US20150376964A1 - Multiphase drilling systems and methods - Google Patents
Multiphase drilling systems and methods Download PDFInfo
- Publication number
- US20150376964A1 US20150376964A1 US14/753,343 US201514753343A US2015376964A1 US 20150376964 A1 US20150376964 A1 US 20150376964A1 US 201514753343 A US201514753343 A US 201514753343A US 2015376964 A1 US2015376964 A1 US 2015376964A1
- Authority
- US
- United States
- Prior art keywords
- drilling fluid
- gas
- drilling
- wellbore
- liquid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 160
- 238000000034 method Methods 0.000 title claims abstract description 44
- 239000012530 fluid Substances 0.000 claims abstract description 111
- 239000007788 liquid Substances 0.000 claims abstract description 85
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 64
- 238000005520 cutting process Methods 0.000 claims abstract description 31
- 239000007789 gas Substances 0.000 claims description 85
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 claims description 44
- 238000002347 injection Methods 0.000 claims description 39
- 239000007924 injection Substances 0.000 claims description 39
- 239000007787 solid Substances 0.000 claims description 24
- 229910052757 nitrogen Inorganic materials 0.000 claims description 22
- 238000004891 communication Methods 0.000 claims description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 20
- 239000011148 porous material Substances 0.000 claims description 17
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 claims description 6
- 239000001301 oxygen Substances 0.000 claims description 6
- 229910052760 oxygen Inorganic materials 0.000 claims description 6
- 229920000642 polymer Polymers 0.000 claims description 6
- 239000002199 base oil Substances 0.000 claims description 5
- 239000004927 clay Substances 0.000 claims description 2
- 238000002485 combustion reaction Methods 0.000 claims description 2
- 229910001507 metal halide Inorganic materials 0.000 claims description 2
- 150000005309 metal halides Chemical class 0.000 claims description 2
- 230000035515 penetration Effects 0.000 claims description 2
- 238000004064 recycling Methods 0.000 claims description 2
- 238000005755 formation reaction Methods 0.000 description 56
- 239000003570 air Substances 0.000 description 16
- 239000000203 mixture Substances 0.000 description 14
- LYCAIKOWRPUZTN-UHFFFAOYSA-N Ethylene glycol Chemical compound OCCO LYCAIKOWRPUZTN-UHFFFAOYSA-N 0.000 description 13
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 12
- 239000003921 oil Substances 0.000 description 12
- RWSOTUBLDIXVET-UHFFFAOYSA-N Dihydrogen sulfide Chemical compound S RWSOTUBLDIXVET-UHFFFAOYSA-N 0.000 description 9
- 238000004519 manufacturing process Methods 0.000 description 8
- 239000011435 rock Substances 0.000 description 8
- 230000003628 erosive effect Effects 0.000 description 7
- 229930195733 hydrocarbon Natural products 0.000 description 7
- 150000002430 hydrocarbons Chemical group 0.000 description 7
- 239000000243 solution Substances 0.000 description 7
- 239000004215 Carbon black (E152) Substances 0.000 description 6
- 239000004020 conductor Substances 0.000 description 6
- 238000007796 conventional method Methods 0.000 description 6
- 230000002829 reductive effect Effects 0.000 description 6
- 239000012267 brine Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 239000000839 emulsion Substances 0.000 description 5
- 238000001914 filtration Methods 0.000 description 5
- WGCNASOHLSPBMP-UHFFFAOYSA-N hydroxyacetaldehyde Natural products OCC=O WGCNASOHLSPBMP-UHFFFAOYSA-N 0.000 description 5
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 description 5
- VTYYLEPIZMXCLO-UHFFFAOYSA-L Calcium carbonate Chemical compound [Ca+2].[O-]C([O-])=O VTYYLEPIZMXCLO-UHFFFAOYSA-L 0.000 description 4
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 4
- WCUXLLCKKVVCTQ-UHFFFAOYSA-M Potassium chloride Chemical compound [Cl-].[K+] WCUXLLCKKVVCTQ-UHFFFAOYSA-M 0.000 description 4
- 206010038933 Retinopathy of prematurity Diseases 0.000 description 4
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 description 4
- 229920002472 Starch Polymers 0.000 description 4
- 230000008859 change Effects 0.000 description 4
- 239000003795 chemical substances by application Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 230000002706 hydrostatic effect Effects 0.000 description 4
- 239000003345 natural gas Substances 0.000 description 4
- 238000004088 simulation Methods 0.000 description 4
- 239000002002 slurry Substances 0.000 description 4
- 235000019698 starch Nutrition 0.000 description 4
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 3
- DNIAPMSPPWPWGF-UHFFFAOYSA-N Propylene glycol Chemical compound CC(O)CO DNIAPMSPPWPWGF-UHFFFAOYSA-N 0.000 description 3
- 235000009508 confectionery Nutrition 0.000 description 3
- -1 diesel Substances 0.000 description 3
- MTHSVFCYNBDYFN-UHFFFAOYSA-N diethylene glycol Chemical compound OCCOCCO MTHSVFCYNBDYFN-UHFFFAOYSA-N 0.000 description 3
- 230000009977 dual effect Effects 0.000 description 3
- 229910000037 hydrogen sulfide Inorganic materials 0.000 description 3
- 239000003595 mist Substances 0.000 description 3
- 239000004033 plastic Substances 0.000 description 3
- 229920003023 plastic Polymers 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 150000003839 salts Chemical class 0.000 description 3
- 230000007704 transition Effects 0.000 description 3
- 206010063836 Atrioventricular septal defect Diseases 0.000 description 2
- UXVMQQNJUSDDNG-UHFFFAOYSA-L Calcium chloride Chemical compound [Cl-].[Cl-].[Ca+2] UXVMQQNJUSDDNG-UHFFFAOYSA-L 0.000 description 2
- UQSXHKLRYXJYBZ-UHFFFAOYSA-N Iron oxide Chemical compound [Fe]=O UQSXHKLRYXJYBZ-UHFFFAOYSA-N 0.000 description 2
- TWRXJAOTZQYOKJ-UHFFFAOYSA-L Magnesium chloride Chemical compound [Mg+2].[Cl-].[Cl-] TWRXJAOTZQYOKJ-UHFFFAOYSA-L 0.000 description 2
- 229920000881 Modified starch Polymers 0.000 description 2
- ZLMJMSJWJFRBEC-UHFFFAOYSA-N Potassium Chemical compound [K] ZLMJMSJWJFRBEC-UHFFFAOYSA-N 0.000 description 2
- ATUOYWHBWRKTHZ-UHFFFAOYSA-N Propane Chemical compound CCC ATUOYWHBWRKTHZ-UHFFFAOYSA-N 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 239000000654 additive Substances 0.000 description 2
- 150000001336 alkenes Chemical class 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 229910052792 caesium Inorganic materials 0.000 description 2
- TVFDJXOCXUVLDH-UHFFFAOYSA-N caesium atom Chemical compound [Cs] TVFDJXOCXUVLDH-UHFFFAOYSA-N 0.000 description 2
- 229910000019 calcium carbonate Inorganic materials 0.000 description 2
- 239000001110 calcium chloride Substances 0.000 description 2
- 229910001628 calcium chloride Inorganic materials 0.000 description 2
- OSGAYBCDTDRGGQ-UHFFFAOYSA-L calcium sulfate Chemical compound [Ca+2].[O-]S([O-])(=O)=O OSGAYBCDTDRGGQ-UHFFFAOYSA-L 0.000 description 2
- 239000001569 carbon dioxide Substances 0.000 description 2
- 229910002092 carbon dioxide Inorganic materials 0.000 description 2
- 239000001913 cellulose Substances 0.000 description 2
- 229920002678 cellulose Polymers 0.000 description 2
- 239000010779 crude oil Substances 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000001211 electron capture detection Methods 0.000 description 2
- 150000002148 esters Chemical class 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 239000000446 fuel Substances 0.000 description 2
- 239000000295 fuel oil Substances 0.000 description 2
- 239000003350 kerosene Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000012528 membrane Substances 0.000 description 2
- 239000002480 mineral oil Substances 0.000 description 2
- 235000010446 mineral oil Nutrition 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 229910052700 potassium Inorganic materials 0.000 description 2
- 239000011591 potassium Substances 0.000 description 2
- SCVFZCLFOSHCOH-UHFFFAOYSA-M potassium acetate Chemical compound [K+].CC([O-])=O SCVFZCLFOSHCOH-UHFFFAOYSA-M 0.000 description 2
- 239000001103 potassium chloride Substances 0.000 description 2
- 235000011164 potassium chloride Nutrition 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- JHJLBTNAGRQEKS-UHFFFAOYSA-M sodium bromide Chemical compound [Na+].[Br-] JHJLBTNAGRQEKS-UHFFFAOYSA-M 0.000 description 2
- 239000011780 sodium chloride Substances 0.000 description 2
- 239000008107 starch Substances 0.000 description 2
- 239000004094 surface-active agent Substances 0.000 description 2
- 230000008961 swelling Effects 0.000 description 2
- PUPZLCDOIYMWBV-UHFFFAOYSA-N (+/-)-1,3-Butanediol Chemical compound CC(O)CCO PUPZLCDOIYMWBV-UHFFFAOYSA-N 0.000 description 1
- OMDQUFIYNPYJFM-XKDAHURESA-N (2r,3r,4s,5r,6s)-2-(hydroxymethyl)-6-[[(2r,3s,4r,5s,6r)-4,5,6-trihydroxy-3-[(2s,3s,4s,5s,6r)-3,4,5-trihydroxy-6-(hydroxymethyl)oxan-2-yl]oxyoxan-2-yl]methoxy]oxane-3,4,5-triol Chemical compound O[C@@H]1[C@@H](O)[C@@H](O)[C@@H](CO)O[C@@H]1OC[C@@H]1[C@@H](O[C@H]2[C@H]([C@@H](O)[C@H](O)[C@@H](CO)O2)O)[C@H](O)[C@H](O)[C@H](O)O1 OMDQUFIYNPYJFM-XKDAHURESA-N 0.000 description 1
- IEORSVTYLWZQJQ-UHFFFAOYSA-N 2-(2-nonylphenoxy)ethanol Chemical compound CCCCCCCCCC1=CC=CC=C1OCCO IEORSVTYLWZQJQ-UHFFFAOYSA-N 0.000 description 1
- 239000001763 2-hydroxyethyl(trimethyl)azanium Substances 0.000 description 1
- 229920002134 Carboxymethyl cellulose Polymers 0.000 description 1
- VEXZGXHMUGYJMC-UHFFFAOYSA-M Chloride anion Chemical compound [Cl-] VEXZGXHMUGYJMC-UHFFFAOYSA-M 0.000 description 1
- 235000019743 Choline chloride Nutrition 0.000 description 1
- BDAGIHXWWSANSR-UHFFFAOYSA-M Formate Chemical compound [O-]C=O BDAGIHXWWSANSR-UHFFFAOYSA-M 0.000 description 1
- 229920000926 Galactomannan Polymers 0.000 description 1
- DGAQECJNVWCQMB-PUAWFVPOSA-M Ilexoside XXIX Chemical compound C[C@@H]1CC[C@@]2(CC[C@@]3(C(=CC[C@H]4[C@]3(CC[C@@H]5[C@@]4(CC[C@@H](C5(C)C)OS(=O)(=O)[O-])C)C)[C@@H]2[C@]1(C)O)C)C(=O)O[C@H]6[C@@H]([C@H]([C@@H]([C@H](O6)CO)O)O)O.[Na+] DGAQECJNVWCQMB-PUAWFVPOSA-M 0.000 description 1
- 206010024119 Left ventricular failure Diseases 0.000 description 1
- WHXSMMKQMYFTQS-UHFFFAOYSA-N Lithium Chemical compound [Li] WHXSMMKQMYFTQS-UHFFFAOYSA-N 0.000 description 1
- 229920003171 Poly (ethylene oxide) Polymers 0.000 description 1
- 239000004113 Sepiolite Substances 0.000 description 1
- 241000589634 Xanthomonas Species 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 150000001338 aliphatic hydrocarbons Chemical class 0.000 description 1
- 239000012080 ambient air Substances 0.000 description 1
- 150000001412 amines Chemical class 0.000 description 1
- 239000012736 aqueous medium Substances 0.000 description 1
- 239000010426 asphalt Substances 0.000 description 1
- 229960000892 attapulgite Drugs 0.000 description 1
- TZCXTZWJZNENPQ-UHFFFAOYSA-L barium sulfate Chemical compound [Ba+2].[O-]S([O-])(=O)=O TZCXTZWJZNENPQ-UHFFFAOYSA-L 0.000 description 1
- 239000010428 baryte Substances 0.000 description 1
- 229910052601 baryte Inorganic materials 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000003115 biocidal effect Effects 0.000 description 1
- 239000003139 biocide Substances 0.000 description 1
- 229910001622 calcium bromide Inorganic materials 0.000 description 1
- WGEFECGEFUFIQW-UHFFFAOYSA-L calcium dibromide Chemical compound [Ca+2].[Br-].[Br-] WGEFECGEFUFIQW-UHFFFAOYSA-L 0.000 description 1
- 159000000007 calcium salts Chemical class 0.000 description 1
- 239000001768 carboxy methyl cellulose Substances 0.000 description 1
- 235000010948 carboxy methyl cellulose Nutrition 0.000 description 1
- 125000004181 carboxyalkyl group Chemical group 0.000 description 1
- 125000002057 carboxymethyl group Chemical group [H]OC(=O)C([H])([H])[*] 0.000 description 1
- 239000008112 carboxymethyl-cellulose Substances 0.000 description 1
- 239000003518 caustics Substances 0.000 description 1
- 229920003086 cellulose ether Polymers 0.000 description 1
- SGMZJAMFUVOLNK-UHFFFAOYSA-M choline chloride Chemical compound [Cl-].C[N+](C)(C)CCO SGMZJAMFUVOLNK-UHFFFAOYSA-M 0.000 description 1
- 229960003178 choline chloride Drugs 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000001687 destabilization Effects 0.000 description 1
- 235000014113 dietary fatty acids Nutrition 0.000 description 1
- 150000002009 diols Chemical class 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 239000010459 dolomite Substances 0.000 description 1
- 229910000514 dolomite Inorganic materials 0.000 description 1
- 239000003995 emulsifying agent Substances 0.000 description 1
- 230000001804 emulsifying effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 150000002170 ethers Chemical class 0.000 description 1
- 230000001747 exhibiting effect Effects 0.000 description 1
- 239000000194 fatty acid Substances 0.000 description 1
- 229930195729 fatty acid Natural products 0.000 description 1
- 150000004665 fatty acids Chemical class 0.000 description 1
- 238000011049 filling Methods 0.000 description 1
- 239000000706 filtrate Substances 0.000 description 1
- 150000004675 formic acid derivatives Chemical class 0.000 description 1
- 239000002737 fuel gas Substances 0.000 description 1
- 239000000499 gel Substances 0.000 description 1
- 150000004676 glycans Chemical class 0.000 description 1
- 239000012510 hollow fiber Substances 0.000 description 1
- 230000036571 hydration Effects 0.000 description 1
- 238000006703 hydration reaction Methods 0.000 description 1
- 229920001477 hydrophilic polymer Polymers 0.000 description 1
- 229920013821 hydroxy alkyl cellulose Polymers 0.000 description 1
- 230000004941 influx Effects 0.000 description 1
- 230000002401 inhibitory effect Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000003077 lignite Substances 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 229910052744 lithium Inorganic materials 0.000 description 1
- 239000010687 lubricating oil Substances 0.000 description 1
- 229910001629 magnesium chloride Inorganic materials 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 235000019426 modified starch Nutrition 0.000 description 1
- 229920000847 nonoxynol Polymers 0.000 description 1
- 125000001400 nonyl group Chemical group [H]C([*])([H])C([H])([H])C([H])([H])C([H])([H])C([H])([H])C([H])([H])C([H])([H])C([H])([H])C([H])([H])[H] 0.000 description 1
- 239000010742 number 1 fuel oil Substances 0.000 description 1
- 239000007764 o/w emulsion Substances 0.000 description 1
- JRZJOMJEPLMPRA-UHFFFAOYSA-N olefin Natural products CCCCCCCC=C JRZJOMJEPLMPRA-UHFFFAOYSA-N 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 125000006353 oxyethylene group Chemical group 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 229910052625 palygorskite Inorganic materials 0.000 description 1
- 239000012188 paraffin wax Substances 0.000 description 1
- 239000012466 permeate Substances 0.000 description 1
- 229920002401 polyacrylamide Polymers 0.000 description 1
- 229920001282 polysaccharide Polymers 0.000 description 1
- 239000005017 polysaccharide Substances 0.000 description 1
- 235000011056 potassium acetate Nutrition 0.000 description 1
- WFIZEGIEIOHZCP-UHFFFAOYSA-M potassium formate Chemical compound [K+].[O-]C=O WFIZEGIEIOHZCP-UHFFFAOYSA-M 0.000 description 1
- 239000001294 propane Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000006903 response to temperature Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 229910052624 sepiolite Inorganic materials 0.000 description 1
- 235000019355 sepiolite Nutrition 0.000 description 1
- 239000003079 shale oil Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 150000004760 silicates Chemical class 0.000 description 1
- 239000011734 sodium Substances 0.000 description 1
- 229910052708 sodium Inorganic materials 0.000 description 1
- 239000003381 stabilizer Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000003784 tall oil Substances 0.000 description 1
- 239000011275 tar sand Substances 0.000 description 1
- ZIBGPFATKBEMQZ-UHFFFAOYSA-N triethylene glycol Chemical compound OCCOCCOCCO ZIBGPFATKBEMQZ-UHFFFAOYSA-N 0.000 description 1
- 239000006200 vaporizer Substances 0.000 description 1
- 235000013311 vegetables Nutrition 0.000 description 1
- 238000013022 venting Methods 0.000 description 1
- 229920001285 xanthan gum Polymers 0.000 description 1
- 239000004711 α-olefin Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/16—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using gaseous fluids
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/02—Well-drilling compositions
- C09K8/38—Gaseous or foamed well-drilling compositions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/063—Arrangements for treating drilling fluids outside the borehole by separating components
- E21B21/067—Separating gases from drilling fluids
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/14—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using liquids and gases, e.g. foams
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B3/00—Rotary drilling
- E21B3/02—Surface drives for rotary drilling
- E21B3/04—Rotary tables
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives for drilling, used in the borehole
- E21B4/02—Fluid rotary type drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E21B2021/005—
Definitions
- the present invention relates to multiphase drilling systems and methods.
- Drilling a wellbore typically requires circulating a drilling fluid to flush the bore of cuttings produced by action of a rotating drill bit.
- the drilling fluid may be pumped down the well inside the drill string and through the bit and jetted into the cutting face where it assists in penetrating the fractures created by the bit, lifting the bit fractured chips by penetrating the fractures and hydraulically lifting the chips into the circulating fluid stream.
- the drilling fluid then carries the chips up the lower annulus formed between an outer surface of the drill string and a wall of the wellbore.
- the drilling fluid and chips or returns continue up the upper annulus formed between a casing or lining and the drill string and to the surface where the chips are separated from the fluid.
- the cleaned fluid is then reintroduced to the well completing the circulation cycle.
- the drilling fluid may also cool the drill bit and support the wall of the wellbore.
- Deploying a drilling rig to a wellsite is an expensive task. Oil and gas companies are constantly searching for ways to reduce time spent by the drilling rig at the wellsite.
- the rig time includes time spent drilling/tripping and non-productive time.
- the time spent drilling may be reduced by increasing a rate of penetration (ROP) of the drill bit through the rock formations, especially non-productive formations between the surface and the deeper hydrocarbon-bearing formations.
- ROP rate of penetration
- BHP bottom hole pressure
- the BHP includes a static component generated by the hydrostatic fluid column weight and a dynamic component generated by hydraulic drag due to naturally occurring resistance to flow through the annulus.
- the influence of BHP on the ROP is often discussed in terms of chip hold down effect.
- An increase in BHP tends to compact the rock formation being drilled, artificially increasing the shear strength of the rock and tending to hold rock chips created by the bit in place (chip hold down effect) thereby forcing re-drilling/re-fracturing of previously drilled rock and reducing the ROP.
- An increase in BHP also increases downtime by shortening the life of the bit, thereby requiring more frequent replacement or tripping of the drill bit.
- a method for drilling a wellbore includes injecting drilling fluid through a drill string disposed in the wellbore and rotating a drill bit disposed on a bottom of the drill string.
- the drilling fluid includes a liquid and a gas.
- the drilling fluid is injected at the surface.
- the drilling fluid exits the drill bit and carries cuttings from the drill bit.
- the drilling fluid and cuttings (returns) flow to the surface via an annulus formed between the drill string and the wellbore.
- the liquid is injected at a rate so that a liquid velocity of the returns in the annulus is sufficient to transport the cuttings.
- the method further includes drilling through at least a portion of a non-productive formation.
- a method for drilling a wellbore includes injecting drilling fluid through a drill string disposed in the wellbore and rotating a drill bit disposed on a bottom of the drill string.
- the drilling fluid includes a liquid and a gas.
- the drilling fluid is injected at the surface.
- the drilling fluid exits the drill bit and carries cuttings from the drill bit.
- the drilling fluid and cuttings flow to the surface via an annulus formed between the drill string and the wellbore.
- a liquid volume fraction of the drilling fluid at standard temperature and pressure is greater than or equal to 0.01.
- the method further includes drilling through at least a portion of a non-productive formation.
- FIG. 1A is a flow diagram of a drilling system, according to one embodiment of the present invention.
- FIG. 1B is a cross-section of a wellbore being drilled with the drilling system.
- FIG. 2 illustrates a pressure profile comparing an embodiment of the present invention with prior art drilling systems.
- FIG. 2A illustrates controlling injection rates based on formation changes.
- FIG. 3 is a cross-section of an actual wellbore partially drilled with a method, according to another embodiment of the present invention.
- FIG. 3A is a table illustrating intervals of the wellbore drilled with conventional methods and embodiments of the present invention.
- FIG. 3B is a table illustrating intervals of other wellbores in the same field drilled with embodiments of the present invention.
- FIG. 3C is a table illustrating motors used with embodiments of the present invention.
- FIG. 3D illustrates ROPs of similar intervals in the same field air drilled.
- FIG. 4 is a cross-section of an actual wellbore partially drilled with a method, according to another embodiment of the present invention.
- FIG. 4A is a table of intervals of the wellbore drilled with conventional methods and embodiments of the present invention.
- FIG. 4B is a table of some of the geological formations traversed by the wellbore.
- FIG. 4C is a table illustrating intervals of other wellbores in the same field drilled with embodiments of the present invention.
- FIG. 4D is a table illustrating motors used with embodiments of the present invention.
- FIG. 5 is a cross-section of an actual wellbore partially drilled with a method, according to another embodiment of the present invention.
- FIG. 5A is a table of intervals of the wellbore drilled with conventional methods and embodiments of the present invention.
- FIG. 5B is a table of geological formations traversed by the wellbore.
- FIG. 5C is a table illustrating an interval of another wellbore in the same field drilled with an embodiment of the present invention.
- FIG. 5D is a table illustrating motors used with embodiments of the present invention.
- FIGS. 6A-6H are tables illustrating simulated annulus profiles of drilling a wellbore while varying gas injection rate and liquid/mud injection rate, according to other embodiments of the present invention.
- FIG. 7 is a flow diagram of a drilling system, according to another embodiment of the present invention.
- FIG. 1A is a flow diagram of a drilling system 1 , according to one embodiment of the present invention.
- FIG. 1B is a cross-section of a wellbore 100 being drilled using the drilling system 1 .
- the drilling system 1 may be deployed on land or offshore.
- the drilling system 1 may include a drilling rig (not shown) used to support drilling operations.
- the drilling rig may include a derrick supported from a support structure having a rig floor or platform on which drilling operators may work. Many of the components used on the rig, such as a Kelly and rotary table or top drive, power tongs, slips, draw works and other equipment, are not shown for ease of depiction.
- a wellbore 100 has already been partially drilled, casing 115 set and cemented 120 into place.
- the casing string 115 extends from the surface 105 of the wellbore 100 where a wellhead 40 is typically located.
- Drilling fluid 145 f may be injected through a drill string 135 deployed in the well
- the drilling fluid 145 f may be a mixture and may include a first fluid which is a gas 145 g (see FIG. 2A ) at standard temperature and pressure (STP, 60° F., 14.7 psia) and a second fluid which is a liquid 145 l (see FIG. 2A ) at STP.
- the mixture may be heterogeneous (i.e., insoluble) or homogenous (i.e., a solution) and may vary in properties (i.e., density and/or phases) in response to temperature and/or pressure.
- the liquid 145 l may be water, glycerol, glycol, or base oil, such as kerosene, diesel, mineral oil, fuel oil, vegetable ester, linear alpha olefin, internal olefin, linear paraffin, crude oil, or combinations thereof.
- the gas 145 g may be any gas having an oxygen concentration less than the oxygen concentration sufficient for combustion (i.e., eight percent), such as nitrogen, natural gas, or carbon dioxide.
- the nitrogen may be generated at the surface using a nitrogen production unit (NPU) 20 which may generate substantially pure (i.e., greater than or equal to ninety-five percent pure) nitrogen. Alternatively, the nitrogen may be delivered from cryogenic bottles or bulk tanks.
- the gas 145 g may be a mixture of gases, such as exhaust gas from the rig's prime mover or fuel-gas driven compressors or a mixture of nitrogen, natural gas, and/or carbon dioxide.
- the liquid 145 l may be mud (have solids suspended and/or dissolved therein).
- the mud may be oil-based and may have water emulsified therein (invert emulsion).
- the solids may include an organophilic clay, lignite, and/or asphalt.
- the base oil may be viscosified.
- the mud may be water-based.
- the solids may be dissolved in the liquid, forming a solution, such as brine.
- the dissolved solids may include metal halides, such as potassium, cesium, or calcium salts or mixtures thereof; or formates, such as cesium, sodium, potassium, lithium, or mixtures thereof.
- the brine may further include silicates, amines, oils, such as distillated hydrocarbons, olefins, or paraffins.
- the brine may further include hydration and dispersion inhibiting polymers, such as polyanionic cellulose (PAC), partially hydrolyzed polyacrylamide (PHPA), partially hydrolyzed polyacylanitrile (PH-PAN) fluids).
- the mud may be glycol based as discussed in U.S. Pat. No. 6,291,405, which is hereby incorporated by reference in its entirety.
- the glycol-based mud may include a water-miscible glycol, with a molecular weight of less than about two hundred, such as ethylene glycol, diethylene glycol, triethylene glycol, propylene glycol, butylene glycol and mixtures thereof, at a concentration: of at least 70%, 70% to 100%, 80% to 100%, or 85% to 100%, (by volume); water, not in excess of 30% by volume; a salt or salts selected from the group consisting of sodium chloride, potassium chloride, magnesium chloride, calcium chloride, sodium bromide, calcium bromide, potassium acetate, potassium formate and choline chloride at a concentration greater than 50,000 mg/liter of water in the mud; an anti-sticking additive at a concentration of greater than 0.5% by weight of the mud; a filtration control agent for lowering fluid loss of the drilling fluid;
- the mud may be an oil in water emulsion as discussed in U.S. Pat. No. 4,411,801, which is hereby incorporated by reference in its entirety.
- the mud may include an emulsifying amount of an emulsifier, such as one or more surfactants, such as three surfactants in equal parts, such as polyoxyethylene glycol five hundred mono-tallate which is, generally, the mono esters of tall oil fatty acids and mixed polyoxyethelene diols having an average polymer length of about four hundred fifty to five hundred fifty oxyethylene (EtO) units, a nonyl pheno ethoxylate containing about 43% by weight EtO groups, and a nonyl phenol ethoxylate containing 65% by weight EtO groups; a liquid hydrocarbon coating agent, being present in an amount of at least about 5% or 5% to 35% by volume of the mud, such as light crude oil, certain napthas, kerosene, fuel oil, gas oil, light lubricating
- one or more solid hydrophilic polymer prills may be added to the drilling fluid. If water from an exposed formation should enter the annulus, the prill will absorb the water and swell up, thereby facilitating removal from the returns by the solids shaker.
- the drilling fluid may have properties which are not normally acceptable in conventional drilling, parameters, such as viscosity reduced to a level where the fluid could be weighted up quickly in the event that the well requires hydrostatic control, relatively low density, and filtration rate not controlled and tending to be substantially higher than that used in conventional operations.
- the liquid portion 145 l may be pure base oil, pure water, brine, or water treated with a shale stabilizer, such as Dionic, NCL-100, or cc300kf (without viscosity additives).
- a shale stabilizer such as Dionic, NCL-100, or cc300kf (without viscosity additives).
- the liquid portion 145 l of the drilling fluid 145 f may be stored in a reservoir, such as one or more tanks 5 or pits.
- the tanks 5 may be in fluid communication with one or more rig pumps 10 which pump the liquid 145 l portion through an outlet conduit 12 , such as pipe.
- the outlet pipe 12 may be in fluid communication with a nitrogen outlet line 27 and a standpipe 28 .
- the gas portion 145 g of the drilling fluid 145 f may be produced by one or more of the NPUs 20 .
- Each NPU 20 may be in fluid communication with one or more air compressors 22 .
- the compressors 22 may receive ambient air and discharge compressed air to the NPUs 20 .
- the NPUs 20 may each include a cooler, a demister, a heater, one or more particulate filters, and one or more membranes.
- the membranes may include hollow fibers which allow oxygen and water vapor to permeate a wall of the fiber and conduct nitrogen through the fiber.
- An oxygen probe (not shown) may monitor and assure that the produced nitrogen meets a predetermined purity.
- One or more booster compressors 25 may be in fluid communication with the NPUs 20 .
- the boosters 25 may compress the nitrogen exiting the NPUs 20 to achieve a predetermined injection or standpipe pressure.
- the boosters 25 may be positive displacement type, such as reciprocating or screw, or turbomachine type, such as centrifugal.
- a pressure sensor (PI), temperature sensor (TI), and flow meter (FM) may be installed in the nitrogen outlet 27 and in data communication with a surface controller (SC, not shown).
- the SC may monitor the flow rate of the nitrogen and adjust the air compressors and/or booster compressors to maintain a predetermined flow rate. Additionally, the SC may monitor a speed of the pump 10 and adjust a speed of the pump 10 to maintain a predetermined flow rate. Additionally, the outlet 12 may include a FM in communication with the SC.
- the liquid 145 l portion and gas 145 g portion may be commingled at the junction 32 of the outlet lines, thereby forming the drilling fluid 145 f .
- the drilling fluid 145 f may flow through the standpipe 28 and into the drill string 135 via a swivel (Kelly or top drive).
- the drilling fluid 145 f may be pumped down through the drill string 135 and exit the drill bit 140 , where the fluid may circulate the cuttings away from the bit 140 and return the cuttings up an annulus 110 defined between an inner surface of the casing 115 or wellbore 100 and an outer surface of the drill string 135 .
- the return mixture (returns) 145 r may return to the surface 105 and be diverted through an outlet of a rotating control device (RCD) 15 and into a primary returns line (PRL) 29 .
- the drilling fluid may be pumped into the annulus and return through the drill string (aka reverse circulation).
- the RCD 15 may provide an annular seal around the drill string 135 during drilling and while adding or removing (i.e., during a tripping operation to change a worn bit) segments or stands to/from the drill string 135 .
- the RCD 15 achieves fluid isolation by packing off around the drill string 135 .
- the RCD 15 may include a pressure containing housing mounted on the wellhead 40 where one or more packer elements are supported between bearings and isolated by mechanical seals.
- the RCD 15 may be the active type or the passive type.
- the active type RCD uses external hydraulic pressure to activate the packer elements.
- the sealing pressure is normally increased as the annulus pressure increases.
- the passive type RCD uses a mechanical seal with the sealing action supplemented by wellbore pressure.
- a stripper or pack-off elements may be used instead of the RCD 15 .
- One or more blowout preventers (BOPs) 16 - 18 may be attached to the wellhead 40 .
- BOPs blowout preventers
- the RCD 15 may include a bleed off line to vent the wellbore pressure when the RCD is inactive.
- a bleed line 54 may be included for removing the RCD 15 for servicing.
- a PI may be installed in the PRL 29 and in data communication with the SC. Additionally, a TI (not shown) may be installed.
- One or more control valves or variable choke valves 30 may be disposed in the PRL 29 .
- the choke 30 may be in communication with the SC and fortified to operate in an environment where the returns 145 r contain substantial drill cuttings and other solids.
- the choke 30 may be fully open or bypassed during normal drilling and present only to allow the SC to control backpressure exerted on the annulus 110 should a kick occur.
- the choke 30 may be employed during normal drilling to exert a predetermined back pressure on the annulus to vary bottom hole pressure independent of the liquid 145 l and gas 145 g injection rates.
- the drill string 135 may include a drill bit 140 disposed on a longitudinal end thereof.
- the drill string 135 may be made up of joints or segments of drill pipe, casing, or liner threaded together or coiled tubing.
- the drill string 135 may also include a bottom hole assembly (BHA) (not shown) that may include the bit 140 , drill collars, a mud motor, a bent sub, measurement while drilling (MWD) sensors, logging while drilling (LWD) sensors and/or a check or float valve (to prevent backflow of fluid from the annulus).
- BHA bottom hole assembly
- the mud motor may be a positive displacement type (i.e., a Moineau motor) or a turbomachine type (i.e., a mud turbine).
- the drill string 135 may further include float valves distributed therealong, such as one in every thirty joints or ten stands, to maintain backpressure on the returns while adding joints thereto.
- the drill bit 140 may be rotated from the surface by the rotary table or top drive and/or downhole by the mud motor. If a bent sub and mud motor is included in the BHA, slide drilling may be effected by only the mud motor rotating the drill bit and rotary or straight drilling may be effected by rotating the drill string from the surface slowly while the mud motor rotates the drill bit.
- the BHA may include an orienter to switch between rotary and slide drilling. If the drill string 135 is casing or liner, the liner or casing may be suspended in the wellbore 100 and cemented after drilling.
- the returns 145 r may then be processed by a separator 35 .
- the separator 35 may be a four-phase horizontal separator.
- An oil outlet 35 o and a water outlet 35 w in communication with respective compartments of the separator 35 may conduct the liquid portion of the returns 145 r to a solids shaker 60 .
- a sparge pump 55 may deliver a predetermined quantity of the liquid portion 145 l of the drilling fluid 145 f from the mud tanks 5 to the solids compartment of the separator 35 to flush cuttings.
- the cuttings slurry may be discharged to the shaker via a solids line 35 s .
- the recombined liquid 145 l and solids may flow through a combined outlet to a solids shaker 60 .
- the separator 35 may include a level sensor (not shown) in data communication with the SC for detecting the liquid/mud level in the separator. Additionally, an FM (not shown) may be disposed in the water 35 w and oil outlets 35 o and in fluid communication with the SC.
- the separator 35 may further include a gas outlet 35 g to a flare 45 or gas recovery line.
- the gas outlet line 35 g may include a FM in data communication with the SC to measure the flow rate of returned gas.
- the gas outlet line may further include an adjustable control valve or choke 37 in communication with the SC which may be used to control pressure in the separator and/or to control back pressure exerted on the annulus 110 if erosion of the choke 30 becomes a problem.
- a pressure relief line 35 f may include a pressure relief valve in communication with the gas compartment of the separator 35 and lead to the flare 45 .
- the separator 35 may be a vertical separator or a cyclonic separator and may separate two or more phases.
- a two-phase separator may be used to separate gas and then the remaining liquid and cuttings may be discharged to a solids shaker.
- the remaining liquid and cuttings may instead be discharged to a second, lower pressure separator.
- the lower pressure separator may be a three-phase separator (gas, liquid, and solids/slurry) from which the gas may vent to a second flare or cold vent, the liquids may be discharged to the mud tank, and the solids/slurry may be discharged to a shaker.
- the solids shaker 60 may remove heavy solids from the liquid portion 145 l and may discharge the removed solids to a solids bin (not shown).
- An outlet line of the shaker 60 may lead to a first of the tanks 5 .
- An outlet of the first tank 5 may feed a centrifuge 65 which may remove fine solids from the liquid 145 l and discharge the removed fines to the bin.
- the solids bin may include a load cell (not shown) in data communication with the SC.
- An outlet line of the centrifuge 65 may discharge the liquid portion 145 l into a second one of the mud tanks 5 .
- a bypass line 53 may be included to provide the option of closing the PRL 29 and bypassing the choke 30 and the separator 35 .
- the bypass line 53 may lead directly to the solids shaker 50 .
- the bypass line 53 may be used to return to conventional overbalanced drilling in the event that the wellbore becomes unstable (i.e., a kick or an unstable formation).
- One or more secondary lines 51 may be provided to allow circulation in the event that one or more of the BOPs 16 - 18 are closed.
- the secondary lines 51 may include one or more chokes 41 and lead to a degasser 42 .
- One or more fuel such as propane, natural gas, or methane, tanks 45 f may be provided to maintain ignition in the flare 45 .
- the fuel 45 f may be a liquid in the tanks and vaporized in a pilot line 45 p to the flare 45 by a vaporizer 45 v.
- the drill string 135 is made up of jointed drill pipe or casing, joints periodically need to be added to the drill string. Injection of the drilling fluid 145 f may be halted to add a joint.
- the standpipe 28 may be vented and the float valves may close to prevent backflow of returns through the drill string 135 .
- the choke 30 may be closed to prevent loss of the dynamic BHP due to halting circulation of the drilling fluid.
- only injection of the gas portion 145 g may be halted and injection of the liquid portion 145 l may instead be diverted from the standpipe to a kill line 13 and into one of the chokes 30 , 41 so that the choke 30 , 41 may compensate for the loss of dynamic BHP.
- injection of the drilling fluid 145 f may be diverted into the kill line 13 and through the choke 30 to compensate for the loss of the BHP.
- a continuous circulation system or continuous flow subs may be used to maintain circulation while adding joints to the drill string 135 .
- a safety factor may be utilized or the formation may be stable so that loss of the dynamic BHP is not a concern and no attempt to maintain or compensate for loss of dynamic BHP is necessary.
- Stands may have to be removed or added if the drill string 135 has to be removed or tripped to change the drill bit 140 .
- the NPUs 20 may be shut down so that only the liquid 145 l is injected through the drill string 135 .
- a bleed line 52 may include a branch 52 s to the separator and a branch 52 t to the mud tanks 5 and a vent line 56 may lead to atmosphere.
- the circulation may be continued until the annulus 110 is filled to a predetermined level, such as partially, substantially, or completely, with the liquid/mud.
- circulation may be halted by shutting the rig pumps 10 down.
- the predetermined level may be selected so that the exposed formations are near-balanced or overbalanced. If a stand is being removed, the liquid 145 l may be added via the kill line 13 to maintain the liquid level in the annulus. Alternatively, if the density of the liquid is insufficient for overbalancing the exposed formation(s), a higher density liquid may be used to overbalance the exposed formation(s). This higher density liquid/mud may be premixed in a kill tank (not shown) or may be formed by adding weighting agents to the liquid.
- shutoff valves i.e., gate or ball valves
- check valves i.e., check valves
- the shutoff valves may be in communication with the SC so that they are opened or closed by the SC.
- a dual concentric drill string may be used instead of the drill string 135 .
- a concentric drill string may be particularly useful for delicate formations, such as tar sand formations or coal bed methane formations.
- a suitable concentric tubular string is illustrated in FIGS. 3A and 3B of International Patent Application Pub. WO 2007/092956 (Atty. Dock. No. WEAT/0730-PCT, hereinafter '956 PCT), which is herein incorporated by reference in its entirety.
- the concentric drill string may include joints assembled together. Each joint may include an outer tubular having a longitudinal bore therethrough and an inner tubular having a longitudinal bore there through. The inner tubular may be mounted within the outer tubular.
- An annulus may be formed between the inner and outer tubulars. Drilling fluid may be injected through the annulus formed between the tubulars and return to the surface via the inner tubular bore or vice versa. The delicate formations may then be spared from exposure to the drilling fluid and the returns.
- an eccentric dual drill string may be used instead of the concentric dual drill string.
- a suitable eccentric drill string is illustrated in FIGS. 5A-5E of the '956 PCT.
- a partition is formed in a wall of each joint and divides an interior of the drill string into two flow paths.
- a box is provided at a first longitudinal end of the joint and the pin is provided at the second longitudinal end of the joint.
- a face of one of the pin and box has a groove formed therein which receives a gasket.
- the face of one of the pin and box may have an enlarged partition to ensure a seal over a certain angle ⁇ . This angle ⁇ allows for some thread slippage.
- the outer layer of insulation illustrated in the '956 PCT may be omitted.
- FIG. 2 illustrates a pressure profile comparing an embodiment of the present invention with prior art drilling systems.
- FIG. 2A illustrates controlling injection rates based on formation changes.
- the formations exposed to the wellbore 100 exhibit a pore gradient 200 p and a fracture gradient 200 f .
- the formation pressure gradients 200 f,p are often converted to an equivalent mud density (EMD) and a bottomhole pressure gradient of the returns is converted to an equivalent circulating density (ECD).
- ECD equivalent mud density
- ECD equivalent circulating density
- Conventional overbalanced drilling 245 o uses mud having a density so that the pressure exerted by the returns 245 o on the exposed formations is within a window defined between the pore 200 p and fracture 200 f gradients.
- Some formations also exhibit a stability gradient 200 s . If the ECD of the returns is less than the stability gradient 200 s , the wellbore 100 may collapse.
- air drilling 245 a is unsuitable for these formations that exhibit a stability gradient 200 s due to the negligible hydrostatic contribution of air to the ECD of the returns 245 a .
- air drilling 245 a may be suitable to drill the wellbore 100 to depth D 1 as the exposed formations do not exhibit the stability gradient 200 s .
- casing or liner strings 115 s,i are set at or near depths D 1 , D 2 where changes in the pore 200 p and/or fracture 200 f gradients occur so that the bottomhole pressure exerted by the overbalanced returns 245 o (greater than the pore pressure at bottomhole) does not fracture a formation at a shallower depth.
- the injection rates of the gas portion 145 g and the liquid 145 l portion of the drilling fluid 145 f may be controlled so that an ECD of the returns 145 r is substantially less than the pore EMD 200 p in order to maximize the ROP.
- the ECD of the returns 145 r may be less than or equal two-thirds, one-half, or one-third the pore EMD 200 p .
- the injection rates may be controlled to achieve an ECD 145 r equal to or slightly greater than the stability EMD 200 s . Maintaining the ECD slightly greater than the stability EMD 200 s provides a safety factor against wellbore collapse and will tolerate minor BHP fluctuations, such as those created while adding joints or stands to the drill string 135 .
- the liquid rate 145 l may be substantially decreased and the gas rate 145 g may be substantially increased due to a change in hole size resulting from setting of the intermediate casing 115 i (note, due to the relative scaling of the injection rates, the decrease in liquid rate is somewhat obscured).
- the increase in gas injection rate 145 g may be necessary to maintain the ECD 145 r substantially equal to the stability EMD 200 s .
- the gas rate 145 g may be reduced correspondingly to a rate that the formation gas enters the annulus 110 to maintain a constant ECD 145 r .
- a formation irregularity such as sloughing rock, causes an increase in the stability gradient.
- the gas rate 145 g may be correspondingly reduced so that the ECD 145 r is maintained at or above the increased stability gradient (by the safety factor). Note, that even after the irregularity is passed, the ECD 145 r may still be maintained at the increased level to prevent collapse of the irregularity even when the irregularity is no longer at bottomhole.
- the method may be halted at depth D 5 due to the beginning of a productive formation (the formations above depth D 5 may be nonproductive).
- controlling the ECD of the returns 145 r to be substantially less than the pore EMD 200 p may also eliminate the need to set one or more of the casing strings 115 i,s as sensitivity to changes in the pore and/or fracture EMDs 200 p,f is substantially reduced or eliminated.
- a liquid volume fraction (LVF) of the drilling fluid may range from 0.01 to 0.07 or 0.01 to 0.025 at STP or be greater than or equal to 0.01 at STP.
- the injection rates may be controlled to achieve an ECD at a top of an exposed formation or at total depth, such as 100 to 1,000 kg/m3, 200 to 700 kg/m3, or 250 to 1,000 kg/m3.
- the ECD may be increased, such as to 1,200, 1,300, 1,500, or 2,000 kg/m3.
- the injection rates may be controlled to achieve a predefined LVF at total depth, such as greater than 0.5.
- the injection rates may be controlled so that a first flow regime (discussed below) is maintained in a lower portion of the annulus, such as along the BHA, and a second flow regime is maintained in an upper portion of the annulus, such as from an upper end of the BHA to at or near the surface.
- a first flow regime discussed below
- a second flow regime is maintained in an upper portion of the annulus, such as from an upper end of the BHA to at or near the surface.
- the injection rates may be controlled to achieve an ECD equal to, substantially equal to, or slightly greater than the pore EMD of the exposed formation.
- the stability EMD may be proximate to the pore EMD.
- the ECD may need to be greater than the pore EMD.
- FIG. 3 is a cross-section of an actual wellbore 300 partially drilled with a method, according to another embodiment of the present invention.
- FIG. 3A is a table illustrating intervals of the wellbore 300 drilled with conventional methods and an embodiment of the present invention.
- FIG. 3B is a table illustrating intervals of other wellbores in the same field drilled with embodiments of the present invention.
- FIG. 3C is a table illustrating motors used with embodiments of the present invention.
- a conductor interval (not shown) was pre-drilled from surface 105 and conductor casing (not shown) was pre-installed.
- a first interval 320 of the wellbore was air drilled.
- a surface casing 115 s was run-in and cemented into the wellbore 300 .
- a second interval 330 was drilled according to an embodiment of the present invention.
- the liquid portion 145 l of the drilling fluid was an invert-emulsion oil based mud having a density of 950 kg/m3.
- the gas portion 145 g of the drilling fluid 145 f was nitrogen.
- the gas injection rate 145 g during drilling ranged between 80-100 m3/min and the liquid rate 145 l was 2.4 m3/min so that the ECD ranged between 600-700 kg/m3.
- a staging gas rate was used to transition from zero injection once drilling fluid has ceased, due for example to adding a joint or stand to the drill string, to the full drilling gas injection rate.
- a mud motor was used in the BHA of the drill string.
- the second interval 330 was stopped before encountering a formation having potential for hydrogen sulfide (a.k.a. sour gas).
- a third interval 340 of the wellbore was drilled conventionally overbalanced.
- An intermediate casing 115 i was then run-in and cemented into the wellbore 300 .
- a fourth interval 350 of the wellbore 300 was drilled according to an embodiment of the present invention.
- the mud may have been the same mud used as the second interval 330 and a mud motor was also employed.
- the gas injection was rate was the same as for the interval 330 and the liquid rate ranged between 1.4-1.6 m3/min so that the ECD ranged between 600-700 kg/m3.
- the reduction in liquid rate is attributable to the reduction in hole size.
- the fourth interval 350 was drilled to a depth past the kick-off point (KOP) 306 .
- the fourth interval 350 was stopped before encountering a formation having a potential for swelling.
- a fifth interval 370 was drilled conventionally overbalanced.
- a production liner 115 l was run-in and hung from the intermediate casing 115 i using a liner hanger and packer 305 .
- the production liner 115 l was then cemented into the wellbore 300 .
- a sixth interval 370 of the wellbore to total depth and including the horizontal production section was drilled using a calcium carbonate polymer mud and overbalanced due to a potential for sour gas.
- Intervals 380 and 390 were drilled using embodiments of the present invention for other wellbores in the same field.
- the mud used may have been the same as that used for interval 330 .
- FIG. 3D illustrates ROPs of similar intervals 330 a, b in the same field air drilled.
- the intervals 330 a,b were drilled at about the same depth as the interval 330 .
- the ROP for interval 330 was about ten m/hr and the ROPs for the intervals 330 a,b were about fifteen and nineteen m/hr, respectively.
- the interval 330 is significantly higher than conventional overbalanced drilling and approaching the ROP achieved by air drilling.
- switching from air to conventional overbalanced drilling for later sections requires a transition time (i.e., filling the wellbore with mud and switching drill bits) which is not a disability of one or more embodiments of the present invention.
- FIG. 4 is a cross-section of an actual wellbore 400 partially drilled with a method, according to another embodiment of the present invention.
- FIG. 4A is a table of intervals of the wellbore 400 drilled with conventional methods and embodiments of the present invention.
- FIG. 4C is a table illustrating intervals of other wellbores in the same field drilled with embodiments of the present invention.
- FIG. 4D is a table illustrating motors used with embodiments of the present invention.
- a conductor interval (not shown) was pre-drilled from surface 105 and conductor casing (not shown) was pre-installed.
- a first interval 420 of the wellbore was drilled overbalanced using a gel-slurry mud.
- a surface casing 115 s was run-in and cemented into the wellbore 400 .
- a second interval 430 was drilled, according to an embodiment of the present invention.
- the liquid 145 l portion of the drilling fluid was an invert-emulsion mineral oil based mud having a density of 900 kg/m3.
- the liquid portion 145 l of the drilling fluid also had a viscosity equal to 50-55 sec/L, a plastic viscosity less than 12 MPa-s, a yield point equal to 1-2 Pa, a high pressure high temperature (HPHT) filtration equal to 10-15 CC/30 min, an activity (Aw) equal to 0.45-0.48, and an oil-to-water ratio equal to 95/5 percent.
- the gas portion 145 g of the drilling fluid was nitrogen.
- the gas injection rate 145 g during drilling was from 50-80 m3/min and the liquid rate 145 l ranged between 1.2-1.5 m3/min so that the ECD was about 300 kg/m3.
- the second interval 430 was stopped to install intermediate casing 115 i .
- a third interval 440 of the wellbore to total depth and including the horizontal production section was drilled underbalanced.
- FIG. 4B is a table of some of the geological formations traversed by the wellbore. The table also illustrates the pore pressure at the top of the formation, and the EMD derived from the pore pressure.
- Intervals 450 and 460 were drilled using embodiments of the present invention for other wellbores in the same field.
- the mud used may have been the same as that used for interval 430 .
- FIG. 5 is a cross-section of an actual wellbore 500 partially drilled with a method, according to another embodiment of the present invention.
- FIG. 5A is a table illustrating intervals of the wellbore 500 drilled with conventional methods and embodiments of the present invention.
- FIG. 5B is a table of geological formations traversed by the wellbore.
- FIG. 5C is a table illustrating an interval of another wellbore in the same field drilled with an embodiment of the present invention.
- FIG. 5D is a table illustrating motors used with embodiments of the present invention.
- a conductor interval (not shown) was pre-drilled from surface 105 and conductor casing (not shown) was pre-installed.
- a first interval 520 of the wellbore was air drilled. The first interval was stopped due to expected fault zones.
- a second interval 530 was drilled conventionally overbalanced.
- a surface casing 115 s was run-in and cemented into the wellbore 500 .
- a third interval 540 was drilled according to an embodiment of the present invention.
- the liquid 145 l portion of the drilling fluid 145 f was an invert-emulsion oil based mud having a density of 850 kg/m3.
- the liquid portion 145 l of the drilling fluid 145 f also had a viscosity equal to 40 sec/L, a plastic viscosity less than 12 MPa-s, a yield point equal to 1-1.5 Pa, an Aw equal to 0.50, an oil-to-water ratio equal to 95/5 percent, and an electrical stability greater than 500 volts.
- the gas portion 145 g of the drilling fluid was nitrogen.
- the gas injection rate 145 g during drilling ranged between 40-95 m3/min and the liquid rate 145 l ranged between 2.24-2.6 m3/min so that the ECD was about 600 kg/m3.
- the third interval 540 was stopped due to intersection with an aquifer.
- a fourth interval 550 of the wellbore was drilled conventionally overbalanced.
- An intermediate casing 115 i was then run-in and cemented into the wellbore 500 .
- a fifth interval 560 of the wellbore 500 was drilled according to an embodiment of the present invention.
- the liquid 145 l portion of the drilling fluid 145 f was an invert-emulsion oil based mud having a density of 850 kg/m3
- the liquid portion 145 l of the drilling fluid 145 f also had a viscosity equal to 40 sec/L, a plastic viscosity less than 12 MPa-s, a yield point equal to 1.5-3.0 Pa, an Aw equal to 0.50, an oil-to-water ratio equal to 95/5 percent, a chloride concentration of 300k-340k mg/L, and an electrical stability greater than 500 volts.
- the gas portion 145 g of the drilling fluid 145 f was nitrogen.
- the gas injection rate 145 g during drilling ranged between 40-95 m3/min and the liquid rate 145 l ranged between 2.24-2.6 m3/min so that the ECD was about 600 kg/m3.
- the fifth interval 560 was drilled to a depth past the kick-off point (KOP) 506 and through a hard and abrasive rock (i.e., sandstone) Formation J.
- the ROP of was about ten m/hr through the interval 560 .
- the expected ROP for a conventional overbalanced drilling method of this formation is about one to two m/hr.
- the fifth interval 560 was stopped before encountering a formation having a potential for swelling.
- a sixth interval 570 was drilled conventionally overbalanced.
- a production liner 115 l was run-in and hung from the intermediate casing 115 i using a liner hanger and packer 405 .
- the production liner 115 l was then cemented into the wellbore 500 .
- a seventh interval 580 of the wellbore to total depth and including the horizontal production section was drilled using a formate mud and overbalanced due to a potential for sour gas.
- Interval 590 was drilled using an embodiment of the present invention for another wellbore in the same field.
- the mud used may have been the same as that used for interval 540 .
- FIGS. 3-5 also illustrate grouping of the formations by productivity.
- productive formation means a formation containing hydrocarbon reserves having a net present value equaling or exceeding the capital investment required to drill and complete the formation.
- non-productive formation includes formations having nuisance quantities of hydrocarbon reserves, usually natural gas.
- One or more embodiments discussed herein may be employed to drill at least a portion of a non-productive formation, one non-productive formation, and/or multiple non-productive formations.
- FIGS. 6A-6H are tables illustrating simulated annulus profiles of drilling a wellbore while varying gas injection rate and liquid/mud injection rate, according to other embodiments of the present invention.
- a minimum liquid rate may be first selected to achieve a minimum annular velocity to transport the cuttings from the bit.
- Bit size may be a primary factor in this determination.
- ECDs may be modeled using liquid rates greater than or equal to the minimum rate and varying gas rates. If a motor is used to rotate the bit, equivalent liquid velocities (ELVs) may also be calculated and minimum ELV and maximum ELV may be used as a boundary.
- the target gradient window may be defined including a minimum, such as the stability gradient and a maximum, such as a predetermined ratio above the stability gradient. Once all of the boundaries are set, the liquid and gas rates may be selected.
- the liquid and gas rates may be selected so that a velocity of the drilling fluid 145 f equals or exceeds the slip velocity of the cuttings generated at the bit.
- the gas portion 145 g may tend to reduce the viscosity of the drilling fluid 145 f relative to the viscosity of the liquid portion 145 l .
- the degree of viscosity reduction may be controlled by the gas rate which may increase the shear rate and therefore decrease the viscosity of Bingham/Power-Law fluids. The effect on Newtonian fluids may be less.
- the increased velocity afforded by adding the gas portion 145 g may readily compensate for the loss of viscosity.
- the simulations include gas injection rates of 100, 110, 120, and 150 m3/min at STP.
- the liquid injection rate is simulated at 2100 and 2400 l/min (2.1 and 2.4 m3/min).
- the liquid is plain water and the gas is nitrogen.
- Each simulation is conducted for an identical wellbore.
- the simulations illustrate annulus pressure profile, annulus temperature profile, a liquid volume fraction (LVF), gas velocity, liquid velocity, flow pattern or regime, hydrostatic head, friction loss, and ECD at total depth. Also illustrated are gas and liquid transit times, liquid holdup, and motor equivalent liquid velocity (ELV).
- the ECDs range from about 400 to about 600 kg/m3.
- the annulus flow regime is bubble flow for a lower portion of the annulus and slug flow for an upper portion of the annulus (with a return to bubble flow or annular-mist at the surface).
- the flow LVF at total depth ranges from about 0.58 to about 0.75.
- the injection LVFs at STP (calculated from nominal injection rates) range from 0.0138 to 0.0234. Pressure drop in the annulus is hydrostatically dominated or substantially hydrostatically dominated.
- annulus flow regimes such as bubble, slug, transition (froth), annular-mist, turbulent (LVF is equal to or substantially equal to one), or laminar (LVF is equal to or substantially equal to one) may be experienced in the annulus for a vertical or substantially vertical interval.
- Two or more annulus flow regimes such as stratified, wave, elongated bubble, slug, annular-mist, dispersed bubble (froth), turbulent (LVF is equal to or substantially equal to one), or laminar (LVF is equal to or substantially equal to one) may be experienced in the annulus for a horizontal or substantially horizontal interval. While the liquid/gas injection ratios may be selected to maximize ROP, hydraulic impact and horsepower at the bit, the resultant flow regimes may be adjusted by minor variation in gas/liquid injection ratio and by variation in surface choke pressure.
- the drilling fluid 145 f may be variable in form as the fluid proceeds through the wellbore 100 .
- this form may include a highly compressed mixture as the drilling fluid moves down the drill string 135 , through the bit 140 , and by the BHA.
- the drilling fluid 145 f may then expand as the returns 145 r flow up the annulus 110 as the gas 145 g may become the primary phase, thereby creating high fluid velocity. This high velocity may effectively transport cuttings up the annulus 110 and out of the wellbore 100 .
- the drilling fluid 145 f even when highly compressed may still be a relatively low viscosity, low density, and high filtration mixture as compared to conventional mud.
- the combination of these parameters has resulted in rates of excavation increasing by as much as an order of magnitude over conventional overbalanced drilling systems.
- Conventional overbalanced drilling systems cannot maintain such high ROPs as the cuttings removal rates would not be sufficient to prevent the cuttings from choking the annulus.
- the exceptional circulating properties of the drilling fluid 145 f may overcome the limitations of conventional mud systems by providing exceptionally high fluid velocities in the annulus and thus removing the cuttings at a rate high enough to prevent the buildup of cuttings in the annulus.
- the use of the drilling fluid 145 f may reduce or eliminate cuttings beds in directional intervals due to the high degree of fluid turbulence which may be present in the annulus. Such an increase in ROP may substantially reduce the cost of a drilling campaign.
- the liquid portion 145 l may have low viscosity and high filtrate parameters to further enhance ROP while at the same providing enhanced wellbore stability; as measured by caliper logging technology and increased hole cleaning performance.
- fluid optimization of hydraulic impact and hydraulic horsepower is more readily achieved without the dangers of hole erosion.
- FIG. 7 is a flow diagram of a drilling system 700 , according to another embodiment of the present invention. Comparing to FIG. 1A , the lines 52 , 52 s , 52 t , the flare pilot 45 f , 45 v , 45 p , and the separator relief 35 f have been removed for clarity.
- a recycle line 727 has been added.
- the recycle line 727 may include a primary compressor 722 , a booster compressor 725 , instruments TI, PI, and FM, a shut-off valve, and a check valve.
- the recycle line 727 may conduct gas discharged from the separator 35 to the compressors 722 , 725 which may re-pressurize the gas and inject the recycled gas into the gas outlet 27 .
- the recycled gas may mix with the NPU nitrogen to form the gas portion 145 g of the drilling fluid.
- the SC may be in communication with the compressors 722 , 725 and instrumentation to control the flow rate of recycled gas into the outlet 27 , such as by controlling the speed of the compressors 722 , 725 or by further including a flow control valve (not shown) in the recycle line 727 .
- the SC may vent excess gas to the flare by controlling the choke 37 .
- the SC may reduce the nitrogen produced by the NPU 20 accordingly.
- the recycle line 727 may further include a hydrocarbon sensor and a hydrogen sulfide sensor in communication with the SC.
- the SC may shut down the compressors 722 , 725 and close a solenoid operated shut-off valve (not shown), thereby venting the sour gas to the flare 45 .
- the SC may still recycle the nitrogen/sweet gas mixture.
- the SC may calculate the flow rate of the sweet/sour gas by performing a mass balance.
- injection of recycled gas may conserve energy otherwise used to drive the NPU 20 . Further, recycling the gas may further reduce the required capacity of the NPU 20 , thereby reducing the footprint of the drilling system 700 .
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Earth Drilling (AREA)
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
Description
- This application is a continuation of U.S. patent application Ser. No. 12/541,242, filed Aug. 14, 2009, which claims benefit of U.S. Prov. Pat. App. No. 61/159,176, filed Mar. 11, 2009, and U.S. Prov. Pat. App. No. 61/089,456, filed Aug. 15, 2008, all of which are herein incorporated by reference in their entireties.
- 1. Field of the Invention
- The present invention relates to multiphase drilling systems and methods.
- 2. Description of the Related Art
- Drilling a wellbore typically requires circulating a drilling fluid to flush the bore of cuttings produced by action of a rotating drill bit. The drilling fluid may be pumped down the well inside the drill string and through the bit and jetted into the cutting face where it assists in penetrating the fractures created by the bit, lifting the bit fractured chips by penetrating the fractures and hydraulically lifting the chips into the circulating fluid stream. The drilling fluid then carries the chips up the lower annulus formed between an outer surface of the drill string and a wall of the wellbore. The drilling fluid and chips or returns continue up the upper annulus formed between a casing or lining and the drill string and to the surface where the chips are separated from the fluid. The cleaned fluid is then reintroduced to the well completing the circulation cycle. The drilling fluid may also cool the drill bit and support the wall of the wellbore.
- Deploying a drilling rig to a wellsite is an expensive task. Oil and gas companies are constantly searching for ways to reduce time spent by the drilling rig at the wellsite. The rig time includes time spent drilling/tripping and non-productive time. The time spent drilling may be reduced by increasing a rate of penetration (ROP) of the drill bit through the rock formations, especially non-productive formations between the surface and the deeper hydrocarbon-bearing formations.
- Primary factors which govern ROP include: bit type, weight on bit (WOB), rotary speed of the bit, formation characteristics, and a bottom hole pressure (BHP) exerted by the returns on the formation being drilled. The BHP includes a static component generated by the hydrostatic fluid column weight and a dynamic component generated by hydraulic drag due to naturally occurring resistance to flow through the annulus. The influence of BHP on the ROP is often discussed in terms of chip hold down effect. An increase in BHP tends to compact the rock formation being drilled, artificially increasing the shear strength of the rock and tending to hold rock chips created by the bit in place (chip hold down effect) thereby forcing re-drilling/re-fracturing of previously drilled rock and reducing the ROP. An increase in BHP also increases downtime by shortening the life of the bit, thereby requiring more frequent replacement or tripping of the drill bit.
- To increase the ROP, drillers in many hard rock drilling areas have turned to using air for drilling fluid. As compared to conventional drilling mud, typically oil or water based, the density is reduced by orders of magnitude, thereby greatly reducing BHP, improving ROP and extending the life of the drill bit. However, air drilling is limited to select geological formations, which are consolidated with minimal water influx and do not produce hydrogen sulfide. Therefore, there exists a need in the art for a method of drilling a wellbore that increases ROP, improves the life of the drill bit, and does not suffer from the limitations of air drilling.
- In one embodiment, a method for drilling a wellbore includes injecting drilling fluid through a drill string disposed in the wellbore and rotating a drill bit disposed on a bottom of the drill string. The drilling fluid includes a liquid and a gas. The drilling fluid is injected at the surface. The drilling fluid exits the drill bit and carries cuttings from the drill bit. The drilling fluid and cuttings (returns) flow to the surface via an annulus formed between the drill string and the wellbore. The liquid is injected at a rate so that a liquid velocity of the returns in the annulus is sufficient to transport the cuttings. The method further includes drilling through at least a portion of a non-productive formation.
- In another embodiment, a method for drilling a wellbore includes injecting drilling fluid through a drill string disposed in the wellbore and rotating a drill bit disposed on a bottom of the drill string. The drilling fluid includes a liquid and a gas. The drilling fluid is injected at the surface. The drilling fluid exits the drill bit and carries cuttings from the drill bit. The drilling fluid and cuttings (returns) flow to the surface via an annulus formed between the drill string and the wellbore. A liquid volume fraction of the drilling fluid at standard temperature and pressure is greater than or equal to 0.01. The method further includes drilling through at least a portion of a non-productive formation.
- So that the manner in which the above recited features of the present invention can be understood in detail, a more particular description of the invention, briefly summarized above, may be had by reference to embodiments, some of which are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments of this invention and are therefore not to be considered limiting of its scope, for the invention may admit to other equally effective embodiments.
-
FIG. 1A is a flow diagram of a drilling system, according to one embodiment of the present invention.FIG. 1B is a cross-section of a wellbore being drilled with the drilling system. -
FIG. 2 illustrates a pressure profile comparing an embodiment of the present invention with prior art drilling systems.FIG. 2A illustrates controlling injection rates based on formation changes. -
FIG. 3 is a cross-section of an actual wellbore partially drilled with a method, according to another embodiment of the present invention.FIG. 3A is a table illustrating intervals of the wellbore drilled with conventional methods and embodiments of the present invention.FIG. 3B is a table illustrating intervals of other wellbores in the same field drilled with embodiments of the present invention.FIG. 3C is a table illustrating motors used with embodiments of the present invention.FIG. 3D illustrates ROPs of similar intervals in the same field air drilled. -
FIG. 4 is a cross-section of an actual wellbore partially drilled with a method, according to another embodiment of the present invention.FIG. 4A is a table of intervals of the wellbore drilled with conventional methods and embodiments of the present invention.FIG. 4B is a table of some of the geological formations traversed by the wellbore.FIG. 4C is a table illustrating intervals of other wellbores in the same field drilled with embodiments of the present invention.FIG. 4D is a table illustrating motors used with embodiments of the present invention. -
FIG. 5 is a cross-section of an actual wellbore partially drilled with a method, according to another embodiment of the present invention.FIG. 5A is a table of intervals of the wellbore drilled with conventional methods and embodiments of the present invention.FIG. 5B is a table of geological formations traversed by the wellbore.FIG. 5C is a table illustrating an interval of another wellbore in the same field drilled with an embodiment of the present invention.FIG. 5D is a table illustrating motors used with embodiments of the present invention. -
FIGS. 6A-6H are tables illustrating simulated annulus profiles of drilling a wellbore while varying gas injection rate and liquid/mud injection rate, according to other embodiments of the present invention. -
FIG. 7 is a flow diagram of a drilling system, according to another embodiment of the present invention. -
FIG. 1A is a flow diagram of adrilling system 1, according to one embodiment of the present invention.FIG. 1B is a cross-section of awellbore 100 being drilled using thedrilling system 1. Thedrilling system 1 may be deployed on land or offshore. Thedrilling system 1 may include a drilling rig (not shown) used to support drilling operations. The drilling rig may include a derrick supported from a support structure having a rig floor or platform on which drilling operators may work. Many of the components used on the rig, such as a Kelly and rotary table or top drive, power tongs, slips, draw works and other equipment, are not shown for ease of depiction. Awellbore 100 has already been partially drilled, casing 115 set and cemented 120 into place. Thecasing string 115 extends from thesurface 105 of thewellbore 100 where awellhead 40 is typically located.Drilling fluid 145 f may be injected through adrill string 135 deployed in the wellbore. - The
drilling fluid 145 f may be a mixture and may include a first fluid which is agas 145 g (seeFIG. 2A ) at standard temperature and pressure (STP, 60° F., 14.7 psia) and a second fluid which is a liquid 145 l (seeFIG. 2A ) at STP. The mixture may be heterogeneous (i.e., insoluble) or homogenous (i.e., a solution) and may vary in properties (i.e., density and/or phases) in response to temperature and/or pressure. The liquid 145 l may be water, glycerol, glycol, or base oil, such as kerosene, diesel, mineral oil, fuel oil, vegetable ester, linear alpha olefin, internal olefin, linear paraffin, crude oil, or combinations thereof. Thegas 145 g may be any gas having an oxygen concentration less than the oxygen concentration sufficient for combustion (i.e., eight percent), such as nitrogen, natural gas, or carbon dioxide. The nitrogen may be generated at the surface using a nitrogen production unit (NPU) 20 which may generate substantially pure (i.e., greater than or equal to ninety-five percent pure) nitrogen. Alternatively, the nitrogen may be delivered from cryogenic bottles or bulk tanks. Thegas 145 g may be a mixture of gases, such as exhaust gas from the rig's prime mover or fuel-gas driven compressors or a mixture of nitrogen, natural gas, and/or carbon dioxide. - The liquid 145 l may be mud (have solids suspended and/or dissolved therein). The mud may be oil-based and may have water emulsified therein (invert emulsion). The solids may include an organophilic clay, lignite, and/or asphalt. The base oil may be viscosified. Alternatively, the mud may be water-based. The solids may be dissolved in the liquid, forming a solution, such as brine. The dissolved solids may include metal halides, such as potassium, cesium, or calcium salts or mixtures thereof; or formates, such as cesium, sodium, potassium, lithium, or mixtures thereof. The brine may further include silicates, amines, oils, such as distillated hydrocarbons, olefins, or paraffins. The brine may further include hydration and dispersion inhibiting polymers, such as polyanionic cellulose (PAC), partially hydrolyzed polyacrylamide (PHPA), partially hydrolyzed polyacylanitrile (PH-PAN) fluids).
- Alternatively, the mud may be glycol based as discussed in U.S. Pat. No. 6,291,405, which is hereby incorporated by reference in its entirety. The glycol-based mud may include a water-miscible glycol, with a molecular weight of less than about two hundred, such as ethylene glycol, diethylene glycol, triethylene glycol, propylene glycol, butylene glycol and mixtures thereof, at a concentration: of at least 70%, 70% to 100%, 80% to 100%, or 85% to 100%, (by volume); water, not in excess of 30% by volume; a salt or salts selected from the group consisting of sodium chloride, potassium chloride, magnesium chloride, calcium chloride, sodium bromide, calcium bromide, potassium acetate, potassium formate and choline chloride at a concentration greater than 50,000 mg/liter of water in the mud; an anti-sticking additive at a concentration of greater than 0.5% by weight of the mud; a filtration control agent for lowering fluid loss of the drilling fluid; a viscosifier for suspension of solids and weighting material in the drilling fluid, such as glycol-soluble gums, polymers or gels, or with rod-like clays such as attapulgite or sepiolite; and weighting material, such as barite, iron oxide, dolomite, calcium carbonate or soluble salts.
- Alternatively, the mud may be an oil in water emulsion as discussed in U.S. Pat. No. 4,411,801, which is hereby incorporated by reference in its entirety. The mud may include an emulsifying amount of an emulsifier, such as one or more surfactants, such as three surfactants in equal parts, such as polyoxyethylene glycol five hundred mono-tallate which is, generally, the mono esters of tall oil fatty acids and mixed polyoxyethelene diols having an average polymer length of about four hundred fifty to five hundred fifty oxyethylene (EtO) units, a nonyl pheno ethoxylate containing about 43% by weight EtO groups, and a nonyl phenol ethoxylate containing 65% by weight EtO groups; a liquid hydrocarbon coating agent, being present in an amount of at least about 5% or 5% to 35% by volume of the mud, such as light crude oil, certain napthas, kerosene, fuel oil, gas oil, light lubricating oil, coal oil, diesel, light shale oil, pure or mixed liquid aliphatic hydrocarbons, or mixtures thereof; an aqueous medium, such as water or brine, such as sodium chloride solutions, calcium chloride solutions, potassium chloride solutions, calcium sulfate solutions, or a mixture of such solutions, present in amounts of about 0.5 lbs/gal (ppg) to saturation (2.5 lbs/gal); a viscosifier, such as starches or starch derivatives, such as converted starches; water-dispersible cellulose derivatives; polysaccharide gums, carboxyalkyl cellulose ethers, hydroxyalkyl cellulose ethers, carboxymethyl starch, or xanthomonas (xanthan) gum (XC polymer) galactomannan gums present in amounts of from about 0.005 to about 0.02 ppg; a filtration control agent, such as processed starch with biocide, carboxymethyl cellulose, or pre-gelatinized starch, present in amounts of from about 0.05 to about 0.25 ppg; and a pH control agent, such as a caustic, such as KOH and MgO to achieve a pH of the mud, such as eight to twelve or ten.
- Additionally, if the liquid portion 145 l is oil or oil based, one or more solid hydrophilic polymer prills may be added to the drilling fluid. If water from an exposed formation should enter the annulus, the prill will absorb the water and swell up, thereby facilitating removal from the returns by the solids shaker.
- Additionally, the drilling fluid may have properties which are not normally acceptable in conventional drilling, parameters, such as viscosity reduced to a level where the fluid could be weighted up quickly in the event that the well requires hydrostatic control, relatively low density, and filtration rate not controlled and tending to be substantially higher than that used in conventional operations.
- Alternatively, the liquid portion 145 l may be pure base oil, pure water, brine, or water treated with a shale stabilizer, such as Dionic, NCL-100, or cc300kf (without viscosity additives).
- The liquid portion 145 l of the
drilling fluid 145 f may be stored in a reservoir, such as one ormore tanks 5 or pits. Thetanks 5 may be in fluid communication with one or more rig pumps 10 which pump the liquid 145 l portion through anoutlet conduit 12, such as pipe. Theoutlet pipe 12 may be in fluid communication with anitrogen outlet line 27 and astandpipe 28. - The
gas portion 145 g of thedrilling fluid 145 f may be produced by one or more of theNPUs 20. EachNPU 20 may be in fluid communication with one ormore air compressors 22. Thecompressors 22 may receive ambient air and discharge compressed air to theNPUs 20. TheNPUs 20 may each include a cooler, a demister, a heater, one or more particulate filters, and one or more membranes. The membranes may include hollow fibers which allow oxygen and water vapor to permeate a wall of the fiber and conduct nitrogen through the fiber. An oxygen probe (not shown) may monitor and assure that the produced nitrogen meets a predetermined purity. One ormore booster compressors 25 may be in fluid communication with theNPUs 20. Theboosters 25 may compress the nitrogen exiting theNPUs 20 to achieve a predetermined injection or standpipe pressure. Theboosters 25 may be positive displacement type, such as reciprocating or screw, or turbomachine type, such as centrifugal. - A pressure sensor (PI), temperature sensor (TI), and flow meter (FM) may be installed in the
nitrogen outlet 27 and in data communication with a surface controller (SC, not shown). The SC may monitor the flow rate of the nitrogen and adjust the air compressors and/or booster compressors to maintain a predetermined flow rate. Additionally, the SC may monitor a speed of thepump 10 and adjust a speed of thepump 10 to maintain a predetermined flow rate. Additionally, theoutlet 12 may include a FM in communication with the SC. - The liquid 145 l portion and
gas 145 g portion may be commingled at thejunction 32 of the outlet lines, thereby forming thedrilling fluid 145 f. Thedrilling fluid 145 f may flow through thestandpipe 28 and into thedrill string 135 via a swivel (Kelly or top drive). Thedrilling fluid 145 f may be pumped down through thedrill string 135 and exit thedrill bit 140, where the fluid may circulate the cuttings away from thebit 140 and return the cuttings up anannulus 110 defined between an inner surface of thecasing 115 orwellbore 100 and an outer surface of thedrill string 135. The return mixture (returns) 145 r may return to thesurface 105 and be diverted through an outlet of a rotating control device (RCD) 15 and into a primary returns line (PRL) 29. Alternatively, the drilling fluid may be pumped into the annulus and return through the drill string (aka reverse circulation). - The
RCD 15 may provide an annular seal around thedrill string 135 during drilling and while adding or removing (i.e., during a tripping operation to change a worn bit) segments or stands to/from thedrill string 135. TheRCD 15 achieves fluid isolation by packing off around thedrill string 135. TheRCD 15 may include a pressure containing housing mounted on thewellhead 40 where one or more packer elements are supported between bearings and isolated by mechanical seals. TheRCD 15 may be the active type or the passive type. The active type RCD uses external hydraulic pressure to activate the packer elements. The sealing pressure is normally increased as the annulus pressure increases. The passive type RCD uses a mechanical seal with the sealing action supplemented by wellbore pressure. If thedrillstring 135 is coiled tubing or other non-jointed tubular, a stripper or pack-off elements (not shown) may be used instead of theRCD 15. One or more blowout preventers (BOPs) 16-18 may be attached to thewellhead 40. If the RCD is the active type, it may be in communication with and/or controlled by the SC. TheRCD 15 may include a bleed off line to vent the wellbore pressure when the RCD is inactive. Ableed line 54 may be included for removing theRCD 15 for servicing. - A PI may be installed in the
PRL 29 and in data communication with the SC. Additionally, a TI (not shown) may be installed. One or more control valves orvariable choke valves 30 may be disposed in thePRL 29. Thechoke 30 may be in communication with the SC and fortified to operate in an environment where thereturns 145 r contain substantial drill cuttings and other solids. Thechoke 30 may be fully open or bypassed during normal drilling and present only to allow the SC to control backpressure exerted on theannulus 110 should a kick occur. Alternatively, thechoke 30 may be employed during normal drilling to exert a predetermined back pressure on the annulus to vary bottom hole pressure independent of the liquid 145 l andgas 145 g injection rates. - The
drill string 135 may include adrill bit 140 disposed on a longitudinal end thereof. Thedrill string 135 may be made up of joints or segments of drill pipe, casing, or liner threaded together or coiled tubing. Thedrill string 135 may also include a bottom hole assembly (BHA) (not shown) that may include thebit 140, drill collars, a mud motor, a bent sub, measurement while drilling (MWD) sensors, logging while drilling (LWD) sensors and/or a check or float valve (to prevent backflow of fluid from the annulus). The mud motor may be a positive displacement type (i.e., a Moineau motor) or a turbomachine type (i.e., a mud turbine). Thedrill string 135 may further include float valves distributed therealong, such as one in every thirty joints or ten stands, to maintain backpressure on the returns while adding joints thereto. Thedrill bit 140 may be rotated from the surface by the rotary table or top drive and/or downhole by the mud motor. If a bent sub and mud motor is included in the BHA, slide drilling may be effected by only the mud motor rotating the drill bit and rotary or straight drilling may be effected by rotating the drill string from the surface slowly while the mud motor rotates the drill bit. Alternatively, if thedrill string 135 is coiled tubing, the BHA may include an orienter to switch between rotary and slide drilling. If thedrill string 135 is casing or liner, the liner or casing may be suspended in thewellbore 100 and cemented after drilling. - The
returns 145 r may then be processed by aseparator 35. Theseparator 35 may be a four-phase horizontal separator. An oil outlet 35 o and awater outlet 35 w in communication with respective compartments of theseparator 35 may conduct the liquid portion of thereturns 145 r to asolids shaker 60. Asparge pump 55 may deliver a predetermined quantity of the liquid portion 145 l of thedrilling fluid 145 f from themud tanks 5 to the solids compartment of theseparator 35 to flush cuttings. The cuttings slurry may be discharged to the shaker via asolids line 35 s. The recombined liquid 145 l and solids may flow through a combined outlet to asolids shaker 60. Additionally, theseparator 35 may include a level sensor (not shown) in data communication with the SC for detecting the liquid/mud level in the separator. Additionally, an FM (not shown) may be disposed in thewater 35 w and oil outlets 35 o and in fluid communication with the SC. - The
separator 35 may further include agas outlet 35 g to aflare 45 or gas recovery line. Thegas outlet line 35 g may include a FM in data communication with the SC to measure the flow rate of returned gas. The gas outlet line may further include an adjustable control valve or choke 37 in communication with the SC which may be used to control pressure in the separator and/or to control back pressure exerted on theannulus 110 if erosion of thechoke 30 becomes a problem. Apressure relief line 35 f may include a pressure relief valve in communication with the gas compartment of theseparator 35 and lead to theflare 45. - Alternatively, the
separator 35 may be a vertical separator or a cyclonic separator and may separate two or more phases. For example, a two-phase separator may be used to separate gas and then the remaining liquid and cuttings may be discharged to a solids shaker. Alternatively, the remaining liquid and cuttings may instead be discharged to a second, lower pressure separator. The lower pressure separator may be a three-phase separator (gas, liquid, and solids/slurry) from which the gas may vent to a second flare or cold vent, the liquids may be discharged to the mud tank, and the solids/slurry may be discharged to a shaker. - The
solids shaker 60 may remove heavy solids from the liquid portion 145 l and may discharge the removed solids to a solids bin (not shown). An outlet line of theshaker 60 may lead to a first of thetanks 5. An outlet of thefirst tank 5 may feed acentrifuge 65 which may remove fine solids from the liquid 145 l and discharge the removed fines to the bin. Additionally, the solids bin may include a load cell (not shown) in data communication with the SC. An outlet line of thecentrifuge 65 may discharge the liquid portion 145 l into a second one of themud tanks 5. - A
bypass line 53 may be included to provide the option of closing thePRL 29 and bypassing thechoke 30 and theseparator 35. Thebypass line 53 may lead directly to the solids shaker 50. Thebypass line 53 may be used to return to conventional overbalanced drilling in the event that the wellbore becomes unstable (i.e., a kick or an unstable formation). One or moresecondary lines 51 may be provided to allow circulation in the event that one or more of the BOPs 16-18 are closed. Thesecondary lines 51 may include one ormore chokes 41 and lead to adegasser 42. - One or more fuel, such as propane, natural gas, or methane,
tanks 45 f may be provided to maintain ignition in theflare 45. Thefuel 45 f may be a liquid in the tanks and vaporized in apilot line 45 p to theflare 45 by avaporizer 45 v. - If the
drill string 135 is made up of jointed drill pipe or casing, joints periodically need to be added to the drill string. Injection of thedrilling fluid 145 f may be halted to add a joint. Thestandpipe 28 may be vented and the float valves may close to prevent backflow of returns through thedrill string 135. Thechoke 30 may be closed to prevent loss of the dynamic BHP due to halting circulation of the drilling fluid. Alternatively, only injection of thegas portion 145 g may be halted and injection of the liquid portion 145 l may instead be diverted from the standpipe to akill line 13 and into one of thechokes choke drilling fluid 145 f may be diverted into thekill line 13 and through thechoke 30 to compensate for the loss of the BHP. Alternatively, a continuous circulation system or continuous flow subs may be used to maintain circulation while adding joints to thedrill string 135. Alternatively, a safety factor may be utilized or the formation may be stable so that loss of the dynamic BHP is not a concern and no attempt to maintain or compensate for loss of dynamic BHP is necessary. - Stands may have to be removed or added if the
drill string 135 has to be removed or tripped to change thedrill bit 140. During adding or removing stands, theNPUs 20 may be shut down so that only the liquid 145 l is injected through thedrill string 135. For shutdown of theNPUs 20 and/or to prevent overpressure of thecompressors bleed line 52 may include abranch 52 s to the separator and abranch 52 t to themud tanks 5 and avent line 56 may lead to atmosphere. The circulation may be continued until theannulus 110 is filled to a predetermined level, such as partially, substantially, or completely, with the liquid/mud. Once theannulus 110 is filled to the predetermined level, circulation may be halted by shutting the rig pumps 10 down. The predetermined level may be selected so that the exposed formations are near-balanced or overbalanced. If a stand is being removed, the liquid 145 l may be added via thekill line 13 to maintain the liquid level in the annulus. Alternatively, if the density of the liquid is insufficient for overbalancing the exposed formation(s), a higher density liquid may be used to overbalance the exposed formation(s). This higher density liquid/mud may be premixed in a kill tank (not shown) or may be formed by adding weighting agents to the liquid. - Various shutoff valves (i.e., gate or ball valves), and check valves are shown. The shutoff valves may be in communication with the SC so that they are opened or closed by the SC.
- Alternatively, a dual concentric drill string may be used instead of the
drill string 135. A concentric drill string may be particularly useful for delicate formations, such as tar sand formations or coal bed methane formations. A suitable concentric tubular string is illustrated in FIGS. 3A and 3B of International Patent Application Pub. WO 2007/092956 (Atty. Dock. No. WEAT/0730-PCT, hereinafter '956 PCT), which is herein incorporated by reference in its entirety. The concentric drill string may include joints assembled together. Each joint may include an outer tubular having a longitudinal bore therethrough and an inner tubular having a longitudinal bore there through. The inner tubular may be mounted within the outer tubular. An annulus may be formed between the inner and outer tubulars. Drilling fluid may be injected through the annulus formed between the tubulars and return to the surface via the inner tubular bore or vice versa. The delicate formations may then be spared from exposure to the drilling fluid and the returns. - Alternatively, an eccentric dual drill string may be used instead of the concentric dual drill string. A suitable eccentric drill string is illustrated in FIGS. 5A-5E of the '956 PCT. A partition is formed in a wall of each joint and divides an interior of the drill string into two flow paths. A box is provided at a first longitudinal end of the joint and the pin is provided at the second longitudinal end of the joint. A face of one of the pin and box has a groove formed therein which receives a gasket. The face of one of the pin and box may have an enlarged partition to ensure a seal over a certain angle α. This angle α allows for some thread slippage. The outer layer of insulation illustrated in the '956 PCT may be omitted.
-
FIG. 2 illustrates a pressure profile comparing an embodiment of the present invention with prior art drilling systems.FIG. 2A illustrates controlling injection rates based on formation changes. - As typical, the formations exposed to the
wellbore 100 exhibit apore gradient 200 p and afracture gradient 200 f. For analytical convenience, theformation pressure gradients 200 f,p are often converted to an equivalent mud density (EMD) and a bottomhole pressure gradient of the returns is converted to an equivalent circulating density (ECD). Conventional overbalanced drilling 245 o uses mud having a density so that the pressure exerted by the returns 245 o on the exposed formations is within a window defined between thepore 200 p and fracture 200 f gradients. Some formations also exhibit astability gradient 200 s. If the ECD of the returns is less than thestability gradient 200 s, thewellbore 100 may collapse. As discussed above and illustrated,air drilling 245 a is unsuitable for these formations that exhibit astability gradient 200 s due to the negligible hydrostatic contribution of air to the ECD of thereturns 245 a. Note,air drilling 245 a may be suitable to drill thewellbore 100 to depth D1 as the exposed formations do not exhibit thestability gradient 200 s. Also, as typical, casing orliner strings 115 s,i are set at or near depths D1, D2 where changes in thepore 200 p and/or fracture 200 f gradients occur so that the bottomhole pressure exerted by the overbalanced returns 245 o (greater than the pore pressure at bottomhole) does not fracture a formation at a shallower depth. - The injection rates of the
gas portion 145 g and the liquid 145 l portion of thedrilling fluid 145 f may be controlled so that an ECD of thereturns 145 r is substantially less than thepore EMD 200 p in order to maximize the ROP. For example, the ECD of thereturns 145 r may be less than or equal two-thirds, one-half, or one-third thepore EMD 200 p. For formations exhibiting astability gradient 200 s, the injection rates may be controlled to achieve anECD 145 r equal to or slightly greater than thestability EMD 200 s. Maintaining the ECD slightly greater than thestability EMD 200 s provides a safety factor against wellbore collapse and will tolerate minor BHP fluctuations, such as those created while adding joints or stands to thedrill string 135. - At depth D2, the liquid rate 145 l may be substantially decreased and the
gas rate 145 g may be substantially increased due to a change in hole size resulting from setting of theintermediate casing 115 i (note, due to the relative scaling of the injection rates, the decrease in liquid rate is somewhat obscured). The increase ingas injection rate 145 g may be necessary to maintain theECD 145 r substantially equal to thestability EMD 200 s. At depth D3, a gas kick is experienced, thegas rate 145 g may be reduced correspondingly to a rate that the formation gas enters theannulus 110 to maintain aconstant ECD 145 r. When a gas kick is encountered during conventional overbalanced drilling, drilling is halted and one of theBOPs choke 41 is used to exert back pressure on the annulus to restore the overbalanced condition. The formation gas is circulated from the wellbore and the density of the drilling mud is increased to restore the overbalanced condition (without the choke). The sequence of steps varies depending on which method (Driller's or Engineer's) is employed. Once the heavier mud has filled the annulus, drilling may continue. In contrast, theRCD 15 and theseparator 35 of thedrilling system 1 allow drilling to continue through a kick unabated and without a substantial change in ECD, thereby maintaining the ROP. - At depth D4, a formation irregularity, such as sloughing rock, causes an increase in the stability gradient. The
gas rate 145 g may be correspondingly reduced so that theECD 145 r is maintained at or above the increased stability gradient (by the safety factor). Note, that even after the irregularity is passed, theECD 145 r may still be maintained at the increased level to prevent collapse of the irregularity even when the irregularity is no longer at bottomhole. The method may be halted at depth D5 due to the beginning of a productive formation (the formations above depth D5 may be nonproductive). - Advantageously, controlling the ECD of the
returns 145 r to be substantially less than thepore EMD 200 p may also eliminate the need to set one or more of the casing strings 115 i,s as sensitivity to changes in the pore and/or fractureEMDs 200 p,f is substantially reduced or eliminated. - A liquid volume fraction (LVF) of the drilling fluid may range from 0.01 to 0.07 or 0.01 to 0.025 at STP or be greater than or equal to 0.01 at STP. The injection rates may be controlled to achieve an ECD at a top of an exposed formation or at total depth, such as 100 to 1,000 kg/m3, 200 to 700 kg/m3, or 250 to 1,000 kg/m3. However, for wellbores with serious stability issues or substantial gas potential, the ECD may be increased, such as to 1,200, 1,300, 1,500, or 2,000 kg/m3. Alternatively, the injection rates may be controlled to achieve a predefined LVF at total depth, such as greater than 0.5. Alternatively, the injection rates may be controlled so that a first flow regime (discussed below) is maintained in a lower portion of the annulus, such as along the BHA, and a second flow regime is maintained in an upper portion of the annulus, such as from an upper end of the BHA to at or near the surface.
- Alternatively, the injection rates may be controlled to achieve an ECD equal to, substantially equal to, or slightly greater than the pore EMD of the exposed formation. For example, in certain unstable formations, the stability EMD may be proximate to the pore EMD. In these instances, to maintain the ECD substantially equal to the stability EMD, the ECD may need to be greater than the pore EMD.
-
FIG. 3 is a cross-section of anactual wellbore 300 partially drilled with a method, according to another embodiment of the present invention.FIG. 3A is a table illustrating intervals of thewellbore 300 drilled with conventional methods and an embodiment of the present invention.FIG. 3B is a table illustrating intervals of other wellbores in the same field drilled with embodiments of the present invention.FIG. 3C is a table illustrating motors used with embodiments of the present invention. - A conductor interval (not shown) was pre-drilled from
surface 105 and conductor casing (not shown) was pre-installed. Afirst interval 320 of the wellbore was air drilled. Asurface casing 115 s was run-in and cemented into thewellbore 300. Asecond interval 330 was drilled according to an embodiment of the present invention. In this embodiment, the liquid portion 145 l of the drilling fluid was an invert-emulsion oil based mud having a density of 950 kg/m3. Thegas portion 145 g of thedrilling fluid 145 f was nitrogen. Thegas injection rate 145 g during drilling ranged between 80-100 m3/min and the liquid rate 145 l was 2.4 m3/min so that the ECD ranged between 600-700 kg/m3. A staging gas rate was used to transition from zero injection once drilling fluid has ceased, due for example to adding a joint or stand to the drill string, to the full drilling gas injection rate. A mud motor was used in the BHA of the drill string. Thesecond interval 330 was stopped before encountering a formation having potential for hydrogen sulfide (a.k.a. sour gas). - A
third interval 340 of the wellbore was drilled conventionally overbalanced. Anintermediate casing 115 i was then run-in and cemented into thewellbore 300. Afourth interval 350 of thewellbore 300 was drilled according to an embodiment of the present invention. In this embodiment, the mud may have been the same mud used as thesecond interval 330 and a mud motor was also employed. The gas injection was rate was the same as for theinterval 330 and the liquid rate ranged between 1.4-1.6 m3/min so that the ECD ranged between 600-700 kg/m3. As discussed above, the reduction in liquid rate is attributable to the reduction in hole size. Thefourth interval 350 was drilled to a depth past the kick-off point (KOP) 306. Thefourth interval 350 was stopped before encountering a formation having a potential for swelling. Afifth interval 370 was drilled conventionally overbalanced. A production liner 115 l was run-in and hung from theintermediate casing 115 i using a liner hanger andpacker 305. The production liner 115 l was then cemented into thewellbore 300. Asixth interval 370 of the wellbore to total depth and including the horizontal production section was drilled using a calcium carbonate polymer mud and overbalanced due to a potential for sour gas. -
Intervals interval 330. -
FIG. 3D illustrates ROPs ofsimilar intervals 330 a, b in the same field air drilled. Theintervals 330 a,b were drilled at about the same depth as theinterval 330. The ROP forinterval 330 was about ten m/hr and the ROPs for theintervals 330 a,b were about fifteen and nineteen m/hr, respectively. While not exceeding the ROP of air drilling, theinterval 330 is significantly higher than conventional overbalanced drilling and approaching the ROP achieved by air drilling. Further, switching from air to conventional overbalanced drilling for later sections requires a transition time (i.e., filling the wellbore with mud and switching drill bits) which is not a disability of one or more embodiments of the present invention. -
FIG. 4 is a cross-section of anactual wellbore 400 partially drilled with a method, according to another embodiment of the present invention.FIG. 4A is a table of intervals of thewellbore 400 drilled with conventional methods and embodiments of the present invention.FIG. 4C is a table illustrating intervals of other wellbores in the same field drilled with embodiments of the present invention.FIG. 4D is a table illustrating motors used with embodiments of the present invention. - A conductor interval (not shown) was pre-drilled from
surface 105 and conductor casing (not shown) was pre-installed. Afirst interval 420 of the wellbore was drilled overbalanced using a gel-slurry mud. Asurface casing 115 s was run-in and cemented into thewellbore 400. Asecond interval 430 was drilled, according to an embodiment of the present invention. In this embodiment, the liquid 145 l portion of the drilling fluid was an invert-emulsion mineral oil based mud having a density of 900 kg/m3. The liquid portion 145 l of the drilling fluid also had a viscosity equal to 50-55 sec/L, a plastic viscosity less than 12 MPa-s, a yield point equal to 1-2 Pa, a high pressure high temperature (HPHT) filtration equal to 10-15 CC/30 min, an activity (Aw) equal to 0.45-0.48, and an oil-to-water ratio equal to 95/5 percent. Thegas portion 145 g of the drilling fluid was nitrogen. Thegas injection rate 145 g during drilling was from 50-80 m3/min and the liquid rate 145 l ranged between 1.2-1.5 m3/min so that the ECD was about 300 kg/m3. Thesecond interval 430 was stopped to installintermediate casing 115 i. Athird interval 440 of the wellbore to total depth and including the horizontal production section was drilled underbalanced. -
FIG. 4B is a table of some of the geological formations traversed by the wellbore. The table also illustrates the pore pressure at the top of the formation, and the EMD derived from the pore pressure. -
Intervals interval 430. -
FIG. 5 is a cross-section of an actual wellbore 500 partially drilled with a method, according to another embodiment of the present invention.FIG. 5A is a table illustrating intervals of the wellbore 500 drilled with conventional methods and embodiments of the present invention.FIG. 5B is a table of geological formations traversed by the wellbore.FIG. 5C is a table illustrating an interval of another wellbore in the same field drilled with an embodiment of the present invention.FIG. 5D is a table illustrating motors used with embodiments of the present invention. - A conductor interval (not shown) was pre-drilled from
surface 105 and conductor casing (not shown) was pre-installed. Afirst interval 520 of the wellbore was air drilled. The first interval was stopped due to expected fault zones. Asecond interval 530 was drilled conventionally overbalanced. Asurface casing 115 s was run-in and cemented into the wellbore 500. Athird interval 540 was drilled according to an embodiment of the present invention. In this embodiment, the liquid 145 l portion of thedrilling fluid 145 f was an invert-emulsion oil based mud having a density of 850 kg/m3. The liquid portion 145 l of thedrilling fluid 145 f also had a viscosity equal to 40 sec/L, a plastic viscosity less than 12 MPa-s, a yield point equal to 1-1.5 Pa, an Aw equal to 0.50, an oil-to-water ratio equal to 95/5 percent, and an electrical stability greater than 500 volts. Thegas portion 145 g of the drilling fluid was nitrogen. Thegas injection rate 145 g during drilling ranged between 40-95 m3/min and the liquid rate 145 l ranged between 2.24-2.6 m3/min so that the ECD was about 600 kg/m3. Thethird interval 540 was stopped due to intersection with an aquifer. - A
fourth interval 550 of the wellbore was drilled conventionally overbalanced. Anintermediate casing 115 i was then run-in and cemented into the wellbore 500. Afifth interval 560 of the wellbore 500 was drilled according to an embodiment of the present invention. In this embodiment, the liquid 145 l portion of thedrilling fluid 145 f was an invert-emulsion oil based mud having a density of 850 kg/m3 The liquid portion 145 l of thedrilling fluid 145 f also had a viscosity equal to 40 sec/L, a plastic viscosity less than 12 MPa-s, a yield point equal to 1.5-3.0 Pa, an Aw equal to 0.50, an oil-to-water ratio equal to 95/5 percent, a chloride concentration of 300k-340k mg/L, and an electrical stability greater than 500 volts. Thegas portion 145 g of thedrilling fluid 145 f was nitrogen. Thegas injection rate 145 g during drilling ranged between 40-95 m3/min and the liquid rate 145 l ranged between 2.24-2.6 m3/min so that the ECD was about 600 kg/m3. Thefifth interval 560 was drilled to a depth past the kick-off point (KOP) 506 and through a hard and abrasive rock (i.e., sandstone) Formation J. The ROP of was about ten m/hr through theinterval 560. The expected ROP for a conventional overbalanced drilling method of this formation is about one to two m/hr. - The
fifth interval 560 was stopped before encountering a formation having a potential for swelling. Asixth interval 570 was drilled conventionally overbalanced. A production liner 115 l was run-in and hung from theintermediate casing 115 i using a liner hanger andpacker 405. The production liner 115 l was then cemented into the wellbore 500. Aseventh interval 580 of the wellbore to total depth and including the horizontal production section was drilled using a formate mud and overbalanced due to a potential for sour gas. -
Interval 590 was drilled using an embodiment of the present invention for another wellbore in the same field. The mud used may have been the same as that used forinterval 540. -
FIGS. 3-5 also illustrate grouping of the formations by productivity. As used herein, the term productive formation means a formation containing hydrocarbon reserves having a net present value equaling or exceeding the capital investment required to drill and complete the formation. Conversely, the term non-productive formation includes formations having nuisance quantities of hydrocarbon reserves, usually natural gas. One or more embodiments discussed herein may be employed to drill at least a portion of a non-productive formation, one non-productive formation, and/or multiple non-productive formations. -
FIGS. 6A-6H are tables illustrating simulated annulus profiles of drilling a wellbore while varying gas injection rate and liquid/mud injection rate, according to other embodiments of the present invention. - To select the liquid rate 145 l, a minimum liquid rate may be first selected to achieve a minimum annular velocity to transport the cuttings from the bit. Bit size may be a primary factor in this determination. Once the minimum velocity is selected, ECDs may be modeled using liquid rates greater than or equal to the minimum rate and varying gas rates. If a motor is used to rotate the bit, equivalent liquid velocities (ELVs) may also be calculated and minimum ELV and maximum ELV may be used as a boundary. The target gradient window may be defined including a minimum, such as the stability gradient and a maximum, such as a predetermined ratio above the stability gradient. Once all of the boundaries are set, the liquid and gas rates may be selected.
- Alternatively, the liquid and gas rates may be selected so that a velocity of the
drilling fluid 145 f equals or exceeds the slip velocity of the cuttings generated at the bit. Thegas portion 145 g may tend to reduce the viscosity of thedrilling fluid 145 f relative to the viscosity of the liquid portion 145 l. The degree of viscosity reduction may be controlled by the gas rate which may increase the shear rate and therefore decrease the viscosity of Bingham/Power-Law fluids. The effect on Newtonian fluids may be less. The increased velocity afforded by adding thegas portion 145 g may readily compensate for the loss of viscosity. - The simulations include gas injection rates of 100, 110, 120, and 150 m3/min at STP. For each gas injection rate, the liquid injection rate is simulated at 2100 and 2400 l/min (2.1 and 2.4 m3/min). For each simulation, the liquid is plain water and the gas is nitrogen. Each simulation is conducted for an identical wellbore. The simulations illustrate annulus pressure profile, annulus temperature profile, a liquid volume fraction (LVF), gas velocity, liquid velocity, flow pattern or regime, hydrostatic head, friction loss, and ECD at total depth. Also illustrated are gas and liquid transit times, liquid holdup, and motor equivalent liquid velocity (ELV). The ECDs range from about 400 to about 600 kg/m3. As simulated, the annulus flow regime is bubble flow for a lower portion of the annulus and slug flow for an upper portion of the annulus (with a return to bubble flow or annular-mist at the surface). In one example, the flow LVF at total depth ranges from about 0.58 to about 0.75. The injection LVFs at STP (calculated from nominal injection rates) range from 0.0138 to 0.0234. Pressure drop in the annulus is hydrostatically dominated or substantially hydrostatically dominated.
- Two or more annulus flow regimes, such as bubble, slug, transition (froth), annular-mist, turbulent (LVF is equal to or substantially equal to one), or laminar (LVF is equal to or substantially equal to one) may be experienced in the annulus for a vertical or substantially vertical interval. Two or more annulus flow regimes, such as stratified, wave, elongated bubble, slug, annular-mist, dispersed bubble (froth), turbulent (LVF is equal to or substantially equal to one), or laminar (LVF is equal to or substantially equal to one) may be experienced in the annulus for a horizontal or substantially horizontal interval. While the liquid/gas injection ratios may be selected to maximize ROP, hydraulic impact and horsepower at the bit, the resultant flow regimes may be adjusted by minor variation in gas/liquid injection ratio and by variation in surface choke pressure.
- Advantageously, the
drilling fluid 145 f may be variable in form as the fluid proceeds through thewellbore 100. Initially, this form may include a highly compressed mixture as the drilling fluid moves down thedrill string 135, through thebit 140, and by the BHA. Thedrilling fluid 145 f may then expand as thereturns 145 r flow up theannulus 110 as thegas 145 g may become the primary phase, thereby creating high fluid velocity. This high velocity may effectively transport cuttings up theannulus 110 and out of thewellbore 100. - Due to the
gas portion 145 g, thedrilling fluid 145 f, even when highly compressed may still be a relatively low viscosity, low density, and high filtration mixture as compared to conventional mud. The combination of these parameters has resulted in rates of excavation increasing by as much as an order of magnitude over conventional overbalanced drilling systems. Conventional overbalanced drilling systems cannot maintain such high ROPs as the cuttings removal rates would not be sufficient to prevent the cuttings from choking the annulus. The exceptional circulating properties of thedrilling fluid 145 f may overcome the limitations of conventional mud systems by providing exceptionally high fluid velocities in the annulus and thus removing the cuttings at a rate high enough to prevent the buildup of cuttings in the annulus. Further, the use of thedrilling fluid 145 f may reduce or eliminate cuttings beds in directional intervals due to the high degree of fluid turbulence which may be present in the annulus. Such an increase in ROP may substantially reduce the cost of a drilling campaign. - An unexpected result was achieved during field trials: no wellbore erosion occurred in the annulus. Extremely high circulation rates of fluids, be they gas or liquid, involving significant pressure losses between two surfaces may result in a destabilization of the wellbore due to this pressure loss. In conventional mud drilling, annular velocities are controlled in the area of highest pressure drop; which is the narrowest point in the annulus typically located next to the drilling collars, to ensure that erosion of the wellbore does not occur. If the circulating fluid is in laminar flow, then the boundary layer may be such that erosion potential will be limited. However, if the flow is turbulent, then the energy may not be smoothly dissipated across the flow and the effect of erosion can be substantial. During the tried embodiments, high turbulent annulus flow velocities were achieved around the drill collars and no erosion occurred. To verify wellbore integrity, a caliper log was run on one interval drilled with one of the tried embodiments and the results showed a well to have a near perfect gage from beginning to end of the excavation except over a very short interval where a producing hydrocarbon zone was allowed to discharge into the well while drilling operations continued unabated.
- The liquid portion 145 l may have low viscosity and high filtrate parameters to further enhance ROP while at the same providing enhanced wellbore stability; as measured by caliper logging technology and increased hole cleaning performance. In a multiphase transitional flow regime fluid optimization of hydraulic impact and hydraulic horsepower is more readily achieved without the dangers of hole erosion.
-
FIG. 7 is a flow diagram of adrilling system 700, according to another embodiment of the present invention. Comparing toFIG. 1A , thelines flare pilot separator relief 35 f have been removed for clarity. Arecycle line 727 has been added. Therecycle line 727 may include aprimary compressor 722, abooster compressor 725, instruments TI, PI, and FM, a shut-off valve, and a check valve. Therecycle line 727 may conduct gas discharged from theseparator 35 to thecompressors gas outlet 27. The recycled gas may mix with the NPU nitrogen to form thegas portion 145 g of the drilling fluid. The SC may be in communication with thecompressors outlet 27, such as by controlling the speed of thecompressors recycle line 727. The SC may vent excess gas to the flare by controlling thechoke 37. The SC may reduce the nitrogen produced by theNPU 20 accordingly. - The
recycle line 727 may further include a hydrocarbon sensor and a hydrogen sulfide sensor in communication with the SC. Upon detection of sour gas, the SC may shut down thecompressors flare 45. Upon detection of sweet gas, the SC may still recycle the nitrogen/sweet gas mixture. The SC may calculate the flow rate of the sweet/sour gas by performing a mass balance. - Advantageously, injection of recycled gas may conserve energy otherwise used to drive the
NPU 20. Further, recycling the gas may further reduce the required capacity of theNPU 20, thereby reducing the footprint of thedrilling system 700. - While the foregoing is directed to embodiments of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof, and the scope thereof is determined by the claims that follow.
Claims (26)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/753,343 US20150376964A1 (en) | 2008-08-15 | 2015-06-29 | Multiphase drilling systems and methods |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US8945608P | 2008-08-15 | 2008-08-15 | |
US15917609P | 2009-03-11 | 2009-03-11 | |
US12/541,242 US9097085B2 (en) | 2008-08-15 | 2009-08-14 | Multiphase drilling systems and methods |
US14/753,343 US20150376964A1 (en) | 2008-08-15 | 2015-06-29 | Multiphase drilling systems and methods |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/541,242 Continuation US9097085B2 (en) | 2008-08-15 | 2009-08-14 | Multiphase drilling systems and methods |
Publications (1)
Publication Number | Publication Date |
---|---|
US20150376964A1 true US20150376964A1 (en) | 2015-12-31 |
Family
ID=41669338
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/541,242 Expired - Fee Related US9097085B2 (en) | 2008-08-15 | 2009-08-14 | Multiphase drilling systems and methods |
US14/753,343 Abandoned US20150376964A1 (en) | 2008-08-15 | 2015-06-29 | Multiphase drilling systems and methods |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/541,242 Expired - Fee Related US9097085B2 (en) | 2008-08-15 | 2009-08-14 | Multiphase drilling systems and methods |
Country Status (6)
Country | Link |
---|---|
US (2) | US9097085B2 (en) |
AU (1) | AU2009281823B2 (en) |
BR (1) | BRPI0917018B1 (en) |
CA (2) | CA2852132C (en) |
MX (1) | MX354355B (en) |
WO (1) | WO2010019900A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017147563A1 (en) * | 2016-02-26 | 2017-08-31 | Beaton Curtis L | Method and apparatus for splitting or cleaving rock |
CN110939426A (en) * | 2019-11-19 | 2020-03-31 | 东北石油大学 | Centrifugal separation mechanism and co-well injection and production device using same |
CN111550202A (en) * | 2020-06-17 | 2020-08-18 | 焦作煤业(集团)有限责任公司 | Crawler-type coal water-gas separation and metering conveying device |
US11034596B2 (en) * | 2013-11-27 | 2021-06-15 | Sinomine Resources (Us) Inc. | Methods to separate brine from invert emulsions used in drilling and completion fluids |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9010440B2 (en) * | 2009-02-11 | 2015-04-21 | Weatherford/Lamb, Inc. | Method and apparatus for centrifugal separation |
WO2012122468A1 (en) * | 2011-03-09 | 2012-09-13 | Prad Research And Development Limited | Method for automatic pressure control during drilling including correction for drill string movement |
US10138692B2 (en) * | 2012-04-27 | 2018-11-27 | Weatherford Technology Holdings, Llc | Method and apparatus for controlling the flow of wellbore returns |
US20140048331A1 (en) * | 2012-08-14 | 2014-02-20 | Weatherford/Lamb, Inc. | Managed pressure drilling system having well control mode |
WO2015187157A1 (en) * | 2014-06-04 | 2015-12-10 | Landmark Graphics Corporation | Optimized ubd operation envelope |
WO2017058151A1 (en) | 2015-09-29 | 2017-04-06 | Halliburton Energy Services, Inc. | Wellbore reverse circulation with flow-activated motor |
US20170260820A1 (en) * | 2016-03-10 | 2017-09-14 | Saudi Arabian Oil Company | Method and Apparatus for Suction Monitoring and Control in Rig Pumps |
US10337249B2 (en) * | 2017-02-04 | 2019-07-02 | Jason A Hatfield | Drilling wells with air |
CN107133434B (en) * | 2017-07-19 | 2020-04-21 | 四川建筑职业技术学院 | Method for calculating critical volume concentration of debris flow |
CN110792418B (en) * | 2018-08-03 | 2022-03-01 | 中国石油天然气股份有限公司 | Wellbore working fluid formula optimization method and device |
CN109443859A (en) * | 2018-12-25 | 2019-03-08 | 西安科技大学 | A kind of negative pressure low temperature coal seam gas-bearing capacity measurement sampler |
CN110185442A (en) * | 2019-06-05 | 2019-08-30 | 中海石油(中国)有限公司 | Displacement method kill-job experimental provision and method |
WO2021142547A1 (en) * | 2020-01-16 | 2021-07-22 | Opla Energy Ltd. | Pressure management device for drilling system |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3463231A (en) * | 1968-02-12 | 1969-08-26 | Chevron Res | Generation and use of foamed well circulation fluids |
US4099583A (en) * | 1977-04-11 | 1978-07-11 | Exxon Production Research Company | Gas lift system for marine drilling riser |
US4732580A (en) * | 1986-10-01 | 1988-03-22 | The Boc Group, Inc. | Argon and nitrogen coproduction process |
US4741401A (en) * | 1987-01-16 | 1988-05-03 | The Dow Chemical Company | Method for treating subterranean formations |
US5552377A (en) * | 1993-04-20 | 1996-09-03 | Kindred; Jack E. | Mud sweep and spacer composition |
US5663121A (en) * | 1993-12-23 | 1997-09-02 | Moody; Eugene I. | Method and apparatus for providing a stream of inert gases in underbalanced drilling of a well bore |
US5873420A (en) * | 1997-05-27 | 1999-02-23 | Gearhart; Marvin | Air and mud control system for underbalanced drilling |
US20020112888A1 (en) * | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
US20040065440A1 (en) * | 2002-10-04 | 2004-04-08 | Halliburton Energy Services, Inc. | Dual-gradient drilling using nitrogen injection |
US7337660B2 (en) * | 2004-05-12 | 2008-03-04 | Halliburton Energy Services, Inc. | Method and system for reservoir characterization in connection with drilling operations |
US7703551B2 (en) * | 2005-06-21 | 2010-04-27 | Bow River Tools And Services Ltd. | Fluid driven drilling motor and system |
US7767628B2 (en) * | 2005-12-02 | 2010-08-03 | Clearwater International, Llc | Method for foaming a hydrocarbon drilling fluid and for producing light weight hydrocarbon fluids |
EP2016254B1 (en) * | 2006-05-08 | 2017-03-22 | Mako Rentals, Inc. | Downhole swivel apparatus and method |
US7798246B2 (en) * | 2006-05-30 | 2010-09-21 | Schlumberger Technology Corporation | Apparatus and method to control the rotation of a downhole drill bit |
-
2009
- 2009-08-14 WO PCT/US2009/053914 patent/WO2010019900A1/en active Application Filing
- 2009-08-14 MX MX2011001751A patent/MX354355B/en active IP Right Grant
- 2009-08-14 CA CA2852132A patent/CA2852132C/en not_active Expired - Fee Related
- 2009-08-14 US US12/541,242 patent/US9097085B2/en not_active Expired - Fee Related
- 2009-08-14 AU AU2009281823A patent/AU2009281823B2/en not_active Ceased
- 2009-08-14 CA CA2734461A patent/CA2734461C/en not_active Expired - Fee Related
- 2009-08-14 BR BRPI0917018-9A patent/BRPI0917018B1/en not_active IP Right Cessation
-
2015
- 2015-06-29 US US14/753,343 patent/US20150376964A1/en not_active Abandoned
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11034596B2 (en) * | 2013-11-27 | 2021-06-15 | Sinomine Resources (Us) Inc. | Methods to separate brine from invert emulsions used in drilling and completion fluids |
WO2017147563A1 (en) * | 2016-02-26 | 2017-08-31 | Beaton Curtis L | Method and apparatus for splitting or cleaving rock |
US10087755B2 (en) | 2016-02-26 | 2018-10-02 | L. Curtis Beaton | Method and apparatus for splitting or cleaving rock |
US11002134B2 (en) | 2016-02-26 | 2021-05-11 | L. Curtis Beaton | Method and apparatus for splitting or cleaving rock |
CN110939426A (en) * | 2019-11-19 | 2020-03-31 | 东北石油大学 | Centrifugal separation mechanism and co-well injection and production device using same |
CN111550202A (en) * | 2020-06-17 | 2020-08-18 | 焦作煤业(集团)有限责任公司 | Crawler-type coal water-gas separation and metering conveying device |
Also Published As
Publication number | Publication date |
---|---|
CA2852132C (en) | 2015-06-30 |
US9097085B2 (en) | 2015-08-04 |
CA2852132A1 (en) | 2010-02-18 |
AU2009281823A1 (en) | 2010-02-18 |
AU2009281823B2 (en) | 2015-10-08 |
BRPI0917018A2 (en) | 2016-02-16 |
BRPI0917018B1 (en) | 2019-03-19 |
MX354355B (en) | 2018-02-22 |
CA2734461C (en) | 2014-08-12 |
MX2011001751A (en) | 2011-05-10 |
CA2734461A1 (en) | 2010-02-18 |
WO2010019900A1 (en) | 2010-02-18 |
US20100147591A1 (en) | 2010-06-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9097085B2 (en) | Multiphase drilling systems and methods | |
CA2950951C (en) | Curaua fibers as lost-circulation materials and fluid-loss additives in wellbore fluids | |
CA2666180C (en) | Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell | |
CA2941124C (en) | Organic water scavenging additives for use in drilling fluids | |
US11492532B2 (en) | Stable emulsion drilling fluids | |
CA2959581A1 (en) | Use of carbonates as wellbore treatment | |
AU2015268632B2 (en) | Multiphase drilling systems and methods | |
US11970658B2 (en) | Low density hydrate inhibitive fluids | |
Martin | Managed pressure drilling techniques and tools | |
WO2020023401A1 (en) | Emulsifiers for direct emulsion drilling fluids | |
Gao | DRILLING FLUIDS FOR HIGH TEMPERATURE WELLS. | |
Dayan | Drilling Fluid Design for Geothermal Wells | |
Fossli et al. | Drilling depleted reservoirs using controlled mud level technology in mature subsea fields | |
Javay et al. | The Use Of Aerated Drilling Fluid Technique Through Top Fractured Formations In A Deep Gas Field-A Case History | |
Park et al. | The success of synthetic-based drilling fluids offshore Gulf of Mexico: a field comparison to conventional systems | |
US11248156B2 (en) | Borehole fluid with a thiamine-based shale inhibitor | |
Fossli et al. | Managed-pressure drilling; techniques and options for improving efficiency, operability, and well safety in subsea TTRD | |
Mokhalalati et al. | Aerated mud drilling experience in Abu Dhabi | |
Robinson et al. | The Super Lateral Campaign–Engineered Design Enables Drilling Beyond 30,000 Feet | |
Al Hmoud | Managed pressure casing drilling analysis for an appraisal well in Jordan | |
Mofrad | LGFRW Consideration in Underbalanced Drilling | |
McLean et al. | AADE-10-DF-HO-04 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: WEATHERFORD TECHNOLOGY HOLDINGS, LLC, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:WEATHERFORD/LAMB, INC.;REEL/FRAME:036572/0673 Effective date: 20141121 Owner name: WEATHERFORD INTERNATIONAL, INC. AND WEATHERFORD CA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SUNCOR ENERGY INC.;REEL/FRAME:036512/0474 Effective date: 20100216 Owner name: SUNCOR ENERGY INC., CANADA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:DANIEL GUY POMERLEAU, BY ENGINEERING DRILLING SOLUTIONS, INC.;REEL/FRAME:036512/0281 Effective date: 20100129 Owner name: WEATHERFORD/LAMB, INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:WEATHERFORD INTERNATIONAL, INC. AND WEATHERFORD CANADA PARTNERSHIP;REEL/FRAME:036512/0578 Effective date: 20110207 Owner name: WEATHERFORD TECHNOLOGY HOLDINGS, LLC, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:LUBRIZOL OILFIELD SOLUTIONS, INC.;REEL/FRAME:036512/0860 Effective date: 20150730 Owner name: LUBRIZOL OILFIELD SOLUTIONS, INC., OHIO Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:WEATHERFORD TECHNOLOGY HOLDINGS, LLC;REEL/FRAME:036512/0775 Effective date: 20150601 Owner name: WEATHERFORD/LAMB, INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CORB, KEITH KENNETH;BUTLER, STUART DWIGHT;JOLLYMORE, GREGG MACKAY;SIGNING DATES FROM 20090811 TO 20100211;REEL/FRAME:036511/0902 Owner name: SUNCOR ENERGY INC., CANADA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:STAYSKO, BOB;REEL/FRAME:036512/0377 Effective date: 20100216 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |