US20210057909A1 - Optimized energy management system - Google Patents
Optimized energy management system Download PDFInfo
- Publication number
- US20210057909A1 US20210057909A1 US16/832,581 US202016832581A US2021057909A1 US 20210057909 A1 US20210057909 A1 US 20210057909A1 US 202016832581 A US202016832581 A US 202016832581A US 2021057909 A1 US2021057909 A1 US 2021057909A1
- Authority
- US
- United States
- Prior art keywords
- cost
- demand
- energy
- grid
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 claims abstract description 53
- 230000002123 temporal effect Effects 0.000 claims 1
- 238000003860 storage Methods 0.000 abstract description 59
- 238000005265 energy consumption Methods 0.000 abstract description 5
- 230000002349 favourable effect Effects 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 description 55
- 238000005516 engineering process Methods 0.000 description 30
- 238000004364 calculation method Methods 0.000 description 24
- 230000006870 function Effects 0.000 description 24
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 22
- 230000005611 electricity Effects 0.000 description 20
- 230000008569 process Effects 0.000 description 19
- 238000007726 management method Methods 0.000 description 18
- 238000004891 communication Methods 0.000 description 9
- 230000006854 communication Effects 0.000 description 9
- 238000005457 optimization Methods 0.000 description 8
- 239000000446 fuel Substances 0.000 description 7
- 230000008859 change Effects 0.000 description 6
- 230000001276 controlling effect Effects 0.000 description 6
- 238000009434 installation Methods 0.000 description 6
- 238000005406 washing Methods 0.000 description 6
- 238000013461 design Methods 0.000 description 5
- 238000004851 dishwashing Methods 0.000 description 5
- 238000013459 approach Methods 0.000 description 4
- 230000001174 ascending effect Effects 0.000 description 4
- 238000012360 testing method Methods 0.000 description 4
- 235000021152 breakfast Nutrition 0.000 description 3
- 239000003990 capacitor Substances 0.000 description 3
- 238000001816 cooling Methods 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 3
- 238000010438 heat treatment Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 238000005057 refrigeration Methods 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 239000002253 acid Substances 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000009472 formulation Methods 0.000 description 2
- 230000003116 impacting effect Effects 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 230000001788 irregular Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000007257 malfunction Effects 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 229910052987 metal hydride Inorganic materials 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000003121 nonmonotonic effect Effects 0.000 description 2
- 229920008347 Cellulose acetate propionate Polymers 0.000 description 1
- 208000003443 Unconsciousness Diseases 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000000872 buffer Substances 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 238000012885 constant function Methods 0.000 description 1
- 238000009470 controlled atmosphere packaging Methods 0.000 description 1
- 238000010411 cooking Methods 0.000 description 1
- 230000001351 cycling effect Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 235000013305 food Nutrition 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 230000003760 hair shine Effects 0.000 description 1
- 230000002401 inhibitory effect Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 229910052759 nickel Inorganic materials 0.000 description 1
- PXHVJJICTQNCMI-UHFFFAOYSA-N nickel Substances [Ni] PXHVJJICTQNCMI-UHFFFAOYSA-N 0.000 description 1
- -1 nickel metal hydride Chemical class 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000002829 reductive effect Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/008—Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/62—The condition being non-electrical, e.g. temperature
- H02J2310/64—The condition being economic, e.g. tariff based load management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Definitions
- the invention relates generally to the field of energy management, and more particularly, to various systems and methods for optimizing the control of energy supply and demand in residences and businesses.
- Electric utilities have conventionally arranged to install special devices in homes and businesses that, when remotely activated by the utility, cut power to certain devices (e.g., air conditioners or hot water heaters) during peak loading conditions.
- certain devices e.g., air conditioners or hot water heaters
- Customers who agree to install such devices are given discounts or other incentives for installing such devices, and in exchange the utility is able to better manage energy demand remotely.
- Such arrangements are typically ad-hoc and require that customers submit to the whims of the utility company.
- Some electric utilities charge varying rates based on demand. For example, during periods of peak demand, a higher rate for electricity is charged. Conversely, during low-demand periods, a lower rate can be charged. Regulators in recent years have also forced utilities to purchase electricity back from consumers who are able to generate more than they need. Such programs have met with limited success for various reasons most particularly the inability of some types of energy users to curtail energy use and the lack of real-time information regarding the immediate cost of energy usage.
- the invention includes various systems and methods for increasing the efficiency with which energy can be managed.
- an integrated control device manages the supply of energy from various sources (e.g., electric grid, battery, photovoltaic cells, fuel cells) and the demand for energy from consumption devices (e.g., hot-water heaters, HVAC systems, and appliances).
- sources e.g., electric grid, battery, photovoltaic cells, fuel cells
- consumption devices e.g., hot-water heaters, HVAC systems, and appliances.
- An optimization algorithm determines based on various factors when to activate the energy sources and when to activate the consumption devices.
- the algorithm takes into account such factors as the supply of charge on batteries, the dynamic price of electricity, weather forecasts, and others in order to schedule and activate energy supplies and consumption devices.
- Devices that can be scheduled for flexible turn-on times e.g., a washing machine or dishwasher are scheduled for periods in which cheap energy supply is projected to be available.
- FIG. 1 shows a system employing various principles of the present invention.
- FIG. 2 shows one possible arrangement for controller 104 of FIG. 1 .
- FIG. 3 shows a process and data/control flow for controlling energy production and usage in accordance with certain aspects of the present invention.
- FIG. 4 shows a typical residential demand curve for electrical energy consumption.
- FIG. 5 shows a production curve for electricity from photovoltaic panels overlaid onto the demand curve of FIG. 4 .
- FIG. 6 shows how excess production may exceed the ability of the system's electronics to deliver power to the grid, meaning that a hardware constraint limits the rate of sale.
- FIG. 7 shows the cost and availability of power from multiple sources.
- FIG. 8 shows a least-cost determination method according to one variation of the invention.
- FIG. 9 shows in flow chart form one variation of an algorithm for least-cost determination according to various principles of the invention.
- FIG. 10 shows how a deferrable load can be shifted from a high-cost period (zone 3) to a lower-cost period (zone 7).
- FIG. 1I shows a process for least-cost dispatch calculation.
- FIG. 12 shows a process for determining whether a deferrable load can be serviced in a zone.
- FIG. 13 shows a process for estimating a daily profile.
- FIG. 14 shows the piecewise constant approximation of a monotonic cost of production curve.
- FIG. 15 shows the piecewise constant approximation of a non-monotonic cost of production curve.
- FIG. 1 shows a system employing various principles of the present invention.
- apparatus 101 includes a unit 103 comprising a controller 104 and an internal storage device 105 .
- Internal storage device 105 may comprise, for example, a plurality of lead-acid or nickel-metal-hydride storage batteries for storing electrical energy, and/or large capacitors.
- External storage device 106 may be optionally included to store additional electrical energy.
- storage devices 105 and 106 may provide power to various devices during times of electrical grid outages or during periods where electrical grid costs exceed certain thresholds, and they may be used to sell power back to the electrical utility during times that are determined to be favorable.
- the storage capacities of devices 105 and 106 may be selected to suit a particular environment, such as the needs of a typical home residence, business, or other electrical consumer.
- the smallest storage capacity anticipated is 840 amp-hours (All) at 12V, while currently planned units have capacities ranging to 1600 AH at 48V. Larger storage capacity may be obtained in the future using flywheels or very large capacitors.
- Controller 104 may comprise a computer and memory programmed with computer software for controlling the operation of apparatus 101 in order to receive electrical power from power sources 109 through 115 and to distribute electrical power to devices 116 through 122 . Further details of various steps that may be carried out by such software are described in more detail herein.
- Controller 104 and internal storage device 105 may be housed in a unit 103 such as a metal rack having appropriate cabling and support structures.
- a unit 103 such as a metal rack having appropriate cabling and support structures.
- One possible design for unit 103 is shown in a pending U.S. patent application Ser. No. 11/037,832 by Danley et al. filed on Jan. 18, 2005, entitled “Fully Integrated Power Storage and Supply Appliance with Power Uploading Capability” (published as U.S. Pat. Appl. Pub. No. 20060158037).
- Apparatus 101 also includes a user interface 102 for controlling the operation of unit 103 .
- the user interface may comprise a keypad and CRT, LED or LCD display panel or vacuum fluorescent type; a computer display and keyboard; or any other similar interface.
- the user interface may be used to select various modes of operation; to display information regarding the operation of the apparatus; and for programming the apparatus.
- An optional control center 108 may be provided to transmit commands to apparatus 101 through a network, such as WAN 107 (e.g., the Internet).
- Control center 108 may be located at a remote location, such as a central control facility, that transmits commands to a plurality of units 101 located in different homes or businesses.
- control center 108 may transmit pricing information (e.g., current price of electricity) so that controller 104 may make decisions regarding the control and distribution of electricity according to various principles of the invention.
- Apparatus 101 is coupled to the electric utility grid 115 through a power interface (not shown), which may include circuit breakers, surge suppressors and other electrical devices. Electricity may be supplied in various forms, such as 110 volts or 240 volts commonly found in homes.
- a backup generator 114 may also be provided and be controlled by apparatus 101 when needed.
- One or more alternative energy sources 109 through 113 may also be provided in order to provide electrical power to the apparatus.
- Such sources may include photovoltaic (PV) cells 109 , which may be mounted on a roof of the home or business; micro-hydroelectric power generators 110 , which generate power based on the movement of water; gas turbines 111 ; windmills or other wind-based devices 112 ; and fuel cells 113 .
- PV photovoltaic
- Other sources may of course be provided.
- power from one or more of the power sources can be used to charge storage units 105 and 106 and/or to meet demand in addition to electric grid 115 .
- these additional power sources (as well as storage units 105 and 106 ) can be used to meet energy demand. Additionally, surplus power can be sold back to the power grid based on optimization of supply and demand calculations as explained in more detail herein.
- FIG. 1 The bold lines shown in FIG. 1 indicate electrical distribution paths. Control paths to and from the various devices are not separately shown but are implied in FIG. 1 .
- One or more power-consuming devices 116 through 122 may also be controlled by and receive power from apparatus 101 .
- These include one or more sensors 116 (e.g., thermostats, occupancy sensors, humidity gauges and the like); heating/ventilation/air-conditioning units 117 ; hot water heaters 118 ; window shades 119 ; windows 120 (e.g., open/close and/or tint controls); and one or more appliances 121 (e.g., washing machines; dryers; dishwashers; refrigerators; etc.).
- Some appliances may be so-called “smart” appliances that can receive control signals directly from apparatus 101 .
- Other conventional appliances can be controlled using one or more controllable relays 122 . It is not necessary in all embodiments that apparatus 101 directly provide electricity to devices 116 through 112 .
- apparatus 101 could be tied into the electrical power system in a home or business and electricity would be supplied through that path to the devices. Appropriate cut-off devices and bypass switches would then be used, for example, in the event of a power outage to disconnect the home wiring system from the electrical grid and to connect apparatus 101 to the wiring network.
- cut-off devices and bypass switches would then be used, for example, in the event of a power outage to disconnect the home wiring system from the electrical grid and to connect apparatus 101 to the wiring network.
- FIG. 2 shows further details of controller 104 according to one variation of the invention.
- a watchdog timer 209 continuously monitors the operation of apparatus 101 in order to detect possible malfunctions.
- watchdog timer 209 periodically polls devices in the system to ensure that they are functioning, and that no error signals have been detected.
- Watchdog timer 209 may be coupled to a modem 210 to report failures or other events to control center 108 .
- a USB port 211 and pager interface 212 may also be provided to receive inputs from or report data to various devices. For example, the report of a malfunction can be transmitted to a pager worn by the owner of the premises in which the apparatus is located.
- FIG. 2 Various software functions shown in FIG. 2 include an administrative function 201 , which may include such things as interfacing with watchdog timer 209 ; operating the user interface 102 ; controlling the modes of the apparatus; and other administrative operations.
- a safety function 202 monitors voltage levels, temperatures, and other variables in order to ensure that the apparatus is operating safely and to shut down the device if an unsafe condition is detected.
- An optimization function 203 makes decisions concerning whether and when to activate various power sources and power-consuming devices.
- a communication function 204 interfaces to a web server 207 in order to provide external communications facilities.
- a logging function 205 maintains records regarding the operation of the device and stores them in a nonvolatile device such as compact flash storage device 206 .
- An input/output board 208 provides communication and control signals to various devices in the system, which may include pollable devices 213 ; voltage sources 214 ; pulse-based devices 215 ; message-based devices 216 ; and other types of devices 217 .
- Various device drivers may also be provided but are not separately shown in FIG. 2 . Rather than controlling devices directly, the apparatus can be configured to operate with a third-part home-automation control system in order to control the devices.
- energy usage can be optimized to deliver power in the most efficient way, where efficiency is defined in terms of the amount of energy used, cost, or a balance of the two.
- efficiency is defined in terms of the amount of energy used, cost, or a balance of the two.
- emphasis has been on conservation—e.g., turning out lights when a room is not occupied, or turning down the thermostat at night.
- various algorithms can be used to increase the energy and cost savings.
- a small business may pay for electricity on a per-kilowatt hour basis with an additional charge for a peak number of kilowatt-hours during a billing period.
- the so-called “demand rate” is designed to discourage peaky consumption because of the high cost of providing high amounts of power for a short period.
- the instantaneous energy usage can be monitored and, if demand exceeds a threshold, power from batteries can be used to reduce demand from the grid, or non-critical energy uses such as a large commercial freezer that can easily be unplugged for an extended time period with little or no impact can be temporarily shut off.
- the sensors ( 116 ) allow monitoring of individual loads.
- the direct controls ( 117 , 118 , 119 , 120 ) allow for the interruption of certain appliances, while the controllable relays ( 122 ) allow for control of appliances without built-in control logic. Whether and to what extent an appliance can be interrupted is defined in the energy source configuration element ( 313 ), described with reference to FIG. 3 below.
- the method for addressing deferrable load which is described subsequently allows an electrical service (cooling in this example) to be optimally rescheduled for a later time to reduce cost.
- the system can control the laundry devices so that they are not activated until later in the day, when energy costs are cheaper.
- the system can determine based on the date (e.g., June 21) and the weather forecast (e.g., sunny) that likely production from solar panels will be high, and decide to sell power from the batteries to the grid (when the rate is high) with the expectation that the batteries can be recharged later in the day when the family is not home and energy usage is minimal.
- the batteries could alternatively be recharged later in the day from the power grid, when electrical costs are lower.
- Certain variations of the invention consider weather when forecasting demand for electrical power and the supply from energy sources whose production capacity is weather dependent, such as PV panels.
- Certain embodiments of the invention allow for control of individual appliances due to the connections to sensors ( 116 ), controllable appliances ( 117 , 118 , 119 , and 120 ) and controllable relays ( 122 ). Appliance performance characteristics and criticality are expressed in the energy source configuration elements ( 313 , discussed below). The system knows the amount of current storage and supply from alternative sources and can provide an accurate forecast of demand and alternative supply by methods described subsequently. Together these can provide the user with information to manage energy effectively in real time or to develop algorithms to be executed in the absence of direct control.
- FIG. 3 shows a process and data/control flow for controlling energy production and usage in accordance with certain aspects of the present invention.
- a clock 301 acts as a control loop for the process.
- energy usage is monitored by circuit or services
- energy production is monitored by source.
- external information regarding such variables as current grid prices; fuel prices; grid voltage; current/forecasted weather; demand-side management (DSM) requests (e.g., a request from a utility under an established demand response program for subscribing customers to reduce demand or supply power from a user controlled source at a specific hour), and commands received from central control center 108 are monitored.
- DSM demand-side management
- the current energy source configuration is determined (step 313 ), including such things as what power sources are available and how much energy is stored in storage devices.
- End use of technology configuration is obtained (step 314 ), including the inventory of technologies that consume energy in the home or business ranging from small sources such as lights to major HVAC equipment.
- the inventory may include the number of such appliances, the circuit on which they are located, how and to what extent they can be controlled, typical day-of-use patterns, and whether there is flexibility in scheduling the use of the appliance. For example, it may be possible to delay the hour at which the dishwasher is activated from the time it is loaded until a later hour, if the cost would be lower at that time.
- Block 314 can be provided through a user interface during a configuration step. Information from these blocks is input to a baseline demand forecast step 304 and a baseline production capacity forecast 305 .
- the demand forecast step 304 can be performed in many different ways.
- energy demand is forecast based on historical data (e.g., energy demand based on the time of day and time of year for the particular facility in which the device is located).
- energy demand can take into account ambient conditions such as temperature and sunshine.
- one of several preprogrammed energy demand models can be selected by a user of the system.
- energy demand can be forecasted at particular points in time (e.g., in five-minute increments) for a forecast period (e.g., 24 hours).
- the baseline production capacity forecast step 305 can also be carried out in various ways. If solar cells are available, a production forecast can be based on a weather forecast (e.g., sunny, partly sunny, partly cloudy, cloudy, showers, etc.) in combination with time-of-year, in combination with historical data. If a fuel cell is available, data concerning production availability for the fuel cell can be obtained, and so forth. For sources which are not weather dependent, the production capacity (and efficiency as measured in terms of $/kWh) can be initially estimated from engineering data. The engineering estimated can be subsequently replaced with actual operating data which reflects the characteristics of the specific unit rather the general model.
- a weather forecast e.g., sunny, partly sunny, partly cloudy, cloudy, showers, etc.
- the production capacity can be estimated as a function of solar insolation using the design efficiency data characteristic of the panel. Of course, this too may vary with the actual location and factors such as the amount of dust which has built up on the units since the last rain. These factors can be accounted for by two methods. Facility specific factors (facing, degree of shading) are incorporated through the collection of actual performance data over different seasons. Short-term factors are incorporated by the method of re-estimating the model parameters every 15 minutes, rather than simply executing the same model. The best predictor of production in the next 15 minutes is generally the previous 15 minutes.
- the baseline demand forecast 304 and baseline production capacity forecast 305 provide a detailed picture of the potential supply of power by source and demand by use of energy. Essentially these frame an optimization problem which can be solved. Embodiments of the invention can determine how to modify demand by turning off unneeded services and/or delaying others, how to deploy various sources to meet demand, and how to distribute power to the grid to achieve the lowest possible cost of service (which may be negative if the home or business is able to produce more power than it consumes in a time period).
- a least-cost dispatch model step 308 determines the lowest cost way of meeting the unmodified demand using the available sources. This calculation provides an estimate of the expected value of power during the forecast period. This estimate is then used to determine which uses of energy should be deferred and until when.
- the deferrable service schedule is element 309 in FIG. 3 . Details of 309 are provided below.
- the final step in the calculation is to determine when energy should be bought and sold (arbitraged), details of which are provided below.
- commands are issued to the devices to effect their operation in 318 .
- Some of the devices can be under the direct control of the invention (e.g. the batteries) but others can be controlled by means of a communications interface.
- the means of communicating with appliances is specified in the configuration specification 317 , in which the installer of the system specifies the physical means of communicating to the device, the communications protocols, the addressing protocols, and the structure and content of the messages.
- the means of communications can include wireless means (e.g. IEEE 802.11 networks of various generations, or IEEE 802.15.4 networks), radio frequency transmission over the power line (such as with X10), or Ethernet.
- the communications protocols can include Internet Protocols or methods designed for low cost, low bandwidth control such as LonWorks.
- the addressing protocols can include any method for distinguishing between multiple appliances connected to the same network. IP addresses are an example as is the naming scheme used by X10 (house code:unit code), but many home automation controllers implement proprietary schemes.
- the message structure is specific to the appliance design.
- Energy demand at a premise varies over the time of day.
- a typical home there is a peak in the morning when the family gets up, turns on lights, radios and televisions, cooks breakfast, and heats hot water to make up for the amount used in showers.
- demand drops to a lower level but not to zero as the air conditioners, refrigerators, hot waters and the like continue to operate.
- Usage goes up as the family returns, peaking around dinner when the entire family is home. This creates the typical “double hump” demand curve as shown in FIG. 4 .
- Businesses tend to follow different patterns depending on the nature of the business. Usage is low when the office is closed, and relatively constant when the office is open. In extreme climates where air conditioning cannot be cut back overnight, energy use over the course of the day is more constant. Businesses like restaurants may start later in morning and their peak extends farther into the evening. A factory with an energy intensive process operating three shifts may show little or variation over the course of the day.
- FIG. 5 shows a production curve for electricity from photovoltaic panels ( 502 ) overlaid onto the demand curve ( 501 ). Since PV panels have zero marginal cost, they are the preferred source of power whenever available. PV panels, however, produce power only when the sun shines. On a clear day, power production is at its peak around the middle of the day (subject, of course to the orientation of the panels and possible obstructions such as large buildings or trees).
- demand exceeds the power available from the PV panels the difference must be made up with power purchased from the grid, as at 503 in FIG. 5 .
- solar power exceeds the demand as at 504 , the excess can be sold to the grid.
- the distance between the supply curve and the demand curve represents the amount of power available for sale at any instance (in kW). The integral of this power over a time interval is the energy sold (kWh).
- the excess production may exceed the ability of the system's electronics to deliver power to the grid. That is, there may be a hardware constraint that limits the rate of sale (measured in kW). This is shown by line 601 in FIG. 6 as an increment over the demand curve.
- the example just presented assumes that there are two sources of electrical supply to the premise. These are the grid and the PV panels. Preference is generally given to the solar panels as a source when they are available because the marginal cost is zero while the marginal cost of the grid is the prevailing rate. There may, however, be one or more alternative sources with non-zero marginal cost. These may be used (deployed) when their marginal cost is lower than the other alternatives.
- the irregular curve in the bottom graph plots the price of electricity (in cents/kWh) over the course of a day.
- the area 704 represents the price of electricity from the grid. As is common in many areas, this varies over the course of the day.
- the time of day rates is designed to reflect the marginally higher cost of power production at the peak demand periods of morning and early evening. At these times utilities must dispatch power from their least efficient units, while, when cost is lower, they need power only from the most efficient units. In this rate diagram, there is a broad morning peak, and a peak and “shoulder” rate 706 in the early evening.
- the line 705 shows the marginal cost of producing power from an alternative source A.
- This may be a fuel cell, a small scale hydroelectric turbine, a natural gas turbine, a wind generator, or a gasoline or diesel backup generator. In this example, this is a constant over the course of the day, but this is not necessarily the case.
- Marginal cost is shown here rather than total cost (which includes amortization of the capital cost and operating and maintenance costs not related to actual use) as the immediate decision on the relative merit of a potential source at any instant is related only to the marginal cost.
- the marginal cost of solar power is essentially zero. This is shown by line 707 .
- the upper graph shows the capacity of the solar panels 702 (which is a function of solar insolation, and hence, time of day) and the capacity of the Alternative Source A 703 , which is shown as flat, but need not be.
- the capacity of the grid is not shown as is it presumed to exceed demand and is, therefore, irrelevant.
- Line 701 represents the total production capacity of the PV panels and Alternative Source A.
- the production capacity curves can be initially derived from engineering data provided by the supplier of the technology. These curves can then be updated based on data collected during actual use.
- the sensor, data logging, and computational capabilities of embodiments of the invention make it possible to re-estimate a linear production model every 15 minutes in one embodiment.
- FIG. 8 shows a day divided into 13 zones, labeled Z1 through Z13 from morning until evening. These zones delineate different modes of operation, stemming either from a change in the relative prices of the different sources of energy or changes in demand relative to the capacity of the different sources.
- the modes of operation in this example are as follows:
- the controller performs an instantaneous calculation of comparative cost and selects the optimal order of dispatch.
- the objective of the algorithm is to define the production from each source.
- ns number of sources of power (unitless)
- MCs(t) marginal cost of source s at time t (cents per kWh)
- CAPs(t) capacity of source s at time t (kW)
- MCo(t) rate per kWh prevailing at time t (cents per kWh)
- CAPo(t) >> demand at time t (kW)
- PROD(k) CAPk(t)
- PROD(k) MAXIMUM(CAPk(t),SELLCAP)
- SELLCAP SELLCAP ⁇ PROD(k) ENDIF END FOR END IF END WHILE
- FIG. 9 shows this process graphically in flow chart form.
- the controller may be used to control sources where the cost does vary with capacity.
- efficiency and, hence, cost per kWh
- speed of operation This is generally true of mechanical devices.
- This section describes a family of approaches to the determination of the least cost dispatch in the cases where cost per kWh is a function of kWh from a source. This general solution will work in the case where price is constant, but the calculation may be substantially more difficult and time consuming. Given the limited computational power that may exist in the controller and the need to keep that capacity available for safety monitoring, communications, and other functions, it may be useful to implement both the general and simpler (special case) algorithm and to use the simpler one when appropriate.
- FIG. 14 shows a common exponential production cost curve ( 1401 ).
- This curve can be approximated by a series of ranges within each of which cost is assumed to be constant. ( 1402 ). These ranges can be defined by several means. The simplest is to define the regions with a fixed width—spanning, say, 100-watt intervals (0-100 watts, 100-200 watts, etc.). An alternative is to create irregular intervals to reflect that there is greater change in some areas of the curve than others. Narrower zones are used where the production curve is steepest. This latter approach may be preferred in that it yields greater accuracy in cost estimation for the same number of ranges. Equivalent or better accuracy can, of course, be achieved by using more (narrower) ranges, but at a penalty in the speed of calculation.
- the correct constant value to use for an interval is the one which gives the same total cost as the accurate curve. This is given by:
- AVGCOSTi ( 1 ⁇ / ⁇ ( PMax i - Pmax i - 1 ) ) ⁇ ⁇ PMax i - 1 PMax i ⁇ MCi ⁇ ( x , t ) ⁇ dx
- the least cost dispatch solution can be obtained using precisely the same algorithm as for the constant price case previously presented by treating each range as a virtual alternative source.
- the increasing price ensures that the ranges will be dispatched in order.
- the curve is not continually increasing, but simply non-decreasing (i.e. there is a range over which the marginal cost is constant), it is logical to include this entirely within a range, to avoid the risk that there would be two ranges (or virtual sources) with the same prices that might be dispatched in the incorrect order.
- the most general case involves a non-monotonic marginal cost curve—that is, a curve in which the first derivative of the curve is neither always non-increasing or always non-decreasing.
- FIG. 15 shows the actual production curve ( 1501 ) and a piecewise constant approximation ( 1502 ).
- the zones are numbered to support the discussion which follows.
- the algorithm specified for the fixed-cost case would choose to dispatch zone 4 first, followed by 3, 5, 13, 6, 2, etc. in that order.
- zone 4 i.e. dispatch the zone
- This technology is most efficient when producing at the level comprising zone 4.
- zone 1 or zone 2 treats each zone as a logical separate source, which can only be dispatched in ascending order.
- the problem can be formulated into a binary integer program of modest scale.
- the starting assumption is that the production (marginal cost) curve can be decomposed into a number of zones. This is done for both the constant cost sources (e.g. the grid and solar at a point in time t) as for the sources for which the marginal cost is not constant with level of production, whether these are monotonic or not.
- the second of the three stages of the optimization (following the least-cost dispatch) is to manage the electrical loads in the home or business.
- the concept of using computers or microprocessors to manage electrical loads is not new, but the invention offers innovation in several areas, described below.
- Point-of-use technologies most commonly address lights and HVAC equipment.
- Lighting controls couple the lights to occupancy sensors which turn on the light when the room is occupied and off after a user specified time period when the room is not occupied.
- a switch is installed in series between the sensor and the lamp so that the light turns on only when occupancy is detected and the switch is in the on position. This prevents the light from being used when the occupant feels that there is sufficient light from other sources. This is simple, reliable, and commonly deployed technology. Use of the invention does not preclude this sort of controlled light.
- thermostat consists of three components—a temperature sensor, a mechanism for turning the connected HVAC component on when temperature is out of range, and a user interface of some kind.
- the temperature was a bimetallic strip that curved increasingly as the temperature rose.
- This bimetallic switch composed on contact of a simple contact switch that comprised the on/off control mechanism.
- the user interface was a simple rotating knob that moved the location of the bimetallic strip so that a greater or lesser curve was necessary to close the contact.
- This generation of technology was simple to use and cheap and effective in regulating temperature, but required manual intervention to adjust the set-point to reflect different user preferences for factors such as time of day or vacation.
- thermostats of more recent design incorporate a processor so that users can program the preferred temperature by time of day and day of week. These offer improved performance but have several basic flaws: (I) the classification of daily patterns into weekend and weekday is too simplistic; (2) the system does not automatically compensate for deviations from the patterns, such as on holidays, vacations, or days when a person must stay home from work; (3) in installations where there are multiple zones with individual thermostats, there is unnecessary duplication of the processor, since a single processor could easily manage multiple zones; (4) when there are multiple thermostats they are unconnected to the others and operates independently, the user interface on the thermostat is very poor in comparison to the web-based application interfaces; (5) thermostats cannot be controlled remotely.
- HACs home automation controllers
- SmarthomeTM and Control4TM home automation controllers
- HACs are typically multi-function devices, providing functionality in one or more of four areas: entertainment, premises security, communications and networking, and environmental control which includes lighting and HVAC.
- This generation of controller provides a superior user interface typically using a CRT or LCD monitor (sometimes compact) and keyboard or custom keypad, and a single controller which can manage multiple zones and end-use functions.
- CRT or LCD monitor sometimes compact
- keyboard or custom keypad a single controller which can manage multiple zones and end-use functions.
- the more powerful processor and better interface allows for more complex configuration of usage patterns.
- HAC development has focused first on management of entertainment systems including whole-home audio and video and home theatre.
- Variants of the invention by means of integrated supply side and storage technology and advanced algorithms, provide superior energy management.
- Least-cost dispatching is the first step in advanced control.
- the second step is management of deferrable loads.
- the total demand is made up of multiple small components. Some of these can be deferred or accelerated. That is, the service they supply can be rescheduled to reduce energy costs. In some cases this simply changes the time at which the energy is used. In other cases it can reduce the total amount of energy used.
- Dishwashing Dishes can be loaded for washing at a future time, up to the time when the dishes are needed less the cycle time. Energy use is roughly the same whether dishes are washed immediately or later.
- Clothes washing Clothes washers and dryers, like dishwashers, are similarly deferrable. In the case of dryers it is sometimes advantageous from a quality of service perspective to delay the start so that the cycle finishes when someone is there to empty the dryer.
- Hot Water Heaters are typically designed to maintain water at a constant high temperature. Energy is lost from the system in two basic ways—through the use of hot water and standing losses, which are losses that occur when water is not being used. Standing losses occur though the shell of the hot water heater itself and from the hot water in the pipes throughout the premise. Since the ramp up in energy prices in the 1970s the insulation of the hot water heaters has been improved substantially, until the losses are much smaller than was previously the norm.
- Hot water pipes are not typically insulated. In a model household, the demand for hot water drops off when everyone is done with their morning showers, except for some latent dishwashing or clothes washing. Thus, demand is essentially zero during the day. Shutting off hot water heating when there is no demand is useful for reducing instantaneous demand, but can also reduce total energy consumption. The energy savings are due to the nonlinear nature of heat loss. Roughly, the rate of heat loss from a warm body is a function of the third power of the temperature—the standing losses are higher when the temperature is higher. Allowing the water to cool reduces the rate of heat loss. Hence, less energy is used to heat water later when it is needed than to heat it immediately and then keep it warm for hours. The method for optimally scheduling loads that need not be executed at a specific time is described below.
- Refrigerators are not typically useful from the perspective of energy demand management. A more or less constant low temperature is essential for preserving food safely and maintaining its quality. As in the dishwasher, there are losses when the refrigerator is used (i.e. the door is opened) as well as standing losses even when the refrigerator is not being used. In the case of refrigerators, it is imperative that the temperature be returned to the set point as quickly as possible when heat is allowed to enter the cabinet. Thus, it is not possible to save energy by deferring the cooling. A refrigerator's total energy will be essentially the same regardless of the energy management system.
- the high quality insulation of a modern refrigerator makes it possible to defer load for modest periods (on the order of 15 minutes) while in temperature maintenance mode without adversely affecting the interior temperature. This is useful for load management if not for energy management.
- FIG. 10 shows the energy and load impact of deferring energy use from these controllable loads.
- FIG. 10 shows an energy process (e.g. dish washing) which is initiated in the morning.
- “initiated” refers to setting up for execution during a specified time interval.
- the energy required to execute the process is the integral of the load (power) shown on the vertical access over the time interval of the process.
- element 1001 is the originally scheduled time for a service (e.g., washing the breakfast dishes). This is a relatively expensive time, as utility rates are high and solar production is low. Element 1002 is a better time—solar production exceeds the ability to sell to the grid, so the marginal value of the power is zero. Performing the service in zone 7 gets it done at no cost, but still in time for the family's arrival home after work.
- a service e.g., washing the breakfast dishes.
- parameters can be established for various daily profiles and for the end-use technologies.
- the end-use technology profile specifics what can be controlled and how, as previously described.
- the daily profile describes the preferred set-point for each technology over the course of the day, such as the temperature.
- the configuration specifics when the service must be available. For example, the specification for the hot water heater may require that hot water be available at 0730 for the morning wakeup and at 1800, while the dishwasher must have finished running by 0730 or 1700. Given these parameters, according to the invention the optimal time to execute the process can be determined.
- the least cost dispatch calculation determines the marginal value of electric power as a function of the time of day as described previously.
- the management of deferrable loads begins with the configuration of deferrable loads ( 1101 ).
- the user of the system or the installer defines which loads (e.g. dishwashing, refrigeration) can be deferred and under what circumstances.
- loads e.g. dishwashing, refrigeration
- the rule can be established that there should be no pending dishwashing at 0700 and 1700, meaning that the dishes must be clean before breakfast and before dinner.
- the rule for refrigeration could be that it must operate at least three hours out of every four.
- the rule for freezers could be that it can be shut down for two hours at a time.
- the actual management process is initiated when a deferrable load is initiated (i.e. scheduled for service) (step 1102 ).
- the least cost dispatch model is rerun (step 1103 ). This, as described previously, divides the forecast period into zones (1 to n) and calculates the marginal value of electricity in each.
- the calculation determines which zones are candidates for the deferrable service ( 1104 ). This is a two step process. First, there is a simple calculation to determine which zones occur before the deferrable load must be completed. Then, it is determined whether there is sufficient power in that zone to complete the service. There are two elements to this determination—the power determination and the energy determination. Power is the instantaneous difference between the baseline demand (i.e. without the deferred load) and the power available in the zone without exceeding the capacity of the marginal supply (termed “available marginal supply capacity”). Exceeding the capacity of the marginal supply would increase the marginal cost of supply and potentially the marginal value. The second part is to determine where there is sufficient energy to deliver the service. Energy is the integral of power over time, so this determination involves integrating the available marginal supply capacity over a contiguous interval when this capacity exceeds the demand of the deferrable load. This method is shown in FIG. 12 .
- the determination of whether a deferrable load can be serviced in a zone is essentially a determination of whether there is an interval in that zone during which there is sufficient marginal supply capacity to meet the deferrable load.
- the actual load may vary by instant, but for this calculation it is sufficient to approximate it by a piecewise constant function comprised of short intervals. Five minutes is sufficient.
- the process for determining whether there is sufficient marginal power in a zone to supply a deferrable demand begins with dividing the zone into these short intervals (step 1201 ).
- the available marginal supply capacity (AMCS) in each interval is calculated (step 1202 ).
- the system then steps through the intervals in order to find a contiguous period during which the AMCS is, at all instances, greater than the approximated load of the deferred services.
- This determination begins by setting the hypothesis that there is enough energy to “not enough energy” and the length of the contiguous set of intervals under test to 0 (steps 1202 , 1203 ). Then, for the intervals in order, the system tests whether the AMCS is greater than or equal to the load of the deferred service (step 1205 ). If not, the length of the interval under test is set to zero (step 1206 ) and the search continues though the remainder of the zone. If there is sufficient capacity (AMCS>deferrable load), the length of the interval set is increased by 1 (step 1207 ). At this point the method determines whether the entire deferrable load requirement has been met (i.e.
- the length of the interval set is greater than or equal to the duration of the deferrable load) (step 1208 ). If not, the next interval is tested. If so, then the hypothesis that there is sufficient energy is set to “enough energy” (step 1209 ) and the method ends with the determination that the deferrable load can be scheduled for the zone under test.
- the system calculates when the services can be performed at the lowest cost. This is done by looping through the candidate zones ( 1105 ) and ( 1106 ). At the completion of the process, the deferrable load is scheduled for execution. That is, the current on the deferrable load's circuit is shut off until the start of the zone determined to be the lowest cost (step 1107 ).
- the new cost is calculated by incrementing demand in each zone before the scheduled time of delivery by an amount necessary to meet the deferrable demand, and then repeating the least cost dispatch calculation.
- the preferred zone to perform the service is the one where the marginal cost is lowest.
- the third aspect of the optimization is the determination of when to buy or sell power from the grid. Sales to the grid can be made in three different ways—(1) the meter can be run in reverse, essentially selling power back at the prevailing retail price, (2) when utilities declare an emergency, power can be sold under an established demand response program, and (3) power can be sold in the wholesale power market.
- Effective management of the buy/sell decision can be based on the arbitrage algorithm discussed below. This calculation builds on the least cost dispatch algorithm, and should be executed after the deferrable loads have been scheduled.
- Variants of the invention include three capabilities for optimal energy management—(1) optimal (least-cost) dispatching of multiple supplies, (2) management of demand side resources, and (3) use of storage.
- This section addresses how storage can be deployed optimally.
- Storage can take multiple forms, including batteries (including but not limited to lead acid and nickel metal hydride), large capacitors (sometimes called supercap), mechanical storage in the form of a flywheel, and compressed air.
- the invention is designed to work with any form of storage or multiple forms of storage in a single installation. The specific form of storage is not critical, nor is storage technology an aspect of the invention.
- storage technology provides emergency backup when supply from the grid is interrupted; (2) storage buffers the difference between demand at an instant in the supply from variant sources like photovoltaics and wind, allowing them to be used when there is no grid connection; (3) storage extends the period of usefulness of technologies like solar and wind which show large variation in production over the course of the day; (4) where the cost of a supply varies over the course of the day (as in the case of time of day rates) storage provides for shifting demand from time of high cost to low cost; (5) storage can provide for the mitigation of “demand charges” which are based on peak consumption, possibly to the extent necessary to move to a lower cost contract; and (6) in sufficient quantity (as from multiple units (100's or 1000's) energy for and from storage can be traded on the wholesale market allowing for arbitraging.
- “buying” storage refers to putting energy into storage from any source, and “selling” storage as discharging from storage to meet demand, sell to the grid, sell on the wholesale market, or transfer to another form or storage.
- the logical unit for measuring storage is Amp hours (Ah) at the voltage of service, which can be 120V, 220V split phase, 208 3 phase, or 240 2-wire for foreign installations.
- Amp hours Ah
- the capacity and current storage of mechanical technologies are not naturally measured in Amp hours, but in units such as Newton meters for flywheels or liters at a pressure given in kilopascals for compressed air. These, however, can be converted to the equivalent Amp hours by a simple engineering calculation accounting for the efficiency of the generator.
- the following pseudocode provides one example of the method of calculation:
- the objective is to maximize revenue as given above, subject to the standard non-negativity constraint necessary to solution of a linear program:
- the storage at the start of period 1 for technology i is Cio.
- the charge at the end of the period is given by:
- equation 6 is in standard form and equation 7 is readily transformed:
- This formulation is the simplest one. It assumes a perfect storage in which energy can be stored and retrieved without loss or any cost other than the cost of the energy. This is not a realistic case, but the explanation is clearer without these additional complications and the formulation is precisely the same. There are two factors to consider. The first is that not all of the power purchased can be stored with perfect efficiency.
- the objective function with an efficiency term is as follows:
- CycleCost is the estimated cost of executing a cycle.
- Cio in equation 3 is replaced with Cio′, which is a function (determined, e.g., via experimentation and/or engineering data for a specific device) of the starting capacity, the number of cycles, and the total amount of energy stored. This is stated as follows:
- the second double sum (of SBij) equals the amount of energy added to the device over its life since startup.
- Nz(t) is the number of zone used in a cycle. This function is characteristic of a specific storage technology. It should be estimated from engineering principles and the design data for the specific device.
- the problem has been formulated as a relatively simple binary integer program with linear constraints.
- the problems is then limited to 20 zero/one variables (10 sell options and 10 buy options). Assuming that the optimum solution would not likely involve selling in the 3 zones with the lowest rates nor buying in the zones with the three highest rates, the problem size is reduced to 7 buy options and 7 sell options.
- the daily service profile is an estimate of load over the course of the forecasting period.
- the forecasting period at a minimum should span the next 24 hours, but 48 hours may be better.
- the only barrier to the longer period is the processor time required to perform the longer forecast without impacting the basic safety monitoring function of the controller's processor.
- the size of the problem that must be solved at any installation for any period is determined by the number of load zones reflecting changes in the grid rate schedule or the relative rank of costs of the grid and alternative sources. More zones imply a larger optimization problem and exponentially longer solution time, potentially reducing the forecast period from 48 hours to the acceptable 24 hours.
- the first method is based on past usage patterns. This is shown in FIG. 13 .
- the process begins with the specification of categories of patterns ( 1301 ). In a typical home or business, there are distinct differences between different kinds of days, such as weekdays or weekends, workdays or non-work days, vacation days, holidays, or other. In addition, patterns will be defined for sunny days, cloudy days, partly cloudy days, and rainy days.
- engineering principles e.g. a building energy model like DOE-2
- an estimate can be made of the load for 15 minute intervals for the next 24 hours (step 1302 ). While this estimate should be as accurate as can readily be obtained, it is not critical that it be highly accurate, as the remainder of the process is directed at correcting this error.
- the next step is to select a pattern for use for the next 24 hours (step 1303 ). If the day is a weekday and sunny, for example, a sunny weekday pattern should be elected. Again, however, the consequences of choosing a bad pattern at this point are not serious. At this point the routine re-estimation begins. This is shown by the loop (step 1308 ) which executes every 15 minutes or more frequently if new data are received from the network indicating a change in ambient conditions, utility rates, or other factors or there is a substantial change in the load at the house.
- the objective of this final step is to improve the fidelity of the patterns after the initial crude estimate, to accommodate changes in the premises, to incorporate longer term patterns in energy use (such as from climate or the degradation of HVAC equipment).
- Short-term changes as in the ease of weather are integrated by re-estimation every 15 minutes or more frequently in response to changing conditions.
- one of the best predictions of a day's weather is to assume that it will be like yesterday, and the best prediction of the upcoming hour is the past hour.
- weather docs change.
- this can be transmitted from the control center ( 101 ) to the facility in the form of direction to use a specific pattern. In this way the forecast can accommodate predictions for rain, snow, clearing, or other weather patterns.
- One method for doing this is described below.
- Step 2 Scale the selected pattern to reflect actual use.
- Use pattern i which has the highest r2.
- Estimate demand for the next 24 hours by scaling the selected pattern by the ratio of the actual absolute use of energy over the past four hours vs. the energy use as expressed in the selected pattern.
- Step 3 Update the Pattern. Adjust the pattern to reflect the difference between measured and projected for the last hour and the scale factor used for the forecast.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Automation & Control Theory (AREA)
- General Engineering & Computer Science (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Methods and systems are provided for optimizing the control of energy supply and demand. An energy control unit includes one or more algorithms for scheduling the control of energy consumption devices on the basis of variables relating to forecast energy supply and demand. Devices for which energy consumption can be scheduled or deferred are activated during periods of cheapest energy usage. Battery storage and alternative energy sources (e.g., photovoltaic cells) are activated to sell energy to the power grid during periods that are determined to correspond to favorable cost conditions.
Description
- This application is a continuation of U.S. patent application Ser. No. 14/862,070, filed Aug. 24, 2010, now issued U.S. Pat. No. 8,903,560, which is a continuation of U.S. patent application Ser. No. 11/837,888, filed Aug. 13, 2007, now U.S. Pat. No. 7,783,390, which is a continuation of U.S. patent application Ser. No. 11/144,834, filed Jun. 6, 2005, now U.S. Pat. No. 7,274,975. Said applications are incorporated by reference herein.
- The invention relates generally to the field of energy management, and more particularly, to various systems and methods for optimizing the control of energy supply and demand in residences and businesses.
- As energy demand around the world has increased, pressure from environmental concerns and energy price volatility has heightened the need for energy conservation and alternative energy sources. Programmable thermostats have permitted consumers to program their heating and cooling systems to reduce consumption during periods when they are not home or are asleep. Solar panels, fuel cells, windmills, back-up generators and other energy sources have become increasingly available for use in residential homes and businesses. However, the use of such alternative sources and technologies has been limited because of such factors as difficulty in recovering costs; unpredictability of alternative energy supplies (e.g., sun, wind), and difficulty in integrating such sources and devices into conventional electrical systems.
- Electric utilities have conventionally arranged to install special devices in homes and businesses that, when remotely activated by the utility, cut power to certain devices (e.g., air conditioners or hot water heaters) during peak loading conditions. Customers who agree to install such devices are given discounts or other incentives for installing such devices, and in exchange the utility is able to better manage energy demand remotely. However, such arrangements are typically ad-hoc and require that customers submit to the whims of the utility company.
- Some electric utilities charge varying rates based on demand. For example, during periods of peak demand, a higher rate for electricity is charged. Conversely, during low-demand periods, a lower rate can be charged. Regulators in recent years have also forced utilities to purchase electricity back from consumers who are able to generate more than they need. Such programs have met with limited success for various reasons most particularly the inability of some types of energy users to curtail energy use and the lack of real-time information regarding the immediate cost of energy usage.
- The invention includes various systems and methods for increasing the efficiency with which energy can be managed. In one variation, an integrated control device manages the supply of energy from various sources (e.g., electric grid, battery, photovoltaic cells, fuel cells) and the demand for energy from consumption devices (e.g., hot-water heaters, HVAC systems, and appliances). An optimization algorithm determines based on various factors when to activate the energy sources and when to activate the consumption devices.
- In one variation, the algorithm takes into account such factors as the supply of charge on batteries, the dynamic price of electricity, weather forecasts, and others in order to schedule and activate energy supplies and consumption devices. Devices that can be scheduled for flexible turn-on times (e.g., a washing machine or dishwasher) are scheduled for periods in which cheap energy supply is projected to be available.
- In another variation, when the algorithm determines that electricity can be favorably sold to the electricity grid, alternative energy sources and storage devices are activated and electricity is sold to the grid. Customer preferences for maintaining control over the allocation of power can be taken into account in certain variations of the algorithm.
- Other variations and embodiments are described in more detail below, and the invention is not intended to be limited in any way by this brief summary.
-
FIG. 1 shows a system employing various principles of the present invention. -
FIG. 2 shows one possible arrangement forcontroller 104 ofFIG. 1 . -
FIG. 3 shows a process and data/control flow for controlling energy production and usage in accordance with certain aspects of the present invention. -
FIG. 4 shows a typical residential demand curve for electrical energy consumption. -
FIG. 5 shows a production curve for electricity from photovoltaic panels overlaid onto the demand curve ofFIG. 4 . -
FIG. 6 shows how excess production may exceed the ability of the system's electronics to deliver power to the grid, meaning that a hardware constraint limits the rate of sale. -
FIG. 7 shows the cost and availability of power from multiple sources. -
FIG. 8 shows a least-cost determination method according to one variation of the invention. -
FIG. 9 shows in flow chart form one variation of an algorithm for least-cost determination according to various principles of the invention. -
FIG. 10 shows how a deferrable load can be shifted from a high-cost period (zone 3) to a lower-cost period (zone 7). -
FIG. 1I shows a process for least-cost dispatch calculation. -
FIG. 12 shows a process for determining whether a deferrable load can be serviced in a zone. -
FIG. 13 shows a process for estimating a daily profile. -
FIG. 14 shows the piecewise constant approximation of a monotonic cost of production curve. -
FIG. 15 shows the piecewise constant approximation of a non-monotonic cost of production curve. -
FIG. 1 shows a system employing various principles of the present invention. As shown inFIG. 1 ,apparatus 101 includes aunit 103 comprising acontroller 104 and aninternal storage device 105.Internal storage device 105 may comprise, for example, a plurality of lead-acid or nickel-metal-hydride storage batteries for storing electrical energy, and/or large capacitors.External storage device 106 may be optionally included to store additional electrical energy. As explained in more detail herein,storage devices devices - Storage in the form of compressed air is usually discounted due to the poor thermodynamic efficiency, but the capital cost is low and in some cases the marginal value of solar power is zero (when supply exceeds demand the excess cannot be sold or stored by other means), so compressed air storage may be practical in some embodiments of the invention. Finally, in some specific locations it may be possible to store power by pumping water to an elevated water tower or reservoir (pumped storage) which could increase storage capacity by another factor of 10. Power electronics, including inverters for converting DC electrical energy into AC energy, circuit breakers, phase converters and the like, may also be included but are not separately shown in
FIG. 1 . -
Controller 104 may comprise a computer and memory programmed with computer software for controlling the operation ofapparatus 101 in order to receive electrical power frompower sources 109 through 115 and to distribute electrical power todevices 116 through 122. Further details of various steps that may be carried out by such software are described in more detail herein. -
Controller 104 andinternal storage device 105 may be housed in aunit 103 such as a metal rack having appropriate cabling and support structures. One possible design forunit 103 is shown in a pending U.S. patent application Ser. No. 11/037,832 by Danley et al. filed on Jan. 18, 2005, entitled “Fully Integrated Power Storage and Supply Appliance with Power Uploading Capability” (published as U.S. Pat. Appl. Pub. No. 20060158037). -
Apparatus 101 also includes auser interface 102 for controlling the operation ofunit 103. The user interface may comprise a keypad and CRT, LED or LCD display panel or vacuum fluorescent type; a computer display and keyboard; or any other similar interface. The user interface may be used to select various modes of operation; to display information regarding the operation of the apparatus; and for programming the apparatus. - An
optional control center 108 may be provided to transmit commands toapparatus 101 through a network, such as WAN 107 (e.g., the Internet).Control center 108 may be located at a remote location, such as a central control facility, that transmits commands to a plurality ofunits 101 located in different homes or businesses. In addition to transmitting commands,control center 108 may transmit pricing information (e.g., current price of electricity) so thatcontroller 104 may make decisions regarding the control and distribution of electricity according to various principles of the invention. -
Apparatus 101 is coupled to theelectric utility grid 115 through a power interface (not shown), which may include circuit breakers, surge suppressors and other electrical devices. Electricity may be supplied in various forms, such as 110 volts or 240 volts commonly found in homes. Abackup generator 114 may also be provided and be controlled byapparatus 101 when needed. One or morealternative energy sources 109 through 113 may also be provided in order to provide electrical power to the apparatus. Such sources may include photovoltaic (PV)cells 109, which may be mounted on a roof of the home or business;micro-hydroelectric power generators 110, which generate power based on the movement of water;gas turbines 111; windmills or other wind-baseddevices 112; andfuel cells 113. Other sources may of course be provided. - During normal operation, power from one or more of the power sources can be used to charge
storage units electric grid 115. During power outages or brownouts fromgrid 115, these additional power sources (as well asstorage units 105 and 106) can be used to meet energy demand. Additionally, surplus power can be sold back to the power grid based on optimization of supply and demand calculations as explained in more detail herein. - The bold lines shown in
FIG. 1 indicate electrical distribution paths. Control paths to and from the various devices are not separately shown but are implied inFIG. 1 . - One or more power-consuming
devices 116 through 122 may also be controlled by and receive power fromapparatus 101. These include one or more sensors 116 (e.g., thermostats, occupancy sensors, humidity gauges and the like); heating/ventilation/air-conditioning units 117;hot water heaters 118; window shades 119; windows 120 (e.g., open/close and/or tint controls); and one or more appliances 121 (e.g., washing machines; dryers; dishwashers; refrigerators; etc.). Some appliances may be so-called “smart” appliances that can receive control signals directly fromapparatus 101. Other conventional appliances can be controlled using one or morecontrollable relays 122. It is not necessary in all embodiments thatapparatus 101 directly provide electricity todevices 116 through 112. For example,apparatus 101 could be tied into the electrical power system in a home or business and electricity would be supplied through that path to the devices. Appropriate cut-off devices and bypass switches would then be used, for example, in the event of a power outage to disconnect the home wiring system from the electrical grid and to connectapparatus 101 to the wiring network. Such schemes are conventional and no further details are necessary to understand their operation. -
FIG. 2 shows further details ofcontroller 104 according to one variation of the invention. Awatchdog timer 209 continuously monitors the operation ofapparatus 101 in order to detect possible malfunctions. In one variation,watchdog timer 209 periodically polls devices in the system to ensure that they are functioning, and that no error signals have been detected.Watchdog timer 209 may be coupled to amodem 210 to report failures or other events to controlcenter 108. AUSB port 211 andpager interface 212 may also be provided to receive inputs from or report data to various devices. For example, the report of a malfunction can be transmitted to a pager worn by the owner of the premises in which the apparatus is located. - Various software functions shown in
FIG. 2 include anadministrative function 201, which may include such things as interfacing withwatchdog timer 209; operating theuser interface 102; controlling the modes of the apparatus; and other administrative operations. Asafety function 202 monitors voltage levels, temperatures, and other variables in order to ensure that the apparatus is operating safely and to shut down the device if an unsafe condition is detected. Anoptimization function 203, details of which are provided below, makes decisions concerning whether and when to activate various power sources and power-consuming devices. Acommunication function 204 interfaces to aweb server 207 in order to provide external communications facilities. Alogging function 205 maintains records regarding the operation of the device and stores them in a nonvolatile device such as compactflash storage device 206. An input/output board 208 provides communication and control signals to various devices in the system, which may includepollable devices 213;voltage sources 214; pulse-baseddevices 215; message-baseddevices 216; and other types ofdevices 217. Various device drivers may also be provided but are not separately shown inFIG. 2 . Rather than controlling devices directly, the apparatus can be configured to operate with a third-part home-automation control system in order to control the devices. - According to various principles of the invention, energy usage can be optimized to deliver power in the most efficient way, where efficiency is defined in terms of the amount of energy used, cost, or a balance of the two. In conventional energy management systems, emphasis has been on conservation—e.g., turning out lights when a room is not occupied, or turning down the thermostat at night. By integrating supply side options with energy consumption choices, various algorithms can be used to increase the energy and cost savings.
- For example, a small business may pay for electricity on a per-kilowatt hour basis with an additional charge for a peak number of kilowatt-hours during a billing period. The so-called “demand rate” is designed to discourage peaky consumption because of the high cost of providing high amounts of power for a short period. According to various principles of the invention, the instantaneous energy usage can be monitored and, if demand exceeds a threshold, power from batteries can be used to reduce demand from the grid, or non-critical energy uses such as a large commercial freezer that can easily be unplugged for an extended time period with little or no impact can be temporarily shut off. This is made capable by several features of the invention. For example, the sensors (116) allow monitoring of individual loads. The direct controls (117, 118, 119, 120) allow for the interruption of certain appliances, while the controllable relays (122) allow for control of appliances without built-in control logic. Whether and to what extent an appliance can be interrupted is defined in the energy source configuration element (313), described with reference to
FIG. 3 below. The method for addressing deferrable load which is described subsequently allows an electrical service (cooling in this example) to be optimally rescheduled for a later time to reduce cost. - As another example, suppose that residents of a house are cooking, showering, watching TV, and starting laundry. They pay time-of-use rates that are at a peak in the morning and evening, so power from the grid is 14 cents per KWh. Given the high price, according to various inventive principles, the system can control the laundry devices so that they are not activated until later in the day, when energy costs are cheaper. In one variation, the system can determine based on the date (e.g., June 21) and the weather forecast (e.g., sunny) that likely production from solar panels will be high, and decide to sell power from the batteries to the grid (when the rate is high) with the expectation that the batteries can be recharged later in the day when the family is not home and energy usage is minimal. The batteries could alternatively be recharged later in the day from the power grid, when electrical costs are lower.
- Certain variations of the invention consider weather when forecasting demand for electrical power and the supply from energy sources whose production capacity is weather dependent, such as PV panels.
- As yet another example, suppose that a power outage occurs, removing power from a home. Conventional back-up systems would immediately provide battery back-up or engage a back-up generator in order to supply power to pre-selected “critical” devices, such as freezers, refrigerators, selected lights, etc. According to certain principles of the invention, a controller programmed to optimize energy supply and usage would defer turning on the freezer or refrigerator during the first hour or two of the black-out, because of its knowledge that such devices can be disconnected from the power grid for an hour or two with little or no consequence, thus preserving energy. However, if the outage persists, backup power could be selectively applied to those devices, while inhibiting others. Other examples and principles are explained in more detail below.
- There are at least two methods for managing loads during an emergency. The simpler method, which is currently the common approach for premises with backup energy systems, is to wire the facility with two (or more) circuits, one designated “secure” and the other “unsecure.” When grid power is interrupted, services are maintained for the secure circuit only. The weakness of this approach is that the priorities for use of the limited backup supply change over the duration of an outage. Refrigeration is not immediately critical, but very important later. Upstairs lights may not be important during the day but very important at night.
- Certain embodiments of the invention allow for control of individual appliances due to the connections to sensors (116), controllable appliances (117, 118, 119, and 120) and controllable relays (122). Appliance performance characteristics and criticality are expressed in the energy source configuration elements (313, discussed below). The system knows the amount of current storage and supply from alternative sources and can provide an accurate forecast of demand and alternative supply by methods described subsequently. Together these can provide the user with information to manage energy effectively in real time or to develop algorithms to be executed in the absence of direct control.
-
FIG. 3 shows a process and data/control flow for controlling energy production and usage in accordance with certain aspects of the present invention. Aclock 301 acts as a control loop for the process. Instep 302, energy usage is monitored by circuit or services, and instep 303, energy production is monitored by source. Instep 312, external information regarding such variables as current grid prices; fuel prices; grid voltage; current/forecasted weather; demand-side management (DSM) requests (e.g., a request from a utility under an established demand response program for subscribing customers to reduce demand or supply power from a user controlled source at a specific hour), and commands received fromcentral control center 108 are monitored. The current energy source configuration is determined (step 313), including such things as what power sources are available and how much energy is stored in storage devices. End use of technology configuration is obtained (step 314), including the inventory of technologies that consume energy in the home or business ranging from small sources such as lights to major HVAC equipment. The inventory may include the number of such appliances, the circuit on which they are located, how and to what extent they can be controlled, typical day-of-use patterns, and whether there is flexibility in scheduling the use of the appliance. For example, it may be possible to delay the hour at which the dishwasher is activated from the time it is loaded until a later hour, if the cost would be lower at that time. Block 314 can be provided through a user interface during a configuration step. Information from these blocks is input to a baselinedemand forecast step 304 and a baselineproduction capacity forecast 305. - The
demand forecast step 304 can be performed in many different ways. In one embodiment, energy demand is forecast based on historical data (e.g., energy demand based on the time of day and time of year for the particular facility in which the device is located). In another embodiment, energy demand can take into account ambient conditions such as temperature and sunshine. In yet another embodiment, one of several preprogrammed energy demand models can be selected by a user of the system. In one or more of these embodiments, energy demand can be forecasted at particular points in time (e.g., in five-minute increments) for a forecast period (e.g., 24 hours). - The baseline production
capacity forecast step 305 can also be carried out in various ways. If solar cells are available, a production forecast can be based on a weather forecast (e.g., sunny, partly sunny, partly cloudy, cloudy, showers, etc.) in combination with time-of-year, in combination with historical data. If a fuel cell is available, data concerning production availability for the fuel cell can be obtained, and so forth. For sources which are not weather dependent, the production capacity (and efficiency as measured in terms of $/kWh) can be initially estimated from engineering data. The engineering estimated can be subsequently replaced with actual operating data which reflects the characteristics of the specific unit rather the general model. - For solar, the production capacity can be estimated as a function of solar insolation using the design efficiency data characteristic of the panel. Of course, this too may vary with the actual location and factors such as the amount of dust which has built up on the units since the last rain. These factors can be accounted for by two methods. Facility specific factors (facing, degree of shading) are incorporated through the collection of actual performance data over different seasons. Short-term factors are incorporated by the method of re-estimating the model parameters every 15 minutes, rather than simply executing the same model. The best predictor of production in the next 15 minutes is generally the previous 15 minutes.
- The
baseline demand forecast 304 and baselineproduction capacity forecast 305 provide a detailed picture of the potential supply of power by source and demand by use of energy. Essentially these frame an optimization problem which can be solved. Embodiments of the invention can determine how to modify demand by turning off unneeded services and/or delaying others, how to deploy various sources to meet demand, and how to distribute power to the grid to achieve the lowest possible cost of service (which may be negative if the home or business is able to produce more power than it consumes in a time period). - Given the input demand and supply projections, this optimization can be done in two basic steps—the calculations and the implementation. The calculation of the optimal strategy can be done in three parts. First, a least-cost dispatch model step 308 (details of which are provided below) determines the lowest cost way of meeting the unmodified demand using the available sources. This calculation provides an estimate of the expected value of power during the forecast period. This estimate is then used to determine which uses of energy should be deferred and until when. The deferrable service schedule is
element 309 inFIG. 3 . Details of 309 are provided below. The final step in the calculation is to determine when energy should be bought and sold (arbitraged), details of which are provided below. - Once the use of end-use technologies, sources, and storage have been determined in 308, 309, and 310, commands are issued to the devices to effect their operation in 318. Some of the devices can be under the direct control of the invention (e.g. the batteries) but others can be controlled by means of a communications interface. The means of communicating with appliances is specified in the
configuration specification 317, in which the installer of the system specifies the physical means of communicating to the device, the communications protocols, the addressing protocols, and the structure and content of the messages. The means of communications can include wireless means (e.g. IEEE 802.11 networks of various generations, or IEEE 802.15.4 networks), radio frequency transmission over the power line (such as with X10), or Ethernet. The communications protocols can include Internet Protocols or methods designed for low cost, low bandwidth control such as LonWorks. The addressing protocols can include any method for distinguishing between multiple appliances connected to the same network. IP addresses are an example as is the naming scheme used by X10 (house code:unit code), but many home automation controllers implement proprietary schemes. The message structure is specific to the appliance design. - The following describes in more detail how the system can determine which of multiple, alternative sources of power to draw on to meet demand. These are methods of
element 308 ofFIG. 3 . The explanation necessarily begins with a discussion of supply and demand management in the context of a grid connected system with one or more alternative energy sources. - Energy demand at a premise varies over the time of day. In a typical home there is a peak in the morning when the family gets up, turns on lights, radios and televisions, cooks breakfast, and heats hot water to make up for the amount used in showers. When the family leaves for work and school it may leave the clothes washer and dishwasher running, but when these are done, demand drops to a lower level but not to zero as the air conditioners, refrigerators, hot waters and the like continue to operate. Usage goes up as the family returns, peaking around dinner when the entire family is home. This creates the typical “double hump” demand curve as shown in
FIG. 4 . - Businesses tend to follow different patterns depending on the nature of the business. Usage is low when the office is closed, and relatively constant when the office is open. In extreme climates where air conditioning cannot be cut back overnight, energy use over the course of the day is more constant. Businesses like restaurants may start later in morning and their peak extends farther into the evening. A factory with an energy intensive process operating three shifts may show little or variation over the course of the day.
- As alternative energy sources become available, management of electricity involves more than simply buying power from the grid. The question becomes when and to what extent power can be derived from the alternative sources, and when it is economically optimal to do so.
- Each alternative source of energy has its own profile of capacity over the course of the day as well as fixed and marginal costs.
FIG. 5 shows a production curve for electricity from photovoltaic panels (502) overlaid onto the demand curve (501). Since PV panels have zero marginal cost, they are the preferred source of power whenever available. PV panels, however, produce power only when the sun shines. On a clear day, power production is at its peak around the middle of the day (subject, of course to the orientation of the panels and possible obstructions such as large buildings or trees). When demand exceeds the power available from the PV panels, the difference must be made up with power purchased from the grid, as at 503 inFIG. 5 . When solar power exceeds the demand, as at 504, the excess can be sold to the grid. The distance between the supply curve and the demand curve represents the amount of power available for sale at any instance (in kW). The integral of this power over a time interval is the energy sold (kWh). - In some cases the excess production (shown as the distance between the supply and demand curves at any time) may exceed the ability of the system's electronics to deliver power to the grid. That is, there may be a hardware constraint that limits the rate of sale (measured in kW). This is shown by
line 601 inFIG. 6 as an increment over the demand curve. - The example just presented assumes that there are two sources of electrical supply to the premise. These are the grid and the PV panels. Preference is generally given to the solar panels as a source when they are available because the marginal cost is zero while the marginal cost of the grid is the prevailing rate. There may, however, be one or more alternative sources with non-zero marginal cost. These may be used (deployed) when their marginal cost is lower than the other alternatives.
- This is shown in
FIG. 7 . The irregular curve in the bottom graph plots the price of electricity (in cents/kWh) over the course of a day. Thearea 704 represents the price of electricity from the grid. As is common in many areas, this varies over the course of the day. The time of day rates is designed to reflect the marginally higher cost of power production at the peak demand periods of morning and early evening. At these times utilities must dispatch power from their least efficient units, while, when cost is lower, they need power only from the most efficient units. In this rate diagram, there is a broad morning peak, and a peak and “shoulder”rate 706 in the early evening. - The
line 705 shows the marginal cost of producing power from an alternative source A. This may be a fuel cell, a small scale hydroelectric turbine, a natural gas turbine, a wind generator, or a gasoline or diesel backup generator. In this example, this is a constant over the course of the day, but this is not necessarily the case. Marginal cost is shown here rather than total cost (which includes amortization of the capital cost and operating and maintenance costs not related to actual use) as the immediate decision on the relative merit of a potential source at any instant is related only to the marginal cost. The marginal cost of solar power is essentially zero. This is shown byline 707. - The upper graph shows the capacity of the solar panels 702 (which is a function of solar insolation, and hence, time of day) and the capacity of the
Alternative Source A 703, which is shown as flat, but need not be. The capacity of the grid is not shown as is it presumed to exceed demand and is, therefore, irrelevant.Line 701 represents the total production capacity of the PV panels and Alternative Source A. The production capacity curves can be initially derived from engineering data provided by the supplier of the technology. These curves can then be updated based on data collected during actual use. The sensor, data logging, and computational capabilities of embodiments of the invention make it possible to re-estimate a linear production model every 15 minutes in one embodiment. - At any point in time, there is a particular order of preference in deriving power from the different sources. This is in increasing order of marginal cost beginning with the least expensive.
-
FIG. 8 shows a day divided into 13 zones, labeled Z1 through Z13 from morning until evening. These zones delineate different modes of operation, stemming either from a change in the relative prices of the different sources of energy or changes in demand relative to the capacity of the different sources. The modes of operation in this example are as follows: -
- Z1: There is no solar production and the marginal price of the alternative source is greater than the price from the grid. Demand is met entirely with purchases from the grid.
- Z2: The price from the grid increases with the morning peak period and now exceeds the marginal cost of the alternative source. Production from the alternative source is immediately taken to its maximum, but this is not sufficient to supply the full demand. The difference is bought from the grid.
- Z3: Solar production begins to ramp up. Production from the solar panels and the alternative source is not sufficient to meet demand. Solar and the alternative source are used at full capacity. The balance is purchased from the grid.
- Z4: Demand is met fully from the solar panels and the alternative source. There are no longer purchases from the grid. Sales to the grid begin.
- Z5: The price from the grid drops so that it is no longer economical to use the alternative power source. Production from the solar panels is not sufficient to meet demand, so there are some minor purchases from the grid.
- Z6: Solar production now exceeds demands. The entire excess can be sold to the grid as the total excess is less than the capacity of the unit to return power to the grid.
- Z7: All production is from solar. Sales to the grid are at the maximum capacity of the unit.
- Z8: All production is from solar, and there is excess capacity to sell to the grid, but the excess is less than the maximum capacity of the unit.
- Z9: Solar demand is no longer sufficient to meet demand. Full demand could be met without purchases from the grid as both solar and the alternative sources are deployed. However, the marginal cost of the alternative source is greater than the price of electricity from the grid, so the difference between demand and solar production is made up through purchases from the grid. There are no sales to the grid even though there is sufficient onsite capacity, as it is not cost effective.
- Z10: It is not possible to meet demand solely from the solar panels and the alternative power unit. Purchases from the grid are necessary. Sales are not possible. Solar power is used to the maximum possible extent, but the alternative power source is not used as it is not cost effective.
- Z11: The price of power from the grid increases to the point where it is cost effective to deploy the alternative power source. As demand exceeds solar production plus the maximum capacity of the alternative source, the alternative source is run at full capacity. The balance is purchased from the grid.
- Z12: Solar production drops to zero. The alternative power source is run at capacity. The balance of demand is met with purchases from the grid.
- Z13: The price of power from the grid is lower than the marginal cost of production from alternative source A. All power is purchased from the grid.
- The following table summarizes the above modes and decision-making points:
-
Grid Production from Production from Zone Purchases Solar Panels Alternative Source Z1 Yes Z2 Yes Yes Z3 Yes Yes Yes Z4 Yes Yes Z5 Yes Yes Z6 Yes Z7 Yes Z8 Yes Z9 Yes Yes Z10 Yes Yes Z11 Yes Yes Yes Z12 Yes Yes Z13 Yes - At any point in time, according to one variation of the invention, the controller performs an instantaneous calculation of comparative cost and selects the optimal order of dispatch. Essentially, the objective of the algorithm is to define the production from each source. One variation of this algorithm is described in the following pseudo code:
-
j,k,m = arbitrary counters t = current time (arbitrary serial time measure) ns = number of sources of power (unitless) MCs(t) = marginal cost of source s at time t (cents per kWh) CAPs(t) = capacity of source s at time t (kW) Let s = 0 represent the grid MCo(t) = rate per kWh prevailing at time t (cents per kWh) CAPo(t) >> demand at time t (kW) Let s = 1 represent solar MC1(t) = 0 (i.e. the marginal cost of the solar system is zero (cents per kWh) D(t) = aggregate demand at time t (kW) SELLCAP = maximum rate at which power can be sold to the grid (kW) UNSAT = demand not satisfied by currently committed capacity (kW) ORDER = vector of index number (s) of sources in ascending order of cost at time t PRODk = optimal production from source k (kW) // initialize unsatisfied demand to total demand UNSAT = D(t) // initialize production from all sources to zero FOR k = 1 TO ns PROD(k) = 0 NEXT k // sort sources in ascending order of prices (using a simple sort algorithm) ORDER(1) = SOURCE NUMBER (s) OF LOWEST COST ORDER(2) = SOURCE NUMBER OF SECOND LOWEST COST Etc. // allocate production from lowest cost to highest until demand is met // loop through sources in ascending order while the amount of allocated power is not // sufficient to meet demand (i.e. UNSAT > 0) j = 0 DO WHILE UNSAT > 0 j = j + l k = ORDER(j) // determine if this is the marginal source // (i.e. the most expensive one necessary to meet demand) IF (UNSAT>CAPk(t)) THEN // not the marginal producer PROD(k) = CAPk(t)) UNSAT = UNSAT − PRODUCTION(k) ELSE // this is the marginal producer // determine if it is cost effective to sell or not by comparing to the cost of the grid IF MCk(t) < MCo(t) THEN // You can sell from this unit. There are two cases: IF CAPk(t) > UNSAT + SELLCAP THEN // Case 1: the maximum capacity of the marginal unit (k) is // sufficient to meet demand and sell the power at the maximum capacity of the unit PROD(k) = UNSAT + SELLCAP UNSAT = 0 SELLCAP = 0 ELSE // Case 2: you can sell the full capacity of this unit. PROD(k) = CAPk(t) SELLCAP = SELLCAP − (CAPk(t) − UNSAT) UNSAT = 0 // Determine if there is an unallocated source that is not needed // to meet demand, but which can sell power effectively IF j < ns THEN FOR m = j + 1 to ns k = ORDER(m) IF MCk(t) < MCo(t) Then //marginal cost of this source is less than the grid price, so // power can be sold PROD(k) = MAXIMUM(CAPk(t),SELLCAP) SELLCAP = SELLCAP − PROD(k) ENDIF END FOR END IF END WHILE -
FIG. 9 shows this process graphically in flow chart form. - The case discussed to this point pertains where the marginal cost of production from a source is not a function of the capacity drawn from that source. This is the case, for example, with the grid (in the absence of demand charges) and photovoltaic panels (where the marginal cost is approximately zero) and so will pertain in many situations.
- In some cases, however, the controller may be used to control sources where the cost does vary with capacity. In diesel generators, for example efficiency (and, hence, cost per kWh) varies with speed of operation. This is generally true of mechanical devices. This section describes a family of approaches to the determination of the least cost dispatch in the cases where cost per kWh is a function of kWh from a source. This general solution will work in the case where price is constant, but the calculation may be substantially more difficult and time consuming. Given the limited computational power that may exist in the controller and the need to keep that capacity available for safety monitoring, communications, and other functions, it may be useful to implement both the general and simpler (special case) algorithm and to use the simpler one when appropriate.
- The general problem to be solved in least cost dispatch is to minimize the cost of production necessary to meet demand. In the case where marginal cost is a function of production from a unit, this objective is stated as follows:
-
- where x=amount of power drawn from a source
- Such that:
-
- This is the same problem as stated for the basic case, except that marginal cost (MC) is now a function of production from the technology.
- Within the general problem of dispatch with production-variant marginal cost, there is one special case which can also be solved by a simple means. This is the case where cost is non-decreasing over any interval from zero to the capacity of the unit for each dispatchable unit.
-
FIG. 14 shows a common exponential production cost curve (1401). This curve can be approximated by a series of ranges within each of which cost is assumed to be constant. (1402). These ranges can be defined by several means. The simplest is to define the regions with a fixed width—spanning, say, 100-watt intervals (0-100 watts, 100-200 watts, etc.). An alternative is to create irregular intervals to reflect that there is greater change in some areas of the curve than others. Narrower zones are used where the production curve is steepest. This latter approach may be preferred in that it yields greater accuracy in cost estimation for the same number of ranges. Equivalent or better accuracy can, of course, be achieved by using more (narrower) ranges, but at a penalty in the speed of calculation. - For use in the least cost dispatch calculation, the correct constant value to use for an interval is the one which gives the same total cost as the accurate curve. This is given by:
-
- Where:
- AVGCOSTi=the average marginal cost to be used for interval i
PMaxi=the upper bound of the interval - MCi(x,t)=marginal cost of source
- Note that this average cost pertains only at time t, since the least cost dispatch problem is solved for a specific time. Different solutions pertain at different times. The subscript t is not included in this notation as it is implicit.
- In the special case (as illustrated in
FIG. 14 ) where cost is increasing, the least cost dispatch solution can be obtained using precisely the same algorithm as for the constant price case previously presented by treating each range as a virtual alternative source. The increasing price ensures that the ranges will be dispatched in order. In the event that the curve is not continually increasing, but simply non-decreasing (i.e. there is a range over which the marginal cost is constant), it is logical to include this entirely within a range, to avoid the risk that there would be two ranges (or virtual sources) with the same prices that might be dispatched in the incorrect order. - The most general case involves a non-monotonic marginal cost curve—that is, a curve in which the first derivative of the curve is neither always non-increasing or always non-decreasing. This is illustrated in
FIG. 15 , which shows the actual production curve (1501) and a piecewise constant approximation (1502). In this figure the zones are numbered to support the discussion which follows. In this case, the algorithm specified for the fixed-cost case would choose to dispatchzone 4 first, followed by 3, 5, 13, 6, 2, etc. in that order. Clearly this is not possible from a physical perspective. One cannot commit the power from a zone (i.e. dispatch the zone) until the prior zone has been committed. Simply, this technology is most efficient when producing at thelevel comprising zone 4. One does not have the option of producing a very small amount (i.e.zone 1 or zone 2) at the cost ofzone 4. To solve the problem one variation of the model which follows treats each zone as a logical separate source, which can only be dispatched in ascending order. - Though the fixed-cost case cannot be used, the problem can be formulated into a binary integer program of modest scale. The starting assumption is that the production (marginal cost) curve can be decomposed into a number of zones. This is done for both the constant cost sources (e.g. the grid and solar at a point in time t) as for the sources for which the marginal cost is not constant with level of production, whether these are monotonic or not.
- The second of the three stages of the optimization (following the least-cost dispatch) is to manage the electrical loads in the home or business. The concept of using computers or microprocessors to manage electrical loads is not new, but the invention offers innovation in several areas, described below.
- Conventional load management is done in two ways—at the point of use and by means of a central controller. Point-of-use technologies most commonly address lights and HVAC equipment. Lighting controls couple the lights to occupancy sensors which turn on the light when the room is occupied and off after a user specified time period when the room is not occupied. In some installations a switch is installed in series between the sensor and the lamp so that the light turns on only when occupancy is detected and the switch is in the on position. This prevents the light from being used when the occupant feels that there is sufficient light from other sources. This is simple, reliable, and commonly deployed technology. Use of the invention does not preclude this sort of controlled light.
- HVAC equipment is controlled by a thermostat. A thermostat consists of three components—a temperature sensor, a mechanism for turning the connected HVAC component on when temperature is out of range, and a user interface of some kind. In simple, older thermostats, the temperature was a bimetallic strip that curved increasingly as the temperature rose. This bimetallic switch composed on contact of a simple contact switch that comprised the on/off control mechanism. The user interface was a simple rotating knob that moved the location of the bimetallic strip so that a greater or lesser curve was necessary to close the contact. This generation of technology was simple to use and cheap and effective in regulating temperature, but required manual intervention to adjust the set-point to reflect different user preferences for factors such as time of day or vacation.
- Common thermostats of more recent design incorporate a processor so that users can program the preferred temperature by time of day and day of week. These offer improved performance but have several basic flaws: (I) the classification of daily patterns into weekend and weekday is too simplistic; (2) the system does not automatically compensate for deviations from the patterns, such as on holidays, vacations, or days when a person must stay home from work; (3) in installations where there are multiple zones with individual thermostats, there is unnecessary duplication of the processor, since a single processor could easily manage multiple zones; (4) when there are multiple thermostats they are unconnected to the others and operates independently, the user interface on the thermostat is very poor in comparison to the web-based application interfaces; (5) thermostats cannot be controlled remotely.
- A more advanced generation of control systems has emerged to address these problems and to provide more advanced control. These are home automation controllers (HACs) such as those offered by Smarthome™ and Control4™. HACs are typically multi-function devices, providing functionality in one or more of four areas: entertainment, premises security, communications and networking, and environmental control which includes lighting and HVAC. This generation of controller provides a superior user interface typically using a CRT or LCD monitor (sometimes compact) and keyboard or custom keypad, and a single controller which can manage multiple zones and end-use functions. The more powerful processor and better interface allows for more complex configuration of usage patterns.
- To date, however, environmental control has been the least developed of the HAC control functions. HAC development has focused first on management of entertainment systems including whole-home audio and video and home theatre. Variants of the invention, by means of integrated supply side and storage technology and advanced algorithms, provide superior energy management.
- Least-cost dispatching is the first step in advanced control. The second step is management of deferrable loads. The total demand is made up of multiple small components. Some of these can be deferred or accelerated. That is, the service they supply can be rescheduled to reduce energy costs. In some cases this simply changes the time at which the energy is used. In other cases it can reduce the total amount of energy used. Some examples include:
- Dishwashing: Dishes can be loaded for washing at a future time, up to the time when the dishes are needed less the cycle time. Energy use is roughly the same whether dishes are washed immediately or later.
- Clothes washing: Clothes washers and dryers, like dishwashers, are similarly deferrable. In the case of dryers it is sometimes advantageous from a quality of service perspective to delay the start so that the cycle finishes when someone is there to empty the dryer.
- Hot Water Heaters: Hot water heaters are typically designed to maintain water at a constant high temperature. Energy is lost from the system in two basic ways—through the use of hot water and standing losses, which are losses that occur when water is not being used. Standing losses occur though the shell of the hot water heater itself and from the hot water in the pipes throughout the premise. Since the ramp up in energy prices in the 1970s the insulation of the hot water heaters has been improved substantially, until the losses are much smaller than was previously the norm.
- Hot water pipes, however, are not typically insulated. In a model household, the demand for hot water drops off when everyone is done with their morning showers, except for some latent dishwashing or clothes washing. Thus, demand is essentially zero during the day. Shutting off hot water heating when there is no demand is useful for reducing instantaneous demand, but can also reduce total energy consumption. The energy savings are due to the nonlinear nature of heat loss. Roughly, the rate of heat loss from a warm body is a function of the third power of the temperature—the standing losses are higher when the temperature is higher. Allowing the water to cool reduces the rate of heat loss. Hence, less energy is used to heat water later when it is needed than to heat it immediately and then keep it warm for hours. The method for optimally scheduling loads that need not be executed at a specific time is described below.
- Refrigerators: Refrigerators are not typically useful from the perspective of energy demand management. A more or less constant low temperature is essential for preserving food safely and maintaining its quality. As in the dishwasher, there are losses when the refrigerator is used (i.e. the door is opened) as well as standing losses even when the refrigerator is not being used. In the case of refrigerators, it is imperative that the temperature be returned to the set point as quickly as possible when heat is allowed to enter the cabinet. Thus, it is not possible to save energy by deferring the cooling. A refrigerator's total energy will be essentially the same regardless of the energy management system.
- That said, however, the high quality insulation of a modern refrigerator makes it possible to defer load for modest periods (on the order of 15 minutes) while in temperature maintenance mode without adversely affecting the interior temperature. This is useful for load management if not for energy management.
-
FIG. 10 shows the energy and load impact of deferring energy use from these controllable loads.FIG. 10 shows an energy process (e.g. dish washing) which is initiated in the morning. Here “initiated” refers to setting up for execution during a specified time interval. The energy required to execute the process is the integral of the load (power) shown on the vertical access over the time interval of the process. - In
FIG. 10 ,element 1001 is the originally scheduled time for a service (e.g., washing the breakfast dishes). This is a relatively expensive time, as utility rates are high and solar production is low.Element 1002 is a better time—solar production exceeds the ability to sell to the grid, so the marginal value of the power is zero. Performing the service in zone 7 gets it done at no cost, but still in time for the family's arrival home after work. - During the configuration process, parameters can be established for various daily profiles and for the end-use technologies. The end-use technology profile specifics what can be controlled and how, as previously described. The daily profile describes the preferred set-point for each technology over the course of the day, such as the temperature. For deferrable loads, the configuration specifics when the service must be available. For example, the specification for the hot water heater may require that hot water be available at 0730 for the morning wakeup and at 1800, while the dishwasher must have finished running by 0730 or 1700. Given these parameters, according to the invention the optimal time to execute the process can be determined.
- This determination rests on the least cost dispatch calculation and, hence, is outside the capability of the HAC systems other than the invention. The method of this variation of the invention is shown in
FIG. 11 . The least cost dispatch calculation determines the marginal value of electric power as a function of the time of day as described previously. The management of deferrable loads begins with the configuration of deferrable loads (1101). In this step, the user of the system or the installer defines which loads (e.g. dishwashing, refrigeration) can be deferred and under what circumstances. For example, the rule can be established that there should be no pending dishwashing at 0700 and 1700, meaning that the dishes must be clean before breakfast and before dinner. The rule for refrigeration could be that it must operate at least three hours out of every four. The rule for freezers could be that it can be shut down for two hours at a time. The actual management process is initiated when a deferrable load is initiated (i.e. scheduled for service) (step 1102). The least cost dispatch model is rerun (step 1103). This, as described previously, divides the forecast period into zones (1 to n) and calculates the marginal value of electricity in each. - The calculation then determines which zones are candidates for the deferrable service (1104). This is a two step process. First, there is a simple calculation to determine which zones occur before the deferrable load must be completed. Then, it is determined whether there is sufficient power in that zone to complete the service. There are two elements to this determination—the power determination and the energy determination. Power is the instantaneous difference between the baseline demand (i.e. without the deferred load) and the power available in the zone without exceeding the capacity of the marginal supply (termed “available marginal supply capacity”). Exceeding the capacity of the marginal supply would increase the marginal cost of supply and potentially the marginal value. The second part is to determine where there is sufficient energy to deliver the service. Energy is the integral of power over time, so this determination involves integrating the available marginal supply capacity over a contiguous interval when this capacity exceeds the demand of the deferrable load. This method is shown in
FIG. 12 . - The determination of whether a deferrable load can be serviced in a zone is essentially a determination of whether there is an interval in that zone during which there is sufficient marginal supply capacity to meet the deferrable load. The actual load may vary by instant, but for this calculation it is sufficient to approximate it by a piecewise constant function comprised of short intervals. Five minutes is sufficient. The process for determining whether there is sufficient marginal power in a zone to supply a deferrable demand begins with dividing the zone into these short intervals (step 1201). The available marginal supply capacity (AMCS) in each interval is calculated (step 1202). The system then steps through the intervals in order to find a contiguous period during which the AMCS is, at all instances, greater than the approximated load of the deferred services.
- This determination begins by setting the hypothesis that there is enough energy to “not enough energy” and the length of the contiguous set of intervals under test to 0 (
steps 1202, 1203). Then, for the intervals in order, the system tests whether the AMCS is greater than or equal to the load of the deferred service (step 1205). If not, the length of the interval under test is set to zero (step 1206) and the search continues though the remainder of the zone. If there is sufficient capacity (AMCS>deferrable load), the length of the interval set is increased by 1 (step 1207). At this point the method determines whether the entire deferrable load requirement has been met (i.e. the length of the interval set is greater than or equal to the duration of the deferrable load) (step 1208). If not, the next interval is tested. If so, then the hypothesis that there is sufficient energy is set to “enough energy” (step 1209) and the method ends with the determination that the deferrable load can be scheduled for the zone under test. - If it is determined that there is more than one zone when the services can be performed, the system calculates when the services can be performed at the lowest cost. This is done by looping through the candidate zones (1105) and (1106). At the completion of the process, the deferrable load is scheduled for execution. That is, the current on the deferrable load's circuit is shut off until the start of the zone determined to be the lowest cost (step 1107).
- If there is no zone which has sufficient energy available to perform the deferred service without impacting the dispatch calculation, it is necessary to accept that the service must be performed at a higher cost. In this case, the new cost is calculated by incrementing demand in each zone before the scheduled time of delivery by an amount necessary to meet the deferrable demand, and then repeating the least cost dispatch calculation. The preferred zone to perform the service is the one where the marginal cost is lowest.
- The third aspect of the optimization is the determination of when to buy or sell power from the grid. Sales to the grid can be made in three different ways—(1) the meter can be run in reverse, essentially selling power back at the prevailing retail price, (2) when utilities declare an emergency, power can be sold under an established demand response program, and (3) power can be sold in the wholesale power market.
- Effective management of the buy/sell decision can be based on the arbitrage algorithm discussed below. This calculation builds on the least cost dispatch algorithm, and should be executed after the deferrable loads have been scheduled.
- Variants of the invention include three capabilities for optimal energy management—(1) optimal (least-cost) dispatching of multiple supplies, (2) management of demand side resources, and (3) use of storage. This section addresses how storage can be deployed optimally. Storage can take multiple forms, including batteries (including but not limited to lead acid and nickel metal hydride), large capacitors (sometimes called supercap), mechanical storage in the form of a flywheel, and compressed air. The invention is designed to work with any form of storage or multiple forms of storage in a single installation. The specific form of storage is not critical, nor is storage technology an aspect of the invention.
- The value of storage technology is manifest: (1) storage provides emergency backup when supply from the grid is interrupted; (2) storage buffers the difference between demand at an instant in the supply from variant sources like photovoltaics and wind, allowing them to be used when there is no grid connection; (3) storage extends the period of usefulness of technologies like solar and wind which show large variation in production over the course of the day; (4) where the cost of a supply varies over the course of the day (as in the case of time of day rates) storage provides for shifting demand from time of high cost to low cost; (5) storage can provide for the mitigation of “demand charges” which are based on peak consumption, possibly to the extent necessary to move to a lower cost contract; and (6) in sufficient quantity (as from multiple units (100's or 1000's) energy for and from storage can be traded on the wholesale market allowing for arbitraging.
- For simplicity of notation, “buying” storage refers to putting energy into storage from any source, and “selling” storage as discharging from storage to meet demand, sell to the grid, sell on the wholesale market, or transfer to another form or storage.
- As the invention specifically addresses management of electricity, the logical unit for measuring storage is Amp hours (Ah) at the voltage of service, which can be 120V, 220V split phase, 208 3 phase, or 240 2-wire for foreign installations. The capacity and current storage of mechanical technologies are not naturally measured in Amp hours, but in units such as Newton meters for flywheels or liters at a pressure given in kilopascals for compressed air. These, however, can be converted to the equivalent Amp hours by a simple engineering calculation accounting for the efficiency of the generator. The following pseudocode provides one example of the method of calculation:
-
- Nt=number of technologies
- Nz=number of “zones” of uniform value as shown in
FIG. 10 - Vk=the value of power in zone k. The value of power is the marginal cost of power in a zone from the least-cost dispatch calculation except in two cases—(1) where power is being sold, at which point the value is the sales price, and (2) where there is excess power from an alternative source than can neither be sold or stored, in which case the value is zero.
- SCi=Storage capacity of technology i
- SSi,j=storage sold from technology i in time interval j
- SBi,j=storage bought for technology i in time interval j
- Cij=energy stored in technology i at end of time interval j
- Cio=energy stored in
technology 1 at start of planning period
- Revenue in any time interval i is given by:
-
R=Σ j=1 ntΣk=1 nz(SSkj−SBkj)Vk (eq. 1) - The objective is to maximize revenue as given above, subject to the standard non-negativity constraint necessary to solution of a linear program:
-
SSij≥0∀i,j -
SBij≥0∀i,j (eq. 2) - Additionally, there are the obvious physical constraints that one cannot “buy” more storage than there is unused capacity or sell more storage than there is currently stored. As defined, the storage at the start of
period 1 for technology i is Cio. The charge at the end of the period is given by: -
C i1 =C i0 +SB i1 −SS i1 -
C i2 =C i1 +SB i2 −SS i2 =C i0 +SB i1 −SS i1 +SB i2 −SS i2 -
C i3 =C i3 +SB i3 −SS i3 =C i0 +SB i1 −SS i1 +SB i2 −SS i2 +SB i3 −SS i3 -
. . . -
Cin=Ci 0+Σj=1 n=1(SBij−SSij) (eq. 3) - The constraint on not buying more than the capacity allows is given by:
-
SB in ≤SC i −C i0−1 ∀i,n -
SB in ≤SC i −C i0−1 (eq. 4) -
SB in ≤SC i−(C i0+Σj=1 n=1(SBij−SSij))∀n≥2 (eq. 5) -
Equation 4 is in standard form for a linear program.Equation 5 is put in standard form simply by rearranging terms: -
SB in−Σj=1 n=1 SBij+Σ j=1 n=1 SSij≤SC i −C i0 (eq. 5a) - The constraints on not selling more than is stored are stated as follows:
-
SS i,m ≤C i,m−1 ∀i,m -
SS i,1 ≤C i0 (eq. 6) -
SS in≤(C i0+Σj=1 n=1(SSij−SSij))∀n≥2 (eq. 7) - As for the earlier constraints, equation 6 is in standard form and equation 7 is readily transformed:
-
SSin−Σ j=1 n=1 SBij+Σ j=1 n=1 SSij≤C i0 (eq. 7a) - Solution of this LP by standard means (e.g. the Simplex Algorithm) is not difficult, but, as had been emphasized previously, this calculation must be repeated frequently on a small processor. Hence, there may be an advantage in simplifying the calculation to the maximum possible extent. These observations assist in simplifying the calculation:
- Principle 1: Since the value of energy is constant in any period, if it makes sense to buy storage, the system will buy the maximum amount possible.
- Principle 2: Similarly, if it makes sense to sell storage, the system will sell the maximum amount possible.
- Principle 3: It will never make sense to both buy and sell in one period.
- Together, the first two observations transform the problem from a general linear programming problem into the special form of a binary integer program.
- Let:
-
- XSi,j=1 if capacity is sold from technology i in period j and 0 otherwise
- XBi,j=1 if capacity is bought for technology i in period j and 0 otherwise
- The objective function now becomes
-
Maximize R=Σ j−1 ntΣk−1 nz(SSkj−SBkj)V i (eq. 8) -
- Where SSij and SBij are constants calculated as follows:
-
SS in =C i,n−1 -
SB in =SCi−C i,n−1 (eq. 9) - Where Ci,n are still calculated as in equation 3.
- The constraints are rewritten as follows:
-
SB in−Σj=1 n=1 SBij+Σ j=1 n=1 SSij≤SC i −C i0 (eq. 5a) becomes -
XBinSB in−Σj=1 n=1 XBijSBij+Σ j=1 n=1 XSijSSij≤SC i −C i0 (eq. 5b) -
SSin−Σ j=1 n=1 SBij+Σ j=1 n=1 SSij≤C i0 (eq. 7a) becomes -
XBinSSin−Σ j=1 n=1 XBijSBij+Σ j=1 n=1 XSijSSij≤C i0 (eq. 7b) - This formulation is the simplest one. It assumes a perfect storage in which energy can be stored and retrieved without loss or any cost other than the cost of the energy. This is not a realistic case, but the explanation is clearer without these additional complications and the formulation is precisely the same. There are two factors to consider. The first is that not all of the power purchased can be stored with perfect efficiency.
- The simplest method to address this is to add an efficiency term to the objective function, which provides for less revenue when power is sold. This term (off) is less than 1 and is a linear approximation of average energy lost in a buy/sell (charge/discharge) cycle. The objective function with an efficiency term is as follows:
-
Maximize R=Σ j=1 ntΣi=1 nz(eff×XS ij SS ij −XB ij SB ij)V ik (eq. 10) - The other factor to consider is that some forms of storage (notably batteries) lose capacity with repeated cycles and are limited in the number of cycles they can execute. These can be addressed by adjusting the objective function to include a cost of cycling as follows:
-
Maximize Σj=1 ntΣi=1 nz XS ij(eff×SS ij V i)−Σj=1 ntΣi=1 nz XB ij(SB ij V i−CycleCost) (Eq. 11) - The constraints remain the same. CycleCost is the estimated cost of executing a cycle. Cio in equation 3 is replaced with Cio′, which is a function (determined, e.g., via experimentation and/or engineering data for a specific device) of the starting capacity, the number of cycles, and the total amount of energy stored. This is stated as follows:
-
Cio′=F(Cio,Σ t=0 ∞Σj=0 nz(t)(XSij),Σt=0 ∞Σj=0 nz(t)(SBij)) (Eq 12) - In
equation 12 there are two summations over time from time=0 to time=infinity. These sums represent the history of the storage device. The sum of Xij represents the number of times the technology was used, as XSij=1 whenever power is added to the technology. The second double sum (of SBij) equals the amount of energy added to the device over its life since startup. Nz(t) is the number of zone used in a cycle. This function is characteristic of a specific storage technology. It should be estimated from engineering principles and the design data for the specific device. - At this point the problem has been formulated as a relatively simple binary integer program with linear constraints. For the most common case where there is a single storage medium (e.g. batteries) and the forecasting period is limited to ten zones (1 to 1.5 days under most utility rate schedules), the problems is then limited to 20 zero/one variables (10 sell options and 10 buy options). Assuming that the optimum solution would not likely involve selling in the 3 zones with the lowest rates nor buying in the zones with the three highest rates, the problem size is reduced to 7 buy options and 7 sell options. Thus, in six of the 10 periods, there are only two options (do nothing and either buy or sell depending on whether it is a high value period or a low value period), while in the other four period there are, in theory, four options do nothing, buy only, sell only, and buy and sell. The last of these makes no sense, of course, so ¼ of the options need not evaluated, leaving only three. Thus, the total number of combinations is given by
-
Number of combinations=26×34=5184. - As the evaluation of an option involves only a few simple additions, the options can be quickly evaluated through simple enumeration. This ease, while special, is in fact the most common as there are very few if any current installations with more than one form of storage.
- For larger cases it may be necessary to solve the problem by the standard means of solving binary integer programming problems, as addressed in the section on least cost dispatch.
- Referring again to
FIG. 3 , step 311 will now be explained in more detail (estimating the daily service profile). The daily service profile is an estimate of load over the course of the forecasting period. The forecasting period at a minimum should span the next 24 hours, but 48 hours may be better. The only barrier to the longer period is the processor time required to perform the longer forecast without impacting the basic safety monitoring function of the controller's processor. The size of the problem that must be solved at any installation for any period is determined by the number of load zones reflecting changes in the grid rate schedule or the relative rank of costs of the grid and alternative sources. More zones imply a larger optimization problem and exponentially longer solution time, potentially reducing the forecast period from 48 hours to the acceptable 24 hours. - In preparing the daily service profile, demand (measured in kW) can be estimated at 15 minute intervals for the forecast period. There are two preferred methods for doing this. The first method is based on past usage patterns. This is shown in
FIG. 13 . The process begins with the specification of categories of patterns (1301). In a typical home or business, there are distinct differences between different kinds of days, such as weekdays or weekends, workdays or non-work days, vacation days, holidays, or other. In addition, patterns will be defined for sunny days, cloudy days, partly cloudy days, and rainy days. Using engineering principles, (e.g. a building energy model like DOE-2) an estimate can be made of the load for 15 minute intervals for the next 24 hours (step 1302). While this estimate should be as accurate as can readily be obtained, it is not critical that it be highly accurate, as the remainder of the process is directed at correcting this error. - The next step is to select a pattern for use for the next 24 hours (step 1303). If the day is a weekday and sunny, for example, a sunny weekday pattern should be elected. Again, however, the consequences of choosing a bad pattern at this point are not serious. At this point the routine re-estimation begins. This is shown by the loop (step 1308) which executes every 15 minutes or more frequently if new data are received from the network indicating a change in ambient conditions, utility rates, or other factors or there is a substantial change in the load at the house.
- Every cycle, actual load for the past four hours is compared to the load from each available pattern. A correlation coefficient (r-squared) is calculated, (1304) and the best match is identified (1305). This pattern is then sealed up or down linearly to reflect the absolute level of energy use (1306) as described below. The final step is to update the pattern to reflect actual energy use (1307). A simple method for accomplishing this is described below. An alternative method is to use a Bayesian approximation.
- The objective of this final step is to improve the fidelity of the patterns after the initial crude estimate, to accommodate changes in the premises, to incorporate longer term patterns in energy use (such as from climate or the degradation of HVAC equipment). Short-term changes as in the ease of weather are integrated by re-estimation every 15 minutes or more frequently in response to changing conditions. Historically, one of the best predictions of a day's weather is to assume that it will be like yesterday, and the best prediction of the upcoming hour is the past hour. Obviously, however, weather docs change. When forecast information is available, this can be transmitted from the control center (101) to the facility in the form of direction to use a specific pattern. In this way the forecast can accommodate predictions for rain, snow, clearing, or other weather patterns. One method for doing this is described below.
-
Define Np Number of patterns (e.g. weekday, weekend, vacation) T Time period in 15 minute intervals t = (−16 . . . −1) for the four hours prior to the current time t = 0 for the current time t = (1 . . . 96) for the next 24 hours Lij Load (kW) at time j using pattern i ALj Actual load (kW) at time j, j = (−16 . . . −1) (prior four hours) PLj Predicted load (kW) at time j, j = 1, 96 (next 24 hours) SF Scale factor, which is the ratio of the energy actually used in the last four hours over the energy that would have been used had the selected pattern actually pertained - Step 1: Identify the most accurate pattern. Calculate r2 for ALj vs. Lij for all patterns i, for the past four hours (j=−16 . . . −1). r2 is the standard goodness of fit measure, where r is given by=[Cov(AL,Li)]/[StdDev(AL)×StdDev(Li)]. Use pattern i which has the highest r2.
- Step 2: Scale the selected pattern to reflect actual use. Use pattern i which has the highest r2. Estimate demand for the next 24 hours by scaling the selected pattern by the ratio of the actual absolute use of energy over the past four hours vs. the energy use as expressed in the selected pattern.
-
SF=Σ j=−16 −1 ALj/Σ j=−16 −1 Lij -
PLj=SF×Lij for j−(1 . . . 96) - Use this PLj as the forecasted for the next 24 hours.
- Step 3: Update the Pattern. Adjust the pattern to reflect the difference between measured and projected for the last hour and the scale factor used for the forecast.
-
Lij=0.5*(Lij+ALj) for j=(−16 . . . −1) - past is average of actual and estimated
-
Lij=Lij*((SF+1)/2) for j=(1 . . . 96) - future is adjusted by having the scale factor estimate demand for the next 24 hours by scaling the selected pattern by the ratio of the actual absolute use of energy over the past four hours vs. the energy use as expressed in the selected pattern.
- Any of the steps or modules described above may be provided in software and stored as computer-executable instructions on one or more computer-readable media. Numerals used in the appended claims are provided for clarity only and should not be interpreted to limit the order of any steps or elements recited in the claims.
Claims (10)
1. A method for deferring demand for electrical energy,
comprising the computer-implemented steps of:
(1) estimating, with a computer, a cost over a forecasting period for electrical energy at a location, wherein the forecasting period is divided into multiple zones, the cost of electrical energy is estimated based on a forecast of demand for electrical energy in each zone, and the forecast of demand is based on factors including historical data of electrical energy at the location and an ambient condition at the location;
(2) determining, with the computer, a demand for electrical energy by one or more devices at the location;
(3) identifying, with the computer, a zone of the multiple zones in which a power supply capacity is greater that an electrical load of at least one device of the one or more devices;
(4) repeating step (3) to identify one or more zones of the multiple zones having a total duration exceeding an operational time of the at least one device;
(5) selecting, with the computer, a zone of the one or more zones identified in step (4) as a lower-cost time period; and
(6) deferring, with the computer, electrical consumption for the at least one device from a higher-cost time period to the lower-cost time period.
2. The method of claim 1 , wherein the power supply capacity is generated by a non-grid-based power source.
3. The method of claim 2 , wherein the non-grid-based power source is a photovoltaic power source.
4. The method of claim 1 , wherein step (5) includes
(5a) identifying, from the one or more zones, a plurality of candidate intervals for selection as the lower-cost time period, and
(5b) selecting as the lower-cost time period the candidate interval resulting in the lowest cost.
5. The method of claim 1 , wherein step (5) includes
(5a) determining that there is insufficient power supply capacity to provide the electrical load of the at least one device for the operational time,
(5b) incrementing demand in each zone by an amount sufficient to provide the electrical load of the at least one device,
(5c) re-estimating the cost over the forecasting period for electrical energy based on the incremented demand in each zone, and
(5d) selecting the portion of the forecasting period having the lowest re-estimated cost as the lower-cost time period.
6. The method of claim 1 , wherein step (5) includes
(5a) determining, using a configuration specifying temporal limits on deferral of operation of the at least one device, a candidate interval comprising one or more zones of the multiple zones during which the at least one device may be operated,
(5b) repeating step (5a) so as to identify a plurality of candidate intervals for selection as the lower-cost time period, and
(5c) selecting as the lower-cost time period the candidate interval resulting in the lowest cost.
7-10. (canceled)
11. The method of claim 1 , wherein the power supply capacity is generated by a non-grid-based power source, and step (4) includes identifying the lower-cost time period based on a characteristic of the non-grid-based power source.
12. The method of claim 11 , wherein the characteristic of the non-grid based power source includes a fixed marginal cost of the non-grid-based power source, and step (2) includes determining, with the computer, said fixed marginal cost.
13. The method of claim 1 , wherein step (1) includes estimating the forecast of demand at pre-determined time intervals of the forecasting period, and each of the pre-determined time intervals is less than one hour.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/832,581 US20210057909A1 (en) | 2005-06-06 | 2020-03-27 | Optimized energy management system |
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/144,834 US7274975B2 (en) | 2005-06-06 | 2005-06-06 | Optimized energy management system |
US11/837,888 US7783390B2 (en) | 2005-06-06 | 2007-08-13 | Method for deferring demand for electrical energy |
US12/862,070 US8903560B2 (en) | 2005-06-06 | 2010-08-24 | Optimized energy management system |
US14/558,316 US20150207319A1 (en) | 2005-06-06 | 2014-12-02 | Optimized energy management system |
US15/950,283 US20190089153A1 (en) | 2005-06-06 | 2018-04-11 | Optimized energy management system |
US16/832,581 US20210057909A1 (en) | 2005-06-06 | 2020-03-27 | Optimized energy management system |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/950,283 Continuation US20190089153A1 (en) | 2005-06-06 | 2018-04-11 | Optimized energy management system |
Publications (1)
Publication Number | Publication Date |
---|---|
US20210057909A1 true US20210057909A1 (en) | 2021-02-25 |
Family
ID=37495191
Family Applications (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/144,834 Active 2025-10-05 US7274975B2 (en) | 2005-06-06 | 2005-06-06 | Optimized energy management system |
US11/837,888 Active US7783390B2 (en) | 2005-06-06 | 2007-08-13 | Method for deferring demand for electrical energy |
US12/862,070 Active 2026-12-03 US8903560B2 (en) | 2005-06-06 | 2010-08-24 | Optimized energy management system |
US14/558,316 Abandoned US20150207319A1 (en) | 2005-06-06 | 2014-12-02 | Optimized energy management system |
US15/950,283 Abandoned US20190089153A1 (en) | 2005-06-06 | 2018-04-11 | Optimized energy management system |
US16/832,581 Abandoned US20210057909A1 (en) | 2005-06-06 | 2020-03-27 | Optimized energy management system |
Family Applications Before (5)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/144,834 Active 2025-10-05 US7274975B2 (en) | 2005-06-06 | 2005-06-06 | Optimized energy management system |
US11/837,888 Active US7783390B2 (en) | 2005-06-06 | 2007-08-13 | Method for deferring demand for electrical energy |
US12/862,070 Active 2026-12-03 US8903560B2 (en) | 2005-06-06 | 2010-08-24 | Optimized energy management system |
US14/558,316 Abandoned US20150207319A1 (en) | 2005-06-06 | 2014-12-02 | Optimized energy management system |
US15/950,283 Abandoned US20190089153A1 (en) | 2005-06-06 | 2018-04-11 | Optimized energy management system |
Country Status (3)
Country | Link |
---|---|
US (6) | US7274975B2 (en) |
TW (1) | TWI441407B (en) |
WO (1) | WO2006132760A2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11381101B1 (en) * | 2021-10-06 | 2022-07-05 | Geotab Inc. | Systems for vehicle battery charging around charge-adverse time periods |
US20240097443A1 (en) * | 2021-10-21 | 2024-03-21 | State Grid Zhejiang Electric Power Co., Ltd. Taizhou power supply company | Source-network-load-storage coordination dispatching method in background of coupling of renewable energy sources |
WO2024010942A3 (en) * | 2022-07-07 | 2024-04-04 | Abdelrazek Sherif | Method and software to aid in creating dispatch profiles of energy storage systems and to model performance of energy storage systems |
WO2024188720A1 (en) * | 2023-03-10 | 2024-09-19 | Bdr Thermea Group B.V. | Profile information for dynamic control of an energy management system |
Families Citing this family (812)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8560476B2 (en) * | 2003-08-26 | 2013-10-15 | The Trustees Of Columbia University In The City Of New York | Martingale control of production for optimal profitability of oil and gas fields |
US8019445B2 (en) * | 2004-06-15 | 2011-09-13 | Intelligent Generation Llc | Method and apparatus for optimization of distributed generation |
JP4945077B2 (en) * | 2004-12-03 | 2012-06-06 | シャープ株式会社 | Power storage equipment management system |
US20070005195A1 (en) * | 2005-01-10 | 2007-01-04 | Nicholas Pasquale | Distributed energy storage for reducing power demand |
US7623042B2 (en) | 2005-03-14 | 2009-11-24 | Regents Of The University Of California | Wireless network control for building lighting system |
US7243044B2 (en) * | 2005-04-22 | 2007-07-10 | Johnson Controls Technology Company | Method and system for assessing energy performance |
CN101156294B (en) * | 2005-04-28 | 2010-12-29 | 罗斯蒙德公司 | Charging system for field devices |
US7274975B2 (en) * | 2005-06-06 | 2007-09-25 | Gridpoint, Inc. | Optimized energy management system |
DE102005055648A1 (en) * | 2005-11-22 | 2007-11-15 | BSH Bosch und Siemens Hausgeräte GmbH | Washing machine |
US7627401B2 (en) * | 2006-02-07 | 2009-12-01 | Glenbrook Associates, Inc. | System and method for remotely regulating the power consumption of an electric appliance |
EP1989490B1 (en) * | 2006-02-10 | 2011-12-21 | Danfoss A/S | Method and system for controlling the climate in a house |
US7805618B2 (en) * | 2006-02-17 | 2010-09-28 | International Business Machines Corporation | Component indicators used during extended power-off service |
WO2007118128A2 (en) * | 2006-04-07 | 2007-10-18 | I-Conserve, Llc | Artificial-intelligence-based energy auditing, monitoring and control |
US8103389B2 (en) * | 2006-05-18 | 2012-01-24 | Gridpoint, Inc. | Modular energy control system |
GB0614193D0 (en) * | 2006-07-18 | 2006-08-23 | Martin Energy Ltd | Aggregated management system |
US20090043519A1 (en) * | 2006-08-10 | 2009-02-12 | V2Green, Inc. | Electric Resource Power Meter in a Power Aggregation System for Distributed Electric Resources |
US7844370B2 (en) * | 2006-08-10 | 2010-11-30 | Gridpoint, Inc. | Scheduling and control in a power aggregation system for distributed electric resources |
US20080040263A1 (en) * | 2006-08-10 | 2008-02-14 | V2 Green, Inc. | Business Methods in a Power Aggregation System for Distributed Electric Resources |
US20080040295A1 (en) * | 2006-08-10 | 2008-02-14 | V2 Green, Inc. | Power Aggregation System for Distributed Electric Resources |
US20080052145A1 (en) * | 2006-08-10 | 2008-02-28 | V2 Green, Inc. | Power Aggregation System for Distributed Electric Resources |
US7949435B2 (en) * | 2006-08-10 | 2011-05-24 | V2Green, Inc. | User interface and user control in a power aggregation system for distributed electric resources |
US20080040223A1 (en) * | 2006-08-10 | 2008-02-14 | V2 Green Inc. | Electric Resource Module in a Power Aggregation System for Distributed Electric Resources |
US20090043520A1 (en) * | 2006-08-10 | 2009-02-12 | V2Green, Inc. | User Interface and User Control in a Power Aggregation System for Distributed Electric Resources |
US20080039979A1 (en) * | 2006-08-10 | 2008-02-14 | V2 Green Inc. | Smart Islanding and Power Backup in a Power Aggregation System for Distributed Electric Resources |
US7747739B2 (en) * | 2006-08-10 | 2010-06-29 | Gridpoint, Inc. | Connection locator in a power aggregation system for distributed electric resources |
US8898278B2 (en) | 2006-08-10 | 2014-11-25 | Gridpoint, Inc. | Connection locator in a power aggregation system for distributed electric resources |
US20090040029A1 (en) | 2006-08-10 | 2009-02-12 | V2Green, Inc. | Transceiver and charging component for a power aggregation system |
US20080040296A1 (en) * | 2006-08-10 | 2008-02-14 | V2 Green Inc. | Electric Resource Power Meter in a Power Aggregation System for Distributed Electric Resources |
US20090066287A1 (en) * | 2006-08-10 | 2009-03-12 | V2Green, Inc. | Business Methods in a Power Aggregation System for Distributed Electric Resources |
WO2008039759A2 (en) * | 2006-09-25 | 2008-04-03 | Intelligent Management Systems Corporation | System and method for resource management |
US20080091626A1 (en) * | 2006-10-17 | 2008-04-17 | Gary Kremen | Systems, methods and financial instruments for renewable energy consumer premises equipment financing |
US7890436B2 (en) * | 2006-10-17 | 2011-02-15 | Clean Power Finance, Inc. | Billing and payment methods and systems enabling consumer premises equipment |
US20080091590A1 (en) * | 2006-10-17 | 2008-04-17 | Gary Kremen | Methods, systems and financial instruments for financing renewable energy consumer premises equipment |
US20080091580A1 (en) * | 2006-10-17 | 2008-04-17 | Gary Kremen | Methods for cost reduction and underwriting considerations for financing renewable energy consumer premises equipment (CPE) |
US20080091589A1 (en) * | 2006-10-17 | 2008-04-17 | Gary Kremen | Method for underwriting the financing of solar consumer premises equipment |
US7590472B2 (en) * | 2006-11-09 | 2009-09-15 | Gridpoint, Inc. | Energy arbitrage by load shifting |
WO2008086114A2 (en) * | 2007-01-03 | 2008-07-17 | Gridpoint, Inc. | Utility console for controlling energy resources |
US20080167931A1 (en) * | 2007-01-04 | 2008-07-10 | Richard Allen Gerstemeier | Community resource management systems and methods |
US9031874B2 (en) * | 2007-01-12 | 2015-05-12 | Clean Power Finance, Inc. | Methods, systems and agreements for increasing the likelihood of repayments under a financing agreement for renewable energy equipment |
US7698219B2 (en) * | 2007-01-12 | 2010-04-13 | Clean Power Finance, Inc. | Methods, systems and agreements for increasing the likelihood of repayments under a financing agreement for renewable energy equipment |
US8650057B2 (en) * | 2007-01-19 | 2014-02-11 | Accenture Global Services Gmbh | Integrated energy merchant value chain |
WO2009051853A1 (en) | 2007-10-15 | 2009-04-23 | And, Llc | Systems for highly efficient solar power |
US7920942B2 (en) * | 2007-03-01 | 2011-04-05 | Wisconsin Alumni Research Foundation | Control of combined storage and generation in distributed energy resources |
US8121742B2 (en) * | 2007-11-08 | 2012-02-21 | Flohr Daniel P | Methods, circuits, and computer program products for generation following load management |
US9003211B2 (en) * | 2007-03-20 | 2015-04-07 | Power Assure, Inc. | Method and apparatus for holistic power management to dynamically and automatically turn servers, network equipment and facility components on and off inside and across multiple data centers based on a variety of parameters without violating existing service levels |
IE20080293A1 (en) | 2007-04-17 | 2008-10-29 | Timothy Patrick Cooper | A load management controller |
CA2685525C (en) * | 2007-05-02 | 2012-12-18 | Rosemount, Inc. | Industrial process field device with improved battery assembly |
FR2916098B1 (en) * | 2007-05-11 | 2009-07-03 | Commissariat Energie Atomique | METHOD FOR CHARGING A STORAGE ELEMENT OF AN AUTONOMOUS SYSTEM |
US20090024541A1 (en) * | 2007-07-20 | 2009-01-22 | Gary Kremen | Power purchase methods, agreements and financial instruments for tax-advantaged financing residential renewable energy equipment |
CA2732060A1 (en) * | 2007-07-25 | 2009-01-29 | Trulite, Inc. | Apparatus, system, and method to manage the generation and use of hybrid electric power |
US8078332B2 (en) | 2007-07-26 | 2011-12-13 | Areva T & D, Inc. | Methods for managing high or low voltage conditions from selected areas of a power system of a utility company |
US8085009B2 (en) | 2007-08-13 | 2011-12-27 | The Powerwise Group, Inc. | IGBT/FET-based energy savings device for reducing a predetermined amount of voltage using pulse width modulation |
US8619443B2 (en) | 2010-09-29 | 2013-12-31 | The Powerwise Group, Inc. | System and method to boost voltage |
US20090048717A1 (en) * | 2007-08-15 | 2009-02-19 | Constellation Energy Group, Inc. | Multiple input building controller |
US8219505B2 (en) * | 2007-08-15 | 2012-07-10 | Constellation Energy Group, Inc. | Energy usage prediction and control system and method |
US8120307B2 (en) * | 2007-08-24 | 2012-02-21 | The Powerwise Group, Inc. | System and method for providing constant loading in AC power applications |
US8085010B2 (en) * | 2007-08-24 | 2011-12-27 | The Powerwise Group, Inc. | TRIAC/SCR-based energy savings device for reducing a predetermined amount of voltage using pulse width modulation |
US8542685B2 (en) | 2007-08-28 | 2013-09-24 | Consert, Inc. | System and method for priority delivery of load management messages on IP-based networks |
US20100235008A1 (en) * | 2007-08-28 | 2010-09-16 | Forbes Jr Joseph W | System and method for determining carbon credits utilizing two-way devices that report power usage data |
US9130402B2 (en) | 2007-08-28 | 2015-09-08 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US20090063228A1 (en) * | 2007-08-28 | 2009-03-05 | Forbes Jr Joseph W | Method and apparatus for providing a virtual electric utility |
US10295969B2 (en) | 2007-08-28 | 2019-05-21 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US8527107B2 (en) | 2007-08-28 | 2013-09-03 | Consert Inc. | Method and apparatus for effecting controlled restart of electrical servcie with a utility service area |
US9177323B2 (en) | 2007-08-28 | 2015-11-03 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8806239B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators |
US8260470B2 (en) | 2007-08-28 | 2012-09-04 | Consert, Inc. | System and method for selective disconnection of electrical service to end customers |
US8131403B2 (en) | 2007-08-28 | 2012-03-06 | Consert, Inc. | System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8996183B2 (en) | 2007-08-28 | 2015-03-31 | Consert Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US8700187B2 (en) | 2007-08-28 | 2014-04-15 | Consert Inc. | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
US7715951B2 (en) * | 2007-08-28 | 2010-05-11 | Consert, Inc. | System and method for managing consumption of power supplied by an electric utility |
US8890505B2 (en) | 2007-08-28 | 2014-11-18 | Causam Energy, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US8805552B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | Method and apparatus for actively managing consumption of electric power over an electric power grid |
US7991512B2 (en) | 2007-08-28 | 2011-08-02 | General Electric Company | Hybrid robust predictive optimization method of power system dispatch |
US8145361B2 (en) | 2007-08-28 | 2012-03-27 | Consert, Inc. | System and method for manipulating controlled energy using devices to manage customer bills |
US7693609B2 (en) * | 2007-09-05 | 2010-04-06 | Consolidated Edison Company Of New York, Inc. | Hybrid vehicle recharging system and method of operation |
US7960944B2 (en) * | 2007-09-05 | 2011-06-14 | Eveready Battery Company, Inc. | Power supply that supplies power to and communicates with an electrical appliance |
US7917251B2 (en) * | 2007-09-05 | 2011-03-29 | Consolidated Edison Company Of New York, Inc. | Metering system and method of operation |
DE102007055517A1 (en) * | 2007-09-10 | 2009-03-12 | Siemens Ag | Method for operating a power supply network |
US8698447B2 (en) | 2007-09-14 | 2014-04-15 | The Powerwise Group, Inc. | Energy saving system and method for devices with rotating or reciprocating masses |
US8810190B2 (en) | 2007-09-14 | 2014-08-19 | The Powerwise Group, Inc. | Motor controller system and method for maximizing energy savings |
US8892221B2 (en) * | 2007-09-18 | 2014-11-18 | Groundswell Technologies, Inc. | Integrated resource monitoring system with interactive logic control for well water extraction |
US20090076632A1 (en) * | 2007-09-18 | 2009-03-19 | Groundswell Technologies, Inc. | Integrated resource monitoring system with interactive logic control |
US8396608B2 (en) * | 2007-09-24 | 2013-03-12 | Budderfly Ventures Llc | Computer based energy management |
US8140279B2 (en) | 2007-09-24 | 2012-03-20 | Budderfly Ventures, Llc | Computer based energy management |
US8160752B2 (en) | 2008-09-30 | 2012-04-17 | Zome Networks, Inc. | Managing energy usage |
US20090094097A1 (en) * | 2007-10-03 | 2009-04-09 | Seth Gardenswartz | Network-based optimization of services |
US20090094173A1 (en) * | 2007-10-05 | 2009-04-09 | Adaptive Logic Control, Llc | Intelligent Power Unit, and Applications Thereof |
SG152074A1 (en) * | 2007-10-09 | 2009-05-29 | Dragon Energy Pte Ltd | Roof based energy conversion system |
US7919953B2 (en) | 2007-10-23 | 2011-04-05 | Ampt, Llc | Solar power capacitor alternative switch circuitry system for enhanced capacitor life |
EP2203911A4 (en) | 2007-10-25 | 2011-12-28 | Trilliant Networks Inc | Gas meter having ultra-sensitive magnetic material retrofitted onto meter dial and method for performing meter retrofit |
WO2009058111A1 (en) * | 2007-10-29 | 2009-05-07 | Carrier Corporation | Fuel cell for hvac&r |
WO2009067254A1 (en) | 2007-11-25 | 2009-05-28 | Trilliant Networks, Inc. | System and method for operating mesh devices in multi-tree overlapping mesh networks |
EP2215556B1 (en) | 2007-11-25 | 2019-08-28 | Trilliant Networks, Inc. | System and method for transmitting power status notifications in an advanced metering infrastructure network |
US8332055B2 (en) | 2007-11-25 | 2012-12-11 | Trilliant Networks, Inc. | Energy use control system and method |
WO2009067261A1 (en) | 2007-11-25 | 2009-05-28 | Trilliant Networks, Inc. | System and method for transmitting and receiving information on a neighborhood area network |
US8138934B2 (en) | 2007-11-25 | 2012-03-20 | Trilliant Networks, Inc. | System and method for false alert filtering of event messages within a network |
US8938311B2 (en) | 2007-11-29 | 2015-01-20 | Daniel P. Flohr | Methods of remotely managing water heating units in a water heater |
US20100179705A1 (en) * | 2009-01-14 | 2010-07-15 | Sequentric Energy Systems, Llc | Methods, circuits, water heaters, and computer program products for remote management of separate heating elements in storage water heaters |
US20100017045A1 (en) * | 2007-11-30 | 2010-01-21 | Johnson Controls Technology Company | Electrical demand response using energy storage in vehicles and buildings |
US8872379B2 (en) * | 2007-11-30 | 2014-10-28 | Johnson Controls Technology Company | Efficient usage, storage, and sharing of energy in buildings, vehicles, and equipment |
US7915760B2 (en) * | 2007-12-12 | 2011-03-29 | Evans Sr Bruce Jonathan | Electric power conservation system for storing electric power for use during off-peak hours |
US7653499B2 (en) * | 2007-12-14 | 2010-01-26 | International Business Machines Corporation | Method and system for automated energy usage monitoring within a data center |
US8228034B2 (en) | 2007-12-18 | 2012-07-24 | Dan Guatto | Method and system for load shifting |
WO2009080122A1 (en) * | 2007-12-21 | 2009-07-02 | Abb Research Ltd. | A control arrangement, a controle device, a method, a computer program and a computer readable medium |
US20090189445A1 (en) * | 2008-01-24 | 2009-07-30 | Renewable Energy Holdings, Llc | Renewable energy management and storage system |
WO2009103020A2 (en) * | 2008-02-14 | 2009-08-20 | Alliance For Sustainable Energy, Llc | Renewable energy delivery systems and methods |
US20100003184A1 (en) * | 2008-02-22 | 2010-01-07 | Toyota Jidosha Kabushiki Kaisha | Method for storing solar thermal energy |
JP5178242B2 (en) * | 2008-02-29 | 2013-04-10 | 株式会社東芝 | Energy storage device operation plan creation method and operation plan creation device |
US8116915B2 (en) * | 2008-03-03 | 2012-02-14 | University Of Delaware | Methods and apparatus using hierarchical priority and control algorithms for grid-integrated vehicles |
US20090228324A1 (en) * | 2008-03-04 | 2009-09-10 | Ronald Ambrosio | Method and System for Efficient Energy Distribution in Electrical Grids Using Sensor and Actuator Networks |
US8965719B1 (en) | 2008-03-07 | 2015-02-24 | Versify Solutions, Inc. | Universal performance monitor for power generators |
JP5365037B2 (en) | 2008-03-18 | 2013-12-11 | トヨタ自動車株式会社 | Hydrogen generator, ammonia burning internal combustion engine, and fuel cell |
WO2009117742A1 (en) * | 2008-03-21 | 2009-09-24 | The Trustees Of Columbia University In The City Of New York | Methods and systems of determining the effectiveness of capital improvement projects |
WO2009117741A1 (en) * | 2008-03-21 | 2009-09-24 | The Trustees Of Columbia University In The City Of New York | Decision support control centers |
US10539311B2 (en) | 2008-04-14 | 2020-01-21 | Digital Lumens Incorporated | Sensor-based lighting methods, apparatus, and systems |
US8368321B2 (en) | 2008-04-14 | 2013-02-05 | Digital Lumens Incorporated | Power management unit with rules-based power consumption management |
US8866408B2 (en) * | 2008-04-14 | 2014-10-21 | Digital Lumens Incorporated | Methods, apparatus, and systems for automatic power adjustment based on energy demand information |
US8373362B2 (en) | 2008-04-14 | 2013-02-12 | Digital Lumens Incorporated | Methods, systems, and apparatus for commissioning an LED lighting fixture with remote reporting |
US8610376B2 (en) | 2008-04-14 | 2013-12-17 | Digital Lumens Incorporated | LED lighting methods, apparatus, and systems including historic sensor data logging |
US8610377B2 (en) | 2008-04-14 | 2013-12-17 | Digital Lumens, Incorporated | Methods, apparatus, and systems for prediction of lighting module performance |
US8841859B2 (en) | 2008-04-14 | 2014-09-23 | Digital Lumens Incorporated | LED lighting methods, apparatus, and systems including rules-based sensor data logging |
US8754589B2 (en) | 2008-04-14 | 2014-06-17 | Digtial Lumens Incorporated | Power management unit with temperature protection |
CA2665397A1 (en) | 2008-04-14 | 2009-10-14 | Robert F. Cruickshank, Iii | A method & apparatus for orchestrating utility power supply & demand in real time using a continuous pricing signal sent via a network to home networks & smart appliances |
US8823277B2 (en) | 2008-04-14 | 2014-09-02 | Digital Lumens Incorporated | Methods, systems, and apparatus for mapping a network of lighting fixtures with light module identification |
US8531134B2 (en) | 2008-04-14 | 2013-09-10 | Digital Lumens Incorporated | LED-based lighting methods, apparatus, and systems employing LED light bars, occupancy sensing, local state machine, and time-based tracking of operational modes |
US8552664B2 (en) | 2008-04-14 | 2013-10-08 | Digital Lumens Incorporated | Power management unit with ballast interface |
US8805550B2 (en) | 2008-04-14 | 2014-08-12 | Digital Lumens Incorporated | Power management unit with power source arbitration |
US8339069B2 (en) | 2008-04-14 | 2012-12-25 | Digital Lumens Incorporated | Power management unit with power metering |
US7970561B2 (en) * | 2008-04-14 | 2011-06-28 | Power Assure, Inc. | Method to calculate energy efficiency of information technology equipment |
US8543249B2 (en) | 2008-04-14 | 2013-09-24 | Digital Lumens Incorporated | Power management unit with modular sensor bus |
US20090265042A1 (en) * | 2008-04-17 | 2009-10-22 | Mollenkopf James D | System and Method for Providing Voltage Regulation in a Power Distribution System |
US8239073B2 (en) | 2008-04-17 | 2012-08-07 | Asoka Usa Corporation | Systems and methods for controlling energy consumption |
US8359874B2 (en) | 2008-04-18 | 2013-01-29 | Whirlpool Corporation | Secondary cooling path in refrigerator |
US20100235144A1 (en) * | 2008-04-24 | 2010-09-16 | David Mosberger-Tang | Method and system for automated monitoring of the production and/or consumption of meterable substances or thermodynamically quantifiable entities, including power and energy |
US8761948B1 (en) | 2008-04-25 | 2014-06-24 | Versify Solutions, Inc. | System and method for managing and monitoring renewable energy power generation |
US7839017B2 (en) * | 2009-03-02 | 2010-11-23 | Adura Technologies, Inc. | Systems and methods for remotely controlling an electrical load |
US20100114340A1 (en) * | 2008-06-02 | 2010-05-06 | Charles Huizenga | Automatic provisioning of wireless control systems |
US8364325B2 (en) | 2008-06-02 | 2013-01-29 | Adura Technologies, Inc. | Intelligence in distributed lighting control devices |
US8275471B2 (en) * | 2009-11-06 | 2012-09-25 | Adura Technologies, Inc. | Sensor interface for wireless control |
US8600571B2 (en) * | 2008-06-19 | 2013-12-03 | Honeywell International Inc. | Energy optimization system |
EP2139090A1 (en) * | 2008-06-24 | 2009-12-30 | ABB Research Ltd. | Method for operating a battery energy storage system |
WO2010008479A2 (en) | 2008-06-25 | 2010-01-21 | Versify Solutions, Llc | Aggregator, monitor, and manager of distributed demand response |
US8138627B2 (en) * | 2008-06-27 | 2012-03-20 | Sharp Laboratories Of America, Inc. | Power management of network-connected devices in peak power periods |
US8319358B2 (en) | 2008-06-30 | 2012-11-27 | Demand Energy Networks, Inc. | Electric vehicle charging methods, battery charging methods, electric vehicle charging systems, energy device control apparatuses, and electric vehicles |
US8097967B2 (en) | 2008-06-30 | 2012-01-17 | Demand Energy Networks, Inc. | Energy systems, energy devices, energy utilization methods, and energy transfer methods |
WO2010003711A1 (en) * | 2008-07-08 | 2010-01-14 | Siemens Aktiengesellschaft | Adapter device and method for charging a vehicle |
US8263276B1 (en) * | 2008-07-08 | 2012-09-11 | Bloom Energy Corporation | Startup power control in a fuel cell system |
US8990096B2 (en) * | 2008-07-11 | 2015-03-24 | Michael W. Shore | Distributing alternatively generated power to a real estate development |
US8090476B2 (en) * | 2008-07-11 | 2012-01-03 | International Business Machines Corporation | System and method to control data center air handling systems |
US20110125432A1 (en) * | 2008-07-13 | 2011-05-26 | Afeka Tel Aviv Academic College Of Engineering | Remote monitoring of device operation by tracking its power consumption |
US8429435B1 (en) * | 2008-07-25 | 2013-04-23 | Autani Corporation | Automation devices, systems, architectures, and methods for energy management and other applications |
JP5011230B2 (en) * | 2008-08-04 | 2012-08-29 | 株式会社東芝 | Secondary battery control device and control method |
US8004255B2 (en) | 2008-08-07 | 2011-08-23 | The Powerwise Group, Inc. | Power supply for IGBT/FET drivers |
US8314511B2 (en) * | 2008-08-12 | 2012-11-20 | Mike Schuler | Method and apparatus for allocating electricity from a distributor |
WO2010022059A1 (en) | 2008-08-18 | 2010-02-25 | Austin Christopher B | Vehicular battery charger, charging system, and method |
US8699377B2 (en) | 2008-09-04 | 2014-04-15 | Trilliant Networks, Inc. | System and method for implementing mesh network communications using a mesh network protocol |
US9722813B2 (en) * | 2008-09-08 | 2017-08-01 | Tendril Networks, Inc. | Consumer directed energy management systems and methods |
US7953518B2 (en) * | 2008-09-08 | 2011-05-31 | Microsoft Corporation | Energy cost reduction and ad delivery |
US8183712B2 (en) | 2008-09-10 | 2012-05-22 | International Business Machines Corporation | Method and system for organizing and optimizing electricity consumption |
GB0816721D0 (en) * | 2008-09-13 | 2008-10-22 | Daniel Simon R | Systems,devices and methods for electricity provision,usage monitoring,analysis and enabling improvements in efficiency |
US9303878B2 (en) | 2008-09-15 | 2016-04-05 | General Electric Company | Hybrid range and method of use thereof |
US8843242B2 (en) | 2008-09-15 | 2014-09-23 | General Electric Company | System and method for minimizing consumer impact during demand responses |
EP2335125B1 (en) | 2008-09-15 | 2020-05-13 | Haier US Appliance Solutions, Inc. | Energy management of household appliances |
US8803040B2 (en) | 2008-09-15 | 2014-08-12 | General Electric Company | Load shedding for surface heating units on electromechanically controlled cooking appliances |
US8548638B2 (en) | 2008-09-15 | 2013-10-01 | General Electric Company | Energy management system and method |
US8541719B2 (en) | 2008-09-15 | 2013-09-24 | General Electric Company | System for reduced peak power consumption by a cooking appliance |
US20100070214A1 (en) * | 2008-09-18 | 2010-03-18 | Searete Llc, A Limited Liability Corporation Of The State Of Delaware | System and method for identifying appliances by electrical characteristics |
US20100070225A1 (en) * | 2008-09-18 | 2010-03-18 | Searete Llc, A Limited Liability Corporation Of The State Of Delaware | System and method for identifying appliances by electrical characteristics |
US20100070218A1 (en) * | 2008-09-18 | 2010-03-18 | Searete Llc, A Limited Liability Corporation Of The State Of Delaware | System and method for identifying appliances by electrical characteristics |
US20100070227A1 (en) * | 2008-09-18 | 2010-03-18 | Searete Llc, A Limited Liability Corporation Of The State Of Delaware | System and method for identifying appliances by electrical characteristics |
US20100181957A1 (en) * | 2008-09-19 | 2010-07-22 | Christoph Goeltner | Solar powered, grid independent EV charging system |
EP2353128A4 (en) * | 2008-10-01 | 2013-09-04 | Silver Spring Networks Inc | Method and system of applying environmental incentives |
WO2010051477A2 (en) * | 2008-10-31 | 2010-05-06 | Levinton Manufacturing Company, Ltd. | System and method for charging a vehicle |
WO2010053562A2 (en) | 2008-11-06 | 2010-05-14 | Silver Springs Networks, Inc. | System and method for identifying power usage issues |
DE102008037575A1 (en) | 2008-11-21 | 2010-07-29 | EnBW Energie Baden-Württemberg AG | Computerized process for optimizing energy usage in a local system |
DE202008015537U1 (en) | 2008-11-21 | 2010-04-08 | EnBW Energie Baden-Württemberg AG | Decentralized energy efficiency through autonomous, self-organizing systems taking into account heterogeneous energy sources |
US8289182B2 (en) | 2008-11-21 | 2012-10-16 | Trilliant Networks, Inc. | Methods and systems for virtual energy management display |
US20100161146A1 (en) * | 2008-12-23 | 2010-06-24 | International Business Machines Corporation | Variable energy pricing in shortage conditions |
GB2466511A (en) * | 2008-12-29 | 2010-06-30 | Mark Christopher Higginson | Power supply having multiple power sources |
US20100169227A1 (en) * | 2008-12-31 | 2010-07-01 | International Business Machines Corporation | ENERGY MANAGEMENT AND QUALITY OF SERVICE (QoS) |
US8352091B2 (en) | 2009-01-02 | 2013-01-08 | International Business Machines Corporation | Distributed grid-interactive photovoltaic-based power dispatching |
CA2749770C (en) * | 2009-01-14 | 2021-07-20 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
US8706650B2 (en) * | 2009-01-14 | 2014-04-22 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
FR2941328B1 (en) * | 2009-01-19 | 2012-11-02 | Commissariat Energie Atomique | METHOD FOR PREDICTING THE ELECTRIC PRODUCTION OF A PHOTOVOLTAIC DEVICE |
US20100191489A1 (en) * | 2009-01-28 | 2010-07-29 | Uqm Technologies, Inc. | Distributed Generation Power System |
US8891338B2 (en) | 2009-01-29 | 2014-11-18 | Itron, Inc. | Measuring the accuracy of an endpoint clock from a remote device |
US8155900B1 (en) | 2009-01-29 | 2012-04-10 | Comverge, Inc. | Method and system for calculating energy metrics of a building and one or more zones within the building |
US8442698B2 (en) * | 2009-01-30 | 2013-05-14 | Board Of Regents, The University Of Texas System | Methods and apparatus for design and control of multi-port power electronic interface for renewable energy sources |
US8255085B2 (en) * | 2009-02-05 | 2012-08-28 | Johnson Controls Technology Company | Asymmetrical control system and method for energy savings in buildings |
US8352769B1 (en) | 2009-02-09 | 2013-01-08 | Cisco Technology, Inc. | System and method for querying for energy data in a network environment |
US8732501B1 (en) * | 2009-02-09 | 2014-05-20 | Cisco Technology, Inc. | System and method for intelligent energy management in a network environment |
US8193661B2 (en) | 2009-02-17 | 2012-06-05 | Lineage Power Corporation | DC plant controller and method for selecting among multiple power sources and DC plant employing the same |
DE202009007114U1 (en) * | 2009-02-18 | 2010-07-08 | Liebherr-Hausgeräte Ochsenhausen GmbH | Cooling and / or freezer with energy storage |
JP5655011B2 (en) * | 2009-02-20 | 2015-01-14 | アクララ パワー−ライン システムズ インコーポレイテッド | Wireless broadband communication network for utilities |
WO2010096783A1 (en) | 2009-02-20 | 2010-08-26 | The Trustees Of Columbia University In The City Of New York | Dynamic contingency avoidance and mitigation system |
US8201000B2 (en) | 2009-02-24 | 2012-06-12 | International Business Machines Corporation | Computing load management method and system |
US8205106B2 (en) | 2009-02-24 | 2012-06-19 | International Business Machines Corporation | Energy load management method and system |
US20100217452A1 (en) * | 2009-02-26 | 2010-08-26 | Mccord Alan | Overlay packet data network for managing energy and method for using same |
EP2406778A4 (en) | 2009-03-11 | 2014-06-25 | Trilliant Networks Inc | Process, device and system for mapping transformers to meters and locating non-technical line losses |
KR20120017416A (en) | 2009-04-01 | 2012-02-28 | 넥스트로넥스 인크. | A grid tie solar system and a method |
JP5099066B2 (en) * | 2009-04-10 | 2012-12-12 | オムロン株式会社 | Energy monitoring apparatus, control method therefor, and energy monitoring program |
TWI484746B (en) * | 2009-04-14 | 2015-05-11 | Ampt Llc | Solar energy power system, vacillatory method of solar energy power creation, method of solar energy power conversion, efficient method of solar energy power creation and method of solar energy power creation |
US8954170B2 (en) | 2009-04-14 | 2015-02-10 | Digital Lumens Incorporated | Power management unit with multi-input arbitration |
US8536802B2 (en) | 2009-04-14 | 2013-09-17 | Digital Lumens Incorporated | LED-based lighting methods, apparatus, and systems employing LED light bars, occupancy sensing, and local state machine |
US8593135B2 (en) * | 2009-04-14 | 2013-11-26 | Digital Lumens Incorporated | Low-cost power measurement circuit |
US20100264739A1 (en) * | 2009-04-15 | 2010-10-21 | Monte Errington | Modular adaptive power matrix |
WO2010120315A1 (en) | 2009-04-17 | 2010-10-21 | Ampt, Llc | Methods and apparatus for adaptive operation of solar power systems |
US8200373B2 (en) * | 2009-04-23 | 2012-06-12 | Pentair Water Pool And Spa, Inc. | Energy production and consumption matching system |
US10013666B2 (en) | 2009-04-24 | 2018-07-03 | Rockwell Automation Technologies, Inc. | Product lifecycle sustainability score tracking and indicia |
US8892540B2 (en) | 2009-04-24 | 2014-11-18 | Rockwell Automation Technologies, Inc. | Dynamic sustainability search engine |
US9406036B2 (en) | 2009-04-24 | 2016-08-02 | Rockwell Automation Technologies, Inc. | Discrete energy assignments for manufacturing specifications |
US9129231B2 (en) | 2009-04-24 | 2015-09-08 | Rockwell Automation Technologies, Inc. | Real time energy consumption analysis and reporting |
US8321187B2 (en) | 2009-04-24 | 2012-11-27 | Rockwell Automation Technologies, Inc. | Process simulation utilizing component-specific consumption data |
US10223167B2 (en) * | 2009-04-24 | 2019-03-05 | Rockwell Automation Technologies, Inc. | Discrete resource management |
US8494685B2 (en) * | 2009-04-27 | 2013-07-23 | Cisco Technology, Inc. | System for utilizing predictive energy consumption |
WO2010126894A1 (en) * | 2009-04-30 | 2010-11-04 | Alevo, Inc. | Vehicle utility communication system |
CN101880046A (en) * | 2009-05-05 | 2010-11-10 | 中村德彦 | Compound equipment |
KR101408404B1 (en) | 2009-05-08 | 2014-06-17 | 콘서트 아이엔씨. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
KR101563487B1 (en) | 2009-05-11 | 2015-10-27 | 엘지전자 주식회사 | Portable terminal controlling home appliance |
GB0908215D0 (en) * | 2009-05-14 | 2009-06-24 | Rolls Royce Plc | Distributed power generation |
US8068938B2 (en) * | 2009-05-15 | 2011-11-29 | General Electric Company | Method and system for managing a load demand on an electrical grid |
US20100292857A1 (en) * | 2009-05-18 | 2010-11-18 | Consolidated Edison Company Of New York, Inc. | Electrical network command and control system and method of operation |
US8350697B2 (en) * | 2009-05-18 | 2013-01-08 | Alarm.Com Incorporated | Remote device control and energy monitoring by analyzing data and applying rules |
US8600574B2 (en) * | 2009-05-19 | 2013-12-03 | International Business Machines Corporation | Dynamic specification of power supply sources |
DE102009033642A1 (en) * | 2009-05-28 | 2010-12-02 | Liebherr-Hausgeräte Ochsenhausen GmbH | Fridge and / or freezer |
US8725625B2 (en) | 2009-05-28 | 2014-05-13 | The Trustees Of Columbia University In The City Of New York | Capital asset planning system |
US20100306027A1 (en) * | 2009-06-02 | 2010-12-02 | International Business Machines Corporation | Net-Metering In A Power Distribution System |
US8219259B2 (en) * | 2009-06-03 | 2012-07-10 | International Business Machines Corporation | Maintaining uniform power consumption from an electric utility by a local load in a power distribution system |
US8836601B2 (en) | 2013-02-04 | 2014-09-16 | Ubiquiti Networks, Inc. | Dual receiver/transmitter radio devices with choke |
US9496620B2 (en) | 2013-02-04 | 2016-11-15 | Ubiquiti Networks, Inc. | Radio system for long-range high-speed wireless communication |
DE102009024212B4 (en) * | 2009-06-08 | 2012-03-01 | Adensis Gmbh | Method and device for avoiding an impending reduction in the feed-in power of a photovoltaic system and use of a device for carrying out the method |
US20110133684A1 (en) * | 2009-06-10 | 2011-06-09 | Alevo, Inc. | Electric Gas Stations Having Range Extension and Grid Balancing |
US20100318237A1 (en) * | 2009-06-11 | 2010-12-16 | Maglaque Chad L | System and method for energy device management |
US11269303B2 (en) | 2009-06-22 | 2022-03-08 | Johnson Controls Technology Company | Systems and methods for detecting changes in energy usage in a building |
US9196009B2 (en) | 2009-06-22 | 2015-11-24 | Johnson Controls Technology Company | Systems and methods for detecting changes in energy usage in a building |
US10739741B2 (en) | 2009-06-22 | 2020-08-11 | Johnson Controls Technology Company | Systems and methods for detecting changes in energy usage in a building |
US8600556B2 (en) * | 2009-06-22 | 2013-12-03 | Johnson Controls Technology Company | Smart building manager |
ATE555533T1 (en) | 2009-06-24 | 2012-05-15 | Alcatel Lucent | METHOD FOR CONTROLLING A NETWORK COMPUTING CLUSTER USING IT SERVICES |
US8369997B2 (en) * | 2010-04-28 | 2013-02-05 | David Valin | Solar panel wind turbine communication server network apparatus method and mechanism |
DE102009031550A1 (en) * | 2009-07-02 | 2011-01-05 | Siemens Aktiengesellschaft | Device for energy distribution and method |
US8135499B2 (en) | 2009-07-07 | 2012-03-13 | International Business Machines Corporation | Load shedding of a selected substation by an electric utility |
CA2708001A1 (en) * | 2009-07-13 | 2011-01-13 | Lineage Power Corporation | System and method for combining the outputs of multiple, disparate types of power sources |
US8095245B1 (en) * | 2009-07-29 | 2012-01-10 | Lockheed Martin Corporation | Thermal energy dispatch system |
EP2467919A4 (en) * | 2009-08-17 | 2017-05-24 | VionX Energy Corporation | Energy storage systems and associated methods |
EP2287991A1 (en) * | 2009-08-19 | 2011-02-23 | ABB Research Ltd. | Optimizing power consumption of data centres |
US20100138063A1 (en) * | 2009-08-28 | 2010-06-03 | General Electric Company | Systems and methods for interfacing renewable power sources to a power grid |
US20100138057A1 (en) * | 2009-08-28 | 2010-06-03 | General Electric Company | Systems and methods for interfacing renewable power sources to a power grid |
DE102009040090A1 (en) * | 2009-09-04 | 2011-03-10 | Voltwerk Electronics Gmbh | Island unit for a power grid with a control unit for controlling an energy flow between the power generation unit, the energy storage unit, the load unit and / or the power grid |
US8698446B2 (en) | 2009-09-08 | 2014-04-15 | The Powerwise Group, Inc. | Method to save energy for devices with rotating or reciprocating masses |
EA021950B1 (en) | 2009-09-08 | 2015-10-30 | Дзе Пауэрвайз Груп, Инк. | Energy saving system and method for devices with rotating or reciprocating masses |
US8527223B2 (en) * | 2009-09-11 | 2013-09-03 | University Of Cincinnati | Methods and systems for energy prognosis |
US8744638B2 (en) * | 2009-09-11 | 2014-06-03 | General Electric Company | Method and system for demand response in a distribution network |
US8869569B2 (en) | 2009-09-15 | 2014-10-28 | General Electric Company | Clothes washer demand response with at least one additional spin cycle |
US8874277B2 (en) * | 2009-09-15 | 2014-10-28 | Denis Kouroussis | Smart-grid adaptive power management method and system with power factor optimization and total harmonic distortion reduction |
US8943857B2 (en) | 2009-09-15 | 2015-02-03 | General Electric Company | Clothes washer demand response by duty cycling the heater and/or the mechanical action |
WO2011032265A1 (en) * | 2009-09-15 | 2011-03-24 | The University Of Western Ontario | Utilization of distributed generator inverters as statcom |
US8522579B2 (en) | 2009-09-15 | 2013-09-03 | General Electric Company | Clothes washer demand response with dual wattage or auxiliary heater |
US8943845B2 (en) | 2009-09-15 | 2015-02-03 | General Electric Company | Window air conditioner demand supply management response |
US20110071952A1 (en) * | 2009-09-18 | 2011-03-24 | Gaffney Michael P | System and method of optimizing resource consumption |
US8781462B2 (en) | 2009-09-28 | 2014-07-15 | Itron, Inc. | Methodology and apparatus for validating network coverage |
JP5405963B2 (en) * | 2009-09-28 | 2014-02-05 | パナソニック株式会社 | Heat pump hot water supply system |
JP5685715B2 (en) * | 2009-09-28 | 2015-03-18 | パナソニックIpマネジメント株式会社 | Grid-connected power supply system |
JP5405964B2 (en) * | 2009-09-28 | 2014-02-05 | パナソニック株式会社 | Heat pump hot water supply system |
US20110077878A1 (en) * | 2009-09-30 | 2011-03-31 | Lathrop Frederick L | Power supply with data communications |
JP5807171B2 (en) * | 2009-09-30 | 2015-11-10 | パナソニックIpマネジメント株式会社 | Energy management system and power supply control device |
JP2011083086A (en) * | 2009-10-05 | 2011-04-21 | Panasonic Electric Works Co Ltd | Electric power distribution system |
US20110082599A1 (en) * | 2009-10-06 | 2011-04-07 | Makarand Shinde | Optimizing Utility Usage by Smart Monitoring |
US20110087522A1 (en) * | 2009-10-08 | 2011-04-14 | International Business Machines Corporation | Method for deploying a probing environment for provisioned services to recommend optimal balance in service level agreement user experience and environmental metrics |
DE102009048784A1 (en) * | 2009-10-08 | 2011-04-14 | Dr. Ing. H.C. F. Porsche Aktiengesellschaft | Method of powering a power consumer |
CA2777154C (en) | 2009-10-09 | 2015-07-21 | Consert Inc. | Apparatus and method for controlling communications to and from utility service points |
TWI407302B (en) * | 2009-10-09 | 2013-09-01 | Smart power management system and the method thereof | |
US20110087384A1 (en) * | 2009-10-09 | 2011-04-14 | Consolidated Edison Company Of New York, Inc. | System and method for conserving electrical capacity |
US9466737B2 (en) | 2009-10-19 | 2016-10-11 | Ampt, Llc | Solar panel string converter topology |
US9367825B2 (en) * | 2009-10-23 | 2016-06-14 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model |
US8457802B1 (en) | 2009-10-23 | 2013-06-04 | Viridity Energy, Inc. | System and method for energy management |
US9159042B2 (en) | 2009-10-23 | 2015-10-13 | Viridity Energy, Inc. | Facilitating revenue generation from data shifting by data centers |
US8892264B2 (en) * | 2009-10-23 | 2014-11-18 | Viridity Energy, Inc. | Methods, apparatus and systems for managing energy assets |
US20130245847A1 (en) * | 2009-10-23 | 2013-09-19 | Alain P. Steven | Facilitating revenue generation from wholesale electricity markets using an enineering-based energy asset model |
US9159108B2 (en) | 2009-10-23 | 2015-10-13 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets |
JP5507959B2 (en) * | 2009-10-26 | 2014-05-28 | パナソニック株式会社 | Power selling system |
US20120215371A1 (en) * | 2009-10-26 | 2012-08-23 | Daegeun Seo | Method of controlling network system |
US8471406B2 (en) * | 2009-11-02 | 2013-06-25 | General Electric Company | Controllable energy utilization system and associated method |
JP5520574B2 (en) * | 2009-11-06 | 2014-06-11 | パナソニック株式会社 | Power interchange system |
JP4845062B2 (en) * | 2009-11-16 | 2011-12-28 | シャープ株式会社 | Power operation system, power operation method, and solar power generation apparatus |
US8648495B2 (en) * | 2009-11-23 | 2014-02-11 | Ses Technologies, Llc | Smart-grid combination power system |
KR101623785B1 (en) * | 2009-11-24 | 2016-05-24 | 엘지전자 주식회사 | A method and an apparatus for managing an energy on smart power supply network |
US9256214B2 (en) * | 2009-11-24 | 2016-02-09 | Lg Electronics Inc. | Network system and method of controlling network system |
JP5645394B2 (en) * | 2009-11-30 | 2014-12-24 | 京セラ株式会社 | Control device, control system, and control method |
US20160370776A1 (en) * | 2009-11-30 | 2016-12-22 | Kyocera Corporation | Energy management apparatus and energy management method for energy management apparatus for keeping power supply-demand balance of power grid |
US8560140B2 (en) * | 2009-12-21 | 2013-10-15 | Bsh Home Appliances Corporation | Home appliance and method for operating a home appliance |
WO2011079235A1 (en) * | 2009-12-22 | 2011-06-30 | Interactive Grid Solutions, Llc | Distributed energy source system |
US8369998B2 (en) * | 2009-12-22 | 2013-02-05 | General Electric Company | Updating demand response settings |
US20110137481A1 (en) * | 2009-12-23 | 2011-06-09 | General Electric Company | System and metehod for providing power grid energy from a battery |
US8738190B2 (en) * | 2010-01-08 | 2014-05-27 | Rockwell Automation Technologies, Inc. | Industrial control energy object |
US9274518B2 (en) | 2010-01-08 | 2016-03-01 | Rockwell Automation Technologies, Inc. | Industrial control energy object |
JP5789792B2 (en) * | 2010-01-12 | 2015-10-07 | パナソニックIpマネジメント株式会社 | Supply and demand control device, supply and demand control method, and supply and demand control system |
RU2510557C1 (en) * | 2010-01-14 | 2014-03-27 | ЭлДжи ЭЛЕКТРОНИКС ИНК. | Auxiliary device for powering home appliances, using intelligent network |
GB2469361B (en) * | 2010-01-28 | 2011-04-13 | Energy2Trade Ltd | Power flow measurement and management |
EP2365416A1 (en) * | 2010-02-02 | 2011-09-14 | Samsung Electronics Co., Ltd. | Method and apparatus for controlling operations of devices based on information about power consumption of the devices |
US8996900B2 (en) * | 2010-02-04 | 2015-03-31 | Cisco Technology, Inc. | System and method for managing power consumption in data propagation environments |
JP5645244B2 (en) * | 2010-02-05 | 2014-12-24 | パナソニックIpマネジメント株式会社 | Energy supply and demand control system |
WO2011100377A1 (en) * | 2010-02-09 | 2011-08-18 | Fleet Energy Company Usa, Llc | Apparatus, system and method for grid storage |
US8457803B2 (en) * | 2010-02-10 | 2013-06-04 | Enernoc, Inc. | Apparatus and method for demand coordination network |
CA2824200C (en) * | 2010-02-11 | 2020-08-18 | Mike Schuler | Method and apparatus for allocating electricity from a distributor |
US9386905B2 (en) * | 2010-02-17 | 2016-07-12 | Lg Electronics Inc. | Network system |
JP5539750B2 (en) * | 2010-02-17 | 2014-07-02 | トヨタホーム株式会社 | Residential power system |
US9043038B2 (en) * | 2010-02-18 | 2015-05-26 | University Of Delaware | Aggregation server for grid-integrated vehicles |
EP2539861A4 (en) | 2010-02-24 | 2013-08-07 | Univ Columbia | Metric monitoring and financial validation system for tracking performance of improvement to an infrastructure |
WO2011105070A1 (en) * | 2010-02-25 | 2011-09-01 | パナソニック株式会社 | Demand and supply control apparatus, demand and supply control method, and program |
US8269374B2 (en) | 2010-03-04 | 2012-09-18 | De Caires Damian | Solar panel power management system and method |
DE102010002914A1 (en) * | 2010-03-16 | 2011-09-22 | Robert Bosch Gmbh | Method and device for electrical consumption and generation detection |
EP2369710A1 (en) * | 2010-03-26 | 2011-09-28 | Alcatel Lucent | A method of estimating an energy demand to be covered by a supplier, corresponding computer program product, and data storage device therefor |
JP5576476B2 (en) * | 2010-03-29 | 2014-08-20 | 株式会社日立製作所 | Energy management system, energy management apparatus and energy management method |
CN105976258B (en) * | 2010-04-08 | 2019-12-10 | 能源管理公司 | Energy saving metering system and method |
US9213325B2 (en) | 2010-04-21 | 2015-12-15 | Institut Polytechnique De Grenoble | System and method for managing services in a living place |
US9310792B2 (en) * | 2010-05-03 | 2016-04-12 | Battelle Memorial Institute | Scheduling and modeling the operation of controllable and non-controllable electronic devices |
ES2777887T3 (en) * | 2010-05-03 | 2020-08-06 | Siemens Gamesa Renewable Energy As | System for exchanging electrical energy between a battery and an electrical network and the respective procedure |
WO2011140553A1 (en) * | 2010-05-07 | 2011-11-10 | Advanced Energy Industries, Inc. | Systems and methods for forecasting solar power |
US20110276194A1 (en) * | 2010-05-10 | 2011-11-10 | Emalfarb Hal A | System and method for energy management |
CN102097803A (en) * | 2010-05-11 | 2011-06-15 | 珠海兴业新能源科技有限公司 | Grading control micro power grid networking method |
TWI401611B (en) * | 2010-05-26 | 2013-07-11 | Univ Yuan Ze | Method for optimizing installation capacity of hybrid energy generation system |
CN102263418B (en) * | 2010-05-27 | 2013-08-07 | 元智大学 | Apparatus capacity allocation method of hybrid energy power generation system |
US8682635B2 (en) | 2010-05-28 | 2014-03-25 | Rockwell Automation Technologies, Inc. | Optimal self-maintained energy management system and use |
US10984345B2 (en) | 2010-06-01 | 2021-04-20 | International Business Machines Corporation | Management of power sources and jobs in an integrated power system |
DE102010022462A1 (en) * | 2010-06-02 | 2011-12-08 | Abb Technology Ag | Method and apparatus for adjusting a production schedule for a production process |
US20110302078A1 (en) | 2010-06-02 | 2011-12-08 | Bryan Marc Failing | Managing an energy transfer between a vehicle and an energy transfer system |
US8346403B2 (en) * | 2010-06-04 | 2013-01-01 | Cooper Technologies Company, Inc. | In-wall occupancy sensor with mode selection features |
US8646936B2 (en) | 2010-06-04 | 2014-02-11 | Cooper Technologies Company | In-wall occupancy sensor with dimmable night light |
DE102010017277A1 (en) | 2010-06-08 | 2011-12-08 | SCHÜCO International KG | Method for controlling a power supply device |
US10205319B2 (en) | 2010-06-11 | 2019-02-12 | Eaton Intelligent Power Limited | Automatic matching of sources to loads |
WO2011162576A2 (en) * | 2010-06-25 | 2011-12-29 | 엘지전자 주식회사 | Network system |
CN103155484A (en) * | 2010-06-26 | 2013-06-12 | Lg电子株式会社 | Component for network system |
EP2587731B1 (en) * | 2010-06-26 | 2016-09-28 | LG Electronics Inc. | Method for controlling component for network system |
US9026812B2 (en) | 2010-06-29 | 2015-05-05 | Cisco Technology, Inc. | System and method for providing intelligent power management in a network environment |
US8676394B2 (en) | 2010-06-30 | 2014-03-18 | Siemens Aktiengesellschaft | Integrated demand response for energy utilization |
US9727828B2 (en) | 2010-07-02 | 2017-08-08 | Alstom Technology Ltd. | Method for evaluating operational and financial performance for dispatchers using after the fact analysis |
US20110071690A1 (en) * | 2010-07-02 | 2011-03-24 | David Sun | Methods that provide dispatchers in power grid control centers with a capability to manage changes |
US8972070B2 (en) * | 2010-07-02 | 2015-03-03 | Alstom Grid Inc. | Multi-interval dispatch system tools for enabling dispatchers in power grid control centers to manage changes |
US9093840B2 (en) * | 2010-07-02 | 2015-07-28 | Alstom Technology Ltd. | System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US9251479B2 (en) * | 2010-07-02 | 2016-02-02 | General Electric Technology Gmbh | Multi-interval dispatch method for enabling dispatchers in power grid control centers to manage changes |
US8538593B2 (en) * | 2010-07-02 | 2013-09-17 | Alstom Grid Inc. | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US9558250B2 (en) * | 2010-07-02 | 2017-01-31 | Alstom Technology Ltd. | System tools for evaluating operational and financial performance from dispatchers using after the fact analysis |
MX2013000577A (en) | 2010-07-16 | 2013-06-05 | Univ Columbia | Machine learning for power grids. |
US9129241B2 (en) * | 2010-07-16 | 2015-09-08 | Lg Electronics Inc. | Component for a network system |
WO2012148597A1 (en) | 2011-04-29 | 2012-11-01 | Electric Transportation Engineering Corporation, D/B/A Ecotality North America | Device to facilitate moving an electrical cable of an electric vehicle charging station and method of providing the same |
WO2012148596A1 (en) | 2011-04-29 | 2012-11-01 | Electric Transportation Engineering Corporation, D/B/A Ecotality North America | System for measuring electricity and method of providing and using the same |
KR101713331B1 (en) * | 2010-07-30 | 2017-03-08 | 삼성전자주식회사 | Method and Apparatus for Controlling Energy Supply |
JP5481305B2 (en) * | 2010-07-30 | 2014-04-23 | 株式会社東芝 | Output distribution controller |
DE102010033756A1 (en) | 2010-08-09 | 2012-02-09 | Siemens Aktiengesellschaft | A method for computer-aided control of the electrical energy consumption of a plurality of energy consumers in an electrical energy network |
DE102010039490A1 (en) | 2010-08-18 | 2012-02-23 | Deckel Maho Pfronten Gmbh | Method and apparatus for generating control data for forming a tooth of a spur gear toothing by milling machining a workpiece on a machine tool |
DE102010039491A1 (en) * | 2010-08-18 | 2012-02-23 | Deckel Maho Pfronten Gmbh | Method and device for generating control data for forming a tooth flank by milling machining of a workpiece on a machine tool |
US9084120B2 (en) | 2010-08-27 | 2015-07-14 | Trilliant Networks Inc. | System and method for interference free operation of co-located transceivers |
US20110125337A1 (en) * | 2010-08-30 | 2011-05-26 | Vyacheslav Zavadsky | Household appliance adapted to work with time of use electricity rates |
GB2483305A (en) * | 2010-09-06 | 2012-03-07 | Sony Corp | Managing consumption of renewable energy |
WO2012037055A1 (en) | 2010-09-13 | 2012-03-22 | Trilliant Networks | Process for detecting energy theft |
US9104211B2 (en) | 2010-11-19 | 2015-08-11 | Google Inc. | Temperature controller with model-based time to target calculation and display |
US9348394B2 (en) | 2010-09-14 | 2016-05-24 | Microsoft Technology Licensing, Llc | Managing computational workloads of computing apparatuses powered by renewable resources |
EP2616892B1 (en) * | 2010-09-17 | 2015-06-17 | LG Electronics Inc. | Network system |
US8801862B2 (en) | 2010-09-27 | 2014-08-12 | General Electric Company | Dishwasher auto hot start and DSM |
WO2012044275A1 (en) | 2010-09-27 | 2012-04-05 | Hewlett-Packard Development Company L.P. | Computer system with power measurement |
JP2012080664A (en) * | 2010-09-30 | 2012-04-19 | Toshiba Corp | User energy management system |
US20120083930A1 (en) | 2010-09-30 | 2012-04-05 | Robert Bosch Gmbh | Adaptive load management: a system for incorporating customer electrical demand information for demand and supply side energy management |
JP5696877B2 (en) | 2010-10-01 | 2015-04-08 | 清水建設株式会社 | Operation management device, operation management method, and operation management program |
US20120083939A1 (en) * | 2010-10-04 | 2012-04-05 | Rognli Roger W | Dynamic control of small-scale electrical loads for matching variations in electric utility supply |
JP5625853B2 (en) * | 2010-12-10 | 2014-11-19 | ソニー株式会社 | Distributed processing system, arithmetic device, arithmetic control device, arithmetic control method, arithmetic task completion probability calculation method, and program |
US8666520B2 (en) | 2010-10-12 | 2014-03-04 | General Electric Company | Methods, systems, and apparatus for shedding loads from an electrical grid |
US8002903B1 (en) | 2010-10-26 | 2011-08-23 | General Electric Company | Dishwasher that uses cold water during peak electricity demand and associated method of control |
WO2012057119A1 (en) * | 2010-10-27 | 2012-05-03 | 三洋電機株式会社 | Electricity supply system |
US8565931B2 (en) | 2010-10-27 | 2013-10-22 | Hewlett-Packard Development Company, L.P. | Managing energy demand in an infrastructure |
US8849469B2 (en) | 2010-10-28 | 2014-09-30 | Microsoft Corporation | Data center system that accommodates episodic computation |
US9160169B2 (en) * | 2010-10-29 | 2015-10-13 | The Boeing Company | Scheduling to maximize utilization preferred power sources (SMUPPS) |
JP5909672B2 (en) * | 2010-11-02 | 2016-04-27 | パナソニックIpマネジメント株式会社 | Control device |
CA2816978C (en) | 2010-11-04 | 2020-07-28 | Digital Lumens Incorporated | Method, apparatus, and system for occupancy sensing |
EP2641137A2 (en) | 2010-11-15 | 2013-09-25 | Trilliant Holdings, Inc. | System and method for securely communicating across multiple networks using a single radio |
US9300141B2 (en) | 2010-11-18 | 2016-03-29 | John J. Marhoefer | Virtual power plant system and method incorporating renewal energy, storage and scalable value-based optimization |
US9448567B2 (en) | 2010-11-19 | 2016-09-20 | Google Inc. | Power management in single circuit HVAC systems and in multiple circuit HVAC systems |
US9092039B2 (en) | 2010-11-19 | 2015-07-28 | Google Inc. | HVAC controller with user-friendly installation features with wire insertion detection |
US9046898B2 (en) | 2011-02-24 | 2015-06-02 | Google Inc. | Power-preserving communications architecture with long-polling persistent cloud channel for wireless network-connected thermostat |
US20120130555A1 (en) * | 2010-11-23 | 2012-05-24 | Howard Jelinek | Hybrid energy cube |
US9118213B2 (en) | 2010-11-24 | 2015-08-25 | Kohler Co. | Portal for harvesting energy from distributed electrical power sources |
IT1402973B1 (en) * | 2010-11-30 | 2013-09-27 | Palladino | METHOD OF OPTIMIZATION OF DOMESTIC LOADS POWERED BY A RENEWABLE ENERGY PLANT, AND ITS OPTIMIZATION SYSTEM. |
US20120136496A1 (en) * | 2010-11-30 | 2012-05-31 | General Electric Company | System and method for estimating demand response in electric power systems |
US8150641B2 (en) * | 2010-12-06 | 2012-04-03 | General Electric Company | System, device, and method for estimating possible power output of wind turbines |
CN103229379B (en) * | 2010-12-07 | 2016-05-04 | 西门子公司 | Control system |
EP2652685A2 (en) | 2010-12-13 | 2013-10-23 | Fraunhofer USA, Inc. | Methods and system for nonintrusive load monitoring |
US8370283B2 (en) * | 2010-12-15 | 2013-02-05 | Scienergy, Inc. | Predicting energy consumption |
US9906029B2 (en) * | 2010-12-16 | 2018-02-27 | Lennox Industries Inc. | Priority-based energy management |
US8548640B2 (en) * | 2010-12-21 | 2013-10-01 | Microsoft Corporation | Home heating server |
DE102010063757A1 (en) * | 2010-12-21 | 2012-06-21 | BSH Bosch und Siemens Hausgeräte GmbH | Method and device for operating a household appliance and household appliance |
TWI423554B (en) | 2010-12-22 | 2014-01-11 | 財團法人工業技術研究院 | Interactive charging management system and method thereof |
JP5807201B2 (en) * | 2010-12-28 | 2015-11-10 | パナソニックIpマネジメント株式会社 | Power control device |
KR101203842B1 (en) * | 2010-12-28 | 2012-11-21 | 엘지전자 주식회사 | Control method of energy management system |
WO2012097204A1 (en) | 2011-01-14 | 2012-07-19 | Trilliant Holdings, Inc. | Process, device and system for volt/var optimization |
DE102011008808A1 (en) * | 2011-01-18 | 2012-07-19 | Liebherr-Hausgeräte Ochsenhausen GmbH | Fridge and / or freezer |
US9218628B2 (en) * | 2011-01-24 | 2015-12-22 | Beet, Llc | Method and system for generating behavior profiles for device members of a network |
EP2479862A1 (en) * | 2011-01-25 | 2012-07-25 | Thomson Licensing | Management of the power supply of a local power transport grid |
US8970394B2 (en) | 2011-01-25 | 2015-03-03 | Trilliant Holdings Inc. | Aggregated real-time power outages/restoration reporting (RTPOR) in a secure mesh network |
US8463449B2 (en) * | 2011-01-28 | 2013-06-11 | Dean Sanders | Systems, apparatus, and methods of a solar energy grid integrated system with energy storage appliance |
JP6081375B2 (en) | 2011-01-31 | 2017-02-15 | ミルバンク マニュファクチャリング カンパニーMilbank Manufacturing Co. | Energy interface system |
KR101817355B1 (en) * | 2011-01-31 | 2018-01-11 | 삼성전자주식회사 | Method and apparatus for controlling electric power of smart appliance |
US20120200156A1 (en) * | 2011-02-08 | 2012-08-09 | Chuck Weller | System for generating electrical power for a port |
EP3429163B1 (en) | 2011-02-10 | 2020-08-19 | Trilliant Holdings, Inc. | Device and method for facilitating secure communications over a cellular network |
US8683479B1 (en) | 2011-02-16 | 2014-03-25 | Hewlett-Packard Development Company, L.P. | Shifting information technology workload demands |
US9324116B2 (en) * | 2011-02-21 | 2016-04-26 | Spirae, Inc. | Energy services interface |
US8938320B2 (en) * | 2011-02-23 | 2015-01-20 | Kabushiki Kaisha Toshiba | Regional energy management system, regional energy integrated management device and regional energy integrated management method used in regional energy management system |
US8944338B2 (en) | 2011-02-24 | 2015-02-03 | Google Inc. | Thermostat with self-configuring connections to facilitate do-it-yourself installation |
DE102011004713B4 (en) * | 2011-02-25 | 2018-10-11 | BSH Hausgeräte GmbH | A method for determining a start time for the start of an operating process of a household appliance |
JP2012186950A (en) * | 2011-03-07 | 2012-09-27 | Denso Corp | Electric power supply system |
WO2012122310A1 (en) | 2011-03-08 | 2012-09-13 | Trilliant Networks, Inc. | System and method for managing load distribution across a power grid |
US9633320B2 (en) * | 2011-03-15 | 2017-04-25 | Kabushiki Kaisha Toshiba | Energy demand prediction apparatus and method |
US8874242B2 (en) | 2011-03-18 | 2014-10-28 | Rockwell Automation Technologies, Inc. | Graphical language for optimization and use |
AU2012230991A1 (en) | 2011-03-21 | 2013-10-10 | Digital Lumens Incorporated | Methods, apparatus and systems for providing occupancy-based variable lighting |
JP5259763B2 (en) * | 2011-03-25 | 2013-08-07 | 株式会社東芝 | Power management apparatus, system and method |
US20120260206A1 (en) * | 2011-04-06 | 2012-10-11 | Cipollo Nicholas J | Method and apparatus for creating and modifying graphical schedules in conjunction with historical data |
EP2695269B2 (en) * | 2011-04-08 | 2017-10-25 | SMA Solar Technology AG | Optimized load management |
WO2012145563A1 (en) * | 2011-04-19 | 2012-10-26 | Viridity Energy, Inc. | Methods, apparatus and systems for managing energy assets |
ITTV20110052A1 (en) * | 2011-04-19 | 2012-10-20 | Bergamin Luca | SINGLE-PHASE AND AUTOMATIC HYBRID SYSTEM WITH DEDICATED EQUIPMENT TO MANAGE ENERGY PRODUCED BY RENEWABLE SOURCES |
WO2012143051A1 (en) * | 2011-04-20 | 2012-10-26 | Telefonaktiebolaget L M Ericsson (Publ) | Method and apparatus in an electricity distribution network |
JP5927576B2 (en) * | 2011-04-21 | 2016-06-01 | パナソニックIpマネジメント株式会社 | Energy management device and energy management system |
CN103547496B (en) | 2011-05-16 | 2017-03-22 | 沃尔沃拉斯特瓦格纳公司 | Energy management method of vehicle and vehicle |
US9287711B2 (en) * | 2011-05-16 | 2016-03-15 | General Electric Company | Reducing demand/response effects implementing volt/VAR control |
US10879727B1 (en) | 2011-05-26 | 2020-12-29 | James Carl Cooper | Power source load control |
WO2012162646A1 (en) * | 2011-05-26 | 2012-11-29 | Ice Energy, Inc. | System and method for improving grid efficiency utilizing statistical distribution control |
US11183843B1 (en) | 2011-05-26 | 2021-11-23 | J. Carl Cooper | Power source load control |
US10840735B1 (en) | 2011-05-26 | 2020-11-17 | J. Carl Cooper | Power source load control |
US11522365B1 (en) | 2011-05-26 | 2022-12-06 | J. Carl Cooper | Inverter power source load dependent frequency control and load shedding |
EP2528179A1 (en) * | 2011-05-27 | 2012-11-28 | ABB Oy | Converter arrangement and method in connection with converter arrangement |
US9525285B2 (en) | 2011-06-13 | 2016-12-20 | Demand Energy Networks, Inc. | Energy systems and energy supply methods |
CA2840199C (en) | 2011-06-23 | 2019-05-14 | Inventus Holdings, Llc | Multiple renewables site electrical generation and reactive power control |
DE102011078045A1 (en) * | 2011-06-24 | 2012-12-27 | Siemens Aktiengesellschaft | Methods and apparatus for allocating energy |
PT2541720T (en) * | 2011-06-29 | 2018-11-20 | Acciona Energia Sa | Procedure for supply control and storage of power provided by a renewable energy generation plant |
US8838285B2 (en) | 2011-07-26 | 2014-09-16 | General Electric Company | Devices and methods for decentralized power factor control |
US8761954B2 (en) | 2011-07-26 | 2014-06-24 | General Electric Company | Devices and methods for decentralized coordinated volt/VAR control |
US9570909B2 (en) | 2011-07-26 | 2017-02-14 | General Electric Company | Devices and methods for decentralized power loss reduction control |
US8838284B2 (en) | 2011-07-26 | 2014-09-16 | General Electric Company | Devices and methods for decentralized Volt/VAR control |
US8965588B2 (en) | 2011-07-26 | 2015-02-24 | General Electric Company | Devices and methods for decentralized voltage control |
FR2978623B1 (en) * | 2011-07-28 | 2015-01-09 | Technicatome | SYSTEM FOR PRODUCING AND DISTRIBUTING ELECTRICAL ENERGY ON AN ELECTRICAL NETWORK AND ASSOCIATED OPTIMIZATION METHOD |
US20130035795A1 (en) * | 2011-08-02 | 2013-02-07 | Clemens Pfeiffer | System And Method For Using Data Centers As Virtual Power Plants |
US10228667B2 (en) | 2011-08-02 | 2019-03-12 | Synaptic Power Inc. | System and a method of controlling a plurality of devices |
US10935948B2 (en) | 2011-08-02 | 2021-03-02 | Synaptic Power Inc. | System and method for managing interactions between a plurality of devices |
ITTO20110762A1 (en) | 2011-08-11 | 2013-02-12 | Sisvel Technology Srl | SYSTEM OF GENERATION AND USE (FOR ACCUMULATION AND DELIVERY) OF ELECTRICITY PRODUCED BY POWER SOURCES OF POWER CURRENT CONTINUES, AND ITS RELATED SYSTEM MANAGEMENT METHOD |
US8849473B2 (en) | 2011-08-17 | 2014-09-30 | Cisco Technology, Inc. | System and method for notifying and for controlling power demand |
US8571955B2 (en) * | 2011-08-18 | 2013-10-29 | Siemens Aktiengesellschaft | Aggregator-based electric microgrid for residential applications incorporating renewable energy sources |
US8855828B2 (en) * | 2011-08-19 | 2014-10-07 | Qualcomm Incorporated | Facilitating distributed power production units in a power group to store power for power conditioning during an anticipated temporary power production disruption |
US9049078B2 (en) | 2011-08-31 | 2015-06-02 | Eneroc, Inc. | NOC-oriented control of a demand coordination network |
US8751054B2 (en) * | 2011-09-02 | 2014-06-10 | Sharp Laboratories Of America, Inc. | Energy prediction system |
US8326467B2 (en) * | 2011-09-06 | 2012-12-04 | General Electric Company | Controller and method of controlling a power system |
US9058167B2 (en) | 2011-09-06 | 2015-06-16 | Cisco Technology, Inc. | Power conservation in a distributed digital video recorder/content delivery network system |
JP5480216B2 (en) * | 2011-09-09 | 2014-04-23 | 株式会社東芝 | Storage battery rental capacity determination device and storage battery rental capacity determination method |
US9811130B2 (en) * | 2011-09-12 | 2017-11-07 | The Boeing Company | Power management control system |
EP2757649B1 (en) * | 2011-09-13 | 2021-07-28 | Toshiba Mitsubishi-Electric Industrial Systems Corporation | Peak cut system |
US20130066482A1 (en) * | 2011-09-13 | 2013-03-14 | Samsung Electronics Co., Ltd. | Apparatus and method for executing energy demand response process in an electrical power network |
US9082294B2 (en) | 2011-09-14 | 2015-07-14 | Enernoc, Inc. | Apparatus and method for receiving and transporting real time energy data |
JP5914891B2 (en) * | 2011-09-15 | 2016-05-11 | パナソニックIpマネジメント株式会社 | Energy saving evaluation device, energy saving evaluation method, server device, program |
DE102011082780A1 (en) * | 2011-09-15 | 2013-03-21 | Siemens Aktiengesellschaft | Local power supply network for e.g. electrical household appliances, has configuration unit for computing combination of power generation units and storage units such that computed combination corresponds to preset optimum decision criteria |
CA2752364A1 (en) * | 2011-09-15 | 2013-03-15 | Zerofootprint Software Inc. | System and method for processing and displaying data relating to consumption data |
US20120095605A1 (en) | 2011-09-17 | 2012-04-19 | Tran Bao Q | Smart building systems and methods |
US9001787B1 (en) | 2011-09-20 | 2015-04-07 | Trilliant Networks Inc. | System and method for implementing handover of a hybrid communications module |
US8862279B2 (en) | 2011-09-28 | 2014-10-14 | Causam Energy, Inc. | Systems and methods for optimizing microgrid power generation and management with predictive modeling |
US9225173B2 (en) | 2011-09-28 | 2015-12-29 | Causam Energy, Inc. | Systems and methods for microgrid power generation and management |
US8751036B2 (en) | 2011-09-28 | 2014-06-10 | Causam Energy, Inc. | Systems and methods for microgrid power generation management with selective disconnect |
US20150318699A2 (en) * | 2011-09-29 | 2015-11-05 | James Frederick Wolter | Power generation system with integrated renewable energy generation, energy storage, and power control |
US8843238B2 (en) | 2011-09-30 | 2014-09-23 | Johnson Controls Technology Company | Systems and methods for controlling energy use in a building management system using energy budgets |
US9488966B2 (en) | 2011-09-30 | 2016-11-08 | Panasonic Intellectual Property Management Co., Ltd. | Control device, integrated circuit, control method, and program for controlling an appliance performing different operations |
KR101901230B1 (en) * | 2011-09-30 | 2018-11-06 | 삼성전자 주식회사 | Management System and Method For Electric Device, Apparatus and Portable Device supporting the same |
US8755943B2 (en) * | 2011-09-30 | 2014-06-17 | Johnson Controls Technology Company | Systems and methods for controlling energy use in a building management system using energy budgets |
US8165721B2 (en) * | 2011-10-02 | 2012-04-24 | John Alexander Petit | Intelliaire climate controller |
US9003216B2 (en) | 2011-10-03 | 2015-04-07 | Microsoft Technology Licensing, Llc | Power regulation of power grid via datacenter |
US8624411B2 (en) | 2011-10-14 | 2014-01-07 | General Electric Company | Power generation system including predictive control apparatus to reduce influences of weather-varying factors |
US8538595B2 (en) * | 2011-10-15 | 2013-09-17 | Philip Scott Lyren | Home appliance that can operate in a time range |
JP2014534405A (en) | 2011-10-21 | 2014-12-18 | ネスト・ラブズ・インコーポレイテッド | User-friendly, networked learning thermostat and related systems and methods |
JP5919531B2 (en) * | 2011-10-24 | 2016-05-18 | パナソニックIpマネジメント株式会社 | Energy management device, energy management system and program |
JP6051509B2 (en) * | 2011-10-31 | 2016-12-27 | ソニー株式会社 | Power generation control system, power generation control program, and electronic device |
CA3045805A1 (en) | 2011-11-03 | 2013-05-10 | Digital Lumens Incorporated | Methods, systems, and apparatus for intelligent lighting |
US9515489B2 (en) * | 2011-11-07 | 2016-12-06 | Global Link Co., Ltd. | Feed system to be used in residence such as multi-unit apartment complex |
US9093863B2 (en) * | 2011-11-07 | 2015-07-28 | Elwha Llc | Smart circuit breaker |
US20130132745A1 (en) | 2011-11-22 | 2013-05-23 | Cisco Technology Inc. | System and method for network enabled wake for networks |
WO2013082698A1 (en) * | 2011-12-05 | 2013-06-13 | Hatch Ltd. | System, method and controller for managing and controlling a micro-grid |
JP5095036B1 (en) * | 2011-12-06 | 2012-12-12 | 中国電力株式会社 | Hydroelectric power generation plan adjustment apparatus, hydroelectric power generation plan adjustment method, and program |
US9192019B2 (en) | 2011-12-07 | 2015-11-17 | Abl Ip Holding Llc | System for and method of commissioning lighting devices |
US9638431B2 (en) | 2011-12-08 | 2017-05-02 | Energyhub, Inc. | Enhanced premises monitoring and/or control |
US20150113875A1 (en) * | 2011-12-13 | 2015-04-30 | Matthew Liotta | Apparatus and Method for Optimizing Delivery of Nutrients in a Hydroponics System |
US20140336837A1 (en) * | 2011-12-14 | 2014-11-13 | Kyocera Corporation | Display terminal, power control system, and display method |
US8417391B1 (en) | 2011-12-15 | 2013-04-09 | Restore Nv | Automated demand response energy management system |
US20130159095A1 (en) * | 2011-12-16 | 2013-06-20 | Telefonaktiebolaget L M Ericsson (Publ.) | Intelligent Automatic Brand Personality Agents In Social Media Services |
CN103620634A (en) * | 2011-12-21 | 2014-03-05 | 松下电器产业株式会社 | Information processing device, method for generating electric power price list, information processing system, and display device |
US9946285B2 (en) | 2011-12-23 | 2018-04-17 | International Business Machines Corporation | Energy allocation system for balancing energy consumption |
US8359750B2 (en) | 2011-12-28 | 2013-01-29 | Tran Bao Q | Smart building systems and methods |
US9136706B2 (en) * | 2011-12-28 | 2015-09-15 | Kabushiki Kaisha Toshiba | Power management system and power management method |
US20120109399A1 (en) * | 2012-01-01 | 2012-05-03 | Bao Tran | Energy resource conservation systems and methods |
US9292013B2 (en) * | 2012-01-12 | 2016-03-22 | Enerallies, Inc. | Energy management computer system |
US8965594B2 (en) | 2012-01-19 | 2015-02-24 | General Compression, Inc. | System and method for conserving energy resources through storage and delivery of renewable energy |
US9141169B2 (en) | 2012-01-20 | 2015-09-22 | Cisco Technology, Inc. | System and method to conserve power in an access network without loss of service quality |
US10069300B2 (en) * | 2012-01-20 | 2018-09-04 | Sunpower Corporation | Methods and apparatus for dispatching electrical energy from distributed energy resources |
US20130190937A1 (en) * | 2012-01-23 | 2013-07-25 | General Electric Company | Systems, Methods, and Apparatus for Monitoring and Alerting Based on Energy Sources and Energy Consumption |
US9026259B2 (en) * | 2012-01-25 | 2015-05-05 | General Electric Company | Power generation optimization in microgrid including renewable power source |
KR20130091844A (en) * | 2012-02-09 | 2013-08-20 | 한국전자통신연구원 | Home energy managemetnt apparatus and method for interworking with renewable energy |
US20120150679A1 (en) * | 2012-02-16 | 2012-06-14 | Lazaris Spyros J | Energy management system for power transmission to an intelligent electricity grid from a multi-resource renewable energy installation |
US8918225B2 (en) * | 2012-02-16 | 2014-12-23 | Spyros J. Lazaris | Renewable energy-based electricity grid infrastructure and method of grid infrastructure automation and operation |
US9188109B2 (en) * | 2012-02-16 | 2015-11-17 | Spyros James Lazaris | Virtualization, optimization and adaptation of dynamic demand response in a renewable energy-based electricity grid infrastructure |
US9459606B2 (en) * | 2012-02-28 | 2016-10-04 | Panasonic Intellectual Property Management Co., Ltd. | Display apparatus for control information, method for displaying control information, and system for displaying control information |
US20130232151A1 (en) * | 2012-03-05 | 2013-09-05 | Green Charge Networks Llc | Aggregation of Load Profiles for Consumption Management Systems |
CA2867898C (en) | 2012-03-19 | 2023-02-14 | Digital Lumens Incorporated | Methods, systems, and apparatus for providing variable illumination |
JP5813544B2 (en) * | 2012-03-22 | 2015-11-17 | 株式会社東芝 | ENERGY MANAGEMENT DEVICE, ITS MANAGEMENT METHOD, AND ENERGY MANAGEMENT PROGRAM |
CN104185935B (en) * | 2012-03-28 | 2017-03-15 | 皇家飞利浦有限公司 | For the method and apparatus for operating lighting mains according to energy requirement and energy supply |
US9509176B2 (en) | 2012-04-04 | 2016-11-29 | Ihi Inc. | Energy storage modeling and control |
US9748771B2 (en) | 2012-04-12 | 2017-08-29 | International Business Machines Corporation | Plug arrangements for alleviating peak loads |
US9455572B2 (en) * | 2012-04-27 | 2016-09-27 | Marvin A Motsenbocker | Voltage prioritization of solar loads |
US8761953B2 (en) | 2012-04-30 | 2014-06-24 | Innovari, Inc. | Grid optimization resource dispatch scheduling |
US9431827B2 (en) | 2012-04-30 | 2016-08-30 | Green Charge Networks Llc | Load isolation consumption management systems and methods |
WO2013166510A1 (en) * | 2012-05-04 | 2013-11-07 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets using an engineering-based energy asset model |
US10169832B2 (en) * | 2013-05-08 | 2019-01-01 | Instant Access Networks, Llc | Method and instrumentation for sustainable energy load flow management system performing as resilient adaptive microgrid system |
US9817376B1 (en) | 2012-05-19 | 2017-11-14 | Growing Energy Labs, Inc. | Adaptive energy storage operating system for multiple economic services |
US20190317463A1 (en) | 2012-05-19 | 2019-10-17 | Growing Energy Labs, Inc. | Adaptive energy storage operating system for multiple economic services |
KR20130133399A (en) * | 2012-05-29 | 2013-12-09 | 에스케이이노베이션 주식회사 | Demand controller, charger, remote charging control system and control method |
US9390388B2 (en) | 2012-05-31 | 2016-07-12 | Johnson Controls Technology Company | Systems and methods for measuring and verifying energy usage in a building |
US8774976B2 (en) | 2012-05-31 | 2014-07-08 | Sharp Laboratories Of America, Inc. | Method and system for reducing peak load charge on utility bill using target peak load and countermeasures |
US8761949B2 (en) | 2012-05-31 | 2014-06-24 | Sharp Laboratories Of America, Inc. | Method and system for mitigating impact of malfunction in actual load determination on peak load management |
AT513342A1 (en) | 2012-06-12 | 2014-03-15 | Fronius Int Gmbh | Method and device for managing energy generated by a power generation unit |
US20130338843A1 (en) * | 2012-06-18 | 2013-12-19 | Reza Iravani | Systems, methods and controllers for control of power distribution devices and systems |
US9461471B2 (en) | 2012-06-20 | 2016-10-04 | Causam Energy, Inc | System and methods for actively managing electric power over an electric power grid and providing revenue grade date usable for settlement |
US9207698B2 (en) | 2012-06-20 | 2015-12-08 | Causam Energy, Inc. | Method and apparatus for actively managing electric power over an electric power grid |
US9465398B2 (en) | 2012-06-20 | 2016-10-11 | Causam Energy, Inc. | System and methods for actively managing electric power over an electric power grid |
US9183163B2 (en) | 2012-06-27 | 2015-11-10 | Ubiquiti Networks, Inc. | Method and apparatus for distributed control of an interfacing-device network |
US20140006235A1 (en) * | 2012-06-28 | 2014-01-02 | International Business Machines Corporation | Method, Apparatus, and Product for distribution-based incentives relating to resource consumption |
US9367108B2 (en) * | 2012-06-28 | 2016-06-14 | Nec Corporation | Reduction of operational cost using energy storage management and demand response |
US20140015323A1 (en) * | 2012-07-10 | 2014-01-16 | Arista Power, Inc. | Power Management System |
WO2014009954A2 (en) | 2012-07-12 | 2014-01-16 | Nova Lumos Ltd. | System and method for on-demand electrical power |
US9985468B2 (en) | 2012-07-12 | 2018-05-29 | Nova Lumos Ltd. | Secured on-demand energy systems |
US9563215B2 (en) | 2012-07-14 | 2017-02-07 | Causam Energy, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US9831677B2 (en) | 2012-07-19 | 2017-11-28 | Solarcity Corporation | Software abstraction layer for energy generation and storage systems |
US8996191B2 (en) * | 2012-07-19 | 2015-03-31 | Solarcity Corporation | Techniques for provisioning energy generation and storage systems |
US10475138B2 (en) | 2015-09-23 | 2019-11-12 | Causam Energy, Inc. | Systems and methods for advanced energy network |
US8849715B2 (en) | 2012-10-24 | 2014-09-30 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US10311416B2 (en) | 2014-10-22 | 2019-06-04 | Causam Energy, Inc. | Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same |
US9513648B2 (en) | 2012-07-31 | 2016-12-06 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US8983669B2 (en) | 2012-07-31 | 2015-03-17 | Causam Energy, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US10861112B2 (en) | 2012-07-31 | 2020-12-08 | Causam Energy, Inc. | Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform |
US10678279B2 (en) | 2012-08-01 | 2020-06-09 | Tendril Oe, Llc | Optimization of energy use through model-based simulations |
US9219294B2 (en) | 2012-08-22 | 2015-12-22 | Eric D. Albsmeier | Power management system that changes the operating conditions of a battery charger |
DE102012107788B4 (en) * | 2012-08-23 | 2015-05-07 | Deutsches Zentrum für Luft- und Raumfahrt e.V. | Energy management of a system according to an economic market model approach |
US9569804B2 (en) * | 2012-08-27 | 2017-02-14 | Gridium, Inc. | Systems and methods for energy consumption and energy demand management |
US10140670B2 (en) | 2012-08-31 | 2018-11-27 | Engie Storage Services Na Llc | Energy management methods and systems based on financial impact |
CN103679306A (en) * | 2012-08-31 | 2014-03-26 | 国际商业机器公司 | Method and system for saving building energy consumption |
JP5978865B2 (en) * | 2012-09-05 | 2016-08-24 | 沖電気工業株式会社 | Power supply / demand control device, power supply / demand system, power supply / demand control method, and program |
US9547316B2 (en) * | 2012-09-07 | 2017-01-17 | Opower, Inc. | Thermostat classification method and system |
US9331498B2 (en) | 2012-09-07 | 2016-05-03 | Kohler Co. | Power generation system that provides efficient battery charger selection |
DE102012017803A1 (en) * | 2012-09-10 | 2014-03-13 | Rwe Effizienz Gmbh | Emergency power supply |
US9093582B2 (en) | 2012-09-19 | 2015-07-28 | Opterra Energy Services, Inc. | Solar canopy assembly |
US9093583B2 (en) | 2012-09-19 | 2015-07-28 | Opterra Energy Services, Inc. | Folding solar canopy assembly |
US20140077055A1 (en) | 2012-09-19 | 2014-03-20 | Chevron U.S.A Inc.. | Bracing assembly |
US8829855B2 (en) * | 2012-09-26 | 2014-09-09 | Kohler Co. | Power generation system that optimizes the power provided to start a generator |
US20160241036A1 (en) * | 2012-09-27 | 2016-08-18 | James F. Wolter | Energy apparatuses, energy systems, and energy management methods including energy storage |
US9002531B2 (en) * | 2012-09-28 | 2015-04-07 | Sharp Laboratories Of America, Inc. | System and method for predictive peak load management via integrated load management |
GB2506401A (en) | 2012-09-28 | 2014-04-02 | Ibm | Method for allocating electrical energy in a smart grid |
TWM449396U (en) * | 2012-10-03 | 2013-03-21 | Changs Ascending Entpr Co Ltd | Smart energy-storage system |
US10284003B2 (en) * | 2012-10-09 | 2019-05-07 | General Electric Company | End-user based backup management |
US9136707B2 (en) * | 2012-10-09 | 2015-09-15 | Yahoo! Inc. | Multimode distribution systems and methods for providing power from power sources to power consuming devices |
US20140100672A1 (en) * | 2012-10-09 | 2014-04-10 | General Electric Company | Utility Based Backup Management |
US8897632B2 (en) | 2012-10-17 | 2014-11-25 | Daniel P. Flohr | Methods of remotely managing water heating units in a water heater and related water heaters |
US20140129042A1 (en) * | 2012-11-07 | 2014-05-08 | Dorazio Enterprises, Inc. | Community Based Energy Management System |
US20140136004A1 (en) * | 2012-11-12 | 2014-05-15 | Kevin J. Williams | Personal Power Preserver |
US9348384B2 (en) | 2012-11-12 | 2016-05-24 | Kevin J. Williams | Distributed energy source system |
US10381691B1 (en) * | 2012-11-15 | 2019-08-13 | Nova Greentech, Inc. | Modular battery network systems and methods for managing modular battery network systems |
DE102013221750A1 (en) * | 2012-11-15 | 2014-05-15 | Siemens Aktiengesellschaft | Method for computer-aided control of power in an electric power grid |
CN103853106B (en) * | 2012-11-28 | 2016-08-24 | 同济大学 | A kind of energy consumption Prediction Parameters optimization method of building energy supplied equipment |
US9639904B2 (en) * | 2012-12-11 | 2017-05-02 | Opterra Energy Services, Inc. | Systems and methods for minimizing energy costs for a power consumption system that has access to off-grid resources |
US9568900B2 (en) | 2012-12-11 | 2017-02-14 | Opterra Energy Services, Inc. | Systems and methods for regulating an alternative energy source that is decoupled from a power grid |
DE102012113051A1 (en) | 2012-12-21 | 2014-06-26 | Evonik Industries Ag | A method for providing control power for stabilizing an AC power network, comprising an energy storage |
DE102012113050A1 (en) * | 2012-12-21 | 2014-06-26 | Evonik Industries Ag | Method of providing control power to stabilize an AC grid |
US9575480B1 (en) * | 2012-12-21 | 2017-02-21 | Esolar Inc. | Solution stabilization for linear program-based control systems |
DE102012113049A1 (en) * | 2012-12-21 | 2014-06-26 | Evonik Industries Ag | Method for operating energy storage |
US9488968B2 (en) | 2013-01-15 | 2016-11-08 | Wovn, Inc. | Energy distribution system and related methods, devices, and systems |
US20150355245A1 (en) * | 2013-01-25 | 2015-12-10 | Circuitmeter Inc. | System and method for monitoring an electrical network |
US9543635B2 (en) | 2013-02-04 | 2017-01-10 | Ubiquiti Networks, Inc. | Operation of radio devices for long-range high-speed wireless communication |
US9397820B2 (en) | 2013-02-04 | 2016-07-19 | Ubiquiti Networks, Inc. | Agile duplexing wireless radio devices |
US9423779B2 (en) | 2013-02-06 | 2016-08-23 | Tendril Networks, Inc. | Dynamically adaptive personalized smart energy profiles |
US9373885B2 (en) | 2013-02-08 | 2016-06-21 | Ubiquiti Networks, Inc. | Radio system for high-speed wireless communication |
US9310815B2 (en) | 2013-02-12 | 2016-04-12 | Tendril Networks, Inc. | Setpoint adjustment-based duty cycling |
US9063551B2 (en) * | 2013-02-14 | 2015-06-23 | Intellihot Green Technologies, Inc. | Adaptive heating control system for a water heater |
WO2014164220A1 (en) | 2013-03-13 | 2014-10-09 | Abb Technology Ag | Method and apparatus for managing demand response resources in a power distribution network |
US9235657B1 (en) | 2013-03-13 | 2016-01-12 | Johnson Controls Technology Company | System identification and model development |
US9436179B1 (en) * | 2013-03-13 | 2016-09-06 | Johnson Controls Technology Company | Systems and methods for energy cost optimization in a building system |
US9852481B1 (en) * | 2013-03-13 | 2017-12-26 | Johnson Controls Technology Company | Systems and methods for cascaded model predictive control |
US9501804B2 (en) | 2013-03-15 | 2016-11-22 | Rockwell Automation Technologies, Inc. | Multi-core processor for performing energy-related operations in an industrial automation system using energy information determined with an organizational model of the industrial automation system |
US9842372B2 (en) * | 2013-03-15 | 2017-12-12 | Rockwell Automation Technologies, Inc. | Systems and methods for controlling assets using energy information determined with an organizational model of an industrial automation system |
US9728964B2 (en) * | 2013-03-15 | 2017-08-08 | Vivint, Inc. | Power production monitoring or control |
US9423848B2 (en) | 2013-03-15 | 2016-08-23 | Rockwell Automation Technologies, Inc. | Extensible energy management architecture |
US9397497B2 (en) | 2013-03-15 | 2016-07-19 | Ampt, Llc | High efficiency interleaved solar power supply system |
US9911163B2 (en) | 2013-03-15 | 2018-03-06 | Rockwell Automation Technologies, Inc. | Systems and methods for determining energy information using an organizational model of an industrial automation system |
CN103151798B (en) * | 2013-03-27 | 2015-02-04 | 浙江省电力公司电力科学研究院 | Optimizing method of independent microgrid system |
CZ304509B6 (en) * | 2013-04-25 | 2014-06-04 | Unites Systems A.S. | System for managing electric power produced by photovoltaic cells |
EP2992395B1 (en) | 2013-04-30 | 2018-03-07 | Digital Lumens Incorporated | Operating light emitting diodes at low temperature |
US9171276B2 (en) * | 2013-05-06 | 2015-10-27 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets using an engineering-based model |
US9098876B2 (en) * | 2013-05-06 | 2015-08-04 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model |
US9506962B2 (en) | 2013-05-08 | 2016-11-29 | Litecontrol Corporation | Resource control system with local reallocation |
US9691112B2 (en) * | 2013-05-31 | 2017-06-27 | International Business Machines Corporation | Grid-friendly data center |
DE102013226885A1 (en) * | 2013-06-03 | 2014-12-04 | Kyoshin Electric Co., Ltd | I-U characteristic measuring method and I-U characteristic measuring device for solar cells as well as program for I-U characteristic measuring device |
US20140361624A1 (en) * | 2013-06-10 | 2014-12-11 | Active Power, Inc. | Apparatus and methods for control of load power quality in uninterruptible power systems |
CA2855181A1 (en) * | 2013-06-25 | 2014-12-25 | Mcogen, Inc. | Power generation system and method |
TWI479442B (en) * | 2013-06-26 | 2015-04-01 | China Steel Corp | Central air conditioning user usage estimation method |
FR3008207B1 (en) * | 2013-07-04 | 2016-12-02 | M Et R Energies | UNIT AND METHOD FOR ENERGY REGULATION OF A SYSTEM FOR PRODUCTION AND ELECTRIC CONSUMPTION |
ITTO20130566A1 (en) * | 2013-07-05 | 2013-10-04 | Zilio En S R L | MONITORING SYSTEM FOR DOMESTIC AND INDUSTRIAL CONSUMPTION. |
US9118153B2 (en) * | 2013-07-15 | 2015-08-25 | Sap Se | Renewable energy forecasting socket |
US9760957B2 (en) * | 2013-07-17 | 2017-09-12 | Carnegie Mellon University | Distributed methods and software for balancing supply and demand in an electric power network |
US20150066228A1 (en) | 2013-07-26 | 2015-03-05 | Peaknrg | Building Management and Appliance Control System |
US10253993B2 (en) | 2013-08-19 | 2019-04-09 | Mcogen, Inc. | Temperature modulated desiccant evaporative cooler and indirect and direct evaporative air conditioning systems, methods, and apparatus |
US9958924B2 (en) | 2013-08-28 | 2018-05-01 | Cisco Technology, Inc. | Configuration of energy savings |
US9686093B2 (en) * | 2013-09-10 | 2017-06-20 | Whirlpool Corporation | Method for determining an optimal schedule of an appliance |
US9511675B2 (en) | 2013-09-13 | 2016-12-06 | Nissan North America, Inc. | Methods of decreasing peak energy consumption |
EP2852023B1 (en) * | 2013-09-18 | 2016-11-02 | Alcatel Lucent | Methods of controlling or at least partly controlling energy consumption and energy provision in different hierachical levels of a power grid |
US9722426B2 (en) | 2013-09-26 | 2017-08-01 | Wellhead Electric Company, Inc. | Hybrid energy system and method |
ES2973287T3 (en) | 2013-09-26 | 2024-06-19 | Wellhead Power Solutions Llc | Hybrid energy system and method |
JP6160957B2 (en) * | 2013-09-30 | 2017-07-12 | パナソニックIpマネジメント株式会社 | Power management apparatus, power management method, and program |
CA2926260C (en) | 2013-10-10 | 2023-01-24 | Digital Lumens Incorporated | Methods, systems, and apparatus for intelligent lighting |
ES2767051T3 (en) | 2013-10-11 | 2020-06-16 | Ubiquiti Inc | Wireless Radio System Optimization Through Persistent Spectrum Analysis |
WO2015061360A1 (en) * | 2013-10-21 | 2015-04-30 | Stc. Unm | Systems and methods for distributing power using photovoltaic resources and a shifting battery system |
US9846886B2 (en) * | 2013-11-07 | 2017-12-19 | Palo Alto Research Center Incorporated | Strategic modeling for economic optimization of grid-tied energy assets |
IN2013CH05460A (en) * | 2013-11-27 | 2015-05-29 | Schneider Electric Ind Sas | |
CN104699015A (en) * | 2013-12-06 | 2015-06-10 | 珠海格力电器股份有限公司 | Air conditioner monitoring system based on distributed power generation and air conditioner system applying same |
DE102014001856A1 (en) * | 2013-12-16 | 2015-06-18 | Liebherr-Hausgeräte Ochsenhausen GmbH | Fridge and / or freezer |
FR3016248B1 (en) * | 2014-01-08 | 2017-12-15 | Caluga | IMPROVED SYSTEM FOR MANAGING A PUBLIC ELECTRICITY NETWORK BY PACKING DOMESTIC PRODUCTION AND STORAGE MEANS |
US9429925B2 (en) * | 2014-01-15 | 2016-08-30 | Haier Us Appliance Solutions, Inc. | Method for operating an appliance and a refrigerator appliance |
TWI559648B (en) | 2014-01-21 | 2016-11-21 | 台達電子工業股份有限公司 | Charging apparatus with dynamical charging power and method of operating the same |
US10796254B2 (en) * | 2014-02-18 | 2020-10-06 | Siemens Industry, Inc. | Systems, methods and apparatus for integrated optimal outage coordination in energy delivery systems |
PL3114884T3 (en) | 2014-03-07 | 2020-05-18 | Ubiquiti Inc. | Cloud device identification and authentication |
US20150256355A1 (en) | 2014-03-07 | 2015-09-10 | Robert J. Pera | Wall-mounted interactive sensing and audio-visual node devices for networked living and work spaces |
WO2015139061A1 (en) * | 2014-03-14 | 2015-09-17 | Power Analytics Corporation | Ramp rate control system and methods using energy storage devices |
EP3120642B1 (en) | 2014-03-17 | 2023-06-07 | Ubiquiti Inc. | Array antennas having a plurality of directional beams |
US9509159B2 (en) | 2014-03-20 | 2016-11-29 | Nissan North America, Inc. | Systems and methods for decreasing peak energy consumption of a power consumer using vehicle battery capacity |
US20150277410A1 (en) * | 2014-03-25 | 2015-10-01 | Arizona Board Of Regents On Behalf Of Arizona State University | Power delivery system management |
WO2015153717A1 (en) | 2014-04-01 | 2015-10-08 | Ubiquiti Networks, Inc. | Antenna assembly |
EP3127053A1 (en) * | 2014-04-03 | 2017-02-08 | Siemens Aktiengesellschaft | Determination of energy distribution plans for an energy installation assemblage |
KR20150123540A (en) * | 2014-04-25 | 2015-11-04 | 삼성전자주식회사 | A method and an apparatus operating of a smart system for optimization of power consumption |
US10048670B2 (en) * | 2014-05-08 | 2018-08-14 | Beet, Llc | Automation operating and management system |
CN103944492A (en) * | 2014-05-08 | 2014-07-23 | 阳光电源股份有限公司 | Inverter and photovoltaic power generation system |
US10066604B2 (en) * | 2014-05-13 | 2018-09-04 | General Electric Company | Method and system for hybrid wind power generation |
US9503623B2 (en) | 2014-06-03 | 2016-11-22 | Applied Minds, Llc | Color night vision cameras, systems, and methods thereof |
WO2015187970A2 (en) | 2014-06-06 | 2015-12-10 | Innovari, Inc. | Real time capacity monitoring for measurement and verification of demand side management |
US11181564B2 (en) | 2014-06-29 | 2021-11-23 | International Business Machines Corporation | Distributed control of electric power grids |
US20150378381A1 (en) * | 2014-06-30 | 2015-12-31 | Qualcomm Incorporated | Systems and methods for energy cost optimization |
US10078315B2 (en) * | 2014-07-11 | 2018-09-18 | Nec Corporation | Collaborative balancing of renewable energy overproduction with electricity-heat coupling and electric and thermal storage for prosumer communities |
US20160011617A1 (en) * | 2014-07-11 | 2016-01-14 | Microsoft Technology Licensing, Llc | Power management of server installations |
US9933804B2 (en) | 2014-07-11 | 2018-04-03 | Microsoft Technology Licensing, Llc | Server installation as a grid condition sensor |
US9035479B1 (en) * | 2014-07-11 | 2015-05-19 | Wind Stream Properties, Llc | Turbine controller for optimizing economic present value of the turbine |
US10234835B2 (en) | 2014-07-11 | 2019-03-19 | Microsoft Technology Licensing, Llc | Management of computing devices using modulated electricity |
KR102072421B1 (en) * | 2014-07-30 | 2020-02-03 | 삼성전자 주식회사 | Method and Apparatus for management according to device power information and utility data |
US10693295B2 (en) * | 2014-07-31 | 2020-06-23 | Alternate Power Source, Inc. | Residential electric load shifting energy storage system |
WO2016017025A1 (en) * | 2014-08-01 | 2016-02-04 | 三菱電機株式会社 | Management server, energy management system, management method, and program |
JP6542357B2 (en) | 2014-08-19 | 2019-07-10 | オリガミ エナジー リミテッド | Power distribution control system |
US10041476B2 (en) | 2014-09-02 | 2018-08-07 | Siemens Industry, Inc. | Systems, methods and apparatus for improved energy management systems with security-oriented probabilistic wind power generation dispatch |
US9985437B2 (en) * | 2014-09-26 | 2018-05-29 | Enrichment Technology Company Ltd., Zweigniederlassung Deutschland | Combined electrical power plant |
JP5958921B2 (en) | 2014-10-10 | 2016-08-02 | パナソニックIpマネジメント株式会社 | Energy planning system |
US10116560B2 (en) | 2014-10-20 | 2018-10-30 | Causam Energy, Inc. | Systems, methods, and apparatus for communicating messages of distributed private networks over multiple public communication networks |
SG10201406883UA (en) * | 2014-10-23 | 2016-05-30 | Sun Electric Pte Ltd | "Power Grid System And Method Of Consolidating Power Injection And Consumption In A Power Grid System" |
CN104376379B (en) * | 2014-11-17 | 2018-03-23 | 南方电网科学研究院有限责任公司 | Optimization method of retailer electricity purchasing and selling strategy considering bilateral transaction |
CN104392394B (en) * | 2014-11-20 | 2017-05-31 | 四川大学 | A kind of detection method of micro-capacitance sensor energy storage nargin |
US9785126B2 (en) | 2014-11-25 | 2017-10-10 | Rockwell Automation Technologies, Inc. | Inferred energy usage and multiple levels of energy usage |
US9798343B2 (en) | 2014-11-25 | 2017-10-24 | Rockwell Automation Technologies, Inc. | Quantifying operating strategy energy usage |
US9798306B2 (en) | 2014-11-25 | 2017-10-24 | Rockwell Automation Technologies, Inc. | Energy usage auto-baseline for diagnostics and prognostics |
US10769734B2 (en) | 2015-01-13 | 2020-09-08 | Causam Energy, Inc. | Systems and methods for advanced energy settlements, network-based messaging, and software applications for electric power grids, microgrids, grid elements, and/or electric power networks |
US9794522B2 (en) | 2015-02-06 | 2017-10-17 | Google Inc. | Systems, methods, and devices for managing coexistence of multiple transceiver devices by optimizing component layout |
GB201503332D0 (en) * | 2015-02-27 | 2015-04-15 | Bransfield Garth Simon And Sales Michael J And Azuri Technologies Ltd And Preston Nigel And Barclay | Solar home system |
WO2016139781A1 (en) * | 2015-03-04 | 2016-09-09 | 日本電気株式会社 | Power generation control device, power generation device, control device, control system, control method, and recording medium |
US9669720B2 (en) | 2015-03-27 | 2017-06-06 | Nissan North America, Inc. | Managing the exchange of electrical power with rechargeable vehicle batteries in V2X systems |
WO2016158028A1 (en) * | 2015-03-30 | 2016-10-06 | オムロン株式会社 | Management device, management system, control method for management device, and control program |
US9904269B2 (en) | 2015-03-31 | 2018-02-27 | Enernoc, Inc. | Apparatus and method for demand coordination network control |
US9987934B2 (en) | 2015-04-07 | 2018-06-05 | Mi-Jack Products, Inc. | Electric power system for one or more electric cranes |
US10574057B2 (en) * | 2015-05-19 | 2020-02-25 | The Regents Of The University Of California | Battery control methods and circuits, and energy storage to grid connection systems |
JP2018524550A (en) * | 2015-05-29 | 2018-08-30 | パーフェクトリー グリーン コーポレーションPerfectly Green Corporation | System, method, and computer program product for energy distribution |
CH711204A1 (en) | 2015-06-05 | 2016-12-15 | Bkw Energie Ag | Method for controlling a local power user. |
US9543998B2 (en) | 2015-06-14 | 2017-01-10 | Google Inc. | Systems, methods, and devices for managing coexistence of multiple transceiver devices using bypass circuitry |
US20180142925A1 (en) * | 2015-06-16 | 2018-05-24 | De Luca Oven Technologies, Llc | A high-wattage power appliance system |
DE102015110029A1 (en) * | 2015-06-23 | 2016-12-29 | Sma Solar Technology Ag | METHOD FOR CONTROLLING A CONSUMER |
JP6864679B2 (en) * | 2015-07-03 | 2021-04-28 | ユニバーシティ オブ サウス アフリカ | Electronic controller for home energy control based on timing and tariff data |
US10147984B2 (en) | 2015-07-31 | 2018-12-04 | SynCells, Inc. | Portable and modular energy storage for multiple applications |
EP3329456A4 (en) * | 2015-07-31 | 2019-01-16 | Commonwealth Edison Company | Methods and systems for determining economic viability of a microgrid |
WO2017038719A1 (en) * | 2015-08-28 | 2017-03-09 | 京セラ株式会社 | Communication device, management server, and communication method |
US20180212551A1 (en) * | 2015-09-10 | 2018-07-26 | Diversified Solar Systems, Llc | Mobile solar collector and electricity production system |
DE102015219201A1 (en) * | 2015-10-05 | 2017-04-06 | Bayerische Motoren Werke Aktiengesellschaft | Determination of an operating strategy for a local store |
DE102015219202A1 (en) * | 2015-10-05 | 2017-04-06 | Bayerische Motoren Werke Aktiengesellschaft | Optimization of charging / discharging plans for electric vehicles |
EP3157121A1 (en) * | 2015-10-14 | 2017-04-19 | Advanced Digital Broadcast S.A. | System and method for managing electric power consumption |
JP6427090B2 (en) * | 2015-12-07 | 2018-11-21 | 株式会社日立製作所 | Power generation amount prediction device, power generation amount prediction method, system stabilization device, and system stabilization method |
US9559521B1 (en) | 2015-12-09 | 2017-01-31 | King Electric Vehicles Inc. | Renewable energy system with integrated home power |
FR3045900B1 (en) * | 2015-12-21 | 2018-11-16 | Electricite De France | SYSTEM AND METHOD FOR CONTROLLING AN ENERGY STORAGE DEVICE |
US11214157B2 (en) * | 2015-12-30 | 2022-01-04 | Proterra Inc. | Electric vehicle charging to reduce utility cost |
CN105676657A (en) * | 2015-12-31 | 2016-06-15 | 天津大学 | Intelligent household electrical appliance electrical load group control method |
US10348092B1 (en) | 2016-01-19 | 2019-07-09 | Noel Diaz | Electrical power distribution control device |
EP3408542A4 (en) | 2016-01-27 | 2019-08-28 | South East Water Corporation | Methods and systems for controlling supply of power generated by a weather dependent power generator |
US10148092B2 (en) * | 2016-01-27 | 2018-12-04 | Alliance For Sustainable Energy, Llc | Real time voltage regulation through gather and broadcast techniques |
US11143163B2 (en) | 2016-03-08 | 2021-10-12 | Semtive Inc. | Vertical axis wind turbine |
CN105811402B (en) * | 2016-03-22 | 2018-03-06 | 广西电网有限责任公司电力科学研究院 | A kind of Electric Load Prediction System and its Forecasting Methodology |
US10824119B2 (en) | 2016-03-29 | 2020-11-03 | International Business Machines Corporation | Intelligent energy switch |
US10395196B2 (en) * | 2016-04-01 | 2019-08-27 | Enel X North America, Inc. | Two-stage control systems and methods for economical optimization of an electrical system |
WO2017173406A1 (en) | 2016-04-01 | 2017-10-05 | Tendril Networks, Inc. | Orchestrated energy |
US10985610B2 (en) | 2016-04-01 | 2021-04-20 | Enel X North America, Inc. | High speed control systems and methods for economical optimization of an electrical system |
US9929665B2 (en) * | 2016-04-20 | 2018-03-27 | International Business Machines Corporation | Remotely controllable modular power control device for power generation |
US10235516B2 (en) | 2016-05-10 | 2019-03-19 | Cisco Technology, Inc. | Method for authenticating a networked endpoint using a physical (power) challenge |
US10613213B2 (en) | 2016-05-13 | 2020-04-07 | Google Llc | Systems, methods, and devices for utilizing radar with smart devices |
US10687184B2 (en) | 2016-05-13 | 2020-06-16 | Google Llc | Systems, methods, and devices for utilizing radar-based touch interfaces |
US11334834B2 (en) * | 2016-05-23 | 2022-05-17 | General Electric Company | System and method for controlling power production from a wind farm |
US10615604B2 (en) | 2016-05-28 | 2020-04-07 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for distributed energy resources |
US10148120B2 (en) | 2016-07-28 | 2018-12-04 | International Business Machines Corporation | Optimal distributed energy resource management system |
WO2018026964A1 (en) * | 2016-08-03 | 2018-02-08 | Zeco Systems Inc. | Distributed resource electrical demand forecasting system and method |
EP3497768B8 (en) | 2016-08-08 | 2023-12-06 | Orison Inc. | Plug and play with smart energy storage units |
US20190181680A1 (en) * | 2016-08-09 | 2019-06-13 | Yanmar Co., Ltd. | Control device optimizing evaluation of energy management in in-plant energy network |
US10452032B1 (en) | 2016-09-08 | 2019-10-22 | PXiSE Energy Solutions, LLC | Optimizing power contribution of distributed energy resources for real time power demand scheduling |
US20180090989A1 (en) * | 2016-09-28 | 2018-03-29 | Albert Subbloie | Multi Sensor Pack and Control of Energy Consumption Devices |
CN106650995A (en) * | 2016-10-13 | 2017-05-10 | 中国能源建设集团广东省电力设计研究院有限公司 | Energy planning and strategy support system under energy conservation and emission reduction goals |
US11693376B1 (en) | 2016-11-15 | 2023-07-04 | Homer Alan Mantooth | Smart green power node |
US10516269B2 (en) | 2016-11-16 | 2019-12-24 | Alliance For Sustainable Energy, Llc | Real time feedback-based optimization of distributed energy resources |
TWI613350B (en) * | 2016-11-25 | 2018-02-01 | Building roof temperature regulation structure | |
EP3343717A1 (en) * | 2016-12-27 | 2018-07-04 | Vito NV | Hierarchical implicit controller for shielded system in a grid |
US20180197252A1 (en) * | 2017-01-12 | 2018-07-12 | Damian Antone Bollermann | Methods And Systems For A Renewable Electricity System |
WO2018139602A1 (en) * | 2017-01-27 | 2018-08-02 | 京セラ株式会社 | Power control method, power management server, control device, and power control system |
US10566881B2 (en) | 2017-01-27 | 2020-02-18 | Franklin Electric Co., Inc. | Motor drive system including removable bypass circuit and/or cooling features |
EP3580719A4 (en) | 2017-02-13 | 2020-09-16 | Griddy Holdings LLC | Methods and systems for an automated utility marketplace platform |
US10599175B1 (en) | 2017-02-28 | 2020-03-24 | PXiSE Energy Solutions, LLC | Time synchronized frequency and voltage regulation of electric power balancing areas |
US20180287380A1 (en) * | 2017-03-29 | 2018-10-04 | Hong Fu Jin Precision Industry (Shenzhen) Co., Ltd. | External and redundant power device and power system |
US10706375B2 (en) | 2017-03-29 | 2020-07-07 | Johnson Controls Technology Company | Central plant with asset allocator |
WO2018187593A1 (en) * | 2017-04-07 | 2018-10-11 | Nexant, Inc. | Systems and methods for optimally delivering electrical energy in a network |
US11875371B1 (en) | 2017-04-24 | 2024-01-16 | Skyline Products, Inc. | Price optimization system |
US11675322B2 (en) | 2017-04-25 | 2023-06-13 | Johnson Controls Technology Company | Predictive building control system with discomfort threshold adjustment |
US11371739B2 (en) | 2017-04-25 | 2022-06-28 | Johnson Controls Technology Company | Predictive building control system with neural network based comfort prediction |
CN110753886B (en) | 2017-04-25 | 2023-05-05 | 江森自控科技公司 | Predictive building control system with neural network-based constraint generation |
CA3028006C (en) * | 2017-05-15 | 2021-05-18 | Dynapower Company Llc | Energy storage system for photovoltaic energy and method of storing photovoltaic energy |
US10999652B2 (en) | 2017-05-24 | 2021-05-04 | Engie Storage Services Na Llc | Energy-based curtailment systems and methods |
CN110915091A (en) | 2017-06-07 | 2020-03-24 | 开利公司 | Transport refrigeration unit architecture and control for smart grid optimization and integration |
US11271769B2 (en) | 2019-11-14 | 2022-03-08 | Johnson Controls Tyco IP Holdings LLP | Central plant control system with asset allocation override |
US11271766B2 (en) | 2017-06-13 | 2022-03-08 | SynCells, Inc. | Energy virtualization layer with a universal smart gateway |
US11394573B2 (en) | 2017-06-13 | 2022-07-19 | SynCells, Inc. | Energy virtualization layer with a universal smart gateway |
US10203738B2 (en) * | 2017-06-13 | 2019-02-12 | SynCells, Inc. | Energy virtualization layer for commercial and residential installations |
US11125461B2 (en) | 2017-06-13 | 2021-09-21 | Gerard O'Hora | Smart vent system with local and central control |
US10389134B2 (en) | 2017-06-21 | 2019-08-20 | Katerra, Inc. | Electrical power distribution system and method |
US10658841B2 (en) | 2017-07-14 | 2020-05-19 | Engie Storage Services Na Llc | Clustered power generator architecture |
US10916968B2 (en) | 2017-08-17 | 2021-02-09 | Budderfly, Inc. | Third party energy management |
US10998727B2 (en) * | 2017-08-31 | 2021-05-04 | Energy Internet Corporation, Inc. | Power management across point of source to point of load |
CA3047155C (en) * | 2017-09-11 | 2023-08-01 | Drone Energy Ip Holdings, Llc | Energy offloading system |
US10931108B2 (en) | 2017-09-19 | 2021-02-23 | International Business Machines Corporation | Scheduling the activities of daily living (ADLs) with minimum power usage cost on smart grid network |
US10850713B2 (en) | 2017-10-20 | 2020-12-01 | SynCells, Inc. | Robotics for rotating energy cells in vehicles |
EP3480754B1 (en) * | 2017-11-07 | 2021-09-08 | KONE Corporation | Managing power demand of a plurality of passenger transport installations |
US20190146425A1 (en) * | 2017-11-15 | 2019-05-16 | Electronics And Telecommunications Research Institute | Method and apparatus for controlling demand management based on energy source selection by real-time price information |
US10734811B2 (en) | 2017-11-27 | 2020-08-04 | Ihi Inc. | System and method for optimal control of energy storage system |
US10990072B2 (en) | 2017-11-28 | 2021-04-27 | PXiSE Energy Solutions, LLC | Maintaining power grid stability using predicted data |
US20190171265A1 (en) * | 2017-12-05 | 2019-06-06 | Hewlett Packard Enterprise Development Lp | Power input module |
CN108181947A (en) * | 2018-01-04 | 2018-06-19 | 国网江苏省电力有限公司电力科学研究院 | A kind of user side load responding method based on the regulation and control of load cluster temperature |
CA3030490A1 (en) * | 2018-01-22 | 2019-07-22 | Pason Power Inc. | Intelligent energy management system for distributed energy resources and energy storage systems using machine learning |
DE102018202755A1 (en) * | 2018-02-23 | 2019-08-29 | Bayerische Motoren Werke Aktiengesellschaft | Method and control device for adapting an electric power supply to an electrical power requirement in an electrical network |
US10559960B2 (en) * | 2018-03-05 | 2020-02-11 | Greensmith Energy Management Systems, Inc | Apparatus, device and computer implemented method for controlling power plant system |
US10756570B2 (en) * | 2018-03-09 | 2020-08-25 | Alliance For Sustainable Energy, Llc | Coordinated net-load management |
US10790662B2 (en) | 2018-04-03 | 2020-09-29 | Katerra, Inc. | DC bus-based electrical power router utilizing multiple configurable bidirectional AC/DC converters |
US11051644B2 (en) * | 2018-04-11 | 2021-07-06 | Lawrence Silverman | Smart address identification and secure mailbox |
US10897138B2 (en) | 2018-04-12 | 2021-01-19 | Katerra, Inc. | Method and apparatus for dynamic electrical load sensing and line to load switching |
JP7417972B2 (en) * | 2018-04-19 | 2024-01-19 | パナソニックIpマネジメント株式会社 | Power systems and power system control methods |
MX2020011155A (en) * | 2018-04-25 | 2021-01-29 | Neil crawford | Energy generation, storage and management system. |
WO2019227121A1 (en) * | 2018-05-29 | 2019-12-05 | Onsite Energy Solutions Technologies Pty Ltd | Electricity supply network and method of operation |
WO2019231873A1 (en) * | 2018-06-01 | 2019-12-05 | Energy Harbors Corporation, Inc. | Power management across point of source to point of load |
US11196258B2 (en) * | 2018-08-03 | 2021-12-07 | Sacramento Municipal Utility District | Energy control and storage system for controlling power based on a load shape |
US11556102B2 (en) | 2018-08-09 | 2023-01-17 | United Renewable Energy, LLC | Off-grid electrical power system |
US10811883B2 (en) * | 2018-08-09 | 2020-10-20 | United Renewable Energy, LLC | Off-grid electrical power system |
US11158007B2 (en) * | 2018-08-10 | 2021-10-26 | International Business Machines Corporation | Dynamic energy consumption and harvesting with feedback |
WO2020047664A1 (en) * | 2018-09-05 | 2020-03-12 | Dpm Technologies Inc. | Systems and methods for intelligent control of rotating electric machines |
EP3624293B1 (en) * | 2018-09-11 | 2021-11-03 | Bayerische Motoren Werke Aktiengesellschaft | Method and control device for operating a stationary, electric energy storage that is provided for an electric consumption unit, like, e.g., a household |
EP3624292B1 (en) | 2018-09-11 | 2021-06-23 | Bayerische Motoren Werke Aktiengesellschaft | Method and control device for operating a stationary, electric energy storage that is provided for an electric consumption unit, like, e.g., a household |
US11055732B2 (en) | 2018-09-12 | 2021-07-06 | Mitsubishi Electric Research Laboratories, Inc. | Day-ahead joint generation scheduling and bidding optimization for power plants |
US11664663B2 (en) | 2018-09-12 | 2023-05-30 | Semtive Inc. | Micro inverter and controller |
WO2020055411A1 (en) * | 2018-09-13 | 2020-03-19 | General Electric Company | Systems and methods for rapidly responding to commanded power profiles |
EP3884558A4 (en) | 2019-01-31 | 2022-08-17 | General Electric Company | Battery charge and discharge power control in a power grid |
US11135936B2 (en) | 2019-03-06 | 2021-10-05 | Fermata, LLC | Methods for using temperature data to protect electric vehicle battery health during use of bidirectional charger |
CA3133484A1 (en) | 2019-03-14 | 2020-09-17 | Paficic Inc. | Systems, methods, and computer systems for enabling a private utility |
WO2020198689A1 (en) | 2019-03-28 | 2020-10-01 | Nuvve Corporation | Multi-technology grid regulation service |
CN110009527A (en) * | 2019-04-04 | 2019-07-12 | 国家电网有限公司 | A kind of integrated energy system user portrait method and system |
WO2020234887A1 (en) | 2019-05-23 | 2020-11-26 | Foresight Energy Ltd. | System and method for optimization of power consumption and power storage |
WO2021016397A1 (en) | 2019-07-24 | 2021-01-28 | Uplight, Inc. | Adaptive thermal comfort learning for optimized hvac control |
US11916387B2 (en) * | 2019-09-05 | 2024-02-27 | Barksdale, Inc. | Adaptive control of electricity consumption |
CN112747416B (en) * | 2019-10-31 | 2022-04-05 | 北京国双科技有限公司 | Energy consumption prediction method and device for air conditioning system |
US11958372B2 (en) | 2019-11-26 | 2024-04-16 | Fermata Energy Llc | Device for bi-directional power conversion and charging for use with electric vehicles |
GB2592218B (en) * | 2020-02-19 | 2022-06-22 | Conductify Ltd | A method for managing an energy system |
US11251620B2 (en) * | 2020-03-03 | 2022-02-15 | Caterpillar Inc. | Micro-grid site predictive control for multipower resource management with machine learning |
CN111476677B (en) * | 2020-04-03 | 2023-06-20 | 国网湖南省电力有限公司 | Electricity consumption type electricity sales amount analysis and prediction method and system based on big data |
US11535113B2 (en) * | 2020-05-05 | 2022-12-27 | Toyota Motor North America, Inc. | Transport battery recharging via virtual power plant |
CN111709574B (en) * | 2020-06-16 | 2022-02-22 | 广东电网有限责任公司 | Distributed cluster configuration scheduling method, computer equipment and storage medium |
EP3934048A1 (en) | 2020-06-30 | 2022-01-05 | Solaredge Technologies Ltd. | Smart energy home |
FR3114699A1 (en) * | 2020-09-30 | 2022-04-01 | Energy Pool Developpement | Device and method for automatic load management |
US11381090B2 (en) | 2020-10-05 | 2022-07-05 | ATMA Energy, LLC | Systems and methods for dynamic control of distributed energy resource systems |
IL302084A (en) * | 2020-10-16 | 2023-06-01 | Vast Solar Pty Ltd | Hybrid electrical power generation system and method of simulating the same |
CA3201020A1 (en) * | 2020-11-10 | 2022-05-19 | Helmerich & Payne Technologies, Llc | Systems and techniques for power management |
CN112381300A (en) * | 2020-11-17 | 2021-02-19 | 国网北京市电力公司 | Energy utilization system, energy analysis method and device based on energy utilization system |
DE102020216261A1 (en) | 2020-12-18 | 2022-06-23 | Zf Friedrichshafen Ag | Method and control device for supplying energy to an agricultural machine |
US11846959B2 (en) * | 2021-01-13 | 2023-12-19 | Whirlpool Corporation | Household energy management system utilizing multiple scales of time |
US11056912B1 (en) | 2021-01-25 | 2021-07-06 | PXiSE Energy Solutions, LLC | Power system optimization using hierarchical clusters |
US11722002B2 (en) | 2021-02-03 | 2023-08-08 | Honda Motor Co., Ltd. | Management of power supply in enclosed space |
CN113076385B (en) * | 2021-03-15 | 2023-10-13 | 国网湖北省电力有限公司超高压公司 | Method for automatically acquiring power grid special area distribution map grade information |
US20220302701A1 (en) * | 2021-03-22 | 2022-09-22 | NAD Grid Corp | Electric utility load distribution systems and methods |
WO2022236424A1 (en) | 2021-05-13 | 2022-11-17 | Exro Technologies Inc. | Method and appartus to drive coils of a multiphase electric machine |
US11784358B2 (en) | 2021-07-07 | 2023-10-10 | The Aerospace Corporation | Self regulating modular battery |
WO2023279196A1 (en) | 2021-07-08 | 2023-01-12 | Exro Technologies Inc. | Dynamically reconfigurable power converter utilizing windings of electrical machine |
EP4117134A1 (en) | 2021-07-08 | 2023-01-11 | Galooli Ltd | Systems and methods for maximizing solar energy usage and optimizing non-renewable energy sources |
CN113612242A (en) * | 2021-07-30 | 2021-11-05 | 国网能源研究院有限公司 | User-side energy storage site selection and volume fixing method and device for improving flexibility of power grid |
WO2023081708A1 (en) * | 2021-11-04 | 2023-05-11 | Enertopia Corporation | Energy management system |
US20230216339A1 (en) * | 2021-12-31 | 2023-07-06 | Duke Energy Corporation | Systems and methods for differential power generation |
US20230246453A1 (en) * | 2022-01-31 | 2023-08-03 | 8Me Nova, Llc | Renewable energy system with tunable variability |
US11747781B1 (en) | 2022-03-21 | 2023-09-05 | Nuvve Corporation | Intelligent local energy management system at local mixed power generating sites for providing grid services |
US11695274B1 (en) | 2022-03-21 | 2023-07-04 | Nuvve Corporation | Aggregation platform for intelligent local energy management system |
EP4293850A1 (en) * | 2022-06-14 | 2023-12-20 | Seedia Sp. z o.o. | Method and system of wireless management of the operation of a power supply system of electric loads |
ES2957852A1 (en) * | 2022-06-23 | 2024-01-26 | Univ Huelva | ENERGY DEMAND OPTIMIZER SYSTEM FOR ELECTRICAL MICROGRIDS (Machine-translation by Google Translate, not legally binding) |
WO2024171186A1 (en) * | 2023-02-16 | 2024-08-22 | Aquarius Engines (Am) Ltd | System and methods for generation of power supply plan from multiple energy resources to meet needs of a predicted load |
WO2024181598A1 (en) * | 2023-02-28 | 2024-09-06 | 케빈랩 주식회사 | Power supply system |
WO2024192479A1 (en) * | 2023-03-23 | 2024-09-26 | Ibms Pty Ptd | Technology configured to enable improved strategic control over electrically powered infrastructure based on energy supply parameters |
DE102023109029A1 (en) | 2023-04-11 | 2024-10-17 | Vaillant Gmbh | Price-optimized performance control of heat pumps |
CN117196683A (en) * | 2023-09-26 | 2023-12-08 | 国网宁夏电力有限公司 | LSTM-based thermal power enterprise intra-month rolling matching transaction bidding system |
CN118732718A (en) * | 2024-09-04 | 2024-10-01 | 中国水利水电第九工程局有限公司 | Tracking system for photovoltaic module cloth control |
Family Cites Families (228)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2082110A (en) * | 1934-10-20 | 1937-06-01 | Bell Telephone Labor Inc | Regulating system |
US4014539A (en) * | 1975-08-14 | 1977-03-29 | Addressograph Multigraph Corporation | Angular path sheet conveying |
US4104539A (en) | 1976-04-05 | 1978-08-01 | Hase A M | Parallel redundant and load sharing regulated AC system |
US4324987A (en) * | 1978-05-26 | 1982-04-13 | Cyborex Laboratories, Inc. | System and method for optimizing shed/restore operations for electrical loads |
US4264960A (en) * | 1979-07-02 | 1981-04-28 | Sangamo Weston, Inc. | System for controlling power distribution to customer loads |
US4348668A (en) * | 1979-07-02 | 1982-09-07 | Sangamo Weston, Inc. | System for controlling power distribution to customer loads |
US4315163A (en) | 1980-09-16 | 1982-02-09 | Frank Bienville | Multipower electrical system for supplying electrical energy to a house or the like |
US4381457A (en) * | 1981-04-23 | 1983-04-26 | Ladco Development Co., Inc. | Method and apparatus for preventing loss of data from volatile memory |
US4384214A (en) * | 1981-08-03 | 1983-05-17 | Integrated Switching Supplies, Inc. | Non-interrupting power supplies for loads of less than 500 watts |
USRE33504E (en) | 1983-10-13 | 1990-12-25 | Lutron Electronics Co., Inc. | Wall box dimer switch with plural remote control switches |
US4724332A (en) * | 1985-06-12 | 1988-02-09 | Curtis Instruments, Inc. | Synchronous load lock-out control system for battery powered equipment |
US4742291A (en) * | 1985-11-21 | 1988-05-03 | Bobier Electronics, Inc. | Interface control for storage battery based alternate energy systems |
US4742441A (en) * | 1986-11-21 | 1988-05-03 | Heart Interface Corporation | High frequency switching power converter |
US4855922A (en) * | 1987-03-20 | 1989-08-08 | Scientific-Atlanta, Inc. | Apparatus and method for monitoring an energy management system |
US4733223A (en) * | 1987-03-26 | 1988-03-22 | Gilbert William C | Apparatus for monitoring a communications system |
GB8800527D0 (en) * | 1988-01-11 | 1988-02-10 | Farnell Instr Ltd | Control arrangement for switched mode power supply |
US4894764A (en) * | 1988-04-08 | 1990-01-16 | Omnion Power Engineering Corporation | Modular AC output battery load levelling system |
US4899270A (en) * | 1989-03-14 | 1990-02-06 | Statpower Technologies Corp. | DC-to-DC power supply including an energy transferring snubber circuit |
US5218282A (en) | 1990-03-22 | 1993-06-08 | Stanley Home Automation | Automatic door operator including electronic travel detection |
US5155672A (en) | 1990-08-09 | 1992-10-13 | Heart Interface Corporation | Switched multi-tapped transformer power conversion method and apparatus |
US5206537A (en) * | 1990-09-24 | 1993-04-27 | Ecm International Inc. | Epcon energy field system an energy producing conglomerate (EPCAN) system using wind energy, solar panels, and steam turbines |
US5969435A (en) | 1991-01-08 | 1999-10-19 | Nextek Power Systems, Inc. | Modular DC cogenerator systems |
US5786642A (en) | 1991-01-08 | 1998-07-28 | Nextek Power Systems Inc. | Modular power management system and method |
US5793125A (en) | 1991-02-25 | 1998-08-11 | Tarng; Min Ming | Smart integrated socket automation system |
US5150685A (en) | 1991-09-11 | 1992-09-29 | Porter Fred C | Apparatus and method for converting conventionally fueled engines to operate on an alternative fuel |
US5220746A (en) | 1991-10-28 | 1993-06-22 | Stanley Home Automation | Slide gate brake member |
US5761083A (en) | 1992-03-25 | 1998-06-02 | Brown, Jr.; Robert J. | Energy management and home automation system |
US5373433A (en) | 1992-05-05 | 1994-12-13 | Trace Engineering | Power inverter for generating voltage regulated sine wave replica |
US5278480A (en) | 1992-10-26 | 1994-01-11 | Stanley Home Automation | Door opener control with adaptive limits and method therefor |
US5410720A (en) * | 1992-10-28 | 1995-04-25 | Alpha Technologies | Apparatus and methods for generating an AC power signal for cable TV distribution systems |
US5286967A (en) | 1992-12-04 | 1994-02-15 | Stanley Home Automation | Method and apparatus for self-biasing a light beam obstacle detector with a bias light |
US5465011A (en) | 1992-12-14 | 1995-11-07 | Square D Company | Uninterruptible power supply with improved output regulation |
US5396165A (en) * | 1993-02-02 | 1995-03-07 | Teledyne Industries, Inc. | Efficient power transfer system |
US5338369A (en) | 1993-02-16 | 1994-08-16 | Rawlings Lyle K | Roof-integratable photovolatic modules |
JPH0795771A (en) * | 1993-09-20 | 1995-04-07 | Sansha Electric Mfg Co Ltd | Cooling structure of power unit |
US5642002A (en) * | 1993-10-29 | 1997-06-24 | Alpha Technologies | Apparatus and methods for generating uninterruptible AC power signals |
US5621662A (en) | 1994-02-15 | 1997-04-15 | Intellinet, Inc. | Home automation system |
US6274950B1 (en) | 1994-03-03 | 2001-08-14 | American Power Conversion | Battery communication system |
US5619077A (en) * | 1994-03-18 | 1997-04-08 | Holophane Lighting, Inc. | System and method for providing alternate AC voltage |
US5629601A (en) * | 1994-04-18 | 1997-05-13 | Feldstein; Robert S. | Compound battery charging system |
JP3387625B2 (en) | 1994-05-25 | 2003-03-17 | シャープ株式会社 | Home automation system |
US5412297A (en) | 1994-06-27 | 1995-05-02 | Stanley Home Automation | Monitored radio frequency door edge sensor |
US5457600A (en) | 1994-07-20 | 1995-10-10 | American Power Conversion Corporation | Power surge protector |
US5583413A (en) | 1994-09-06 | 1996-12-10 | Cruising Equipment, Inc. | Power conversion equipment monitor/controller method and apparatus |
US5939855A (en) | 1994-09-06 | 1999-08-17 | Cruising Equipment, Inc. | Power conversion equipment monitor/controller method and apparatus |
US5576533A (en) | 1994-10-17 | 1996-11-19 | Premier Global Corporation Ltd. | Circuit for converting solar energy into AC power |
WO1996013135A1 (en) | 1994-10-20 | 1996-05-02 | Ies Technologies, Inc. | Automated appliance control system |
DE69532135T2 (en) * | 1994-11-04 | 2004-08-26 | Andrew Corp., Orland Park | ANTENNA CONTROL SYSTEM |
US5572438A (en) | 1995-01-05 | 1996-11-05 | Teco Energy Management Services | Engery management and building automation system |
US5565843A (en) | 1995-03-24 | 1996-10-15 | Stanley Home Automation | Garage door message display system |
EP0736828A3 (en) * | 1995-04-06 | 1997-11-12 | Seiko Epson Corporation | Battery driven electronic apparatus and method of controlling power supply in the apparatus |
DE19516838A1 (en) * | 1995-05-08 | 1996-11-14 | Hagen Batterie Ag | Method and circuit arrangement for covering energy peak demand in electrical AC or three-phase networks |
US5600540A (en) * | 1995-05-15 | 1997-02-04 | Blomquist; Michael L. | Heat sink and retainer for electronic integrated circuits |
US5635770A (en) * | 1995-06-30 | 1997-06-03 | Beacon Power Systems, Inc. | Fueling system starter interrupt for an alternate fuel vehicle |
US5590495A (en) * | 1995-07-06 | 1997-01-07 | Bressler Group Inc. | Solar roofing system |
US5649839A (en) * | 1995-08-10 | 1997-07-22 | Yu; Jeff | Power center |
FR2738417B1 (en) * | 1995-08-30 | 1997-11-07 | Gaia Converter | CONTINUOUSLY SWITCHED VOLTAGE CONVERTER |
US5612580A (en) * | 1995-10-10 | 1997-03-18 | Northrop Grumman Corporation | Uninterruptible power system |
US5656919A (en) | 1995-11-14 | 1997-08-12 | Cruising Equipment, Inc. | Accurate battery state-of-charge monitoring and indicating apparatus and method |
DE69620124T2 (en) * | 1995-12-20 | 2002-10-31 | Sharp Kk | Inverter control method and device |
US5675123A (en) | 1996-02-09 | 1997-10-07 | Cruising Equipment Company, Inc. | Clam-shell housing having releasably attachable, wall-mounting mechanism |
US6239579B1 (en) * | 1996-07-05 | 2001-05-29 | Estco Battery Management Inc. | Device for managing battery packs by selectively monitoring and assessing the operative capacity of the battery modules in the pack |
US5994892A (en) | 1996-07-31 | 1999-11-30 | Sacramento Municipal Utility District | Integrated circuit design automatic utility meter: apparatus & method |
US5895440A (en) | 1996-12-23 | 1999-04-20 | Cruising Equipment Company, Inc. | Battery monitor and cycle status indicator |
US5789828A (en) | 1996-12-24 | 1998-08-04 | Tremaine; Susan C. | Low voltage power supply and distribution center |
US5844326A (en) | 1997-06-23 | 1998-12-01 | Cruising Equipment Company, Inc. | Managed electrical outlet for providing rank-ordered over-current protection |
US6068513A (en) * | 1997-08-19 | 2000-05-30 | Statpower Technologies Partnership | DC connection method |
US5949640A (en) | 1997-08-19 | 1999-09-07 | Statpower Technologies Corp. | Power inverter with re-orientable display panel and AC port modules |
US6028426A (en) * | 1997-08-19 | 2000-02-22 | Statpower Technologies Partnership | Temperature compensated current measurement device |
US6021052A (en) * | 1997-09-22 | 2000-02-01 | Statpower Technologies Partnership | DC/AC power converter |
US6177737B1 (en) * | 1997-12-17 | 2001-01-23 | Proflow, Inc. | Vehicle electrical power back-up circuit and method |
US6618709B1 (en) | 1998-04-03 | 2003-09-09 | Enerwise Global Technologies, Inc. | Computer assisted and/or implemented process and architecture for web-based monitoring of energy related usage, and client accessibility therefor |
ATE367661T1 (en) * | 1998-06-09 | 2007-08-15 | Farnow Technologies Pty Ltd | REDOX GEL BATTERY |
US6038156A (en) * | 1998-06-09 | 2000-03-14 | Heart Interface Corporation | Power inverter with improved heat sink configuration |
US5895326A (en) * | 1998-06-29 | 1999-04-20 | Cozza; Frank Charles | Electronic golf wrist movement training device |
US5982652A (en) | 1998-07-14 | 1999-11-09 | American Power Conversion | Method and apparatus for providing uninterruptible power using a power controller and a redundant power controller |
US6556410B1 (en) * | 1998-07-24 | 2003-04-29 | American Power Conversion, Inc. | Universal surge protector for notebook computers |
US6226600B1 (en) * | 1998-08-03 | 2001-05-01 | Rodenberg, Iii Ernest A. | Programmable electricity consumption monitor |
JP2000069575A (en) | 1998-08-25 | 2000-03-03 | Matsushita Electric Works Ltd | Home automation system |
US6278279B1 (en) | 1998-08-28 | 2001-08-21 | International Business Machines Corporation | Path test for a DC battery back-up system |
US6199136B1 (en) | 1998-09-02 | 2001-03-06 | U.S. Philips Corporation | Method and apparatus for a low data-rate network to be represented on and controllable by high data-rate home audio/video interoperability (HAVi) network |
JP3697121B2 (en) | 1998-10-15 | 2005-09-21 | キヤノン株式会社 | Photovoltaic power generation apparatus and control method thereof |
JP2000184471A (en) | 1998-12-11 | 2000-06-30 | Nec Corp | Home automation system |
US6097108A (en) | 1999-02-11 | 2000-08-01 | Forward Electric, Inc. | Apparatus and method for fail-safe control of events in preparation for electrical power transfers |
RU2216076C2 (en) * | 1999-03-29 | 2003-11-10 | Кавасаки Дзюкогио Кабусики Кайся | Storage battery, device accommodating storage battery, method for locally distributed electrical energy generation, and device for electrical energy generation by this method |
US6134124A (en) | 1999-05-12 | 2000-10-17 | Abb Power T&D Company Inc. | Universal distributed-resource interface |
US6404658B1 (en) | 1999-05-13 | 2002-06-11 | American Power Conversion | Method and apparatus for converting a DC voltage to an AC voltage |
US6365990B2 (en) * | 1999-06-21 | 2002-04-02 | Reliance Controls Corporation | Cover plate terminal assembly for a transfer switch |
US6875591B1 (en) * | 1999-08-10 | 2005-04-05 | Kyowa, Hakko Kogyo Co., Ltd. | Process for producing GDP-fucose |
US6288916B1 (en) | 1999-10-15 | 2001-09-11 | Alpha Technologies, Inc. | Multiple output uninterruptible alternating current power supplies for communications system |
US6657320B1 (en) | 1999-11-03 | 2003-12-02 | Active Power, Inc. | Integrated flywheel uninterruptible power supply system |
US6428694B1 (en) | 1999-11-17 | 2002-08-06 | Komex H2O Science, Inc. | Solar powered environmental remediation devices |
US6925361B1 (en) * | 1999-11-30 | 2005-08-02 | Orion Engineering Corp. | Distributed energy neural network integration system |
US6823223B2 (en) | 1999-12-30 | 2004-11-23 | Microsoft Corporation | Method and apparatus for providing distributed scene programming of a home automation and control system |
US6593856B1 (en) | 2000-01-06 | 2003-07-15 | Visteon Global Technologies Inc. | Homebound/outbound feature for automotive applications |
US6453687B2 (en) | 2000-01-07 | 2002-09-24 | Robertshaw Controls Company | Refrigeration monitor unit |
US6404075B1 (en) * | 2000-01-18 | 2002-06-11 | Chevron Energy Solutions, L.P. | Uninterruptible power generation system |
US20010048373A1 (en) | 2000-01-19 | 2001-12-06 | David Sandelman | Home automation identification system |
US6700214B2 (en) * | 2000-02-14 | 2004-03-02 | Aura Systems, Inc. | Mobile power generation system |
US6225780B1 (en) * | 2000-02-24 | 2001-05-01 | General Motors Corporation | Battery charge maintenance through opportunity equalization |
US6215281B1 (en) * | 2000-03-16 | 2001-04-10 | General Motors Corporation | Method and apparatus for reducing battery charge time and energy consumption, as in a nickel metal hydride battery pack |
AU2001271241A1 (en) | 2000-03-20 | 2001-10-03 | Alpha Technologies, Inc. | Uninterruptible power supplies employing fuel cells |
US6310783B1 (en) | 2000-03-29 | 2001-10-30 | Powerware Corporation | Modular method and apparatus for building an uninterruptible power system (UPS) |
KR100339398B1 (en) | 2000-03-30 | 2002-06-01 | 구자홍 | refrigerator and control method of the same |
ATE317564T1 (en) | 2000-04-10 | 2006-02-15 | Zensys As | RF CONTROLLED HOME AUTOMATION SYSTEM WITH DUAL FUNCTIONAL NETWORK NODES |
US6718213B1 (en) * | 2000-06-19 | 2004-04-06 | Electric City Corporation | Variable base load energy management system and method |
US6347925B1 (en) * | 2000-06-29 | 2002-02-19 | Beacon Power Corporation | Flywheel system with parallel pumping arrangement |
US7234062B2 (en) | 2000-07-18 | 2007-06-19 | General Electric Company | Authentication of remote appliance messages using an embedded cryptographic device |
US6297977B1 (en) | 2000-09-12 | 2001-10-02 | Honeywell Power Systems Inc. | Parallel operation of multiple generators |
JP2002111887A (en) | 2000-09-21 | 2002-04-12 | Stuart Argyle Andrews | Home automation centralized control system |
US6681156B1 (en) * | 2000-09-28 | 2004-01-20 | Siemens Aktiengesellschaft | System and method for planning energy supply and interface to an energy management system for use in planning energy supply |
US7733069B2 (en) | 2000-09-29 | 2010-06-08 | Canon Kabushiki Kaisha | Power converting apparatus and power generating apparatus |
KR20030051705A (en) * | 2000-10-10 | 2003-06-25 | 아메리칸 일렉트릭 파워 컴퍼니, 인코퍼레이티드 | A power load-leveling system and packet electrical storage |
US20020135232A1 (en) | 2000-10-13 | 2002-09-26 | Xantrex International | Method and apparatus for distributing electric power |
US6741442B1 (en) * | 2000-10-13 | 2004-05-25 | American Power Conversion Corporation | Intelligent power distribution system |
US6756998B1 (en) | 2000-10-19 | 2004-06-29 | Destiny Networks, Inc. | User interface and method for home automation system |
JP2002132292A (en) | 2000-10-26 | 2002-05-09 | Daisuke Murakami | Home automation system by speech |
US20020052940A1 (en) * | 2000-10-27 | 2002-05-02 | Jenny Myers | Method and system for using wireless devices to control one or more generic systems |
AU2002246920A1 (en) | 2000-10-27 | 2002-08-06 | Emerson Electric Co. | Uninterruptible power supply |
JP2002142462A (en) * | 2000-10-30 | 2002-05-17 | Canon Inc | Power converter and method of preventing its burglary |
US6817266B1 (en) | 2000-11-03 | 2004-11-16 | Beacon Power Corporation | Stiff metal hub for an energy storage rotor |
JP2002152858A (en) | 2000-11-10 | 2002-05-24 | Kunitomo Kobayashi | Home automation system |
US6538343B1 (en) * | 2000-11-28 | 2003-03-25 | Electric Power Research Institute, Inc. | Method for reducing the load imposed on a power source, and apparatus for implementing the method |
US20020063368A1 (en) * | 2000-11-29 | 2002-05-30 | Kabir Omar M. | Mesh bearing damper for an energy storage rotor |
US6304006B1 (en) | 2000-12-28 | 2001-10-16 | Abb T&D Technology Ltd. | Energy management uninterruptible power supply system |
US6353304B1 (en) * | 2001-01-19 | 2002-03-05 | Sandia Corporation | Optimal management of batteries in electric systems |
US6489561B2 (en) | 2001-01-30 | 2002-12-03 | American Power Conversion | Battery wire lead management |
US6693371B2 (en) * | 2001-02-06 | 2004-02-17 | American Power Corporation | Integrated uninterruptible power supply enclosure |
US6560131B1 (en) * | 2001-02-13 | 2003-05-06 | Vonbrethorst William F. | Stored energy power system |
US6673479B2 (en) * | 2001-03-15 | 2004-01-06 | Hydrogenics Corporation | System and method for enabling the real time buying and selling of electricity generated by fuel cell powered vehicles |
US6869309B2 (en) * | 2001-03-19 | 2005-03-22 | American Power Conversion | Enclosed battery assembly for an uninterruptible power supply |
US7718889B2 (en) | 2001-03-20 | 2010-05-18 | American Power Conversion Corporation | Adjustable scalable rack power system and method |
US20020135983A1 (en) | 2001-03-20 | 2002-09-26 | Christpher Freitas | Energy conversion apparatus |
US6865685B2 (en) * | 2001-03-20 | 2005-03-08 | American Power Conversion | Power supply event notification system for sending an electronic notification to multiple destinations |
US6445088B1 (en) | 2001-03-20 | 2002-09-03 | American Power Conversion | Multipurpose data port |
US7114098B2 (en) | 2001-03-20 | 2006-09-26 | American Power Conversion Corporation | Power supply critical state monitoring system |
JP2002281170A (en) | 2001-03-21 | 2002-09-27 | Sharp Corp | Facsimile equipment and telecommunications processor |
US6874691B1 (en) * | 2001-04-10 | 2005-04-05 | Excel Energy Technologies, Inc. | System and method for energy management |
US6424119B1 (en) | 2001-04-19 | 2002-07-23 | American Power Conversion | Multiple energy storage device controller |
US20020153865A1 (en) | 2001-04-19 | 2002-10-24 | Nelson James E. | Uninterruptible power supply system having an NiMH or Li-ion battery |
US7129676B2 (en) | 2001-04-19 | 2006-10-31 | American Power Conversion | Controlling re-charge of a nickel metal-hydride (NiMH) or nickel cadmuim (NiCd) battery |
US20020167174A1 (en) | 2001-05-09 | 2002-11-14 | Haass Michael A. | Portable generator for commucications systems |
EP1260886A3 (en) | 2001-05-23 | 2003-11-05 | ABB Sace S.p.A. | Home automation system |
EP1263108A1 (en) * | 2001-06-01 | 2002-12-04 | Roke Manor Research Limited | Community energy comsumption management |
US6560114B2 (en) | 2001-06-29 | 2003-05-06 | Intel Corporation | Rack-mounted server and associated methods |
US6741007B2 (en) | 2001-07-27 | 2004-05-25 | Beacon Power Corporation | Permanent magnet motor assembly having a device and method of reducing parasitic losses |
US6959756B2 (en) * | 2001-08-07 | 2005-11-01 | Beacon Power Corporation | Device for cooling a bearing; flywheel energy storage system using such a bearing cooling device and methods related thereto |
US20030033548A1 (en) * | 2001-08-07 | 2003-02-13 | Kuiawa Christian L. | Uninterruptible power supply management network system |
US7100054B2 (en) * | 2001-08-09 | 2006-08-29 | American Power Conversion | Computer network security system |
US20030036820A1 (en) * | 2001-08-16 | 2003-02-20 | International Business Machines Corporation | Method for optimizing energy consumption and cost |
US6747378B2 (en) * | 2001-08-20 | 2004-06-08 | Beacon Power Corporation | Dual stiffness bearing damping system |
JP2003079054A (en) * | 2001-08-31 | 2003-03-14 | Sanyo Electric Co Ltd | Solar power generation system having storage battery |
US20040076809A1 (en) * | 2001-09-13 | 2004-04-22 | Spears Ward R. | Composite flywheel rim having commingled layers with macroscopically uniform patterns of fiber arrangement and methods for manufacturing same |
US6824861B2 (en) | 2001-09-13 | 2004-11-30 | Beacon Power Corporation | Composite flywheel rim with co-mingled fiber layers and methods for manufacturing same |
US6852401B2 (en) * | 2001-09-13 | 2005-02-08 | Beacon Power Corporation | Composite flywheel rim with co-mingled fiber layers and methods for manufacturing same |
US7174806B2 (en) * | 2001-09-13 | 2007-02-13 | Beacon Power Corporation | Flexible bearing damping system, energy storage system using such a system, and a method related thereto |
US7034420B2 (en) * | 2001-09-13 | 2006-04-25 | Beacon Power Corporation | Crash management system for implementation in flywheel systems |
US7679245B2 (en) * | 2001-09-17 | 2010-03-16 | Beacon Power Corporation | Repulsive lift systems, flywheel energy storage systems utilizing such systems and methods related thereto |
US6675872B2 (en) * | 2001-09-17 | 2004-01-13 | Beacon Power Corporation | Heat energy dissipation device for a flywheel energy storage system (FESS), an FESS with such a dissipation device and methods for dissipating heat energy |
US6963802B2 (en) * | 2001-10-05 | 2005-11-08 | Enis Ben M | Method of coordinating and stabilizing the delivery of wind generated energy |
WO2003036688A2 (en) * | 2001-10-25 | 2003-05-01 | Sandia Corporation | Alternating current photovoltaic building block |
KR100440999B1 (en) | 2001-11-08 | 2004-07-21 | 삼성전자주식회사 | Starting control apparatus for home automation and therof method |
US6983212B2 (en) | 2001-11-27 | 2006-01-03 | American Power Conversion Corporation | Battery management system and method |
US6614132B2 (en) | 2001-11-30 | 2003-09-02 | Beacon Power Corporation | Multiple flywheel energy storage system |
FR2833126B1 (en) | 2001-12-05 | 2007-01-12 | Somfy | ESTABLISHING DOMOTIC NETWORK |
US6924731B2 (en) | 2001-12-11 | 2005-08-02 | American Power Conversion Corporation | Power supply alarm control system |
US7144646B2 (en) | 2001-12-14 | 2006-12-05 | Ballard Power Systems Inc. | Method and apparatus for multiple mode control of voltage from a fuel cell system |
US6721672B2 (en) * | 2002-01-02 | 2004-04-13 | American Power Conversion | Method and apparatus for preventing overloads of power distribution networks |
US6579168B1 (en) * | 2002-01-03 | 2003-06-17 | Marconi Communications, Inc. | Back-up DC vent system for equipment enclosure |
JP2003282122A (en) * | 2002-02-19 | 2003-10-03 | Proton Energy Systems Inc | Energy storage and recovery system and its use method |
EP1490941A4 (en) * | 2002-03-28 | 2007-01-10 | Robertshaw Controls Co | Energy management system and method |
US20030192582A1 (en) | 2002-04-10 | 2003-10-16 | Hector Guevara | Thermal electric generator |
IL153261A0 (en) | 2002-12-04 | 2003-07-06 | Cohen Michael | Load bearing system with secure pouch attachment |
US6668565B1 (en) | 2002-04-12 | 2003-12-30 | American Power Conversion | Rack-mounted equipment cooling |
JP3908076B2 (en) | 2002-04-16 | 2007-04-25 | 株式会社日立製作所 | DC backup power supply |
WO2003090394A2 (en) | 2002-04-17 | 2003-10-30 | Black & Decker Inc. | Home automation system |
US7057308B2 (en) | 2002-04-30 | 2006-06-06 | American Power Conversion Corporation | Battery connect/disconnect for an uninterruptible power supply |
US6883328B2 (en) | 2002-05-22 | 2005-04-26 | Ormat Technologies, Inc. | Hybrid power system for continuous reliable power at remote locations |
US7162714B2 (en) | 2002-05-22 | 2007-01-09 | American Power Conversion Corporation | Software-based watchdog method and apparatus |
US20030220803A1 (en) | 2002-05-22 | 2003-11-27 | Giaquinto Todd Joseph | Product replacement method and system |
US6841971B1 (en) * | 2002-05-29 | 2005-01-11 | Alpha Technologies, Inc. | Charge balancing systems and methods |
US6704198B2 (en) * | 2002-06-12 | 2004-03-09 | Avava Technology Corp. | Equipment enclosure with heat exchanger |
US6774602B2 (en) | 2002-06-14 | 2004-08-10 | Delphi Technologies, Inc. | Apparatus and method for providing temporary power |
US6889752B2 (en) * | 2002-07-11 | 2005-05-10 | Avaya Technology Corp. | Systems and methods for weatherproof cabinets with multiple compartment cooling |
US7464035B2 (en) | 2002-07-24 | 2008-12-09 | Robert Bosch Corporation | Voice control of home automation systems via telephone |
JP3825020B2 (en) | 2002-08-01 | 2006-09-20 | 株式会社アイ・ヒッツ研究所 | Distributed power supply system |
US6695577B1 (en) * | 2002-08-13 | 2004-02-24 | American Power Conversion | Fan grill |
US7912958B2 (en) * | 2002-08-21 | 2011-03-22 | American Power Coversion Corporation | Method and apparatus for automatic IP allocation bootstrapping of embedded network management cards used in networked uninterruptible power supplies and other supported devices |
US6847196B2 (en) * | 2002-08-28 | 2005-01-25 | Xantrex Technology Inc. | Method and apparatus for reducing switching losses in a switching circuit |
US6902837B2 (en) * | 2002-09-13 | 2005-06-07 | Proton Energy Systems, Inc. | Method and system for balanced control of backup power |
US20040056638A1 (en) * | 2002-09-20 | 2004-03-25 | Bamber Claire E. | Electrical outlet and back-up power supply for the same |
KR100859408B1 (en) | 2002-09-28 | 2008-09-22 | 주식회사 케이티 | DSL apparatus for home automation communication |
US6702661B1 (en) * | 2002-11-25 | 2004-03-09 | Lucent Technologies Inc. | Cooling method and apparatus |
US7752858B2 (en) * | 2002-11-25 | 2010-07-13 | American Power Conversion Corporation | Exhaust air removal system |
JP3906801B2 (en) | 2002-12-27 | 2007-04-18 | 松下電工株式会社 | Apartment house home automation system |
US6745590B1 (en) * | 2003-01-13 | 2004-06-08 | American Power Conversion | Condensate removal system |
US6722142B1 (en) | 2003-02-07 | 2004-04-20 | Sub-Zero Freezer Company, Inc. | Refrigerated enclosure |
US20040249922A1 (en) | 2003-03-31 | 2004-12-09 | Hackman Thomas J. | Home automation system security |
KR100531141B1 (en) | 2003-04-01 | 2005-11-28 | 최동욱 | System and method for home automation using ir and rf combined remocon module |
US20040260407A1 (en) | 2003-04-08 | 2004-12-23 | William Wimsatt | Home automation control architecture |
US7193830B2 (en) | 2003-04-10 | 2007-03-20 | American Power Conversion Corporation | Surge suppressor |
FR2853736B1 (en) | 2003-04-14 | 2005-06-03 | Somfy | METHOD FOR CONSTITUTING A GROUP OF ELEMENTS IN A DOMOTIC NETWORK |
US20040213384A1 (en) | 2003-04-23 | 2004-10-28 | Alles Harold Gene | Remote access, control, and support of home automation system |
WO2004100344A2 (en) | 2003-05-02 | 2004-11-18 | Ballard Power Systems Corporation | Method and apparatus for tracking maximum power point for inverters in photovoltaic applications |
US7112131B2 (en) | 2003-05-13 | 2006-09-26 | American Power Conversion Corporation | Rack enclosure |
FR2855338B1 (en) | 2003-05-20 | 2006-09-15 | Somfy Sas | DEVICE COMPRISING A MINI APPARATUS OF ELECTRIC POWER STORAGE MEDIUM POWERED BY A PHOTOVOLTAIC PANEL AND ITS CHARGING METHOD |
MXPA05013137A (en) * | 2003-06-05 | 2006-08-23 | Enfo Broadcast As | A method and a system for automatic management of demand for non-durables. |
CA2504101C (en) | 2003-06-06 | 2010-05-11 | Alpha Technologies Inc. | Connection systems and methods for utility meters |
US7509529B2 (en) * | 2003-07-18 | 2009-03-24 | American Power Conversion Corporation | System and method for performing user recovery of guided procedures for an uninterruptible power supply |
US7573232B2 (en) * | 2003-08-08 | 2009-08-11 | American Power Conversion Corporation | Battery exchange apparatus and method for uninterruptible power supply |
FR2858734B1 (en) | 2003-08-08 | 2005-10-21 | Philippe Delberghe | DOMOTIC EQUIPMENT WITH UNIFIED RHM INTERFACE |
US8008804B2 (en) * | 2003-08-15 | 2011-08-30 | Beacon Power Corporation | Methods, systems and apparatus for regulating frequency of generated power using flywheel energy storage systems with varying load and/or power generation |
US7259477B2 (en) * | 2003-08-15 | 2007-08-21 | American Power Conversion Corporation | Uninterruptible power supply |
US7043380B2 (en) * | 2003-09-16 | 2006-05-09 | Rodenberg Iii Ernest Adolph | Programmable electricity consumption monitoring system and method |
US7091707B2 (en) * | 2003-09-29 | 2006-08-15 | Xantrex Technology, Inc. | Method and apparatus for controlling power drawn from an energy converter |
US7196494B2 (en) * | 2003-10-17 | 2007-03-27 | Xantrex International | Method and apparatus for charging batteries in a system of batteries |
WO2005045671A1 (en) * | 2003-10-27 | 2005-05-19 | American Power Conversion Corporation | System and method for updating a software program |
CN1910067A (en) * | 2003-10-27 | 2007-02-07 | M·埃尼斯·本 | Method and apparatus for storing and using energy to reduce the end-user cost of energy |
US7281958B2 (en) | 2004-01-23 | 2007-10-16 | American Power Conversion Corporation | Power terminal block |
US7612472B2 (en) | 2004-01-23 | 2009-11-03 | American Power Conversion Corporation | Method and apparatus for monitoring energy storage devices |
US7446433B2 (en) | 2004-01-23 | 2008-11-04 | American Power Conversion Corporation | Methods and apparatus for providing uninterruptible power |
US7379305B2 (en) | 2004-01-23 | 2008-05-27 | American Power Conversion Corporation | Modular UPS |
US7432615B2 (en) | 2004-01-29 | 2008-10-07 | American Power Conversion Corporation | Uninterruptable power supply system and method |
EP1571745A1 (en) * | 2004-03-01 | 2005-09-07 | Alcatel | Power consumption management method |
US20070005195A1 (en) * | 2005-01-10 | 2007-01-04 | Nicholas Pasquale | Distributed energy storage for reducing power demand |
US20060158037A1 (en) | 2005-01-18 | 2006-07-20 | Danley Douglas R | Fully integrated power storage and supply appliance with power uploading capability |
US7227275B2 (en) | 2005-02-01 | 2007-06-05 | Vrb Power Systems Inc. | Method for retrofitting wind turbine farms |
US7274975B2 (en) * | 2005-06-06 | 2007-09-25 | Gridpoint, Inc. | Optimized energy management system |
-
2005
- 2005-06-06 US US11/144,834 patent/US7274975B2/en active Active
-
2006
- 2006-05-12 WO PCT/US2006/018465 patent/WO2006132760A2/en active Application Filing
- 2006-05-19 TW TW095117837A patent/TWI441407B/en not_active IP Right Cessation
-
2007
- 2007-08-13 US US11/837,888 patent/US7783390B2/en active Active
-
2010
- 2010-08-24 US US12/862,070 patent/US8903560B2/en active Active
-
2014
- 2014-12-02 US US14/558,316 patent/US20150207319A1/en not_active Abandoned
-
2018
- 2018-04-11 US US15/950,283 patent/US20190089153A1/en not_active Abandoned
-
2020
- 2020-03-27 US US16/832,581 patent/US20210057909A1/en not_active Abandoned
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11381101B1 (en) * | 2021-10-06 | 2022-07-05 | Geotab Inc. | Systems for vehicle battery charging around charge-adverse time periods |
US11394061B1 (en) * | 2021-10-06 | 2022-07-19 | Geotab Inc. | Methods for vehicle battery charging around charge-adverse time periods |
US11535114B1 (en) | 2021-10-06 | 2022-12-27 | Geotab Inc. | Systems for vehicle battery charging using charge-restriction event |
US20240097443A1 (en) * | 2021-10-21 | 2024-03-21 | State Grid Zhejiang Electric Power Co., Ltd. Taizhou power supply company | Source-network-load-storage coordination dispatching method in background of coupling of renewable energy sources |
US12027860B2 (en) * | 2021-10-21 | 2024-07-02 | State Grid Zhejiang Electric Power Co., Ltd. Taizhou power supply company | Source-network-load-storage coordination dispatching method in background of coupling of renewable energy sources |
WO2024010942A3 (en) * | 2022-07-07 | 2024-04-04 | Abdelrazek Sherif | Method and software to aid in creating dispatch profiles of energy storage systems and to model performance of energy storage systems |
WO2024188720A1 (en) * | 2023-03-10 | 2024-09-19 | Bdr Thermea Group B.V. | Profile information for dynamic control of an energy management system |
Also Published As
Publication number | Publication date |
---|---|
TW200709529A (en) | 2007-03-01 |
US20190089153A1 (en) | 2019-03-21 |
WO2006132760A3 (en) | 2007-07-05 |
US7783390B2 (en) | 2010-08-24 |
US20150207319A1 (en) | 2015-07-23 |
US20110208365A1 (en) | 2011-08-25 |
US7274975B2 (en) | 2007-09-25 |
US8903560B2 (en) | 2014-12-02 |
US20060276938A1 (en) | 2006-12-07 |
TWI441407B (en) | 2014-06-11 |
US20070276547A1 (en) | 2007-11-29 |
WO2006132760A2 (en) | 2006-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210057909A1 (en) | Optimized energy management system | |
US8676389B2 (en) | Modular energy control system | |
Shakeri et al. | An intelligent system architecture in home energy management systems (HEMS) for efficient demand response in smart grid | |
Kiliccote et al. | Characterization of demand response in the commercial, industrial, and residential sectors in the United States | |
US9671843B2 (en) | Computer implemented electrical energy hub management system and method | |
JP5823085B1 (en) | Water heater operation management device, water heater operation management system, and water heater operation management method | |
Iwafune et al. | A comparison of the effects of energy management using heat pump water heaters and batteries in photovoltaic-installed houses | |
WO2012090365A1 (en) | Operation planning method and method for operating heat-pump hot-water supply heating system | |
US20110251730A1 (en) | Electric energy bill reduction in dynamic pricing environments | |
US20220352717A1 (en) | Demand response of loads having thermal reserves | |
KR20170002312A (en) | Adaptive energy management scheduling system and method for hybrid energy storage system with renewable energy resources | |
Elweddad et al. | Designing an energy management system for household consumptions with an off-grid hybrid power system. | |
Babu et al. | IoT based residential energy management system for demand side response through load transfer with various types of domestic appliances | |
Dzobo et al. | Optimal power control strategy of a hybrid energy system considering demand response strategy and customer interruption cost | |
Peash et al. | Optimizing Residential Energy Consumption: Exploring Demand Side Management Strategies | |
JP7353096B2 (en) | Power storage control device | |
Chidzonga et al. | Energy optimization for a smart home with renewable generation | |
Jo et al. | Home Energy Management Systems (HEMSs) with Optimal Energy Management of Home Appliances Using IoT | |
Mishra | Energy optimizations for smart buildings and smart grids | |
Ashourpouri | Demand Dispatch Control for Balancing Load with Generation | |
Aygun et al. | Optimal Energy Management of Power Grid with Electric Vehicles and Flexible Loads | |
Hamza | An Intelligent System Architecture in Home Energy | |
Energy | On–Line Demand Management of Low Voltage Residential Distribution Networks in Smart Grids |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STPP | Information on status: patent application and granting procedure in general |
Free format text: APPLICATION DISPATCHED FROM PREEXAM, NOT YET DOCKETED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |