US20150023737A1 - Jack-up rig and method of installing the same on location of operation - Google Patents
Jack-up rig and method of installing the same on location of operation Download PDFInfo
- Publication number
- US20150023737A1 US20150023737A1 US14/335,352 US201414335352A US2015023737A1 US 20150023737 A1 US20150023737 A1 US 20150023737A1 US 201414335352 A US201414335352 A US 201414335352A US 2015023737 A1 US2015023737 A1 US 2015023737A1
- Authority
- US
- United States
- Prior art keywords
- jack
- leg
- spud
- rig
- hull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/08—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
- E02B17/0836—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/021—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/021—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
- E02B17/022—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform adapted to travel on the bottom
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/08—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/08—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
- E02B17/0827—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with screws and nuts mechanism
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0039—Methods for placing the offshore structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0039—Methods for placing the offshore structure
- E02B2017/0043—Placing the offshore structure on a pre-installed foundation structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/006—Platforms with supporting legs with lattice style supporting legs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0073—Details of sea bottom engaging footing
- E02B2017/0082—Spudcans, skirts or extended feet
Definitions
- the present invention relates generally to offshore rigs, particularly to the jack-up type of offshore rigs. More specifically, the invention relates to a jack-up rig and method of operating a jack-up rig so that it may be installed and operable at a desired location.
- Offshore rigs are widely used in many industries, for example in the construction and installation of offshore wind mills, or in the exploration and exploitation of hydrocarbon reservoirs under the seabed.
- Offshore jack-up rigs are typically deployed in waters with depths of up to 150 m.
- a jack-up rig normally comprises a buoyant hull and three or more jack-up legs, these legs providing support for the floatable hull when in elevated conditions.
- the legs When a jack-up rig arrives on a location, the legs are lowered until they rest on the soil of the seabed; after this, the hull may be jacked up using a jacking drive system to raise the hull above the water, elevating the hull to a height where operations can be performed in spite of the wave action and current present in open water situations.
- a jack-up rig when used in water depths up to around 150 m can be devoted to the mobility and flexibility of the rig; the legs can be raised with relative ease and the floating hull towed or self-propelled to another location if needed, e.g. if weather conditions dictate it or if there is a need for moving the jack-up rig.
- the legs of a jack-up rig are commonly made up of tubular columns or trusses with each truss comprising vertical chords connected with cross braces normally diagonally disposed.
- the legs typically terminate in a jack-up support structure that rests on the seabed.
- These structures known as spud cans, provide an enlarged bearing area in order to distribute the load of the rig evenly over a larger area and reduce the pressure exerted on the soil of the seabed.
- spud cans provides a reduced penetration depth of the legs required by the support structure to support the jack-up rig and/or ensures safe operation of the jack-up rig.
- Spud cans may also allow the jack-up rig to be operated in varied locations and soil types without having to change the length of the jack-up legs.
- Spud cans are typically fixed to each jack-up leg; as well as the above mentioned benefits, spud cans also improve the ability of the jack-up rig to be supported on uneven seabeds or slopes, moreover, having spud cans mounted on each leg may allow elevation of each leg independently of each other.
- Spud cans are typically made up of a generally conical upper half connected to the jack-up leg and a generally conical lower half that acts as the contact interface with the seabed. The conical shape provides some degree of penetration into the seabed, serving to improve anchoring effects of the spud cans and legs in general.
- Some spud cans may have vertical skirts mounted along the outer edges to further improve penetration and anchoring effects in certain seabed conditions and types of soil.
- KR-A 10-2013-0005787, KR-A 10-2012-0139931 and KR-A 10-2012-0139932 describes a spud can attaching and detaching method on a jack-up platform.
- the inventions deal with specific methods of attaching and detaching the spud cans through several stages comprising a stage of changing the centre of gravity, followed by a stage of leg climbing, followed by a phase of detaching/attaching followed by a final phase of leg descent.
- an offshore jack-up rig comprising a main buoyant hull serving as the platform for the rigs main deck, i.e. the basic construction on and in which the rest of the rig is built.
- Hulls for jack-up rigs typically have a substantially triangular shape seen in a top view, although other shapes have been known and as such the present invention is not limited to a triangular hull shape.
- the hull comprises leg wells through said hull each leg well comprising a jack-up leg movably coupled to said hull where each of said leg wells surrounding said legs are formed by one or more walls. Often, the vertical walls forms a triangle in a horizontal cross section, but the cross section may take other shapes e.g. round or square.
- Each leg well comprising a jack-up leg movably coupled to the hull as explained below and the leg has a lower end suitable for connecting to a spud can.
- the hull has one or more vertical shafts through said main hull, suitable for receiving jack-up legs, said shafts having inner walls with a substantially straight geometry.
- These shafts are typically referred to as leg wells and typically a jack-up rig will have three or more leg wells, one for each leg. In principle, it may have two or even one leg, hence, each of said leg wells surrounding said legs are formed by one or more walls with said walls being substantially vertically straight.
- substantially straight is taken to mean that no substantial recesses, protrusions or indentations exist on the inside of the shafts at least not on a scale in the order of the spud cans of cross section of the legs.
- any recesses, protrusions, indentations or other deviation from vertical inside the leg wells is less than the longest diameter of the circumscribed circle of the cross section of the leg, such as less than 50% of that, such as less than 30% of that, such as less than 20% of that, such as less than 10% of that.
- the spud cans of prior art jack-ups include a recess at the bottom end of each leg well, arranged so that the spud cans may be retracted substantially or completely into the hull. This makes long distance transit of the jack-up feasible either under its own power, under tow or on a heavy lift.
- a substantially straight geometry is therefore taken to mean that 50% or less of the spud can is retractable into the leg well, such as 40% or less, such as 30% or less, such as 20% or less, such as 10% or less, such as 5% or less, such as 1% or less.
- the invention may enable the construction of a simpler hull with relatively lower cost and/or more space inside and at the same time enable the use of larger spud cans which may be beneficial, particularly for sites with difficult soil conditions.
- having substantially straight sided inner walls serve the purpose of allowing the legs of the jack-up rig to be moved longitudinally through the leg wells with a relatively smaller clearance in order to save space inside the main hull and potentially simplify the design and construction of the leg wells—and thereby the complexity of the bulkheads supporting the leg wells and the hull around them.
- the vertical leg wells through the hull also comprise an embodiment wherein the lower part of the leg well, opening to the underneath of the hull comprises minor, non-substantial recesses or protrusions.
- Each jack-up leg is installed in one of the previously mentioned leg wells through the interface of a jacking drive system allowing the jack-up legs to be lowered to the seabed vertically through the hull and lift the jack-up rig from the surface of the sea into a position where the jack-up rig can be operated with significantly less influence from the effects of the sea and wave action.
- the spud cans are not limited to a lattice construction design for jack-up legs; hence, the invention can be applied to other types of legs in conjunction with a similar system.
- a jacking drive system is installed and fixed to the hull of the jack-up rig in or around the leg wells in such a way that the system can operate the jack-up legs to be lowered or raised as described above.
- the jacking drive system comprises a leg driving structure, typically jacking gears, for driving the jack-up legs vertically up and down relative to the main hull, a support structure for said jacking gears, and a leg guide structure typically referred to as guide rails which support the jack-up legs in the leg wells while allowing the leg to move in the vertical direction.
- jacking gears will be used as an example of a driving structure and guide rails as an example of a guide structure.
- the jacking drive system further comprises a leg clamping device that rigidly locks the legs in place in such a way that the jack-up legs, when the leg clamping device is engaged, are effectively rigidly attached to the main hull of the jack-up rig.
- the leg guide rails act as guides on which the legs move longitudinally in the leg wells.
- the guide rails provide guidance of the movement of the jack-up legs along with providing structural support.
- the guide rails are of a design that allows movement of the jack-up legs while at the same time holding them in place in all directions other than longitudinally along the leg well.
- leg guide structure such as leg guide rails
- the lowest part or lower guide rails are positioned as close to the bottom of the main hull of the jack-up rig as possible.
- the leg guide structure (such as the lower or lowest guide rail) is mounted close to the bottom of the hull, such as within 10 m, such as with 7 m, such as with 6 m, such as with 4 m, such as with 3 m, such as with 2 m, such as with 1 m, such as at the bottom of the leg well or main hull.
- the upper part or rails are positioned as close to the top of the leg wells as possible, or even above, on the support structure of the jacking gears. Having the guide rails as far apart as possible improves structural integrity in terms of handling bending moments in the jack-up legs introduced when they are lowered onto the seabed.
- One embodiment of the invention comprises spud cans, defined as support structures attached to the lower ends of the legs of a jack-up rig for the purpose of increasing bearing load capacity, i.e. to distribute the load of the rig onto a larger area.
- spud cans defined as support structures attached to the lower ends of the legs of a jack-up rig for the purpose of increasing bearing load capacity, i.e. to distribute the load of the rig onto a larger area.
- spud cans In areas with unfavourable seabed conditions, such as in areas with muddy or otherwise soft soil conditions, it may be advantageous to have spud cans of increased size to distribute loads even further.
- the spud cans are designed to be detachable such that they can be removed and reattached when needed. For example, this may be beneficial if soil conditions in an operational location are unfavourable for jacking down a jack-up rig.
- One way to accommodate such a challenge is to change the design of the spud can, e.g. by increasing the contact surface between spud can and seabed.
- spud cans it is undesirable to have the spud cans attached to the legs during transport or towing for longer distances.
- Very large spud cans may make transport by heavy lift vessel impossible and/or introduce large drag and this slow down or increase the complexity of towing operations.
- provision of attachable spud cans address several challenges and simplify the design of the jack-up rig, particularly in consideration of hull and bulkhead design.
- one considered advantage of the present invention is that it makes the provision of large spud cans more practical so that, for example, the outer diameter of a spud can may be at least 20 m, such as at least 25 m, such as at least 30 m, such as at least 35 m, such as at least 40 m, such as at least 50 m.
- the invention may reduce cost and/or allow enhanced jack up hulls with more straight leg wells with larger or even normal spud cans.
- the jack-up legs and spud cans attach to each other through a coupling interface system; the coupling interface system may be of various designs.
- the interface system is of the same type as jacking drive system of leg rails and rack and pinions used in the jacking gears as may prove advantageous in some embodiments.
- spud cans may be welded in the legs permanently particularly for rigs where the expected use of the rig does not envision long rig moves. While it is typically not advantageous to performing welding requiring high strength under water it may be preferable e.g. out of cost consideration and/or simplicity.
- the spud cans will be connected wet i.e. submerged. Dry connection of the spud cans to the legs may also be feasible.
- the jack up is placed on a risible platform such as a large heavy lift and the spud can be placed underneath the jack-up on a dock, barge, boat or floating on its hull.
- Another embodiment of the invention has a wedge and groove system for coupling the jack-up leg and the spud can, in which the spud can has special fittings on its upwards facing area to which the legs can attach.
- Each column of the leg has multiple grooves or teeth fitting into similar grooves or teeth in the spud can.
- these corresponding sets of teeth can be locked together by inserting a wedge in the spud can fitting, thus forcing the corresponding sets of teeth together and locking the spud can and jack-up leg to each other.
- Such a mechanical coupling has several advantages over for instance a hydraulic coupling: it is simpler, more cost effective and is inherently safer and more reliable when exposed to the harsh conditions of a subsea environment.
- the sets of teeth mentioned in the above is comprised of a single groove in the spud can fitting and a corresponding single groove in the jack-up leg columns. These two are aligned when the column is inserted vertically into the spud can fitting. In this position, the aligned grooves can accommodate the insertion of a wedge that locks the spud can fitting and column together fixedly.
- the wedge mentioned in the above is locked in place by one or more pins inserted into the wedge and the spud can fitting, locking the two together and preventing the wedge from coming loose, consequently preventing the teeth locking the jack-up leg and spud can fitting from losing their connection.
- This locking mechanism should be engaged when the jack-up leg has connected to the spud can via the coupling interface system.
- the locking mechanism can be activated in different ways.
- One embodiment includes a remote operated engagement system, for instance via an interface in the main control room of the jack-up rig, or in another instance from the bridge of an accompanying towboat, alternatively from the main deck of the jack-up rig or any other location deemed suitable for controlling the spud cans, e.g. in the same location where the jack-up legs and the jacking drive system itself is controlled and monitored.
- the system is engaged locally on the jack-up leg and/or spud can.
- This requires direct access to the spud can or jack-up leg and may be accomplished by the use of a remote-operated-vehicle (ROV) or by the employment of divers.
- ROV remote-operated-vehicle
- This method may be more cost effective compared to a remotely controlled engagement system as the costs and relative rareness of the need for attaching or detaching the spud cans may outweigh the potential time savings of a remotely operated solution, although it may be argued whether the first option is inherently safer than deploying divers.
- the spud can has a ballast system enabling it to adjust its buoyancy, allowing it to either stay afloat or be lowered to the sea floor.
- sea floor is used to designate a resting place for the spud can as it is submerged—typically the seabed.
- the sea floor may be a subsea construction for holding the spud can or other suitable device for holding the spud can during the connection procedure. For example it may be desirable to have the spud cans floating during transit, being towed to the location of the jack-up rig.
- the spud cans When jacking down the legs to the seabed on the other hand, the spud cans should typically not be buoyant but rather be resting on the seabed attached to the jack-up legs. Generally, the spud cans may comprises a flushing system for assisting the release of the spud can when the rig needs to be moved from one operating position to another.
- An embodiment of the invention comprises a method with which the spud cans are installed on the jack-up legs of a jack-up rig.
- the method of attaching spud cans to the jack-up legs comprise a procedure where the spud cans are moved, either towed or lifted, to a desired location for mounting the spud cans.
- This will typically be a place with suitable water depth for performing the operation and preferably sheltered so that the motions of the jack-up can be minimized during installation.
- the spud cans are submerged and lowered to the sea floor or other suitable rest e.g. by means of a ballast system, adjusting the buoyancy of the spud cans.
- the jack-up rig floating on its main buoyant hull or on a transport e.g. a heavy lifter, may be moved or towed into position such that it has a jack-up leg positioned directly above and aligned with the spud can. During this process, the leg may be partly extended towards the spud can.
- the jack-up leg is lowered down through the water to the top of the spud can.
- the coupling interfaces between the jack-up leg and spud may ensure a fit between the two and allow them to be locked together by various means as described above.
- the spud can may be hoisted up to the leg. With the jack-up leg and spud can connected and locked together the procedure is repeated for remaining jack-up legs until all legs have been fitted with spud cans.
- the jack-up legs are raised to a level where the spud cans are raised to immediately below the main hull or to at least enough clearance to stay clear of the seabed.
- the jack-up rig can be transported to the actual site of operation for which the spud cans have been designed.
- the jack up rig may then begin operating such drilling a well or building an offshore construction.
- the spud cans of all legs of the jack-up rig are lowered to the sea floor before the jack-up rig is moved into position, in which case the spud cans are placed on the sea floor such that they are aligned with the jack-up legs. Consequently, the legs can be lowered onto the spud cans in a more efficient manner.
- the spud cans are lowered to the sea floor one at a time with the jack-up rig moved into position and the leg jacking down upon said spud can.
- the procedure is repeated: another spud can is lowered to the sea floor, the jack-up rig is moved into position and the jack-up leg lowered and fastened and then raised again. This procedure is then repeated until all legs have been attached to their corresponding spud cans.
- the jack-up legs may be lowered into the sea to a designated depth. To fasten the spud can, it is hoisted up from the sea floor and onto the legs, then locked into place.
- the attachment of the spud cans is performed at the site of operation where the spud cans may be optionally lowered to the seabed for installation via any of the above described methods.
- a jack-up rig comprising a main buoyant hull, one or more vertical shafts referred to as lake wells, through said hull, suitable for receiving jack-up legs, said lake wells having inner walls with a substantially straight geometry such that no substantial recesses, indentations or protrusions exist on the inside of the lake wells.
- the lake wells described in item 1 wherein the lower part of the lake well opening to the underneath of the hull may comprise minor, non-substantial recesses or protrusions.
- a jack-up rig as described in item 1 - 2 further comprising one or more jack-up legs.
- a jacking drive system as described in item 4 said jacking drive system comprising jacking gears for driving said jack-up legs vertically up and down relative to the main hull, a support structure on which the jacking gears are installed, and leg guide rails for guiding the movement of the jack-up legs and providing structural support of said legs, in the lake wells described in item 1 .
- a jack-up rig as described in item 3 further comprising separate spud cans attachable to a jack-up leg.
- the jack-up leg of item 3 further comprising a coupling interface system allowing the coupling of a spud can and said jack-up leg.
- the coupling interface system of item 8 being of a design based on a wedge and groove principle in which the columns of said jack-up leg are fitted to appropriate fittings installed on the top faces of said spud cans, with both jack-up leg column and spud can fitting having corresponding sets of teeth or grooves that may be locked together after insertion of a jack-up leg column into a spud can fitting.
- a method for operating a jack-up rig in which separate spud cans are attached to the legs of a jack-up rig comprising the following steps:
- a method for operating a jack-up rig as described in item 16 where the method is performed on a location with favourable soil conditions in relative proximity to the operational location.
- a method for operating a jack-up rig as described in item 16 where the method is performed on the location of the operation.
- a method for operating a jack-up rig as described in item 16 where all spud cans are lowered to the seabed, aligned to the jack-up rig and the jack-up legs are lowered down onto the spud cans.
- a method for operating a jack-up rig as described in item 16 where one spud can is lowered to the seabed at a time, the jack-up rig moved into place and aligned to the spud can and the leg consequently lowered to and fastened to the spud can.
- a method for operating a jack-up rig as described in item 16 where the spud cans are lowered to the seabed, the jack-up rig moved into place and aligned to the spud can and the leg consequently lowered into the sea, but not all the way to the seabed, whereafter the spud cans are hoisted from the seabed up onto the legs and fastened.
- FIG. 1 shows a jack-up rig according to an embodiment of the invention.
- FIG. 2 shows a side view of the hull and jack-up leg area of a jack-up rig according to an embodiment of the invention.
- FIG. 3 shows a jack-up leg with an attached spud can according to an embodiment of the invention.
- FIG. 4 depicts a side view of a detachable spud can with a jack-up leg attached according to an embodiment of the invention.
- FIGS. 5 a - f illustrate a method of installing detachable spud cans to a jack-up rig according to an embodiment of the invention.
- FIG. 1 shows an embodiment of a jack-up rig 100 and its main features: a buoyant main hull 101 , in which vertical shafts, known as leg wells 102 , run from the upper deck to the underside of the hull.
- leg wells 102 vertical shafts
- jack-up legs 103 are installed and connected to a jacking drive system 104 , allowing the legs to move up and down vertically to allow the main hull to be lifted out of the water and stand fixedly on the legs, resting on the seabed.
- a spud can 105 At the end of each jack-up leg is installed a spud can 105 , the purpose of which is to distribute the load of the jack-up rig across a larger area to reduce penetration depth into the seabed when the legs are lowered into the seabed.
- one embodiment of the jack-up rig may comprise a derrick area, an accommodation area 107 of the rig, housing all personnel quarters, mess area, control rooms, etc. and a helipad 108 for delivering and extracting personnel, supplies etc. to the rig during operations at sea.
- FIG. 2 shows a cut-out of the main hull 101 of a jack-up rig, specifically the part of the hull containing the leg well 102 through which a jack-up leg 103 runs.
- the jack-up leg is installed by means of a jacking drive system 104 .
- the leg wells have substantially straight walls 201 to have as simple and robust construction as possible, reducing the complexity of bulkheads and thus production costs.
- the jacking drive system 104 is installed in and on top of the main hull 101 and comprises jacking gears 202 connected to the jack-up legs 103 , driving them vertically up or down, along with leg clamping devices 203 fixing the legs in position, when the desired height of the platform has been achieved, and finally several sets of guide rails 204 .
- the guide rails serve to guide the leg as it moves longitudinally along the leg well and ensure the structural integrity of the system; typically, the further apart the upper and lower sets of guide rails are, the less forces are imposed by the legs on the hull, hence, a lighter structure may be used and/or harsher conditions can be tolerated with the same structure emphasizing the benefit of moving the guide rails down to the bottom of the leg wells.
- the greyed out areas 205 indicates where there would otherwise be recesses for receiving spud cans for prior art jack-up rigs.
- the spud cans are detachable and/or mounted after a longer transit, there is no need for recesses to house the spud cans when the legs are raised into the hull.
- FIG. 3 depicts the lower part of a jack-up leg 103 with a spud can 105 attached.
- the spud can comprises a hollow construction 301 with fittings 302 attached to the upper face 303 of the spud can.
- Each fitting is part of the coupling interface system 304 that attaches the columns 305 of the jack-up legs to the spud can itself and lock them in place, creating a fixed construction able to withstand the harsh conditions and forces of a subsea environment.
- FIG. 4 shows a side view of one embodiment of a detachable spud can 105 and in detail an embodiment of the coupling interface system 304 .
- On the upper face 303 of the spud can are installed fittings 302 for each column 305 of the jack-up leg 103 .
- At the lower end of each column a set of column teeth 401 corresponds to a set of fitting teeth 402 on the spud can fitting 302 .
- the column When the column is inserted into the column slot 403 , the column can be locked in place by wedges 404 pushing the fitting teeth into the column teeth, the teeth being able to pivot around a hinge mechanism 407 .
- FIG. 5 a - f illustrates one embodiment of a method through which detachable spud cans can be installed on the jack-up legs of a jack-up rig.
- the detachable spud cans 105 are transported by a support vessel 501 to a location in proximity of the intended operational location, but with more benign soil conditions and water depths.
- the spud cans are lowered to the seabed 502 by a hoisting system 503 on the support vessel 501 and placed such that they are ready to be aligned with the jack-up rig 100 .
- FIG. 5 b shows the jack-up rig 100 floating on the sea surface 504 and positioned directly above the spud cans resting on the seabed. In this position the jack-up legs 103 are lifted completely out of the water and the lower parts encased in the buoyant hull 101 such that the legs are supported entirely by the floating hull.
- FIG. 5 c one jack-up leg has been lowered onto, and fixed to, its corresponding spud can positioned on the seabed. The process is repeated for the remaining jack-up legs in FIG. 5 d resulting in all the legs having spud cans installed and resting on the seabed.
- FIG. 5 e shows the legs having been raised once again, allowing the rig to be towed from the spud can installation location to an operation location.
- FIG. 5 f illustrates the jack-up rig on an operation location 505 .
- the jack-up legs have been lowered to the seabed and the jack-up rig is raised above sea level in a position 506 ready for performing operations. In this position the legs completely support the main hull of the rig, effectively removing the main hull from the effects of the sea and wave action to provide safer working conditions compared to being afloat on the sea surface.
- FIG. 5 a - f summarises just one embodiment, and it should be emphasized that several variations in the method may be applicable and beneficial on the conditions of the location, the exact design of the spud cans, the coupling interface system, etc.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
- Jib Cranes (AREA)
Abstract
A system and method for accommodating normal, or larger than normal, support footings for the legs of an offshore jack-up rig, with the support footings now to be known as spud cans, and an improved hull design to accommodate legs with attachable spud cans, along with a method of mounting said spud cans by submerging them, lowering each jack-up leg down on the designated spud can and locking the two units in together.
Description
- The present invention relates generally to offshore rigs, particularly to the jack-up type of offshore rigs. More specifically, the invention relates to a jack-up rig and method of operating a jack-up rig so that it may be installed and operable at a desired location.
- Offshore rigs are widely used in many industries, for example in the construction and installation of offshore wind mills, or in the exploration and exploitation of hydrocarbon reservoirs under the seabed.
- Offshore jack-up rigs are typically deployed in waters with depths of up to 150 m. A jack-up rig normally comprises a buoyant hull and three or more jack-up legs, these legs providing support for the floatable hull when in elevated conditions. When a jack-up rig arrives on a location, the legs are lowered until they rest on the soil of the seabed; after this, the hull may be jacked up using a jacking drive system to raise the hull above the water, elevating the hull to a height where operations can be performed in spite of the wave action and current present in open water situations.
- The advantages of a jack-up rig when used in water depths up to around 150 m can be devoted to the mobility and flexibility of the rig; the legs can be raised with relative ease and the floating hull towed or self-propelled to another location if needed, e.g. if weather conditions dictate it or if there is a need for moving the jack-up rig.
- The legs of a jack-up rig are commonly made up of tubular columns or trusses with each truss comprising vertical chords connected with cross braces normally diagonally disposed. The legs typically terminate in a jack-up support structure that rests on the seabed. These structures, known as spud cans, provide an enlarged bearing area in order to distribute the load of the rig evenly over a larger area and reduce the pressure exerted on the soil of the seabed. Typically the use of spud cans provides a reduced penetration depth of the legs required by the support structure to support the jack-up rig and/or ensures safe operation of the jack-up rig. Spud cans may also allow the jack-up rig to be operated in varied locations and soil types without having to change the length of the jack-up legs.
- Spud cans are typically fixed to each jack-up leg; as well as the above mentioned benefits, spud cans also improve the ability of the jack-up rig to be supported on uneven seabeds or slopes, moreover, having spud cans mounted on each leg may allow elevation of each leg independently of each other. Spud cans are typically made up of a generally conical upper half connected to the jack-up leg and a generally conical lower half that acts as the contact interface with the seabed. The conical shape provides some degree of penetration into the seabed, serving to improve anchoring effects of the spud cans and legs in general. Some spud cans may have vertical skirts mounted along the outer edges to further improve penetration and anchoring effects in certain seabed conditions and types of soil.
- In some cases, soil conditions may prove to be too unfavourable to allow safe use of conventional spud cans, hence, not providing a bearing area large enough to distribute the loads of the rig adequately. In such cases it can be necessary for instance to increase the size of the spud cans to a point where it is not feasible to have such large spud cans permanently attached to the jack-up rig. In such cases, solutions have been proposed in the prior art; U.S. Pat. No. 5,807,028 describes a supporting construction to be fastened to the seabed and act as fixed support construction for the jack-up legs. GB 2340161 describes a base which can receive a common foot structure connected to the legs instead of placing the foot structure directly on the seabed.
- KR-A 10-2013-0005787, KR-A 10-2012-0139931 and KR-A 10-2012-0139932 describes a spud can attaching and detaching method on a jack-up platform. The inventions deal with specific methods of attaching and detaching the spud cans through several stages comprising a stage of changing the centre of gravity, followed by a stage of leg climbing, followed by a phase of detaching/attaching followed by a final phase of leg descent.
- Disclosed herein are embodiments of an offshore rig of a jack-up rig type.
- According to one aspect, disclosed herein as an offshore jack-up rig, comprising a main buoyant hull serving as the platform for the rigs main deck, i.e. the basic construction on and in which the rest of the rig is built. Hulls for jack-up rigs typically have a substantially triangular shape seen in a top view, although other shapes have been known and as such the present invention is not limited to a triangular hull shape. The hull comprises leg wells through said hull each leg well comprising a jack-up leg movably coupled to said hull where each of said leg wells surrounding said legs are formed by one or more walls. Often, the vertical walls forms a triangle in a horizontal cross section, but the cross section may take other shapes e.g. round or square. Each leg well comprising a jack-up leg movably coupled to the hull as explained below and the leg has a lower end suitable for connecting to a spud can.
- In one embodiment, the hull has one or more vertical shafts through said main hull, suitable for receiving jack-up legs, said shafts having inner walls with a substantially straight geometry. These shafts are typically referred to as leg wells and typically a jack-up rig will have three or more leg wells, one for each leg. In principle, it may have two or even one leg, hence, each of said leg wells surrounding said legs are formed by one or more walls with said walls being substantially vertically straight. In one embodiment, substantially straight is taken to mean that no substantial recesses, protrusions or indentations exist on the inside of the shafts at least not on a scale in the order of the spud cans of cross section of the legs. Accordingly, in one embodiment, any recesses, protrusions, indentations or other deviation from vertical inside the leg wells is less than the longest diameter of the circumscribed circle of the cross section of the leg, such as less than 50% of that, such as less than 30% of that, such as less than 20% of that, such as less than 10% of that. As explained further below, the spud cans of prior art jack-ups include a recess at the bottom end of each leg well, arranged so that the spud cans may be retracted substantially or completely into the hull. This makes long distance transit of the jack-up feasible either under its own power, under tow or on a heavy lift. While larger spud cans may be advantageous for installation of the jack-up rig on site, they are not practical on prior art jack-up rigs because the recess must be so large that it is prohibitive for the construction of the bulk heads of the hull, in particular considering that the torsional forces transferred from the leg to the leg well via the guide rails must be absorbed by a shorter straight section. In one embodiment, a substantially straight geometry is therefore taken to mean that 50% or less of the spud can is retractable into the leg well, such as 40% or less, such as 30% or less, such as 20% or less, such as 10% or less, such as 5% or less, such as 1% or less. In this way the invention may enable the construction of a simpler hull with relatively lower cost and/or more space inside and at the same time enable the use of larger spud cans which may be beneficial, particularly for sites with difficult soil conditions.
- In one embodiment, having substantially straight sided inner walls serve the purpose of allowing the legs of the jack-up rig to be moved longitudinally through the leg wells with a relatively smaller clearance in order to save space inside the main hull and potentially simplify the design and construction of the leg wells—and thereby the complexity of the bulkheads supporting the leg wells and the hull around them.
- The vertical leg wells through the hull, being substantially straight sided, also comprise an embodiment wherein the lower part of the leg well, opening to the underneath of the hull comprises minor, non-substantial recesses or protrusions. This is to be understood such that the angle between the vertical leg well and the horizontal underside of the hull may be substantially orthogonal, but can also permit depressions and/or protrusions around each leg well, thus resulting in the angle between hull underside and leg well walls being smaller respectively larger than 90 degrees. Accordingly, in one embodiment, this angle deviates less than 30 degrees from 90 degrees, such as 20 degrees or less, such as 10 degrees or less, such as 5 degrees or less.
- Further embodiments comprise one or more jack-up legs installed in the leg wells in the main hull. A jack-up leg is typically formed by tubular columns or trusses with each truss comprising vertical chords connected with cross braces normally diagonally disposed. These legs have excellent resistance to the effects of wave action in rough seas. Each jack-up leg is installed in one of the previously mentioned leg wells through the interface of a jacking drive system allowing the jack-up legs to be lowered to the seabed vertically through the hull and lift the jack-up rig from the surface of the sea into a position where the jack-up rig can be operated with significantly less influence from the effects of the sea and wave action.
- The spud cans are not limited to a lattice construction design for jack-up legs; hence, the invention can be applied to other types of legs in conjunction with a similar system.
- In one embodiment, a jacking drive system is installed and fixed to the hull of the jack-up rig in or around the leg wells in such a way that the system can operate the jack-up legs to be lowered or raised as described above. In one embodiment, the jacking drive system comprises a leg driving structure, typically jacking gears, for driving the jack-up legs vertically up and down relative to the main hull, a support structure for said jacking gears, and a leg guide structure typically referred to as guide rails which support the jack-up legs in the leg wells while allowing the leg to move in the vertical direction. In the following jacking gears will be used as an example of a driving structure and guide rails as an example of a guide structure.
- In one embodiment, the jacking drive system further comprises a leg clamping device that rigidly locks the legs in place in such a way that the jack-up legs, when the leg clamping device is engaged, are effectively rigidly attached to the main hull of the jack-up rig.
- In one embodiment, the leg guide rails act as guides on which the legs move longitudinally in the leg wells. The guide rails provide guidance of the movement of the jack-up legs along with providing structural support. In a further embodiment, the guide rails are of a design that allows movement of the jack-up legs while at the same time holding them in place in all directions other than longitudinally along the leg well.
- One advantage of a substantially straight walled leg well is that the vertical spacing between the highest and lowest guide structure may be increased relative to leg well with a recess for receiving the spud can. Accordingly, in one embodiment, at least a part of the leg guide structure, such as leg guide rails, are installed inside the leg well at each end respectively, in such a manner that the lowest part or lower guide rails are positioned as close to the bottom of the main hull of the jack-up rig as possible. In one embodiment, at least part of the leg guide structure (such as the lower or lowest guide rail) is mounted close to the bottom of the hull, such as within 10 m, such as with 7 m, such as with 6 m, such as with 4 m, such as with 3 m, such as with 2 m, such as with 1 m, such as at the bottom of the leg well or main hull. In some embodiments, the upper part or rails are positioned as close to the top of the leg wells as possible, or even above, on the support structure of the jacking gears. Having the guide rails as far apart as possible improves structural integrity in terms of handling bending moments in the jack-up legs introduced when they are lowered onto the seabed.
- One embodiment of the invention comprises spud cans, defined as support structures attached to the lower ends of the legs of a jack-up rig for the purpose of increasing bearing load capacity, i.e. to distribute the load of the rig onto a larger area. In areas with unfavourable seabed conditions, such as in areas with muddy or otherwise soft soil conditions, it may be advantageous to have spud cans of increased size to distribute loads even further.
- In one embodiment of the invention the spud cans are designed to be detachable such that they can be removed and reattached when needed. For example, this may be beneficial if soil conditions in an operational location are unfavourable for jacking down a jack-up rig. One way to accommodate such a challenge is to change the design of the spud can, e.g. by increasing the contact surface between spud can and seabed.
- In one such embodiment, it is undesirable to have the spud cans attached to the legs during transport or towing for longer distances. Very large spud cans may make transport by heavy lift vessel impossible and/or introduce large drag and this slow down or increase the complexity of towing operations. Accordingly, provision of attachable spud cans address several challenges and simplify the design of the jack-up rig, particularly in consideration of hull and bulkhead design. Accordingly, one considered advantage of the present invention is that it makes the provision of large spud cans more practical so that, for example, the outer diameter of a spud can may be at least 20 m, such as at least 25 m, such as at least 30 m, such as at least 35 m, such as at least 40 m, such as at least 50 m. In these cases, being able to change the spud cans depending on size and conditions may be favourable. In some embodiments, the invention may reduce cost and/or allow enhanced jack up hulls with more straight leg wells with larger or even normal spud cans.
- In one embodiment, the jack-up legs and spud cans attach to each other through a coupling interface system; the coupling interface system may be of various designs. In one embodiment, the interface system is of the same type as jacking drive system of leg rails and rack and pinions used in the jacking gears as may prove advantageous in some embodiments.
- In some embodiments, spud cans may be welded in the legs permanently particularly for rigs where the expected use of the rig does not envision long rig moves. While it is typically not advantageous to performing welding requiring high strength under water it may be preferable e.g. out of cost consideration and/or simplicity.
- In many embodiments, the spud cans will be connected wet i.e. submerged. Dry connection of the spud cans to the legs may also be feasible. In one embodiment, the jack up is placed on a risible platform such as a large heavy lift and the spud can be placed underneath the jack-up on a dock, barge, boat or floating on its hull.
- Another embodiment of the invention has a wedge and groove system for coupling the jack-up leg and the spud can, in which the spud can has special fittings on its upwards facing area to which the legs can attach. Each column of the leg has multiple grooves or teeth fitting into similar grooves or teeth in the spud can. In a further embodiment, these corresponding sets of teeth can be locked together by inserting a wedge in the spud can fitting, thus forcing the corresponding sets of teeth together and locking the spud can and jack-up leg to each other. Such a mechanical coupling has several advantages over for instance a hydraulic coupling: it is simpler, more cost effective and is inherently safer and more reliable when exposed to the harsh conditions of a subsea environment.
- In one embodiment, the sets of teeth mentioned in the above is comprised of a single groove in the spud can fitting and a corresponding single groove in the jack-up leg columns. These two are aligned when the column is inserted vertically into the spud can fitting. In this position, the aligned grooves can accommodate the insertion of a wedge that locks the spud can fitting and column together fixedly.
- In one embodiment, the wedge mentioned in the above is locked in place by one or more pins inserted into the wedge and the spud can fitting, locking the two together and preventing the wedge from coming loose, consequently preventing the teeth locking the jack-up leg and spud can fitting from losing their connection. This locking mechanism should be engaged when the jack-up leg has connected to the spud can via the coupling interface system.
- In some embodiments, the locking mechanism can be activated in different ways. One embodiment includes a remote operated engagement system, for instance via an interface in the main control room of the jack-up rig, or in another instance from the bridge of an accompanying towboat, alternatively from the main deck of the jack-up rig or any other location deemed suitable for controlling the spud cans, e.g. in the same location where the jack-up legs and the jacking drive system itself is controlled and monitored.
- In another embodiment, the system is engaged locally on the jack-up leg and/or spud can. This requires direct access to the spud can or jack-up leg and may be accomplished by the use of a remote-operated-vehicle (ROV) or by the employment of divers. This method may be more cost effective compared to a remotely controlled engagement system as the costs and relative rareness of the need for attaching or detaching the spud cans may outweigh the potential time savings of a remotely operated solution, although it may be argued whether the first option is inherently safer than deploying divers.
- In one embodiment, the spud can has a ballast system enabling it to adjust its buoyancy, allowing it to either stay afloat or be lowered to the sea floor. In the present context the term sea floor is used to designate a resting place for the spud can as it is submerged—typically the seabed. However, the sea floor may be a subsea construction for holding the spud can or other suitable device for holding the spud can during the connection procedure. For example it may be desirable to have the spud cans floating during transit, being towed to the location of the jack-up rig. When jacking down the legs to the seabed on the other hand, the spud cans should typically not be buoyant but rather be resting on the seabed attached to the jack-up legs. Generally, the spud cans may comprises a flushing system for assisting the release of the spud can when the rig needs to be moved from one operating position to another.
- An embodiment of the invention comprises a method with which the spud cans are installed on the jack-up legs of a jack-up rig.
- In one embodiment, the method of attaching spud cans to the jack-up legs comprise a procedure where the spud cans are moved, either towed or lifted, to a desired location for mounting the spud cans. This will typically be a place with suitable water depth for performing the operation and preferably sheltered so that the motions of the jack-up can be minimized during installation. In relation hereof, the spud cans are submerged and lowered to the sea floor or other suitable rest e.g. by means of a ballast system, adjusting the buoyancy of the spud cans. Once a spud can is resting on the sea floor, the jack-up rig, floating on its main buoyant hull or on a transport e.g. a heavy lifter, may be moved or towed into position such that it has a jack-up leg positioned directly above and aligned with the spud can. During this process, the leg may be partly extended towards the spud can. When the spud can and leg has been aligned, the jack-up leg is lowered down through the water to the top of the spud can. The coupling interfaces between the jack-up leg and spud may ensure a fit between the two and allow them to be locked together by various means as described above. Alternatively or in combination with lowering the leg to the spud, the spud can may be hoisted up to the leg. With the jack-up leg and spud can connected and locked together the procedure is repeated for remaining jack-up legs until all legs have been fitted with spud cans.
- When this is accomplished the jack-up legs are raised to a level where the spud cans are raised to immediately below the main hull or to at least enough clearance to stay clear of the seabed.
- In this state, the jack-up rig can be transported to the actual site of operation for which the spud cans have been designed. The jack up rig may then begin operating such drilling a well or building an offshore construction.
- In one embodiment, the spud cans of all legs of the jack-up rig are lowered to the sea floor before the jack-up rig is moved into position, in which case the spud cans are placed on the sea floor such that they are aligned with the jack-up legs. Consequently, the legs can be lowered onto the spud cans in a more efficient manner.
- In another embodiment, the spud cans are lowered to the sea floor one at a time with the jack-up rig moved into position and the leg jacking down upon said spud can. When one leg is attached and locked to the spud can, the procedure is repeated: another spud can is lowered to the sea floor, the jack-up rig is moved into position and the jack-up leg lowered and fastened and then raised again. This procedure is then repeated until all legs have been attached to their corresponding spud cans.
- In one embodiment, the jack-up legs may be lowered into the sea to a designated depth. To fasten the spud can, it is hoisted up from the sea floor and onto the legs, then locked into place.
- In some embodiments, the attachment of the spud cans is performed at the site of operation where the spud cans may be optionally lowered to the seabed for installation via any of the above described methods.
- The following is an itemized list of some embodiments of the invention:
- 1. A jack-up rig comprising a main buoyant hull, one or more vertical shafts referred to as lake wells, through said hull, suitable for receiving jack-up legs, said lake wells having inner walls with a substantially straight geometry such that no substantial recesses, indentations or protrusions exist on the inside of the lake wells.
- 2. The lake wells described in item 1, wherein the lower part of the lake well opening to the underneath of the hull may comprise minor, non-substantial recesses or protrusions.
- 3. A jack-up rig as described in item 1-2, further comprising one or more jack-up legs.
- 4. A jack-up rig as described in item 1-3 with said jack-up legs mounted to be lowered or raised by a jacking drive system, said system attached to the main hull to facilitate movement of the jack-up legs vertically through the hull.
- 5. A jacking drive system as described in item 4, said jacking drive system comprising jacking gears for driving said jack-up legs vertically up and down relative to the main hull, a support structure on which the jacking gears are installed, and leg guide rails for guiding the movement of the jack-up legs and providing structural support of said legs, in the lake wells described in item 1.
- 6. A jack-up rig as described in item 5 with said jack-up leg guide rails mounted on the inside of the lake well at each end respectively and in such a manner that the lower guide rails are positioned as close to the bottom of the hull of the platform of the jack-up rig as possible.
- 7. A jack-up rig as described in item 3, further comprising separate spud cans attachable to a jack-up leg.
- 8. The jack-up leg of item 3, further comprising a coupling interface system allowing the coupling of a spud can and said jack-up leg.
- 9. The coupling interface system of item 8, being of a design based on a wedge and groove principle in which the columns of said jack-up leg are fitted to appropriate fittings installed on the top faces of said spud cans, with both jack-up leg column and spud can fitting having corresponding sets of teeth or grooves that may be locked together after insertion of a jack-up leg column into a spud can fitting.
- 10. The coupling interface system of item 8, wherein the spud can fitting and jack-up leg columns have a single groove each, that are aligned when the jack-up leg column is inserted vertically into the spud can fitting.
- 11. The coupling interface system of item 8-10, in which the interface may accommodate the insertion of a wedge to lock said spud can fitting and jack-up leg column fixedly to each other, in such a way that the wedge pushes the set of teeth of the spud can fitting into the corresponding teeth of the jack-up leg column.
- 12. The coupling interface system of item 8-10, wherein the wedge described in item 12 is locked in place by the insertion of one or more pins, locking the wedge and spud can fitting mentioned in item 9 together.
- 13. The coupling interface system of item 8, wherein the coupling interface system is remotely operated, such as from the main control room of the jack-up rig, such as from the same location as the jack-up legs are operated.
- 14. The coupling interface system of item 8 wherein the coupling interface system requires on site manipulation to be locked such as by the use of a Remote-Operated-Vehicle, such as by diver assistance.
- 15. The spud cans of item 7 wherein the spud can has a system to adjust buoyancy allowing it to be lowered beneath surface level of a body of water.
- 16. A method for operating a jack-up rig in which separate spud cans are attached to the legs of a jack-up rig, comprising the following steps:
-
- a. The spud cans are lowered to the seabed in a position accessible to the jack-up rig, allowing the jack-up legs to be attached to the spud cans,
- b. The jack-up rig, floating on its main buoyant hull, is moved into position so that the given jack-up leg is located directly above the spud can resting on the seabed,
- c. Each leg is lowered through the lake wells in the hull and powered by the jacking drive system until the leg connects with the appropriate spud can on the seabed,
- d. The spud can and jack-up leg are fastened together by means of the fastening mechanism described in item 8,
- e. The process is repeated for each leg of the jack-up rig until all legs have been connected to a spud can.
- 17. A method for operating a jack-up rig as described in item 16, where the method is performed on a location with favourable soil conditions in relative proximity to the operational location.
- 18. A method for operating a jack-up rig as described in item 16, where the method is performed on the location of the operation.
- 19. A method for operating a jack-up rig as described in item 16, where all spud cans are lowered to the seabed, aligned to the jack-up rig and the jack-up legs are lowered down onto the spud cans.
- 20. A method for operating a jack-up rig as described in item 16, where one spud can is lowered to the seabed at a time, the jack-up rig moved into place and aligned to the spud can and the leg consequently lowered to and fastened to the spud can.
- 21. A method for operating a jack-up rig as described in item 16, where the spud cans are lowered to the seabed, the jack-up rig moved into place and aligned to the spud can and the leg consequently lowered into the sea, but not all the way to the seabed, whereafter the spud cans are hoisted from the seabed up onto the legs and fastened.
-
FIG. 1 shows a jack-up rig according to an embodiment of the invention. -
FIG. 2 shows a side view of the hull and jack-up leg area of a jack-up rig according to an embodiment of the invention. -
FIG. 3 shows a jack-up leg with an attached spud can according to an embodiment of the invention. -
FIG. 4 depicts a side view of a detachable spud can with a jack-up leg attached according to an embodiment of the invention. -
FIGS. 5 a-f illustrate a method of installing detachable spud cans to a jack-up rig according to an embodiment of the invention. -
FIG. 1 shows an embodiment of a jack-uprig 100 and its main features: a buoyantmain hull 101, in which vertical shafts, known asleg wells 102, run from the upper deck to the underside of the hull. Through the leg wells, jack-uplegs 103 are installed and connected to a jackingdrive system 104, allowing the legs to move up and down vertically to allow the main hull to be lifted out of the water and stand fixedly on the legs, resting on the seabed. At the end of each jack-up leg is installed a spud can 105, the purpose of which is to distribute the load of the jack-up rig across a larger area to reduce penetration depth into the seabed when the legs are lowered into the seabed. - Furthermore, one embodiment of the jack-up rig may comprise a derrick area, an
accommodation area 107 of the rig, housing all personnel quarters, mess area, control rooms, etc. and ahelipad 108 for delivering and extracting personnel, supplies etc. to the rig during operations at sea. -
FIG. 2 shows a cut-out of themain hull 101 of a jack-up rig, specifically the part of the hull containing the leg well 102 through which a jack-upleg 103 runs. The jack-up leg is installed by means of a jackingdrive system 104. - The leg wells have substantially
straight walls 201 to have as simple and robust construction as possible, reducing the complexity of bulkheads and thus production costs. - The jacking
drive system 104 is installed in and on top of themain hull 101 and comprises jackinggears 202 connected to the jack-uplegs 103, driving them vertically up or down, along withleg clamping devices 203 fixing the legs in position, when the desired height of the platform has been achieved, and finally several sets of guide rails 204. The guide rails serve to guide the leg as it moves longitudinally along the leg well and ensure the structural integrity of the system; typically, the further apart the upper and lower sets of guide rails are, the less forces are imposed by the legs on the hull, hence, a lighter structure may be used and/or harsher conditions can be tolerated with the same structure emphasizing the benefit of moving the guide rails down to the bottom of the leg wells. - The greyed out
areas 205 indicates where there would otherwise be recesses for receiving spud cans for prior art jack-up rigs. In the present invention, since the spud cans are detachable and/or mounted after a longer transit, there is no need for recesses to house the spud cans when the legs are raised into the hull. -
FIG. 3 depicts the lower part of a jack-upleg 103 with a spud can 105 attached. The spud can comprises ahollow construction 301 withfittings 302 attached to theupper face 303 of the spud can. Each fitting is part of thecoupling interface system 304 that attaches thecolumns 305 of the jack-up legs to the spud can itself and lock them in place, creating a fixed construction able to withstand the harsh conditions and forces of a subsea environment. -
FIG. 4 shows a side view of one embodiment of a detachable spud can 105 and in detail an embodiment of thecoupling interface system 304. On theupper face 303 of the spud can are installedfittings 302 for eachcolumn 305 of the jack-upleg 103. At the lower end of each column a set ofcolumn teeth 401 corresponds to a set offitting teeth 402 on the spud can fitting 302. When the column is inserted into thecolumn slot 403, the column can be locked in place bywedges 404 pushing the fitting teeth into the column teeth, the teeth being able to pivot around ahinge mechanism 407. By insertingpins 405 intoslots 406 in the fitting and wedges, the wedges are fastened to the fitting effectively locking the jack-up leg to the spud can once the process has been repeated for all columns. It should be noted that other embodiments utilising other principles of fastening the legs and spud cans to each other may be applied and this particular embodiment is exemplary. -
FIG. 5 a-f illustrates one embodiment of a method through which detachable spud cans can be installed on the jack-up legs of a jack-up rig. InFIG. 5 a, thedetachable spud cans 105 are transported by asupport vessel 501 to a location in proximity of the intended operational location, but with more benign soil conditions and water depths. The spud cans are lowered to theseabed 502 by ahoisting system 503 on thesupport vessel 501 and placed such that they are ready to be aligned with the jack-uprig 100. -
FIG. 5 b shows the jack-uprig 100 floating on thesea surface 504 and positioned directly above the spud cans resting on the seabed. In this position the jack-uplegs 103 are lifted completely out of the water and the lower parts encased in thebuoyant hull 101 such that the legs are supported entirely by the floating hull. - In
FIG. 5 c one jack-up leg has been lowered onto, and fixed to, its corresponding spud can positioned on the seabed. The process is repeated for the remaining jack-up legs inFIG. 5 d resulting in all the legs having spud cans installed and resting on the seabed. -
FIG. 5 e shows the legs having been raised once again, allowing the rig to be towed from the spud can installation location to an operation location.FIG. 5 f illustrates the jack-up rig on anoperation location 505. The jack-up legs have been lowered to the seabed and the jack-up rig is raised above sea level in aposition 506 ready for performing operations. In this position the legs completely support the main hull of the rig, effectively removing the main hull from the effects of the sea and wave action to provide safer working conditions compared to being afloat on the sea surface. - The method disclosed in
FIG. 5 a-f summarises just one embodiment, and it should be emphasized that several variations in the method may be applicable and beneficial on the conditions of the location, the exact design of the spud cans, the coupling interface system, etc.
Claims (24)
1. A jack-up rig comprising:
a main buoyant hull,
three or more leg wells through said hull,
a jack-up leg in each of the leg wells, the jack-up legs movably coupled to said hull;
each of said leg wells surrounding said legs are formed by one or more walls, and
said walls are substantially vertically straight.
2. The jack-up rig according to claim 1 , further comprising a jacking drive system, wherein said jack-up legs are mounted so as to be individually lowered or raised by the jacking drive system, the jacking drive system attached to the main hull to facilitate movement of the jack-up legs vertically through the hull.
3. The jack-up rig according to claim 1 , further comprising a jacking drive system, wherein said jack-up legs are mounted in each leg well so as to be lowered or raised by the jacking drive system attached to the hull,
said jacking drive system comprising:
a leg driving structure for driving said jack-up legs vertically up and down relative to the main hull,
a support structure on which the leg driving structure is installed, and
a leg guide structure for guiding the movement of the jack-up legs and providing structural support of said legs,
wherein at least part of the leg guide structure is mounted close to the bottom of the hull.
4. The jack-up rig according to claim 3 , wherein:
the leg driving structure comprises jacking gears; and
the leg guide structure comprises guide rails.
5. The jack-up rig according to claim 3 , wherein at least part of the leg guide structure is mounted within 10 m to the bottom of the hull.
6. The jack-up rig according to claim 3 , wherein at least part of the leg guide structure is mounted within 7 m to the bottom of the hull.
7. The jack-up rig according to claim 3 , wherein at least part of the leg guide structure is mounted within 6 m to the bottom of the hull.
8. The jack-up rig according to claim 3 , wherein at least part of the leg guide structure is mounted within 4 m to the bottom of the hull.
9. The jack-up rig according to claim 3 , wherein at least part of the leg guide structure is mounted within 3 m to the bottom of the hull.
10. The jack-up rig according to claim 3 , wherein at least part of the leg guide structure is mounted within 2 m to the bottom of the hull.
11. The jack-up rig according to claim 3 , wherein at least part of the leg guide structure is mounted within 1 m to the bottom of the hull.
12. The jack-up rig according to claim 1 , further comprising separate spud cans attached to the lower end of each jack-up leg.
13. The jack-up rig according to claim 1 , further comprising a coupling interface system allowing the coupling of a spud can and a jack-up leg.
14. The jack-up rig according claim 13 , wherein the coupling interface system is remotely operated.
15. The jack-up rig according claim 13 , wherein the coupling interface system is remotely operated from the main control room of the jack-up rig or from a same location as the jack-up legs are operated.
16. The jack-up rig according to claim 12 , wherein said spud can comprises a system to adjust buoyancy.
17. A method of operating a jack-up rig comprising a main buoyant hull, three or more leg wells through said hull, a jack-up leg in each of the leg wells, the jack-up legs movably coupled to said hull, the method comprising:
submerging a spud can for each leg to a position accessible to the jack-up rig,
allowing a jack-up leg to be directly attached to said spud can,
floating the jack-up rig (e.g. on its main buoyant hull) and moving it into position so that the jack-up leg is located directly above the spud can, and
connecting the leg with the spud can by lowering the leg through the leg wells in the hull and/or hoisting the spud cans up onto the leg.
18. The method according to claim 17 , wherein the jack-up rig is floating on its main buoyant hull.
19. The method of claim 17 , further comprising raising the jack-up legs with attached spud cans to a level where the spud cans have clearance, transporting the jack-up rig to a site of operation for which the spud cans have been designed, installing the jack-up rig by lowering the spud cans to the seabed, and operating the jack-up.
20. The method of claim 17 , further comprising raising the jack-up legs with attached spud cans to a level where the spud cans have clearance immediately below the main hull, transporting the jack-up rig to a site of operation for which the spud cans have been designed, installing the jack-up rig by lowering the spud cans to the seabed, and operating the jack-up.
21. The method of claim 17 , where the method is performed on the location of an operation of the jack-up rig.
22. The method of claim 17 , where all spud cans are lowered to the sea floor, aligned to the jack-up rig, and the jack-up legs are lowered down onto the spud cans and connected.
23. The method of claim 17 , where one spud can is lowered to the sea floor at a time, the jack-up rig moved into place and aligned to the spud can, and the leg lowered to and fastened to the spud can.
24. The method of claim 17 , where the spud cans are lowered to the sea floor, the jack-up rig moved into place and aligned to the spud can and the leg lowered into the sea, but not all the way to the sea floor, and the spud can is hoisted from the sea floor up onto the legs and fastened.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DKPA201300438 | 2013-07-19 | ||
DKPA201300438 | 2013-07-19 |
Publications (1)
Publication Number | Publication Date |
---|---|
US20150023737A1 true US20150023737A1 (en) | 2015-01-22 |
Family
ID=51454199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/335,352 Abandoned US20150023737A1 (en) | 2013-07-19 | 2014-07-18 | Jack-up rig and method of installing the same on location of operation |
Country Status (4)
Country | Link |
---|---|
US (1) | US20150023737A1 (en) |
GB (1) | GB2522942A (en) |
NO (1) | NO20140910A1 (en) |
TW (3) | TWD174990S (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804077A (en) * | 2016-03-28 | 2016-07-27 | 武汉船用机械有限责任公司 | Pile pulling method for self-elevating platform |
KR20160105097A (en) * | 2015-02-27 | 2016-09-06 | 대우조선해양 주식회사 | Mounting structure and method for legwell of jack-up rig |
JP2023067404A (en) * | 2021-11-01 | 2023-05-16 | 富士海事工業株式会社 | Lifting device |
CN116732961A (en) * | 2023-08-14 | 2023-09-12 | 浙江华东岩土勘察设计研究院有限公司 | Positioning system of offshore jack-up platform |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SG11201806231PA (en) | 2016-01-22 | 2018-08-30 | Gustomsc Resources Bv | Measurement system, leg guide, jack-up platform |
NL2021708B1 (en) * | 2018-09-25 | 2020-05-07 | Gustomsc Resources Bv | Method for stabilizing a jack-up platform unit |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2586966A (en) * | 1949-08-08 | 1952-02-26 | Theodore M Kuss | Deep water oil well drilling system |
US3118283A (en) * | 1964-01-21 | Xkilling barge | ||
US4382718A (en) * | 1980-05-20 | 1983-05-10 | Mitsui Engineering & Shipbuilding Co., Ltd. | Vertically movable marine working platform structure having vertically movable groundable support frames |
US5018904A (en) * | 1988-07-28 | 1991-05-28 | Technic Geoproduction | Sea-bed support device for the legs of a self-elevating oil-rig platform |
US5741089A (en) * | 1994-12-23 | 1998-04-21 | Shell Offshore Inc. | Method for enhanced redeployability of hyjack platforms |
US6231269B1 (en) * | 1999-03-05 | 2001-05-15 | Friede & Goldman, Ltd. | Apparatus for releasing a rack chock of a jack-up rig |
US6523491B1 (en) * | 1999-11-12 | 2003-02-25 | Textron Inc. | Lift boat |
US20050260040A1 (en) * | 2001-04-16 | 2005-11-24 | Ingle James E | Mobile wind-driven electric generating systems and method and apparatus |
US20090090191A1 (en) * | 2007-10-05 | 2009-04-09 | Bernardino Lenders | Methods and structures for monitoring offshore platform supports |
US20100067989A1 (en) * | 2007-03-30 | 2010-03-18 | Brown Michael D | Vessel for transporting wind turbines and methods thereof |
US20110305521A1 (en) * | 2010-06-09 | 2011-12-15 | Wouter Joachim Henstra | Movable brace frame for self-installing platform |
US20120128435A1 (en) * | 2010-10-21 | 2012-05-24 | Conocophillips Company | Ice worthy jack-up drilling unit with conical piled monopod and sockets |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2906100A (en) * | 1955-05-16 | 1959-09-29 | De Long Corp | Method of operating portable marine structure |
US7037044B2 (en) * | 2003-10-15 | 2006-05-02 | Technip France | Deck-to-column connection for extendable draft platform |
KR20120139932A (en) * | 2011-06-20 | 2012-12-28 | 대우조선해양 주식회사 | Method and system of attaching and detaching spud can to the jack-up platform |
KR101805482B1 (en) * | 2011-07-07 | 2018-01-10 | 대우조선해양 주식회사 | Jack-up Platform with Attaching And Detaching Spud Can and Attaching And Detaching Method of The Spud Can |
-
2014
- 2014-07-16 GB GB1412603.1A patent/GB2522942A/en not_active Withdrawn
- 2014-07-17 NO NO20140910A patent/NO20140910A1/en not_active Application Discontinuation
- 2014-07-18 US US14/335,352 patent/US20150023737A1/en not_active Abandoned
-
2015
- 2015-04-16 TW TW104301971F patent/TWD174990S/en unknown
- 2015-04-16 TW TW104301969F patent/TWD174989S/en unknown
- 2015-04-16 TW TW104301968F patent/TWD174988S/en unknown
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3118283A (en) * | 1964-01-21 | Xkilling barge | ||
US2586966A (en) * | 1949-08-08 | 1952-02-26 | Theodore M Kuss | Deep water oil well drilling system |
US4382718A (en) * | 1980-05-20 | 1983-05-10 | Mitsui Engineering & Shipbuilding Co., Ltd. | Vertically movable marine working platform structure having vertically movable groundable support frames |
US5018904A (en) * | 1988-07-28 | 1991-05-28 | Technic Geoproduction | Sea-bed support device for the legs of a self-elevating oil-rig platform |
US5741089A (en) * | 1994-12-23 | 1998-04-21 | Shell Offshore Inc. | Method for enhanced redeployability of hyjack platforms |
US6231269B1 (en) * | 1999-03-05 | 2001-05-15 | Friede & Goldman, Ltd. | Apparatus for releasing a rack chock of a jack-up rig |
US6523491B1 (en) * | 1999-11-12 | 2003-02-25 | Textron Inc. | Lift boat |
US20050260040A1 (en) * | 2001-04-16 | 2005-11-24 | Ingle James E | Mobile wind-driven electric generating systems and method and apparatus |
US20100067989A1 (en) * | 2007-03-30 | 2010-03-18 | Brown Michael D | Vessel for transporting wind turbines and methods thereof |
US20090090191A1 (en) * | 2007-10-05 | 2009-04-09 | Bernardino Lenders | Methods and structures for monitoring offshore platform supports |
US20110305521A1 (en) * | 2010-06-09 | 2011-12-15 | Wouter Joachim Henstra | Movable brace frame for self-installing platform |
US20120128435A1 (en) * | 2010-10-21 | 2012-05-24 | Conocophillips Company | Ice worthy jack-up drilling unit with conical piled monopod and sockets |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160105097A (en) * | 2015-02-27 | 2016-09-06 | 대우조선해양 주식회사 | Mounting structure and method for legwell of jack-up rig |
KR101726434B1 (en) * | 2015-02-27 | 2017-04-12 | 대우조선해양 주식회사 | Mounting structure and method for legwell of jack-up rig |
CN105804077A (en) * | 2016-03-28 | 2016-07-27 | 武汉船用机械有限责任公司 | Pile pulling method for self-elevating platform |
JP2023067404A (en) * | 2021-11-01 | 2023-05-16 | 富士海事工業株式会社 | Lifting device |
JP7316694B2 (en) | 2021-11-01 | 2023-07-28 | 富士海事工業株式会社 | lift device |
CN116732961A (en) * | 2023-08-14 | 2023-09-12 | 浙江华东岩土勘察设计研究院有限公司 | Positioning system of offshore jack-up platform |
Also Published As
Publication number | Publication date |
---|---|
GB2522942A (en) | 2015-08-12 |
TWD174988S (en) | 2016-04-21 |
TWD174990S (en) | 2016-04-21 |
GB201412603D0 (en) | 2014-08-27 |
NO20140910A1 (en) | 2015-01-20 |
TWD174989S (en) | 2016-04-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20150023737A1 (en) | Jack-up rig and method of installing the same on location of operation | |
US5421676A (en) | Tension leg platform and method of instalation therefor | |
US5551802A (en) | Tension leg platform and method of installation therefor | |
US4456404A (en) | Method and apparatus for positioning a working barge above a sea surface | |
US20110158784A1 (en) | Arm assembly and methods of passing a pipe from a first vessel to a second vessel using the arm assembly | |
US4065934A (en) | Rig transport method | |
US6443659B1 (en) | Movable self-elevating artificial work island with modular hull | |
US20080237175A1 (en) | Extension assemblies and methods thereof | |
WO2008122898A2 (en) | Methods of positioning an elevating support vessel | |
EP2142711A2 (en) | Extension bridges and methods of tender assist | |
WO2012144952A1 (en) | A multi-functional jack up system for decommissioning an offshore platform | |
US20080237174A1 (en) | Crane support apparatus and methods thereof | |
WO2008152512A2 (en) | Track-mounted crane support | |
US4266887A (en) | Self-elevating fixed platform | |
US4041711A (en) | Method and apparatus for quickly erecting off-shore platforms | |
KR20100087094A (en) | Method for installing a drilling apparatus on a rig and for preparing drilling operations | |
JPS62215711A (en) | Ocean structure and method for anchoring the same | |
US8534213B2 (en) | Skid shoe assembly for loading and transporting large structures | |
US3946684A (en) | Semi-submersible jackup apparatus | |
US4505615A (en) | Method of supporting a shallow water drilling barge | |
RU2579162C2 (en) | Mobile drilling rig | |
WO1999048753A9 (en) | Spar construction method | |
EP3688232B1 (en) | Plug and abandonment of one or more offshore platform wellbores of an offshore platform using a marine jack-up type vessel | |
KR20150140792A (en) | Arctic telescoping mobile offshore drilling unit | |
KR20170053245A (en) | Offshore structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: A.P. MOLLER - MAERSK A/S, DENMARK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:NORDERUD-POULSEN, MORTEN;REEL/FRAME:033621/0857 Effective date: 20140731 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |