US20240093579A1 - High-efficiency yield-increasing exploitation method for natural gas hydrates - Google Patents
High-efficiency yield-increasing exploitation method for natural gas hydrates Download PDFInfo
- Publication number
- US20240093579A1 US20240093579A1 US18/341,816 US202318341816A US2024093579A1 US 20240093579 A1 US20240093579 A1 US 20240093579A1 US 202318341816 A US202318341816 A US 202318341816A US 2024093579 A1 US2024093579 A1 US 2024093579A1
- Authority
- US
- United States
- Prior art keywords
- natural gas
- horizontal well
- reservoirs
- cement slurry
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Natural products C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 title claims abstract description 83
- 239000003345 natural gas Substances 0.000 title claims abstract description 73
- -1 natural gas hydrates Chemical class 0.000 title claims abstract description 71
- 238000000034 method Methods 0.000 title claims abstract description 55
- NMJORVOYSJLJGU-UHFFFAOYSA-N methane clathrate Chemical compound C.C.C.C.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O NMJORVOYSJLJGU-UHFFFAOYSA-N 0.000 claims abstract description 62
- 238000005553 drilling Methods 0.000 claims abstract description 34
- 238000002347 injection Methods 0.000 claims abstract description 25
- 239000007924 injection Substances 0.000 claims abstract description 25
- 230000035699 permeability Effects 0.000 claims abstract description 16
- 230000006872 improvement Effects 0.000 claims abstract description 10
- 230000001965 increasing effect Effects 0.000 claims abstract description 6
- 239000004568 cement Substances 0.000 claims description 75
- 239000006260 foam Substances 0.000 claims description 71
- 239000002002 slurry Substances 0.000 claims description 57
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 36
- 239000011148 porous material Substances 0.000 claims description 26
- 239000007789 gas Substances 0.000 claims description 24
- 239000004088 foaming agent Substances 0.000 claims description 23
- 239000013535 sea water Substances 0.000 claims description 21
- 238000000354 decomposition reaction Methods 0.000 claims description 17
- 239000003112 inhibitor Substances 0.000 claims description 17
- 239000012530 fluid Substances 0.000 claims description 15
- 238000011084 recovery Methods 0.000 claims description 14
- 150000004677 hydrates Chemical group 0.000 claims description 12
- 230000007423 decrease Effects 0.000 claims description 10
- 239000004576 sand Substances 0.000 claims description 8
- 239000003381 stabilizer Substances 0.000 claims description 8
- 238000004519 manufacturing process Methods 0.000 claims description 7
- 239000012141 concentrate Substances 0.000 claims description 6
- 238000002360 preparation method Methods 0.000 claims description 6
- 238000003491 array Methods 0.000 claims description 5
- 238000013461 design Methods 0.000 claims description 5
- 230000009471 action Effects 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims description 4
- 230000009467 reduction Effects 0.000 claims description 4
- 239000011398 Portland cement Substances 0.000 claims description 3
- DBMJMQXJHONAFJ-UHFFFAOYSA-M Sodium laurylsulphate Chemical group [Na+].CCCCCCCCCCCCOS([O-])(=O)=O DBMJMQXJHONAFJ-UHFFFAOYSA-M 0.000 claims description 3
- QAOWNCQODCNURD-UHFFFAOYSA-L Sulfate Chemical compound [O-]S([O-])(=O)=O QAOWNCQODCNURD-UHFFFAOYSA-L 0.000 claims description 3
- 238000010521 absorption reaction Methods 0.000 claims description 3
- 238000004364 calculation method Methods 0.000 claims description 3
- 239000003795 chemical substances by application Substances 0.000 claims description 3
- 238000009826 distribution Methods 0.000 claims description 3
- 238000005187 foaming Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 239000011347 resin Substances 0.000 claims description 3
- 229920005989 resin Polymers 0.000 claims description 3
- 238000003756 stirring Methods 0.000 claims description 3
- 239000000126 substance Substances 0.000 claims description 3
- 238000012546 transfer Methods 0.000 claims description 3
- 238000002156 mixing Methods 0.000 claims 1
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 6
- 239000000243 solution Substances 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 229910002092 carbon dioxide Inorganic materials 0.000 description 3
- 239000001569 carbon dioxide Substances 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 2
- 238000005243 fluidization Methods 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- VUZPPFZMUPKLLV-UHFFFAOYSA-N methane;hydrate Chemical class C.O VUZPPFZMUPKLLV-UHFFFAOYSA-N 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 150000003839 salts Chemical class 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0099—Equipment or details not covered by groups E21B15/00 - E21B40/00 specially adapted for drilling for or production of natural hydrate or clathrate gas reservoirs; Drilling through or monitoring of formations containing gas hydrates or clathrates
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
- E21B33/138—Plastering the borehole wall; Injecting into the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
Definitions
- the present invention relates to a high-efficiency yield-increasing exploitation method for natural gas hydrates, and belongs to the technical field of the exploitation of the natural gas hydrates.
- Natural gas hydrates are anew clean and efficient energy with huge reserves. According to incomplete statistics, organic carbon reserves in natural gas hydrates are twice as large as those of fossil energy, such as oil gases, around the world. Due to the shallow depth of burying storage, poor cementation, poor permeability, non-stratified rock properties, and other characteristics in the majority of natural gas hydrate reservoirs, the conventional exploitation method of oil gases is unable to be suitable for the exploitation of the natural gas hydrate reservoirs.
- the depressurization method is such a method that the pressure in the reservoirs is reduced via control over the bottom pore pressure of exploitation wellholes, the original exploitation condition of the natural gas hydrates therein is destroyed, and the natural gas hydrates are forcedly decomposed into methane gases and water for the recovery of the methane gases.
- the heat injection method is such a method that heat is injected into the reservoirs to elevate the temperature of the reservoirs, the original exploitation condition of the natural gas hydrates therein is destroyed, and the natural gas hydrates are forcedly decomposed into methane gases and water for the recovery of the methane gases.
- the inhibitor injection method is such a method that the temperature at which the hydrates are stabilized is reduced by injecting thermodynamic inhibitors of the hydrates into the reservoirs, or the original equilibrium condition in the reservoirs is destroyed under the increased pressure.
- the carbon dioxide replacement method is such a method that methane in methane hydrates is replaced by injecting carbon dioxide which is prone to produce hydrates into the reservoirs to recover the methane gases therefrom.
- the solid-fluidization method is such a method that hydrate-containing non-stratified rock deposit sediments are crushed into fine granules via seabed exploitation, and mixed with seawater, and the mixture is lifted to a platform for further processing along a closed pipeline.
- the depressurization method has the advantages of high gas recovery rate, easiness in operation, low costs, and the like, which is called a preferred method for most possibly achieving the commercial exploitation of the natural gas hydrates in the future.
- the decomposition of the natural gas hydrates in the reservoirs will further weaken the cementation of the reservoirs, and the reservoirs are compacted under the action of overburden pressure to reduce the permeability, which severely affects the high-efficiency exploitation of the natural gas hydrates.
- the current exploitation method still has the defect of low yield, and the commercial exploitation condition of the natural gas hydrates hasn't been reached yet.
- the present invention provides a high-efficiency yield-increasing exploitation method of natural gas hydrates, in which the seepage capability and stability of reservoirs are improved by fracturing of horizontal wells for fracture forming and the injection of foam cement slurry, and the exploitation yield of the natural gas hydrates is improved by an exploitation method of depressurization+heat injection, which provides a guarantee for achieving the commercial exploitation of the natural gas hydrate reservoirs across the sea area in the future.
- a high-efficiency yield-increasing exploitation method for natural gas hydrates includes the following steps:
- fracturing for fracture forming at the horizontal well section of the first horizontal well is implemented, a seawater fracturing fluid is injected into the first horizontal well, and flows into the natural gas hydrate reservoirs along the horizontal well section, so that fractures are formed in the hydrate reservoirs between the first horizontal well and the second horizontal well, and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs,
- foam cement slurry is injected into the horizontal well section of the first horizontal well, is distributed all over the natural gas hydrate reservoirs, and is cured for forming for a period of time, thereby improving the stability of the hydrate reservoirs, and finally, a resin or oligomer chemical sand control agent which is commonly used in the art is injected into a periphery of the well to reduce or avoid a sand production rate during an exploitation of the natural gas hydrates at the later period and improve the safety of the natural gas hydrates in exploitation; and in this step, the first horizontal well is designed as a fracturing well; the horizontal well section of the first horizontal well is fractured only in order to maintain the stability of the wellhole; seawater which is convenient to obtain, sufficient in supply, and low in costs serves as the fracturing fluid, with a fracturing pressure thereof being larger than a fracture forming pressure of the hydrate reservoirs, and the seawater fracturing fluid flows into the hydrate reservoirs along the horizontal well section of the
- the exploitation yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection; and in order to reduce the exploitation costs of the natural gas hydrates, seawater is injected into the natural gas hydrate reservoirs along the first horizontal well at a temperature of more than 60° C. to elevate the temperature of the reservoirs, and meanwhile, a bottom pore pressure of the second horizontal well and the third horizontal well is reduced; and a decomposition rate of the natural gas hydrates in the reservoirs is improved under the collaborative action of the two operations.
- drilling time is shortened by rapid drilling along the horizontal well
- the permeability of the reservoirs may be effectively improved by fracturing for fracture forming
- the stability of the reservoirs may be improved by injecting foam cement slurry into the reservoirs
- the yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection.
- the method has the advantages of reducing drilling costs, improving the permeability of the reservoirs, enhancing the stability of the reservoirs, improving the gas recovery efficiency and the like.
- an exploratory trench cycle drilling manner is available, that is, a wellhole of the drilled well at a seawater section is not provided with a water-proofing pipe, and a drilling fluid returning from an annular space of a wellhole of the drilled well at a stratum section and rock debris carried thereby are discharged to a seabed at a mud line; and by the exploratory trench cycle drilling manner, a drilling rate may be improved significantly, a drilling cycle may be shortened, drilling costs may be reduced, and safety risks arising from closed cycle drilling may be avoided.
- the drilled well is designed as the horizontal well, and as a wellhole of the horizontal well may be obviously longer than that of a vertical well, a contact area between the exploitation wellbore and the reservoirs may be increased to lay a foundation for improving the yield of the natural gas hydrate during exploitation at the later period.
- a total of 3 horizontal wells are provided, which constitute a well array.
- multiple well arrays may be used for combined exploitation; and if the site condition (smaller hydrate enrichment regions, and farther disperse distance) does not satisfy the condition, single-well exploitation may also be implemented, that is, the exploitation of one well array is completed before the exploitation of the next well array.
- a distance among multiple well arrays may be calculated with formulas (1)-(4).
- an interval among different horizontal wells may be determined by the following method:
- a pressure distribution in the natural gas hydrate reservoirs may be as follows:
- P 1 is a bottom pore pressure of the horizontal wells, MPa
- P 2 is a pressure in the natural gas hydrate reservoirs, MPa
- Q is a flow in pores of the natural gas hydrate reservoirs, m 3 /s
- ⁇ is a fluid viscosity in the reservoirs, mPa ⁇ s
- L is a seepage radius of a fluid in the reservoirs, m
- K is an absolute permeability of the natural gas hydrate reservoirs, mD
- A is a sectional area of seepage flow of the natural gas hydrate reservoirs, m 2 ;
- the pressure P 2 in the reservoirs needs to conform to the following criteria:
- T is a reservoir temperature, K
- ⁇ T d is a temperature at which a decline in a hydrate equilibrium is caused by a thermodynamic hydrate inhibitor, K
- ⁇ T d may be obtained by the following formula through calculation:
- ⁇ ⁇ T d ⁇ ⁇ T d , r ⁇ ln ⁇ ( 1 - x ) ln ⁇ ( 1 - x r ) ( 4 )
- x is a molar fraction of the thermodynamic hydrate inhibitor in a water phase, which is dimensionless
- x r is a reference molar fraction of the thermodynamic hydrate inhibitor in the water phase, which is dimensionless
- ⁇ T d,r is a temperature at which the decline in the hydrate equilibrium is caused under the molar fraction of the thermodynamic hydrate inhibitor as x r , K;
- thermodynamic hydrate inhibitor is the seawater, and the seawater, containing salinity, belongs to a salt-based thermodynamic hydrate inhibitor.
- a fracturing pressure is larger than a fracture forming pressure of the natural gas hydrate reservoirs.
- step (2) a preparation process of the foam cement slurry is as follows:
- a certain mass of cement is mixed with water to form cement slurry, and a certain mass of foaming agent and foam stabilizer are added to the cement slurry with stirring until fine and stable bubbles which are independent of each other are formed, and the foam cement slurry with low density and high permeability may be formed, with a density thereof being less than 1.0 g/cm 3 , which needs, however, to be determined according to actual design and requirements on site, that is, ⁇ gfc in the formula (5).
- the construction method is readily available, without arranging any additional equipment, and the formed foam cement slurry has the advantages of stable properties, high compressive strength, low costs, and the like. What there will be to adopt in the construction method is thinner foam cement slurry. This may improve the liquidity of the foam cement slurry in the reservoirs, making it distributed all over the pores of the reservoirs better.
- the using amount of the cement is as follows:
- M sn is the using amount of the cement, kg
- ⁇ gfc is the design dry density of the foam cement, kg/m 3
- V gfc is the volume of the dry foam cement, m 3
- S a is a mass coefficient, which is dimensionless, wherein it is 1.2 for ordinary Portland cement, and 1.4 for sulfate cement
- M w is the water supply volume
- a is a basic ratio of water to materials, which is dimensionless
- M p is the mass of the foaming agent in the foam cement slurry, kg
- V py is the volume of a foam concentrate formed from the foaming agent, m 3
- ⁇ py is the density of the foam concentrate formed from the foaming agent, kg/m 3
- b is the times of foaming of the foaming agent, which is dimensionless
- the using amount of the foam stabilizer is half of that of the foaming agent.
- an injection rate of the foam cement slurry is as follows:
- V fc is a volume of the foam cement slurry to be injected into the natural gas hydrate reservoirs, m 3 ;
- L 2 is a length of the horizontal well section, m;
- H is a thickness of the natural gas hydrate reservoirs, m; and
- S f is a porosity of the natural gas hydrate reservoirs subjected to fracturing for fracture forming, which is dimensionless.
- the foaming agent is preferably sodium dodecyl sulfate, and the foam stabilizer is preferably laurinol.
- step (2) during the injection of the foam cement slurry into the horizontal well section of the first horizontal well, when it is found that there is the foam cement slurry in the second horizontal well and the third horizontal well, the injection of the foam cement slurry may be stopped, and meanwhile, the foam cement slurry is removed rapidly from the second horizontal well and the third horizontal well, that is, clear water may be injected into drill stems in the second horizontal well and the third horizontal well, the foam cement slurry carried thereby returns upwards from an annular space between the drill stems and drivepipes to fulfill the objective of cleaning; and then, each of the horizontal wells is shut in for 48 h, until the foam cement slurry injected into the natural gas hydrate reservoirs is cured for forming, which may improve the stability of the reservoirs during the exploitation of the natural gas hydrates and reduce risks of the collapse and sand production of the natural gas hydrate reservoirs.
- the pressure distributed in the reservoirs is reduced by controlling a pressure decay amplitude at the bottoms of the second horizontal well and the third horizontal well, so that the natural gas hydrates in the reservoirs are decomposed into gases and water, and meanwhile, and the gases flow into the second horizontal well and the third horizontal well under a differential pressure for recovery.
- a relationship between absorption of heat from the decomposition of the hydrates and a heat transfer around the reservoirs is coordinated by controlling the bottom pore pressure of the second horizontal well and the third horizontal well with a multi-stage step-by-step depressurization strategy, that is, the pressure decay amplitude at the bottoms of the wells is reduced slowly after the bottom pore pressure is reduced to a hydrate phase equilibrium condition in decomposition, and with every 0.5 MPa of the bottom pore pressure declining, a bottom pore pressure value is maintained until a gas recovery rate declines significantly before the depressurization of the next step, thereby fulfilling the objective of reducing or avoiding the secondary generation risk of the hydrates in the reservoirs.
- a method for reducing the bottom pore pressure is as follows:
- the wellhole Before the exploitation of the hydrates, the wellhole is filled with water, at which the bottom pore pressure is equal to a gravity pressure of water; and after exploitation starts, the water will be pumped to a platform from the wellhole, and with a decrease in the water volume in the wellhole, the bottom pore pressure will decline gradually, thereby reducing the pressure in the reservoirs.
- the pressure decay amplitude at the bottoms of the wells ranges from 0.1 to 0.2 Mpa/h, and significant reduction in gas production refers to reduction of gas production to 1000 cubic meters/day below.
- seawater temperature at a sea level is higher, seawater can be supplied sufficiently and contains a certain salinity, and after being heated on the platform, the pumped seawater with the higher temperature is injected into the natural gas hydrate reservoirs along the first horizontal well; if the seawater temperature is lower, the measure of heating before injecting on the platform can be taken; the objective of heating the reservoirs can be fulfilled in a process that the injected seawater flows in fractures and pores of the natural gas hydrate reservoirs, and the temperature of the reservoirs is effectively maintained and elevated by making up heat absorbed from the decomposition of the natural gas hydrates in the reservoirs, and thus the gas recovery efficiency from the decomposition of the natural gas hydrates is further improved; and finally, the natural gas hydrates are decomposed into water and natural gases with the seawater injected into the reservoirs, which are recovered from the second horizontal well and the third horizontal well. According to the combined exploitation method of depressurization of the horizontal
- FIG. 1 is a schematic diagram of a horizontal well of natural gas hydrate reservoirs according to the present invention.
- FIG. 2 is a schematic top view of an exploitation of natural gas hydrate reservoirs.
- a high-efficiency yield-increasing exploitation method for natural gas hydrates includes the following steps:
- drilling well arrays are drilled in an exploratory trench cycle drilling manner, each of which includes three horizontal wells: a first horizontal well 6 , and a second horizontal well 8 and a third horizontal well 9 positioned on two sides of the first horizontal well 6 , and each of the horizontal wells includes a vertical well section 3 , an inclined well section 4 , and a horizontal well section 5 ;
- the drilling efficiency of single wells may be improved, and the drilling operation along the horizontal wells may increase a contact area between an exploitation wellhole and the reservoirs to improve the exploitation yield of the natural gas hydrates.
- fracturing is implemented for fracture forming at the horizontal well section 5 of the first horizontal well 6 , a seawater fracturing fluid is injected into the first horizontal well and flows into the natural gas hydrate reservoirs along the horizontal well section, so that fractures 7 are formed in the hydrate reservoirs between the first horizontal well and the second horizontal well, and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs,
- foam cement slurry is injected into the horizontal well section of the first horizontal well, is distributed all over the natural gas hydrate reservoirs, and is cured for forming for a period of time, thereby improving the stability of the hydrate reservoirs,
- a resin or oligomer chemical sand control agent which is commonly used in the art is injected into a periphery of the well to reduce or avoid a sand production rate during an exploitation of the natural gas hydrates at the later period and improve the safety of the natural gas hydrates in exploitation;
- the first horizontal well is designed as a fracturing well; the horizontal well section of the first horizontal well is fractured only in order to maintain the stability of the wellhole; seawater which is convenient to obtain, sufficient in supply, and low in costs serves as the fracturing fluid, with a fracturing pressure thereof being larger than a fracture forming pressure of the hydrate reservoirs, and the seawater fracturing fluid flows into the hydrate reservoirs along the horizontal well section of the first horizontal well, forming the fractures in the hydrate reservoirs between the first horizontal well and the second horizontal well and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs.
- the exploitation yield of the natural gas hydrates may be improved via the combined exploitation of depressurization of the horizontal well and heat injection, and in order to reduce the exploitation costs of the natural gas hydrates, seawater is injected into the natural gas hydrate reservoirs along the first horizontal well 6 at a temperature of more than 60° C. to elevate the reservoir temperature; and meanwhile, a pressure at bottoms of the second horizontal well 8 and the third horizontal well 9 is reduced, so as to improve a decomposition rate of the natural gas hydrates in the reservoirs under the collaborative action of the two operations.
- drilling time is shortened by rapid drilling along the horizontal well
- the permeability of the reservoirs may be effectively improved by fracturing for fracture forming
- the stability of the reservoirs may be improved by injecting foam cement slurry into the reservoirs
- the yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection.
- the method has the advantages of reducing drilling costs, improving the permeability of the reservoirs, enhancing the stability of the reservoirs, improving the gas recovery efficiency and the like.
- a high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 1 in that in step (1), an interval among different horizontal wells is determined by the following method:
- a pressure distribution in natural gas hydrate reservoirs may be as follows:
- P 1 is a bottom pore pressure of the horizontal wells, MPa
- P 2 is a pressure in the natural gas hydrate reservoirs, MPa
- Q is a flow in pores of the natural gas hydrate reservoirs, m 3 /s
- ⁇ is a fluid viscosity in the reservoirs, mPa ⁇ s
- L is a seepage radius of a fluid in the reservoirs, m
- K is an absolute permeability of the natural gas hydrate reservoirs, mD
- A is a sectional area of seepage flow of the natural gas hydrate reservoirs, m 2 ;
- the pressure P 2 in the reservoirs needs to conform to the following criteria:
- T is a reservoir temperature, K
- ⁇ T d is a temperature at which a decline in a hydrate equilibrium is caused by a thermodynamic hydrate inhibitor, K
- ⁇ T d may be obtained by the following formula through calculation:
- ⁇ ⁇ T d ⁇ ⁇ T d , r ⁇ ln ⁇ ( 1 - x ) ln ⁇ ( 1 - x r ) ( 4 )
- x is a molar fraction of the thermodynamic hydrate inhibitor in a water phase, which is dimensionless
- x r is a reference molar fraction of the thermodynamic hydrate inhibitor in the water phase, which is dimensionless
- ⁇ T d,r is a temperature at which the decline in the hydrate equilibrium is caused under the molar fraction of the thermodynamic hydrate inhibitor as x r , K;
- a high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 2 in that in step (2), during fracturing, a fracturing pressure is larger than a fracture forming pressure of the natural gas hydrate reservoirs.
- step (2) a preparation process of foam cement slurry is as follows:
- a certain mass of cement is mixed with water to form cement slurry, and a certain mass of foaming agent (sodium dodecyl sulfate) and foam stabilizer (laurinol) are added to the cement slurry with stirring until fine and stable bubbles which are independent of each other are formed, and the foam cement slurry with low density and high permeability may be formed, with a density thereof being less than 1.0 g/cm 3 , which needs, however, to be determined according to actual design and requirements on site, that is, ⁇ gfc in the formula (5).
- the construction method is readily available, without arranging any additional equipment, and the formed foam cement slurry has the advantages of stable properties, high compressive strength, low costs, and the like. What there will be to adopt in the construction method is thinner foam cement slurry. This may improve the liquidity of the foam cement slurry in the reservoirs, making it distributed all over the pores of the reservoirs better.
- the using amount of the cement is as follows:
- M sn is the using amount of the cement, kg
- ⁇ gfc is the design dry density of the foam cement, kg/m 3
- V gfc is the volume of the dry foam cement, m 3
- S a is a mass coefficient, which is dimensionless, wherein it is 1.2 for ordinary Portland cement, and 1.4 for sulfate cement
- M w is the water supply volume
- a is a basic ratio of water to materials, which is dimensionless
- M p is the mass of the foaming agent in the foam cement slurry, kg
- V py is the volume of a foam concentrate formed from the foaming agent, m 3
- ⁇ py is the density of the foam concentrate formed from the foaming agent, kg/m 3
- b is the times of foaming of the foaming agent, which is dimensionless
- the using amount of the foam stabilizer is half of that of the foaming agent.
- the injection rate of the foam cement slurry is as follows:
- V fc is a volume of the foam cement slurry to be injected into the natural gas hydrate reservoirs, m 3 ;
- L 2 is a length of the horizontal well section, m;
- H is a thickness of the natural gas hydrate reservoirs, m; and
- S f is a porosity of the natural gas hydrate reservoirs subjected to fracturing for fracture forming, which is dimensionless.
- a high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 3 in that in step (2), during the injection of foam cement slurry into the horizontal well section of the first horizontal well, when it is found that there is the foam cement slurry in the second horizontal well and the third horizontal well, the injection of the foam cement slurry may be stopped, and meanwhile, the foam cement slurry is removed rapidly from the second horizontal well and the third horizontal well, that is, clear water may be injected into drill stems in the second horizontal well and the third horizontal well, the foam cement slurry carried thereby returns upwards from an annular space between the drill stems and drivepipes to fulfill the objective of cleaning; and then, each of the horizontal wells is shut in for 48 h, until the foam cement slurry injected into the natural gas hydrate reservoirs is cured for forming, which may improve the stability of the reservoirs during the exploitation of the natural gas hydrates and reduce risks of the collapse and sand production of the natural gas hydrate reservoirs.
- a high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 4 in that, in step (3), the pressure distributed in the reservoirs is reduced by controlling a pressure decay amplitude at the bottoms of the second horizontal well and the third horizontal well, so that the natural gas hydrates in the reservoirs are decomposed into gases and water, and meanwhile, and the gases flow into the second horizontal well and the third horizontal well under a differential pressure for recovery
- a relationship between absorption of heat from the decomposition of the hydrates and a heat transfer around the reservoirs is coordinated by controlling the bottom hole pressure of the second horizontal well and the third horizontal well with a multi-stage step-by-step depressurization strategy, that is, the pressure decay amplitude at the bottoms of the wells is reduced slowly after the bottom hole pressure is reduced to a hydrate phase equilibrium condition in decomposition, ranging from 0.1 to 0.2 MPa, and with every 0.5 MPa of the bottom hole pressure declining, a bottom hole pressure value is maintained until a gas recovery rate declines significantly (i.e., declining to 1000 cubic meters/day below) before the depressurization of the next step, thereby fulfilling the objective of reducing or avoiding the secondary generation risk of the hydrates in the reservoirs.
- a method for reducing the bottom pore pressure is as follows:
- the wellhole Before the exploitation of the hydrates, the wellhole is filled with water, at which the bottom pore pressure is equal to a gravity pressure of water; and after exploitation starts, the water will be pumped to a platform from the wellhole, and with a decrease in the water volume in the wellhole, the bottom pore pressure will decline gradually, thereby reducing the pressure in the reservoirs.
Abstract
Description
- This application claims priority to Chinese Patent Application Ser. No. CN2022111066505 filed on 13 Sep. 2022.
- The present invention relates to a high-efficiency yield-increasing exploitation method for natural gas hydrates, and belongs to the technical field of the exploitation of the natural gas hydrates.
- Natural gas hydrates are anew clean and efficient energy with huge reserves. According to incomplete statistics, organic carbon reserves in natural gas hydrates are twice as large as those of fossil energy, such as oil gases, around the world. Due to the shallow depth of burying storage, poor cementation, poor permeability, non-stratified rock properties, and other characteristics in the majority of natural gas hydrate reservoirs, the conventional exploitation method of oil gases is unable to be suitable for the exploitation of the natural gas hydrate reservoirs. In order to more efficiently exploit the natural gas hydrates in the reservoirs, researchers have, in recent years, proposed a variety of different exploitation methods, including a depressurization method, a heat injection method, an inhibitor injection method, a carbon dioxide replacement method, a solid-fluidization method, and the like.
- The depressurization method is such a method that the pressure in the reservoirs is reduced via control over the bottom pore pressure of exploitation wellholes, the original exploitation condition of the natural gas hydrates therein is destroyed, and the natural gas hydrates are forcedly decomposed into methane gases and water for the recovery of the methane gases. The heat injection method is such a method that heat is injected into the reservoirs to elevate the temperature of the reservoirs, the original exploitation condition of the natural gas hydrates therein is destroyed, and the natural gas hydrates are forcedly decomposed into methane gases and water for the recovery of the methane gases. The inhibitor injection method is such a method that the temperature at which the hydrates are stabilized is reduced by injecting thermodynamic inhibitors of the hydrates into the reservoirs, or the original equilibrium condition in the reservoirs is destroyed under the increased pressure. The carbon dioxide replacement method is such a method that methane in methane hydrates is replaced by injecting carbon dioxide which is prone to produce hydrates into the reservoirs to recover the methane gases therefrom. The solid-fluidization method is such a method that hydrate-containing non-stratified rock deposit sediments are crushed into fine granules via seabed exploitation, and mixed with seawater, and the mixture is lifted to a platform for further processing along a closed pipeline.
- In the existing method, the depressurization method has the advantages of high gas recovery rate, easiness in operation, low costs, and the like, which is called a preferred method for most possibly achieving the commercial exploitation of the natural gas hydrates in the future. However, during the exploitation of the natural gas hydrates, the decomposition of the natural gas hydrates in the reservoirs will further weaken the cementation of the reservoirs, and the reservoirs are compacted under the action of overburden pressure to reduce the permeability, which severely affects the high-efficiency exploitation of the natural gas hydrates. Meanwhile, the current exploitation method still has the defect of low yield, and the commercial exploitation condition of the natural gas hydrates hasn't been reached yet.
- In conclusion, the high-efficiency yield-increasing exploitation method of the natural gas hydrates hasn't been found yet, which is a key difficulty that restricts the commercial exploitation of the natural gas hydrates. Therefore, the present invention is provided.
- Aiming at the defects in the prior art, and especially for difficulties of low yield, short time of duration, and poor economic efficiency during the exploitation of the natural gas hydrates, the present invention provides a high-efficiency yield-increasing exploitation method of natural gas hydrates, in which the seepage capability and stability of reservoirs are improved by fracturing of horizontal wells for fracture forming and the injection of foam cement slurry, and the exploitation yield of the natural gas hydrates is improved by an exploitation method of depressurization+heat injection, which provides a guarantee for achieving the commercial exploitation of the natural gas hydrate reservoirs across the sea area in the future.
- In the present invention, the following technical solutions are as follow:
- A high-efficiency yield-increasing exploitation method for natural gas hydrates includes the following steps:
-
- (1) drilling of natural gas hydrate reservoirs along horizontal wells
as for the natural gas hydrate reservoirs, well arrays are drilled in an exploratory trench drilling manner along the horizontal wells, each of which includes three horizontal wells: a first horizontal well, and a second horizontal well and a third horizontal well positioned on two sides of the first horizontal well, and each of the horizontal wells includes a vertical well section, an inclined well section, and a horizontal well section,
by the exploratory trench drilling manner, the drilling efficiency of single wells may be improved, and the drilling operation along the horizontal wells may increase a contact area between an exploitation wellhole and the reservoirs to improve the exploitation yield of the natural gas hydrates. - (2) seepage increasing by fracturing for fracture forming and stability improvement by grouting in the natural gas hydrate reservoirs
- (1) drilling of natural gas hydrate reservoirs along horizontal wells
- After the drilling operation is completed, fracturing for fracture forming at the horizontal well section of the first horizontal well is implemented, a seawater fracturing fluid is injected into the first horizontal well, and flows into the natural gas hydrate reservoirs along the horizontal well section, so that fractures are formed in the hydrate reservoirs between the first horizontal well and the second horizontal well, and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs,
- and then, foam cement slurry is injected into the horizontal well section of the first horizontal well, is distributed all over the natural gas hydrate reservoirs, and is cured for forming for a period of time, thereby improving the stability of the hydrate reservoirs, and
finally, a resin or oligomer chemical sand control agent which is commonly used in the art is injected into a periphery of the well to reduce or avoid a sand production rate during an exploitation of the natural gas hydrates at the later period and improve the safety of the natural gas hydrates in exploitation;
and in this step, the first horizontal well is designed as a fracturing well; the horizontal well section of the first horizontal well is fractured only in order to maintain the stability of the wellhole; seawater which is convenient to obtain, sufficient in supply, and low in costs serves as the fracturing fluid, with a fracturing pressure thereof being larger than a fracture forming pressure of the hydrate reservoirs, and the seawater fracturing fluid flows into the hydrate reservoirs along the horizontal well section of the first horizontal well, forming the fractures in the hydrate reservoirs between the first horizontal well and the second horizontal well and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs. -
- (3) Yield improvement by combined exploitation of depressurization of the horizontal well and heat injection
- The exploitation yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection; and in order to reduce the exploitation costs of the natural gas hydrates, seawater is injected into the natural gas hydrate reservoirs along the first horizontal well at a temperature of more than 60° C. to elevate the temperature of the reservoirs, and meanwhile, a bottom pore pressure of the second horizontal well and the third horizontal well is reduced; and a decomposition rate of the natural gas hydrates in the reservoirs is improved under the collaborative action of the two operations.
- According to the above-mentioned technical solution, drilling time is shortened by rapid drilling along the horizontal well, the permeability of the reservoirs may be effectively improved by fracturing for fracture forming, the stability of the reservoirs may be improved by injecting foam cement slurry into the reservoirs, and the yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection. The method has the advantages of reducing drilling costs, improving the permeability of the reservoirs, enhancing the stability of the reservoirs, improving the gas recovery efficiency and the like.
- According to the present invention, preferably, in step (1), in view of an upper stratum above the deep-water natural gas hydrate reservoirs, featuring shallow depth, softness, and looseness, an exploratory trench cycle drilling manner is available, that is, a wellhole of the drilled well at a seawater section is not provided with a water-proofing pipe, and a drilling fluid returning from an annular space of a wellhole of the drilled well at a stratum section and rock debris carried thereby are discharged to a seabed at a mud line; and by the exploratory trench cycle drilling manner, a drilling rate may be improved significantly, a drilling cycle may be shortened, drilling costs may be reduced, and safety risks arising from closed cycle drilling may be avoided. Meanwhile, the drilled well is designed as the horizontal well, and as a wellhole of the horizontal well may be obviously longer than that of a vertical well, a contact area between the exploitation wellbore and the reservoirs may be increased to lay a foundation for improving the yield of the natural gas hydrate during exploitation at the later period. During drilling every time, a total of 3 horizontal wells are provided, which constitute a well array. During exploitation, if the site condition (larger hydrate enrichment regions, and closer distance among regions) satisfies the condition, multiple well arrays may be used for combined exploitation; and if the site condition (smaller hydrate enrichment regions, and farther disperse distance) does not satisfy the condition, single-well exploitation may also be implemented, that is, the exploitation of one well array is completed before the exploitation of the next well array. A distance among multiple well arrays may be calculated with formulas (1)-(4).
- Preferable, in step (1), an interval among different horizontal wells may be determined by the following method:
- Firstly, based on a Darcy's law, a pressure distribution in the natural gas hydrate reservoirs may be as follows:
-
- where P1 is a bottom pore pressure of the horizontal wells, MPa; P2 is a pressure in the natural gas hydrate reservoirs, MPa; Q is a flow in pores of the natural gas hydrate reservoirs, m3/s; μ is a fluid viscosity in the reservoirs, mPa·s; L is a seepage radius of a fluid in the reservoirs, m; K is an absolute permeability of the natural gas hydrate reservoirs, mD; A is a sectional area of seepage flow of the natural gas hydrate reservoirs, m2;
- then, in order to achieve a decomposition of the natural gas hydrates during an exploitation of the natural gas hydrates under reduced pressure, the pressure P2 in the reservoirs needs to conform to the following criteria:
-
- where T is a reservoir temperature, K; ΔTd is a temperature at which a decline in a hydrate equilibrium is caused by a thermodynamic hydrate inhibitor, K;
- ΔTd may be obtained by the following formula through calculation:
-
- where x is a molar fraction of the thermodynamic hydrate inhibitor in a water phase, which is dimensionless; xr is a reference molar fraction of the thermodynamic hydrate inhibitor in the water phase, which is dimensionless; ΔTd,r is a temperature at which the decline in the hydrate equilibrium is caused under the molar fraction of the thermodynamic hydrate inhibitor as xr, K; and
- an interval (L1=L) between every two horizontal wells is solved according to formulas (1)-(4), based on which the layout of the three horizontal wells is supported theoretically.
- In formulas (3) and (4), the thermodynamic hydrate inhibitor is the seawater, and the seawater, containing salinity, belongs to a salt-based thermodynamic hydrate inhibitor.
- Preferably, in step (2), during fracturing, a fracturing pressure is larger than a fracture forming pressure of the natural gas hydrate reservoirs.
- Preferably, in step (2), a preparation process of the foam cement slurry is as follows:
- a certain mass of cement is mixed with water to form cement slurry, and a certain mass of foaming agent and foam stabilizer are added to the cement slurry with stirring until fine and stable bubbles which are independent of each other are formed, and the foam cement slurry with low density and high permeability may be formed, with a density thereof being less than 1.0 g/cm3, which needs, however, to be determined according to actual design and requirements on site, that is, ρgfc in the formula (5). The construction method is readily available, without arranging any additional equipment, and the formed foam cement slurry has the advantages of stable properties, high compressive strength, low costs, and the like. What there will be to adopt in the construction method is thinner foam cement slurry. This may improve the liquidity of the foam cement slurry in the reservoirs, making it distributed all over the pores of the reservoirs better.
- In the preparation of the foam cement slurry, according to the properties of the required foam cement slurry and a mix proportioning principle thereof, the using amount of the cement is as follows:
-
- where Msn is the using amount of the cement, kg; ρgfc is the design dry density of the foam cement, kg/m3; Vgfc is the volume of the dry foam cement, m3; Sa is a mass coefficient, which is dimensionless, wherein it is 1.2 for ordinary Portland cement, and 1.4 for sulfate cement;
- water supply volume:
-
M w =a·M sn (6) - where Mw is the water supply volume; a is a basic ratio of water to materials, which is dimensionless;
- the using amount of the foaming agent:
-
- where Mp is the mass of the foaming agent in the foam cement slurry, kg; Vpy is the volume of a foam concentrate formed from the foaming agent, m3; ρpy is the density of the foam concentrate formed from the foaming agent, kg/m3; b is the times of foaming of the foaming agent, which is dimensionless; and
- the using amount of the foam stabilizer is half of that of the foaming agent.
- Preferably, in step (2), an injection rate of the foam cement slurry is as follows:
-
V fc≥2L 1 ·L 2 ·H·S f (8) - where Vfc is a volume of the foam cement slurry to be injected into the natural gas hydrate reservoirs, m3; L2 is a length of the horizontal well section, m; H is a thickness of the natural gas hydrate reservoirs, m; and Sf is a porosity of the natural gas hydrate reservoirs subjected to fracturing for fracture forming, which is dimensionless.
- Preferably, the foaming agent is preferably sodium dodecyl sulfate, and the foam stabilizer is preferably laurinol.
- Preferably, in step (2), during the injection of the foam cement slurry into the horizontal well section of the first horizontal well, when it is found that there is the foam cement slurry in the second horizontal well and the third horizontal well, the injection of the foam cement slurry may be stopped, and meanwhile, the foam cement slurry is removed rapidly from the second horizontal well and the third horizontal well, that is, clear water may be injected into drill stems in the second horizontal well and the third horizontal well, the foam cement slurry carried thereby returns upwards from an annular space between the drill stems and drivepipes to fulfill the objective of cleaning; and then, each of the horizontal wells is shut in for 48 h, until the foam cement slurry injected into the natural gas hydrate reservoirs is cured for forming, which may improve the stability of the reservoirs during the exploitation of the natural gas hydrates and reduce risks of the collapse and sand production of the natural gas hydrate reservoirs.
- Preferably, in step (3), the pressure distributed in the reservoirs is reduced by controlling a pressure decay amplitude at the bottoms of the second horizontal well and the third horizontal well, so that the natural gas hydrates in the reservoirs are decomposed into gases and water, and meanwhile, and the gases flow into the second horizontal well and the third horizontal well under a differential pressure for recovery.
- In order to solve the problem of the secondary generation of the hydrates due to the rapid decomposition of the natural gas hydrates for a short time in the reservoirs, a relationship between absorption of heat from the decomposition of the hydrates and a heat transfer around the reservoirs is coordinated by controlling the bottom pore pressure of the second horizontal well and the third horizontal well with a multi-stage step-by-step depressurization strategy, that is, the pressure decay amplitude at the bottoms of the wells is reduced slowly after the bottom pore pressure is reduced to a hydrate phase equilibrium condition in decomposition, and with every 0.5 MPa of the bottom pore pressure declining, a bottom pore pressure value is maintained until a gas recovery rate declines significantly before the depressurization of the next step, thereby fulfilling the objective of reducing or avoiding the secondary generation risk of the hydrates in the reservoirs.
- A method for reducing the bottom pore pressure is as follows:
- Before the exploitation of the hydrates, the wellhole is filled with water, at which the bottom pore pressure is equal to a gravity pressure of water; and after exploitation starts, the water will be pumped to a platform from the wellhole, and with a decrease in the water volume in the wellhole, the bottom pore pressure will decline gradually, thereby reducing the pressure in the reservoirs.
- Preferably, the pressure decay amplitude at the bottoms of the wells ranges from 0.1 to 0.2 Mpa/h, and significant reduction in gas production refers to reduction of gas production to 1000 cubic meters/day below.
- All aspects not fully described in the present invention can be referenced to the prior art.
- The present invention has the following beneficial effects:
- According to the present invention, during the exploitation of the natural gas hydrates across the sea area, seawater temperature at a sea level is higher, seawater can be supplied sufficiently and contains a certain salinity, and after being heated on the platform, the pumped seawater with the higher temperature is injected into the natural gas hydrate reservoirs along the first horizontal well; if the seawater temperature is lower, the measure of heating before injecting on the platform can be taken; the objective of heating the reservoirs can be fulfilled in a process that the injected seawater flows in fractures and pores of the natural gas hydrate reservoirs, and the temperature of the reservoirs is effectively maintained and elevated by making up heat absorbed from the decomposition of the natural gas hydrates in the reservoirs, and thus the gas recovery efficiency from the decomposition of the natural gas hydrates is further improved; and finally, the natural gas hydrates are decomposed into water and natural gases with the seawater injected into the reservoirs, which are recovered from the second horizontal well and the third horizontal well. According to the combined exploitation method of depressurization of the horizontal well and heat injection, the yield of the natural gases can be maintained at a higher level during the exploitation of the natural gas hydrates to meet the requirements of the commercial exploitation of the natural gas hydrates.
-
FIG. 1 is a schematic diagram of a horizontal well of natural gas hydrate reservoirs according to the present invention; and -
FIG. 2 is a schematic top view of an exploitation of natural gas hydrate reservoirs. - Illustrations of all the numerals: 1—Shallow stratum, 2—Natural gas hydrate reservoir, 3—Vertical well section, 4—Inclined well section, 5—Horizontal well section, 6—Horizontal well, 7—Fracture, 8—Second horizontal well, and 9—Third horizontal well.
- To make a person skilled in the art better understand the technical solutions of the present specification, the following describes the technical solutions of the present specification clearly and completely, but the present invention is not limited thereto. Any content not described in details in the present invention belongs to the conventional technology in the art.
- A high-efficiency yield-increasing exploitation method for natural gas hydrates includes the following steps:
- drilling of natural gas hydrate reservoirs along horizontal wells
- In view of an upper shallow stratum 1 above the deep-water natural gas hydrate reservoirs, featuring softness, and looseness, as for the natural
gas hydrate reservoirs 2, drilling well arrays are drilled in an exploratory trench cycle drilling manner, each of which includes three horizontal wells: a firsthorizontal well 6, and a second horizontal well 8 and a third horizontal well 9 positioned on two sides of the firsthorizontal well 6, and each of the horizontal wells includes avertical well section 3, aninclined well section 4, and ahorizontal well section 5; - by the exploratory trench drilling manner, the drilling efficiency of single wells may be improved, and the drilling operation along the horizontal wells may increase a contact area between an exploitation wellhole and the reservoirs to improve the exploitation yield of the natural gas hydrates.
-
- (1) seepage increasing by fracturing for fracture forming and stability improvement by grouting in the natural gas hydrate reservoirs
- After the drilling operation is completed, fracturing is implemented for fracture forming at the
horizontal well section 5 of the firsthorizontal well 6, a seawater fracturing fluid is injected into the first horizontal well and flows into the natural gas hydrate reservoirs along the horizontal well section, so thatfractures 7 are formed in the hydrate reservoirs between the first horizontal well and the second horizontal well, and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs, - then, foam cement slurry is injected into the horizontal well section of the first horizontal well, is distributed all over the natural gas hydrate reservoirs, and is cured for forming for a period of time, thereby improving the stability of the hydrate reservoirs,
- and finally, a resin or oligomer chemical sand control agent which is commonly used in the art is injected into a periphery of the well to reduce or avoid a sand production rate during an exploitation of the natural gas hydrates at the later period and improve the safety of the natural gas hydrates in exploitation;
- and in this step, the first horizontal well is designed as a fracturing well; the horizontal well section of the first horizontal well is fractured only in order to maintain the stability of the wellhole; seawater which is convenient to obtain, sufficient in supply, and low in costs serves as the fracturing fluid, with a fracturing pressure thereof being larger than a fracture forming pressure of the hydrate reservoirs, and the seawater fracturing fluid flows into the hydrate reservoirs along the horizontal well section of the first horizontal well, forming the fractures in the hydrate reservoirs between the first horizontal well and the second horizontal well and between the first horizontal well and the third horizontal well to improve the permeability of such reservoirs.
-
- (2) Yield improvement by combined exploitation of depressurization of the horizontal well and heat injection
- The exploitation yield of the natural gas hydrates may be improved via the combined exploitation of depressurization of the horizontal well and heat injection, and in order to reduce the exploitation costs of the natural gas hydrates, seawater is injected into the natural gas hydrate reservoirs along the first
horizontal well 6 at a temperature of more than 60° C. to elevate the reservoir temperature; and meanwhile, a pressure at bottoms of the second horizontal well 8 and the third horizontal well 9 is reduced, so as to improve a decomposition rate of the natural gas hydrates in the reservoirs under the collaborative action of the two operations. - According to the above-mentioned technical solution, drilling time is shortened by rapid drilling along the horizontal well, the permeability of the reservoirs may be effectively improved by fracturing for fracture forming, the stability of the reservoirs may be improved by injecting foam cement slurry into the reservoirs, and the yield of the natural gas hydrates may be improved by the combined exploitation method of depressurization of the horizontal well and heat injection. The method has the advantages of reducing drilling costs, improving the permeability of the reservoirs, enhancing the stability of the reservoirs, improving the gas recovery efficiency and the like.
- A high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 1 in that in step (1), an interval among different horizontal wells is determined by the following method:
- Firstly, based on a Darcy's law, a pressure distribution in natural gas hydrate reservoirs may be as follows:
-
- where P1 is a bottom pore pressure of the horizontal wells, MPa; P2 is a pressure in the natural gas hydrate reservoirs, MPa; Q is a flow in pores of the natural gas hydrate reservoirs, m3/s; μ is a fluid viscosity in the reservoirs, mPa·s; L is a seepage radius of a fluid in the reservoirs, m; K is an absolute permeability of the natural gas hydrate reservoirs, mD; A is a sectional area of seepage flow of the natural gas hydrate reservoirs, m2;
- then, in order to achieve a decomposition of the natural gas hydrates during an exploitation of the natural gas hydrates under reduced pressure, the pressure P2 in the reservoirs needs to conform to the following criteria:
-
- where T is a reservoir temperature, K; ΔTd is a temperature at which a decline in a hydrate equilibrium is caused by a thermodynamic hydrate inhibitor, K;
- ΔTd may be obtained by the following formula through calculation:
-
- where x is a molar fraction of the thermodynamic hydrate inhibitor in a water phase, which is dimensionless; xr is a reference molar fraction of the thermodynamic hydrate inhibitor in the water phase, which is dimensionless; ΔTd,r is a temperature at which the decline in the hydrate equilibrium is caused under the molar fraction of the thermodynamic hydrate inhibitor as xr, K; and
- an interval (L1=L) between every two horizontal wells is solved according to formulas (1)-(4), based on which the layout of the three horizontal wells is supported theoretically.
- A high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 2 in that in step (2), during fracturing, a fracturing pressure is larger than a fracture forming pressure of the natural gas hydrate reservoirs.
- In step (2), a preparation process of foam cement slurry is as follows:
- a certain mass of cement is mixed with water to form cement slurry, and a certain mass of foaming agent (sodium dodecyl sulfate) and foam stabilizer (laurinol) are added to the cement slurry with stirring until fine and stable bubbles which are independent of each other are formed, and the foam cement slurry with low density and high permeability may be formed, with a density thereof being less than 1.0 g/cm3, which needs, however, to be determined according to actual design and requirements on site, that is, ρgfc in the formula (5). The construction method is readily available, without arranging any additional equipment, and the formed foam cement slurry has the advantages of stable properties, high compressive strength, low costs, and the like. What there will be to adopt in the construction method is thinner foam cement slurry. This may improve the liquidity of the foam cement slurry in the reservoirs, making it distributed all over the pores of the reservoirs better.
- In the preparation of the foam cement slurry, according to the properties of the required foam cement slurry and a mix proportioning principle thereof, the using amount of the cement is as follows:
-
- where Msn is the using amount of the cement, kg; ρgfc is the design dry density of the foam cement, kg/m3; Vgfc is the volume of the dry foam cement, m3; Sa is a mass coefficient, which is dimensionless, wherein it is 1.2 for ordinary Portland cement, and 1.4 for sulfate cement;
- water supply volume:
-
M w =a·M w (6) - where Mw is the water supply volume; a is a basic ratio of water to materials, which is dimensionless;
- the using amount of the foaming agent:
-
- where Mp is the mass of the foaming agent in the foam cement slurry, kg; Vpy is the volume of a foam concentrate formed from the foaming agent, m3; ρpy is the density of the foam concentrate formed from the foaming agent, kg/m3; b is the times of foaming of the foaming agent, which is dimensionless; and
- the using amount of the foam stabilizer is half of that of the foaming agent.
- The injection rate of the foam cement slurry is as follows:
-
V fc≥2L 1 ·L 2 ·H·S f (8) - where Vfc is a volume of the foam cement slurry to be injected into the natural gas hydrate reservoirs, m3; L2 is a length of the horizontal well section, m; H is a thickness of the natural gas hydrate reservoirs, m; and Sf is a porosity of the natural gas hydrate reservoirs subjected to fracturing for fracture forming, which is dimensionless.
- A high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 3 in that in step (2), during the injection of foam cement slurry into the horizontal well section of the first horizontal well, when it is found that there is the foam cement slurry in the second horizontal well and the third horizontal well, the injection of the foam cement slurry may be stopped, and meanwhile, the foam cement slurry is removed rapidly from the second horizontal well and the third horizontal well, that is, clear water may be injected into drill stems in the second horizontal well and the third horizontal well, the foam cement slurry carried thereby returns upwards from an annular space between the drill stems and drivepipes to fulfill the objective of cleaning; and then, each of the horizontal wells is shut in for 48 h, until the foam cement slurry injected into the natural gas hydrate reservoirs is cured for forming, which may improve the stability of the reservoirs during the exploitation of the natural gas hydrates and reduce risks of the collapse and sand production of the natural gas hydrate reservoirs.
- A high-efficiency yield-increasing exploitation method for natural gas hydrates is different from Example 4 in that, in step (3), the pressure distributed in the reservoirs is reduced by controlling a pressure decay amplitude at the bottoms of the second horizontal well and the third horizontal well, so that the natural gas hydrates in the reservoirs are decomposed into gases and water, and meanwhile, and the gases flow into the second horizontal well and the third horizontal well under a differential pressure for recovery
- In order to solve the problem of the secondary generation of the hydrates due to the rapid decomposition of the natural gas hydrates for a short time in the reservoirs, a relationship between absorption of heat from the decomposition of the hydrates and a heat transfer around the reservoirs is coordinated by controlling the bottom hole pressure of the second horizontal well and the third horizontal well with a multi-stage step-by-step depressurization strategy, that is, the pressure decay amplitude at the bottoms of the wells is reduced slowly after the bottom hole pressure is reduced to a hydrate phase equilibrium condition in decomposition, ranging from 0.1 to 0.2 MPa, and with every 0.5 MPa of the bottom hole pressure declining, a bottom hole pressure value is maintained until a gas recovery rate declines significantly (i.e., declining to 1000 cubic meters/day below) before the depressurization of the next step, thereby fulfilling the objective of reducing or avoiding the secondary generation risk of the hydrates in the reservoirs.
- A method for reducing the bottom pore pressure is as follows:
- Before the exploitation of the hydrates, the wellhole is filled with water, at which the bottom pore pressure is equal to a gravity pressure of water; and after exploitation starts, the water will be pumped to a platform from the wellhole, and with a decrease in the water volume in the wellhole, the bottom pore pressure will decline gradually, thereby reducing the pressure in the reservoirs.
- The above descriptions are only preferred implementations of the prevent invention, and it should be noted that a person of ordinary skill in the art can further make several improvements and modifications without departing from the principle of the present invention, and those improvements and modifications should be included in the protection scope of the present disclosure.
Claims (9)
M w =α·M w (6)
V fc≥2L 1 ·L 2 ·H·S f (8)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211106650.5 | 2022-09-13 | ||
CN202211106650.5A CN115306366B (en) | 2022-09-13 | 2022-09-13 | Efficient yield-increasing exploitation method for natural gas hydrate |
Publications (2)
Publication Number | Publication Date |
---|---|
US20240093579A1 true US20240093579A1 (en) | 2024-03-21 |
US11952869B1 US11952869B1 (en) | 2024-04-09 |
Family
ID=83866368
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US18/341,816 Active US11952869B1 (en) | 2022-09-13 | 2023-06-27 | High-efficiency yield-increasing exploitation method for natural gas hydrates |
Country Status (2)
Country | Link |
---|---|
US (1) | US11952869B1 (en) |
CN (1) | CN115306366B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5868202A (en) * | 1997-09-22 | 1999-02-09 | Tarim Associates For Scientific Mineral And Oil Exploration Ag | Hydrologic cells for recovery of hydrocarbons or thermal energy from coal, oil-shale, tar-sands and oil-bearing formations |
US7441603B2 (en) * | 2003-11-03 | 2008-10-28 | Exxonmobil Upstream Research Company | Hydrocarbon recovery from impermeable oil shales |
CN107542441A (en) * | 2017-10-23 | 2018-01-05 | 大庆东油睿佳石油科技有限公司 | A kind of method of parallel water horizontal well hot-water flooding exploitation of gas hydrate |
CN107676061A (en) * | 2017-10-23 | 2018-02-09 | 大庆东油睿佳石油科技有限公司 | A kind of method of parallel water horizontal well exploitation offshore natural gas hydrate |
US11434740B1 (en) * | 2021-10-13 | 2022-09-06 | Halliburton Energy Services, Inc. | Methods of fracturing and rupturing rock formations for enhancing heat exchange efficiency in geothermal wells |
US20230142443A1 (en) * | 2021-11-09 | 2023-05-11 | Halliburton Energy Services, Inc. | Acid precursor treatment fluid generating and/or releasing acid for use downhole in a subterranean formation |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6158517A (en) * | 1997-05-07 | 2000-12-12 | Tarim Associates For Scientific Mineral And Oil Exploration | Artificial aquifers in hydrologic cells for primary and enhanced oil recoveries, for exploitation of heavy oil, tar sands and gas hydrates |
US8232438B2 (en) * | 2008-08-25 | 2012-07-31 | Chevron U.S.A. Inc. | Method and system for jointly producing and processing hydrocarbons from natural gas hydrate and conventional hydrocarbon reservoirs |
US8925632B2 (en) * | 2010-12-09 | 2015-01-06 | Mgm Energy Corp. | In situ process to recover methane gas from hydrates |
CN106761589B (en) * | 2017-01-03 | 2018-12-25 | 中国石油大学(北京) | A kind of method of Gas Hydrate In Sea Areas reservoir reconstruction exploitation |
CN107420083B (en) * | 2017-07-14 | 2018-11-16 | 中国石油大学(华东) | A kind of well group structure and method hidden using geothermal energy development hydrate |
CN107575201A (en) * | 2017-10-23 | 2018-01-12 | 大庆东油睿佳石油科技有限公司 | A kind of method of gas hydrates parallel water horizontal well microwave heating exploitation |
CN107542439A (en) * | 2017-10-23 | 2018-01-05 | 大庆东油睿佳石油科技有限公司 | A kind of method of row's formula horizontal wells gas hydrates |
CN107575197A (en) * | 2017-10-23 | 2018-01-12 | 大庆东油睿佳石油科技有限公司 | A kind of method of row's formula horizontal well chemical flooding exploitation of gas hydrate |
CN108180001B (en) * | 2018-01-19 | 2020-06-30 | 吉林大学 | Method for transforming marine argillaceous silt type natural gas hydrate reservoir by foam grouting method |
CN108590595B (en) * | 2018-04-10 | 2020-04-21 | 广东石油化工学院 | Method for exploiting non-diagenetic natural gas hydrate by utilizing F-shaped well group |
CN110469313A (en) * | 2019-08-08 | 2019-11-19 | 中国石油大学(华东) | A kind of liquid nitrogen fracturing reform device and method for gas hydrates reservoir |
CN113323631B (en) * | 2020-02-28 | 2022-03-15 | 中国科学院地质与地球物理研究所 | Natural gas hydrate reservoir exploitation structure and natural gas hydrate exploitation method for injecting hydraulic calcium oxide through gas fracturing |
CN111827936B (en) * | 2020-08-13 | 2021-04-16 | 中国石油大学(华东) | Batch drilling rolling type well group natural gas hydrate exploitation system and method |
CN112901121B (en) * | 2021-02-10 | 2022-06-10 | 清华大学深圳国际研究生院 | Method for exploiting natural gas hydrate |
CN113669041B (en) * | 2021-10-08 | 2023-09-05 | 中国石油大学(华东) | Sea hydrate reservoir exploitation method by injecting seawater to assist low-frequency electric field heating |
CN114396255B (en) * | 2021-11-25 | 2023-09-19 | 西南石油大学 | Reservoir temperature prediction method for underground gas storage well |
CN114517664B (en) * | 2022-02-21 | 2022-10-04 | 吉林大学 | Sea area hydrate drainage well auxiliary pressure reduction exploitation method |
CN114718520B (en) * | 2022-03-18 | 2024-03-29 | 中国石油大学(华东) | Method and device for drilling and extracting marine natural gas hydrate |
-
2022
- 2022-09-13 CN CN202211106650.5A patent/CN115306366B/en active Active
-
2023
- 2023-06-27 US US18/341,816 patent/US11952869B1/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5868202A (en) * | 1997-09-22 | 1999-02-09 | Tarim Associates For Scientific Mineral And Oil Exploration Ag | Hydrologic cells for recovery of hydrocarbons or thermal energy from coal, oil-shale, tar-sands and oil-bearing formations |
US7441603B2 (en) * | 2003-11-03 | 2008-10-28 | Exxonmobil Upstream Research Company | Hydrocarbon recovery from impermeable oil shales |
CN107542441A (en) * | 2017-10-23 | 2018-01-05 | 大庆东油睿佳石油科技有限公司 | A kind of method of parallel water horizontal well hot-water flooding exploitation of gas hydrate |
CN107676061A (en) * | 2017-10-23 | 2018-02-09 | 大庆东油睿佳石油科技有限公司 | A kind of method of parallel water horizontal well exploitation offshore natural gas hydrate |
US11434740B1 (en) * | 2021-10-13 | 2022-09-06 | Halliburton Energy Services, Inc. | Methods of fracturing and rupturing rock formations for enhancing heat exchange efficiency in geothermal wells |
US20230142443A1 (en) * | 2021-11-09 | 2023-05-11 | Halliburton Energy Services, Inc. | Acid precursor treatment fluid generating and/or releasing acid for use downhole in a subterranean formation |
Also Published As
Publication number | Publication date |
---|---|
CN115306366A (en) | 2022-11-08 |
CN115306366B (en) | 2023-04-28 |
US11952869B1 (en) | 2024-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Crawford et al. | Carbon dioxide-a multipurpose additive for effective well stimulation | |
Li et al. | A review: Enhanced recovery of natural gas hydrate reservoirs | |
US6325147B1 (en) | Enhanced oil recovery process with combined injection of an aqueous phase and of at least partially water-miscible gas | |
RU2263774C2 (en) | Mehtod for obtaining hydrocarbons from rock rich in organic compounds | |
CN100587227C (en) | Method for exploiting natural gas hydrates and device thereof | |
US4265310A (en) | Fracture preheat oil recovery process | |
US4300633A (en) | Method of cementing wells with foam-containing cement | |
CN108868736B (en) | double-L well structure and method for exploiting marine hydrate reservoir by fracturing | |
CN106854984B (en) | A kind of gas hydrates method of replacing of combination injection hot sea water enhancing methane exploitation and carbon dioxide sequestration | |
JP7082771B2 (en) | Mining structure of natural gas hydrate reservoir and method of mining natural gas hydrate by injecting hydraulic lime by gas crushing | |
CN101027480A (en) | Method of developing and producing deep geothermal reservoirs | |
CN113294126B (en) | Natural gas hydrate combined mining method and device for stabilizing stratum | |
JPH0144878B2 (en) | ||
CN106545325B (en) | Device and method for supporting marine natural gas hydrate production-increasing cracks | |
CN106194122A (en) | The method that a kind of oil field abandoned well transform geothermal well or sub-salt well as | |
CN109736752A (en) | A kind of voltage drop method auxiliary temperature control CO2The recovery method of displacer gas hydrate | |
CN106930740A (en) | A kind of method for injecting saturation hot brine stimulation for natural gas hydrate dissociation | |
Al-Obaidi | A way to increase the efficiency of water isolating works using water repellent | |
US9657559B2 (en) | Methods and systems for causing reaction driven cracking in subsurface rock formations | |
CN107882544B (en) | A kind of mixing heat release method for removing blockage for carbonate cementation molding sand rock heavy oil wells | |
US11952869B1 (en) | High-efficiency yield-increasing exploitation method for natural gas hydrates | |
CN112127852A (en) | Efficient argillaceous powder sand mold natural gas hydrate exploitation system and exploitation method thereof | |
CN114135254A (en) | Hydrate solid fluidization-depressurization combined mining method | |
CN111550222B (en) | Method for exploiting natural gas hydrate by injecting steam | |
Wang et al. | Improving the Effective Supporting and Fracturing Technology is the Key to the Successful Stimulation of Low-Permeability and Low-Rank Coalbed Methane Reservoirs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SHANDONG PENGBO SAFETY AND ENVIRONMENTAL PROTECTION SERVICE CO., LTD., CHINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ZHANG, JIANBO;WANG, ZHIYUQN;WANG, YUTING;AND OTHERS;REEL/FRAME:064068/0680 Effective date: 20230621 Owner name: CHINA UNIVERSITY OF PETROLEUM (EAST CHINA), CHINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ZHANG, JIANBO;WANG, ZHIYUQN;WANG, YUTING;AND OTHERS;REEL/FRAME:064068/0680 Effective date: 20230621 |
|
FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO SMALL (ORIGINAL EVENT CODE: SMAL); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
STCF | Information on status: patent grant |