KR20100087094A - Method for installing a drilling apparatus on a rig and for preparing drilling operations - Google Patents

Method for installing a drilling apparatus on a rig and for preparing drilling operations Download PDF

Info

Publication number
KR20100087094A
KR20100087094A KR1020107008058A KR20107008058A KR20100087094A KR 20100087094 A KR20100087094 A KR 20100087094A KR 1020107008058 A KR1020107008058 A KR 1020107008058A KR 20107008058 A KR20107008058 A KR 20107008058A KR 20100087094 A KR20100087094 A KR 20100087094A
Authority
KR
South Korea
Prior art keywords
barge
platform
drilling
drilling device
interface means
Prior art date
Application number
KR1020107008058A
Other languages
Korean (ko)
Inventor
쟝-끌로드 부르동
도미니끄 미쉘
베르나르 까스떼랑
로랑 다로스
프레데릭 닐쏭
Original Assignee
디엣스웰
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 디엣스웰 filed Critical 디엣스웰
Publication of KR20100087094A publication Critical patent/KR20100087094A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B75/00Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0047Methods for placing the offshore structure using a barge

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

본 발명은, 드릴링 작업을 준비하는 방법으로서, 한번의 작업으로 리그(20)에 장비를 완전히 갖춘 드릴링 장치(10)를 다른 장소로 옮길수 있는 방식으로 설치하도록 하고, 리그의 위로 드러난 부분(21)은 하나 이상의 상부 갑판(16)을 포함한다. 이 방법은 선체가 승강수단(7a, 7c)을 지지하는 두 개의 평행하는 돌출부(1a, 1b)를 포함하는 반잠수식 공급 바지선(1)을 이용한다. 드릴링 장치(10)가 우선 인터페이스 수단(15b)을 매개로 바지선의 두 레그(1a, 1b)에 설치되고, 바지선은 리그(20) 부근으로 이동한다. 바지선은 리그의 위로 드러난 부분(21)을 돌출부 사이에 배치하도록 움직이고, 밸러스트를 제거하면서 승강 수단을 이용하여 리그의 상부 갑판보다 더 높은 곳으로 드릴링 장치(10)를 올리고, 리그(20)의 상부 갑판에 드릴링 장치를 한번의 작업으로 배치한 후에 이로부터 떨어지게 된다.The present invention provides a method for preparing a drilling operation, in which the drilling device 10 equipped with the equipment in the rig 20 can be moved to another place in one operation, and the upper portion 21 of the rig is exposed. Includes one or more top decks 16. This method utilizes a semi-submersible feed barge 1 in which the hull comprises two parallel projections 1a, 1b for supporting the lifting means 7a, 7c. The drilling device 10 is first installed on the two legs 1a, 1b of the barge via the interface means 15b, and the barge moves near the rig 20. The barge moves to place the raised part 21 of the rig between the protrusions, raises the drilling device 10 to a position higher than the upper deck of the rig by using lifting means while removing the ballast, and the top of the rig 20 The drilling device is placed on the deck in a single operation and then removed from it.

Description

드릴링 장치를 리그에 설치하여 드릴링 작업을 준비하는 방법{METHOD FOR INSTALLING A DRILLING APPARATUS ON A RIG AND FOR PREPARING DRILLING OPERATIONS}METHOD FOR INSTALLING A DRILLING APPARATUS ON A RIG AND FOR PREPARING DRILLING OPERATIONS}

본 발명은 드릴링 작업을 준비하는 방법에 관한 것으로서, 이 방법은 반잠수형 공급 바지선을 이용하여, 장비를 완전히 갖추고 있는 드릴링 장치를 바다 내지 호수의 바닥에 설치되어 있거나 고정되어 있으면서 위로 드러난 부분을 갖고 있는 플랫폼에 한번의 작업으로 설치하는 방법이다.
The present invention relates to a method of preparing a drilling operation, which uses a semi-submersible feed barge, having a fully equipped drilling device installed at the bottom of a sea or lake or having a raised portion while being fixed. This is a one-time installation on the platform.

보통 300m 정도까지의 얕은 물에서 드릴링 작업을 수행할 수 있는 여러 방법들이 있다. 이러한 방법 중 하나에서, 드릴링은 생산작업과 분리되어 있으며, "웰헤드 플랫폼(wellhead platform)"이라고 부르는 드릴링만 하는 플랫폼을 사용한다. 이 플랫폼은 보통, 거주하는 곳도 아니며 장비가 설치되지도 않았고 금속성으로서 "자켓(jacket)"이라고 부르는 바다 또는 호수의 바닥에 설치된 타워형 구조물로 이루어져 있고, 이 구조물 위에 드릴링 장치가 설치되어 있다. 이 장치는 단지 드릴링작업 또는 우물 유지보수작업("개수(改修), work over")을 하기 위해서 설치된 것이다. 또한 이 장치는 서브-구조체, 기중기 및 드릴링 장비, 예를 들어 "블로우 아웃 프리벤터"(BOP), 그리고 드릴 파이프용 핸들링 윈치(handling winch), 측정장치를 수용하는 챔버로 구성되어 있다; 이러한 드릴링 장치는 "기중기 세트" 또는 "리그(rig)"라는 이름으로 알려져 있고, 그 무게는 보통 600톤 내지 800톤에 달한다.There are several ways to perform drilling in shallow water, usually up to 300 m. In one of these methods, drilling is separate from production and uses a drilling only platform called a "wellhead platform". The platform usually consists of a tower-like structure on the bottom of a sea or lake called "jacket", which is neither inhabited nor equipped with equipment, and is metallic, with a drilling device on it. The device is only installed for drilling or well maintenance work ("work over"). The device also consists of a sub-structure, crane and drilling equipment such as a "blow out preventer" (BOP), a handling winch for the drill pipe, a chamber for receiving the measuring device; Such a drilling device is known under the name "crane set" or "rig", and its weight usually ranges from 600 to 800 tons.

플랫폼("자켓")은 엄밀히 말해서 갑판이 구비된 드릴링 작업이 이루어지기 전에 그러나 드릴링 장치는 없이 보어필드에 설치된다.The platform ("jacket") is strictly installed in the borefield before the decked drilling operation takes place but without the drilling device.

문제는, 드릴링 장치를 가능하면 저비용으로 신속하게 그리고 비교적 해수면으로부터 매우 높이, 예를 들어 20m 정도에 위치하는 곳에서 이러한 플랫폼의 상부 갑판에 설치하는 것이다. 또한 드릴링 또는 유지보수 작업이 끝났을 때 반대 작업도 할 수 있어야만 하는데, 예를 들면 드릴링 장치를 다른 플랫폼에 다시 배치하는 것이다.The problem is to install the drilling device on the upper deck of such a platform where it is located at a very high speed, for example about 20 meters, from sea level, quickly and relatively at the lowest possible cost. In addition, when the drilling or maintenance work is finished, the reverse operation must also be possible, for example by relocating the drilling device to another platform.

나아가, 드릴링 작업은 사람과 공급 에너지를 수용하고 또한 드릴 튜브나 드릴링 굴착이수 시설물과 같은 드릴링 장비를 수용하고 보관하기 위해, 기타 여러 시설물(기술지원구역, 거주구역, 유체탱크, 헬리콥터 착륙 플랫폼...)도 필요로 하고 있다. 이러한 시설들은 부피가 매우 크고 무게(수천톤)도 많이 나간다.In addition, drilling operations include many other facilities (technical support zones, residential spaces, fluid tanks, helicopter landing platforms, etc.) to accommodate human and supply energy and to accommodate and store drilling equipment such as drill tubes and drilling rigs. ..) also needs. These facilities are very bulky and weigh many thousands of tons.

한가지 알려져 있는 해결방안(영국특허공보 UK 2199791, 프랑스특허공보 FR 2474992)을 보면, 플랫폼에 일체형 부품으로 "탑 사이드"라고 부르는 완전한 하나의 상부구조물을 올려놓는 것인데, 이 상부구조물은 모든 드릴링 및 생산 시설을 포함하고 있다. 이 시설은 보통 하나 또는 다수의 대용량 부유 크레인에 의해 실행되거나, 아니면 "플로트오버(float over)" 방법에 따른 밸러스트(ballast; 선박에서 적당한 복원성을 유지하고 흘수와 배의 앞뒤 경사를 조절하기 위해 배의 하부에 싣는 중량물) 바지선을 이용하여 이루어진다. 그러나, 밸러스트 작업으로는 상부구조체를 몇 미터 이상으로 올리도록 하는 것은 불가능하다. 또한, 이러한 작업은 플랫폼의 수명과 이용에 대해 비가역적이다.One known solution (British patent publication UK 2199791, French patent publication FR 2474992) involves placing a complete superstructure called the "top side" as an integral part on the platform, which is used for all drilling and production. It includes facilities. This facility is usually carried out by one or more large floating cranes or by ballast according to the "float over" method, in order to maintain adequate stability in ships and to adjust the draft and the ship's forward and backward slopes. The heavy load on the lower part of the barge is made. However, ballasting does not make it possible to raise the superstructure above several meters. In addition, this work is irreversible to the life and use of the platform.

또 다른 해결방안으로서, 플랫폼 부근의 바닥에 놓여 있는 자가상승식 바지선 또는 "잭으로 들어올리는 작업(jack-up)" 유형의 플랫폼으로서, 드릴링에 필요한 부지와 장비를 수용할 수 있는 크기의 플랫폼을 이용하는 것이다. 드릴링 장치는 바지선과 일체로 되어 있는 외팔보 형태의 빔에 안착되어 있고, 플랫폼 위에서 가능하면 상당한 높이에서 하나의 부품으로 이동한다. 그러나, 이는 비용이 매우 많이 들며 기계적으로 까다로울뿐만 아니라 정교함도 요구하는 해결방안이다. 또한, 크기가 매우 큰 자가상승식 바지선은 바다 또는 호수 바닥에 매우 깊은 눌림 자국을 남겨놓기 때문에, 나중에 똑같은 유형의 다른 바지선을 다시 설치하는 것을 매우 어렵게 하는 문제가 있다.Another solution is a self-lifting barge or "jack-up" type platform lying on the floor near the platform, providing a platform sized to accommodate the site and equipment needed for drilling. It is to use. The drilling device is seated in a cantilevered beam that is integral with the barge and moves on a platform, possibly at a significant height, into one part. However, this is a solution that is very expensive and mechanically demanding, but also requires sophistication. In addition, very large self-lifting barges leave very deep depressions at the bottom of the sea or lake, making it very difficult to later re-install another barge of the same type.

또 다른 해결책은, "텐더(tender)"라고 부르는 바지선 또는 지원선박을 이용하는 것인데, 이 선박은 승강수단을 이용하여 약 30 내지 100 톤을 분배함으로써 플랫폼에 드릴링 장치를 설치하고, 드릴링 장치를 차차 조립해 나가는 것이다. 이는 안전성 측면에서 매우 오래 걸리고 까다로우며 위험한 해결방안이고, 따라서 몇일동안은 날씨상황도 매우 좋아야하기 때문에 비용도 많이 소요된다.
Another solution is to use a barge or support vessel called a "tender", which uses a hoist to distribute about 30 to 100 tonnes to install a drilling device on the platform and to assemble the drilling device gradually. It is going to do. This is a very long, tricky and dangerous solution in terms of safety, and is therefore costly because the weather conditions must be very good for several days.

본 발명은 한번의 작업으로, 웰헤드 및 드릴링 장치를 지지하는 갑판이 이미 설치되어 있는 플랫폼에, 장비가 완전히 갖춰진 드릴링 장치를 재배치가능하게 설치하도록 함으로써, 상술한 문제점들을 해결할 수 있는 바람직한 해결방안을 제시하는 것을 그 목적으로 한다. 매우 높은 곳에 드릴링 장치를 설치해야하는 장치는 반잠수형 바지선을 이용하도록 하고 있다. 또한 이 방법은 또한 예를 들어 "스파(Spar)" 유형의 해저면에 고정된 플랫폼에도 적용될 수 있으며, 중요한 점은 플랫폼이 파도에 의해 생기는 끌어올리는 움직임에 영향을 받지 않는다는 것이다. 이러한 단계들을 역순으로 하는 경우, 본 발명의 방법은 장비를 완전히 갖춘 드릴링 장치를 한번의 작업으로 제거할 수 있게 된다.
The present invention provides a preferred solution to solve the above-mentioned problems by repositioning the drilling equipment, which is fully equipped with equipment, on a platform where the deck for supporting the wellhead and the drilling apparatus is already installed in one operation. Its purpose is to present. A device that requires the installation of a drilling device at a very high level uses a semi-submersible barge. The method can also be applied to platforms anchored to the bottom of the "Spar" type, for example, and the important point is that the platform is not affected by the lifting motion caused by the waves. In the reverse order of these steps, the method of the present invention enables the removal of a fully equipped drilling rig in one operation.

이러한 목적을 위해, 본 발명은 드릴링 작업을 준비하는 방법으로서, 바다 내지 호수의 바닥에 설치되어 있거나 고정되어 있는 플랫폼에 장비가 완전히 갖춰진 드릴링 장치를 재배치가능하게 한번의 작업으로 설치하도록 하고, 플랫폼의 위로 드러난 부분이 하나 이상의 웰헤드와 드릴링 장치를 수용하는 하나 이상의 상부 갑판을 포함하며, 길이방향 축을 포함하는 반잠수식 공급 바지선을 이용하며, 바지선의 선체는 공간을 형성하도록 두 개의 평행하는 돌출부를 포함하고, 상기 바지선은 돌출부에 의해 지지되는 승강수단과 밸러스트 및 밸러스트 제거 수단을 포함하고,For this purpose, the present invention provides a method for preparing a drilling operation, in which the drilling apparatus, which is completely equipped with equipment, is installed in a platform installed or fixed at the bottom of the sea or lake, and repositionably installed in one operation. The raised part includes one or more wellheads and one or more upper decks to accommodate the drilling rig, using semi-submersible feed barges with longitudinal axes, the hulls of the barges have two parallel protrusions to form a space. Wherein the barge includes lifting means and ballast and ballast removal means supported by the protrusions,

바지선의 승강수단에 인터페이스 수단을 올려놓는 제1 단계와,A first step of placing the interface means on the lifting means of the barge,

인터페이스 수단에 드릴링 장치를 올려놓는 제2 단계와,A second step of placing the drilling device on the interface means;

플랫폼 부근으로 인터페이스 수단과 일체로 된 드릴링 장치를 갖는 공급 바지선을 수송하는 제3 단계와,A third step of transporting a supply barge having a drilling device integral with the interface means near the platform,

바지선이 플랫폼 부근에 도착했을 때, 인터페이스 수단을 플랫폼의 상부 갑판 보다 더 높이 해수면 위로 배치하기 위해, 바지선에 대해 밸러스트 제거작업을 하고 승강수단을 작동시킴으로써, 인터페이스 수단과 드릴링 장치를 상승시키는 제 4 단계와,When the barge arrives near the platform, the fourth step of elevating the interface means and the drilling device by performing ballast removal on the barge and actuating the lifting means to position the interface means above the platform's upper deck above sea level. Wow,

공급 바지선의 두 돌출부 사이에 플랫폼의 위로 드러난 부분을 배치하기 위해 공급 바지선을 조종하는 제5 단계와,A fifth step of manipulating the supply barge to place the raised portion of the platform between the two protrusions of the supply barge,

공급 바지선에 대해 밸러스트 작업을 하고 승강수단을 작동시킴으로써, 인터페이스 수단과 드릴링 장치를 플랫폼의 상부 갑판에 내려놓는 제6 단계를 포함하는 방법을 제공한다.Ballasting the supply barge and operating the lifting means provides a method comprising the sixth step of lowering the interface means and drilling device onto the upper deck of the platform.

제1 단계에서, 바지선과 드릴링 장치 사이의, 그 다음에는 플랫폼과 드릴링 장치 사이의 인터페이스로 사용될 수 있는 수단을 돌출부에 있는 바지선의 승강수단에 설치하고, 바지선은 예를 들어 포트 시설 내의 부두에 있게 되며 부두 또는 바지선의 크레인과 같은 승강 수단을 이용한다.In the first step, a means which can be used as an interface between the barge and the drilling device, and then between the platform and the drilling device, is installed in the lifting means of the barge in the projection, and the barge is for example at the pier in the port facility. It uses the lifting means such as the crane of the dock or barge.

제2 단계에서, 부두 또는 바지선의 크레인과 같은 승강수단을 이용함으로써 이루어지는 하나 이상의 작업을 통해서, 드릴링 장치는 하부-구조체를 매개로 인터페이스 수단 위에 배치된다.In a second step, the drilling device is disposed over the interface means via the sub-structure, via one or more operations made by using lifting means such as a dock or barge crane.

제3 단계의 핵심이 되는 수송과정 중에, 인터페이스 수단과 드릴링 장치로 이루어진 조립체는 승강수단과 일체로 되어 있고, 승강수단은 바지선의 안정성을 개선하기 위해 아래쪽에 배치되는 것이 바람직하다.During the transportation process, which is the core of the third stage, the assembly consisting of the interface means and the drilling device is integrated with the lifting means, and the lifting means are preferably arranged below to improve the stability of the barge.

본 발명의 제4 단계에서, 바지선이 플랫폼에 매우 가까이 도달하게 되면, 바지선에 대해 밸러스트 제거작업을 하고 승강 수단을 이용함으로써 드릴링 장치와 인터페이스 수단은 연속적으로 또는 동시에 올라가게 된다. 이러한 두가지를 조합하여 실시함으로써, 조립체를 상당한 높이까지 올릴 수 있다.In the fourth step of the invention, when the barge reaches very close to the platform, the drilling device and the interface means are raised continuously or simultaneously by performing ballast removal on the barge and using the lifting means. By combining these two, the assembly can be raised to a significant height.

그 다음 단계에서, 바지선은 플랫폼에 더 가까이 다가가서 돌출부 사이에 플랫폼의 위로 드러난 부분이 배치될 수 있도록 조정된다. 플랫폼을 손상시키지 않도록, 바지선은 앵커를 이용하거나 자동위치제어을 하거나 아니면 이들 둘 다를 모두 이용하여, 미리 고정시키는 작업(anchoring)을 수행하게 될 것이다. 따라서, 그라운드 태클(ground tackle) 및/또는 자동위치제어(dynamic positioning)를 이용하여 조정이 이루어진다.In the next step, the barge is adjusted closer to the platform so that the raised part of the platform can be placed between the protrusions. In order not to damage the platform, the barge will perform anchoring using anchors, automatic positioning or both. Thus, adjustments are made using ground tackle and / or dynamic positioning.

드릴링 장치와 인터페이스 수단은 예를 들어 신속한 바지선의 밸러스트 작업 및/또는 신속한 승강수단의 하강을 통해서 아래로 내려가서 플랫폼의 상부 갑판위에 놓이게 된다.The drilling device and the interface means are lowered down on the upper deck of the platform, for example, by descending the ballast work of the rapid barge and / or by lowering the speed of the lifting means.

마지막으로, 바지선과 드릴링 시스템을 갖는 플랫폼 사이에 예를 들어, 승무원용 다리, 전선, 유체 채널과 같은 연결수단을 설치하게 된다. 예를 들어 드릴 파이프와 같은 큰 드릴링 재료가 바지선에 설치되어 있는 크레인 로더를 이용하여 점진적으로 플랫폼으로 이송된다. 드릴링 작업에 대해서 사람과 물류적으로 많은 지원을 제공하는 측면에서, 바지선의 크기는 모든 장비(기술지원구역, 거주구역, 에너지 생성, 머드 플랜트, 헬리콥터 플랫폼...)를 수용할 수 있을 정도가 되어야 한다.Finally, a connecting means such as, for example, a crew leg, an electric wire, a fluid channel is installed between the barge and the platform with the drilling system. Large drilling materials, for example drill pipes, are gradually transferred to the platform using crane loaders installed on barges. In terms of providing human and logistical support for drilling operations, the barge must be large enough to accommodate all equipment (technical support zones, residential areas, energy generation, mud plants, helicopter platforms ...). do.

일단 드릴링 장치가 플랫폼에 놓이고, 바지선이 플랫폼으로부터 떨어지게 되면, 접이식 갑판 또는 관절식 해치커버 유형의 탈착식 또는 집어넣을 수 있는 장치를 이용하여 바지선의 선체의 돌출부 사이 공간을 커버하는 것이 바람직하다. 따라서, 예를 들어 드릴 파이프와 같은 드릴링 재료를 배치하기 위한 사용가능한 갑판의 표면을 크게 증가시킬 수 있어서 드릴링 작업을 보다 수월하게 할 수 있게 된다. 이 장치가 일단 펼쳐지게 되면 바지선의 구조체의 강성에도 도움이 된다.Once the drilling device is placed on the platform and the barge is removed from the platform, it is desirable to cover the space between the protrusions of the barge's hull using a removable deck or retractable device of the folding deck or articulated hatch cover type. Thus, the surface of the deck available for placing drilling materials, such as, for example, drill pipes, can be greatly increased, making drilling easier. Once deployed, it also helps with the rigidity of the barge's structure.

특정 케이스에 있어서, 예를 들어 플랫폼이 오래되고 부분적으로 부식된 경우, 이 플랫폼은 드릴 튜브를 포함하여 장비를 완전히 갖춘 드릴링 장치와 그 인터페이스 수단의 하중을 지지하여 견뎌내기에는 충분하지 않을 수 있다. 이 경우, 제6 단계에서, 플랫폼에 드릴링 장치의 하중을 전가하도록 즉, 하중이 바지선의 승강 지지부 위에 그리고 갑판에 분배되도록 하는 것이 바람직하다. 바지선의 피할수 없는 움직임을 상쇄하기 위해, 인터페이스 수단과 인터페이스 수단이 안착하고 있는 갑판 사이에 배치된 강도 센서(예를 들어, 스트레인 게이지)와 보조 동력장치가 필요하다. 이 경우, 드릴링 작업을 위해서, 플랫폼이 돌출부 사이에 계속 있고 제7 단계 내지 제8 단계가 일어나지 않도록 바지선이 배치되어 있다.In certain cases, for example, if the platform is old and partially corroded, the platform may not be sufficient to support and withstand the load of the drilling device and its interface means, including the drill tube, with a fully equipped machine. In this case, in the sixth step, it is preferable to transfer the load of the drilling device to the platform, ie to distribute the load over the lifting support of the barge and to the deck. In order to offset the inevitable movement of the barge, a strength sensor (eg, strain gauge) and an auxiliary power unit are required between the interface means and the deck on which the interface means rest. In this case, for drilling purposes, barges are arranged so that the platform remains between the projections and the seventh to eighth steps do not occur.

인터페이스 수단은 예를 들어 제1 단계 중에 바지선의 길이방향 축에 수직하고 단부에서 바지선의 승강수단에 안착하고 있는 두 개의 평행하는 빔을 포함하는 구조체로 형성될 수 있다.The interface means can be formed, for example, of a structure comprising two parallel beams perpendicular to the longitudinal axis of the barge during the first step and seated in the lifting means of the barge at the end.

본 발명의 방법의 펼치는 작업 전체에 있어서, 드릴링 장치는 인터페이스 빔에 안착되어 있다. 인터페이스 빔은 모든 드릴링 작업 중에 플랫폼에 안착하고 있고, 드릴링 장치는 빔 전체 위에 안착하고 있다. 이로써, 본 발명의 단계들을 역순으로 실행함으로써 똑같은 유형의 바지선으로 드릴링 장치를 매우 신속하게 제거하고, 예를 들어 다른 플랫폼에 놓일 수 있게 된다. 공지된 방법에 있어서, 플랫폼에 있는 각각의 웰헤드에 접근하기 위해 인터페이스 빔은 또한 평면의 두 방향을 따라 상부 갑판에서 드릴링 장치를 이동시킬 수 있다.Throughout the unfolding operation of the method of the invention, the drilling device is seated in the interface beam. The interface beam rests on the platform during all drilling operations and the drilling device rests over the entire beam. This makes it possible to remove the drilling device very quickly with the same type of barge by placing the steps of the invention in reverse order, for example on different platforms. In known methods, the interface beam can also move the drilling device in the upper deck along two directions of plane to access each wellhead in the platform.

그러나, 상기 빔은 바지선의 돌출부의 내부 공간과 길이가 같고, 빔이 안착하는 갑판의 측면보다 더 길고, 만일 빔이 고정된 상태에 있게 되면 나중에 바지선을 조종하는 것을 방해할 염려가 있다. 또한, 빔은 플랫폼에 불필요하게 하중을 가하게 된다. 따라서, 각각의 빔은, 예를 들어 스플라이싱에 의해 제1 단계 내지 제6 단계가 이루어지는 동안 일체로 되고 그후 바지선의 승강수단을 이용하여 분리될 수 있는 분리가능한 부분을 각 단부에 포함하는 것이, 바람직하다.However, the beam is the same length as the inner space of the barge's protrusions, and is longer than the side of the deck on which the beam rests, and if the beam remains stationary it may interfere with maneuvering the barge later. In addition, the beam unnecessarily loads the platform. Thus, each beam comprises at each end a separable portion which can be integrated during the first to sixth steps, for example by splicing and then separated using the lifting means of the barge. , desirable.

본 발명의 방법은 첨부된 도면을 참고하여 아래에서 설명하는 내용을 보면 더욱 명확히 이해할 수 있을 것이다.
The method of the present invention will be more clearly understood from the following description with reference to the accompanying drawings.

도 1a 및 도 1b는 본 발명의 방법을 실시하는데 사용되는 바지선에 대한 두 사시도이다.
도 2는 플랫폼에 설치되도록 되어 있는, 인터페이스 빔에 배치된 완전히 장비를 갖춘 드릴링 장치의 측면도이다.
도 3a 및 도 3n은 본 발명의 방법의 단계들을 표로 나타내는 바지선의 측면도들이다.
도 4는 인터페이스 빔의 측면도이다.
도 5는 본 발명의 방법에 의해 사용되는 바지선을 예시적으로 나타내는 측면도이다.
1A and 1B are two perspective views of a barge used to practice the method of the present invention.
FIG. 2 is a side view of a fully equipped drilling device disposed on an interface beam, adapted to be installed on a platform. FIG.
3A and 3N are side views of a barge that tabulates the steps of the method of the present invention.
4 is a side view of the interface beam.
5 is a side view illustratively showing a barge used by the method of the present invention.

도 1a에 도시된 반잠수형 바지선(1)의 선체는 배의 선미부분에 두 개의 돌출부(1a, 1b)를 포함하는데, 이 돌출부는 예를 들어 바지선의 갑판 중 하나를 연장시키고, 플랫폼의 수면 위로 드러난 부분이 예를 들어 30x40 m 정도의 자리를 차지하기에 충분한 공간(2)을 형성한다. 이러한 돌출부는 완전히 장비를 갖춘 드릴링 장치의 무게를 충분히 지탱할 수 있도록 되어 있다. 바지선은 또한 기술지원구역(3a, 3b)과, 헬리콥터 착륙 플랫폼(4)과, 거주구역(5)과, 주 크레인(6a) 및 드릴링 작업에 필요한 모든 지원을 할 수 있는 부 크레인(6b)을 포함하고 있다. 바지선은 구조체 내에 밸러스트 및 밸러스트 제거 수단(ballasting and deballsting means)을 포함하는 데, 이 수단은 예를 들어 속이 빈 중공바디와 같은 것으로서 펌프(도시 안함)를 이용하여 바다물이나 다른 유체를 채우고 비울 수 있어, 건현(freeboard, 뱃전의 수면 위로 드러난 부분)을 크게 바꿀 수 있다. 바지선은 길이방향 축(A-A')을 포함하고 있다.The hull of the semi-submersible barge 1 shown in FIG. 1a includes two protrusions 1a and 1b at the stern of the ship, which extend for example one of the decks of the barge and onto the surface of the platform. The exposed part forms a sufficient space 2 to occupy a position of, for example, 30 × 40 m. These projections are designed to support the weight of a fully equipped drilling rig. The barge also has technical support zones 3a and 3b, helicopter landing platform 4, residential area 5, main crane 6a and an auxiliary crane 6b capable of providing all necessary support for drilling operations. It is included. Barges include ballasting and deballsting means in the structure, such as hollow hollow bodies, for example, which can be filled and emptied of sea water or other fluids using pumps (not shown). This can significantly change the freeboard. The barge includes a longitudinal axis A-A '.

바지선(1)은 4개의 리프트 타워로서, 돌출부(1a)에 안착하고 있는 리프트 타워(7a, 7b)와 돌출부(1b)에 안착하고 있는 리프트 타워(7c, 7d)를 포함하고 있다. 이 리프트 타워는 일반적으로 그 높이가 10 내지 15 미터이며, 리프트 타워는 리트프 지지부를 포함하는데 드릴링 장치는 인터페이스 수단을 통해서 지지부에 안착하고 있고, 예를 들어 각각 250 t까지 들어올릴 수 있는 강력한 유압식 윈치(winch) 또는 다른 승강 시스템이 구비되어 있다.The barge 1 is four lift towers, and includes lift towers 7a and 7b resting on the protrusion 1a and lift towers 7c and 7d resting on the protrusion 1b. The lift towers are typically 10 to 15 meters in height, and the lift towers include a lift support, the drilling device being mounted to the support via the interface means, for example a powerful hydraulic system that can lift up to 250 t each. Winches or other lift systems are provided.

이 도면에서, 접이식 갑판(8)이 접혀져 있어서, 선체의 돌출부(1a, 1b) 사이의 공간(2)은 개방된 상태에 있다. 도 1b에, 접이식 갑판(8)은 펼쳐진 상태에 있고, 드릴 파이프와 같은 드릴링 장치가 배열되어 있다.In this figure, the foldable deck 8 is folded so that the space 2 between the protrusions 1a, 1b of the hull is in an open state. In FIG. 1B, the folding deck 8 is in an unfolded state, in which a drilling device such as a drill pipe is arranged.

도 1의 바지선은 추진수단을 생략한 채로 도시되어 있지만, 자가-추진이 가능할 수 있다는 것을 알 수 있다. 바지선은 자동위치제어(dynamic positionin) 수단을 포함하고 있는데, 도시 되어 있지 않지만 예를 들어 다중-방향 프로펠러와 같은 것이 있다.Although the barge of Figure 1 is shown with the propulsion omitted, it can be seen that self-propulsion may be possible. The barge includes a dynamic positionin means, although not shown but for example a multi-directional propeller.

도 2는 플랫폼(20)에 설치된 완전히 장비를 갖춘 드릴링 장치를 나타내고 있다. 이 장치는 하부-구조체(11), 기중기(12), BOP와 같은 드릴링 장비(13), 및 기타 장비(14)를 포함하고 있다. 드릴링 장치는 인터페이스 빔(15a, 15b)에 안착되어 있다. 플랫폼(20)은 두 개의 갑판을 포함하는 수면위로 드러난 부분(21)을 포함하고 있고, 이 갑판에는 상부 갑판(16)이 포함되어 있는데 이 상부 갑판에 인터페이스 수단(15a, 15b)이 안착되어 있다. 상부 갑판(16)은 보통 해수면(O) 보다 18 내지 20 미터 정도 높은 곳에 있다.2 shows a fully equipped drilling apparatus installed on platform 20. The device comprises a sub-structure 11, a crane 12, a drilling rig 13 such as a BOP, and other equipment 14. The drilling device is seated on the interface beams 15a, 15b. The platform 20 comprises a raised surface 21 comprising two decks, which includes an upper deck 16 on which the interface means 15a, 15b are seated. . The upper deck 16 is usually about 18 to 20 meters above sea level O.

도 3a 내지 도 3n은 본 발명의 방법에 의한 여러가지 단계들을 나타내고 있다. 도 3a 내지 3e에, 예를 들어 포트 시설에서, 드릴링 장치(10)와 인터페이스 수단(15)이, 바지선의 돌출부(1a, 1b)에 의해 지지되는 리프트 타워 위에 설치되는 것을 볼 수 있고, 다섯개의 하위-단계로 되어 있다; 하위-단계의 수는 예를 들어 바지선에 대하여 이용가능한 리프트 수단의 성능 및/또는 시간에 따라 달라질 수 있다. 도시된 예에서, 드릴링 장치(10)는 바지선의 리프트 타워(7a, 7b, 7c, 7d)의 하부측 리프트 지지부에 배치되어 있다. 3A-3N illustrate various steps by the method of the present invention. 3a to 3e, for example in a port facility, it can be seen that the drilling device 10 and the interface means 15 are installed on a lift tower supported by the barges 1a and 1b of the barge, In sub-steps; The number of sub-steps may depend, for example, on the performance and / or time of the lift means available for the barge. In the example shown, the drilling device 10 is arranged in the lower lift support of the barge lift towers 7a, 7b, 7c, 7d.

도 3g는 드릴링 장치를 지지하는 바지선이 플랫폼 쪽으로 자가-추진식으로 수송되는 것을 보여주고 있다; 바지선은 견인될 수도 있다. 수송중에, 예를 들어 해안부근에서, 바지선은 안전성을 보다 확보하기 위해 밸러스트(ballast)를 이용하여 단단히 고정될 수 있다.3g shows that the barge supporting the drilling device is transported self-propelled towards the platform; The barge may be towed. During transport, for example near the coast, the barge can be secured using ballast to ensure more safety.

도 3h에서, 바지선은 플랫폼(20)에 더 가까워지도록 조종되기 시작하여, 바지선의 돌출부(1a, 1b) 사이에 플랫폼의 위로 나와있는 부분(21)이 배치되도록 뒤로부터 접근하게 된다. 지면에 태클(도시 안됨)을 사용하거나 동적 앵커 수단을 사용함으로써 조종은 끝난다. 앵커는 미리 준비되어 있거나 아니면 바지선 자체에 구비되어 있을 수 있다.In FIG. 3H, the barge begins to steer closer to the platform 20, approaching from behind so that the portion 21 extending above the platform is disposed between the protrusions 1a, 1b of the barge. Maneuvering is done by using a tackle (not shown) on the ground or by using dynamic anchoring means. The anchor may be prepared in advance or provided on the barge itself.

도 3i에서, 바지선은 플랫폼(20)에 더 가까워지고, 인터페이스 수단(15)이 플랫폼(20)의 상부 갑판(16) 보다 더 높아 지도록 드릴링 장치(10)를 올린다. 이렇게 올리는 작업은 바지선을 밸러스트 제거작업을 하여 고정하고 리프트 타워(7)를 작동함으로써 종료된다.In FIG. 3 i, the barge is closer to the platform 20 and raises the drilling device 10 so that the interface means 15 is higher than the upper deck 16 of the platform 20. The lifting operation is completed by fixing the barge by removing the ballast and operating the lift tower 7.

도 3j에 도시된 다음 단계를 보면, 바지선은 플랫폼의 위로 나와있는 부분(21)을 선체의 돌출부(1a, 1b) 사이에 배치하도록 조종되었다. 도 3k는 같은 상태에 있는 바지선과, 드릴링 장치(10)와, 플랫폼(20)의 입면도이다. 드릴링 장치(10)는 리프트 수단(7a, 7b, 7c, 7d)의 상부 부분에서 빔(15a)(안보임)과 빔(15b) 위에 놓여 있고, 플랫폼의 위로 나와 있는 부분(21)은 바지선의 돌출부(1a, 1b) 사이에 있는 것을 볼 수 있다.In the next step shown in FIG. 3J, the barge was steered to place the portion 21 emerging above the platform between the hull protrusions 1a and 1b. 3K is an elevational view of the barge, drilling device 10 and platform 20 in the same state. The drilling device 10 lies on the beam 15a (invisible) and the beam 15b in the upper part of the lift means 7a, 7b, 7c, 7d, and the part 21 extending above the platform is the projection of the barge. You can see that it is between (1a, 1b).

도 3l에 도시된 것처럼, 드릴링 장치(10)는 밸러스트를 이용하거나 아니면 아래쪽으로 리프트 타워(7a, 7b, 7c, 7d)를 작동시키거나 또는 이들 두가지를 모두 실행하여, 인터페이스 수단(15a, 15b)을 매개로 플랫폼(20)의 상부 갑판(16)에 안착할 수 있도록 천천히 아래로 내려가게 된다. 버퍼(도시 안됨)가 인터페이스 수단(15a, 15b)과 플랫폼(20)의 상부 갑판(16) 사이에 배치되는데, 이는 예를 들면 바지선을 들어올리는 것 때문에 발생할 수 있는 드릴링 장치(10)와의 과도한 접촉에 의해 플랫폼(20)을 손상시키는 것을 피하기 위한 것이다. 일단 접촉이 되면, 바지선은 드릴링 장치와 떨어지도록 계속해서 밸러스트 제거작업을 하게 된다.As shown in FIG. 3L, the drilling device 10 utilizes ballasts or actuates the lift towers 7a, 7b, 7c, 7d downwards or both to implement the interface means 15a, 15b. Slowly descending to be seated on the upper deck 16 of the platform 20 via the. A buffer (not shown) is arranged between the interface means 15a, 15b and the upper deck 16 of the platform 20, which is for example excessive contact with the drilling device 10 which may arise due to lifting the barge. This is to avoid damaging the platform 20 by. Once in contact, the barge continues to remove the ballast from the drilling rig.

도 3n에 도시된 본 발명의 마지막 단계에서, 바지선은 지면 태클(도시 안함) 및/또는 동적 앵커 수단을 이용하여 드릴링 장치(10)를 지지하는 플랫폼(20) 부근에 고정된다. 접이식 갑판(8)은 펼쳐져서 바지선의 돌출부(1a, 1b) 사이의 공간(2)을 커버하게 된다; 드릴링 장비는 이곳에 놓아두는게 바람직하다.In the last step of the invention shown in FIG. 3N, the barge is secured near the platform 20 supporting the drilling device 10 using ground tackle (not shown) and / or dynamic anchor means. The folding deck 8 is spread out to cover the space 2 between the protrusions 1a and 1b of the barge; Drilling equipment is preferably placed here.

마지막으로, 드릴링 작업을 할수 있도록, 브리지, 전도체, 및 파이프와 같은 연결수단(22)이 바지선과 플랫폼(20) 사이에 설치된다.Finally, connecting means 22 such as bridges, conductors, and pipes are installed between the barge and the platform 20 to allow drilling.

도 4는 플랫폼(20)의 상부 데크(16)에 안착하고 있는 인터페이스 빔들 중 하나의 인터페이스 빔(15b, 15a)을 나타내고 있는데, 인터페이스 빔은 두 개의 분리가능한 부분(15c와 15d, 15e와 15f)을 포함하고 있는데 예를 들어 스플라이싱에 의해 빔의 본체와 일체로 되어 있고, 또한 예를 들어 바지선의 크레인(6a, 6b)을 이용하여 드릴링 장치가 플랫폼에 놓이게 되면 인터페이스 빔은 분리된다.FIG. 4 shows one of the interface beams 15b, 15a of the interface beams resting on the upper deck 16 of the platform 20, with the interface beams being two separable portions 15c and 15d, 15e and 15f. It is integrated with the main body of the beam, for example by splicing, and the interface beam is separated when the drilling device is placed on the platform, for example using cranes 6a, 6b of the barge.

도 5는 본 발명의 방법에 의해 사용되는 바지선의 예를 나타내고 있다. 그 선체는 공간(2)을 형성하는 두 개의 돌출부(1a, 1b)를 후방부에 포함하고 있으며, 이 공간에 플랫폼(20)의 위로 드러난 부분(21)이 자리를 잡을 수 있다. 돌출부(1a, 1b)는 4개의 리프트 타워(7a, 7b, 7c, 7d)를 지탱하고 있다. 유동 부두(30a, 30b)와 수직부(31a, 31b)는 밸러스트로 사용되는 중공 체적부를 포함하고 있다. 구조체(32)는 기술지원구역과 거주구역을 수용한다.5 shows an example of a barge used by the method of the present invention. The hull comprises two projections 1a, 1b forming the space 2 at the rear, in which the part 21 exposed above the platform 20 can be located. The protrusions 1a and 1b carry four lift towers 7a, 7b, 7c and 7d. The flow piers 30a and 30b and the vertical portions 31a and 31b include hollow volumes used as ballasts. The structure 32 houses a technical support area and a residential area.

도 1a와 도 1b는 드릴링 장치(10)가 플랫폼(20) 위에 놓여졌을 때 공간(2)을 커버할 수 있게 하는, 예를 들어 접이식 부두 또는 관절식 해치 커버의 형태로 되어 있는, 집어넣을 수 있는 수단(8)을 포함하는 바지선의 예를 보여주고 있다.
1A and 1B are retractable, for example in the form of a foldable wharf or articulated hatch cover, which makes it possible to cover the space 2 when the drilling device 10 is placed on the platform 20. An example of a barge comprising the means 8 is shown.

Claims (9)

장비가 완전히 갖춰진 드릴링 장치(10)를 바다 내지 호수의 바닥에 설치되어 있거나 고정되어 있는 플랫폼(20)에 한번의 작업으로 재배치가능하게 설치하고, 플랫폼의 위로 드러난 부분(21)이 하나 이상의 웰헤드와 드릴링 장치를 수용하는 하나 이상의 상부 갑판(16)을 포함하며, 길이방향 축(A-A')을 포함하며 선체가 공간(2)을 형성하도록 두 개의 평행하는 돌출부(1a, 1b)를 포함하는 반잠수식 공급 바지선(1)을 이용하며, 상기 바지선(1)은 돌출부(1a, 1b)에 의해 지지되는 승강수단(7a, 7b, 7c, 7d)과 밸러스트 및 밸러스트 제거 수단을 포함하는, 드릴링 작업을 준비하는 방법에 있어서,
상기 바지선(1)의 승강수단(7a, 7b, 7c, 7d)에 상기 인터페이스 수단(15a, 15b)을 올려놓는 제1 단계와,
상기 인터페이스 수단(15a, 15b)에 상기 드릴링 장치(10)를 올려놓는 제2 단계와,
상기 플랫폼(20) 부근으로, 상기 인터페이스 수단(15a, 15b)과 일체로 된 드릴링 장치(10)를 갖는 공급 바지선을 수송하는 제3 단계와,
상기 바지선이 플랫폼(20) 부근에 도착했을 때, 상기 인터페이스 수단(15a, 15b)을 해수면 위로 플랫폼(20)의 상부 갑판(16) 보다 더 높이 배치하기 위해, 바지선에 대해 밸러스트 제거작업을 하고 승강수단(7a, 7b, 7c, 7d)을 작동시킴으로써, 인터페이스 수단(15a, 15b)과 드릴링 장치(10)를 상승시키는 제 4 단계와,
상기 플랫폼(20)의 위로 드러난 부분(21)이 공급 바지선의 두 돌출부(1a, 1b) 사이에 배치되도록 공급 바지선을 조종하는 제5 단계와,
공급 바지선에 대해 밸러스트 작업을 하고 승강수단(7a, 7b, 7c, 7d)을 작동시킴으로써, 상기 인터페이스 수단(15a, 15b)과 드릴링 장치(10)를 플랫폼의 상부 갑판(16)에 내려놓는 제6 단계를 포함하는 드릴링 작업을 준비하는 방법.
The fully equipped drilling device 10 is repositionably installed in one operation on the platform 20, which is installed or fixed at the bottom of the sea or lake, with one or more wellheads with a raised part 21 of the platform. And at least one upper deck 16 for receiving the drilling device, comprising a longitudinal axis A-A 'and comprising two parallel protrusions 1a, 1b so that the hull forms a space 2. Using a semi-submersible supply barge 1, wherein the barge 1 includes lifting means 7a, 7b, 7c, 7d and ballast and ballast removal means supported by the protrusions 1a, 1b, In the method of preparing a drilling operation,
A first step of placing the interface means 15a, 15b on the lifting means 7a, 7b, 7c, 7d of the barge 1;
A second step of placing the drilling device 10 on the interface means 15a and 15b,
In the vicinity of the platform 20 a third step of transporting a supply barge with a drilling device 10 integrated with the interface means 15a, 15b;
When the barge arrives near the platform 20, the ballast is removed from the barge and elevated to place the interface means 15a, 15b higher than the upper deck 16 of the platform 20 above sea level. A fourth step of raising the interface means 15a, 15b and the drilling device 10 by operating the means 7a, 7b, 7c, 7d,
A fifth step of manipulating the supply barge such that the raised part 21 of the platform 20 is disposed between the two protrusions 1a and 1b of the supply barge,
A sixth to lower the interface means 15a, 15b and drilling device 10 onto the upper deck 16 of the platform by ballasting the supply barge and activating the elevating means 7a, 7b, 7c, 7d. Method of preparing a drilling operation comprising the steps.
제1항에 있어서,
상기 바지선을 플랫폼(20)에서 떨어지도록 이동시키고, 상기 플랫폼 부근에 위치시키는 제7 단계와,
공급 바지선과 드릴링 장치 사이에서 에너지, 사람, 물품, 액체를 운송하여 드릴링 작업을 실행할 수 있도록, 상기 바지선과 드릴링 장치(10) 사이에 연결수단(22)을 배치하는 제8 단계를 더 포함하는 것을 특징으로 하는 드릴링 작업을 준비하는 방법.
The method of claim 1,
Moving the barge away from the platform 20 and positioning it near the platform;
And an eighth step of arranging the connecting means 22 between the barge and the drilling device 10 so as to carry out drilling operations by transporting energy, people, goods, and liquid between the supply barge and the drilling device. How to prepare for a drilling operation.
제1항에 있어서,
드릴링 작업을 위한 큰 갑판표면을 갖도록, 집어넣을 수 있는 장치(8)를 펼침으로써 바지선의 두 돌출부(1a, 1b) 사이의 공간(2)을 커버하는 제9 단계를 더 포함하는 것을 특징으로 하는 드릴링 작업을 준비하는 방법.
The method of claim 1,
Further comprising a ninth step of covering the space 2 between the two projections 1a, 1b of the barge by unfolding the retractable device 8 to have a large deck surface for drilling operations. How to prepare for drilling work.
제1항에 있어서,
상기 제6 단계에서, 하중이 플랫폼(20) 및 바지선(1) 위에 분배되어 상기 플랫폼(20)이 받는 응력이 감소하도록, 상기 플랫폼(20)의 상부 갑판(16)위에서의 인터페이스 수단(15a, 15b) 및 드릴링 장치(10)의 하중 전달은 부분적으로 이루어지는 것을 특징으로 하는 드릴링 작업을 준비하는 방법.
The method of claim 1,
In the sixth step, the load is distributed over the platform 20 and the barge 1 so that the interface means 15a on the upper deck 16 of the platform 20 are reduced so that the stress on the platform 20 is reduced. 15b) and load transfer of the drilling device (10) in part.
제1항 내지 제4항 중 어느 한 항에 있어서,
상기 인터페이스 수단은 둘 이상의 빔(15a, 15b)을 포함하는 구조체 형태를 취하고,
상기 제1 단계에서, 상기 빔(15a, 15b)은 바지선의 길이방향 축(A-A')에 직교하는 상기 승강수단(7a, 7b, 7c, 7d)에 배치되고, 상기 길이방향 축을 따라 빔(15a)은 최전방에 있고 빔(15b)은 최후방에 있고,
상기 제2 단계에서, 상기 드릴링 장치(10)는 상기 빔(15a, 15b)에 배치되고,
상기 제6 단계에서, 상기 빔(15a, 15b)은 플랫폼의 상부 갑판(16)에 배치되고, 드릴링 장치(10)는 이 빔 위에 안착되는 것을 특징으로 하는 드릴링 작업을 준비하는 방법.
The method according to any one of claims 1 to 4,
The interface means takes the form of a structure comprising at least two beams 15a, 15b,
In the first step, the beams 15a, 15b are arranged on the elevating means 7a, 7b, 7c, 7d orthogonal to the longitudinal axis A-A 'of the barge, and along the longitudinal axis. 15a is at the forefront and beam 15b is at the rear,
In the second step, the drilling device 10 is arranged in the beams 15a and 15b,
In the sixth step, the beam (15a, 15b) is arranged on the upper deck (16) of the platform and the drilling device (10) is seated on the beam.
제5항에 있어서,
각각의 빔(15a, 15b)은 각각의 단부에 분리가능한 부분(15c, 15d, 15e, 15f)을 포함하고, 분리가능한 부분은 상기 제1 단계 내지 제6 단계를 수행하는 동안 상기 빔과 일체로 되어 있고,
하나 이상의 상기 분리가능한 부분(15c, 15d, 15e, 15f)을 분리하는 단계를 더 포함하는 것을 특징으로 하는 드릴링 작업을 준비하는 방법.
The method of claim 5,
Each beam 15a, 15b includes separable portions 15c, 15d, 15e, 15f at each end, and the separable portion is integral with the beam during the first to sixth steps. It is,
Separating at least one of said separable portions (15c, 15d, 15e, 15f).
제1항, 제4항, 제5항 및 제6항 중 어느 한 항에 있어서,
상기 제6 단계를 수행하는 동안 충격없이 상기 드릴링 장치(10)를 배치할 수 있도록, 버퍼수단이 상기 플랫폼(20)의 상부갑판(16)과 상기 인터페이스 수단(15a, 15b) 사이에 배치되는 것을 특징으로 하는 드릴링 작업을 준비하는 방법.
The method according to any one of claims 1, 4, 5 and 6,
A buffer means is disposed between the upper deck 16 of the platform 20 and the interface means 15a, 15b so that the drilling device 10 can be arranged without impact during the sixth step. How to prepare for a drilling operation.
제1항 내지 제7항 중 어느 한 항에 따른 드릴링 작업을 준비하는 방법을 실시하기 위한 반잠수형 바지선으로서,
뾰족한 스템(33a, 33b)을 포함하는 두 개의 평행하는 유동 부두(30a, 30b)를 포함하고, 각각의 상기 유동 부두의 위에는 중공 수직 구조체(31a, 31b)가 설치되어 있고, 상기 수직 구조체는 유동 부두의 후방으로부터 유동 부두의 스템 부근까지 형성되어 있고, 상기 수직 구조체(31a, 31b)는 수평 구조체(32)에 의해 정상부에서 연결되어 있고, 바지선의 후방부에 공간(2)을 한정하는 두 돌출부(1a, 1b)를 형성하도록 상기 수평 구조체는 수직 구조체(31a, 31b)의 전방부 위에 형성되어 있고, 상기 돌출부는 승강수단(7a, 7b, 7c, 7d)을 지지하는 것을 특징으로 하는 바지선.
A semi-submersible barge for carrying out a method for preparing a drilling operation according to any one of claims 1 to 7,
Two parallel flow piers 30a, 30b comprising pointed stems 33a, 33b, each of which is provided with hollow vertical structures 31a, 31b, which flow It is formed from the rear of the pier to the vicinity of the stem of the floating pier, the vertical structures 31a, 31b are connected at the top by a horizontal structure 32, and two protrusions defining a space 2 at the rear of the barge. The barge is characterized in that the horizontal structure is formed on the front portion of the vertical structure (31a, 31b) so as to form (1a, 1b), the protrusion supporting the elevating means (7a, 7b, 7c, 7d).
제8항에 있어서,
상기 바지선은, 펼쳐졌을 때 상기 돌출부(1a, 1b) 사이의 공간(2)을 커버하는, 집어넣을 수 있는 수단(8)을 포함하는 것을 특징으로 하는 바지선.
The method of claim 8,
The barge comprises a retractable means (8) which, when unfolded, covers the space (2) between the protrusions (1a, 1b).
KR1020107008058A 2007-09-13 2008-09-12 Method for installing a drilling apparatus on a rig and for preparing drilling operations KR20100087094A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR0706409A FR2921098B1 (en) 2007-09-13 2007-09-13 METHOD FOR ESTABLISHING A DRILLING APPARATUS AT SEA AND DRILLING PREPARATION
FR0706409 2007-09-13

Publications (1)

Publication Number Publication Date
KR20100087094A true KR20100087094A (en) 2010-08-03

Family

ID=39420334

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020107008058A KR20100087094A (en) 2007-09-13 2008-09-12 Method for installing a drilling apparatus on a rig and for preparing drilling operations

Country Status (4)

Country Link
KR (1) KR20100087094A (en)
CN (1) CN102137973A (en)
FR (1) FR2921098B1 (en)
WO (1) WO2009090321A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190063149A (en) * 2017-11-29 2019-06-07 삼성중공업 주식회사 Variable top side platform

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102712350B (en) * 2009-09-04 2015-11-25 伊特雷科公司 Offshore wind turbines is installed
CN102975816B (en) * 2012-12-17 2015-05-20 中国人民解放军92941部队 Docking and locating guide method of self-elevating drilling platform and fixed sea platform
CN103158838B (en) * 2013-03-18 2016-03-30 中集海洋工程研究院有限公司 The split drilling ship of a kind of rapid-assembling and fractionation and manufacture method
NL2011002C2 (en) * 2013-06-18 2014-12-22 Heerema Marine Contractors Nl Drilling module.
CN103879523A (en) * 2014-03-03 2014-06-25 浙江海洋学院 Drilling ship
GB2564152A (en) * 2017-07-05 2019-01-09 Oil & Gas Decommissioning Ltd Offshore decommissioning vessel and methods of use
CN107719585B (en) * 2017-11-17 2023-12-29 广州碧海新能源有限公司 Ocean platform
CN110389002B (en) * 2019-08-05 2024-08-06 中交上海港湾工程设计研究院有限公司 Sensor assembly for measuring docking impact force

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL93492C (en) *
GB841333A (en) * 1957-12-16 1960-07-13 Moore Corp Lee C Improvements in barge-carried oil well drilling equipment
FR2474557A2 (en) * 1979-10-05 1981-07-31 Doris Dev Richesse Sous Marine Stable configuration marine platform - includes cross-members resting on sea-bed and supports superstructure installed from barge
FR2474992B1 (en) * 1980-02-05 1987-11-27 Doris Dev Richesse Sous Marine FLOATING DEVICE FOR WORK AT SEA
NL8701856A (en) * 1987-01-14 1988-08-01 Allseas Eng Bv METHOD OF MANOURING A CONSTRUCTION ELEMENT WITH RESPECT TO A WATER-FIXED CONSTRUCTION, METHOD FOR BUILDING A CONSTRUCTION AND CONSTRUCTION CONSTRUCTED BY SUCH A METHOD.
US4907912A (en) * 1988-10-05 1990-03-13 Jfp Energy, Inc. Submersible production storage barge and method for transporting and installing a jack-up rig in a body of water
US5403124A (en) * 1993-07-26 1995-04-04 Mcdermott International, Inc. Semisubmersible vessel for transporting and installing heavy deck sections offshore using quick drop ballast system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190063149A (en) * 2017-11-29 2019-06-07 삼성중공업 주식회사 Variable top side platform

Also Published As

Publication number Publication date
FR2921098A1 (en) 2009-03-20
FR2921098B1 (en) 2015-12-11
CN102137973A (en) 2011-07-27
WO2009090321A2 (en) 2009-07-23

Similar Documents

Publication Publication Date Title
US7815398B2 (en) Methods of positioning an elevating support vessel
KR20100087094A (en) Method for installing a drilling apparatus on a rig and for preparing drilling operations
AU2017269088B2 (en) A seabed supported unit and method to provide a shallow water drilling terminal
US20080237175A1 (en) Extension assemblies and methods thereof
US20080237170A1 (en) Extension Bridges and methods of tender assist
US20110158784A1 (en) Arm assembly and methods of passing a pipe from a first vessel to a second vessel using the arm assembly
US20080247827A1 (en) Work-over rig assembly and methods thereof
CA2811927C (en) Articulated multiple buoy marine platform apparatus and method of installation
US20080243365A1 (en) Methods of holding station and mooring and elevating support vessel
US20080237174A1 (en) Crane support apparatus and methods thereof
US8534213B2 (en) Skid shoe assembly for loading and transporting large structures
WO2000078604A1 (en) Lifting vessel and method for positioning, lifting and handling a platform deck and a jacket
US6347909B1 (en) Method to transport and install a deck
GB2485678A (en) Jack-up vessel system for offshore transport and handling of cargo
US20220355907A1 (en) Systems and methods for a rack structure for a transport vessel adapted for use with an offshore self-elevating vessel
KR101964835B1 (en) Facility for launching offshore structure, and method of launching offshore structure
AU2010216203B2 (en) Skid shoe assembly for loading and transporting large structures
WO2011059918A1 (en) Tender assisted drilling spar