US20160101460A1 - Casting apparatus whose cooling flow passage is formed by welding and method for manufacturing the same - Google Patents
Casting apparatus whose cooling flow passage is formed by welding and method for manufacturing the same Download PDFInfo
- Publication number
- US20160101460A1 US20160101460A1 US14/854,438 US201514854438A US2016101460A1 US 20160101460 A1 US20160101460 A1 US 20160101460A1 US 201514854438 A US201514854438 A US 201514854438A US 2016101460 A1 US2016101460 A1 US 2016101460A1
- Authority
- US
- United States
- Prior art keywords
- flow passage
- molten metal
- welding
- casting apparatus
- mold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22C—FOUNDRY MOULDING
- B22C9/00—Moulds or cores; Moulding processes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22C—FOUNDRY MOULDING
- B22C23/00—Tools; Devices not mentioned before for moulding
- B22C23/02—Devices for coating moulds or cores
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22C—FOUNDRY MOULDING
- B22C9/00—Moulds or cores; Moulding processes
- B22C9/06—Permanent moulds for shaped castings
- B22C9/065—Cooling or heating equipment for moulds
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D17/00—Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
- B22D17/20—Accessories: Details
- B22D17/22—Dies; Die plates; Die supports; Cooling equipment for dies; Accessories for loosening and ejecting castings from dies
- B22D17/2218—Cooling or heating equipment for dies
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D30/00—Cooling castings, not restricted to casting processes covered by a single main group
Definitions
- the present invention relates to a casting apparatus, such as a mold and a sprue bushing, used for die-cast casting or a similar casting and a method for manufacturing the casting apparatus. More specifically, the present invention relates to the casting apparatus that internally includes cooling flow passages for cooling the casting apparatus and the method for manufacturing the casting apparatus.
- One or more embodiments provide a casting apparatus manufactured using the welding process for manufacturing the cooling flow passages while minimizing deterioration of durability of the casting apparatus and a method for manufacturing the casting apparatus.
- One or more embodiments of the present invention provides a casting apparatus for manufacturing cast products from molten metal.
- the casting apparatus includes a molten metal contacting surface and a cooling portion.
- the molten metal contacting surface is in contact with the molten metal.
- the cooling portion forms a cooling flow passage.
- the cooling flow passage is configured to cool the molten metal contacting surface.
- At least a part of an inner surface of the cooling flow passage is constituted of a welding portion formed by welding.
- the welding portion seals the cooling flow passage.
- the welding portion is constituted such that an exposure to the molten metal becomes equal to or less than a predetermined ratio with respect to an area of the welding portion constituting the inner surface of the cooling flow passage.
- the inner surface of the cooling flow passage is constituted of the welding portion formed by welding.
- the welding portion is constituted such that the exposure to the molten metal becomes equal to or less than the predetermined ratio with respect to the area of the welding portion constituting the inner surface of the cooling flow passage. This allows minimizing an influence of fatigue degradation caused by a temperature cycle by sufficient cooling. Consequently, the reduction in durability of the casting apparatus caused by the welding process can be minimized.
- the predetermined ratio can be set appropriately depending on the operating state and the design of the casting apparatus.
- FIG. 1 is a cross-sectional view illustrating a constitution of a mold 100 according to a first embodiment of the present invention
- FIG. 2 is a flowchart illustrating a method for using the mold 100 according to the first embodiment
- FIG. 3A is a process drawing illustrating the method for using the mold 100 according to the first embodiment
- FIG. 3B is a process drawing illustrating the method for using the mold 100 according to the first embodiment
- FIG. 3C is a process drawing illustrating the method for using the mold 100 according to the first embodiment
- FIG. 4 is a flowchart illustrating a method for manufacturing the mold 100 according to the first embodiment
- FIG. 5A is a process drawing illustrating the method for manufacturing the mold 100 according to the first embodiment
- FIG. 5B is a process drawing illustrating the method for manufacturing the mold 100 according to the first embodiment
- FIG. 5C is a process drawing illustrating the method for manufacturing the mold 100 according to the first embodiment
- FIG. 6 is a cross-sectional view illustrating a constitution of a die-cast-casting-machine use spool bush 200 according a second embodiment
- FIG. 7 is a flowchart illustrating a method for manufacturing the spool bush 200 according to the second embodiment
- FIG. 8 is an exploded view illustrating the method for manufacturing the spool bush 200 according to the second embodiment
- FIG. 9 is a process drawing illustrating an assembled state (before welding) of a bush body 220 and an outer liner 230 according to the second embodiment
- FIG. 10A is a cross-sectional view illustrating a part of a constitution of a mold 300 according to a third embodiment
- FIG. 10B is a process drawing illustrating a state after a machining process (before welding) of the mold 300 according to the third embodiment.
- FIG. 11 is a flowchart illustrating the method for manufacturing the mold 300 according to the third embodiment.
- FIG. 1 is a cross-sectional view illustrating a constitution of a mold 100 according to a first embodiment of the present invention.
- the mold 100 includes an insert die 110 , a fixed-side main mold 120 , and a movable-side main mold 130 .
- the insert die 110 has a product shape forming surface 110 s , which forms the shape of a cast product.
- the fixed-side main mold 120 has a product shape forming surface 120 s .
- the movable-side main mold 130 has a product shape forming surface 130 s and a depressed portion 130 c .
- the three product shape forming surfaces 110 s , 120 s , and 130 s can form an enclosed space for casting cast products in a mold-set-up state, which will be described later. This enclosed space will be described later.
- the mold 100 is the casting apparatus used for casting.
- the insert die 110 includes a first part 111 , a second part 112 , and a bolt 113 .
- the first part 111 has the product shape forming surface 110 s .
- the second part 112 has an outer surface fitted to the depressed portion 130 c of the movable-side main mold 130 .
- the bolt 113 permanently fastens the first part 111 and the second part 112 .
- all the three product shape forming surfaces 110 s , 120 s , and 130 s have a circular shape around its axial center.
- the product shape forming surfaces 110 s , 120 s , and 130 s are also referred to as molten metal contacting surfaces.
- the product shape forming surface 110 s of the insert die 110 has protrusions 111 p .
- the protrusion 111 p is a shaping part disposed upon request of outer specification of cast products. Focusing on the shape of the protrusion 111 p , the protrusion 111 p has a property of likely to be a high temperature during a molten metal pouring process and likely to be rapidly cooled during cooling. This is because that while the protrusion 111 p is surrounded by molten metal and cooling water, a heat conduction path to the movable-side main mold 130 is narrow.
- the insert die 110 includes cooling water passages 114 (which corresponds to a cooling portion in the appended claims) to reduce the above-described temperature change.
- the cooling water passage 114 has an annular, circulating shape viewed from the axial direction of the bolt 113 .
- the cooling water passage 114 communicates with a cooling water inlet and a cooling water discharge port (not illustrated).
- the cooling water passages 114 are formed by covering openings of the annular depressed portions, which are formed at the first part 111 , with the second part 112 .
- the cooling water passage 114 is sealed from the outside of the cooling water passage 114 with a weld bead 110 b (also referred to as a welding portion or a weld-overlay portion), which joins the first part 111 and the second part 112 .
- a weld bead 110 b also referred to as a welding portion or a weld-overlay portion
- the fixed-side main mold 120 , the movable-side main mold 130 , the first part 111 , and the second part 112 are all made of an SKD 61 and/or other tool steels.
- the weld bead 110 b is a part over which deposited metal with a composition similar to the SKD 61 is overlaid.
- This build-up welding is formed by TIG welding using a TIG welding rod (for example, DS-61G).
- TIG welding rod for example, DS-61G
- the entire outer surface of the weld bead 110 b is in contact with the inner surface of the depressed portion 130 c of the movable-side main mold 130 .
- the mold 100 is constituted such that the weld bead 110 b is not to be exposed to the molten metal. Since the weld bead 110 b is not exposed to the molten metal, this allows preventing a heat cycle caused by the contact of the weld bead 110 b with the molten metal.
- the entire outer surface of the weld bead 110 b is in contact with the movable-side main mold 130 , this allows exchanging heat remarkably effective between the outer surface and the movable-side main mold 130 . Accordingly, partial excessive temperature change only at the outer surface of the weld bead 110 b can be minimized. This allows minimizing a heat check and a crack.
- FIG. 2 is a flowchart illustrating a method for using the mold 100 according to the first embodiment.
- FIG. 3A to FIG. 3C are process drawings illustrating the method for using the mold 100 according to the first embodiment.
- the mold 100 is used in the following method.
- Step S 11 performs a mold-setting-up process.
- the mold-setting-up process forms a mold with the fixed-side main mold 120 and the movable-side main mold 130 from which the cast product has been taken out and where the cooling has been completed (see FIG. 3A ).
- the mold-setting-up process moves the movable-side main mold 130 having the insert die 110 , and forms the enclosed space (see FIG. 3B ).
- the enclosed space is to cast the cast products with the three product shape forming surfaces 110 s , 120 s , and 130 s , which are provided to the fixed-side main mold 120 , the insert die 110 , and the movable-side main mold 130 , respectively.
- Step S 12 performs the molten metal pouring process.
- the molten metal pouring process press-fits a high-temperature molten metal to the mold.
- a high-temperature molten metal for example, an aluminum alloy is used. This heightens the temperatures of all the product shape forming surfaces 110 s , 120 s , and 130 s . Meanwhile, the molten metal hardens and an aluminum die-cast product (not illustrated) is casted. After completion of solidification, the process proceeds to the next process.
- Step S 13 performs a mold opening process.
- the mold opening process moves the movable-side main mold 130 to separate the movable-side main mold 130 from the fixed-side main mold 120 to allow extraction of the aluminum die-cast product (not illustrated).
- Step S 14 extracts the aluminum die-cast product. Then, the manufacturing process for aluminum die-cast products with the mold 100 is completed. The manufacturing process for aluminum die-cast products proceeds to the next process, which does not use the mold 100 .
- Step S 15 applies a mold release agent to the insert die 110 , the fixed-side main mold 120 , and the movable-side main mold 130 with a spray device 190 (see FIG. 3C ).
- This embodiment uses a water-soluble mold release agent for die-casting (for example, TX-2400 and GL-3700) as the mold release agent.
- the mold release agent is applied by spraying the water-soluble mold release agent for die-casting to the product shape forming surfaces 110 s , 120 s , and 130 s (see FIG. 3C ).
- the process can be returned to the mold-setting-up process (Step S 10 ) (Step S 17 ). In the case where the aluminum die-cast product is the end product, the process is terminated.
- the water-soluble mold release agent for die-casting forms mold-releasing films over the product shape forming surfaces 110 s , 120 s , and 130 s . Meanwhile, evaporation of the water vapor allows the product shape forming surfaces 110 s , 120 s , and 130 s to be rapidly cooled. This allows achieving the short cycle time of the casting process.
- the rapid cooling of the product shape forming surfaces 110 s , 120 s , and 130 s increases the problem of thermal fatigue, causing the heat check and the crack.
- the heat check and the crack occur in a process where the product shape forming surfaces 110 s , 120 s , and 130 s whose temperatures become high by the molten metal pouring process are rapidly cooled and contracted by the evaporation of the water vapor of the water-soluble mold release agent for die-casting. This is because that the rapid contraction of the surface generates a thermal expansion difference between the surface part and the inner part, resulting in a strain.
- the protrusion 111 p focusing on its shape, especially the protrusion 111 p provided with the product shape forming surface 110 s , has a property likely to be a high temperature during the molten metal pouring process. This is because that while the protrusion 111 p is surrounded by the molten metal, the heat conduction path to the movable-side main mold 130 is narrow. However, in this embodiment, since the cooling water passages 114 are formed at the inside of the protrusions 111 p , this allows minimizing the excessively high temperature of the protrusions 111 p .
- the protrusion 111 p can also be cooled with the cooling water passage 114 . This allows effectively minimizing the heat check and the crack, which are caused by the cooling by the application of the mold release agent.
- the cooling water passages 114 are sealed by the weld beads 110 b .
- a mold life of a part of a die-casting mold where the welding repair has been performed is remarkably reduced compared with a non-welded portion (for example, Measures For Service Life Of Mold For Die-Casting, written by Masahiko Hihara, NIKKAN KOGYO SHIMBUN, LTD.).
- the weld bead 110 b causes the reduction in mold life at least due to the following reasons. The other reasons will be described later.
- the weld bead 110 b seals the cooling water passage 114 , the weld bead 110 b is not in an excessively high temperature state.
- the weld bead 110 b does not form the product shape forming surface 110 s (not exposed to the enclosed space (see FIG. 3B ), which is to cast the cast product). Accordingly, the weld bead 110 b does not become a high temperature excessively and is not exposed under a rapid temperature decrease, which is caused by application of the mold release agent.
- the weld bead 110 b is in contact with the movable-side main mold 130 . Accordingly, the weld bead 110 b and the movable-side main mold 130 do not form a thermal boundary and do not generate excessively large heat gradient.
- the mold 100 having the constitution of the first embodiment uses the welding process for manufacturing a cooling flow passage 140 while minimizing the deterioration of durability of the mold 100 . This achieves the appropriate cooling flow passage, ensuring achieving the mold 100 having long life.
- FIG. 4 is a flowchart illustrating the method for manufacturing the mold 100 according to the first embodiment.
- FIG. 5A to FIG. 5C are process drawings illustrating the method for manufacturing the mold 100 according to the first embodiment.
- the mold 100 is manufactured by the following method.
- Step S 21 performs the machining process on the respective components (see FIG. 5A ).
- the respective components of the first part 111 and the second part 112 , which constitute the insert die 110 are all manufactured by performing the machining process on materials, which is the SKD 61, before quenching.
- depressed portions 111 w On the outer periphery of the first part 111 , depressed portions 111 w , which have a depressed shape for build-up welding, are formed. On the outer periphery of the second part 112 , depressed portions 112 w , which have a depressed shape for build-up welding, are formed.
- Step S 22 assembles the respective components. Specifically, the first part 111 and the second part 112 , which constitute the insert die 110 , are combined. The combined first part 111 and second part 112 are fastened by the bolt 113 . This forms the depressed portions 111 w and 112 w (see FIG. 5B ) to form the weld beads 110 b across the peripheral areas of the first part 111 and the second part 112 .
- the depressed portions 111 w and 112 w have a semicircular cross section.
- Step S 23 performs the welding process.
- the welding process is performed by forming the weld bead 110 b (see FIG. 1 and FIG. 5C ) by the TIG welding using the TIG welding rod (for example, the DS-61G).
- the weld bead 110 b is appropriately melted into both the first part 111 and the second part 112 , thus constituting a gradient metal.
- the TIG welding rod (for example, the DS-61G) forms the weld-overlay portion by the deposited metal with the composition similar to the SKD 61, and different from the welding repair, the first part 111 and the second part 112 are in the state of before quenching. Accordingly, the weld bead 110 b forms the gradient metal having extremely smooth gradient by including a heating process. Accordingly, the first part 111 and the second part 112 are combined and fastened by the bolt 113 , thus manufacturing a welded half-finished product of the insert die 110 .
- Step S 24 performs the heat treatment (the quenching) on the half-finished product of the insert die 110 .
- the insert die 110 has sufficient toughness and rigidity.
- the first part 111 , the second part 112 , and the weld bead 110 b before quenching are all integratedly quenched. Therefore, the weld bead 110 b has a physical property significantly similar to the first part 111 and the second part 112 . Accordingly, a physical property boundary hardly occurs between the weld beads 110 b and the first part 111 and the second part 112 as the base material, ensuring effectively minimizing the thermal fatigue generated caused by the boundary.
- Step S 25 performs a finishing process.
- the finishing process includes the machining process to form the outer shape of the weld bead 110 b into a shape so as to fit the depressed portion 130 c of the movable-side main mold 130 .
- the finishing process includes the overall machining process of the outer surface and the surface treatment to achieve an appropriate fitting state between the insert die 110 on which thermal distortion is generated and the movable-side main mold 130 .
- the finishing process includes the machining process and the surface treatment to achieve the appropriate fitting state between the fixed-side main mold 120 , the movable-side main mold 130 , and the insert die 110 .
- Step S 26 inspects the mold 100 .
- This inspection includes a pressure resistance inspection, an X-ray inspection, or a similar inspection on the cooling water passage 114 . These processes allow manufacturing the mold 100 having the constitution of the first embodiment.
- This manufacturing process starts manufacturing the respective components of all the first part 111 and the second part 112 , which constitute the insert die 110 , from the process of the machining process on the materials, which is the SKD 61, before quenching, and after welding and joining the first part 111 and the second part 112 , the first part 111 and the second part 112 are integratedly quenched. Furthermore, the welding process forms the weld-overlay portion with the deposited metal with the composition similar to the SKD 61. Accordingly, the physical property boundary hardly occurs between the weld beads 110 b and the first part 111 and the second part 112 as the base material. As a result, the thermal fatigue generated caused by the boundary can be effectively minimized.
- FIG. 6 is an explanatory view illustrating the constitution of a die-cast-casting-machine use spool bush 200 (hereinafter simply referred to as a spool bush) according the second embodiment.
- the spool bush 200 is a component to cause the molten metal to pass through itself and to pour (supply) molten metal to the mold (for example, the mold 100 ).
- the spool bush 200 has its central axis in the vertical direction in the drawing and has a cylindrical shape including a hollow part.
- the spool bush 200 is the casting apparatus used for casting.
- the spool bush 200 includes insertion liners 210 , a bush body 220 , outer liners 230 , and a bolt 213 .
- plunger holes 200 h are formed on the inner surfaces of the insertion liners 210 .
- a plunger (not illustrated), which pushes the molten metal, passes.
- the insertion liner 210 is a replacement component.
- the inner surface of the plunger hole 200 h is also referred to as the molten metal contacting surface.
- the spool bush 200 is constituted as follows.
- the bolt 213 fastens the insertion liner 210 and the bush body 220 .
- the outer liner 230 and the bush body 220 are permanently fastened with two weld beads 200 b 1 and 200 b 2 (also referred to as welding portions).
- the two weld beads 200 b 1 and 200 b 2 are each formed into a ring shape around the central axis of the spool bush 200 .
- the spool bush 200 includes cooling water passages 224 (which corresponds to the cooling portion in the appended claims).
- the cooling water passage 224 is formed of the inner surface of the outer liner 230 and a cooling groove 220 g (see FIG. 8 ).
- the cooling groove 220 g is formed on the outer diameter surface of the bush body 220 .
- the cooling water passages 224 are each formed into the ring shape around the central axis of the spool bush 200 and partially communicate with one another in the central axis direction of the spool bush 200 .
- the cooling water inlet (not illustrated) communicates with the cooling water discharge port (not illustrated). Accordingly, the cooling water passage 224 is constituted as a circulation path. This quickly solidifies a molten metal, allowing shortening the cycle time of casting.
- the spool bush 200 is constituted such that the two weld beads 200 b 1 and 200 b 2 are not exposed to the molten metal during the operation. Thus, the two weld beads 200 b 1 and 200 b 2 are not exposed to the molten metal. This allows preventing a heat cycle, which is caused by the two weld beads 200 b 1 and 200 b 2 in contact with the molten metal.
- FIG. 7 is a flowchart illustrating a method for manufacturing the spool bush 200 according to the second embodiment.
- FIG. 8 is a process drawing illustrating the method for manufacturing the spool bush 200 according to the second embodiment.
- FIG. 9 is a process drawing illustrating an assembled state (before welding) of the bush body 220 and the outer liners 230 according to the second embodiment.
- the spool bush 200 is manufactured by the following method. Step S 21 a performs the machining process of the bush body 220 and the outer liners 230 (see FIG. 8 ). Similar to the first embodiment, these respective components are all manufactured by performing the machining process on materials, which is the SKD 61, before quenching.
- a depressed portion 230 w 1 and a depressed portion 230 w 2 which have a depressed shape for build-up welding, are formed, respectively.
- a depressed portion 220 w 1 and a depressed portion 220 w 2 which have a depressed shape for build-up welding, are formed, respectively (see FIG. 9 ).
- Step S 22 a temporarily assembles the respective components 220 and 230 .
- Step S 22 a combines the bush body 220 and the outer liners 230 .
- the depressed portions 220 w 1 and 230 w 1 to form the weld beads 200 b 1 are formed across the upper ends of the bush body 220 and the outer liners 230 .
- the depressed portions 220 w 1 and 230 w 1 have a semicircular cross section.
- the depressed portions 220 w 2 and 230 w 2 to form the weld beads 200 b 2 are formed across the lower portion of the bush body 220 and the lower end of the outer liner 230 .
- the depressed portions 220 w 2 and 230 w 2 have a semicircular cross section.
- Step S 23 a performs the heat treatment (the quenching) on the respective components 220 and 230 .
- This embodiment performs the heat treatment before the welding process in a state where the respective components 220 and 230 are disassembled. This is because that, regarding the shapes of the respective components 220 and 230 , performing the heat treatment with the respective components 220 and 230 combined results in excessive internal stress, which is generated by the heat treatment.
- Step S 24 a performs the welding process.
- a finish machining process is performed before the welding process to assemble the respective components 220 and 230 . This does not cause excessive internal stress after the heat treatment (in the form of a product).
- the welding process is performed by forming the weld beads 200 b 1 and 200 b 2 (see FIG. 6 ) by the TIG welding using the TIG welding rod (for example, the DS-61G).
- the weld beads 200 b 1 and 200 b 2 are appropriately melted into both the bush body 220 and the outer liner 230 , thus constituting a gradient metal. This manufactures the half-finished product of the spool bush 200 .
- Step S 25 performs the finishing process.
- the finishing process includes the machining process.
- the machining process forms the inner surface shape of the bush body 220 into a shape so as to fit the outer surface shape of the insertion liner 210 , which is the replacement component.
- Step S 26 inspects the mold 100 .
- Step S 27 inserts the insertion liner 210 to the inside of the bush body 220 , and the bolt 213 fastens both.
- This manufacturing process forms the weld-overlay portions at all the respective components of the bush body 220 and the outer liner 230 with the deposited metal with the composition similar to the SKD 61. This ensures effectively minimizing the thermal fatigue.
- the die-cast-casting-machine use spool bush 200 of the second embodiment uses the cooling water passages 224 to quickly solidify the molten metal, thus ensuring shortening the cycle time for casting. Furthermore, without the use of an O-ring or a similar component, the weld beads 200 b 1 and 200 b 2 where thermal fatigue is effectively minimized can constitute the cooling water passages 224 . This allows enhancing the durability of the spool bush 200 .
- FIG. 10A is a cross-sectional view illustrating a part of a constitution of a mold 300 according to the third embodiment.
- the mold 300 has convex portions (illustrated) and internally has cooling flow passages 310 , 320 , and 330 (which corresponds to the cooling portion in the appended claims).
- the two linear cooling flow passages 310 and 330 extend parallel toward the proximity of a product shape forming surface 300 s of the mold 300 .
- the linear cooling flow passage 320 communicates with both the two cooling flow passages 310 and 330 . Accordingly, the three linear cooling flow passages 310 , 320 , and 330 are mutually communicated and form a circulation path.
- the product shape forming surface 300 s is also referred to as the molten metal contacting surface.
- the cooling flow passage 320 is sealed by weld beads 300 b 1 and 300 b 2 at both ends. This forms columnar flow passages 320 c 1 and 300 c 2 at respective both ends of the cooling flow passage 320 .
- the one end of the columnar flow passage 320 c 1 is sealed by the weld bead 300 b 1 and the other end is coupled to the circulation path.
- the one end of a columnar flow passage 320 c 2 is sealed by the weld bead 300 b 2 and the other end is coupled to the circulation path.
- the weld beads 300 b 1 and 300 b 2 seal the one ends of both the columnar flow passages 320 c 1 and 300 c 2 . Therefore, according to the usual viewpoint of hydromechanics, this structure forms a stagnation; therefore, cooling cannot be expected. However, according to analysis of the inventor of this application, the following has been found. Since the cooling water spouts and flows in at constant cycles by evaporation (in another technical field, this has been known as a so-called pop pop boat principle), this structure features high cooling capacity contrary to common sense.
- FIG. 10B is a process drawing illustrating a state after a machining process (before welding) of the mold 300 according to the third embodiment.
- FIG. 11 is a flowchart illustrating the method for manufacturing the mold 300 according to the third embodiment. To achieve the above-described constitution, the mold 300 is manufactured by the following method.
- Step S 31 performs a drilling process (see FIG. 10B ).
- performing the machining process on a mold base metal 350 before quenching the SKD 61 manufactures the mold 300 .
- a drill with a diameter of 6 mm forms three holes.
- the three holes include holes 310 and 330 and one through-hole 320 .
- the two holes 310 and 330 are dug toward the product shape forming surface 300 s up to the proximity of the product shape forming surface 300 s . This constitution allows forming the circulation path inside the mold 300 .
- the drilling process includes a boring process and a rounding process.
- the boring process forms the holes 310 and 330 with a drill for boring (not illustrated).
- the rounding process rounds most depressed portions 310 c and 330 c (see FIG. 10B ) of the bored holes to form rounded most depressed portions 310 r and 330 r (see FIG. 10A ).
- the rounding process uses a dedicated tool whose distal end is rounded. The rounding process is performed to enhance the durability.
- Step S 32 performs a depressed portion forming process.
- the depressed portion forming process forms depressed portions 300 w 1 and 300 w 2 for build-up welding at both the end portions of the through-hole 320 .
- the depressed portions 300 w 1 and 300 w 2 are formed into hemispherical depressed portions (see FIG. 10A ) such that each diameter D of the weld beads 300 b 1 and 300 b 2 for build-up welding (also referred to as the welding portions or the weld-overlay portions) becomes twice as large as the hole diameter, which is 12 mm in this embodiment.
- the diameters D of the weld beads 300 b 1 and 300 b 2 are the most preferable to be 1.5 times to twice the hole diameter viewed from the axial directions of the columnar flow passages 320 c 1 and 300 c 2 , and are also preferable to be 1 time to 2.5 times of the hole diameter.
- the embodiment can be achieved even outside the range.
- the weld beads 300 b 1 and 300 b 2 can achieve sufficient cooling as long as the exposure to the molten metal is constituted so as to be equal to or less than a predetermined ratio with respect to areas of the weld beads 300 b 1 and 300 b 2 , which constitute the inner surfaces of the columnar flow passages 320 c 1 and 300 c 2 .
- the predetermined ratio can be determined according to the operating form (the temperature of molten metal and the shape of the mold).
- Step S 33 performs the welding process.
- the welding process is performed by forming the weld beads 300 b 1 and 300 b 2 by the TIG welding using the TIG welding rod (for example, the DS-61G).
- the weld beads 300 b 1 and 300 b 2 are appropriately melted into the mold base metal 350 , thus constituting a gradient metal.
- the half-finished product of the mold 300 is manufactured.
- Step S 34 performs the heat treatment (the quenching) of the half-finished product of the mold 300 .
- a physical property boundary hardly occurs between the weld beads 300 b 1 and 300 b 2 and the mold base metal 350 , ensuring effectively minimizing the thermal fatigue, which is generated caused by the boundary.
- Step S 35 performs the finishing process.
- Step S 36 inspects the mold 300 .
- This inspection includes the pressure resistance inspection, the X-ray inspection, or a similar inspection on the cooling flow passages 310 , 320 , and 330 . These processes can manufacture the mold 300 having the constitution of the third embodiment.
- the physical property boundary hardly occurs between the weld beads 300 b 1 and 300 b 2 and the mold base metal 350 . Furthermore, since the cooling water spouts and flows in at constant cycles in the columnar flow passages 320 c 1 and 300 c 2 by evaporation, the weld beads 300 b 1 and 300 b 2 can be effectively cooled.
- the exposure of the weld beads 300 b 1 and 300 b 2 to the molten metal becomes equal to or less than the predetermined ratio with respect to the areas of the weld beads 300 b 1 and 300 b 2 , which constitute the inner surfaces of the columnar flow passages 320 c 1 and 300 c 2 , to ensure sufficiently cooling.
- the thermal fatigue generated caused by the boundary with the weld beads 300 b 1 and 300 b 2 can be effectively minimized.
- this build-up welding is formed by the TIG welding using the TIG welding rod; however, another welding method may be employed. Note that since the TIG welding can obtain beautiful, high-quality weld beads (weld-overlay portions) and therefore is preferable in terms of allowing application to welding of various metals.
- the casting apparatus may be constituted as follows.
- the casting apparatus has a plurality of components including a welding component having the welding portion. With the plurality of components assembled, the welding portion is constituted not to be exposed to the molten metal.
- the casting apparatus may be constituted as follows.
- the casting apparatus is a mold.
- the molten metal contacting surface constitutes a part of the mold as a product shape forming surface.
- the product shape forming surface forms a shape of the cast product set in advance.
- An outer surface of the welding portion is constituted so as not to be exposed to the molten metal by contact with any of outer surfaces of the plurality of components.
- the casting apparatus may be constituted as follows.
- the cooling portion is manufactured by welding a material before quenching and subsequently quenching the material.
- the casting apparatus may be constituted as follows.
- the casting apparatus is a mold.
- the cooling flow passage includes a columnar flow passage. One end of the columnar flow passage is sealed by the welding portion. Another end of the columnar flow passage communicates with a circulation path.
- the circulation path causes a cooling medium to circulate.
- the welding portion has a diameter 1.5 times to 2.5 times of a diameter of the columnar flow passage viewed from an axial direction of the columnar flow passage such that the diameter becomes equal to or less than the predetermined ratio.
- the casting apparatus may be constituted as follows. A length of the columnar flow passage from the one end to the other end is longer than the diameter of the columnar flow passage.
- the casting apparatus may be constituted as follows.
- the casting apparatus is a sprue bushing.
- the molten metal contacting surface constitutes a path to cause the molten metal to pass through to supply the molten metal to the mold.
- the casting apparatus may be constituted as follows.
- the columnar flow passage is a mold whose length from the one end to the other end is longer than the diameter of the columnar flow passage.
- While one or more embodiments of the present invention seals the cooling flow passage by the welding process, the reduction in durability of the casting apparatus caused by the welding process can be minimized.
Abstract
A casting apparatus for manufacturing a cast product from molten metal includes a molten metal and a cooling portion. The molten metal contacts a surface for contact with the molten metal. The cooling portion forms a cooling flow passage. The cooling flow passage is configured to cool the molten metal contacting surface. At least a part of an inner surface of the cooling flow passage is constituted of a welding portion formed by welding, the welding portion sealing the cooling flow passage. The welding portion is constituted such that an exposure to the molten metal becomes equal to or less than a predetermined ratio with respect to an area of the welding portion constituting the inner surface of the cooling flow passage.
Description
- This application claims priority from Japanese Patent Application No. 2014-210324 filed with the Japan Patent Office on Oct. 14, 2014, the entire content of which is hereby incorporated by reference.
- 1. Technical Field
- The present invention relates to a casting apparatus, such as a mold and a sprue bushing, used for die-cast casting or a similar casting and a method for manufacturing the casting apparatus. More specifically, the present invention relates to the casting apparatus that internally includes cooling flow passages for cooling the casting apparatus and the method for manufacturing the casting apparatus.
- 2. Related Art
- Conventionally, build-up welding has been performed to repair molds, and there has been proposed an improvement of the method (for example, Japanese Unexamined Patent Application Publication No. 2011-115807). In manufacturing the molds as well, to expand a freedom of design for forming a flow passage, the manufacturing method using the build-up welding has been proposed (for example, Japanese Unexamined Patent Application Publication No. 2004-34133, Japanese Unexamined Patent Application Publication No. H05-309468, and Japanese Unexamined Patent Application Publication No. 2005-52892). Meanwhile, a spread of water-soluble mold release agent for die-casting or a similar agent allows rapidly cooling the molds. While shortening of a manufacturing cycle is achieved, a problem of a heat check and a crack is likely to occur. Furthermore, it has been known as technical common knowledge that the welding repair is one cause of reduction in mold life (“Measures For Service Life Of Mold For Die-Casting”, written by Masahiko Hihara, published by NIKKAN KOGYO SHIMBUN, LTD., Feb. 28, 2003, p. 289). The introduction of a cooling flow passage has been proposed also for the casting apparatus other than the mold such as the sprue bushing (Japanese Unexamined Patent Application Publication No. 2003-10953).
- However, while a welding process is suitable for manufacturing the cooling flow passage, which is required to feature air tightness, from the aspect of durability of the casting apparatus, sufficient examination has been required to the welding process.
- One or more embodiments provide a casting apparatus manufactured using the welding process for manufacturing the cooling flow passages while minimizing deterioration of durability of the casting apparatus and a method for manufacturing the casting apparatus.
- One or more embodiments of the present invention provides a casting apparatus for manufacturing cast products from molten metal. The casting apparatus includes a molten metal contacting surface and a cooling portion. The molten metal contacting surface is in contact with the molten metal. The cooling portion forms a cooling flow passage. The cooling flow passage is configured to cool the molten metal contacting surface. At least a part of an inner surface of the cooling flow passage is constituted of a welding portion formed by welding. The welding portion seals the cooling flow passage. The welding portion is constituted such that an exposure to the molten metal becomes equal to or less than a predetermined ratio with respect to an area of the welding portion constituting the inner surface of the cooling flow passage.
- With the casting apparatus of one or more embodiments according to the present invention, at least a part of the inner surface of the cooling flow passage is constituted of the welding portion formed by welding. This allows minimizing excessive temperature rise by casting and also allows minimizing rapid temperature fall by cooling with a mold release agent. Meanwhile, the welding portion is constituted such that the exposure to the molten metal becomes equal to or less than the predetermined ratio with respect to the area of the welding portion constituting the inner surface of the cooling flow passage. This allows minimizing an influence of fatigue degradation caused by a temperature cycle by sufficient cooling. Consequently, the reduction in durability of the casting apparatus caused by the welding process can be minimized. The predetermined ratio can be set appropriately depending on the operating state and the design of the casting apparatus.
-
FIG. 1 is a cross-sectional view illustrating a constitution of amold 100 according to a first embodiment of the present invention; -
FIG. 2 is a flowchart illustrating a method for using themold 100 according to the first embodiment; -
FIG. 3A is a process drawing illustrating the method for using themold 100 according to the first embodiment; -
FIG. 3B is a process drawing illustrating the method for using themold 100 according to the first embodiment; -
FIG. 3C is a process drawing illustrating the method for using themold 100 according to the first embodiment; -
FIG. 4 is a flowchart illustrating a method for manufacturing themold 100 according to the first embodiment; -
FIG. 5A is a process drawing illustrating the method for manufacturing themold 100 according to the first embodiment; -
FIG. 5B is a process drawing illustrating the method for manufacturing themold 100 according to the first embodiment; -
FIG. 5C is a process drawing illustrating the method for manufacturing themold 100 according to the first embodiment; -
FIG. 6 is a cross-sectional view illustrating a constitution of a die-cast-casting-machineuse spool bush 200 according a second embodiment; -
FIG. 7 is a flowchart illustrating a method for manufacturing thespool bush 200 according to the second embodiment; -
FIG. 8 is an exploded view illustrating the method for manufacturing thespool bush 200 according to the second embodiment; -
FIG. 9 is a process drawing illustrating an assembled state (before welding) of abush body 220 and anouter liner 230 according to the second embodiment; -
FIG. 10A is a cross-sectional view illustrating a part of a constitution of amold 300 according to a third embodiment; -
FIG. 10B is a process drawing illustrating a state after a machining process (before welding) of themold 300 according to the third embodiment; and -
FIG. 11 is a flowchart illustrating the method for manufacturing themold 300 according to the third embodiment. - The following describes respective embodiments of the present invention in the following order. It will be understood that the scope of the present invention is not limited to the described embodiments, unless otherwise stated.
-
FIG. 1 is a cross-sectional view illustrating a constitution of amold 100 according to a first embodiment of the present invention. Themold 100 includes aninsert die 110, a fixed-sidemain mold 120, and a movable-sidemain mold 130. Theinsert die 110 has a productshape forming surface 110 s, which forms the shape of a cast product. The fixed-sidemain mold 120 has a productshape forming surface 120 s. The movable-sidemain mold 130 has a productshape forming surface 130 s and adepressed portion 130 c. The three productshape forming surfaces mold 100 is the casting apparatus used for casting. - The insert die 110 includes a
first part 111, asecond part 112, and abolt 113. Thefirst part 111 has the productshape forming surface 110 s. Thesecond part 112 has an outer surface fitted to thedepressed portion 130 c of the movable-sidemain mold 130. Thebolt 113 permanently fastens thefirst part 111 and thesecond part 112. In this embodiment, when viewed from the axial direction of thebolt 113, all the three productshape forming surfaces shape forming surfaces - The product
shape forming surface 110 s of the insert die 110 hasprotrusions 111 p. Theprotrusion 111 p is a shaping part disposed upon request of outer specification of cast products. Focusing on the shape of theprotrusion 111 p, theprotrusion 111 p has a property of likely to be a high temperature during a molten metal pouring process and likely to be rapidly cooled during cooling. This is because that while theprotrusion 111 p is surrounded by molten metal and cooling water, a heat conduction path to the movable-sidemain mold 130 is narrow. - The insert die 110 includes cooling water passages 114 (which corresponds to a cooling portion in the appended claims) to reduce the above-described temperature change. The cooling
water passage 114 has an annular, circulating shape viewed from the axial direction of thebolt 113. The coolingwater passage 114 communicates with a cooling water inlet and a cooling water discharge port (not illustrated). The coolingwater passages 114 are formed by covering openings of the annular depressed portions, which are formed at thefirst part 111, with thesecond part 112. The coolingwater passage 114 is sealed from the outside of the coolingwater passage 114 with aweld bead 110 b (also referred to as a welding portion or a weld-overlay portion), which joins thefirst part 111 and thesecond part 112. - The fixed-side
main mold 120, the movable-sidemain mold 130, thefirst part 111, and thesecond part 112 are all made of an SKD 61 and/or other tool steels. Theweld bead 110 b is a part over which deposited metal with a composition similar to the SKD 61 is overlaid. This build-up welding is formed by TIG welding using a TIG welding rod (for example, DS-61G). The combination of a plurality of components forms the movable-sidemain mold 130 and the insert die 110, thus constituting one side of themold 100. - The entire outer surface of the
weld bead 110 b is in contact with the inner surface of thedepressed portion 130 c of the movable-sidemain mold 130. Thus, themold 100 is constituted such that theweld bead 110 b is not to be exposed to the molten metal. Since theweld bead 110 b is not exposed to the molten metal, this allows preventing a heat cycle caused by the contact of theweld bead 110 b with the molten metal. Furthermore, the entire outer surface of theweld bead 110 b is in contact with the movable-sidemain mold 130, this allows exchanging heat remarkably effective between the outer surface and the movable-sidemain mold 130. Accordingly, partial excessive temperature change only at the outer surface of theweld bead 110 b can be minimized. This allows minimizing a heat check and a crack. -
FIG. 2 is a flowchart illustrating a method for using themold 100 according to the first embodiment.FIG. 3A toFIG. 3C are process drawings illustrating the method for using themold 100 according to the first embodiment. To produce cast products, themold 100 is used in the following method. - Step S11 performs a mold-setting-up process. The mold-setting-up process forms a mold with the fixed-side
main mold 120 and the movable-sidemain mold 130 from which the cast product has been taken out and where the cooling has been completed (seeFIG. 3A ). The mold-setting-up process moves the movable-sidemain mold 130 having the insert die 110, and forms the enclosed space (seeFIG. 3B ). The enclosed space is to cast the cast products with the three productshape forming surfaces main mold 120, the insert die 110, and the movable-sidemain mold 130, respectively. - Step S12 performs the molten metal pouring process. The molten metal pouring process press-fits a high-temperature molten metal to the mold. As the molten metal, for example, an aluminum alloy is used. This heightens the temperatures of all the product
shape forming surfaces - Step S13 performs a mold opening process. The mold opening process moves the movable-side
main mold 130 to separate the movable-sidemain mold 130 from the fixed-sidemain mold 120 to allow extraction of the aluminum die-cast product (not illustrated). Step S14 extracts the aluminum die-cast product. Then, the manufacturing process for aluminum die-cast products with themold 100 is completed. The manufacturing process for aluminum die-cast products proceeds to the next process, which does not use themold 100. - Step S15 applies a mold release agent to the insert die 110, the fixed-side
main mold 120, and the movable-sidemain mold 130 with a spray device 190 (seeFIG. 3C ). This embodiment uses a water-soluble mold release agent for die-casting (for example, TX-2400 and GL-3700) as the mold release agent. The mold release agent is applied by spraying the water-soluble mold release agent for die-casting to the productshape forming surfaces FIG. 3C ). After completion of the cooling (Step S16), in the case where the aluminum die-cast product is not an end product, the process can be returned to the mold-setting-up process (Step S10) (Step S17). In the case where the aluminum die-cast product is the end product, the process is terminated. - The water-soluble mold release agent for die-casting forms mold-releasing films over the product
shape forming surfaces shape forming surfaces - The rapid cooling of the product
shape forming surfaces shape forming surfaces - In this embodiment, focusing on its shape, especially the
protrusion 111 p provided with the productshape forming surface 110 s, has a property likely to be a high temperature during the molten metal pouring process. This is because that while theprotrusion 111 p is surrounded by the molten metal, the heat conduction path to the movable-sidemain mold 130 is narrow. However, in this embodiment, since the coolingwater passages 114 are formed at the inside of theprotrusions 111 p, this allows minimizing the excessively high temperature of theprotrusions 111 p. Furthermore, while the process continues from the molten metal pouring process (Step S12) to the mold opening process (Step S13) and then proceeds to the application of the mold release agent (Step S15), theprotrusion 111 p can also be cooled with the coolingwater passage 114. This allows effectively minimizing the heat check and the crack, which are caused by the cooling by the application of the mold release agent. - In this embodiment, the cooling
water passages 114 are sealed by theweld beads 110 b. With general technical common knowledge, it is considered that a mold life of a part of a die-casting mold where the welding repair has been performed is remarkably reduced compared with a non-welded portion (for example, Measures For Service Life Of Mold For Die-Casting, written by Masahiko Hihara, NIKKAN KOGYO SHIMBUN, LTD.). However, in this embodiment, it is less likely that theweld bead 110 b causes the reduction in mold life at least due to the following reasons. The other reasons will be described later. - (1) Since the
weld bead 110 b seals the coolingwater passage 114, theweld bead 110 b is not in an excessively high temperature state.
(2) Theweld bead 110 b does not form the productshape forming surface 110 s (not exposed to the enclosed space (seeFIG. 3B ), which is to cast the cast product). Accordingly, theweld bead 110 b does not become a high temperature excessively and is not exposed under a rapid temperature decrease, which is caused by application of the mold release agent.
(3) Theweld bead 110 b is in contact with the movable-sidemain mold 130. Accordingly, theweld bead 110 b and the movable-sidemain mold 130 do not form a thermal boundary and do not generate excessively large heat gradient. - Accordingly, the
mold 100 having the constitution of the first embodiment uses the welding process for manufacturing a cooling flow passage 140 while minimizing the deterioration of durability of themold 100. This achieves the appropriate cooling flow passage, ensuring achieving themold 100 having long life. -
FIG. 4 is a flowchart illustrating the method for manufacturing themold 100 according to the first embodiment.FIG. 5A toFIG. 5C are process drawings illustrating the method for manufacturing themold 100 according to the first embodiment. To achieve the above-described constitution, themold 100 is manufactured by the following method. Step S21 performs the machining process on the respective components (seeFIG. 5A ). Especially, the respective components of thefirst part 111 and thesecond part 112, which constitute the insert die 110, are all manufactured by performing the machining process on materials, which is the SKD 61, before quenching. - On the outer periphery of the
first part 111,depressed portions 111 w, which have a depressed shape for build-up welding, are formed. On the outer periphery of thesecond part 112,depressed portions 112 w, which have a depressed shape for build-up welding, are formed. - Step S22 assembles the respective components. Specifically, the
first part 111 and thesecond part 112, which constitute the insert die 110, are combined. The combinedfirst part 111 andsecond part 112 are fastened by thebolt 113. This forms thedepressed portions FIG. 5B ) to form theweld beads 110 b across the peripheral areas of thefirst part 111 and thesecond part 112. Thedepressed portions - Step S23 performs the welding process. As described above, the welding process is performed by forming the
weld bead 110 b (seeFIG. 1 andFIG. 5C ) by the TIG welding using the TIG welding rod (for example, the DS-61G). Theweld bead 110 b is appropriately melted into both thefirst part 111 and thesecond part 112, thus constituting a gradient metal. - Note that the TIG welding rod (for example, the DS-61G) forms the weld-overlay portion by the deposited metal with the composition similar to the SKD 61, and different from the welding repair, the
first part 111 and thesecond part 112 are in the state of before quenching. Accordingly, theweld bead 110 b forms the gradient metal having extremely smooth gradient by including a heating process. Accordingly, thefirst part 111 and thesecond part 112 are combined and fastened by thebolt 113, thus manufacturing a welded half-finished product of the insert die 110. - Step S24 performs the heat treatment (the quenching) on the half-finished product of the insert die 110. By this process, the insert die 110 has sufficient toughness and rigidity. In this respect, the
first part 111, thesecond part 112, and theweld bead 110 b before quenching are all integratedly quenched. Therefore, theweld bead 110 b has a physical property significantly similar to thefirst part 111 and thesecond part 112. Accordingly, a physical property boundary hardly occurs between theweld beads 110 b and thefirst part 111 and thesecond part 112 as the base material, ensuring effectively minimizing the thermal fatigue generated caused by the boundary. - Step S25 performs a finishing process. The finishing process includes the machining process to form the outer shape of the
weld bead 110 b into a shape so as to fit thedepressed portion 130 c of the movable-sidemain mold 130. Furthermore, the finishing process includes the overall machining process of the outer surface and the surface treatment to achieve an appropriate fitting state between the insert die 110 on which thermal distortion is generated and the movable-sidemain mold 130. Furthermore, the finishing process includes the machining process and the surface treatment to achieve the appropriate fitting state between the fixed-sidemain mold 120, the movable-sidemain mold 130, and the insert die 110. - Step S26 inspects the
mold 100. This inspection includes a pressure resistance inspection, an X-ray inspection, or a similar inspection on the coolingwater passage 114. These processes allow manufacturing themold 100 having the constitution of the first embodiment. - This manufacturing process starts manufacturing the respective components of all the
first part 111 and thesecond part 112, which constitute the insert die 110, from the process of the machining process on the materials, which is the SKD 61, before quenching, and after welding and joining thefirst part 111 and thesecond part 112, thefirst part 111 and thesecond part 112 are integratedly quenched. Furthermore, the welding process forms the weld-overlay portion with the deposited metal with the composition similar to the SKD 61. Accordingly, the physical property boundary hardly occurs between theweld beads 110 b and thefirst part 111 and thesecond part 112 as the base material. As a result, the thermal fatigue generated caused by the boundary can be effectively minimized. -
FIG. 6 is an explanatory view illustrating the constitution of a die-cast-casting-machine use spool bush 200 (hereinafter simply referred to as a spool bush) according the second embodiment. Thespool bush 200 is a component to cause the molten metal to pass through itself and to pour (supply) molten metal to the mold (for example, the mold 100). Thespool bush 200 has its central axis in the vertical direction in the drawing and has a cylindrical shape including a hollow part. Thespool bush 200 is the casting apparatus used for casting. - The
spool bush 200 includesinsertion liners 210, abush body 220,outer liners 230, and abolt 213. On the inner surfaces of theinsertion liners 210, plunger holes 200 h are formed. Through theplunger hole 200 h, a plunger (not illustrated), which pushes the molten metal, passes. Theinsertion liner 210 is a replacement component. The inner surface of theplunger hole 200 h is also referred to as the molten metal contacting surface. - The
spool bush 200 is constituted as follows. Thebolt 213 fastens theinsertion liner 210 and thebush body 220. Theouter liner 230 and thebush body 220 are permanently fastened with two weld beads 200 b 1 and 200 b 2 (also referred to as welding portions). The two weld beads 200 b 1 and 200 b 2 are each formed into a ring shape around the central axis of thespool bush 200. - The
spool bush 200 includes cooling water passages 224 (which corresponds to the cooling portion in the appended claims). The coolingwater passage 224 is formed of the inner surface of theouter liner 230 and acooling groove 220 g (seeFIG. 8 ). The coolinggroove 220 g is formed on the outer diameter surface of thebush body 220. The coolingwater passages 224 are each formed into the ring shape around the central axis of thespool bush 200 and partially communicate with one another in the central axis direction of thespool bush 200. In thecooling water passage 224, the cooling water inlet (not illustrated) communicates with the cooling water discharge port (not illustrated). Accordingly, the coolingwater passage 224 is constituted as a circulation path. This quickly solidifies a molten metal, allowing shortening the cycle time of casting. - The
spool bush 200 is constituted such that the two weld beads 200 b 1 and 200 b 2 are not exposed to the molten metal during the operation. Thus, the two weld beads 200 b 1 and 200 b 2 are not exposed to the molten metal. This allows preventing a heat cycle, which is caused by the two weld beads 200 b 1 and 200 b 2 in contact with the molten metal. -
FIG. 7 is a flowchart illustrating a method for manufacturing thespool bush 200 according to the second embodiment.FIG. 8 is a process drawing illustrating the method for manufacturing thespool bush 200 according to the second embodiment.FIG. 9 is a process drawing illustrating an assembled state (before welding) of thebush body 220 and theouter liners 230 according to the second embodiment. To achieve the above-described constitution, thespool bush 200 is manufactured by the following method. Step S21 a performs the machining process of thebush body 220 and the outer liners 230 (seeFIG. 8 ). Similar to the first embodiment, these respective components are all manufactured by performing the machining process on materials, which is the SKD 61, before quenching. - On the inner periphery at the upper end and on the outer periphery at the lower end of the
outer liner 230, a depressed portion 230 w 1 and a depressed portion 230 w 2, which have a depressed shape for build-up welding, are formed, respectively. On the outer periphery at the upper end and on the inner periphery at the lower end of thebush body 220, a depressed portion 220 w 1 and a depressed portion 220 w 2, which have a depressed shape for build-up welding, are formed, respectively (seeFIG. 9 ). - Step S22 a temporarily assembles the
respective components bush body 220 and theouter liners 230. In this respect, the depressed portions 220 w 1 and 230 w 1 to form the weld beads 200 b 1 (also referred to as the welding portions or the weld-overlay portions) are formed across the upper ends of thebush body 220 and theouter liners 230. The depressed portions 220 w 1 and 230 w 1 have a semicircular cross section. Furthermore, the depressed portions 220 w 2 and 230 w 2 to form the weld beads 200 b 2 are formed across the lower portion of thebush body 220 and the lower end of theouter liner 230. The depressed portions 220 w 2 and 230 w 2 have a semicircular cross section. - Step S23 a performs the heat treatment (the quenching) on the
respective components respective components respective components respective components - Step S24 a performs the welding process. Note that a finish machining process is performed before the welding process to assemble the
respective components FIG. 6 ) by the TIG welding using the TIG welding rod (for example, the DS-61G). The weld beads 200 b 1 and 200 b 2 are appropriately melted into both thebush body 220 and theouter liner 230, thus constituting a gradient metal. This manufactures the half-finished product of thespool bush 200. - Similar to the first embodiment, Step S25 performs the finishing process. The finishing process includes the machining process. The machining process forms the inner surface shape of the
bush body 220 into a shape so as to fit the outer surface shape of theinsertion liner 210, which is the replacement component. Similar to the first embodiment, Step S26 inspects themold 100. Step S27 inserts theinsertion liner 210 to the inside of thebush body 220, and thebolt 213 fastens both. - This manufacturing process forms the weld-overlay portions at all the respective components of the
bush body 220 and theouter liner 230 with the deposited metal with the composition similar to the SKD 61. This ensures effectively minimizing the thermal fatigue. - The die-cast-casting-machine
use spool bush 200 of the second embodiment uses the coolingwater passages 224 to quickly solidify the molten metal, thus ensuring shortening the cycle time for casting. Furthermore, without the use of an O-ring or a similar component, the weld beads 200 b 1 and 200 b 2 where thermal fatigue is effectively minimized can constitute the coolingwater passages 224. This allows enhancing the durability of thespool bush 200. -
FIG. 10A is a cross-sectional view illustrating a part of a constitution of amold 300 according to the third embodiment. Themold 300 has convex portions (illustrated) and internally has coolingflow passages cooling flow passages shape forming surface 300 s of themold 300. On the other hand, the linearcooling flow passage 320 communicates with both the two coolingflow passages cooling flow passages shape forming surface 300 s is also referred to as the molten metal contacting surface. - The
cooling flow passage 320 is sealed by weld beads 300 b 1 and 300 b 2 at both ends. This forms columnar flow passages 320 c 1 and 300 c 2 at respective both ends of thecooling flow passage 320. The one end of the columnar flow passage 320 c 1 is sealed by the weld bead 300 b 1 and the other end is coupled to the circulation path. On the other hand, the one end of a columnar flow passage 320 c 2 is sealed by the weld bead 300 b 2 and the other end is coupled to the circulation path. - The weld beads 300 b 1 and 300 b 2 seal the one ends of both the columnar flow passages 320 c 1 and 300 c 2. Therefore, according to the usual viewpoint of hydromechanics, this structure forms a stagnation; therefore, cooling cannot be expected. However, according to analysis of the inventor of this application, the following has been found. Since the cooling water spouts and flows in at constant cycles by evaporation (in another technical field, this has been known as a so-called pop pop boat principle), this structure features high cooling capacity contrary to common sense.
-
FIG. 10B is a process drawing illustrating a state after a machining process (before welding) of themold 300 according to the third embodiment.FIG. 11 is a flowchart illustrating the method for manufacturing themold 300 according to the third embodiment. To achieve the above-described constitution, themold 300 is manufactured by the following method. - Step S31 performs a drilling process (see
FIG. 10B ). In this embodiment, performing the machining process on amold base metal 350 before quenching the SKD 61 manufactures themold 300. A drill with a diameter of 6 mm forms three holes. The three holes includeholes hole 320. The twoholes shape forming surface 300 s up to the proximity of the productshape forming surface 300 s. This constitution allows forming the circulation path inside themold 300. - The drilling process includes a boring process and a rounding process. The boring process forms the
holes depressed portions FIG. 10B ) of the bored holes to form rounded mostdepressed portions FIG. 10A ). The rounding process uses a dedicated tool whose distal end is rounded. The rounding process is performed to enhance the durability. - Step S32 performs a depressed portion forming process. The depressed portion forming process forms depressed portions 300 w 1 and 300 w 2 for build-up welding at both the end portions of the through-
hole 320. The depressed portions 300 w 1 and 300 w 2 (seeFIG. 10B ) are formed into hemispherical depressed portions (seeFIG. 10A ) such that each diameter D of the weld beads 300 b 1 and 300 b 2 for build-up welding (also referred to as the welding portions or the weld-overlay portions) becomes twice as large as the hole diameter, which is 12 mm in this embodiment. - According to the analysis of the inventor of this application, the larger the diameter D is, the larger the pressure resistance of the cooling flow passage while reduction in durability caused by welding becomes remarkable. Contrary, the smaller the diameter D is, the lower the pressure resistance of the cooling flow passage while the reduction in the durability caused by welding becomes small. Therefore, the diameters D of the weld beads 300 b 1 and 300 b 2 are the most preferable to be 1.5 times to twice the hole diameter viewed from the axial directions of the columnar flow passages 320 c 1 and 300 c 2, and are also preferable to be 1 time to 2.5 times of the hole diameter.
- Note that the embodiment can be achieved even outside the range. From the aspect of durability, the weld beads 300 b 1 and 300 b 2 can achieve sufficient cooling as long as the exposure to the molten metal is constituted so as to be equal to or less than a predetermined ratio with respect to areas of the weld beads 300 b 1 and 300 b 2, which constitute the inner surfaces of the columnar flow passages 320 c 1 and 300 c 2. The predetermined ratio can be determined according to the operating form (the temperature of molten metal and the shape of the mold).
- Step S33 performs the welding process. As described above, the welding process is performed by forming the weld beads 300 b 1 and 300 b 2 by the TIG welding using the TIG welding rod (for example, the DS-61G). The weld beads 300 b 1 and 300 b 2 are appropriately melted into the
mold base metal 350, thus constituting a gradient metal. Thus, the half-finished product of themold 300 is manufactured. - Step S34 performs the heat treatment (the quenching) of the half-finished product of the
mold 300. With this embodiment as well, a physical property boundary hardly occurs between the weld beads 300 b 1 and 300 b 2 and themold base metal 350, ensuring effectively minimizing the thermal fatigue, which is generated caused by the boundary. - Step S35 performs the finishing process. Step S36 inspects the
mold 300. This inspection includes the pressure resistance inspection, the X-ray inspection, or a similar inspection on the coolingflow passages mold 300 having the constitution of the third embodiment. - According to this manufacturing process, similar to the first embodiment and the second embodiment, the physical property boundary hardly occurs between the weld beads 300 b 1 and 300 b 2 and the
mold base metal 350. Furthermore, since the cooling water spouts and flows in at constant cycles in the columnar flow passages 320 c 1 and 300 c 2 by evaporation, the weld beads 300 b 1 and 300 b 2 can be effectively cooled. Additionally, it is constituted such that the exposure of the weld beads 300 b 1 and 300 b 2 to the molten metal becomes equal to or less than the predetermined ratio with respect to the areas of the weld beads 300 b 1 and 300 b 2, which constitute the inner surfaces of the columnar flow passages 320 c 1 and 300 c 2, to ensure sufficiently cooling. As a result, the thermal fatigue generated caused by the boundary with the weld beads 300 b 1 and 300 b 2 can be effectively minimized. - In the above-described embodiment, this build-up welding is formed by the TIG welding using the TIG welding rod; however, another welding method may be employed. Note that since the TIG welding can obtain beautiful, high-quality weld beads (weld-overlay portions) and therefore is preferable in terms of allowing application to welding of various metals.
- The casting apparatus may be constituted as follows. The casting apparatus has a plurality of components including a welding component having the welding portion. With the plurality of components assembled, the welding portion is constituted not to be exposed to the molten metal.
- The casting apparatus may be constituted as follows. The casting apparatus is a mold. The molten metal contacting surface constitutes a part of the mold as a product shape forming surface. The product shape forming surface forms a shape of the cast product set in advance. An outer surface of the welding portion is constituted so as not to be exposed to the molten metal by contact with any of outer surfaces of the plurality of components.
- The casting apparatus may be constituted as follows. The cooling portion is manufactured by welding a material before quenching and subsequently quenching the material.
- The casting apparatus may be constituted as follows. The casting apparatus is a mold. The cooling flow passage includes a columnar flow passage. One end of the columnar flow passage is sealed by the welding portion. Another end of the columnar flow passage communicates with a circulation path. The circulation path causes a cooling medium to circulate. The welding portion has a diameter 1.5 times to 2.5 times of a diameter of the columnar flow passage viewed from an axial direction of the columnar flow passage such that the diameter becomes equal to or less than the predetermined ratio.
- The casting apparatus may be constituted as follows. A length of the columnar flow passage from the one end to the other end is longer than the diameter of the columnar flow passage.
- The casting apparatus may be constituted as follows. The casting apparatus is a sprue bushing. The molten metal contacting surface constitutes a path to cause the molten metal to pass through to supply the molten metal to the mold.
- The casting apparatus may be constituted as follows. The columnar flow passage is a mold whose length from the one end to the other end is longer than the diameter of the columnar flow passage.
- While one or more embodiments of the present invention seals the cooling flow passage by the welding process, the reduction in durability of the casting apparatus caused by the welding process can be minimized.
Claims (10)
1. A casting apparatus for manufacturing a cast product from molten metal, the casting apparatus comprising:
a molten metal contacting surface for contact with the molten metal; and
a cooling portion forming a cooling flow passage, the cooling flow passage being configured to cool the molten metal contacting surface, wherein
at least a part of an inner surface of the cooling flow passage is constituted of a welding portion formed by welding, the welding portion sealing the cooling flow passage, and
the welding portion is constituted such that an exposure to the molten metal becomes equal to or less than a predetermined ratio with respect to an area of the welding portion constituting the inner surface of the cooling flow passage.
2. The casting apparatus according to claim 1 , wherein
the casting apparatus has a plurality of components including a welding component having the welding portion, and
with the plurality of components assembled, the welding portion is constituted not to be exposed to the molten metal.
3. The casting apparatus according to claim 2 , wherein
the casting apparatus is a mold,
the molten metal contacting surface constitutes a part of the mold as a product shape forming surface, the product shape forming surface forming a shape of the cast product set in advance, and
an outer surface of the welding portion is constituted so as not to be exposed to the molten metal by contact with any of outer surfaces of the plurality of components.
4. The casting apparatus according to claim 1 , wherein
the cooling portion is manufactured by welding a material before quenching and subsequently quenching the material.
5. The casting apparatus according to claim 1 , wherein
the casting apparatus is a mold,
the cooling flow passage includes a columnar flow passage, one end of the columnar flow passage being sealed by the welding portion, another end of the columnar flow passage communicating with a circulation path, the circulation path causing a cooling medium to circulate, and
the welding portion has a diameter 1.5 times to 2.5 times of a diameter of the columnar flow passage viewed from an axial direction of the columnar flow passage such that the diameter becomes equal to or less than the predetermined ratio.
6. The casting apparatus according to claim 5 , wherein
the columnar flow passage is a mold whose length from the one end to the other end is longer than the diameter of the columnar flow passage.
7. The casting apparatus according to claim 1 , wherein
the casting apparatus is a sprue bushing, and
the molten metal contacting surface constitutes a path to cause the molten metal to pass through to supply the molten metal to a mold.
8. A method for manufacturing a casting apparatus for manufacturing a cast product from molten metal, the method comprising:
providing a molten metal contacting surface for contact with the molten metal and a material before quenching, a part of a cooling flow passage being formed at the material, the cooling flow passage being configured to cool the molten metal contacting surface, wherein
welding at least a part of an inner surface of the cooling flow passage to form a welding portion configured to seal the cooling flow passage, and
the welding portion is constituted such that an exposure to the molten metal becomes equal to or less than a predetermined ratio with respect to an area of the welding portion constituting the inner surface of the cooling flow passage.
9. The casting apparatus according to claim 2 , wherein
the cooling portion is manufactured by welding a material before quenching and subsequently quenching the material.
10. The casting apparatus according to claim 3 , wherein
the cooling portion is manufactured by welding a material before quenching and subsequently quenching the material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/171,716 US10906090B2 (en) | 2014-10-14 | 2018-10-26 | Method of producing insert die of casting apparatus for manufacturing cast product from molten metal, and casting apparatus |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014210324A JP6474988B2 (en) | 2014-10-14 | 2014-10-14 | Casting device in which cooling channel is formed by welding and method for manufacturing casting device |
JP2014-210324 | 2014-10-14 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/171,716 Continuation US10906090B2 (en) | 2014-10-14 | 2018-10-26 | Method of producing insert die of casting apparatus for manufacturing cast product from molten metal, and casting apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
US20160101460A1 true US20160101460A1 (en) | 2016-04-14 |
Family
ID=55654798
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/854,438 Abandoned US20160101460A1 (en) | 2014-10-14 | 2015-09-15 | Casting apparatus whose cooling flow passage is formed by welding and method for manufacturing the same |
US16/171,716 Active 2036-06-27 US10906090B2 (en) | 2014-10-14 | 2018-10-26 | Method of producing insert die of casting apparatus for manufacturing cast product from molten metal, and casting apparatus |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/171,716 Active 2036-06-27 US10906090B2 (en) | 2014-10-14 | 2018-10-26 | Method of producing insert die of casting apparatus for manufacturing cast product from molten metal, and casting apparatus |
Country Status (2)
Country | Link |
---|---|
US (2) | US20160101460A1 (en) |
JP (1) | JP6474988B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3050390A1 (en) * | 2016-04-26 | 2017-10-27 | Roctool | METHOD AND DEVICE FOR SHELL MOLDING A METAL ALLOY |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109894821B (en) * | 2019-03-26 | 2020-10-02 | 优泰科(苏州)密封技术有限公司 | Shield seal welding method |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05309468A (en) * | 1992-05-11 | 1993-11-22 | Ahresty Corp | Manufacture of die |
JP3415685B2 (en) * | 1994-10-07 | 2003-06-09 | 株式会社アーレスティ | Injection sleeve for die casting machine |
JPH09277009A (en) * | 1996-04-11 | 1997-10-28 | U Mold:Kk | Die for vertical die casting |
JP4675474B2 (en) * | 2000-12-20 | 2011-04-20 | 中央精機株式会社 | Mold for casting |
JP2003010953A (en) * | 2001-06-25 | 2003-01-15 | Daihatsu Motor Co Ltd | Spool bush for die casting machine |
JP4759759B2 (en) * | 2005-05-26 | 2011-08-31 | トヨタ自動車株式会社 | Spool bush for die casting machine |
-
2014
- 2014-10-14 JP JP2014210324A patent/JP6474988B2/en active Active
-
2015
- 2015-09-15 US US14/854,438 patent/US20160101460A1/en not_active Abandoned
-
2018
- 2018-10-26 US US16/171,716 patent/US10906090B2/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3050390A1 (en) * | 2016-04-26 | 2017-10-27 | Roctool | METHOD AND DEVICE FOR SHELL MOLDING A METAL ALLOY |
WO2017186824A1 (en) | 2016-04-26 | 2017-11-02 | Roctool | Method and device for shell-moulding a metal alloy |
KR20180137007A (en) * | 2016-04-26 | 2018-12-26 | 록툴 | METHOD AND APPARATUS FOR DIE CASTING METAL ALLOY |
US10773299B2 (en) | 2016-04-26 | 2020-09-15 | Roctool | Method and device for casting a metal alloy |
KR102352445B1 (en) | 2016-04-26 | 2022-01-17 | 록툴 | Die casting method and apparatus for metal alloy |
Also Published As
Publication number | Publication date |
---|---|
JP6474988B2 (en) | 2019-02-27 |
JP2016078062A (en) | 2016-05-16 |
US20190060981A1 (en) | 2019-02-28 |
US10906090B2 (en) | 2021-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6010328B2 (en) | Hot stamping mold | |
US10906090B2 (en) | Method of producing insert die of casting apparatus for manufacturing cast product from molten metal, and casting apparatus | |
US8069901B2 (en) | Cylinder block manufacturing method, dummy cylinder liner, and dummy cylinder liner casting method | |
US10155264B2 (en) | Water-communicating mechanism | |
JP4518012B2 (en) | Mold cooling structure and cooling method | |
JP5412386B2 (en) | Thin-walled bottomed cylindrical metal member and manufacturing method thereof | |
KR20130074030A (en) | Manufacturing method for base structure and base structure manufactured by the same | |
JP2014069224A (en) | Casting apparatus, method of manufacturing casting apparatus, and method of manufacturing cast article | |
JP2021154292A (en) | Spool bush for die-casting die | |
JP2016151481A (en) | Core barrel manufacturing method and core barrel | |
US10596622B1 (en) | Slides and expendable cores for high pressure die cast closed deck engine block | |
JP2000351054A (en) | Sleeve for die casting | |
KR101705170B1 (en) | The Inserted Pipes for Diecasting | |
US11318530B1 (en) | Slides and expendable cores for high pressure die cast closed deck engine block | |
JP2017025720A (en) | Process of manufacture of regenerative cooling combustion chamber for rocket and regenerative cooling combustion chamber for rocket | |
US20190270137A1 (en) | System and methods for manufacturing regeneratively cooled rocket thrust chamber nozzles | |
EP2796226A1 (en) | Piston with optimum cooling effectiveness for cold-chamber die-casting systems | |
JP2003010953A (en) | Spool bush for die casting machine | |
JP5606354B2 (en) | Mold cooling structure | |
JP2023154824A (en) | Sprue bush | |
US11047333B2 (en) | Cylinder liner, block manufacturing method and cylinder liner manufacturing method | |
JP2000042717A (en) | Die with built-in pipe for adjusting temperature | |
JP2004034133A (en) | Manufacturing method for metal mold | |
US10876494B2 (en) | Cylinder liner, block manufacturing method and cylinder liner manufacturing method | |
US9731347B2 (en) | Core pin for preventing molten metal from flowing into pipe and casting device using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SUZUKISEIKI CORPORATION, JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SUZUKI, KIKUO;REEL/FRAME:036567/0453 Effective date: 20150824 |
|
STCB | Information on status: application discontinuation |