US20140048331A1 - Managed pressure drilling system having well control mode - Google Patents
Managed pressure drilling system having well control mode Download PDFInfo
- Publication number
- US20140048331A1 US20140048331A1 US13/965,380 US201313965380A US2014048331A1 US 20140048331 A1 US20140048331 A1 US 20140048331A1 US 201313965380 A US201313965380 A US 201313965380A US 2014048331 A1 US2014048331 A1 US 2014048331A1
- Authority
- US
- United States
- Prior art keywords
- returns
- drilling
- choke valve
- subsea
- variable choke
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 163
- 239000012530 fluid Substances 0.000 claims abstract description 89
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 30
- 238000000034 method Methods 0.000 claims abstract description 25
- 230000004044 response Effects 0.000 claims abstract description 16
- 238000004891 communication Methods 0.000 claims description 23
- 239000011148 porous material Substances 0.000 claims description 20
- 238000005520 cutting process Methods 0.000 claims description 18
- 238000007872 degassing Methods 0.000 claims description 8
- 238000012544 monitoring process Methods 0.000 claims 2
- 238000005755 formation reaction Methods 0.000 description 24
- 239000007789 gas Substances 0.000 description 20
- 239000007788 liquid Substances 0.000 description 15
- 239000000523 sample Substances 0.000 description 12
- 230000008878 coupling Effects 0.000 description 9
- 238000010168 coupling process Methods 0.000 description 9
- 238000005859 coupling reaction Methods 0.000 description 9
- 229930195733 hydrocarbon Natural products 0.000 description 7
- 150000002430 hydrocarbons Chemical group 0.000 description 7
- 241000282472 Canis lupus familiaris Species 0.000 description 6
- 238000003032 molecular docking Methods 0.000 description 6
- 239000004020 conductor Substances 0.000 description 5
- 238000010926 purge Methods 0.000 description 5
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 4
- 230000003068 static effect Effects 0.000 description 4
- UHOVQNZJYSORNB-UHFFFAOYSA-N Benzene Chemical compound C1=CC=CC=C1 UHOVQNZJYSORNB-UHFFFAOYSA-N 0.000 description 3
- 239000004215 Carbon black (E152) Substances 0.000 description 3
- YXFVVABEGXRONW-UHFFFAOYSA-N Toluene Chemical compound CC1=CC=CC=C1 YXFVVABEGXRONW-UHFFFAOYSA-N 0.000 description 3
- 239000004568 cement Substances 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000005086 pumping Methods 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- XKRFYHLGVUSROY-UHFFFAOYSA-N Argon Chemical compound [Ar] XKRFYHLGVUSROY-UHFFFAOYSA-N 0.000 description 2
- 101100420946 Caenorhabditis elegans sea-2 gene Proteins 0.000 description 2
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 2
- YNQLUTRBYVCPMQ-UHFFFAOYSA-N Ethylbenzene Chemical compound CCC1=CC=CC=C1 YNQLUTRBYVCPMQ-UHFFFAOYSA-N 0.000 description 2
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 210000004907 gland Anatomy 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 239000012528 membrane Substances 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 229910052757 nitrogen Inorganic materials 0.000 description 2
- 239000003921 oil Substances 0.000 description 2
- CTQNGGLPUBDAKN-UHFFFAOYSA-N O-Xylene Chemical compound CC1=CC=CC=C1C CTQNGGLPUBDAKN-UHFFFAOYSA-N 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 229910052786 argon Inorganic materials 0.000 description 1
- 150000004945 aromatic hydrocarbons Chemical class 0.000 description 1
- 239000010426 asphalt Substances 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 239000012267 brine Substances 0.000 description 1
- 239000001569 carbon dioxide Substances 0.000 description 1
- 229910002092 carbon dioxide Inorganic materials 0.000 description 1
- 239000012159 carrier gas Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000010779 crude oil Substances 0.000 description 1
- 238000001739 density measurement Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000839 emulsion Substances 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 239000001307 helium Substances 0.000 description 1
- 229910052734 helium Inorganic materials 0.000 description 1
- SWQJXJOGLNCZEY-UHFFFAOYSA-N helium atom Chemical compound [He] SWQJXJOGLNCZEY-UHFFFAOYSA-N 0.000 description 1
- 230000004941 influx Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000003077 lignite Substances 0.000 description 1
- 239000000314 lubricant Substances 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 239000008096 xylene Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
- E21B21/106—Valve arrangements outside the borehole, e.g. kelly valves
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/06—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
- E21B33/064—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers specially adapted for underwater well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/08—Wipers; Oil savers
- E21B33/085—Rotatable packing means, e.g. rotating blow-out preventers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/001—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor specially adapted for underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/01—Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
Definitions
- the present disclosure generally relates to a managed pressure drilling system having a well control mode.
- a wellbore is formed to access hydrocarbon-bearing formations (e.g., crude oil and/or natural gas) by the use of drilling.
- Drilling is accomplished by utilizing a drill bit that is mounted on the end of a drill string.
- the drill string is often rotated by a top drive or rotary table on a surface platform or rig, and/or by a downhole motor mounted towards the lower end of the drill string.
- the drill string and drill bit are removed and a section of casing is lowered into the wellbore. An annulus is thus formed between the string of casing and the formation.
- the casing string is temporarily hung from the surface of the well.
- a cementing operation is then conducted in order to fill the annulus with cement.
- the casing string is cemented into the wellbore by circulating cement into the annulus defined between the outer wall of the casing and the borehole.
- the combination of cement and casing strengthens the wellbore and facilitates the isolation of certain areas of the formation behind the casing for the production of hydrocarbons.
- Deep water off-shore drilling operations are typically carried out by a mobile offshore drilling unit (MODU), such as a drill ship or a semi-submersible, having the drilling rig aboard and often make use of a marine riser extending between the wellhead of the well that is being drilled in a subsea formation and the MODU.
- the marine riser is a tubular string made up of a plurality of tubular sections that are connected in end-to-end relationship. The riser allows return of the drilling mud with drill cuttings from the hole that is being drilled.
- the marine riser is adapted for being used as a guide means for lowering equipment (such as a drill string carrying a drill bit) into the hole.
- a method of drilling a subsea wellbore includes drilling the subsea wellbore by: injecting drilling fluid through a tubular string extending into the wellbore from an offshore drilling unit (ODU); and rotating a drill bit disposed on a bottom of the tubular string.
- the drilling fluid exits the drill bit and carries cuttings from the drill bit.
- the drilling fluid and cuttings flow to a subsea wellhead via an annulus defined by an outer surface of the tubular string and an inner surface of the subsea wellbore.
- the returns flow from the subsea wellhead to the ODU via a marine riser.
- the method further includes, while drilling the subsea wellbore: measuring a flow rate of the drilling fluid injected into the tubular string; measuring a flow rate of the returns; comparing the returns flow rate to the drilling fluid flow rate to detect a kick by a formation being drilled; and exerting backpressure on the returns using a first variable choke valve.
- the method further includes, in response to detecting the kick: closing a blowout preventer of a subsea pressure control assembly (PCA) against the tubular string; and diverting the flow of returns from the PCA, through a choke line having a second variable choke valve, and through the first variable choke valve.
- PCA subsea pressure control assembly
- a managed pressure drilling system in another embodiment, includes: a first rotating control device (RCD) for connection to a marine riser; a first variable choke valve for connection to an outlet of the first RCD; a first mass flow meter for connection to an outlet of the first variable choke valve; a splice for connecting an inlet of the first variable choke valve to an outlet of a second variable choke valve; and a programmable logic controller (PLC) in communication with the first variable choke valve and the first mass flow meter.
- RCD rotating control device
- PLC programmable logic controller
- the PLC is configured to perform an operation, including, during drilling of a subsea wellbore: measuring a flow rate of returns using the first mass flow meter; comparing the returns flow rate to a drilling fluid flow rate to detect a kick by a formation being drilled; and exerting backpressure on the returns using the first variable choke valve.
- the operation further includes, in response to detecting the kick, diverting the returns through the second variable choke valve, the splice, and the first variable choke valve to alleviate pressure on the first variable choke valve.
- a method of drilling a subsea wellbore includes: drilling the subsea wellbore; and, while drilling the subsea wellbore: measuring a flow rate of drilling fluid injected into a tubular string having a drill bit; measuring a flow rate of drilling returns using a subsea mass flow meter; and comparing the returns flow rate to the drilling fluid flow rate to detect a kick by a formation being drilled.
- the method further includes, in response to detecting the kick: closing a blowout preventer of a subsea pressure control assembly (PCA) against the tubular string; and diverting the flow of returns from the PCA, through a choke line having a second variable choke valve, and through a first variable choke valve.
- PCA subsea pressure control assembly
- a managed pressure drilling system includes: a first rotating control device (RCD) for connection to a marine riser; a first variable choke valve for connection to an outlet of the first RCD; a first mass flow meter for connection to an outlet of the first variable choke valve; a splice for connecting an inlet of the first variable choke valve to an outlet of a second variable choke valve; a second RCD for assembly as part of a subsea pressure control assembly; a subsea mass flow meter for connection to an outlet of the second RCD; and a programmable logic controller (PLC) in communication with the first variable choke valve and the first and second mass flow meters.
- RCD rotating control device
- PLC programmable logic controller
- FIGS. 1A-1C illustrate an offshore drilling system in a managed pressure drilling mode, according to one embodiment of the present disclosure.
- FIGS. 2A and 2B illustrate the offshore drilling system in a managed pressure riser degassing mode.
- FIG. 2C is a table illustrating switching between the modes.
- FIGS. 3A and 3B illustrate the offshore drilling system in a managed pressure well control mode.
- FIG. 3C illustrates operation of the PLC in the managed pressure well control mode.
- FIGS. 4A and 4B illustrate the offshore drilling system in an emergency well control mode.
- FIG. 5 illustrates a pressure control assembly (PCA) of a second offshore drilling system in a managed pressure drilling mode, according to another embodiment of the present disclosure.
- PCA pressure control assembly
- FIGS. 1A-1C illustrate an offshore drilling system 1 in a managed pressure drilling mode, according to one embodiment of the present disclosure.
- the drilling system 1 may include a MODU 1 m, such as a semi-submersible, a drilling rig 1 r, a fluid handling system 1 h, a fluid transport system 1 t, and pressure control assembly (PCA) 1 p, and a drill string 10 .
- the MODU 1 m may carry the drilling rig 1 r and the fluid handling system 1 h aboard and may include a moon pool, through which drilling operations are conducted.
- the semi-submersible may include a lower barge hull which floats below a surface (aka waterline) 2 s of sea 2 and is, therefore, less subject to surface wave action.
- Stability columns may be mounted on the lower barge hull for supporting an upper hull above the waterline.
- the upper hull may have one or more decks for carrying the drilling rig 1 r and fluid handling system 1 h.
- the MODU 1 m may further have a dynamic positioning system (DPS) (not shown) or be moored for maintaining the moon pool in position over a subsea wellhead 50 .
- DPS dynamic positioning system
- the MODU 1 m may be a drill ship.
- a fixed offshore drilling unit or a non-mobile floating offshore drilling unit may be used instead of the MODU 1 m.
- the wellbore may be subsea having a wellhead located adjacent to the waterline and the drilling rig may be a located on a platform adjacent the wellhead.
- the wellbore may be subterranean and the drilling rig located on a terrestrial pad.
- the drilling rig 1 r may include a derrick 3 , a floor 4 , a top drive 5 , and a hoist.
- the top drive 5 may include a motor for rotating 16 a drill string 10 .
- the top drive motor may be electric or hydraulic.
- a frame of the top drive 5 may be linked to a rail (not shown) of the derrick 3 for preventing rotation thereof during rotation 16 of the drill string 10 and allowing for vertical movement of the top drive with a traveling block 6 of the hoist.
- the frame of the top drive 5 may be suspended from the derrick 3 by the traveling block 6 .
- a Kelly valve 11 may be connected to a quill of a top drive 5 .
- the quill may be torsionally driven by the top drive motor and supported from the frame by bearings.
- the top drive 5 may further have an inlet connected to the frame and in fluid communication with the quill.
- the traveling block 6 may be supported by wire rope 7 connected at its upper end to a crown block 8 .
- the wire rope 7 may be woven through sheaves of the blocks 6 , 8 and extend to drawworks 9 for reeling thereof, thereby raising or lowering the traveling block 6 relative to the derrick 3 .
- the drilling rig 1 r may further include a drill string compensator (not shown) to account for heave of the MODU 1 m.
- the drill string compensator may be disposed between the traveling block 6 and the top drive 5 (aka hook mounted) or between the crown block 8 and the derrick 3 (aka top mounted).
- the drill string 10 may be connected to the Kelly valve 11 , such as by threaded couplings.
- the drill string 10 may include a bottomhole assembly (BHA) 10 b and joints of drill pipe 10 p connected together, such as by threaded couplings.
- the BHA 10 b may be connected to the drill pipe 10 p, such as by threaded couplings, and include a drill bit 15 and one or more drill collars 12 connected thereto, such as by threaded couplings.
- the drill bit 15 may be rotated 16 by the top drive 5 via the drill pipe 10 p and/or the BHA 10 b may further include a drilling motor (not shown) for rotating the drill bit.
- the BHA 10 b may further include an instrumentation sub (not shown), such as a measurement while drilling (MWD) and/or a logging while drilling (LWD) sub.
- MWD measurement while drilling
- LWD logging while drilling
- the fluid transport system 1 t may include an upper marine riser package (UMRP) 20 , a marine riser 25 , a booster line 27 , a choke line 28 , and a return line 29 .
- the UMRP 20 may include a diverter 21 , a flex joint 22 , a slip (aka telescopic) joint 23 , a tensioner 24 , and a rotating control device (RCD) 26 .
- a lower end of the RCD 26 may be connected to an upper end of the riser 25 , such as by a flanged connection.
- the slip joint 23 may include an outer barrel connected to an upper end of the RCD 26 , such as by a flanged connection, and an inner barrel connected to the flex joint 22 , such as by a flanged connection.
- the outer barrel may also be connected to the tensioner 24 , such as by a tensioner ring (not shown).
- the flex joint 22 may also connect to the diverter 21 , such as by a flanged connection.
- the diverter 21 may also be connected to the rig floor 4 , such as by a bracket.
- the slip joint 23 may be operable to extend and retract in response to heave of the MODU 1 m relative to the riser 25 while the tensioner 24 may reel wire rope in response to the heave, thereby supporting the riser 25 from the MODU 1 m while accommodating the heave.
- the riser 25 may extend from the PCA 1 p to the MODU 1 m and may connect to the MODU via the UMRP 20 .
- the riser 25 may have one or more buoyancy modules (not shown) disposed therealong to reduce load on the tensioner 24 .
- the RCD 26 may include a docking station and a bearing assembly.
- the docking station may be submerged adjacent the waterline 2 s.
- the docking station may include a housing, a latch, and an interface.
- the RCD housing may be tubular and have one or more sections connected together, such as by flanged connections.
- the RCD housing may have one or more fluid ports formed through a lower housing section and the docking station may include a connection, such as a flanged outlet, fastened to one of the ports.
- the latch may include a hydraulic actuator, such as a piston, one or more fasteners, such as dogs, and a body.
- the latch body may be connected to the housing, such as by threaded couplings.
- a piston chamber may be formed between the latch body and a mid housing section.
- the latch body may have openings formed through a wall thereof for receiving the respective dogs.
- the latch piston 63 p may be disposed in the chamber and may carry seals isolating an upper portion of the chamber from a lower portion of the chamber.
- a cam surface may be formed on an inner surface of the piston for radially displacing the dogs.
- the latch body may further have a landing shoulder formed in an inner surface thereof for receiving a protective sleeve or the bearing assembly.
- Hydraulic passages may be formed through the mid housing section and may provide fluid communication between the interface and respective portions of the hydraulic chamber for selective operation of the piston.
- An RCD umbilical may have hydraulic conduits and may provide fluid communication between the RCD interface and a hydraulic power unit (HPU) via hydraulic manifold.
- the RCD umbilical may further have an electric cable for providing data communication between a control console and the RCD interface via a controller.
- the bearing assembly may include a catch sleeve, one or more strippers, and a bearing pack.
- Each stripper may include a gland or retainer and a seal.
- Each stripper seal may be directional and oriented to seal against drill pipe 10 p in response to higher pressure in the riser 25 than the UMRP 20 .
- Each stripper seal may have a conical shape for fluid pressure to act against a respective tapered surface thereof, thereby generating sealing pressure against the drill pipe 10 p.
- Each stripper seal may have an inner diameter slightly less than a pipe diameter of the drill pipe 10 p to form an interference fit therebetween.
- Each stripper seal may be flexible enough to accommodate and seal against threaded couplings of the drill pipe 10 p having a larger tool joint diameter.
- the drill pipe 10 p may be received through a bore of the bearing assembly so that the stripper seals may engage the drill pipe 10 p.
- the stripper seals may provide a desired barrier in the riser 25 either when the drill pipe 10 p
- the catch sleeve may have a landing shoulder formed at an outer surface thereof, a catch profile formed in an outer surface thereof, and may carry one or more seals on an outer surface thereof. Engagement of the latch dogs with the catch sleeve may connect the bearing assembly to the docking station.
- the gland may have a landing shoulder formed in an inner surface thereof and a catch profile formed in an inner surface thereof for retrieval by a bearing assembly running tool.
- the bearing pack may support the strippers from the catch sleeve such that the strippers may rotate relative to the docking station.
- the bearing pack may include one or more radial bearings, one or more thrust bearings, and a self contained lubricant system. The bearing pack may be disposed between the strippers and be housed in and connected to the catch sleeve, such as by threaded couplings and/or fasteners.
- the bearing assembly may be non-releasably connected to the housing.
- the RCD may be located above the waterline and/or along the UMRP at any other location besides a lower end thereof.
- the RCD may be assembled as part of the riser at any location therealong or as part of the PCA.
- an active seal RCD may be used instead.
- the PCA 1 p may be connected to a wellhead 50 adjacently located to a floor 2 f of the sea 2 .
- a conductor string 51 may be driven into the seafloor 2 f.
- the conductor string 51 may include a housing and joints of conductor pipe connected together, such as by threaded couplings.
- a subsea wellbore 100 may be drilled into the seafloor 2 f and a casing string 52 may be deployed into the wellbore.
- the casing string 52 may include a wellhead housing and joints of casing connected together, such as by threaded couplings.
- the wellhead housing may land in the conductor housing during deployment of the casing string 52 .
- the casing string 52 may be cemented 101 into the wellbore 100 .
- the casing string 52 may extend to a depth adjacent a bottom of an upper formation 104 u.
- the upper formation 104 u may be non-productive and a lower formation 104 b may be a hydrocarbon-bearing reservoir
- the lower formation 104 b may be non-productive (e.g., a depleted zone), environmentally sensitive, such as an aquifer, or unstable.
- the wellbore 100 may include a vertical portion and a deviated, such as horizontal, portion.
- the PCA 1 p may include a wellhead adapter 40 b, one or more flow crosses 41 u,m,b, one or more blow out preventers (BOPs) 42 a,u,b, a lower marine riser package (LMRP), one or more accumulators 44 , and a receiver 46 .
- the LMRP may include a control pod 76 , a flex joint 43 , and a connector 40 u.
- the wellhead adapter 40 b, flow crosses 41 u,m,b, BOPs 42 a,u,b, receiver 46 , connector 40 u, and flex joint 43 may each include a housing having a longitudinal bore therethrough and may each be connected, such as by flanges, such that a continuous bore is maintained therethrough.
- the bore may have drift diameter, corresponding to a drift diameter of the wellhead 50 .
- the flex joints 23 , 43 may accommodate respective horizontal and/or rotational (aka pitch and roll) movement of the MODU 1 m relative to the riser 25 and the riser relative to the PCA 1 p.
- Each of the connector 40 u and wellhead adapter 40 b may include one or more fasteners, such as dogs, for fastening the LMRP to the BOPs 42 a,u,b and the PCA 1 p to an external profile of the wellhead housing, respectively.
- Each of the connector 40 u and wellhead adapter 40 b may further include a seal sleeve for engaging an internal profile of the respective receiver 46 and wellhead housing.
- Each of the connector 40 u and wellhead adapter 40 b may be in electric or hydraulic communication with the control pod 76 and/or further include an electric or hydraulic actuator and an interface, such as a hot stab, so that a remotely operated subsea vehicle (ROV) (not shown) may operate the actuator for engaging the dogs with the external profile.
- ROV remotely operated subsea vehicle
- the LMRP may receive a lower end of the riser 25 and connect the riser to the PCA 1 p.
- the control pod 76 may be in electric, hydraulic, and/or optical communication with a programmable logic controller (PLC) 75 and/or a rig controller (not shown) onboard the MODU 1 m via an umbilical 70 .
- the control pod 76 may include one or more control valves (not shown) in communication with the BOPs 42 a,u,b for operation thereof. Each control valve may include an electric or hydraulic actuator in communication with the umbilical 70 .
- the umbilical 70 may include one or more hydraulic and/or electric control conduit/cables for the actuators.
- the accumulators 44 may store pressurized hydraulic fluid for operating the BOPs 42 a,u,b. Additionally, the accumulators 44 may be used for operating one or more of the other components of the PCA 1 p.
- the PLC 75 and/or rig controller may operate the PCA 1 p via the umbilical 70 and the control pod 76 .
- a lower end of the booster line 27 may be connected to a branch of the flow cross 41 u by a shutoff valve 45 a.
- a booster manifold may also connect to the booster line 27 and have a prong connected to a respective branch of each flow cross 41 m,b.
- Shutoff valves 45 b,c may be disposed in respective prongs of the booster manifold.
- a separate kill line (not shown) may be connected to the branches of the flow crosses 41 m,b instead of the booster manifold.
- An upper end of the booster line 27 may be connected to an outlet of a booster pump 30 b.
- a lower end of the choke line 28 may have prongs connected to respective second branches of the flow crosses 41 m,b.
- Shutoff valves 45 d,e may be disposed in respective prongs of the choke line lower end.
- a pressure sensor 47 a may be connected to a second branch of the upper flow cross 41 u.
- Pressure sensors 47 b,c may be connected to the choke line prongs between respective shutoff valves 45 d,e and respective flow cross second branches.
- Each pressure sensor 47 a - c may be in data communication with the control pod 76 .
- the lines 27 , 28 and umbilical 70 may extend between the MODU 1 m and the PCA 1 p by being fastened to brackets disposed along the riser 25 .
- Each line 27 , 28 may be a flow conduit, such as coiled tubing.
- Each shutoff valve 45 a - e may be automated and have a hydraulic actuator (not shown) operable by the control pod 76 .
- the umbilical may be extended between the MODU and the PCA independently of the riser.
- the valve actuators may be electrical or pneumatic.
- the fluid handling system 1 h may include one or pumps 30 b,d, a gas detector 31 , a reservoir for drilling fluid 60 d, such as a tank, a fluid separator, such as a mud-gas separator (MGS) 32 , a solids separator, such as a shale shaker 33 , one or more flow meters 34 b,d,r, one or more pressure sensors 35 c,d,r, and one or more variable choke valves, such as a managed pressure (MP) choke 36 a and a well control (WC) choke 36 m.
- the mud-gas separator 32 may be vertical, horizontal, or centrifugal and may be operable to separate gas from returns 60 r. The separated gas may be stored or flared.
- a lower end of the return line 29 may be connected to an outlet of the RCD 26 and an upper end of the return line may be connected to an inlet stem of a first flow tee 39 a and have a first shutoff valve 38 a assembled as part thereof.
- An upper end of the choke line 28 may be connected an inlet stem of a second flow tee 39 b and have the WC choke 36 m and pressure sensor 35 c assembled as part thereof.
- a first spool may connect an outlet stem of the first tee 39 a and an inlet stem of a third tee 39 c ( FIG. 2A ).
- the pressure sensor 35 r, MP choke 36 a, flow meter 34 r, gas detector 31 , and a fourth shutoff valve 38 d may be assembled as part of the first spool.
- a second spool may connect an outlet stem of the third tee 39 c and an inlet of the MGS 32 and have a sixth shutoff valve 38 f assembled as part thereof.
- a third spool may connect an outlet stem of the second tee 39 b and an inlet stem of a fourth tee 39 d ( FIG. 2A ) and have a third shutoff valve 38 c assembled as part thereof.
- a first splice may connect branches of the first 39 a and second 39 b tees and have a second shutoff valve 38 b assembled as part thereof.
- a second splice may connect branches of the third 39 c and fourth 39 d tees and have a fifth shutoff valve 38 e assembled as part thereof.
- a fourth spool may connect an outlet stem of the fourth tee 39 d and an inlet stem of the fifth tee 39 e and have a seventh shutoff valve 38 g assembled as part thereof.
- a third splice may connect a liquid outlet of the MGS 32 and a branch of the fifth tee 39 e and have an eighth shutoff valve 38 h assembled as part thereof.
- An outlet stem of the fifth tee 39 e may be connected to an inlet of the shale shaker 33 .
- a supply line 37 p,h may connect an outlet of the mud pump 30 d to the top drive inlet and may have the flow meter 34 d and the pressure sensor 35 d assembled as part thereof.
- An upper end of the booster line 27 may have the flow meter 34 b assembled as part thereof.
- Each pressure sensor 35 c,d,r may be in data communication with the PLC 75 .
- the pressure sensor 35 r may be operable to monitor backpressure exerted by the MP choke 36 a.
- the pressure sensor 35 c may be operable to monitor backpressure exerted by the WC choke 36 m.
- the pressure sensor 35 d may be operable to monitor standpipe pressure.
- Each choke 36 a,m may be fortified to operate in an environment where drilling returns 60 r may include solids, such as cuttings.
- the MP choke 36 a may include a hydraulic actuator operated by the PLC 75 via the HPU to maintain backpressure in the riser 25 .
- the WC choke 36 m may be manually operated.
- the choke actuator may be electrical or pneumatic.
- the WC choke 36 m may also include an actuator operated by the PLC 75 .
- the flow meter 34 r may be a mass flow meter, such as a Coriolis flow meter, and may be in data communication with the PLC 75 .
- the flow meter 34 r may be connected in the first spool downstream of the MP choke 36 a and may be operable to monitor a flow rate of the drilling returns 60 r.
- Each of the flow meters 34 b,d may be a volumetric flow meter, such as a Venturi flow meter, and may be in data communication with the PLC 75 .
- the flow meter 34 d may be operable to monitor a flow rate of the mud pump 30 d.
- the flow meter 34 b may be operable to monitor a flow rate of the drilling fluid 60 d pumped into the riser 25 ( FIG. 2B ).
- the PLC 75 may receive a density measurement of drilling fluid 60 d from a mud blender (not shown) to determine a mass flow rate of the drilling fluid 60 d from the volumetric measurement of the flow meters 34 b,d
- a stroke counter (not shown) may be used to monitor a flow rate of the mud pump and/or booster pump instead of the volumetric flow meters.
- either or both of the volumetric flow meters may be mass flow meters.
- the gas detector 31 may be operable to extract a gas sample from the returns 60 r (if contaminated by formation fluid 62 ( FIG. 3C )) and analyze the captured sample to detect hydrocarbons, such as saturated and/or unsaturated C1 to C10 and/or aromatic hydrocarbons, such as benzene, toluene, ethyl benzene and/or xylene, and/or non-hydrocarbon gases, such as carbon dioxide and nitrogen.
- the gas detector 31 may include a body, a probe, a chromatograph, and a carrier/purge system.
- the body may include a fitting and a penetrator.
- the fitting may have end connectors, such as flanges, for connection within the first spool and a lateral connector, such as a flange for receiving the penetrator.
- the penetrator may have a blind flange portion for connection to the lateral connector, an insertion tube extending from an external face of the blind flange portion for receiving the probe, and a dip tube extending from an internal face thereof for receiving one or more sensors, such as a pressure and/or temperature sensor.
- the probe may include a cage, a mandrel, and one or more sheets.
- Each sheet may include a semi-permeable membrane sheathed by inner and outer protective layers of mesh.
- the mandrel may have a stem portion for receiving the sheets and a fitting portion for connection to the insertion tube.
- Each sheet may be disposed on opposing faces of the mandrel and clamped thereon by first and second members of the cage. Fasteners may then be inserted into respective receiving holes formed through the cage, mandrel, and sheets to secure the probe components together.
- the mandrel may have inlet and outlet ports formed in the fitting portion and in communication with respective channels formed between the mandrel and the sheets.
- the carrier/purge system may be connected to the mandrel ports and a carrier gas, such as helium, argon, or nitrogen, may be injected into the mandrel inlet port to displace sample gas trapped in the channels by the membranes to the mandrel outlet port.
- the carrier/purge system may then transport the sample gas to the chromatograph for analysis.
- the carrier purge system may also be routinely run to purge the probe of condensate.
- the chromatograph may be in data communication with the PLC to report the analysis of the sample.
- the chromatograph may be configured to only analyze the sample for specific hydrocarbons to minimize sample analysis time. For example, the chromatograph may be configured to analyze only for C1-C5 hydrocarbons in twenty-five seconds.
- the mud pump 30 d may pump drilling fluid 60 d from the drilling fluid tank, through the standpipe 37 p and Kelly hose 37 h to the top drive 5 .
- the drilling fluid 60 d may include a base liquid.
- the base liquid may be base refined or synthetic oil, water, brine, or a water/oil emulsion.
- the drilling fluid 60 d may further include solids dissolved or suspended in the base liquid, such as organophilic clay, lignite, and/or asphalt, thereby forming a mud.
- the drilling fluid 60 d may flow from the Kelly hose 37 h and into the drill string 10 via the top drive 5 .
- the drilling fluid 60 d may flow down through the drill string 10 and exit the drill bit 15 , where the fluid may circulate the cuttings away from the bit and return the cuttings up an annulus 105 formed between an inner surface of the casing 101 or wellbore 100 and an outer surface of the drill string 10 .
- the returns 60 r (drilling fluid 60 d plus cuttings) may flow through the annulus 105 to the wellhead 50 .
- the returns 60 r may continue from the wellhead 50 and into the riser 25 via the PCA 1 p.
- the returns 60 r may flow up the riser 25 to the RCD 26 .
- the returns 60 r may be diverted by the RCD 26 into the return line 29 via the RCD outlet.
- the returns 60 r may continue from the return line 29 , through the open (depicted by phantom) first shutoff valve 38 a and first tee 39 a, and into the first spool.
- the returns 60 r may flow through the MP choke 36 a, the flow meter 34 r, the gas detector 31 , and the open fourth shutoff valve 38 d to the third tee 39 c.
- the returns 60 r may continue through the second splice and to the fourth tee 39 d via the open fifth shutoff valve 38 e.
- the returns 60 r may continue through the third spool to the fifth tee 39 e via the open seventh shutoff valve 38 g.
- the returns 60 r may then flow into the shale shaker 33 and be processed thereby to remove the cuttings, thereby completing a cycle.
- the drill string 10 may be rotated 16 by the top drive 5 and lowered by the traveling block 6 , thereby extending the wellbore 100 into the lower formation 104 b.
- the sixth 38 f and eighth 38 h shutoff valves may be open and the fifth 38 e and seventh 38 g shutoff valves may be closed in the drilling mode, thereby routing the returns 60 r through the MGS 32 before discharge into the shaker 33 .
- the PLC 75 may be programmed to operate the MP choke 36 a so that a target bottomhole pressure (BHP) is maintained in the annulus 105 during the drilling operation.
- BHP target bottomhole pressure
- the target BHP may be selected to be within a drilling window defined as greater than or equal to a minimum threshold pressure, such as pore pressure, of the lower formation 104 b and less than or equal to a maximum threshold pressure, such as fracture pressure, of the lower formation, such as an average of the pore and fracture BHPs.
- the minimum threshold may be stability pressure and/or the maximum threshold may be leakoff pressure.
- threshold pressure gradients may be used instead of pressures and the gradients may be at other depths along the lower formation 130 b besides bottomhole, such as the depth of the maximum pore gradient and the depth of the minimum fracture gradient.
- the PLC 75 may be free to vary the BHP within the window during the drilling operation.
- a static density of the drilling fluid 60 d may correspond to a threshold pressure gradient of the lower formation 104 b, such as being equal to a pore pressure gradient.
- the PLC 75 may execute a real time simulation of the drilling operation in order to predict the actual BHP from measured data, such as standpipe pressure from sensor 35 d, mud pump flow rate from flow meter 34 d, wellhead pressure from any of the sensors 47 a - c, and return fluid flow rate from flow meter 34 r. The PLC 75 may then compare the predicted BHP to the target BHP and adjust the MP choke 36 a accordingly.
- a static density of the drilling fluid 60 d may be slightly less than the pore pressure gradient such that an equivalent circulation density (ECD) (static density plus dynamic friction drag) during drilling is equal to the pore pressure gradient.
- ECD equivalent circulation density
- a static density of the drilling fluid 60 d may be slightly greater than the pore pressure gradient.
- the PLC 75 may also perform a mass balance to monitor for a kick ( FIG. 3C ) or lost circulation (not shown).
- the PLC 75 may compare the mass flow rates (i.e., drilling fluid flow rate minus returns flow rate) using the respective counters/meters 34 d,r.
- the PLC 75 may use the mass balance to monitor for formation fluid 62 entering the annulus 105 and contaminating 61 r the returns 60 r or returns 60 r entering the formation 104 b.
- the PLC 75 may shift the drilling system 1 into a managed pressure riser degassing mode.
- the gas detector 31 may also capture and analyze samples of the returns 60 r as an additional safeguard for kick detection.
- the PLC 75 may estimate a mass rate of cuttings (and add the cuttings mass rate to the intake sum) using a rate of penetration (ROP) of the drill bit or a mass flow meter may be added to the cuttings chute of the shaker and the PLC may directly measure the cuttings mass rate.
- the gas detector 31 may be bypassed during the drilling operation.
- the booster pump 30 b may be operated during drilling to compensate for any size discrepancy between the riser annulus and the casing/wellbore annulus and the PLC may account for boosting in the BHP control and mass balance using the flow meter 34 b.
- FIGS. 2A and 2B illustrate the offshore drilling system 1 in a managed pressure riser degassing mode.
- FIG. 2C is a table illustrating switching between the modes.
- the PLC 75 may halt injection of the drilling fluid 60 d by the mud pump 30 d and halt rotation 16 of the drill string 10 by the top drive 5 .
- the Kelly valve 11 may be closed.
- the top drive 5 may also be raised to remove weight on the bit 15 .
- the PLC 75 may then close one or more of the BOPs, such as annular BOP 42 a and pipe ram BOP 42 u, against an outer surface of the drill pipe 10 p.
- the PLC 75 may close the fifth 38 e and seventh 38 g shutoff valves and open the sixth 38 f and eighth 38 h shutoff valves. The PLC 75 may then open the first booster line shutoff valve 45 a and operate the booster pump 30 b, thereby pumping drilling fluid 60 d into a top of the booster line 27 . The drilling fluid 60 d may flow down the booster line 27 and into the upper flow cross 41 u via the open shutoff valve 45 a.
- the drilling fluid 60 d may flow through the LMRP and into a lower end of the riser 25 , thereby displacing any contaminated returns 61 r present therein.
- the drilling fluid 60 d may flow up the riser 25 and drive the contaminated returns 61 r out of the riser 25 .
- the contaminated returns 61 r may be driven up the riser 25 to the RCD 26 .
- the contaminated returns 61 r may be diverted by the RCD 26 into the return line 29 via the RCD outlet.
- the contaminated returns 61 r may continue from the return line 29 , through the open first shutoff valve 38 a and first tee 39 a, and into the first spool.
- the contaminated returns 61 r may flow through the MP choke 36 a, the flow meter 34 r, the gas detector 31 , and the open fourth shutoff valve 38 d to the third tee 39 c.
- the contaminated returns 61 r may continue into an inlet of the MGS 32 via the open sixth shutoff valve 38 f.
- the MGS 32 may degas the contaminated returns 61 r and a liquid portion thereof may be discharged into the third splice.
- the liquid portion of the contaminated returns 61 r may continue into the shale shaker 33 via the open eighth shutoff valve 38 h and the fifth tee 39 e.
- the shale shaker 33 may process the contaminated liquid portion to remove the cuttings and the processed contaminated liquid portion may be diverted into a disposal tank (not shown).
- the gas detector 31 may capture and analyze samples of the contaminated returns 61 r to ensure that the riser 25 has been completely degassed.
- the PLC 75 may shift the drilling system 1 into managed pressure well control mode. If the event that triggered the shift was lost circulation, the returns 60 r may or may not have been contaminated by fluid from the lower formation 104 b.
- the booster pump 30 b may or may not remain operating during shifting between drilling mode and riser degassing mode.
- FIGS. 3A and 3B illustrate the offshore drilling system 1 in a managed pressure well control mode.
- the PLC 75 may halt injection of the drilling fluid 60 d by the booster pump 30 b and close the booster line shutoff valve 45 a.
- the Kelly valve 11 may be opened.
- the PLC 75 may close the first shutoff valve 38 a and open the second shutoff valve 38 b.
- the PLC 75 may then open the second choke line shutoff valve 45 e and operate the mud pump 30 d, thereby pumping drilling fluid 60 d into a top of the drill string 10 via the top drive 5 .
- the drilling fluid 60 d may be flow down through the drill string 10 and exit the drill bit 15 , thereby displacing the contaminated returns 61 r present in the annulus 105 .
- the contaminated returns 61 r may be driven through the annulus 105 to the wellhead 50 .
- the contaminated returns 61 r may be diverted into the choke line 28 by the closed BOPs 41 a,u and via the open shutoff valve 45 e.
- the contaminated returns 61 r may be driven up the choke line 28 to the WC choke 36 m.
- the WC choke 36 m may be fully relaxed or be bypassed.
- the contaminated returns 61 r may continue through the WC choke 36 m and into the first branch via the second tee 39 b.
- the contaminated returns 61 r may flow into the first spool via the open second shutoff valve 38 b and first tee 39 a.
- the contaminated returns 61 r may flow through the MP choke 36 a, the flow meter 34 r, the gas detector 31 , and the open fourth shutoff valve 38 d to the third tee 39 c.
- the contaminated returns 61 r may continue into the inlet of the MGS 32 via the open sixth shutoff valve 38 f.
- the MGS 32 may degas the contaminated returns 61 r and a liquid portion thereof may be discharged into the third splice.
- the liquid portion of the contaminated returns 61 r may continue into the shale shaker 33 via the open eighth shutoff valve 38 h and the fifth tee 39 e.
- the shale shaker 33 may process the contaminated liquid portion to remove the cuttings and the processed contaminated liquid portion may be diverted into a disposal tank (not shown).
- FIG. 3C illustrates operation of the PLC 75 in the managed pressure well control mode.
- a flow rate of the mud pump 30 d for managed pressure well control may be reduced relative to the flow rate of the mud pump during the drilling mode to account for the reduced flow area of the choke line 28 relative to the flow area of the a riser annulus formed between the riser 25 and the drill string 10 .
- the gas detector 31 may capture and analyze samples of the contaminated returns 61 r and the flow meter 34 r may be monitored so the PLC 75 may determine a pore pressure of the lower formation 104 b.
- the PLC 75 may determine a fracture pressure of the formation.
- the pore/fracture pressure may be determined in an incremental fashion, i.e. for a kick, the MP choke 36 a may be monotonically or gradually tightened 63 a,b until the returns are no longer contaminated with production fluid 62 .
- the PLC 75 may calculate the pore pressure to control the kick. The inverse of the incremental process may be used to determine the fracture pressure for a lost circulation scenario.
- the PLC 75 may calculate a pore pressure gradient and a density of the drilling fluid 60 d may be increased to correspond to the determined pore pressure gradient.
- the increased density drilling fluid may be pumped into the drill string 10 until the annulus 105 and choke line 28 are full of the heavier drilling fluid.
- the riser 25 may then be filled with the heavier drilling fluid.
- the PLC 75 may then shift the drilling system 1 back to drilling mode and drilling of the wellbore 100 through the lower formation 104 b may continue with the heavier drilling fluid such that the returns 64 r therefrom maintain at least a balanced condition in the annulus 105 .
- the WC choke 36 m may be tightened (or brought online if bypassed) to alleviate pressure from the MP choke 36 a until the kick has been controlled. Since the WC choke 36 m is located upstream of the first spool, the chokes 36 a,m may operate in a serial fashion. The WC choke 36 m may function as a high pressure stage and the MP choke 36 a may function as a low pressure stage, thereby effectively increasing a maximum operating pressure of the first spool. Should tightening the chokes 36 a,m fail to control the kick, the PLC 75 may shift the drilling system into emergency well control mode.
- FIGS. 4A and 4B illustrate the offshore drilling system 1 in an emergency well control mode.
- the PLC 75 may halt injection of the drilling fluid 60 d by the mud pump 30 b and close the second 38 b and fourth 38 d shutoff valves and open the fifth shutoff valve 38 e.
- the PLC 75 may close a supply valve (not shown) for the mud pump 30 d from the drilling fluid tank and open a supply valve (not shown) for the mud pump 30 d from a kill fluid tank (not shown).
- the PLC 75 may then operate the mud pump 30 d, thereby pumping kill fluid 65 into a top of the drill string 10 via the top drive 5 .
- the kill fluid 65 may be flow down through the drill string 10 and exit the drill bit 15 , thereby displacing the contaminated drilling fluid present in the annulus 105 .
- the contaminated drilling fluid may be driven through the annulus 105 to the wellhead 50 .
- the contaminated drilling fluid may be diverted into the choke line 28 by the closed BOPs 41 a,u and via the open shutoff valve 45 .
- the contaminated drilling fluid may be driven up the choke line 28 to the WC choke 36 m.
- the contaminated drilling fluid may continue through the WC choke 36 m and into the second spool via the second tee 39 b.
- the contaminated drilling fluid may flow into the second branch via the open third shutoff valve 38 c and fourth tee 39 d.
- the contaminated drilling fluid may bypass the first spool and continue into the inlet of the MGS 32 via the open fifth 38 e and 38 f sixth shutoff valves.
- the MGS 32 may degas the contaminated drilling fluid and a liquid portion thereof may be discharged into the third splice.
- the liquid portion of the contaminated drilling fluid may continue into the shale shaker 33 via the open eighth shutoff valve 38 h and the fifth tee 39 e.
- the processed contaminated liquid portion may be diverted into a disposal tank (not shown).
- the WC choke 36 m may be operated to bring the kick under control.
- FIG. 5 illustrates a pressure control assembly (PCA) of a second offshore drilling system in a managed pressure drilling mode, according to another embodiment of the present disclosure.
- the second drilling system may include the MODU 1 m, the drilling rig 1 r, the fluid handling system 1 h, the fluid transport system 1 t, and a pressure control assembly (PCA) 201 p.
- the PCA 201 p may include the wellhead adapter 40 b, the one or more flow crosses 41 u,m,b, the blow out preventers (BOPs) 42 a,u,b, the LMRP, the accumulators 44 , the receiver 46 , a second RCD 226 , and a subsea flow meter 234 .
- BOPs blow out preventers
- the second RCD 226 may be similar to the first RCD 26 .
- a lower end of the second RCD housing may be connected to the annular BOP 42 a and an upper end of the second RCD housing may be connected to the upper flow cross 41 u, such as by flanged connections.
- a pressure sensor may be connected to an upper housing section of the second RCD 226 .
- the pressure sensor may be in data communication with the control pod 76 and the second RCD latch piston may be in fluid communication with the control pod via an interface of the second RCD 226 .
- a lower end of a subsea spool may be connected to an outlet of the second RCD 226 and an upper end of the spool may be connected to the upper flow cross 41 u.
- the spool may have first 245 a and second 245 b shutoff valves and the subsea flow meter 234 assembled as a part thereof.
- Each shutoff valve 245 a,b may be automated and have a hydraulic actuator (not shown) operable by the control pod 76 via fluid communication with a respective umbilical conduit or the LMRP accumulators 44 .
- the subsea flow meter 234 may be a mass flow meter, such as a Coriolis flow meter, and may be in data communication with the PLC 75 via the pod 76 and the umbilical 70 .
- a subsea volumetric flow meter may be used instead of the mass flow meter.
- the returns 60 r may flow through the annulus 105 to the wellhead 50 .
- the returns 60 r may continue from the wellhead 50 to the second RCD 226 via the BOPs 42 a,u,b.
- the returns 60 r may be diverted by the second RCD 226 into the subsea spool via the second RCD outlet.
- the returns 60 r may flow through the open second shutoff valve 245 b, the subsea flow meter 234 , and the first shutoff valve 245 a to a branch of the upper flow cross 41 u.
- the returns 60 r may flow into the riser 25 via the upper flow cross 41 u, the receiver 46 , and the LMRP.
- the returns 60 r may flow up the riser 25 to the first RCD 26 .
- the returns 60 r may be diverted by the first RCD 26 into the return line 29 via the first RCD outlet.
- the returns 60 r may continue from the return line 29 , through the open first shutoff valve 38 a and first tee 39 a, and into the first spool.
- the returns 60 r may flow through the MP choke 36 a, the flow meter 34 r, the gas detector 31 , and the open fourth shutoff valve 38 d to the third tee 39 c.
- the returns 60 r may continue through the second splice and to the fourth tee 39 d via the open fifth shutoff valve 38 e.
- the returns 60 r may continue through the third spool to the fifth tee 39 e via the open seventh shutoff valve 38 g.
- the returns 60 r may then flow into the shale shaker 33 and be processed thereby to remove the cuttings, thereby completing a cycle.
- the PLC may rely on the subsea flow meter 234 instead of the surface flow meter 34 r to perform BHP control and the mass balance.
- the surface flow meter 34 r may be used as a backup to the subsea flow meter 234 should the subsea flow meter fail.
- the degassing, well control, and emergency modes for the PCA 201 p may be similar to that of the PCA 1 p.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
A method of drilling a subsea wellbore includes drilling the subsea wellbore and, while drilling the subsea wellbore: measuring a flow rate of the drilling fluid injected into a tubular string; measuring a flow rate of returns; comparing the returns flow rate to the drilling fluid flow rate to detect a kick by a formation being drilled; and exerting backpressure on the returns using a first variable choke valve. The method further includes, in response to detecting the kick: closing a blowout preventer of a subsea pressure control assembly (PCA) against the tubular string; and diverting the flow of returns from the PCA, through a choke line having a second variable choke valve, and through the first variable choke valve.
Description
- 1. Field of the Disclosure
- The present disclosure generally relates to a managed pressure drilling system having a well control mode.
- 2. Description of the Related Art
- In wellbore construction and completion operations, a wellbore is formed to access hydrocarbon-bearing formations (e.g., crude oil and/or natural gas) by the use of drilling. Drilling is accomplished by utilizing a drill bit that is mounted on the end of a drill string. To drill within the wellbore to a predetermined depth, the drill string is often rotated by a top drive or rotary table on a surface platform or rig, and/or by a downhole motor mounted towards the lower end of the drill string. After drilling to a predetermined depth, the drill string and drill bit are removed and a section of casing is lowered into the wellbore. An annulus is thus formed between the string of casing and the formation. The casing string is temporarily hung from the surface of the well. A cementing operation is then conducted in order to fill the annulus with cement. The casing string is cemented into the wellbore by circulating cement into the annulus defined between the outer wall of the casing and the borehole. The combination of cement and casing strengthens the wellbore and facilitates the isolation of certain areas of the formation behind the casing for the production of hydrocarbons.
- Deep water off-shore drilling operations are typically carried out by a mobile offshore drilling unit (MODU), such as a drill ship or a semi-submersible, having the drilling rig aboard and often make use of a marine riser extending between the wellhead of the well that is being drilled in a subsea formation and the MODU. The marine riser is a tubular string made up of a plurality of tubular sections that are connected in end-to-end relationship. The riser allows return of the drilling mud with drill cuttings from the hole that is being drilled. Also, the marine riser is adapted for being used as a guide means for lowering equipment (such as a drill string carrying a drill bit) into the hole.
- The present disclosure generally relates to a managed pressure drilling system having a well control mode. In one embodiment, a method of drilling a subsea wellbore includes drilling the subsea wellbore by: injecting drilling fluid through a tubular string extending into the wellbore from an offshore drilling unit (ODU); and rotating a drill bit disposed on a bottom of the tubular string. The drilling fluid exits the drill bit and carries cuttings from the drill bit. The drilling fluid and cuttings (returns) flow to a subsea wellhead via an annulus defined by an outer surface of the tubular string and an inner surface of the subsea wellbore. The returns flow from the subsea wellhead to the ODU via a marine riser. The method further includes, while drilling the subsea wellbore: measuring a flow rate of the drilling fluid injected into the tubular string; measuring a flow rate of the returns; comparing the returns flow rate to the drilling fluid flow rate to detect a kick by a formation being drilled; and exerting backpressure on the returns using a first variable choke valve. The method further includes, in response to detecting the kick: closing a blowout preventer of a subsea pressure control assembly (PCA) against the tubular string; and diverting the flow of returns from the PCA, through a choke line having a second variable choke valve, and through the first variable choke valve.
- In another embodiment, a managed pressure drilling system includes: a first rotating control device (RCD) for connection to a marine riser; a first variable choke valve for connection to an outlet of the first RCD; a first mass flow meter for connection to an outlet of the first variable choke valve; a splice for connecting an inlet of the first variable choke valve to an outlet of a second variable choke valve; and a programmable logic controller (PLC) in communication with the first variable choke valve and the first mass flow meter. The PLC is configured to perform an operation, including, during drilling of a subsea wellbore: measuring a flow rate of returns using the first mass flow meter; comparing the returns flow rate to a drilling fluid flow rate to detect a kick by a formation being drilled; and exerting backpressure on the returns using the first variable choke valve. The operation further includes, in response to detecting the kick, diverting the returns through the second variable choke valve, the splice, and the first variable choke valve to alleviate pressure on the first variable choke valve.
- In another embodiment, a method of drilling a subsea wellbore includes: drilling the subsea wellbore; and, while drilling the subsea wellbore: measuring a flow rate of drilling fluid injected into a tubular string having a drill bit; measuring a flow rate of drilling returns using a subsea mass flow meter; and comparing the returns flow rate to the drilling fluid flow rate to detect a kick by a formation being drilled. The method further includes, in response to detecting the kick: closing a blowout preventer of a subsea pressure control assembly (PCA) against the tubular string; and diverting the flow of returns from the PCA, through a choke line having a second variable choke valve, and through a first variable choke valve.
- In another embodiment, a managed pressure drilling system includes: a first rotating control device (RCD) for connection to a marine riser; a first variable choke valve for connection to an outlet of the first RCD; a first mass flow meter for connection to an outlet of the first variable choke valve; a splice for connecting an inlet of the first variable choke valve to an outlet of a second variable choke valve; a second RCD for assembly as part of a subsea pressure control assembly; a subsea mass flow meter for connection to an outlet of the second RCD; and a programmable logic controller (PLC) in communication with the first variable choke valve and the first and second mass flow meters.
- So that the manner in which the above recited features of the present disclosure can be understood in detail, a more particular description of the disclosure, briefly summarized above, may be had by reference to embodiments, some of which are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments of this disclosure and are therefore not to be considered limiting of its scope, for the disclosure may admit to other equally effective embodiments.
-
FIGS. 1A-1C illustrate an offshore drilling system in a managed pressure drilling mode, according to one embodiment of the present disclosure. -
FIGS. 2A and 2B illustrate the offshore drilling system in a managed pressure riser degassing mode.FIG. 2C is a table illustrating switching between the modes. -
FIGS. 3A and 3B illustrate the offshore drilling system in a managed pressure well control mode.FIG. 3C illustrates operation of the PLC in the managed pressure well control mode. -
FIGS. 4A and 4B illustrate the offshore drilling system in an emergency well control mode. -
FIG. 5 illustrates a pressure control assembly (PCA) of a second offshore drilling system in a managed pressure drilling mode, according to another embodiment of the present disclosure. -
FIGS. 1A-1C illustrate anoffshore drilling system 1 in a managed pressure drilling mode, according to one embodiment of the present disclosure. Thedrilling system 1 may include aMODU 1 m, such as a semi-submersible, adrilling rig 1 r, afluid handling system 1 h, afluid transport system 1 t, and pressure control assembly (PCA) 1 p, and adrill string 10. The MODU 1 m may carry thedrilling rig 1 r and thefluid handling system 1 h aboard and may include a moon pool, through which drilling operations are conducted. The semi-submersible may include a lower barge hull which floats below a surface (aka waterline) 2 s ofsea 2 and is, therefore, less subject to surface wave action. Stability columns (only one shown) may be mounted on the lower barge hull for supporting an upper hull above the waterline. The upper hull may have one or more decks for carrying thedrilling rig 1 r andfluid handling system 1 h. TheMODU 1 m may further have a dynamic positioning system (DPS) (not shown) or be moored for maintaining the moon pool in position over asubsea wellhead 50. - Alternatively, the MODU 1 m may be a drill ship. Alternatively, a fixed offshore drilling unit or a non-mobile floating offshore drilling unit may be used instead of the
MODU 1 m. Alternatively, the wellbore may be subsea having a wellhead located adjacent to the waterline and the drilling rig may be a located on a platform adjacent the wellhead. Alternatively, the wellbore may be subterranean and the drilling rig located on a terrestrial pad. - The
drilling rig 1 r may include aderrick 3, afloor 4, atop drive 5, and a hoist. Thetop drive 5 may include a motor for rotating 16 adrill string 10. The top drive motor may be electric or hydraulic. A frame of thetop drive 5 may be linked to a rail (not shown) of thederrick 3 for preventing rotation thereof duringrotation 16 of thedrill string 10 and allowing for vertical movement of the top drive with a travelingblock 6 of the hoist. The frame of thetop drive 5 may be suspended from thederrick 3 by the travelingblock 6. AKelly valve 11 may be connected to a quill of atop drive 5. The quill may be torsionally driven by the top drive motor and supported from the frame by bearings. Thetop drive 5 may further have an inlet connected to the frame and in fluid communication with the quill. - The traveling
block 6 may be supported bywire rope 7 connected at its upper end to acrown block 8. Thewire rope 7 may be woven through sheaves of the 6, 8 and extend to drawworks 9 for reeling thereof, thereby raising or lowering the travelingblocks block 6 relative to thederrick 3. Thedrilling rig 1 r may further include a drill string compensator (not shown) to account for heave of theMODU 1 m. The drill string compensator may be disposed between the travelingblock 6 and the top drive 5 (aka hook mounted) or between thecrown block 8 and the derrick 3 (aka top mounted). - An upper end of the
drill string 10 may be connected to theKelly valve 11, such as by threaded couplings. Thedrill string 10 may include a bottomhole assembly (BHA) 10 b and joints ofdrill pipe 10 p connected together, such as by threaded couplings. TheBHA 10 b may be connected to thedrill pipe 10 p, such as by threaded couplings, and include adrill bit 15 and one ormore drill collars 12 connected thereto, such as by threaded couplings. Thedrill bit 15 may be rotated 16 by thetop drive 5 via thedrill pipe 10 p and/or theBHA 10 b may further include a drilling motor (not shown) for rotating the drill bit. TheBHA 10 b may further include an instrumentation sub (not shown), such as a measurement while drilling (MWD) and/or a logging while drilling (LWD) sub. - The
fluid transport system 1 t may include an upper marine riser package (UMRP) 20, amarine riser 25, abooster line 27, achoke line 28, and areturn line 29. TheUMRP 20 may include adiverter 21, a flex joint 22, a slip (aka telescopic) joint 23, atensioner 24, and a rotating control device (RCD) 26. A lower end of theRCD 26 may be connected to an upper end of theriser 25, such as by a flanged connection. The slip joint 23 may include an outer barrel connected to an upper end of theRCD 26, such as by a flanged connection, and an inner barrel connected to the flex joint 22, such as by a flanged connection. The outer barrel may also be connected to thetensioner 24, such as by a tensioner ring (not shown). - The flex joint 22 may also connect to the
diverter 21, such as by a flanged connection. Thediverter 21 may also be connected to therig floor 4, such as by a bracket. The slip joint 23 may be operable to extend and retract in response to heave of theMODU 1 m relative to theriser 25 while thetensioner 24 may reel wire rope in response to the heave, thereby supporting theriser 25 from theMODU 1 m while accommodating the heave. Theriser 25 may extend from thePCA 1 p to theMODU 1 m and may connect to the MODU via theUMRP 20. Theriser 25 may have one or more buoyancy modules (not shown) disposed therealong to reduce load on thetensioner 24. - The
RCD 26 may include a docking station and a bearing assembly. The docking station may be submerged adjacent thewaterline 2 s. The docking station may include a housing, a latch, and an interface. The RCD housing may be tubular and have one or more sections connected together, such as by flanged connections. The RCD housing may have one or more fluid ports formed through a lower housing section and the docking station may include a connection, such as a flanged outlet, fastened to one of the ports. - The latch may include a hydraulic actuator, such as a piston, one or more fasteners, such as dogs, and a body. The latch body may be connected to the housing, such as by threaded couplings. A piston chamber may be formed between the latch body and a mid housing section. The latch body may have openings formed through a wall thereof for receiving the respective dogs. The latch piston 63 p may be disposed in the chamber and may carry seals isolating an upper portion of the chamber from a lower portion of the chamber. A cam surface may be formed on an inner surface of the piston for radially displacing the dogs. The latch body may further have a landing shoulder formed in an inner surface thereof for receiving a protective sleeve or the bearing assembly.
- Hydraulic passages may be formed through the mid housing section and may provide fluid communication between the interface and respective portions of the hydraulic chamber for selective operation of the piston. An RCD umbilical may have hydraulic conduits and may provide fluid communication between the RCD interface and a hydraulic power unit (HPU) via hydraulic manifold. The RCD umbilical may further have an electric cable for providing data communication between a control console and the RCD interface via a controller.
- The bearing assembly may include a catch sleeve, one or more strippers, and a bearing pack. Each stripper may include a gland or retainer and a seal. Each stripper seal may be directional and oriented to seal against
drill pipe 10 p in response to higher pressure in theriser 25 than theUMRP 20. Each stripper seal may have a conical shape for fluid pressure to act against a respective tapered surface thereof, thereby generating sealing pressure against thedrill pipe 10 p. Each stripper seal may have an inner diameter slightly less than a pipe diameter of thedrill pipe 10 p to form an interference fit therebetween. Each stripper seal may be flexible enough to accommodate and seal against threaded couplings of thedrill pipe 10 p having a larger tool joint diameter. Thedrill pipe 10 p may be received through a bore of the bearing assembly so that the stripper seals may engage thedrill pipe 10 p. The stripper seals may provide a desired barrier in theriser 25 either when thedrill pipe 10 p is stationary or rotating. - The catch sleeve may have a landing shoulder formed at an outer surface thereof, a catch profile formed in an outer surface thereof, and may carry one or more seals on an outer surface thereof. Engagement of the latch dogs with the catch sleeve may connect the bearing assembly to the docking station. The gland may have a landing shoulder formed in an inner surface thereof and a catch profile formed in an inner surface thereof for retrieval by a bearing assembly running tool. The bearing pack may support the strippers from the catch sleeve such that the strippers may rotate relative to the docking station. The bearing pack may include one or more radial bearings, one or more thrust bearings, and a self contained lubricant system. The bearing pack may be disposed between the strippers and be housed in and connected to the catch sleeve, such as by threaded couplings and/or fasteners.
- Alternatively, the bearing assembly may be non-releasably connected to the housing. Alternatively, the RCD may be located above the waterline and/or along the UMRP at any other location besides a lower end thereof. Alternatively, the RCD may be assembled as part of the riser at any location therealong or as part of the PCA. Alternatively, an active seal RCD may be used instead.
- The
PCA 1 p may be connected to awellhead 50 adjacently located to afloor 2 f of thesea 2. Aconductor string 51 may be driven into theseafloor 2 f. Theconductor string 51 may include a housing and joints of conductor pipe connected together, such as by threaded couplings. Once theconductor string 51 has been set, asubsea wellbore 100 may be drilled into theseafloor 2 f and acasing string 52 may be deployed into the wellbore. Thecasing string 52 may include a wellhead housing and joints of casing connected together, such as by threaded couplings. The wellhead housing may land in the conductor housing during deployment of thecasing string 52. Thecasing string 52 may be cemented 101 into thewellbore 100. Thecasing string 52 may extend to a depth adjacent a bottom of anupper formation 104 u. Theupper formation 104 u may be non-productive and alower formation 104 b may be a hydrocarbon-bearing reservoir. - Alternatively, the
lower formation 104 b may be non-productive (e.g., a depleted zone), environmentally sensitive, such as an aquifer, or unstable. Although shown as vertical, thewellbore 100 may include a vertical portion and a deviated, such as horizontal, portion. - The
PCA 1 p may include awellhead adapter 40 b, one or more flow crosses 41 u,m,b, one or more blow out preventers (BOPs) 42 a,u,b, a lower marine riser package (LMRP), one ormore accumulators 44, and areceiver 46. The LMRP may include acontrol pod 76, a flex joint 43, and aconnector 40 u. Thewellhead adapter 40 b, flow crosses 41 u,m,b,BOPs 42 a,u,b,receiver 46,connector 40 u, and flex joint 43, may each include a housing having a longitudinal bore therethrough and may each be connected, such as by flanges, such that a continuous bore is maintained therethrough. The bore may have drift diameter, corresponding to a drift diameter of thewellhead 50. The flex joints 23, 43 may accommodate respective horizontal and/or rotational (aka pitch and roll) movement of theMODU 1 m relative to theriser 25 and the riser relative to thePCA 1 p. - Each of the
connector 40 u andwellhead adapter 40 b may include one or more fasteners, such as dogs, for fastening the LMRP to theBOPs 42 a,u,b and thePCA 1 p to an external profile of the wellhead housing, respectively. Each of theconnector 40 u andwellhead adapter 40 b may further include a seal sleeve for engaging an internal profile of therespective receiver 46 and wellhead housing. Each of theconnector 40 u andwellhead adapter 40 b may be in electric or hydraulic communication with thecontrol pod 76 and/or further include an electric or hydraulic actuator and an interface, such as a hot stab, so that a remotely operated subsea vehicle (ROV) (not shown) may operate the actuator for engaging the dogs with the external profile. - The LMRP may receive a lower end of the
riser 25 and connect the riser to thePCA 1 p. Thecontrol pod 76 may be in electric, hydraulic, and/or optical communication with a programmable logic controller (PLC) 75 and/or a rig controller (not shown) onboard theMODU 1 m via an umbilical 70. Thecontrol pod 76 may include one or more control valves (not shown) in communication with theBOPs 42 a,u,b for operation thereof. Each control valve may include an electric or hydraulic actuator in communication with the umbilical 70. The umbilical 70 may include one or more hydraulic and/or electric control conduit/cables for the actuators. Theaccumulators 44 may store pressurized hydraulic fluid for operating theBOPs 42 a,u,b. Additionally, theaccumulators 44 may be used for operating one or more of the other components of thePCA 1 p. ThePLC 75 and/or rig controller may operate thePCA 1 p via the umbilical 70 and thecontrol pod 76. - A lower end of the
booster line 27 may be connected to a branch of theflow cross 41 u by ashutoff valve 45 a. A booster manifold may also connect to thebooster line 27 and have a prong connected to a respective branch of each flow cross 41 m,b. Shutoff valves 45 b,c may be disposed in respective prongs of the booster manifold. Alternatively, a separate kill line (not shown) may be connected to the branches of the flow crosses 41 m,b instead of the booster manifold. An upper end of thebooster line 27 may be connected to an outlet of abooster pump 30 b. A lower end of thechoke line 28 may have prongs connected to respective second branches of the flow crosses 41 m,b.Shutoff valves 45 d,e may be disposed in respective prongs of the choke line lower end. - A
pressure sensor 47 a may be connected to a second branch of the upper flow cross 41 u.Pressure sensors 47 b,c may be connected to the choke line prongs betweenrespective shutoff valves 45 d,e and respective flow cross second branches. Each pressure sensor 47 a-c may be in data communication with thecontrol pod 76. The 27, 28 and umbilical 70 may extend between thelines MODU 1 m and thePCA 1 p by being fastened to brackets disposed along theriser 25. Each 27, 28 may be a flow conduit, such as coiled tubing. Each shutoff valve 45 a-e may be automated and have a hydraulic actuator (not shown) operable by theline control pod 76. - Alternatively, the umbilical may be extended between the MODU and the PCA independently of the riser. Alternatively, the valve actuators may be electrical or pneumatic.
- The
fluid handling system 1 h may include one or pumps 30 b,d, agas detector 31, a reservoir for drillingfluid 60 d, such as a tank, a fluid separator, such as a mud-gas separator (MGS) 32, a solids separator, such as ashale shaker 33, one ormore flow meters 34 b,d,r, one ormore pressure sensors 35 c,d,r, and one or more variable choke valves, such as a managed pressure (MP) choke 36 a and a well control (WC) choke 36 m. The mud-gas separator 32 may be vertical, horizontal, or centrifugal and may be operable to separate gas fromreturns 60 r. The separated gas may be stored or flared. - A lower end of the
return line 29 may be connected to an outlet of theRCD 26 and an upper end of the return line may be connected to an inlet stem of afirst flow tee 39 a and have afirst shutoff valve 38 a assembled as part thereof. An upper end of thechoke line 28 may be connected an inlet stem of asecond flow tee 39 b and have theWC choke 36 m andpressure sensor 35 c assembled as part thereof. A first spool may connect an outlet stem of thefirst tee 39 a and an inlet stem of athird tee 39 c (FIG. 2A ). Thepressure sensor 35 r, MP choke 36 a,flow meter 34 r,gas detector 31, and afourth shutoff valve 38 d may be assembled as part of the first spool. A second spool may connect an outlet stem of thethird tee 39 c and an inlet of theMGS 32 and have asixth shutoff valve 38 f assembled as part thereof. - A third spool may connect an outlet stem of the
second tee 39 b and an inlet stem of a fourth tee 39 d (FIG. 2A ) and have athird shutoff valve 38 c assembled as part thereof. A first splice may connect branches of the first 39 a and second 39 b tees and have asecond shutoff valve 38 b assembled as part thereof. A second splice may connect branches of the third 39 c and fourth 39 d tees and have afifth shutoff valve 38 e assembled as part thereof. A fourth spool may connect an outlet stem of the fourth tee 39 d and an inlet stem of thefifth tee 39 e and have aseventh shutoff valve 38 g assembled as part thereof. A third splice may connect a liquid outlet of theMGS 32 and a branch of thefifth tee 39 e and have aneighth shutoff valve 38 h assembled as part thereof. An outlet stem of thefifth tee 39 e may be connected to an inlet of theshale shaker 33. - A
supply line 37 p,h may connect an outlet of themud pump 30 d to the top drive inlet and may have theflow meter 34 d and thepressure sensor 35 d assembled as part thereof. An upper end of thebooster line 27 may have theflow meter 34 b assembled as part thereof. Eachpressure sensor 35 c,d,r may be in data communication with thePLC 75. Thepressure sensor 35 r may be operable to monitor backpressure exerted by the MP choke 36 a. Thepressure sensor 35 c may be operable to monitor backpressure exerted by theWC choke 36 m. Thepressure sensor 35 d may be operable to monitor standpipe pressure. Each choke 36 a,m may be fortified to operate in an environment where drilling returns 60 r may include solids, such as cuttings. The MP choke 36 a may include a hydraulic actuator operated by thePLC 75 via the HPU to maintain backpressure in theriser 25. The WC choke 36 m may be manually operated. - Alternatively, the choke actuator may be electrical or pneumatic. Alternatively, the
WC choke 36 m may also include an actuator operated by thePLC 75. - The
flow meter 34 r may be a mass flow meter, such as a Coriolis flow meter, and may be in data communication with thePLC 75. Theflow meter 34 r may be connected in the first spool downstream of the MP choke 36 a and may be operable to monitor a flow rate of the drilling returns 60 r. Each of theflow meters 34 b,d may be a volumetric flow meter, such as a Venturi flow meter, and may be in data communication with thePLC 75. Theflow meter 34 d may be operable to monitor a flow rate of themud pump 30 d. Theflow meter 34 b may be operable to monitor a flow rate of thedrilling fluid 60 d pumped into the riser 25 (FIG. 2B ). ThePLC 75 may receive a density measurement ofdrilling fluid 60 d from a mud blender (not shown) to determine a mass flow rate of thedrilling fluid 60 d from the volumetric measurement of theflow meters 34 b,d. - Alternatively, a stroke counter (not shown) may be used to monitor a flow rate of the mud pump and/or booster pump instead of the volumetric flow meters. Alternatively, either or both of the volumetric flow meters may be mass flow meters.
- The
gas detector 31 may be operable to extract a gas sample from thereturns 60 r (if contaminated by formation fluid 62 (FIG. 3C )) and analyze the captured sample to detect hydrocarbons, such as saturated and/or unsaturated C1 to C10 and/or aromatic hydrocarbons, such as benzene, toluene, ethyl benzene and/or xylene, and/or non-hydrocarbon gases, such as carbon dioxide and nitrogen. Thegas detector 31 may include a body, a probe, a chromatograph, and a carrier/purge system. The body may include a fitting and a penetrator. The fitting may have end connectors, such as flanges, for connection within the first spool and a lateral connector, such as a flange for receiving the penetrator. The penetrator may have a blind flange portion for connection to the lateral connector, an insertion tube extending from an external face of the blind flange portion for receiving the probe, and a dip tube extending from an internal face thereof for receiving one or more sensors, such as a pressure and/or temperature sensor. - The probe may include a cage, a mandrel, and one or more sheets. Each sheet may include a semi-permeable membrane sheathed by inner and outer protective layers of mesh. The mandrel may have a stem portion for receiving the sheets and a fitting portion for connection to the insertion tube. Each sheet may be disposed on opposing faces of the mandrel and clamped thereon by first and second members of the cage. Fasteners may then be inserted into respective receiving holes formed through the cage, mandrel, and sheets to secure the probe components together. The mandrel may have inlet and outlet ports formed in the fitting portion and in communication with respective channels formed between the mandrel and the sheets. The carrier/purge system may be connected to the mandrel ports and a carrier gas, such as helium, argon, or nitrogen, may be injected into the mandrel inlet port to displace sample gas trapped in the channels by the membranes to the mandrel outlet port. The carrier/purge system may then transport the sample gas to the chromatograph for analysis. The carrier purge system may also be routinely run to purge the probe of condensate. The chromatograph may be in data communication with the PLC to report the analysis of the sample. The chromatograph may be configured to only analyze the sample for specific hydrocarbons to minimize sample analysis time. For example, the chromatograph may be configured to analyze only for C1-C5 hydrocarbons in twenty-five seconds.
- In the drilling mode, the
mud pump 30 d may pumpdrilling fluid 60 d from the drilling fluid tank, through thestandpipe 37 p andKelly hose 37 h to thetop drive 5. Thedrilling fluid 60 d may include a base liquid. The base liquid may be base refined or synthetic oil, water, brine, or a water/oil emulsion. Thedrilling fluid 60 d may further include solids dissolved or suspended in the base liquid, such as organophilic clay, lignite, and/or asphalt, thereby forming a mud. - The
drilling fluid 60 d may flow from theKelly hose 37 h and into thedrill string 10 via thetop drive 5. Thedrilling fluid 60 d may flow down through thedrill string 10 and exit thedrill bit 15, where the fluid may circulate the cuttings away from the bit and return the cuttings up anannulus 105 formed between an inner surface of thecasing 101 orwellbore 100 and an outer surface of thedrill string 10. Thereturns 60 r (drilling fluid 60 d plus cuttings) may flow through theannulus 105 to thewellhead 50. Thereturns 60 r may continue from thewellhead 50 and into theriser 25 via thePCA 1 p. Thereturns 60 r may flow up theriser 25 to theRCD 26. Thereturns 60 r may be diverted by theRCD 26 into thereturn line 29 via the RCD outlet. Thereturns 60 r may continue from thereturn line 29, through the open (depicted by phantom)first shutoff valve 38 a andfirst tee 39 a, and into the first spool. Thereturns 60 r may flow through the MP choke 36 a, theflow meter 34 r, thegas detector 31, and the openfourth shutoff valve 38 d to thethird tee 39 c. Thereturns 60 r may continue through the second splice and to the fourth tee 39 d via the openfifth shutoff valve 38 e. Thereturns 60 r may continue through the third spool to thefifth tee 39 e via the openseventh shutoff valve 38 g. Thereturns 60 r may then flow into theshale shaker 33 and be processed thereby to remove the cuttings, thereby completing a cycle. As thedrilling fluid 60 d and returns 60 r circulate, thedrill string 10 may be rotated 16 by thetop drive 5 and lowered by the travelingblock 6, thereby extending thewellbore 100 into thelower formation 104 b. - Alternatively, the sixth 38 f and eighth 38 h shutoff valves may be open and the fifth 38 e and seventh 38 g shutoff valves may be closed in the drilling mode, thereby routing the
returns 60 r through theMGS 32 before discharge into theshaker 33. - The
PLC 75 may be programmed to operate the MP choke 36 a so that a target bottomhole pressure (BHP) is maintained in theannulus 105 during the drilling operation. The target BHP may be selected to be within a drilling window defined as greater than or equal to a minimum threshold pressure, such as pore pressure, of thelower formation 104 b and less than or equal to a maximum threshold pressure, such as fracture pressure, of the lower formation, such as an average of the pore and fracture BHPs. - Alternatively, the minimum threshold may be stability pressure and/or the maximum threshold may be leakoff pressure. Alternatively, threshold pressure gradients may be used instead of pressures and the gradients may be at other depths along the lower formation 130 b besides bottomhole, such as the depth of the maximum pore gradient and the depth of the minimum fracture gradient. Alternatively, the
PLC 75 may be free to vary the BHP within the window during the drilling operation. - A static density of the
drilling fluid 60 d (typically assumed equal toreturns 60 r; effect of cuttings typically assumed to be negligible) may correspond to a threshold pressure gradient of thelower formation 104 b, such as being equal to a pore pressure gradient. During the drilling operation, thePLC 75 may execute a real time simulation of the drilling operation in order to predict the actual BHP from measured data, such as standpipe pressure fromsensor 35 d, mud pump flow rate fromflow meter 34 d, wellhead pressure from any of the sensors 47 a-c, and return fluid flow rate fromflow meter 34 r. ThePLC 75 may then compare the predicted BHP to the target BHP and adjust the MP choke 36 a accordingly. - Alternatively, a static density of the
drilling fluid 60 d may be slightly less than the pore pressure gradient such that an equivalent circulation density (ECD) (static density plus dynamic friction drag) during drilling is equal to the pore pressure gradient. Alternatively, a static density of thedrilling fluid 60 d may be slightly greater than the pore pressure gradient. - During the drilling operation, the
PLC 75 may also perform a mass balance to monitor for a kick (FIG. 3C ) or lost circulation (not shown). As thedrilling fluid 60 d is being pumped into thewellbore 100 by themud pump 30 d and thereturns 60 r are being received from thereturn line 29, thePLC 75 may compare the mass flow rates (i.e., drilling fluid flow rate minus returns flow rate) using the respective counters/meters 34d,r. ThePLC 75 may use the mass balance to monitor forformation fluid 62 entering theannulus 105 and contaminating 61 r thereturns 60 r or returns 60 r entering theformation 104 b. Upon detection of either event, thePLC 75 may shift thedrilling system 1 into a managed pressure riser degassing mode. Thegas detector 31 may also capture and analyze samples of thereturns 60 r as an additional safeguard for kick detection. - Alternatively, the
PLC 75 may estimate a mass rate of cuttings (and add the cuttings mass rate to the intake sum) using a rate of penetration (ROP) of the drill bit or a mass flow meter may be added to the cuttings chute of the shaker and the PLC may directly measure the cuttings mass rate. Alternatively, thegas detector 31 may be bypassed during the drilling operation. Alternatively, thebooster pump 30 b may be operated during drilling to compensate for any size discrepancy between the riser annulus and the casing/wellbore annulus and the PLC may account for boosting in the BHP control and mass balance using theflow meter 34b. -
FIGS. 2A and 2B illustrate theoffshore drilling system 1 in a managed pressure riser degassing mode.FIG. 2C is a table illustrating switching between the modes. To shift thedrilling system 1 to degassing mode, thePLC 75 may halt injection of thedrilling fluid 60 d by themud pump 30 d and haltrotation 16 of thedrill string 10 by thetop drive 5. TheKelly valve 11 may be closed. Thetop drive 5 may also be raised to remove weight on thebit 15. ThePLC 75 may then close one or more of the BOPs, such asannular BOP 42 a andpipe ram BOP 42 u, against an outer surface of thedrill pipe 10 p. ThePLC 75 may close the fifth 38 e and seventh 38 g shutoff valves and open the sixth 38 f and eighth 38 h shutoff valves. ThePLC 75 may then open the first boosterline shutoff valve 45 a and operate thebooster pump 30 b, thereby pumpingdrilling fluid 60 d into a top of thebooster line 27. Thedrilling fluid 60 d may flow down thebooster line 27 and into the upper flow cross 41 u via theopen shutoff valve 45 a. - The
drilling fluid 60 d may flow through the LMRP and into a lower end of theriser 25, thereby displacing any contaminatedreturns 61 r present therein. Thedrilling fluid 60 d may flow up theriser 25 and drive the contaminated returns 61 r out of theriser 25. The contaminated returns 61 r may be driven up theriser 25 to theRCD 26. The contaminated returns 61 r may be diverted by theRCD 26 into thereturn line 29 via the RCD outlet. The contaminated returns 61 r may continue from thereturn line 29, through the openfirst shutoff valve 38 a andfirst tee 39 a, and into the first spool. The contaminated returns 61 r may flow through the MP choke 36 a, theflow meter 34 r, thegas detector 31, and the openfourth shutoff valve 38 d to thethird tee 39 c. The contaminated returns 61 r may continue into an inlet of theMGS 32 via the opensixth shutoff valve 38 f. TheMGS 32 may degas the contaminated returns 61 r and a liquid portion thereof may be discharged into the third splice. The liquid portion of the contaminated returns 61 r may continue into theshale shaker 33 via the openeighth shutoff valve 38 h and thefifth tee 39 e. Theshale shaker 33 may process the contaminated liquid portion to remove the cuttings and the processed contaminated liquid portion may be diverted into a disposal tank (not shown). - As the
riser 25 is being flushed, thegas detector 31 may capture and analyze samples of the contaminated returns 61 r to ensure that theriser 25 has been completely degassed. Once theriser 25 has been degassed, thePLC 75 may shift thedrilling system 1 into managed pressure well control mode. If the event that triggered the shift was lost circulation, thereturns 60 r may or may not have been contaminated by fluid from thelower formation 104 b. - Alternatively, if the
booster pump 30 b had been operating in drilling mode to compensate for any size discrepancy, then thebooster pump 30 b may or may not remain operating during shifting between drilling mode and riser degassing mode. -
FIGS. 3A and 3B illustrate theoffshore drilling system 1 in a managed pressure well control mode. To shift thedrilling system 1 to the managed pressure well control mode, thePLC 75 may halt injection of thedrilling fluid 60 d by thebooster pump 30 b and close the boosterline shutoff valve 45 a. TheKelly valve 11 may be opened. ThePLC 75 may close thefirst shutoff valve 38 a and open thesecond shutoff valve 38 b. ThePLC 75 may then open the second chokeline shutoff valve 45 e and operate themud pump 30 d, thereby pumpingdrilling fluid 60 d into a top of thedrill string 10 via thetop drive 5. Thedrilling fluid 60 d may be flow down through thedrill string 10 and exit thedrill bit 15, thereby displacing the contaminated returns 61 r present in theannulus 105. The contaminated returns 61 r may be driven through theannulus 105 to thewellhead 50. The contaminated returns 61 r may be diverted into thechoke line 28 by the closed BOPs 41 a,u and via theopen shutoff valve 45 e. The contaminated returns 61 r may be driven up thechoke line 28 to theWC choke 36 m. The WC choke 36 m may be fully relaxed or be bypassed. - The contaminated returns 61 r may continue through the
WC choke 36 m and into the first branch via thesecond tee 39 b. The contaminated returns 61 r may flow into the first spool via the opensecond shutoff valve 38 b andfirst tee 39 a. The contaminated returns 61 r may flow through the MP choke 36 a, theflow meter 34 r, thegas detector 31, and the openfourth shutoff valve 38 d to thethird tee 39 c. The contaminated returns 61 r may continue into the inlet of theMGS 32 via the opensixth shutoff valve 38 f. TheMGS 32 may degas the contaminated returns 61 r and a liquid portion thereof may be discharged into the third splice. The liquid portion of the contaminated returns 61 r may continue into theshale shaker 33 via the openeighth shutoff valve 38 h and thefifth tee 39 e. Theshale shaker 33 may process the contaminated liquid portion to remove the cuttings and the processed contaminated liquid portion may be diverted into a disposal tank (not shown). -
FIG. 3C illustrates operation of thePLC 75 in the managed pressure well control mode. A flow rate of themud pump 30 d for managed pressure well control may be reduced relative to the flow rate of the mud pump during the drilling mode to account for the reduced flow area of thechoke line 28 relative to the flow area of the a riser annulus formed between theriser 25 and thedrill string 10. If the trigger event was a kick, as thedrilling fluid 60 d is being pumped through thedrill string 10,annulus 105, and chokeline 28, thegas detector 31 may capture and analyze samples of the contaminated returns 61 r and theflow meter 34 r may be monitored so thePLC 75 may determine a pore pressure of thelower formation 104 b. If the trigger event was lost circulation (not shown), thePLC 75 may determine a fracture pressure of the formation. The pore/fracture pressure may be determined in an incremental fashion, i.e. for a kick, the MP choke 36 a may be monotonically or gradually tightened 63 a,b until the returns are no longer contaminated withproduction fluid 62. Once the back pressure that ended the influx of formation is known, thePLC 75 may calculate the pore pressure to control the kick. The inverse of the incremental process may be used to determine the fracture pressure for a lost circulation scenario. - Once the
PLC 75 has determined the pore pressure, the PLC may calculate a pore pressure gradient and a density of thedrilling fluid 60 d may be increased to correspond to the determined pore pressure gradient. The increased density drilling fluid may be pumped into thedrill string 10 until theannulus 105 and chokeline 28 are full of the heavier drilling fluid. Theriser 25 may then be filled with the heavier drilling fluid. ThePLC 75 may then shift thedrilling system 1 back to drilling mode and drilling of thewellbore 100 through thelower formation 104 b may continue with the heavier drilling fluid such that thereturns 64 r therefrom maintain at least a balanced condition in theannulus 105. - Should the kick be severe such that the back pressure exerted by the MP choke 36 a approaches a maximum operating pressure of the first spool, the
WC choke 36 m may be tightened (or brought online if bypassed) to alleviate pressure from the MP choke 36 a until the kick has been controlled. Since theWC choke 36 m is located upstream of the first spool, thechokes 36 a,m may operate in a serial fashion. The WC choke 36 m may function as a high pressure stage and the MP choke 36 a may function as a low pressure stage, thereby effectively increasing a maximum operating pressure of the first spool. Should tightening thechokes 36 a,m fail to control the kick, thePLC 75 may shift the drilling system into emergency well control mode. -
FIGS. 4A and 4B illustrate theoffshore drilling system 1 in an emergency well control mode. To shift thedrilling system 1 to the emergency well control mode, thePLC 75 may halt injection of thedrilling fluid 60 d by themud pump 30 b and close the second 38 b and fourth 38 d shutoff valves and open thefifth shutoff valve 38 e. ThePLC 75 may close a supply valve (not shown) for themud pump 30 d from the drilling fluid tank and open a supply valve (not shown) for themud pump 30 d from a kill fluid tank (not shown). ThePLC 75 may then operate themud pump 30 d, thereby pumpingkill fluid 65 into a top of thedrill string 10 via thetop drive 5. Thekill fluid 65 may be flow down through thedrill string 10 and exit thedrill bit 15, thereby displacing the contaminated drilling fluid present in theannulus 105. The contaminated drilling fluid may be driven through theannulus 105 to thewellhead 50. The contaminated drilling fluid may be diverted into thechoke line 28 by the closed BOPs 41 a,u and via the open shutoff valve 45. The contaminated drilling fluid may be driven up thechoke line 28 to theWC choke 36 m. - The contaminated drilling fluid may continue through the
WC choke 36 m and into the second spool via thesecond tee 39 b. The contaminated drilling fluid may flow into the second branch via the openthird shutoff valve 38 c and fourth tee 39 d. The contaminated drilling fluid may bypass the first spool and continue into the inlet of theMGS 32 via the open fifth 38 e and 38 f sixth shutoff valves. TheMGS 32 may degas the contaminated drilling fluid and a liquid portion thereof may be discharged into the third splice. The liquid portion of the contaminated drilling fluid may continue into theshale shaker 33 via the openeighth shutoff valve 38 h and thefifth tee 39 e. The processed contaminated liquid portion may be diverted into a disposal tank (not shown). The WC choke 36 m may be operated to bring the kick under control. -
FIG. 5 illustrates a pressure control assembly (PCA) of a second offshore drilling system in a managed pressure drilling mode, according to another embodiment of the present disclosure. The second drilling system may include theMODU 1 m, thedrilling rig 1 r, thefluid handling system 1 h, thefluid transport system 1 t, and a pressure control assembly (PCA) 201 p. ThePCA 201 p may include thewellhead adapter 40 b, the one or more flow crosses 41 u,m,b, the blow out preventers (BOPs) 42 a,u,b, the LMRP, theaccumulators 44, thereceiver 46, asecond RCD 226, and asubsea flow meter 234. - The
second RCD 226 may be similar to thefirst RCD 26. A lower end of the second RCD housing may be connected to theannular BOP 42 a and an upper end of the second RCD housing may be connected to the upper flow cross 41 u, such as by flanged connections. A pressure sensor may be connected to an upper housing section of thesecond RCD 226. The pressure sensor may be in data communication with thecontrol pod 76 and the second RCD latch piston may be in fluid communication with the control pod via an interface of thesecond RCD 226. - A lower end of a subsea spool may be connected to an outlet of the
second RCD 226 and an upper end of the spool may be connected to the upper flow cross 41 u. The spool may have first 245 a and second 245 b shutoff valves and thesubsea flow meter 234 assembled as a part thereof. Eachshutoff valve 245 a,b may be automated and have a hydraulic actuator (not shown) operable by thecontrol pod 76 via fluid communication with a respective umbilical conduit or theLMRP accumulators 44. Thesubsea flow meter 234 may be a mass flow meter, such as a Coriolis flow meter, and may be in data communication with thePLC 75 via thepod 76 and the umbilical 70. - Alternatively, a subsea volumetric flow meter may be used instead of the mass flow meter.
- In the drilling mode, the
returns 60 r may flow through theannulus 105 to thewellhead 50. Thereturns 60 r may continue from thewellhead 50 to thesecond RCD 226 via theBOPs 42 a,u,b. Thereturns 60 r may be diverted by thesecond RCD 226 into the subsea spool via the second RCD outlet. Thereturns 60 r may flow through the opensecond shutoff valve 245 b, thesubsea flow meter 234, and thefirst shutoff valve 245 a to a branch of the upper flow cross 41 u. Thereturns 60 r may flow into theriser 25 via the upper flow cross 41 u, thereceiver 46, and the LMRP. Thereturns 60 r may flow up theriser 25 to thefirst RCD 26. Thereturns 60 r may be diverted by thefirst RCD 26 into thereturn line 29 via the first RCD outlet. Thereturns 60 r may continue from thereturn line 29, through the openfirst shutoff valve 38 a andfirst tee 39 a, and into the first spool. Thereturns 60 r may flow through the MP choke 36 a, theflow meter 34 r, thegas detector 31, and the openfourth shutoff valve 38 d to thethird tee 39 c. Thereturns 60 r may continue through the second splice and to the fourth tee 39 d via the openfifth shutoff valve 38 e. Thereturns 60 r may continue through the third spool to thefifth tee 39 e via the openseventh shutoff valve 38 g. Thereturns 60 r may then flow into theshale shaker 33 and be processed thereby to remove the cuttings, thereby completing a cycle. - During the drilling operation, the PLC may rely on the
subsea flow meter 234 instead of thesurface flow meter 34 r to perform BHP control and the mass balance. Thesurface flow meter 34 r may be used as a backup to thesubsea flow meter 234 should the subsea flow meter fail. - The degassing, well control, and emergency modes for the
PCA 201 p may be similar to that of thePCA 1 p. - While the foregoing is directed to embodiments of the present disclosure, other and further embodiments of the disclosure may be devised without departing from the basic scope thereof, and the scope of the invention is determined by the claims that follow.
Claims (22)
1. A method of drilling a subsea wellbore, comprising:
drilling the subsea wellbore by:
injecting drilling fluid through a tubular string extending into the wellbore from an offshore drilling unit (ODU); and
rotating a drill bit disposed on a bottom of the tubular string, wherein:
the drilling fluid exits the drill bit and carries cuttings from the drill bit,
the drilling fluid and cuttings (returns) flow to a subsea wellhead via an annulus defined by an outer surface of the tubular string and an inner surface of the wellbore, and
the returns flow from the subsea wellhead to the ODU via a marine riser;
while drilling the subsea wellbore:
measuring a flow rate of the drilling fluid injected into the tubular string;
measuring a flow rate of the returns;
comparing the returns flow rate to the drilling fluid flow rate to detect a kick by a formation being drilled; and
exerting backpressure on the returns using a first variable choke valve; and
in response to detecting the kick:
closing a blowout preventer of a subsea pressure control assembly (PCA) against the tubular string; and
diverting the flow of returns from the PCA, through a choke line having a second variable choke valve, and through the first variable choke valve.
2. The method of claim 1 , further comprising, in response to detecting the kick, exerting backpressure on the returns using the first and second variable choke valves to alleviate pressure on the first variable choke valve.
3. The method of claim 2 , further comprising measuring the flow rate of the returns while exerting backpressure using the first and second variable choke valves.
4. The method of claim 1 ,
further comprising increasing the backpressure exerted on the returns in response to detecting the kick,
wherein the backpressure is increased until the kick is controlled.
5. The method of claim 4 , further comprising:
determining a pore pressure of the formation in response to controlling the kick;
determining a pore pressure gradient using the pore pressure; and
increasing a density of the drilling fluid to correspond to the pore pressure gradient.
6. The method of claim 5 , further comprising resuming drilling using the increased density drilling fluid.
7. The method of claim 1 , further comprising degassing the marine riser.
8. The method of claim 7 , further comprising operating a gas detector in fluid communication with the returns during drilling and in response to detecting the kick.
9. The method of claim 1 , wherein during drilling, the returns are diverted from the marine riser and through the first variable choke valve using a rotating control device located adjacent to an upper end of the marine riser.
10. The method of claim 1 , wherein the returns flow rate is measured using a mass flow meter.
11. The method of claim 10 , wherein:
the mass flow meter is part of the PCA, and
the PCA is connected to the subsea wellhead.
12. The method of claim 11 , wherein the returns are diverted from the PCA and through the mass flow meter by a rotating control device of the PCA.
13. A managed pressure drilling system, comprising:
a first rotating control device (RCD) for connection to a marine riser;
a first variable choke valve for connection to an outlet of the first RCD;
a first mass flow meter for connection to an outlet of the first variable choke valve;
a splice for connecting an inlet of the first variable choke valve to an outlet of a second variable choke valve; and
a programmable logic controller (PLC) in communication with the first variable choke valve and the first mass flow meter, and configured to perform an operation, comprising:
during drilling of a subsea wellbore:
measuring a flow rate of returns using the first mass flow meter;
comparing the returns flow rate to a drilling fluid flow rate to detect a kick by a formation being drilled; and
exerting backpressure on the returns using the first variable choke valve; and
in response to detecting the kick, diverting the returns through the second variable choke valve, the splice, and the first variable choke valve to alleviate pressure on the first variable choke valve.
14. The managed pressure drilling system of claim 13 , wherein:
the operation further comprises increasing the backpressure exerted on the returns in response to detecting the kick, and
the backpressure is increased until the kick is controlled.
15. The managed pressure drilling system of claim 14 wherein the operation further comprises:
determining a pore pressure of the formation in response to controlling the kick; and
determining a pore pressure gradient using the pore pressure.
16. The managed pressure drilling system of claim 13 , further comprising:
a second RCD for assembly as part of a subsea pressure control assembly; and
a subsea mass flow meter for connection to an outlet of the second RCD.
17. The managed pressure drilling system of claim 13 , further comprising a gas detector for connection to an outlet of the first mass flow meter.
18. The managed pressure drilling system of claim 17 , wherein the operation further comprises:
monitoring the returns for gas during drilling; and
monitoring degassing of the marine riser using the the gas detector.
19. A method of drilling a subsea wellbore, comprising:
drilling the subsea wellbore;
while drilling the subsea wellbore:
measuring a flow rate of drilling fluid injected into a tubular string having a drill bit;
measuring a flow rate of drilling returns using a subsea mass flow meter; and
comparing the returns flow rate to the drilling fluid flow rate to detect a kick by a formation being drilled; and
in response to detecting the kick:
closing a blowout preventer of a subsea pressure control assembly (PCA) against the tubular string; and
diverting the flow of returns from the PCA, through a choke line having a second variable choke valve, and through a first variable choke valve.
20. The method of claim 19 , wherein:
the subsea mass flow meter is part of the PCA, and
the PCA is connected to a subsea wellhead.
21. The method of claim 20 , wherein the returns are diverted from the PCA and through the mass flow meter by a rotating control device of the PCA.
22. A managed pressure drilling system, comprising:
a first rotating control device (RCD) for connection to a marine riser;
a first variable choke valve for connection to an outlet of the first RCD;
a first mass flow meter for connection to an outlet of the first variable choke valve;
a splice for connecting an inlet of the first variable choke valve to an outlet of a second variable choke valve;
a second RCD for assembly as part of a subsea pressure control assembly;
a subsea mass flow meter for connection to an outlet of the second RCD; and
a programmable logic controller (PLC) in communication with the first variable choke valve and the first and second mass flow meters.
Priority Applications (12)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/965,380 US20140048331A1 (en) | 2012-08-14 | 2013-08-13 | Managed pressure drilling system having well control mode |
| EP17158154.9A EP3196401B1 (en) | 2012-08-14 | 2013-08-14 | Managed pressure drilling system having well control mode |
| AU2013302660A AU2013302660B2 (en) | 2012-08-14 | 2013-08-14 | Managed pressure drilling system having well control mode |
| PCT/US2013/054933 WO2014028613A2 (en) | 2012-08-14 | 2013-08-14 | Managed pressure drilling system having well control mode |
| EP13752783.4A EP2900897B1 (en) | 2012-08-14 | 2013-08-14 | Managed pressure drilling system having well control mode |
| DK13752783.4T DK2900897T3 (en) | 2012-08-14 | 2013-08-14 | DRILLING SYSTEM WITH PRESSURE CONTROL WITH Borehole control function |
| CA2881416A CA2881416C (en) | 2012-08-14 | 2013-08-14 | Managed pressure drilling system having well control mode |
| ES13752783.4T ES2653991T3 (en) | 2012-08-14 | 2013-08-14 | Controlled pressure drilling system featuring a well control mode |
| BR112015003318-0A BR112015003318B1 (en) | 2012-08-14 | 2013-08-14 | METHOD OF DRILLING A SUBSEA WELL HOLE, PRESSURE MANAGED DRILLING SYSTEMS AND METHOD OF MANAGING DRILLING PRESSURES |
| AU2016202031A AU2016202031B2 (en) | 2012-08-14 | 2016-04-01 | Managed pressure drilling system having well control mode |
| US15/426,229 US10329860B2 (en) | 2012-08-14 | 2017-02-07 | Managed pressure drilling system having well control mode |
| CY20171101213T CY1119613T1 (en) | 2012-08-14 | 2017-11-20 | DRILLING SYSTEM WITH MANUFACTURED PRESSURE OPERATING THE WELL |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201261682841P | 2012-08-14 | 2012-08-14 | |
| US13/965,380 US20140048331A1 (en) | 2012-08-14 | 2013-08-13 | Managed pressure drilling system having well control mode |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/426,229 Continuation US10329860B2 (en) | 2012-08-14 | 2017-02-07 | Managed pressure drilling system having well control mode |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20140048331A1 true US20140048331A1 (en) | 2014-02-20 |
Family
ID=50099274
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/965,380 Abandoned US20140048331A1 (en) | 2012-08-14 | 2013-08-13 | Managed pressure drilling system having well control mode |
| US15/426,229 Active US10329860B2 (en) | 2012-08-14 | 2017-02-07 | Managed pressure drilling system having well control mode |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/426,229 Active US10329860B2 (en) | 2012-08-14 | 2017-02-07 | Managed pressure drilling system having well control mode |
Country Status (9)
| Country | Link |
|---|---|
| US (2) | US20140048331A1 (en) |
| EP (2) | EP3196401B1 (en) |
| AU (2) | AU2013302660B2 (en) |
| BR (1) | BR112015003318B1 (en) |
| CA (1) | CA2881416C (en) |
| CY (1) | CY1119613T1 (en) |
| DK (1) | DK2900897T3 (en) |
| ES (1) | ES2653991T3 (en) |
| WO (1) | WO2014028613A2 (en) |
Cited By (34)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20140209316A1 (en) * | 2013-01-30 | 2014-07-31 | Rowan Deepwater Drilling (Gibraltar) Ltd. | Riser fluid handling system |
| US20140277772A1 (en) * | 2013-03-14 | 2014-09-18 | Schlumberger Technology Corporation | Fracturing pump identification and communication |
| US9222319B1 (en) * | 2013-06-04 | 2015-12-29 | BlueStone Royalty, LLC | LCM recovery tank |
| WO2016040272A1 (en) * | 2014-09-09 | 2016-03-17 | Board Of Regents, The University Of Texas System | Systems and methods for well control during managed pressure drilling |
| GB2530572A (en) * | 2014-09-29 | 2016-03-30 | Statoil Petroleum As | Estimating cuttings removal |
| WO2016062314A1 (en) * | 2014-10-24 | 2016-04-28 | Maersk Drilling A/S | Apparatus and methods for control of systems for drilling with closed loop mud circulation |
| WO2016137920A1 (en) * | 2015-02-23 | 2016-09-01 | Weatherford Technology Holdings, Llc | Automatic event detection and control while drilling in closed loop systems |
| WO2016174574A1 (en) * | 2015-04-28 | 2016-11-03 | Drillmec Spa | Control equipment for monitoring flows of drilling muds for uninterrupted drilling mud circulation circuits and method thereof |
| WO2016186616A1 (en) * | 2015-05-15 | 2016-11-24 | Halliburton Energy Services, Inc. | Methods, apparatus, and systems for injecting and detecting compositions in drilling fluid systems |
| US9631444B1 (en) * | 2016-09-12 | 2017-04-25 | China University Of Petroleum (East China) | Kick information identification apparatus and method assisted for wellbore pressure control during horizontal drilling |
| US9631442B2 (en) | 2013-12-19 | 2017-04-25 | Weatherford Technology Holdings, Llc | Heave compensation system for assembling a drill string |
| US20170138168A1 (en) * | 2015-11-13 | 2017-05-18 | Baker Hughes Incorporated | Apparatus and related methods to determine hole cleaning, well bore stability and volumetric cuttings measurements |
| US9664006B2 (en) * | 2015-09-25 | 2017-05-30 | Enhanced Drilling, A.S. | Riser isolation device having automatically operated annular seal |
| WO2017115344A2 (en) | 2016-05-24 | 2017-07-06 | Future Well Control As | Drilling system and method |
| US9816335B2 (en) | 2015-05-29 | 2017-11-14 | Halliburton Energy Services, Inc. | Bypass flushing for gas extraction systems |
| WO2018031296A1 (en) * | 2016-08-11 | 2018-02-15 | Noble Drilling Services Inc. | Method for assembling and disassembling marine riser and auxiliary lines and well pressure control system |
| US20180135365A1 (en) * | 2015-06-03 | 2018-05-17 | Halliburton Energy Services, Inc. | Automatic managed pressure drilling utilizing stationary downhole pressure sensors |
| US20180238467A1 (en) * | 2017-02-23 | 2018-08-23 | General Electric Company | System and methods for operation of a blowout preventor system |
| US20180282137A1 (en) * | 2017-04-03 | 2018-10-04 | National Oilwell Varco, L.P. | Hoisting and tensioning bearing saver |
| US10294746B2 (en) | 2013-03-15 | 2019-05-21 | Cameron International Corporation | Riser gas handling system |
| US10435980B2 (en) | 2015-09-10 | 2019-10-08 | Halliburton Energy Services, Inc. | Integrated rotating control device and gas handling system for a marine drilling system |
| US10533406B2 (en) | 2013-03-14 | 2020-01-14 | Schlumberger Technology Corporation | Systems and methods for pairing system pumps with fluid flow in a fracturing structure |
| US10787900B2 (en) | 2013-11-26 | 2020-09-29 | Weatherford Technology Holdings, Llc | Differential pressure indicator for downhole isolation valve |
| WO2020201322A1 (en) * | 2019-04-02 | 2020-10-08 | Safe Influx Ltd | Automated system and method for use in well control |
| EP3665356A4 (en) * | 2017-08-11 | 2021-03-31 | Services Pétroliers Schlumberger | UNIVERSAL RISER LINE FOR DRILLING WITH CONTROLLED PRESSURE AND UNDERWATER MUD DRILLING |
| US11187056B1 (en) | 2020-05-11 | 2021-11-30 | Schlumberger Technology Corporation | Rotating control device system |
| US11268332B2 (en) | 2019-02-21 | 2022-03-08 | Weatherford Technology Holdings, Llc | Self-aligning, multi-stab connections for managed pressure drilling between rig and riser components |
| US11274517B2 (en) | 2020-05-28 | 2022-03-15 | Schlumberger Technology Corporation | Rotating control device system with rams |
| NO346362B1 (en) * | 2021-01-12 | 2022-06-27 | Electrical Subsea & Drilling As | A system and method for circulating drilling fluid in connection with open water drilling |
| US11401771B2 (en) | 2020-04-21 | 2022-08-02 | Schlumberger Technology Corporation | Rotating control device systems and methods |
| US11530580B2 (en) * | 2020-01-14 | 2022-12-20 | Newpark Drilling Fluids Llc | Probe arrays for monitoring wellbore fluid composition and methods of using the same |
| US11629559B2 (en) | 2019-02-21 | 2023-04-18 | Weatherford Technology Holdings, Llc | Apparatus for connecting drilling components between rig and riser |
| US11732543B2 (en) | 2020-08-25 | 2023-08-22 | Schlumberger Technology Corporation | Rotating control device systems and methods |
| NO20231271A1 (en) * | 2023-11-22 | 2025-05-23 | Enhanced Drilling As | External, removable cementing adapter for managed pressure cementing and a method of managed pressure cementing |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB201515284D0 (en) * | 2015-08-28 | 2015-10-14 | Managed Pressure Operations | Well control method |
| US20200386073A1 (en) * | 2019-06-06 | 2020-12-10 | Halliburton Energy Services, Inc. | Subsurface flow control for downhole operations |
| CN110630194B (en) * | 2019-10-11 | 2021-09-28 | 中国石油集团渤海钻探工程有限公司 | Pressure control drilling pressure compensation device of energy storage unit formula |
| CN110617052B (en) * | 2019-10-12 | 2022-05-13 | 西南石油大学 | Device for controlling pressure of double-gradient drilling through air inflation of marine riser |
| US11982143B2 (en) | 2021-03-02 | 2024-05-14 | Schlumberger Technology Corporation | Communicating with blowout preventer control system |
| US11970933B2 (en) | 2021-12-15 | 2024-04-30 | Helmerich & Payne Technologies, Llc | Transducer assembly for oil and gas wells |
| US12055030B2 (en) | 2022-05-10 | 2024-08-06 | Weatherford Technology Holdings, Llc | Systems and methods for controlling a drilling operation |
| US12366129B2 (en) * | 2023-09-12 | 2025-07-22 | Saudi Arabian Oil Company | Spacer spool with return line to connect rig blow out preventor to managed pressure drilling choke |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20080060846A1 (en) * | 2005-10-20 | 2008-03-13 | Gary Belcher | Annulus pressure control drilling systems and methods |
| US20080105434A1 (en) * | 2006-11-07 | 2008-05-08 | Halliburton Energy Services, Inc. | Offshore Universal Riser System |
| US20100147591A1 (en) * | 2008-08-15 | 2010-06-17 | Daniel Guy Pomerleau | Multiphase drilling systems and methods |
| US20110024195A1 (en) * | 2009-07-31 | 2011-02-03 | Weatherford/Lamb, Inc. | Drilling with a high pressure rotating control device |
| US20110139464A1 (en) * | 2009-10-16 | 2011-06-16 | Anthony Bruce Henderson | Surface Gas Evaluation During Controlled Pressure Drilling |
Family Cites Families (26)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2947318A (en) | 1957-08-26 | 1960-08-02 | Sun Oil Co | Automatic tank switching system |
| US3470971A (en) | 1967-04-28 | 1969-10-07 | Warren Automatic Tool Co | Apparatus and method for automatically controlling fluid pressure in a well bore |
| GB1397880A (en) | 1973-10-09 | 1975-06-18 | Brown Brothers & Co Ltd | Heave compensating device for marine |
| US4565086A (en) | 1984-01-20 | 1986-01-21 | Baker Drilling Equipment Company | Method and apparatus for detecting entrained gases in fluids |
| US4887464A (en) | 1988-11-22 | 1989-12-19 | Anadrill, Inc. | Measurement system and method for quantitatively determining the concentrations of a plurality of gases in drilling mud |
| US6457540B2 (en) | 1996-02-01 | 2002-10-01 | Robert Gardes | Method and system for hydraulic friction controlled drilling and completing geopressured wells utilizing concentric drill strings |
| EG22117A (en) * | 1999-06-03 | 2002-08-30 | Exxonmobil Upstream Res Co | Method and apparatus for controlling pressure and detecting well control problems during drilling of an offshore well using a gas-lifted riser |
| US6374925B1 (en) | 2000-09-22 | 2002-04-23 | Varco Shaffer, Inc. | Well drilling method and system |
| US20020112888A1 (en) | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
| US6575244B2 (en) | 2001-07-31 | 2003-06-10 | M-I L.L.C. | System for controlling the operating pressures within a subterranean borehole |
| US7185719B2 (en) | 2002-02-20 | 2007-03-06 | Shell Oil Company | Dynamic annular pressure control apparatus and method |
| US6904981B2 (en) | 2002-02-20 | 2005-06-14 | Shell Oil Company | Dynamic annular pressure control apparatus and method |
| US6755261B2 (en) | 2002-03-07 | 2004-06-29 | Varco I/P, Inc. | Method and system for controlling well fluid circulation rate |
| US6920942B2 (en) | 2003-01-29 | 2005-07-26 | Varco I/P, Inc. | Method and apparatus for directly controlling pressure and position associated with an adjustable choke apparatus |
| US7044239B2 (en) | 2003-04-25 | 2006-05-16 | Noble Corporation | System and method for automatic drilling to maintain equivalent circulating density at a preferred value |
| US7111503B2 (en) | 2004-01-22 | 2006-09-26 | Datalog Technology Inc. | Sheet-form membrane sample probe, method and apparatus for fluid concentration analysis |
| US7407019B2 (en) | 2005-03-16 | 2008-08-05 | Weatherford Canada Partnership | Method of dynamically controlling open hole pressure in a wellbore using wellhead pressure control |
| MX2008008658A (en) * | 2006-01-05 | 2008-11-28 | At Balance Americas Llc | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system. |
| WO2007092956A2 (en) * | 2006-02-09 | 2007-08-16 | Weatherford/Lamb, Inc. | Managed pressure and/or temperature drilling system and method |
| US8151904B2 (en) * | 2006-06-30 | 2012-04-10 | Baker Hughes Incorporated | Method for improved well control with a downhole device |
| JP4137969B2 (en) * | 2006-12-04 | 2008-08-20 | アイシン精機株式会社 | Eye detection device, eye detection method, and program |
| US8567525B2 (en) * | 2009-08-19 | 2013-10-29 | Smith International, Inc. | Method for determining fluid control events in a borehole using a dynamic annular pressure control system |
| EP2499328B1 (en) * | 2009-11-10 | 2014-03-19 | Ocean Riser Systems AS | System and method for drilling a subsea well |
| BR112012022420B1 (en) * | 2010-03-05 | 2021-03-30 | Safekick Americas Llc | METHOD TO CONTROL A WELL BEING DRILLED IN AN UNDERGROUND FORMATION AND WELL CONTROL SYSTEM |
| US8376046B2 (en) * | 2010-04-26 | 2013-02-19 | II Wayne F. Broussard | Fractionation system and methods of using same |
| US9328575B2 (en) | 2012-01-31 | 2016-05-03 | Weatherford Technology Holdings, Llc | Dual gradient managed pressure drilling |
-
2013
- 2013-08-13 US US13/965,380 patent/US20140048331A1/en not_active Abandoned
- 2013-08-14 BR BR112015003318-0A patent/BR112015003318B1/en active IP Right Grant
- 2013-08-14 EP EP17158154.9A patent/EP3196401B1/en active Active
- 2013-08-14 WO PCT/US2013/054933 patent/WO2014028613A2/en active Application Filing
- 2013-08-14 AU AU2013302660A patent/AU2013302660B2/en not_active Ceased
- 2013-08-14 EP EP13752783.4A patent/EP2900897B1/en active Active
- 2013-08-14 CA CA2881416A patent/CA2881416C/en active Active
- 2013-08-14 ES ES13752783.4T patent/ES2653991T3/en active Active
- 2013-08-14 DK DK13752783.4T patent/DK2900897T3/en active
-
2016
- 2016-04-01 AU AU2016202031A patent/AU2016202031B2/en not_active Expired - Fee Related
-
2017
- 2017-02-07 US US15/426,229 patent/US10329860B2/en active Active
- 2017-11-20 CY CY20171101213T patent/CY1119613T1/en unknown
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20080060846A1 (en) * | 2005-10-20 | 2008-03-13 | Gary Belcher | Annulus pressure control drilling systems and methods |
| US20080105434A1 (en) * | 2006-11-07 | 2008-05-08 | Halliburton Energy Services, Inc. | Offshore Universal Riser System |
| US20100147591A1 (en) * | 2008-08-15 | 2010-06-17 | Daniel Guy Pomerleau | Multiphase drilling systems and methods |
| US20110024195A1 (en) * | 2009-07-31 | 2011-02-03 | Weatherford/Lamb, Inc. | Drilling with a high pressure rotating control device |
| US20110139464A1 (en) * | 2009-10-16 | 2011-06-16 | Anthony Bruce Henderson | Surface Gas Evaluation During Controlled Pressure Drilling |
Cited By (58)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9109420B2 (en) * | 2013-01-30 | 2015-08-18 | Rowan Deepwater Drilling (Gibraltar) Ltd. | Riser fluid handling system |
| US9803443B2 (en) * | 2013-01-30 | 2017-10-31 | Rowan Companies, Inc. | Riser fluid handling system |
| US10309181B2 (en) * | 2013-01-30 | 2019-06-04 | Rowan Companies, Inc. | Riser fluid handling system |
| US20140209316A1 (en) * | 2013-01-30 | 2014-07-31 | Rowan Deepwater Drilling (Gibraltar) Ltd. | Riser fluid handling system |
| US20190330953A1 (en) * | 2013-01-30 | 2019-10-31 | Rowan Companies, Inc. | Riser fluid handling system |
| US10533406B2 (en) | 2013-03-14 | 2020-01-14 | Schlumberger Technology Corporation | Systems and methods for pairing system pumps with fluid flow in a fracturing structure |
| US20140277772A1 (en) * | 2013-03-14 | 2014-09-18 | Schlumberger Technology Corporation | Fracturing pump identification and communication |
| US9534604B2 (en) * | 2013-03-14 | 2017-01-03 | Schlumberger Technology Corporation | System and method of controlling manifold fluid flow |
| US10294746B2 (en) | 2013-03-15 | 2019-05-21 | Cameron International Corporation | Riser gas handling system |
| US9222319B1 (en) * | 2013-06-04 | 2015-12-29 | BlueStone Royalty, LLC | LCM recovery tank |
| US10787900B2 (en) | 2013-11-26 | 2020-09-29 | Weatherford Technology Holdings, Llc | Differential pressure indicator for downhole isolation valve |
| US9631442B2 (en) | 2013-12-19 | 2017-04-25 | Weatherford Technology Holdings, Llc | Heave compensation system for assembling a drill string |
| US11193340B2 (en) | 2013-12-19 | 2021-12-07 | Weatherford Technology Holdings, Llc | Heave compensation system for assembling a drill string |
| US10774599B2 (en) | 2013-12-19 | 2020-09-15 | Weatherford Technology Holdings, Llc | Heave compensation system for assembling a drill string |
| WO2016040272A1 (en) * | 2014-09-09 | 2016-03-17 | Board Of Regents, The University Of Texas System | Systems and methods for well control during managed pressure drilling |
| US10060209B2 (en) | 2014-09-29 | 2018-08-28 | Statoil Petroleum As | Estimating cuttings removal |
| GB2530572B (en) * | 2014-09-29 | 2021-03-10 | Equinor Energy As | Estimating cuttings removal |
| GB2530572A (en) * | 2014-09-29 | 2016-03-30 | Statoil Petroleum As | Estimating cuttings removal |
| WO2016062314A1 (en) * | 2014-10-24 | 2016-04-28 | Maersk Drilling A/S | Apparatus and methods for control of systems for drilling with closed loop mud circulation |
| US10060208B2 (en) | 2015-02-23 | 2018-08-28 | Weatherford Technology Holdings, Llc | Automatic event detection and control while drilling in closed loop systems |
| WO2016137920A1 (en) * | 2015-02-23 | 2016-09-01 | Weatherford Technology Holdings, Llc | Automatic event detection and control while drilling in closed loop systems |
| US10487601B2 (en) | 2015-04-28 | 2019-11-26 | Drillmec S.P.A. | Control equipment for monitoring flows of drilling muds for uninterrupted drilling mud circulation circuits and method thereof |
| WO2016174574A1 (en) * | 2015-04-28 | 2016-11-03 | Drillmec Spa | Control equipment for monitoring flows of drilling muds for uninterrupted drilling mud circulation circuits and method thereof |
| GB2555236A (en) * | 2015-05-15 | 2018-04-25 | Halliburton Energy Services Inc | Methods, apparatus, and systems for injecting and detecting compositions in drilling fluid systems |
| US10641092B2 (en) | 2015-05-15 | 2020-05-05 | Halliburton Energy Services, Inc. | Methods, apparatus, and systems for injecting and detecting compositions in drilling fluid systems |
| GB2555236B (en) * | 2015-05-15 | 2021-04-14 | Halliburton Energy Services Inc | Methods, apparatus, and systems for injecting and detecting compositions in drilling fluid systems |
| WO2016186616A1 (en) * | 2015-05-15 | 2016-11-24 | Halliburton Energy Services, Inc. | Methods, apparatus, and systems for injecting and detecting compositions in drilling fluid systems |
| US10378295B2 (en) | 2015-05-29 | 2019-08-13 | Halliburton Energy Services, Inc. | Bypass flushing for gas extraction systems |
| US9816335B2 (en) | 2015-05-29 | 2017-11-14 | Halliburton Energy Services, Inc. | Bypass flushing for gas extraction systems |
| US20180135365A1 (en) * | 2015-06-03 | 2018-05-17 | Halliburton Energy Services, Inc. | Automatic managed pressure drilling utilizing stationary downhole pressure sensors |
| US10435980B2 (en) | 2015-09-10 | 2019-10-08 | Halliburton Energy Services, Inc. | Integrated rotating control device and gas handling system for a marine drilling system |
| US9664006B2 (en) * | 2015-09-25 | 2017-05-30 | Enhanced Drilling, A.S. | Riser isolation device having automatically operated annular seal |
| US20170138168A1 (en) * | 2015-11-13 | 2017-05-18 | Baker Hughes Incorporated | Apparatus and related methods to determine hole cleaning, well bore stability and volumetric cuttings measurements |
| US10920507B2 (en) * | 2016-05-24 | 2021-02-16 | Future Well Control As | Drilling system and method |
| US20190145202A1 (en) * | 2016-05-24 | 2019-05-16 | Future Well Control As | Drilling System and Method |
| WO2017115344A2 (en) | 2016-05-24 | 2017-07-06 | Future Well Control As | Drilling system and method |
| WO2018031296A1 (en) * | 2016-08-11 | 2018-02-15 | Noble Drilling Services Inc. | Method for assembling and disassembling marine riser and auxiliary lines and well pressure control system |
| US9631444B1 (en) * | 2016-09-12 | 2017-04-25 | China University Of Petroleum (East China) | Kick information identification apparatus and method assisted for wellbore pressure control during horizontal drilling |
| US20180238467A1 (en) * | 2017-02-23 | 2018-08-23 | General Electric Company | System and methods for operation of a blowout preventor system |
| CN110325705A (en) * | 2017-02-23 | 2019-10-11 | 通用电气公司 | System and method for operating blowout preventer system |
| US11279601B2 (en) * | 2017-04-03 | 2022-03-22 | National Oilwell Varco, L.P. | Hoisting and tensioning bearing saver |
| US20180282137A1 (en) * | 2017-04-03 | 2018-10-04 | National Oilwell Varco, L.P. | Hoisting and tensioning bearing saver |
| EP3665356A4 (en) * | 2017-08-11 | 2021-03-31 | Services Pétroliers Schlumberger | UNIVERSAL RISER LINE FOR DRILLING WITH CONTROLLED PRESSURE AND UNDERWATER MUD DRILLING |
| US11225847B2 (en) | 2017-08-11 | 2022-01-18 | Schlumberger Technology Corporation | Universal riser joint for managed pressure drilling and subsea mudlift drilling |
| US11268332B2 (en) | 2019-02-21 | 2022-03-08 | Weatherford Technology Holdings, Llc | Self-aligning, multi-stab connections for managed pressure drilling between rig and riser components |
| US11629559B2 (en) | 2019-02-21 | 2023-04-18 | Weatherford Technology Holdings, Llc | Apparatus for connecting drilling components between rig and riser |
| WO2020201322A1 (en) * | 2019-04-02 | 2020-10-08 | Safe Influx Ltd | Automated system and method for use in well control |
| US11530580B2 (en) * | 2020-01-14 | 2022-12-20 | Newpark Drilling Fluids Llc | Probe arrays for monitoring wellbore fluid composition and methods of using the same |
| US11401771B2 (en) | 2020-04-21 | 2022-08-02 | Schlumberger Technology Corporation | Rotating control device systems and methods |
| US11187056B1 (en) | 2020-05-11 | 2021-11-30 | Schlumberger Technology Corporation | Rotating control device system |
| US11781398B2 (en) | 2020-05-11 | 2023-10-10 | Schlumberger Technology Corporation | Rotating control device system |
| US11274517B2 (en) | 2020-05-28 | 2022-03-15 | Schlumberger Technology Corporation | Rotating control device system with rams |
| US11732543B2 (en) | 2020-08-25 | 2023-08-22 | Schlumberger Technology Corporation | Rotating control device systems and methods |
| WO2022154666A1 (en) * | 2021-01-12 | 2022-07-21 | Electrical Subsea & Drilling As | A system and method for circulating drilling fluid in connection with open water drilling |
| NO346362B1 (en) * | 2021-01-12 | 2022-06-27 | Electrical Subsea & Drilling As | A system and method for circulating drilling fluid in connection with open water drilling |
| GB2616787A (en) * | 2021-01-12 | 2023-09-20 | Electrical Subsea & Drilling As | A system and method for circulating drilling fluid in connection with open water drilling |
| GB2616787B (en) * | 2021-01-12 | 2024-10-30 | Electrical Subsea & Drilling As | A system and method for circulating drilling fluid in connection with open water drilling |
| NO20231271A1 (en) * | 2023-11-22 | 2025-05-23 | Enhanced Drilling As | External, removable cementing adapter for managed pressure cementing and a method of managed pressure cementing |
Also Published As
| Publication number | Publication date |
|---|---|
| US20170145764A1 (en) | 2017-05-25 |
| ES2653991T3 (en) | 2018-02-09 |
| WO2014028613A2 (en) | 2014-02-20 |
| EP3196401A1 (en) | 2017-07-26 |
| BR112015003318B1 (en) | 2021-11-03 |
| CY1119613T1 (en) | 2018-04-04 |
| CA2881416A1 (en) | 2014-02-20 |
| WO2014028613A3 (en) | 2014-10-09 |
| CA2881416C (en) | 2017-01-03 |
| EP2900897A2 (en) | 2015-08-05 |
| AU2016202031A1 (en) | 2016-04-21 |
| BR112015003318A2 (en) | 2017-10-24 |
| US10329860B2 (en) | 2019-06-25 |
| EP2900897B1 (en) | 2017-09-27 |
| AU2013302660A1 (en) | 2015-02-26 |
| AU2013302660B2 (en) | 2016-01-28 |
| DK2900897T3 (en) | 2017-12-11 |
| AU2016202031B2 (en) | 2018-06-14 |
| EP3196401B1 (en) | 2023-06-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10329860B2 (en) | Managed pressure drilling system having well control mode | |
| US11193340B2 (en) | Heave compensation system for assembling a drill string | |
| US9328575B2 (en) | Dual gradient managed pressure drilling | |
| US10107053B2 (en) | Three-way flow sub for continuous circulation | |
| US10012044B2 (en) | Annular isolation device for managed pressure drilling | |
| EP2594731B1 (en) | Managed pressure cementing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: WEATHERFORD/LAMB, INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BOUTALBI, SAID;GRAYSON, MICHAEL BRIAN;REEL/FRAME:031192/0717 Effective date: 20130814 |
|
| AS | Assignment |
Owner name: WEATHERFORD TECHNOLOGY HOLDINGS, LLC, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:WEATHERFORD/LAMB, INC.;REEL/FRAME:034526/0272 Effective date: 20140901 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |