a pressure in the natural gas hydrate reservoirs, MPa; Q is a flow in pores of the natural gas hydrate reservoirs, m3/s; μ is a fluid viscosity in the reservoirs, mPa·s; L is a seepage radius of a fluid in the reservoirs, m; K is an absolute permeability of the natural gas hydrate reservoirs, mD; A is a sectional area of seepage flow of the natural gas hydrate reservoirs, m2;
  • then, in order to achieve a decomposition of the natural gas hydrates during an exploitation of the natural gas hydrates under reduced pressure, the pressure P2 in the reservoirs needs to conform to the following criteria:
  • P 2 P e = 1 0 6 exp ( n = 0 5 a n ( T + Δ T d ) n ) ( 2 ) where { a 0 = - 1 . 9 4 1 3 8 5 0 4 4 6 4 5 6 0 × 1 0 5 a 1 = 3 . 3 1 0 1 8 2 1 3 3 9 7 9 2 6 × 1 0 3 a 2 = - 2 . 2 5 5 4 0 2 6 4 4 9 3 8 0 6 × 1 0 1 a 3 = 7 . 6 7 5 5 9 1 1 7 7 8 7 0 5 9 × 1 0 - 2 a 4 = - 1 . 3 0 4 6 5 8 2 9 7 8 8 7 9 1 × 1 0 - 4 a 5 = 8 . 8 6 0 6 5 3 1 6 6 8 7 5 7 1 × 1 0 - 8 ( 3 )
  • where T is a reservoir temperature, K; ΔTd is a temperature at which a decline in a hydrate equilibrium is caused by a thermodynamic hydrate inhibitor, K;
  • ΔTd may be obtained by the following formula through calculation:
  • Δ T d = Δ T d , r ln ( 1 - x ) ln ( 1 - x r ) ( 4 )
  • where x is a molar fraction of the thermodynamic hydrate inhibitor in a water phase, which is dimensionless; xr is a reference molar fraction of the thermodynamic hydrate inhibitor in the water phase, which is dimensionless; ΔTd,r is a temperature at which the decline in the hydrate equilibrium is caused under the molar fraction of the thermodynamic hydrate inhibitor as xr, K; and
  • an interval (L1=L) between every two horizontal wells is solved according to formulas (1)-(4), based on which the layout of the three horizontal wells is supported theoretically.
  • EXAMPLE 3
  • A high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 2 in that in step (2), during fracturing, a fracturing pressure is larger than a fracture forming pressure of the natural gas hydrate reservoirs.
  • In step (2), a preparation process of foam cement slurry is as follows:
  • a certain mass of cement is mixed with water to form cement slurry, and a certain mass of foaming agent (sodium dodecyl sulfate) and foam stabilizer (laurinol) are added to the cement slurry with stirring until fine and stable bubbles which are independent of each other are formed, and the foam cement slurry with low density and high permeability may be formed, with a density thereof being less than 1.0 g/cm3, which needs, however, to be determined according to actual design and requirements on site, that is, ρgfc in the formula (5). The construction method is readily available, without arranging any additional equipment, and the formed foam cement slurry has the advantages of stable properties, high compressive strength, low costs, and the like. What there will be to adopt in the construction method is thinner foam cement slurry. This may improve the liquidity of the foam cement slurry in the reservoirs, making it distributed all over the pores of the reservoirs better.
  • In the preparation of the foam cement slurry, according to the properties of the required foam cement slurry and a mix proportioning principle thereof, the using amount of the cement is as follows:
  • M s n = V gfc · ρ gfc S a ( 5 )
  • where Msn is the using amount of the cement, kg; ρgfc is the design dry density of the foam cement, kg/m3; Vgfc is the volume of the dry foam cement, m3; Sa is a mass coefficient, which is dimensionless, wherein it is 1.2 for ordinary Portland cement, and 1.4 for sulfate cement;
  • water supply volume:

  • M w =a·M w  (6)
  • where Mw is the water supply volume; a is a basic ratio of water to materials, which is dimensionless;
  • the using amount of the foaming agent:
  • M p = V py · ρ py b + 1 ( 7 )
  • where Mp is the mass of the foaming agent in the foam cement slurry, kg; Vpy is the volume of a foam concentrate formed from the foaming agent, m3; ρpy is the density of the foam concentrate formed from the foaming agent, kg/m3; b is the times of foaming of the foaming agent, which is dimensionless; and
  • the using amount of the foam stabilizer is half of that of the foaming agent.
  • The injection rate of the foam cement slurry is as follows:

  • V fc≥2L 1 ·L 2 ·H·S f  (8)
  • where Vfc is a volume of the foam cement slurry to be injected into the natural gas hydrate reservoirs, m3; L2 is a length of the horizontal well section, m; H is a thickness of the natural gas hydrate reservoirs, m; and Sf is a porosity of the natural gas hydrate reservoirs subjected to fracturing for fracture forming, which is dimensionless.
  • EXAMPLE 4
  • A high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 3 in that in step (2), during the injection of foam cement slurry into the horizontal well section of the first horizontal well, when it is found that there is the foam cement slurry in the second horizontal well and the third horizontal well, the injection of the foam cement slurry may be stopped, and meanwhile, the foam cement slurry is removed rapidly from the second horizontal well and the third horizontal well, that is, clear water may be injected into drill stems in the second horizontal well and the third horizontal well, the foam cement slurry carried thereby returns upwards from an annular space between the drill stems and drivepipes to fulfill the objective of cleaning; and then, each of the horizontal wells is shut in for 48 h, until the foam cement slurry injected into the natural gas hydrate reservoirs is cured for forming, which may improve the stability of the reservoirs during the exploitation of the natural gas hydrates and reduce risks of the collapse and sand production of the natural gas hydrate reservoirs.
  • EXAMPLE 5
  • A high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 4 in that, in step (3), the pressure distributed in the reservoirs is reduced by controlling a pressure decay amplitude at the bottoms of the second horizontal well and the third horizontal well, so that the natural gas hydrates in the reservoirs are decomposed into gases and water, and meanwhile, and the gases flow into the second horizontal well and the third horizontal well under a differential pressure for recovery
  • In order to solve the problem of the secondary generation of the hydrates due to the rapid decomposition of the natural gas hydrates for a short time in the reservoirs, a relationship between absorption of heat from the decomposition of the hydrates and a heat transfer around the reservoirs is coordinated by controlling the bottom hole pressure of the second horizontal well and the third horizontal well with a multi-stage step-by-step depressurization strategy, that is, the pressure decay amplitude at the bottoms of the wells is reduced slowly after the bottom hole pressure is reduced to a hydrate phase equilibrium condition in decomposition, ranging from 0.1 to 0.2 MPa, and with every 0.5 MPa of the bottom hole pressure declining, a bottom hole pressure value is maintained until a gas recovery rate declines significantly (i.e., declining to 1000 cubic meters/day below) before the depressurization of the next step, thereby fulfilling the objective of reducing or avoiding the secondary generation risk of the hydrates in the reservoirs.
  • A method for reducing the bottom pore pressure is as follows:
  • Before the exploitation of the hydrates, the wellhole is filled with water, at which the bottom pore pressure is equal to a gravity pressure of water; and after exploitation starts, the water will be pumped to a platform from the wellhole, and with a decrease in the water volume in the wellhole, the bottom pore pressure will decline gradually, thereby reducing the pressure in the reservoirs.
  • The above descriptions are only preferred implementations of the prevent invention, and it should be noted that a person of ordinary skill in the art can further make several improvements and modifications without departing from the principle of the present invention, and those improvements and modifications should be included in the protection scope of the present disclosure.

Claims (9)

What is claimed is:
1. A high-efficiency yield-increasing exploitation method for natural gas hydrates, comprising the following steps:
(i) drilling of natural gas hydrate reservoirs along horizontal wells
as for the natural gas hydrate reservoirs, drilling well arrays in an exploratory trench drilling manner along the horizontal wells, each of which comprising three horizontal wells: a first horizontal well, and a second horizontal well and a third horizontal well positioned on two sides of the first horizontal well, and each of the horizontal wells comprising a vertical well section, an inclined well section, and a horizontal well section;
(ii) seepage increasing by fracturing for fracture forming and stability improvement by grouting in the natural gas hydrate reservoirs
after completing a drilling operation, implementing fracturing for fracture forming at the horizontal well section of the first horizontal well, injecting a seawater fracturing fluid into the first horizontal well, and allowing the seawater fracturing fluid to flow into the natural gas hydrate reservoirs along the horizontal well section, so that fractures are formed in the hydrate reservoirs between the first horizontal well and the second horizontal well, and between the first horizontal well and the third horizontal well,
then, injecting foam cement slurry into the horizontal well section of the first horizontal well, allowing the foam cement slurry to be distributed all over the natural gas hydrate reservoirs, and curing for forming, and
finally, injecting a resin or oligomer chemical sand control agent into a periphery of the well to reduce or avoid a sand production rate during an exploitation of the natural gas hydrates at a later period; and
(iii) yield improvement by combined exploitation of depressurization of the horizontal wells and heat injection
injecting seawater into the natural gas hydrate reservoirs along the first horizontal well at a temperature of above 60° C., and meanwhile, reducing a bottom pore pressure of the second horizontal well and the third horizontal well, so as to improve a decomposition rate of the natural gas hydrates in the reservoirs under a collaborative action of the two operations.
2. The high-efficiency yield-increasing exploitation method for the natural gas hydrates according to claim 1, wherein in step (i), an interval among different horizontal wells is determined in the following method:
firstly, based on a Darcy's law, a pressure distribution in the natural gas hydrate reservoirs is as follows:
P 2 = P 1 + Q · μL K · A ( 1 )
wherein P1 is a bottom pore pressure of the horizontal wells, MPa; P2 is a pressure in the natural gas hydrate reservoirs, MPa; Q is a flow in pores of the natural gas hydrate reservoirs, m3/s; μ is a fluid viscosity in the reservoirs, mPa·s; L is a seepage radius of a fluid in the reservoirs, m; K is an absolute permeability of the natural gas hydrate reservoirs, mD; A is a sectional area of seepage flow of the natural gas hydrate reservoirs, m2;
then, in order to achieve a decomposition of the natural gas hydrates during an exploitation of the natural gas hydrates under reduced pressure, the pressure P2 in the reservoirs needs to conform to the following criteria:
P 2 P e = 1 0 6 exp ( n = 0 5 a n ( T + Δ T d ) n ) ( 2 )
wherein
{ a 0 = - 1 . 9 4 1 3 8 5 0 4 4 6 4 5 6 0 × 1 0 5 a 1 = 3 . 3 1 0 1 8 2 1 3 3 9 7 9 2 6 × 1 0 3 a 2 = - 2 . 2 5 5 4 0 2 6 4 4 9 3 8 0 6 × 1 0 1 a 3 = 7 . 6 7 5 5 9 1 1 7 7 8 7 0 5 9 × 1 0 - 2 a 4 = - 1 . 3 0 4 6 5 8 2 9 7 8 8 7 9 1 × 1 0 - 4 a 5 = 8 . 8 6 0 6 5 3 1 6 6 8 7 5 7 1 × 1 0 - 8 ( 3 )
wherein T is a reservoir temperature, K; ΔTd is a temperature at which a decline in a hydrate equilibrium is caused by a thermodynamic hydrate inhibitor, K;
ΔTd is obtained by the following formula through calculation:
Δ T d = Δ T d , r ln ( 1 - x ) ln ( 1 - x r ) ( 4 )
wherein x is a molar fraction of the thermodynamic hydrate inhibitor in a water phase, which is dimensionless; xr is a reference molar fraction of the thermodynamic hydrate inhibitor in the water phase, which is dimensionless; ΔTd,r is a temperature at which the decline in the hydrate equilibrium is caused under the molar fraction of the thermodynamic hydrate inhibitor as xr, K; and
an interval (L1=L) between every two horizontal wells is solved according to formulas (1)-(4).
3. The high-efficiency yield-increasing exploitation method for the natural gas hydrates according to claim 1, wherein in step (ii), during fracturing, a fracturing pressure is larger than a fracture forming pressure of the natural gas hydrate reservoirs.
4. The high-efficiency yield-increasing exploitation method for the natural gas hydrates according to claim 3, wherein in step (ii), a preparation process of the foam cement slurry is as follows:
mixing a certain mass of cement with water to form cement slurry, and adding a certain mass of foaming agent and foam stabilizer to the cement slurry with stirring to form foam cement slurry;
in the preparation of the foam cement slurry, according to the properties of the required foam cement slurry and a mix proportioning principle thereof, the using amount of the cement is as follows:
M s n = V gfc · ρ gfc S a ( 5 )
wherein Msn is the using amount of the cement, kg; ρgfc is the design dry density of the foam cement, kg/m3; Vgfc is the volume of the dry foam cement, m3; Sa is a mass coefficient, which is dimensionless, wherein the mass coefficient is 1.2 for ordinary Portland cement, and 1.4 for sulfate cement;
water supply volume:

M w =α·M w  (6)
wherein Mw is the water supply volume; a is a basic ratio of water to materials, which is dimensionless;
the using amount of the foaming agent:
M p = V py · ρ py b + 1 ( 7 )
wherein Mp is the mass of the foaming agent in the foam cement slurry, kg; Vpy is the volume of a foam concentrate formed from the foaming agent, m3; ρpy is the density of the foam concentrate formed from the foaming agent, kg/m3; b is the times of foaming of the foaming agent, which is dimensionless; and
the using amount of the foam stabilizer is half of that of the foaming agent.
5. The high-efficiency yield-increasing exploitation method for the natural gas hydrates according to claim 4, wherein in step (ii), an injection rate of the foam cement slurry is as follows:

V fc≥2L 1 ·L 2 ·H·S f  (8)
wherein Vfc is a volume of the foam cement slurry to be injected into the natural gas hydrate reservoirs, m3; L2 is a length of the horizontal well section, m; H is a thickness of the natural gas hydrate reservoirs, m; and Sf is a porosity of the natural gas hydrate reservoirs subjected to fracturing for fracture forming, which is dimensionless.
6. The high-efficiency yield-increasing exploitation method for the natural gas hydrates according to claim 4, wherein the foaming agent is preferably sodium dodecyl sulfate, and the foam stabilizer is preferably laurinol.
7. The high-efficiency yield-increasing exploitation method for the natural gas hydrates according to claim 5, wherein in step (ii), during the injection of the foam cement slurry into the horizontal well section of the first horizontal well, when the foam cement slurry is found in the second horizontal well and the third horizontal well, the injection of the foam cement slurry should be stopped, and meanwhile, the foam cement slurry is removed rapidly from the second horizontal well and the third horizontal well; and then, each of the horizontal wells is shut in for 48 h, until the foam cement slurry injected into the natural gas hydrate reservoirs is cured for forming.
8. The high-efficiency yield-increasing exploitation method for the natural gas hydrates according to claim 7, wherein in step (iii), the pressure distributed in the reservoirs is reduced by controlling a pressure decay amplitude at the bottoms of the second horizontal well and the third horizontal well, so that the natural gas hydrates in the reservoirs are decomposed into gases and water, and meanwhile, and the gases flow into the second horizontal well and the third horizontal well under a differential pressure for recovery; and
a relationship between absorption of heat from the decomposition of the hydrates and a heat transfer around the reservoirs is coordinated by controlling the bottom pore pressure of the second horizontal well and the third horizontal well with a multi-stage step-by-step depressurization strategy, that is, the pressure decay amplitude at the bottoms of the wells is reduced after the bottom pore pressure is reduced to a hydrate phase equilibrium condition in decomposition, and with every 0.5 MPa of the bottom pore pressure declining, a bottom pore pressure value is maintained until a gas recovery rate declines significantly before the depressurization of the next step.
9. The high-efficiency yield-increasing exploitation method for the natural gas hydrates according to claim 8, wherein the pressure decay amplitude at the bottoms of the wells ranges from 0.1 to 0.2 Mpa/h, and significant reduction in gas recovery rate refers to reduction of gas recovery rate to 1000 cubic meters/day below.
US18/341,816 2022-09-13 2023-06-27 High-efficiency yield-increasing exploitation method for natural gas hydrates Active US11952869B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202211106650.5 2022-09-13
CN202211106650.5A CN115306366B (en) 2022-09-13 2022-09-13 Efficient yield-increasing exploitation method for natural gas hydrate

Publications (2)

Publication Number Publication Date
US20240093579A1 true US20240093579A1 (en) 2024-03-21
US11952869B1 US11952869B1 (en) 2024-04-09

Family

ID=83866368

Family Applications (1)

Application Number Title Priority Date Filing Date
US18/341,816 Active US11952869B1 (en) 2022-09-13 2023-06-27 High-efficiency yield-increasing exploitation method for natural gas hydrates

Country Status (2)

Country Link
US (1) US11952869B1 (en)
CN (1) CN115306366B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5868202A (en) * 1997-09-22 1999-02-09 Tarim Associates For Scientific Mineral And Oil Exploration Ag Hydrologic cells for recovery of hydrocarbons or thermal energy from coal, oil-shale, tar-sands and oil-bearing formations
US7441603B2 (en) * 2003-11-03 2008-10-28 Exxonmobil Upstream Research Company Hydrocarbon recovery from impermeable oil shales
CN107542441A (en) * 2017-10-23 2018-01-05 大庆东油睿佳石油科技有限公司 A kind of method of parallel water horizontal well hot-water flooding exploitation of gas hydrate
CN107676061A (en) * 2017-10-23 2018-02-09 大庆东油睿佳石油科技有限公司 A kind of method of parallel water horizontal well exploitation offshore natural gas hydrate
US11434740B1 (en) * 2021-10-13 2022-09-06 Halliburton Energy Services, Inc. Methods of fracturing and rupturing rock formations for enhancing heat exchange efficiency in geothermal wells
US20230142443A1 (en) * 2021-11-09 2023-05-11 Halliburton Energy Services, Inc. Acid precursor treatment fluid generating and/or releasing acid for use downhole in a subterranean formation

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6158517A (en) * 1997-05-07 2000-12-12 Tarim Associates For Scientific Mineral And Oil Exploration Artificial aquifers in hydrologic cells for primary and enhanced oil recoveries, for exploitation of heavy oil, tar sands and gas hydrates
US8232438B2 (en) * 2008-08-25 2012-07-31 Chevron U.S.A. Inc. Method and system for jointly producing and processing hydrocarbons from natural gas hydrate and conventional hydrocarbon reservoirs
US8925632B2 (en) * 2010-12-09 2015-01-06 Mgm Energy Corp. In situ process to recover methane gas from hydrates
CN106761589B (en) * 2017-01-03 2018-12-25 中国石油大学(北京) A kind of method of Gas Hydrate In Sea Areas reservoir reconstruction exploitation
CN107420083B (en) * 2017-07-14 2018-11-16 中国石油大学(华东) A kind of well group structure and method hidden using geothermal energy development hydrate
CN107575201A (en) * 2017-10-23 2018-01-12 大庆东油睿佳石油科技有限公司 A kind of method of gas hydrates parallel water horizontal well microwave heating exploitation
CN107542439A (en) * 2017-10-23 2018-01-05 大庆东油睿佳石油科技有限公司 A kind of method of row's formula horizontal wells gas hydrates
CN107575197A (en) * 2017-10-23 2018-01-12 大庆东油睿佳石油科技有限公司 A kind of method of row's formula horizontal well chemical flooding exploitation of gas hydrate
CN108180001B (en) * 2018-01-19 2020-06-30 吉林大学 Method for transforming marine argillaceous silt type natural gas hydrate reservoir by foam grouting method
CN108590595B (en) * 2018-04-10 2020-04-21 广东石油化工学院 Method for exploiting non-diagenetic natural gas hydrate by utilizing F-shaped well group
CN110469313A (en) * 2019-08-08 2019-11-19 中国石油大学(华东) A kind of liquid nitrogen fracturing reform device and method for gas hydrates reservoir
CN113323631B (en) * 2020-02-28 2022-03-15 中国科学院地质与地球物理研究所 Natural gas hydrate reservoir exploitation structure and natural gas hydrate exploitation method for injecting hydraulic calcium oxide through gas fracturing
CN111827936B (en) * 2020-08-13 2021-04-16 中国石油大学(华东) Batch drilling rolling type well group natural gas hydrate exploitation system and method
CN112901121B (en) * 2021-02-10 2022-06-10 清华大学深圳国际研究生院 Method for exploiting natural gas hydrate
CN113669041B (en) * 2021-10-08 2023-09-05 中国石油大学(华东) Sea hydrate reservoir exploitation method by injecting seawater to assist low-frequency electric field heating
CN114396255B (en) * 2021-11-25 2023-09-19 西南石油大学 Reservoir temperature prediction method for underground gas storage well
CN114517664B (en) * 2022-02-21 2022-10-04 吉林大学 Sea area hydrate drainage well auxiliary pressure reduction exploitation method
CN114718520B (en) * 2022-03-18 2024-03-29 中国石油大学(华东) Method and device for drilling and extracting marine natural gas hydrate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5868202A (en) * 1997-09-22 1999-02-09 Tarim Associates For Scientific Mineral And Oil Exploration Ag Hydrologic cells for recovery of hydrocarbons or thermal energy from coal, oil-shale, tar-sands and oil-bearing formations
US7441603B2 (en) * 2003-11-03 2008-10-28 Exxonmobil Upstream Research Company Hydrocarbon recovery from impermeable oil shales
CN107542441A (en) * 2017-10-23 2018-01-05 大庆东油睿佳石油科技有限公司 A kind of method of parallel water horizontal well hot-water flooding exploitation of gas hydrate
CN107676061A (en) * 2017-10-23 2018-02-09 大庆东油睿佳石油科技有限公司 A kind of method of parallel water horizontal well exploitation offshore natural gas hydrate
US11434740B1 (en) * 2021-10-13 2022-09-06 Halliburton Energy Services, Inc. Methods of fracturing and rupturing rock formations for enhancing heat exchange efficiency in geothermal wells
US20230142443A1 (en) * 2021-11-09 2023-05-11 Halliburton Energy Services, Inc. Acid precursor treatment fluid generating and/or releasing acid for use downhole in a subterranean formation

Also Published As

Publication number Publication date
CN115306366A (en) 2022-11-08
CN115306366B (en) 2023-04-28
US11952869B1 (en) 2024-04-09

Similar Documents

Publication Publication Date Title
Crawford et al. Carbon dioxide-a multipurpose additive for effective well stimulation
Li et al. A review: Enhanced recovery of natural gas hydrate reservoirs
US6325147B1 (en) Enhanced oil recovery process with combined injection of an aqueous phase and of at least partially water-miscible gas
RU2263774C2 (en) Mehtod for obtaining hydrocarbons from rock rich in organic compounds
CN100587227C (en) Method for exploiting natural gas hydrates and device thereof
US4265310A (en) Fracture preheat oil recovery process
US4300633A (en) Method of cementing wells with foam-containing cement
CN108868736B (en) double-L well structure and method for exploiting marine hydrate reservoir by fracturing
CN106854984B (en) A kind of gas hydrates method of replacing of combination injection hot sea water enhancing methane exploitation and carbon dioxide sequestration
JP7082771B2 (en) Mining structure of natural gas hydrate reservoir and method of mining natural gas hydrate by injecting hydraulic lime by gas crushing
CN101027480A (en) Method of developing and producing deep geothermal reservoirs
CN113294126B (en) Natural gas hydrate combined mining method and device for stabilizing stratum
JPH0144878B2 (en)
CN106545325B (en) Device and method for supporting marine natural gas hydrate production-increasing cracks
CN106194122A (en) The method that a kind of oil field abandoned well transform geothermal well or sub-salt well as
CN109736752A (en) A kind of voltage drop method auxiliary temperature control CO2The recovery method of displacer gas hydrate
CN106930740A (en) A kind of method for injecting saturation hot brine stimulation for natural gas hydrate dissociation
Al-Obaidi A way to increase the efficiency of water isolating works using water repellent
US9657559B2 (en) Methods and systems for causing reaction driven cracking in subsurface rock formations
CN107882544B (en) A kind of mixing heat release method for removing blockage for carbonate cementation molding sand rock heavy oil wells
US11952869B1 (en) High-efficiency yield-increasing exploitation method for natural gas hydrates
CN112127852A (en) Efficient argillaceous powder sand mold natural gas hydrate exploitation system and exploitation method thereof
CN114135254A (en) Hydrate solid fluidization-depressurization combined mining method
CN111550222B (en) Method for exploiting natural gas hydrate by injecting steam
Wang et al. Improving the Effective Supporting and Fracturing Technology is the Key to the Successful Stimulation of Low-Permeability and Low-Rank Coalbed Methane Reservoirs

Legal Events

Date Code Title Description
AS Assignment

Owner name: SHANDONG PENGBO SAFETY AND ENVIRONMENTAL PROTECTION SERVICE CO., LTD., CHINA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ZHANG, JIANBO;WANG, ZHIYUQN;WANG, YUTING;AND OTHERS;REEL/FRAME:064068/0680

Effective date: 20230621

Owner name: CHINA UNIVERSITY OF PETROLEUM (EAST CHINA), CHINA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ZHANG, JIANBO;WANG, ZHIYUQN;WANG, YUTING;AND OTHERS;REEL/FRAME:064068/0680

Effective date: 20230621

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO SMALL (ORIGINAL EVENT CODE: SMAL); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

STCF Information on status: patent grant

Free format text: PATENTED CASE