US20240068312A1 - Modified cement retainer with milling assembly - Google Patents

Modified cement retainer with milling assembly Download PDF

Info

Publication number
US20240068312A1
US20240068312A1 US17/897,987 US202217897987A US2024068312A1 US 20240068312 A1 US20240068312 A1 US 20240068312A1 US 202217897987 A US202217897987 A US 202217897987A US 2024068312 A1 US2024068312 A1 US 2024068312A1
Authority
US
United States
Prior art keywords
tool
wellbore
milling tool
well
milling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US17/897,987
Other versions
US11993992B2 (en
Inventor
Ahmed Abdulaziz Al-Mousa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Saudi Arabian Oil Co
Original Assignee
Saudi Arabian Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Saudi Arabian Oil Co filed Critical Saudi Arabian Oil Co
Priority to US17/897,987 priority Critical patent/US11993992B2/en
Assigned to SAUDI ARABIAN OIL COMPANY reassignment SAUDI ARABIAN OIL COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: AL-MOUSA, AHMED ABDULAZIZ
Publication of US20240068312A1 publication Critical patent/US20240068312A1/en
Application granted granted Critical
Publication of US11993992B2 publication Critical patent/US11993992B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
    • E21B29/002Cutting, e.g. milling, a pipe with a cutter rotating along the circumference of the pipe
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
    • E21B23/06Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells for setting packers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like

Definitions

  • This disclosure relates to wellbore operations, for example, wellbore drilling and makeover operations.
  • Hydrocarbons trapped in subsurface reservoirs can be raised to the surface of the Earth (that is, produced) through wellbores formed from the surface to the subsurface reservoirs.
  • Wellbore drilling systems are used to drill wellbores through a subterranean zone (for example, a formation, a portion of a formation or multiple formations) to the subsurface reservoir.
  • Wellbore drilling operations involve lowering well tools into the wellbore and perform operations inside the wellbore using the lowered tools.
  • Cementing is one such operation in which cement is flowed from the surface to a downhole location and allowed to harden. The cement is flowed through a cement retainer. In some instances, removing the cement retainer or other cement-flowing tool from the wellbore can be more expensive than simply milling through the tool and flowing the resulting debris from within the wellbore.
  • This disclosure relates to a modified cement retainer with milling assembly.
  • a wellbore milling tool is positioned in a hollow portion of an elongate well tool body.
  • the wellbore milling tool and the well tool body define a cement flow pathway from end to end.
  • the wellbore milling tool is connected to the well tool body by a tool retainer.
  • the well tool body with the connected wellbore milling tool is lowered into a wellbore formed from a surface through a subterranean zone.
  • the well tool body is installed within the wellbore at a downhole location. After the installing, the well tool body is sealingly attached to an inner wall of the wellbore at the downhole location.
  • cement is flowed through the cement flow pathway to a wellbore location that is downhole of the downhole location.
  • the tool retainer is activated to separate the wellbore milling tool from the well tool body.
  • the well tool body is milled with the wellbore milling tool.
  • An aspect combinable with any other aspect includes the following features. Flowing the cement and milling the well tool body are implemented in a single trip into the wellbore.
  • a packer is attached to the well tool body. To install the well tool body within the wellbore at the downhole location, the packer is deployed at the downhole location to seal against the inner wall of the wellbore.
  • An aspect combinable with any other aspect includes the following features.
  • An inner diameter of the hollow portion in which the wellbore milling tool is positioned is greater than or equal to an outer diameter of a remainder of the body.
  • An aspect combinable with any other aspect includes the following features.
  • An outer diameter of the wellbore milling tool is greater than or equal to the outer diameter of the remainder of the body.
  • the tool retainer includes a shear pin. To connect the wellbore milling tool to the well tool body by the tool retainer, the shear pin is passed through a circumferential surface of the body and a notch formed on a side of the wellbore milling tool.
  • An aspect combinable with any other aspect includes the following features.
  • To activate the tool retainer to separate the wellbore milling tool from the well tool body the wellbore milling tool and the well tool body are moved axially relative to each other causing the shear pin to be sheared.
  • the tool includes an elongate body that includes a first hollow portion near a first end of the body and a second portion near a second end of the body.
  • a wellbore milling tool is positioned within the first hollow portion.
  • the wellbore milling tool is configured to perform milling operations within a wellbore.
  • a cement flow pathway is defined within the body and the wellbore milling tool.
  • the cement flow pathway extends from the first end of the body to the second end of the body, and passes through the wellbore milling tool.
  • the cement flow pathway is configured to allow flow of cement through the well tool.
  • a tool retainer is attached to the body.
  • the tool retainer is configured to retain the wellbore milling tool within the first hollow portion of the elongate body and to allow lowering the wellbore milling tool attached to the body within the wellbore.
  • a packer is attached to the second portion.
  • the packer is configured to seal against an inner wall of the wellbore.
  • An aspect combinable with any other aspect includes the following features.
  • An inner diameter of the first hollow portion is greater than or equal to an outer diameter of a remainder of the body.
  • An aspect combinable with any other aspect includes the following features.
  • An outer diameter of the wellbore milling tool is greater than or equal to the outer diameter of the remainder of the body.
  • the tool retainer includes a shear pin passing through a circumferential surface of the body and a notch formed on a side of the wellbore milling tool.
  • the shear pin is made of a material that is configured to be sheared in response to an axial movement of the wellbore milling tool and the body relative to each other.
  • An aspect combinable with any other aspect includes the following features.
  • the material with which the shear pin is made is millable by the wellbore milling tool.
  • a string is connected to the wellbore milling tool.
  • the string is configured to lower the well tool inside the wellbore.
  • a string mill is attached to the string axially uphole of the wellbore milling tool.
  • FIG. 1 is a schematic diagram of an example of a well with the well tool described in this disclosure.
  • FIGS. 2 A and 2 B are schematic diagrams of a tool layout of the well tool of FIG. 1 .
  • FIGS. 3 A- 3 D are schematic diagrams of an example of an operation of the well tool of FIG. 1 .
  • FIG. 4 is a flowchart of an example of a process of using the well tool of FIG. 1 .
  • Wellbore operations including cementing operations performed during drilling and workover.
  • a cement retainer is lowered into a wellbore and is installed (or set) at a desired downhole location. Cementing operations are then performed by flowing cement through the cement retainer.
  • a wellbore milling tool is lowered into the wellbore to mill the cement retainer and the top of the cement to a desired depth. This disclosure describes a well tool and a method associated with the well tool that will enable a one-trip system to set the cement retainer, perform the cementing operation and mill through the cement retainer.
  • one-trip it is meant that the well tool that can perform the cementing operation and the milling operation is lowered into the wellbore in a single trip. Further, without needing another trip and using components of the well tool already lowered into the wellbore during the single trip, the cementing operation and then the milling operation are performed at the downhole location within the wellbore.
  • time to implement the excess time to set up a rig to implement the excess trip and costs and equipment associated with excess trips can be reduced. Human error that results in choosing a milling tool of incorrect size or type can be reduced or eliminated by implementing the operations described in this disclosure.
  • FIG. 1 is a schematic diagram of an example of a well 100 with the well tool 102 described in this disclosure.
  • the well 100 includes a wellbore 104 formed from a surface 106 through a subterranean zone 108 towards a subsurface reservoir (not shown).
  • the well tool 102 is lowered into the wellbore 104 to a desired downhole location 110 .
  • the well tool 102 is installed or set. Setting the well tool 102 at the downhole location 110 isolates a well region 112 downhole of the downhole location 110 from a well region 114 uphole of the downhole location 110 .
  • the well tool 102 can be used to perform cementing operations in which cement is flowed from the surface 106 , through the well tool 102 and to the well region 112 downhole of the downhole location 110 . Then, without raising the well tool 102 out of the wellbore 104 and without lowering another well tool into the wellbore 104 (i.e., in a single trip), portions of the well tool 102 are milled. The resulting debris can be flowed out of the wellbore 104 during a subsequent well operation.
  • FIGS. 2 A and 2 B are schematic diagrams of a tool layout of the well tool 102 of FIG. 1 .
  • FIGS. 2 A and 2 B show the well tool 102 disassembled and assembled, respectively.
  • the well tool 102 includes a string 202 that can be lowered into the wellbore 104 from a rig or equipment disposed at the surface 106 of the wellbore 104 .
  • the string 202 can include coiled tubing, wireline, slickline or similar wellbore tubulars.
  • a wellbore milling tool 204 is attached to an end of the string 202 that is lowered into the wellbore 104 .
  • the wellbore milling tool 204 can perform wellbore milling operations.
  • the tool 204 can mill through components installed in the well. To do so, the string 202 can be rotated to cause the wellbore milling tool 204 to rotate. Or, the string 202 can be periodically raised and lowered to cause the wellbore milling tool 204 to also be raised and lowered. During such rotational or axial motion, the wellbore milling tool 204 mills through any component that contacts the tool 204 .
  • a fluid flow pathway ( FIGS. 3 A- 3 D ) is formed through the wellbore milling tool 204 .
  • the fluid flow pathway is formed as a hollow portion extending from one end of the tool 204 to the other end of the tool 204 .
  • the string 202 is also hollow and axially coupled to the fluid flow pathway formed in the tool 204 .
  • Fluids e.g., cement, can be flowed through the fluid flow pathway from the surface 106 , through the string 202 and through the fluid flow pathway formed in the tool 204 .
  • the well tool 102 includes an elongate body 206 that is hollow and defines different portions (i.e., axial length segments) of different sizes. That is, while all the axial length segments are hollow, an inner diameter and an outer diameter of one axial length segment is different from an inner diameter and an outer diameter, respectively, of another axial length segment.
  • the body 206 includes a first portion 208 near a first end of the body 206 and a second portion 210 near a second end of the body 206 .
  • the first portion 208 has an inner diameter that is greater than an outer diameter of the milling tool 204 .
  • the first portion 208 has an axial length equal to or greater than an axial length of the milling tool 204 .
  • the milling tool 204 can be positioned and completely contained within the first portion 208 , as shown in FIG. 2 B .
  • the remainder of the body 206 forms a second portion 210 that can have the same or different outer diameters. But, the outer diameter of the milling tool 204 is greater than the largest outer diameter of the second portion 210 . In this arrangement, the milling tool 204 can mill through an entirety of the second portion 210 .
  • a packer 212 (or similar sealing assembly) is attached to the second portion 210 , e.g., nearer to an end of the second portion 210 .
  • the packer 210 allows the well tool 102 to be installed or set within the wellbore 104 at the desired downhole location 110 as described with reference to FIG. 1 .
  • an outer diameter of the axial length of the second portion 210 to which packer 212 is attached is equal to an outer diameter of the milling tool 204 so that the milling tool 204 can mill through the packer 212 without damaging the packer 212 .
  • the hollow portions that extend from end to end within the body 206 extend the fluid flow pathway defined by the milling tool 204 .
  • Fluids e.g., cement
  • the cement can be flowed through the well tool 102 to the well region 112 ( FIG. 1 ) downhole of the downhole location 110 ( FIG. 1 ).
  • a tool retainer ( FIGS. 3 A- 3 D ) is attached to the body 206 .
  • the tool retainer is configured to retain the milling tool 204 within the first portion 208 and to allow lowering the milling tool 204 attached to the body 206 within the wellbore 104 .
  • the tool retainer can be activated to allow the milling tool 204 to separate from the body 206 .
  • the tool retainer is activated after the cementing operations have been performed by flowing cement through the fluid flow pathway.
  • FIGS. 3 A- 3 D are schematic diagrams of an example of an operation of the well tool 102 .
  • FIGS. 3 A- 3 D show the milling tool 204 ( FIG. 2 ), attached to the string 202 ( FIG. 2 ), wholly contained within the first portion 208 and lowered into the wellbore (not shown in FIGS. 3 A- 3 D ).
  • the tool 102 defines a fluid flow pathway 302 .
  • the tool retainer retains the milling tool 204 within the first portion 208 such that the milling tool 204 and the body 206 ( FIG. 2 ) can be lowered into the wellbore 104 ( FIG. 1 ) together in a single trip.
  • the tool retainer includes a shear pin 304 that passes through a circumferential surface 306 of the body 206 (specifically, the first portion 208 ).
  • the tool retainer also includes a notch 308 formed on a side of the milling tool 204 .
  • the shear pin 304 When the shear pin 304 is radially inserted through the circumferential surface 306 into the notch 308 , the shear pin 304 locks the milling tool 204 and the first portion 208 such that the two components move together axially within the wellbore 104 ( FIG. 1 ).
  • the well tool 102 is set at the desired downhole location 110 ( FIG. 1 ) by deploying the packer 212 ( FIG.
  • a relative axial movement between the milling tool 204 and the body 206 causes the shearing pin 304 to be sheared.
  • the shearing pin 304 can be made of a material that can be sheared when the string 202 , to which the milling tool 204 is attached, is pulled in an uphole direction after the packer 212 ( FIG. 2 ) has been deployed.
  • FIG. 3 A shows that the first portion 208 with the milling tool 204 retained by the tool retainer is lowered into the wellbore 104 (not shown in FIG. 3 A ).
  • the packer 212 (not shown in FIG. 3 A ) is deployed once the body 206 reaches the desired downhole location 110 (not shown in FIG. 3 A ).
  • the fluid flow pathway 302 extends from the surface 106 of the wellbore 104 through the string 202 and the milling tool 204 , through the hollow portion defined by the body 206 to the downhole end of the body 206 .
  • a separate elongate hollow tubular 302 can be disposed within the body 206 and connected (e.g., axially, end-to-end) to the milling tool 204 .
  • the tubular 302 can extend from the downhole end of the milling tool 204 to the downhole end of the body 206 .
  • FIG. 3 B shows fluids, e.g., cement, being flowed through the fluid flow pathway 302 .
  • the cement is flowed from the surface 106 of the wellbore 104 to the wellbore region 112 ( FIG. 1 ) that is downhole of the desired downhole location 110 ( FIG. 1 ) where the packer 212 is deployed.
  • FIG. 3 C shows that the cement flow through the fluid flow pathway 302 has been stopped.
  • the string 202 is pulled axially in an uphole direction causing the shearing pin 304 to be sheared. Consequently, the milling tool 204 is no longer connected to the first portion 208 of the body 206 .
  • FIG. 3 D shows the milling tool 204 being raised uphole of the body 206 (specifically, uphole of the first portion 208 ).
  • the string 202 can then be rotated or moved axially in an uphole-downhole direction (or both), and the milling tool 204 can be brought into contact with the body 206 to mill the body 206 . Because the inner diameter of the first portion 208 is greater than the outer diameter of the milling tool 204 , the axial uphole-downhole motion can be implemented to contact the milling tool 204 against the first portion 208 to mill the first portion 208 .
  • the rotational motion of the milling tool 204 can mill the remainder of the body 206 .
  • the shearing pin 306 and any other component of the tool retainer are made of millable materials that can also be milled by the milling tool 204 . In this manner, the cementing and milling operations are implemented in one-trip. That is, a separate trip to lower a milling tool to remove the body is unnecessary. In addition, the milling tool 204 need not be removed from within the wellbore 104 to mill the body.
  • FIG. 4 is a flowchart of an example of a process 400 of using the well tool of FIG. 1 .
  • the well tool 102 is formed by positioning the milling tool 204 within the first portion 208 of the body 206 .
  • the milling tool 204 is connected to the body 206 , specifically the first portion 208 , by the tool retainer.
  • the well tool body 206 with the connected wellbore milling tool 204 is lowered into the wellbore 104 .
  • the body 206 is installed within the wellbore 104 at the desired downhole location 110 , for example, by deploying the packer 212 .
  • the body 206 is sealingly attached to an inner wall of the wellbore 104 at the downhole location 110 .
  • cement is flowed through the fluid flow pathway (the cement flow pathway) to the wellbore location 112 that is downhole of the downhole location 110 .
  • the tool retainer is activated to separate the milling tool 204 from the body 206 .
  • the body 206 is milled with the milling tool 204 . In this manner, flowing of the cement and milling of the body 206 are implemented in a single trip into the wellbore 104 .

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Milling Processes (AREA)

Abstract

A modified cement retainer with milling assembly includes an elongate body that includes a first hollow portion near a first end of the body and a second portion near a second end of the body. A wellbore milling tool is positioned within the first hollow portion. The wellbore milling tool can perform milling operations within a wellbore. A cement flow pathway is defined within the body and the wellbore milling tool. The cement flow pathway extends end to end through the body, and passes through the wellbore milling tool. The cement flow pathway can flow cement through the well tool. A tool retainer is attached to the body. The tool retainer is can retain the wellbore milling tool within the first hollow portion of the elongate body and allow lowering the wellbore milling tool attached to the body within the wellbore.

Description

    TECHNICAL FIELD
  • This disclosure relates to wellbore operations, for example, wellbore drilling and makeover operations.
  • BACKGROUND
  • Hydrocarbons trapped in subsurface reservoirs can be raised to the surface of the Earth (that is, produced) through wellbores formed from the surface to the subsurface reservoirs. Wellbore drilling systems are used to drill wellbores through a subterranean zone (for example, a formation, a portion of a formation or multiple formations) to the subsurface reservoir. Wellbore drilling operations involve lowering well tools into the wellbore and perform operations inside the wellbore using the lowered tools. Cementing is one such operation in which cement is flowed from the surface to a downhole location and allowed to harden. The cement is flowed through a cement retainer. In some instances, removing the cement retainer or other cement-flowing tool from the wellbore can be more expensive than simply milling through the tool and flowing the resulting debris from within the wellbore.
  • SUMMARY
  • This disclosure relates to a modified cement retainer with milling assembly.
  • Certain aspects of the subject matter described here can be implemented as a method. A wellbore milling tool is positioned in a hollow portion of an elongate well tool body. The wellbore milling tool and the well tool body define a cement flow pathway from end to end. The wellbore milling tool is connected to the well tool body by a tool retainer. The well tool body with the connected wellbore milling tool is lowered into a wellbore formed from a surface through a subterranean zone. The well tool body is installed within the wellbore at a downhole location. After the installing, the well tool body is sealingly attached to an inner wall of the wellbore at the downhole location. After installing the well tool body, cement is flowed through the cement flow pathway to a wellbore location that is downhole of the downhole location. After flowing the cement, the tool retainer is activated to separate the wellbore milling tool from the well tool body. After separating the wellbore milling tool from the well tool body, the well tool body is milled with the wellbore milling tool.
  • An aspect combinable with any other aspect includes the following features. Flowing the cement and milling the well tool body are implemented in a single trip into the wellbore.
  • An aspect combinable with any other aspect includes the following features. A packer is attached to the well tool body. To install the well tool body within the wellbore at the downhole location, the packer is deployed at the downhole location to seal against the inner wall of the wellbore.
  • An aspect combinable with any other aspect includes the following features. An inner diameter of the hollow portion in which the wellbore milling tool is positioned is greater than or equal to an outer diameter of a remainder of the body.
  • An aspect combinable with any other aspect includes the following features. An outer diameter of the wellbore milling tool is greater than or equal to the outer diameter of the remainder of the body.
  • An aspect combinable with any other aspect includes the following features. The tool retainer includes a shear pin. To connect the wellbore milling tool to the well tool body by the tool retainer, the shear pin is passed through a circumferential surface of the body and a notch formed on a side of the wellbore milling tool.
  • An aspect combinable with any other aspect includes the following features. To activate the tool retainer to separate the wellbore milling tool from the well tool body, the wellbore milling tool and the well tool body are moved axially relative to each other causing the shear pin to be sheared.
  • Certain aspects of the subject matter described here can be implemented as a well tool. The tool includes an elongate body that includes a first hollow portion near a first end of the body and a second portion near a second end of the body. A wellbore milling tool is positioned within the first hollow portion. The wellbore milling tool is configured to perform milling operations within a wellbore. A cement flow pathway is defined within the body and the wellbore milling tool. The cement flow pathway extends from the first end of the body to the second end of the body, and passes through the wellbore milling tool. The cement flow pathway is configured to allow flow of cement through the well tool. A tool retainer is attached to the body. The tool retainer is configured to retain the wellbore milling tool within the first hollow portion of the elongate body and to allow lowering the wellbore milling tool attached to the body within the wellbore.
  • An aspect combinable with any other aspect includes the following features. A packer is attached to the second portion. The packer is configured to seal against an inner wall of the wellbore.
  • An aspect combinable with any other aspect includes the following features. An inner diameter of the first hollow portion is greater than or equal to an outer diameter of a remainder of the body.
  • An aspect combinable with any other aspect includes the following features. An outer diameter of the wellbore milling tool is greater than or equal to the outer diameter of the remainder of the body.
  • An aspect combinable with any other aspect includes the following features. The tool retainer includes a shear pin passing through a circumferential surface of the body and a notch formed on a side of the wellbore milling tool. The shear pin is made of a material that is configured to be sheared in response to an axial movement of the wellbore milling tool and the body relative to each other.
  • An aspect combinable with any other aspect includes the following features. The material with which the shear pin is made is millable by the wellbore milling tool.
  • An aspect combinable with any other aspect includes the following features. A string is connected to the wellbore milling tool. The string is configured to lower the well tool inside the wellbore. A string mill is attached to the string axially uphole of the wellbore milling tool.
  • The details of one or more implementations of the subject matter described in this specification are set forth in the accompanying drawings and the description below. Other features, aspects, and advantages of the subject matter will become apparent from the description, the drawings, and the claims.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic diagram of an example of a well with the well tool described in this disclosure.
  • FIGS. 2A and 2B are schematic diagrams of a tool layout of the well tool of FIG. 1 .
  • FIGS. 3A-3D are schematic diagrams of an example of an operation of the well tool of FIG. 1 .
  • FIG. 4 is a flowchart of an example of a process of using the well tool of FIG. 1 .
  • Like reference numbers and designations in the various drawings indicate like elements.
  • DETAILED DESCRIPTION
  • Wellbore operations including cementing operations performed during drilling and workover. In one run (or trip) a cement retainer is lowered into a wellbore and is installed (or set) at a desired downhole location. Cementing operations are then performed by flowing cement through the cement retainer. In another, separate run (or separate trip), a wellbore milling tool is lowered into the wellbore to mill the cement retainer and the top of the cement to a desired depth. This disclosure describes a well tool and a method associated with the well tool that will enable a one-trip system to set the cement retainer, perform the cementing operation and mill through the cement retainer. By “one-trip,” it is meant that the well tool that can perform the cementing operation and the milling operation is lowered into the wellbore in a single trip. Further, without needing another trip and using components of the well tool already lowered into the wellbore during the single trip, the cementing operation and then the milling operation are performed at the downhole location within the wellbore. By reducing multiple trips to a single trip, time to implement the excess, time to set up a rig to implement the excess trip and costs and equipment associated with excess trips can be reduced. Human error that results in choosing a milling tool of incorrect size or type can be reduced or eliminated by implementing the operations described in this disclosure.
  • FIG. 1 is a schematic diagram of an example of a well 100 with the well tool 102 described in this disclosure. The well 100 includes a wellbore 104 formed from a surface 106 through a subterranean zone 108 towards a subsurface reservoir (not shown). The well tool 102 is lowered into the wellbore 104 to a desired downhole location 110. At the downhole location 110, the well tool 102 is installed or set. Setting the well tool 102 at the downhole location 110 isolates a well region 112 downhole of the downhole location 110 from a well region 114 uphole of the downhole location 110. As described below and with references to the following figures, the well tool 102 can be used to perform cementing operations in which cement is flowed from the surface 106, through the well tool 102 and to the well region 112 downhole of the downhole location 110. Then, without raising the well tool 102 out of the wellbore 104 and without lowering another well tool into the wellbore 104 (i.e., in a single trip), portions of the well tool 102 are milled. The resulting debris can be flowed out of the wellbore 104 during a subsequent well operation.
  • FIGS. 2A and 2B are schematic diagrams of a tool layout of the well tool 102 of FIG. 1 . FIGS. 2A and 2B show the well tool 102 disassembled and assembled, respectively. The well tool 102 includes a string 202 that can be lowered into the wellbore 104 from a rig or equipment disposed at the surface 106 of the wellbore 104. For example, the string 202 can include coiled tubing, wireline, slickline or similar wellbore tubulars. A wellbore milling tool 204 is attached to an end of the string 202 that is lowered into the wellbore 104. The wellbore milling tool 204 can perform wellbore milling operations. That is, the tool 204 can mill through components installed in the well. To do so, the string 202 can be rotated to cause the wellbore milling tool 204 to rotate. Or, the string 202 can be periodically raised and lowered to cause the wellbore milling tool 204 to also be raised and lowered. During such rotational or axial motion, the wellbore milling tool 204 mills through any component that contacts the tool 204.
  • In some implementations, a fluid flow pathway (FIGS. 3A-3D) is formed through the wellbore milling tool 204. For example, the fluid flow pathway is formed as a hollow portion extending from one end of the tool 204 to the other end of the tool 204. The string 202 is also hollow and axially coupled to the fluid flow pathway formed in the tool 204. Fluids, e.g., cement, can be flowed through the fluid flow pathway from the surface 106, through the string 202 and through the fluid flow pathway formed in the tool 204.
  • The well tool 102 includes an elongate body 206 that is hollow and defines different portions (i.e., axial length segments) of different sizes. That is, while all the axial length segments are hollow, an inner diameter and an outer diameter of one axial length segment is different from an inner diameter and an outer diameter, respectively, of another axial length segment. The body 206 includes a first portion 208 near a first end of the body 206 and a second portion 210 near a second end of the body 206. The first portion 208 has an inner diameter that is greater than an outer diameter of the milling tool 204. The first portion 208 has an axial length equal to or greater than an axial length of the milling tool 204. In this arrangement, the milling tool 204 can be positioned and completely contained within the first portion 208, as shown in FIG. 2B. The remainder of the body 206 forms a second portion 210 that can have the same or different outer diameters. But, the outer diameter of the milling tool 204 is greater than the largest outer diameter of the second portion 210. In this arrangement, the milling tool 204 can mill through an entirety of the second portion 210.
  • A packer 212 (or similar sealing assembly) is attached to the second portion 210, e.g., nearer to an end of the second portion 210. The packer 210 allows the well tool 102 to be installed or set within the wellbore 104 at the desired downhole location 110 as described with reference to FIG. 1 . In some implementations, an outer diameter of the axial length of the second portion 210 to which packer 212 is attached is equal to an outer diameter of the milling tool 204 so that the milling tool 204 can mill through the packer 212 without damaging the packer 212.
  • The hollow portions that extend from end to end within the body 206 extend the fluid flow pathway defined by the milling tool 204. Fluids, e.g., cement, can be flowed through the fluid flow pathway from the surface 106, through the string 202, through the fluid flow pathway formed in the tool 204, through the hollow portions within the body 206 and to locations downhole of the tool 102. In particular, the cement can be flowed through the well tool 102 to the well region 112 (FIG. 1 ) downhole of the downhole location 110 (FIG. 1 ).
  • A tool retainer (FIGS. 3A-3D) is attached to the body 206. The tool retainer is configured to retain the milling tool 204 within the first portion 208 and to allow lowering the milling tool 204 attached to the body 206 within the wellbore 104. As described below with reference to FIGS. 3A-3D, once the well tool 102 has been installed or set within the wellbore 104 at the desired downhole location 110, the tool retainer can be activated to allow the milling tool 204 to separate from the body 206. In operation, the tool retainer is activated after the cementing operations have been performed by flowing cement through the fluid flow pathway.
  • FIGS. 3A-3D are schematic diagrams of an example of an operation of the well tool 102. FIGS. 3A-3D show the milling tool 204 (FIG. 2 ), attached to the string 202 (FIG. 2 ), wholly contained within the first portion 208 and lowered into the wellbore (not shown in FIGS. 3A-3D). As described above, the tool 102 defines a fluid flow pathway 302. Also, as described above, the tool retainer retains the milling tool 204 within the first portion 208 such that the milling tool 204 and the body 206 (FIG. 2 ) can be lowered into the wellbore 104 (FIG. 1 ) together in a single trip. In some implementations, the tool retainer includes a shear pin 304 that passes through a circumferential surface 306 of the body 206 (specifically, the first portion 208). The tool retainer also includes a notch 308 formed on a side of the milling tool 204. When the shear pin 304 is radially inserted through the circumferential surface 306 into the notch 308, the shear pin 304 locks the milling tool 204 and the first portion 208 such that the two components move together axially within the wellbore 104 (FIG. 1 ). After the well tool 102 is set at the desired downhole location 110 (FIG. 1 ) by deploying the packer 212 (FIG. 2 ), a relative axial movement between the milling tool 204 and the body 206 causes the shearing pin 304 to be sheared. For example, the shearing pin 304 can be made of a material that can be sheared when the string 202, to which the milling tool 204 is attached, is pulled in an uphole direction after the packer 212 (FIG. 2 ) has been deployed.
  • FIG. 3A shows that the first portion 208 with the milling tool 204 retained by the tool retainer is lowered into the wellbore 104 (not shown in FIG. 3A). The packer 212 (not shown in FIG. 3A) is deployed once the body 206 reaches the desired downhole location 110 (not shown in FIG. 3A). The fluid flow pathway 302 extends from the surface 106 of the wellbore 104 through the string 202 and the milling tool 204, through the hollow portion defined by the body 206 to the downhole end of the body 206. In some implementations, a separate elongate hollow tubular 302 can be disposed within the body 206 and connected (e.g., axially, end-to-end) to the milling tool 204. The tubular 302 can extend from the downhole end of the milling tool 204 to the downhole end of the body 206. FIG. 3B shows fluids, e.g., cement, being flowed through the fluid flow pathway 302. The cement is flowed from the surface 106 of the wellbore 104 to the wellbore region 112 (FIG. 1 ) that is downhole of the desired downhole location 110 (FIG. 1 ) where the packer 212 is deployed. FIG. 3C shows that the cement flow through the fluid flow pathway 302 has been stopped. The string 202 is pulled axially in an uphole direction causing the shearing pin 304 to be sheared. Consequently, the milling tool 204 is no longer connected to the first portion 208 of the body 206.
  • FIG. 3D shows the milling tool 204 being raised uphole of the body 206 (specifically, uphole of the first portion 208). The string 202 can then be rotated or moved axially in an uphole-downhole direction (or both), and the milling tool 204 can be brought into contact with the body 206 to mill the body 206. Because the inner diameter of the first portion 208 is greater than the outer diameter of the milling tool 204, the axial uphole-downhole motion can be implemented to contact the milling tool 204 against the first portion 208 to mill the first portion 208. Because the outer diameter of the milling tool 204 is greater than an outer diameter of the remainder of the body 206, the rotational motion of the milling tool 204 can mill the remainder of the body 206. The shearing pin 306 and any other component of the tool retainer are made of millable materials that can also be milled by the milling tool 204. In this manner, the cementing and milling operations are implemented in one-trip. That is, a separate trip to lower a milling tool to remove the body is unnecessary. In addition, the milling tool 204 need not be removed from within the wellbore 104 to mill the body.
  • FIG. 4 is a flowchart of an example of a process 400 of using the well tool of FIG. 1 . At 402, the well tool 102 is formed by positioning the milling tool 204 within the first portion 208 of the body 206. At 404, the milling tool 204 is connected to the body 206, specifically the first portion 208, by the tool retainer. At 406, the well tool body 206 with the connected wellbore milling tool 204 is lowered into the wellbore 104. At 408, the body 206 is installed within the wellbore 104 at the desired downhole location 110, for example, by deploying the packer 212. After the installing, the body 206 is sealingly attached to an inner wall of the wellbore 104 at the downhole location 110. At 410, after installing the body 206, cement is flowed through the fluid flow pathway (the cement flow pathway) to the wellbore location 112 that is downhole of the downhole location 110. At 412, after flowing the cement (specifically, after ceasing the flow of cement), the tool retainer is activated to separate the milling tool 204 from the body 206. At 414, after separating the milling tool 204 from the body 206, the body 206 is milled with the milling tool 204. In this manner, flowing of the cement and milling of the body 206 are implemented in a single trip into the wellbore 104.
  • Thus, particular implementations of the subject matter have been described. Other implementations are within the scope of the following claims. In some cases, the actions recited in the claims can be performed in a different order and still achieve desirable results. In addition, the processes depicted in the accompanying figures do not necessarily require the particular order shown, or sequential order, to achieve desirable results. In certain implementations, multitasking and parallel processing may be advantageous.

Claims (14)

1. A method comprising:
positioning a wellbore milling tool in a hollow portion of an elongate well tool body, wherein the wellbore milling tool and the well tool body define a cement flow pathway from end to end;
connecting the wellbore milling tool to the well tool body by a tool retainer;
lowering the well tool body with the connected wellbore milling tool into a wellbore formed from a surface through a subterranean zone;
installing the well tool body within the wellbore at a downhole location, wherein, after the installing, the well tool body is sealingly attached to an inner wall of the wellbore at the downhole location;
after installing the well tool body, flowing cement through the cement flow pathway to a wellbore location that is downhole of the downhole location;
after flowing the cement, activating the tool retainer to separate the wellbore milling tool from the well tool body; and
after separating the wellbore milling tool from the well tool body, milling the well tool body with the wellbore milling tool.
2. The method of claim 1, wherein flowing the cement and milling the well tool body are implemented in a single trip into the wellbore.
3. The method of claim 1, wherein a packer is attached to the well tool body, wherein installing the well tool body within the wellbore at the downhole location comprises deploying the packer at the downhole location to seal against the inner wall of the wellbore.
4. The method of claim 1, wherein an inner diameter of the hollow portion in which the wellbore milling tool is positioned is greater than or equal to an outer diameter of a remainder of the body.
5. The method of claim 3, wherein an outer diameter of the wellbore milling tool is greater than or equal to the outer diameter of the remainder of the body.
6. The method of claim 1, wherein the tool retainer comprises a shear pin, wherein connecting the wellbore milling tool to the well tool body by the tool retainer comprises passing the shear pin through a circumferential surface of the body and a notch formed on a side of the wellbore milling tool.
7. The method of claim 6, wherein activating the tool retainer to separate the wellbore milling tool from the well tool body comprises axially moving the wellbore milling tool and the well tool body relative to each other causing the shear pin to be sheared.
8. A well tool comprising:
an elongate body comprising a first hollow portion near a first end of the body and a second portion near a second end of the body;
a wellbore milling tool positioned within the first hollow portion, the wellbore milling tool configured to perform milling operations within a wellbore;
a cement flow pathway defined within the body and the wellbore milling tool, the cement flow pathway extending from the first end of the body to the second end of the body and passing through the wellbore milling tool, the cement flow pathway configured to allow flow of cement through the well tool; and
a tool retainer attached to the body, the tool retainer configured to retain the wellbore milling tool within the first hollow portion of the elongate body and to allow lowering the wellbore milling tool attached to the body within the wellbore.
9. The well tool of claim 8, further comprising a packer attached to the second portion, the packer configured to seal against an inner wall of the wellbore.
10. The well tool of claim 8, wherein an inner diameter of the first hollow portion is greater than or equal to an outer diameter of a remainder of the body.
11. The well tool of claim 10, wherein an outer diameter of the wellbore milling tool is greater than or equal to the outer diameter of the remainder of the body.
12. The well tool of claim 8, wherein the tool retainer comprises a shear pin passing through a circumferential surface of the body and a notch formed on a side of the wellbore milling tool, wherein the shear pin is made of a material that is configured to be sheared in response to an axial movement of the wellbore milling tool and the body relative to each other.
13. The well tool of claim 12, wherein the material with which the shear pin is made is millable by the wellbore milling tool.
14. The well tool of claim 8, further comprising:
a string connected to the wellbore milling tool, the string configured to lower the well tool inside the wellbore; and
a string mill attached to the string axially uphole of the wellbore milling tool.
US17/897,987 2022-08-29 2022-08-29 Modified cement retainer with milling assembly Active 2042-11-26 US11993992B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US17/897,987 US11993992B2 (en) 2022-08-29 2022-08-29 Modified cement retainer with milling assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US17/897,987 US11993992B2 (en) 2022-08-29 2022-08-29 Modified cement retainer with milling assembly

Publications (2)

Publication Number Publication Date
US20240068312A1 true US20240068312A1 (en) 2024-02-29
US11993992B2 US11993992B2 (en) 2024-05-28

Family

ID=89998906

Family Applications (1)

Application Number Title Priority Date Filing Date
US17/897,987 Active 2042-11-26 US11993992B2 (en) 2022-08-29 2022-08-29 Modified cement retainer with milling assembly

Country Status (1)

Country Link
US (1) US11993992B2 (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5775428A (en) * 1996-11-20 1998-07-07 Baker Hughes Incorporated Whipstock-setting apparatus
US20150122495A1 (en) * 2013-11-06 2015-05-07 Baker Hughes Incoporated Single Trip Cement Thru Open Hole Whipstick
US20150226017A1 (en) * 2012-08-23 2015-08-13 M-I L.L.C. Drilling assembly
US20180119507A1 (en) * 2016-10-28 2018-05-03 Baker Hughes Incorporated Method and system for abandoning a cased boreole
US20180128071A1 (en) * 2016-11-04 2018-05-10 Baker Hughes Incorporated Debris Bridge Monitoring and Removal for Uphole Milling System
US20190284893A1 (en) * 2016-11-09 2019-09-19 National Oilwell Varco, L.P. Production Tubing Conversion Device and Methods of Use
US20200040683A1 (en) * 2018-08-01 2020-02-06 Weatherford Technology Holdings, Llc Apparatus and method for forming a lateral wellbore
US20200157903A1 (en) * 2018-11-15 2020-05-21 Saudi Arabian Oil Company Milling wellbores
US20200325746A1 (en) * 2017-07-13 2020-10-15 Tyrfing Innovation As A downhole apparatus and a method at a downhole location
US20230091920A1 (en) * 2021-09-20 2023-03-23 Saudi Arabian Oil Company Adjustable mill
US20230272672A1 (en) * 2022-02-25 2023-08-31 Saudi Arabian Oil Company Modified whipstock design integrating cleanout and setting mechanisms

Family Cites Families (180)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US880404A (en) 1907-10-24 1908-02-25 Robert G Sanford Pipe-fishing tool.
US1591264A (en) 1923-10-10 1926-07-06 Lawrence F Baash Attachment for fishing tools
US1789993A (en) 1929-08-02 1931-01-27 Switzer Frank Casing ripper
US1896482A (en) 1930-03-17 1933-02-07 Erd V Crowell Cement retainer
US1949498A (en) 1931-07-06 1934-03-06 Hydril Co Pump-down plug
US2121002A (en) 1936-10-10 1938-06-21 Baker Oil Tools Inc Cement retainer and bridge plug for well casings
US2121051A (en) 1937-07-14 1938-06-21 Baker Oil Tools Inc Cement retainer
US2187487A (en) 1939-01-14 1940-01-16 Baker Oil Tools Inc Bridge plug
US2189697A (en) 1939-03-20 1940-02-06 Baker Oil Tools Inc Cement retainer
US2222233A (en) 1939-03-24 1940-11-19 Mize Loyd Cement retainer
US2316402A (en) 1940-08-19 1943-04-13 Arthur B Canon Cementing wells
US2286075A (en) 1941-01-21 1942-06-09 Phillips Petroleum Co Thermit welding apparatus
US2327092A (en) 1941-04-21 1943-08-17 Halliburton Oil Well Cementing Apparatus for cementing wells
US2411260A (en) 1941-05-16 1946-11-19 Baker Oil Tools Inc Apparatus for supporting and cementing liners or casings in well bores
US2304793A (en) 1941-06-09 1942-12-15 Calpat Corp Method of and apparatus for cutting pipe
US2546978A (en) 1946-02-18 1951-04-03 California Research Corp Well liner and method of cementing
US2672199A (en) 1948-03-12 1954-03-16 Patrick A Mckenna Cement retainer and bridge plug
US2965175A (en) 1949-06-25 1960-12-20 Dailey Oil Tools Inc Pipe puller
US2707998A (en) 1950-09-26 1955-05-10 Baker Oil Tools Inc Setting tool, dump bailer, and well packer apparatus
US2728599A (en) 1952-12-23 1955-12-27 Moore George Waldo Apparatus for recovering junk from a well bore
US2806532A (en) 1953-10-12 1957-09-17 Baker Oil Tools Inc Method and apparatus for pressuring well bores
US2881838A (en) 1953-10-26 1959-04-14 Pan American Petroleum Corp Heavy oil recovery
US2912053A (en) 1954-02-25 1959-11-10 Christian W Breukelman Squeeze cementing tools
US2912273A (en) 1954-09-23 1959-11-10 Houston Oil Field Mat Co Inc Pipe engaging tool
US2751010A (en) 1954-11-18 1956-06-19 Houston Engineers Inc Junk basket
US2915127A (en) 1956-03-29 1959-12-01 Abendroth O'farrel Fluid controlled junk basket
US2965177A (en) 1957-08-12 1960-12-20 Wash Overshot And Spear Engine Fishing tool apparatus
US3116799A (en) 1960-08-01 1964-01-07 Drilling Control Corp Whipstock apparatus and method of using the same
US3147536A (en) 1961-10-27 1964-09-08 Kammerer Jr Archer W Apparatus for milling tubular strings in well bores
GB958734A (en) 1962-08-28 1964-05-27 Shell Int Research Apparatus adapted to be pumped througth a pipe
US3225828A (en) 1963-06-05 1965-12-28 American Coldset Corp Downhole vertical slotting tool
US3369603A (en) 1965-09-02 1968-02-20 Phillips Petroleum Co Plugging of a formation adjacent an oil stratum
US3381748A (en) 1965-12-16 1968-05-07 Exxon Production Research Co Method for sealing leaks in production packers
US3382925A (en) 1966-01-17 1968-05-14 James R. Jennings Reverse circulating junk basket
US3667721A (en) 1970-04-13 1972-06-06 Rucker Co Blowout preventer
US3897038A (en) 1973-01-22 1975-07-29 Hydril Co Blowout preventer with variable inside diameter
US3915426A (en) 1973-01-26 1975-10-28 Hydril Co Blowout preventer with variable inside diameter
US4030354A (en) 1976-02-27 1977-06-21 Scott Kenneth F Testing of ram and annular blowout preventers
US4042019A (en) 1976-03-15 1977-08-16 Henning Jack A Wireline actuated tubing cutter
US4059155A (en) 1976-07-19 1977-11-22 International Enterprises, Inc. Junk basket and method of removing foreign material from a well
US4099699A (en) 1976-09-10 1978-07-11 Cameron Iron Works, Inc. Annular blowout preventer
US4413642A (en) 1977-10-17 1983-11-08 Ross Hill Controls Corporation Blowout preventer control system
US4216827A (en) 1978-05-18 1980-08-12 Crowe Talmadge L Fluid pressure set and released well packer apparatus
US4190112A (en) 1978-09-11 1980-02-26 Davis Carl A Pump down wipe plug and cementing/drilling process
US4227573A (en) 1978-11-16 1980-10-14 Otis Engineering Corporation Reinforced seal unit for pumpdown pistons or well swabs
US4407367A (en) 1978-12-28 1983-10-04 Hri, Inc. Method for in situ recovery of heavy crude oils and tars by hydrocarbon vapor injection
US4254983A (en) 1979-09-19 1981-03-10 Halliburton Company Retriever tool
US4276931A (en) 1979-10-25 1981-07-07 Tri-State Oil Tool Industries, Inc. Junk basket
US4296822A (en) 1979-11-26 1981-10-27 Omega Tools International Multipurpose fluid flow assisted downhole tool
US4285400A (en) 1980-07-14 1981-08-25 Baker International Corporation Releasing tool for pressure activated packer
US4289200A (en) 1980-09-24 1981-09-15 Baker International Corporation Retrievable well apparatus
US4349071A (en) 1980-11-07 1982-09-14 Dresser Industries, Inc. Cement retainer and setting tool assembly
US4391326A (en) 1981-01-22 1983-07-05 Dresser Industries, Inc. Stinger assembly for oil well tool
US4412130A (en) 1981-04-13 1983-10-25 Standard Oil Company Downhole device to detect differences in fluid density
US4422948A (en) 1981-09-08 1983-12-27 Mayco Wellchem, Inc. Lost circulation material
US4562888A (en) 1984-01-12 1986-01-07 Collet James R Tubing head adapter and valve
US4538684A (en) 1984-04-09 1985-09-03 Shell Western F&P Inc. Repair of shallow casing leaks in oil wells
US4611658A (en) 1984-09-26 1986-09-16 Baker Oil Tools, Inc. High pressure retrievable gravel packing apparatus
US4696502A (en) 1985-08-19 1987-09-29 Smith International Dual string packer mill
US4735268A (en) 1986-10-02 1988-04-05 The Western Company Of North America Mechanical setting tool
US4896725A (en) 1986-11-25 1990-01-30 Parker Marvin T In-well heat exchange method for improved recovery of subterranean fluids with poor flowability
US4898245A (en) 1987-01-28 1990-02-06 Texas Iron Works, Inc. Retrievable well bore tubular member packer arrangement and method
US4791992A (en) 1987-08-18 1988-12-20 Dresser Industries, Inc. Hydraulically operated and released isolation packer
US5012863A (en) 1988-06-07 1991-05-07 Smith International, Inc. Pipe milling tool blade and method of dressing same
US4834184A (en) 1988-09-22 1989-05-30 Halliburton Company Drillable, testing, treat, squeeze packer
US4869321A (en) 1989-02-10 1989-09-26 Camco, Incorporated Method of plugging openings in well conduits
US4928762A (en) 1989-02-13 1990-05-29 Halliburton Company Retrievable bridge plug and packer
US4945991A (en) 1989-08-23 1990-08-07 Mobile Oil Corporation Method for gravel packing wells
US5129956A (en) 1989-10-06 1992-07-14 Digital Equipment Corporation Method and apparatus for the aqueous cleaning of populated printed circuit boards
US4953617A (en) 1989-10-19 1990-09-04 Baker Hughes Incorporated Apparatus for setting and retrieving a bridge plug from a subterranean well
US5117909A (en) 1990-10-25 1992-06-02 Atlantic Richfield Company Well conduit sealant and placement method
US5176208A (en) 1991-03-20 1993-01-05 Ponder Fishing Tools, Inc. Reverse circulation tool handling cuttings and debris
US5178219A (en) 1991-06-27 1993-01-12 Halliburton Company Method and apparatus for performing a block squeeze cementing job
US5197547A (en) 1992-05-18 1993-03-30 Morgan Allen B Wireline set packer tool arrangement
US5330000A (en) 1992-09-22 1994-07-19 Halliburton Company Squeeze packer latch
US5295541A (en) 1992-12-22 1994-03-22 Mobil Oil Corporation Casing repair using a plastic resin
US5358048A (en) 1993-04-27 1994-10-25 Ctc International Hydraulic port collar
US5678635A (en) 1994-04-06 1997-10-21 Tiw Corporation Thru tubing bridge plug and method
US5924489A (en) 1994-06-24 1999-07-20 Hatcher; Wayne B. Method of severing a downhole pipe in a well borehole
US5564503A (en) 1994-08-26 1996-10-15 Halliburton Company Methods and systems for subterranean multilateral well drilling and completion
US5580114A (en) 1994-11-25 1996-12-03 Baker Hughes Incorporated Hydraulically actuated fishing tool
US5833001A (en) 1996-12-13 1998-11-10 Schlumberger Technology Corporation Sealing well casings
US5842518A (en) 1997-10-14 1998-12-01 Soybel; Joshua Richard Method for drilling a well in unconsolidated and/or abnormally pressured formations
AU1850199A (en) 1998-03-11 1999-09-23 Baker Hughes Incorporated Apparatus for removal of milling debris
US5944101A (en) 1998-06-15 1999-08-31 Atlantic Richfield Company Apparatus for milling a window in well tubular
US6138764A (en) 1999-04-26 2000-10-31 Camco International, Inc. System and method for deploying a wireline retrievable tool in a deviated well
US20020053428A1 (en) 1999-11-30 2002-05-09 Walter Maples Reverse circulation junk basket
US6371204B1 (en) 2000-01-05 2002-04-16 Union Oil Company Of California Underground well kick detector
US6828531B2 (en) 2000-03-30 2004-12-07 Homer L. Spencer Oil and gas well alloy squeezing method and apparatus
US7600572B2 (en) 2000-06-30 2009-10-13 Bj Services Company Drillable bridge plug
US6491108B1 (en) 2000-06-30 2002-12-10 Bj Services Company Drillable bridge plug
US7255178B2 (en) 2000-06-30 2007-08-14 Bj Services Company Drillable bridge plug
US6899178B2 (en) 2000-09-28 2005-05-31 Paulo S. Tubel Method and system for wireless communications for downhole applications
GB0026460D0 (en) 2000-10-27 2000-12-13 Sps Afos Internat Branch Ltd Combined milling and scraping tool
US6595289B2 (en) 2001-05-04 2003-07-22 Weatherford/Lamb, Inc. Method and apparatus for plugging a wellbore
US7249633B2 (en) 2001-06-29 2007-07-31 Bj Services Company Release tool for coiled tubing
US20030047312A1 (en) 2001-09-10 2003-03-13 Bell William T. Drill pipe explosive severing tool
US6768106B2 (en) 2001-09-21 2004-07-27 Schlumberger Technology Corporation Method of kick detection and cuttings bed buildup detection using a drilling tool
ATE329133T1 (en) 2001-10-08 2006-06-15 Schlumberger Technology Bv STABILIZATION OF A BOREHOLE
US6688386B2 (en) 2002-01-18 2004-02-10 Stream-Flo Industries Ltd. Tubing hanger and adapter assembly
US6976537B1 (en) 2002-01-30 2005-12-20 Turbo-Chem International, Inc. Method for decreasing lost circulation during well operation
GB0207563D0 (en) 2002-04-02 2002-05-15 Sps Afos Group Ltd Junk removal tool
US7591305B2 (en) 2002-04-18 2009-09-22 Tejas Complete Solutions, Lp Patriot retrievable production packer
US7082991B2 (en) 2002-04-18 2006-08-01 Team Oil Tools Slip spring with heel notch
US7049272B2 (en) 2002-07-16 2006-05-23 Santrol, Inc. Downhole chemical delivery system for oil and gas wells
GB0218836D0 (en) 2002-08-14 2002-09-18 Well Worx Ltd Apparatus and method
US7051815B2 (en) 2002-08-22 2006-05-30 Baker Hughes Incorporated Well pump capsule
US20040040707A1 (en) 2002-08-29 2004-03-04 Dusterhoft Ronald G. Well treatment apparatus and method
US7188674B2 (en) 2002-09-05 2007-03-13 Weatherford/Lamb, Inc. Downhole milling machine and method of use
US6808023B2 (en) 2002-10-28 2004-10-26 Schlumberger Technology Corporation Disconnect check valve mechanism for coiled tubing
UA88611C2 (en) 2003-05-13 2009-11-10 Шлюмбергер Текнолоджи Б.В. Well-treating method to prevent or cure lost-circulation
US20070137528A1 (en) 2003-05-14 2007-06-21 Sylvaine Le Roy-Delage Self adaptive cement systems
US7424909B2 (en) 2004-02-27 2008-09-16 Smith International, Inc. Drillable bridge plug
US7117956B2 (en) 2004-07-07 2006-10-10 Halliburton Energy Services, Inc. Pipe conveyed explosive with self contained actuation
US7284611B2 (en) 2004-11-05 2007-10-23 Halliburton Energy Services, Inc. Methods and compositions for controlling lost circulation in subterranean operations
US7488705B2 (en) 2004-12-08 2009-02-10 Halliburton Energy Services, Inc. Oilwell sealant compositions comprising alkali swellable latex
US7188675B2 (en) 2005-01-14 2007-03-13 M-I L.L.C. Finger boot basket
US20060213656A1 (en) 2005-03-23 2006-09-28 Clifton Harold D Rotational set well packer device
GB0507639D0 (en) 2005-04-15 2005-05-25 Caledus Ltd Downhole swivel sub
JP4318732B2 (en) 2005-05-10 2009-08-26 ホーチキ株式会社 Alarm output device
US9109433B2 (en) 2005-08-01 2015-08-18 Baker Hughes Incorporated Early kick detection in an oil and gas well
US7934552B2 (en) 2005-09-08 2011-05-03 Thomas La Rovere Method and apparatus for well casing repair and plugging utilizing molten metal
US7635027B2 (en) 2006-02-08 2009-12-22 Tolson Jet Perforators, Inc. Method and apparatus for completing a horizontal well
US7802621B2 (en) 2006-04-24 2010-09-28 Halliburton Energy Services, Inc. Inflow control devices for sand control screens
EP2016254B1 (en) 2006-05-08 2017-03-22 Mako Rentals, Inc. Downhole swivel apparatus and method
US7762323B2 (en) 2006-09-25 2010-07-27 W. Lynn Frazier Composite cement retainer
US20090250220A1 (en) 2006-11-21 2009-10-08 Prospector Drilling & Tool, Inc. Internal pipe slot tool
US7712527B2 (en) 2007-04-02 2010-05-11 Halliburton Energy Services, Inc. Use of micro-electro-mechanical systems (MEMS) in well treatments
US20080251253A1 (en) 2007-04-13 2008-10-16 Peter Lumbye Method of cementing an off bottom liner
US20080314591A1 (en) 2007-06-21 2008-12-25 Hales John H Single trip well abandonment with dual permanent packers and perforating gun
WO2009023195A1 (en) 2007-08-09 2009-02-19 Dtc International, Inc. Control module for subsea equipment
EA020348B1 (en) 2008-08-12 2014-10-30 Борд Оф Сьюпервайзорз Оф Луизиана Стэйт Юниверсити Энд Эгрикалчурал Энд Мекэникал Колледж Thermoplastic cellulosic fiber blends as lost circulation materials
EP2196516A1 (en) 2008-12-11 2010-06-16 Services Pétroliers Schlumberger Lost circulation material for drilling fluids
US8496055B2 (en) 2008-12-30 2013-07-30 Schlumberger Technology Corporation Efficient single trip gravel pack service tool
US8186446B2 (en) 2009-03-25 2012-05-29 Weatherford/Lamb, Inc. Method and apparatus for a packer assembly
US8151902B2 (en) 2009-04-17 2012-04-10 Baker Hughes Incorporated Slickline conveyed bottom hole assembly with tractor
GB0906934D0 (en) 2009-04-23 2009-06-03 Caledus Ltd Fishing tool
US7861772B2 (en) 2009-05-15 2011-01-04 Baker Hughes Incorporated Packer retrieving mill with debris removal
US20110036570A1 (en) 2009-08-14 2011-02-17 La Rovere Thomas A Method and apparatus for well casing shoe seal
US8522872B2 (en) 2009-10-14 2013-09-03 University Of Utah Research Foundation In situ decomposition of carbonyls at high temperature for fixing incomplete and failed well seals
WO2011106366A2 (en) 2010-02-23 2011-09-01 Tesco Corporation Apparatus and method for cementing liner
GB2489265B (en) 2011-03-23 2017-09-20 Managed Pressure Operations Blow out preventer
US8479828B2 (en) 2010-05-13 2013-07-09 Weatherford/Lamb, Inc. Wellhead control line deployment
US20120012335A1 (en) 2010-07-13 2012-01-19 Richard White Sealing adapter for well tubing head
US8579024B2 (en) 2010-07-14 2013-11-12 Team Oil Tools, Lp Non-damaging slips and drillable bridge plug
US8453724B2 (en) 2010-11-12 2013-06-04 Saudi Arabian Oil Company Tool for recovering junk and debris from a wellbore of a well
AR079760A1 (en) 2010-12-28 2012-02-15 Texproil S R L RECOVERY HYDRAULIC PACKAGING DEVICE USED IN WATER, GAS AND PETROLEUM WELLS OR SIMILAR FLUIDS
US8770276B1 (en) 2011-04-28 2014-07-08 Exelis, Inc. Downhole tool with cones and slips
EP2530238B3 (en) 2011-05-31 2023-10-04 Welltec A/S Downhole tubing cutter tool
BR112014001623B1 (en) 2011-07-05 2021-07-13 Bruce A. Tunget WIRING SYSTEM COMPATIBLE WITH WIRELESS OPERATION FOR UNDERGROUND WELL USE AND ABANDONMENT
CA2968661C (en) 2011-08-22 2019-06-04 Downhole Technology, Llc Downhole tool for use in a wellbore
US9133671B2 (en) 2011-11-14 2015-09-15 Baker Hughes Incorporated Wireline supported bi-directional shifting tool with pumpdown feature
US10053949B2 (en) 2012-03-15 2018-08-21 Magnum Oil Tools International Ltd Cement retainer and squeeze technique
US20140158350A1 (en) 2012-12-12 2014-06-12 Baker Hughes Incorporated All purpose pumpdown instrument
US9416617B2 (en) 2013-02-12 2016-08-16 Weatherford Technology Holdings, Llc Downhole tool having slip inserts composed of different materials
US20160084034A1 (en) 2013-04-18 2016-03-24 Thomas Roane One-trip packer and perforating gun system
US9574417B2 (en) 2013-06-05 2017-02-21 Baker Hughes Incorporated Wireline hydraulic driven mill bottom hole assemblies and methods of using same
EP3099891A1 (en) 2014-01-31 2016-12-07 Archer Oiltools AS Straddle tool with disconnect between seals
US9915114B2 (en) 2015-03-24 2018-03-13 Donald R. Greenlee Retrievable downhole tool
US9657213B2 (en) 2014-10-20 2017-05-23 Kraton Polymers U.S. Llc Curable, resealable, swellable, reactive sealant composition for zonal isolation and well integrity
US10920579B2 (en) 2015-02-17 2021-02-16 Board Of Regents, The University Of Texas System Method and apparatus for early detection of kicks
US10000991B2 (en) 2015-04-18 2018-06-19 Tercel Oilfield Products Usa Llc Frac plug
CA2986438C (en) 2015-05-21 2022-04-12 Thru Tubing Solutions, Inc. Advancement of a tubular string into a wellbore
US20170044864A1 (en) 2015-08-10 2017-02-16 Csi Technologies Llc Method of sealing wells by squeezing sealant
WO2017039740A1 (en) 2015-09-01 2017-03-09 Cameron International Corporation Blowout preventer including blind seal assembly
NO342616B1 (en) 2015-09-11 2018-06-18 Wellguard As A plugging tool, and method of plugging a well
US9464499B1 (en) 2015-09-24 2016-10-11 Bakken Ball Retrieval, LLC Fracturing ball retrieval device and method
AU2015410225B2 (en) 2015-09-25 2021-03-11 Halliburton Energy Services, Inc. Swellable technology for downhole fluids detection
CA3023606C (en) 2016-07-20 2020-01-14 Halliburton Energy Services, Inc. Retractable pump down ring
GB2567066B (en) 2016-07-21 2021-08-04 Landmark Graphics Corp Method for slim hole single trip remedial or plug and abandonment cement barrier
US20180187498A1 (en) 2017-01-03 2018-07-05 General Electric Company Systems and methods for early well kick detection
US20190024473A1 (en) 2017-07-18 2019-01-24 Schlumberger Technology Corporation Rotating annular preventer and methods of use thereof
CN107387018B (en) 2017-07-28 2023-07-14 四机赛瓦石油钻采设备有限公司 Tool for completing setting and cement extrusion construction of cement retainer by one-pass pipe column
US10590732B2 (en) 2017-12-19 2020-03-17 Weatherford Technology Holdings, Llc Packing element booster with ratchet mechanism
WO2019132877A1 (en) 2017-12-27 2019-07-04 Fmc Technologies, Inc. Compact over pull-push stroking tool
NO344284B1 (en) 2018-03-14 2019-10-28 Archer Oiltools As Improved tandem releasable bridge plug system and method for setting such tandem releasable plugs
US10837254B2 (en) 2018-08-14 2020-11-17 Saudi Arabian Oil Company Tandem cement retainer and bridge plug
US10280706B1 (en) 2018-08-31 2019-05-07 Harvey Sharp, III Hydraulic setting tool apparatus and method
US11142976B2 (en) 2019-02-12 2021-10-12 Saudi Arabian Oil Company Positioning downhole-type tools
US11230904B2 (en) 2019-11-11 2022-01-25 Saudi Arabian Oil Company Setting and unsetting a production packer

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5775428A (en) * 1996-11-20 1998-07-07 Baker Hughes Incorporated Whipstock-setting apparatus
US20150226017A1 (en) * 2012-08-23 2015-08-13 M-I L.L.C. Drilling assembly
US20150122495A1 (en) * 2013-11-06 2015-05-07 Baker Hughes Incoporated Single Trip Cement Thru Open Hole Whipstick
US9695639B2 (en) * 2013-11-06 2017-07-04 Baker Hughes Incorporated Single trip cement thru open hole whipstick
US20180119507A1 (en) * 2016-10-28 2018-05-03 Baker Hughes Incorporated Method and system for abandoning a cased boreole
US20180128071A1 (en) * 2016-11-04 2018-05-10 Baker Hughes Incorporated Debris Bridge Monitoring and Removal for Uphole Milling System
US20190284893A1 (en) * 2016-11-09 2019-09-19 National Oilwell Varco, L.P. Production Tubing Conversion Device and Methods of Use
US20200325746A1 (en) * 2017-07-13 2020-10-15 Tyrfing Innovation As A downhole apparatus and a method at a downhole location
US20200040683A1 (en) * 2018-08-01 2020-02-06 Weatherford Technology Holdings, Llc Apparatus and method for forming a lateral wellbore
US20200157903A1 (en) * 2018-11-15 2020-05-21 Saudi Arabian Oil Company Milling wellbores
US20230091920A1 (en) * 2021-09-20 2023-03-23 Saudi Arabian Oil Company Adjustable mill
US20230272672A1 (en) * 2022-02-25 2023-08-31 Saudi Arabian Oil Company Modified whipstock design integrating cleanout and setting mechanisms

Also Published As

Publication number Publication date
US11993992B2 (en) 2024-05-28

Similar Documents

Publication Publication Date Title
US10731417B2 (en) Reduced trip well system for multilateral wells
US6012526A (en) Method for sealing the junctions in multilateral wells
US5785133A (en) Multiple lateral hydrocarbon recovery system and method
US5228518A (en) Downhole activated process and apparatus for centralizing pipe in a wellbore
US7640984B2 (en) Method for drilling and casing a wellbore with a pump down cement float
US5224556A (en) Downhole activated process and apparatus for deep perforation of the formation in a wellbore
AU733035B2 (en) Casing mounted lateral liner seal housing
EP3161249B1 (en) Multi-lateral well system
US20100181079A1 (en) Method and apparatus for cementing a liner in a borehole using a tubular member having an obstruction
WO2014137914A1 (en) Liner top cleaning method prior to bha removal in drilling with advancing liner systems
EP3538739B1 (en) Production tubing conversion device and methods of use
US11492861B2 (en) Packer assembly for use within a borehole
WO1998009054A1 (en) Cement reinforced inflatable seal for a junction of a multilateral
WO1998009054A9 (en) Cement reinforced inflatable seal for a junction of a multilateral
US11993992B2 (en) Modified cement retainer with milling assembly
US11608717B2 (en) Tool deployment and cleanout system
US11566492B1 (en) Downhole tool with casing scraper with induced rotation
US9127522B2 (en) Method and apparatus for sealing an annulus of a wellbore
NO20210901A1 (en) Hydraulic landing nipple
US20020053433A1 (en) Cement diverter system for multilateral junctions and method for cementing a junction
WO2020117208A1 (en) Systems and methods for positioning an isolation device in a borehole
AU772417B2 (en) Method for sealing the junctions in multilateral wells
WO1995017577A1 (en) Apparatus and method for completing a well
WO2022094395A1 (en) Selectively openable communication port for a wellbore drilling system
AU2018453912A1 (en) Advanced pulling prong

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

AS Assignment

Owner name: SAUDI ARABIAN OIL COMPANY, SAUDI ARABIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:AL-MOUSA, AHMED ABDULAZIZ;REEL/FRAME:060936/0360

Effective date: 20220828

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED

STCF Information on status: patent grant

Free format text: PATENTED CASE