US20150021119A1 - Self-launching movable scaffolding system - Google Patents

Self-launching movable scaffolding system Download PDF

Info

Publication number
US20150021119A1
US20150021119A1 US14/350,338 US201114350338A US2015021119A1 US 20150021119 A1 US20150021119 A1 US 20150021119A1 US 201114350338 A US201114350338 A US 201114350338A US 2015021119 A1 US2015021119 A1 US 2015021119A1
Authority
US
United States
Prior art keywords
support
launching
scaffolding system
self
during
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/350,338
Inventor
Martin Pedro Bae
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NRS CONSULTING CO Ltd
Original Assignee
NRS CONSULTING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NRS CONSULTING CO Ltd filed Critical NRS CONSULTING CO Ltd
Assigned to NRS CONSULTING CO., LTD. reassignment NRS CONSULTING CO., LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BAE, MARTIN PEDRO
Publication of US20150021119A1 publication Critical patent/US20150021119A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Definitions

  • the Movable Scaffolding System (MSS) for bridge construction may offer advantages over conventional construction (Conventional Scaffolding), including creating minimal disturbance to surroundings, providing a more concentrated work area for superstructure assembly, and possibly increased worker safety given the improved erection environment.
  • MSS Movable Scaffolding System
  • Movable Scaffolding Systems are conceived to be used in the construction of cast in-situ concrete bridges and they are travelling steel structures supporting the formwork that gives shape to the bridge.
  • the MSS is built to be backed off from the hardened concrete, moved to a new position, and precisely adjusted for concreting the next span.
  • the Movable Scaffolding System was developed in the mid 1970's. The system has since been further developed and has become a very popular system for constructing bridges worldwide. The ability to adapt the MSS to different cross sections allows the contractor to use the equipment for different projects elsewhere.
  • the MSS consists of a support structure spanning between two piers from which formwork is either supported or suspended.
  • the inner formwork (core form) is collapsible and can run on a rail system to allow easy relocation to the next span.
  • the system is designed so that the outer formwork can be opened sufficiently to allow it to pass around the bridge columns during the launching process. After launching the formwork is closed again and after setting to the correct alignment, placement of reinforcement can start.
  • the MSS can be divided into two types, namely, (i) underlane (or underslung) and (ii) overlane (or overhead).
  • the underlane type of MSS has two parallel girders. which supports the formwork.
  • the overlane type of MSS has one or two main girders from which the formwork is suspended.
  • type of bridge deck e.g. single cell, twin cell, double T
  • height of columns e.g. single cell, twin cell, double T
  • NRS is the first in the world to develop the Self-launching MSS (SL-MSS) in order to to solve the problems related to the difficulties in handling pier support brackets over water as well as on high piers.
  • This system is able to transfer forward and mount the pier support brackets without any need of an independent crane.
  • the SL-MSS has been successfully used in the construction of several major bridge projects worldwide and is widely sought after due to its cost and operational efficiency.
  • the existing problems related to current MSS include requirement of long cycle time, inability to deliverable whole rebar cage simultaneously or all at once, requirement of several block-outs in the superstructure, requirement of hanging bars passing through the superstructure deck to support the formwork, requirement of other equipments necessary for relocation of the supports and, last but not least, the complexity of its operation as well as the labor intensive work.
  • This invention provides the new MSS with the self-launching system used for cast-in-situ bridges which can offer many cost-saving advantages to the bridge construction project.
  • FIGS. 1-A and 1 -B show General Arrangement: Elevation and Plan
  • FIGS. 2-A and 2 -B show Section A at Hanger Truss: Rebar cage installation & Concrete positions
  • FIGS. 3-A and 3 -B show Section A at Hanger Truss: Launching position at typical pier & portal pier
  • FIGS. 4-A , 4 -B and 4 -C Section B at Rear Support Rebar cage installation, concreting and launching positions
  • FIGS. 5-A and 5 -B show Section C at Front support: Rebar cage installation and concreting positions
  • FIGS. 6-A and 6 -B show Section C at Front support: Launching position at typical pier & portal pier
  • FIGS. 7-A and 7 -B show Section D at Middle launching support: Launching and relocating positions
  • FIGS. 8-A and 8 -B show Section E at Front launching support: Launching and relocating positions
  • FIGS. 9-A and 9 -B show Launching sequence: Stage 1 and 2
  • FIGS. 10-A and 10 -B show Launching sequence: Stage 3 and 4
  • the self-launching movable scaffolding system (SL-MSS) according to this invention comprises of
  • the assembling and erecting sequence of the said SL-MSS can be described as the following:
  • the launching sequence of the said SL-MSS comprises of the concreting and launching stages as the following:
  • Stage 1 (as shown in FIG. 9A )
  • Stage 2 (as shown in FIG. 9B )
  • Stage 3 (as shown in FIG. 10A )
  • Stage 4 (as shown FIG. 10B )
  • the dismantling process of the said SL-MSS can be described as the following; Process of this operation is depended on the actual condition at site and varied from job to job. A careful planning and drawings should be done before actual dismantling begins.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A self-launching movable scaffolding system comprising: a main girder which transfers loads to supports; a front nose which transfers load of the system to support during launching; a rear nose which transfers load to a rear support during casting and launching, which is equipped with a rail system; hanger trusses which transfer load from a formwork to the main girder during casting; a rear support which provides support to the system during rebar cage installation, casting, and launching; a front support which provides support to the system during rebar cage installation and casting; a front and a middle launching support which provide support to the system during launching; a launching wagon for providing support and movement of the system; a trolley system which provides relocation to the front and middle launching supports and provides rebar cage delivery; and a formwork which is a mold for forming concrete to a shape.

Description

    TECHNICAL FIELD
  • Construction Engineering
  • BACKGROUND ART
  • Bridge construction especially for a whole span cast in-situ concrete bridge, over deep valleys, water crossings with steep slopes, over highway or railway, or environmentally protected regions can offer many challenges. The Movable Scaffolding System (MSS) for bridge construction may offer advantages over conventional construction (Conventional Scaffolding), including creating minimal disturbance to surroundings, providing a more concentrated work area for superstructure assembly, and possibly increased worker safety given the improved erection environment.
  • Conventional Scaffolding or Formwork was formerly built in place, used once and wrecked. Because of high labor cost and material costs, the trend today is toward increasing prefabrication, assembly in large units, erection by mechanical means such as “movable forms” and continuing modify and reuse the forms for other projects.
  • Movable Scaffolding Systems are conceived to be used in the construction of cast in-situ concrete bridges and they are travelling steel structures supporting the formwork that gives shape to the bridge. The MSS is built to be backed off from the hardened concrete, moved to a new position, and precisely adjusted for concreting the next span.
  • The Movable Scaffolding System was developed in the mid 1970's. The system has since been further developed and has become a very popular system for constructing bridges worldwide. The ability to adapt the MSS to different cross sections allows the contractor to use the equipment for different projects elsewhere.
  • MSS System
  • The MSS consists of a support structure spanning between two piers from which formwork is either supported or suspended. The inner formwork (core form) is collapsible and can run on a rail system to allow easy relocation to the next span. The system is designed so that the outer formwork can be opened sufficiently to allow it to pass around the bridge columns during the launching process. After launching the formwork is closed again and after setting to the correct alignment, placement of reinforcement can start.
  • Type of MSS
  • The MSS can be divided into two types, namely, (i) underlane (or underslung) and (ii) overlane (or overhead). The underlane type of MSS has two parallel girders. which supports the formwork. The overlane type of MSS has one or two main girders from which the formwork is suspended.
  • The choice of which type to be used depends on site conditions such as height restrictions, type of bridge deck (e.g. single cell, twin cell, double T) and height of columns.
  • The Self-Launching MSS
  • NRS is the first in the world to develop the Self-launching MSS (SL-MSS) in order to to solve the problems related to the difficulties in handling pier support brackets over water as well as on high piers. This system is able to transfer forward and mount the pier support brackets without any need of an independent crane. The SL-MSS has been successfully used in the construction of several major bridge projects worldwide and is widely sought after due to its cost and operational efficiency.
  • However, the existing problems related to current MSS include requirement of long cycle time, inability to deliverable whole rebar cage simultaneously or all at once, requirement of several block-outs in the superstructure, requirement of hanging bars passing through the superstructure deck to support the formwork, requirement of other equipments necessary for relocation of the supports and, last but not least, the complexity of its operation as well as the labor intensive work.
  • Moreover, most of the movable scaffolding systems at present have limitations in their operation regarding the high costs of construction manpower and the cost of assembling, dissembling and re-assembling.
  • This invention provides the new MSS with the self-launching system used for cast-in-situ bridges which can offer many cost-saving advantages to the bridge construction project.
  • BRIEF DESCRIPTION OF DRAWING
  • FIGS. 1-A and 1-B show General Arrangement: Elevation and Plan
  • FIGS. 2-A and 2-B show Section A at Hanger Truss: Rebar cage installation & Concrete positions
  • FIGS. 3-A and 3-B show Section A at Hanger Truss: Launching position at typical pier & portal pier
  • FIGS. 4-A, 4-B and 4-C Section B at Rear Support: Rebar cage installation, concreting and launching positions
  • FIGS. 5-A and 5-B show Section C at Front support: Rebar cage installation and concreting positions
  • FIGS. 6-A and 6-B show Section C at Front support: Launching position at typical pier & portal pier
  • FIGS. 7-A and 7-B show Section D at Middle launching support: Launching and relocating positions
  • FIGS. 8-A and 8-B show Section E at Front launching support: Launching and relocating positions
  • FIGS. 9-A and 9-B show Launching sequence: Stage 1 and 2
  • FIGS. 10-A and 10-B show Launching sequence: Stage 3 and 4
  • DISCLOSURE OF THE INVENTION
  • The self-launching movable scaffolding system (SL-MSS) according to this invention comprises of
      • Rear Nose (120), as shown in FIG. 1-A, which provides a transfer of load to Rear support (400) during casting and launching is equipped with the mono-rail (701) for electrical lifting hoist (702) used for rebar cage (900) loading.
      • Hanger Trusses (200) which provides a transfer of load from formwork (800) to main girder (100) during casting. There is the second folding function on the upper part of the said hanger trusses (200) which creates the wider opening and the higher position as shown in FIG. 3-B. This will allow the MSS to pass the portal pier area (416) or other obstructions.
      • Rear Support (400) which provides support to the MSS during rebar cage (900) installation, casting, and launching. The said rear support (400) can be opened in the center for rebar cage (900) to pass through as shown in FIG. 4-A and unlike the other previous systems that require the additional rear support for casting, the said Rear support (400) of this invention is now designed to take the casting load. The foldable legs (401), parts of the Rear support (400), are folded up to support directly to the main girder (100) during casting and launching. As shown in FIG. 4-B, Rear support (400) is set for casting stage. The rear support main jacks (402) are activated and transferred load to existing bridge. During MSS launching as shown in FIG. 4-C, The rear support main jacks (402) are deactivated and load is transferred pass through the express rollers (403) to the existing bridge. There are rear support side shifting cylinders (404) equipped at top of the rear support (400) and the main girder (100). They are used for transverse adjusting of the main girder during launching pass through curve spans and for transverse adjusting of the rear support (400) itself before casting. The said Rear Support (400) is fixed to the main girder (100). No other external equipment is required for its relocation.
      • Front Support (410) which provides support to the MSS during rebar cage (900) installation and casting. As shown in FIG. 5-A, The said Front support (410) is opened at the center for rebar cage (900) to pass through. Once finish placing the rebar cage (900), tension bars (415) are installed and engaged to the front support (410) as shown in FIG. 5-B to confine the deflection of the front support (410) during casting stage. Unlike the other previous systems that require the block-outs in bridge structure, there is no any part of the Front support (410) pass through the bridge structure. Therefore, block-outs are not required.
      •  During casting, the front support main jacks (413) are activated and transferred load from main girder (100) to the front support (410). The Front support legs (412) which are parts of the front support (410) provide a transfer of load further to column footing. There are front support side shifting cylinders (414) as shown in FIG. 5-B equipped at top of the front support (410) and the main girder (100) to allow the transverse adjusting of the main girder. As shown in FIG. 6-A, the locking arms (411) at the lower part can be opened to pass the pier during launching. The Lower parts of the front support (410) as shown in FIG. 6-B can be disconnected when launching pass the portal area (416). The said front support (410) is fixed to the main girder (100). No other external equipment is required for its relocation.
      • Front Launching Support (420) provides support to the MSS during launching operation.
      •  The said front launching support (420) is set and secured on the pier top (425) as shown in FIG. 8-A with the launching wagon (500) at top which allows the front nose (110) and the main girder (100) to glide or move over to the new set position. The said front launching support (420) can be dissembled from pier and suspended to front nose (110) as shown in FIG. 8-B in order to relocate to the next pier.
      • Middle Launching Support (430) provides support to the MSS during launching operation. The said middle launching support (430) is suspended to the front nose (110) as shown in FIG. 1-A during casting. The said middle launching support (430) is moved back and set on already cast concrete, as shown in the dotted line in FIG. 1-A , and activated to support the MSS during launching. The cross section FIG. 7-A and 7-B show the middle launching support (430) in active and inactive stages respectively.
      • Trolley system (700) provides relocation to the said Middle lunching support (430) and the said Front launching support (420) and also provides the rebar cage (900) delivery. The said trolley system is composed of the mono-rail (701) set along the rear nose (120), main girder (100), and front nose (110) and the electrical lifting hoist (702).
      • Formwork (800) which is supported by formwork support frame (801) according to this invention does not require hanging bars for its hanging. Therefore, there is no obstruction during the rebar cage (900) installation and concreting, refer to FIGS. 2-A and 2-B.
  • In order to operate the said SL-MSS, the assembling and erecting sequence of the said SL-MSS can be described as the following:
      • 1. Install the temporary tower (501) at the front pier of the span being cast.
      • 2. Install and secure the middle launching support (430) over the temporary concrete foundation behind the abutment (417).
      • 3. Assembly the main girder (100) on ground.
      • 4. Install the said main girder (100) on to the said temporary tower (501) and the said middle launching support (430).
      • 5. Install the front support (410) and front support legs (412), and rear support (400) to the said main girder (100). Activate both supports to take load.
      • 6. Remove the said temporary tower (501) and the said middle launching support (430).
      • 7. Install the hanger trusses (200) to the said main girder (100).
      • 8. Install formwork support frame (801) and formwork (800) on hanger trusses (200).
      • 9. Assembly the front nose (110) on ground. Install the said front nose (110) to the said main girder (100).
      • 10. Install trolley system (700).
      • 11. Install other miscellaneous parts i.e. hydraulics equipment, pumps, working platform to complete.
  • The launching sequence of the said SL-MSS comprises of the concreting and launching stages as the following:
  • Stage 1 (as shown in FIG. 9A)
      • 1.1 MSS is set at the concreting position.
      • 1.2 Front support (410) and rear support (400) are activated.
      • 1.3 Middle launching support (430) is suspended to the front nose (110).
      • 1.4 Front launching support (420) is ready set on top of the next pier.
      • 1.5 Install rebar cage (900) and cast the span.
  • Stage 2 (as shown in FIG. 9B)
      • 2.1 Move back and install the middle launching support (430) on the already cast deck.
      • 2.2 Release the main jacks (413 and 402) at front support (410) and rear support (400) respectively. Rear support (400) is now on the express rollers (403).
      • 2.3 MSS is supported by middle launching support (430) and rear support (400).
      • 2.4 Open the hanger trusses (200).
      • 2.5 Prepare for launching forward to the next span.
  • Stage 3 (as shown in FIG. 10A)
      • 3.1 Launch forward the MSS to the new span until the front support (410) is in same line with the front launching support (420). During launching, the MSS is supported by front launching support (420), middle launching support (430) and rear support (400).
      • 3.2 Activate the main jacks (413 and 402) at front and rear supports (410 and 400) to take load of the MSS. Middle launching support (430) and front launching support (420) are now free.
  • Stage 4 (as shown FIG. 10B)
      • 4.1 Relocate the front launching support (420) to set on the next pier.
      • 4.2 Relocate the middle launching support (430) to suspend to the front nose (110).
      • 4.3 Close up the hanger trusses (200). Prepare the MSS for the casting.
      • 4.4 Repeat the stage 1-4 to complete the cycle for the next span.
  • The dismantling process of the said SL-MSS can be described as the following; Process of this operation is depended on the actual condition at site and varied from job to job. A careful planning and drawings should be done before actual dismantling begins.
  • The general steps to dismantle the MSS after the last span has been completed are as follows:
      • 1. Install temporary tower (501) at rear of main girder (100) to take load of MSS.
      • 2. MSS is supported by temporary tower (501) at the rear and the middle launching support (430) at the front.
      • 3. Dismantle the front nose (110) and front launching support (420).
      • 4. Fold down the bottom hangers (200) & start dismantling the formworks (800) and formwork support frame (801).
      • 5. Dismantle the hanger trusses (200).
      • 6. Dismantle the front support (410) and front support leg (412).
      • 7. Dismantle the rear support (400).
      • 8. Bring down the main girder (100) and dismantle each module.
      • 9. Dismantle the middle launching support (430) and the temporary tower (501).
  • The advantages of the movable scaffolding system when compared to conventional scaffolding or launching gantries are as the following
      • High efficiency in achieving rapid cycles
      • Lightweight
      • Easy to assemble
      • Reduce manpower
      • Can be adapted to different cross sections (allowing reuse elsewhere)
      • High resistance to torsion
      • Maximum deflection=L/400 of span
      • Self launching option (no cranes required for pier bracket relocation)
      • Limited interference to road users below during construction (if applicable)
      • Pre-stress cost reduction (up to 30%) by reduction of deck pre-stressing amount (no cantilever moments) or reduction in number of anchorages & couplers in the pre-stressing of the deck and reduction in amount of pre-stressing operations in the deck
      • Reduction in number of high risk operations (movements & launching)
      • Easier geometry control (span by span construction)
      • No requirement for scaffolding to support the structure
      • Prefabricated rebar cage can be lifted and placed by MSS
        • Less forces in piers
        • No requirement for segmental casting yard and associated transport costs.

Claims (12)

1. A self-launching movable scaffolding system comprising:
a main girder which transfer loads to supports;
a front nose which is an extension part of the main girder located at a front end of the main girder and used to transfer load of the scaffolding system to support during launching;
a rear nose which provides a transfer of load to a rear support during casting and launching wherein the rear nose is equipped with a rail system for a rebar cage delivery and support relocation by a trolley system;
hanger trusses which provide a transfer of load from a formwork to the main girder during casting wherein the hanger trusses have a second folding function on an upper part which creates a wider opening and a higher position for allowing the scaffolding system to pass a portal pier area or other obstructions;
a rear support which provides support to the scaffolding system during rebar cage installation, casting, and launching;
a front support which provides support to the scaffolding system during rebar cage installation and casting;
a front launching support which provides support to the scaffolding system during launching;
a middle launching support which provides support to the scaffolding system during launching wherein the middle launching support can be suspended to the front nose during casting;
a launching wagon for providing support of the scaffolding system which allows the scaffolding system to move both forward and backward and further allows the scaffolding system to adjust sideways;
a trolley system which provides relocation to the middle launching support and the front launching support and further provides the rebar cage delivery; and
a formwork which is a mold for forming concrete to a shape.
2. The self-launching movable scaffolding system according to claim 1 wherein the rear support which provides support to the scaffolding system during rebar cage installation, casting, and launching can be opened at a center for the rebar cage to pass through.
3. The self-launching movable scaffolding system according to claim 1 wherein the front support which provides support to the scaffolding system during rebar cage installation and casting can be opened at a center for the rebar cage to pass through.
4. The self-launching movable scaffolding system according to claim 1 wherein the formwork is supported by a formwork support frame with no hanging bars for its hanging.
5. The self-launching movable scaffolding system according to claim 1 further comprising rear support main jacks which are activated and deactivated in order to transfer load to an existing bridge and pass load through express rollers to the existing bridge, respectively.
6. The self-launching movable scaffolding system according to claim 1 further comprising rear support side shifting cylinders which are equipped at a top of the rear support and the main girder, used for transverse adjusting of the main girder during launching to pass through curve spans and for transverse adjusting of the rear support itself before casting.
7. The self-launching movable scaffolding system according to claim 1 wherein:
the front launching support is set and secured on a pier top with the launching wagon at the top which allows the front nose and the main girder to glide or move over to a new set position; and
the front launching support can be dissembled from a pier and suspended to the front nose in order to relocate to a next pier.
8. The self-launching movable scaffolding system according to claim 1 further comprising tension bars which are installed and engaged to the front support in order to confine a deflection of the front support during casting, after placing of the rebar cage.
9. The self-launching movable scaffolding system according to claim 1 further comprising front support main jacks which are activated to transfer load from the main girder to the front support during casting.
10. The self-launching movable scaffolding system according to claim 1 further comprising front support legs which provide a transfer of load further to a column footing.
11. The self-launching movable scaffolding system according to claim 1 further comprising front support side shifting cylinders which are equipped at a top of the front support and the main girder in order to allow transverse adjusting of the main girder.
12. The self-launching movable scaffolding system according to claim 1 further comprising a mono-rail which is set along the rear nose, the main girder, the front nose and an electrical lifting hoist.
US14/350,338 2011-10-07 2011-10-07 Self-launching movable scaffolding system Abandoned US20150021119A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/TH2011/000046 WO2013052017A1 (en) 2011-10-07 2011-10-07 Self-launching movable scaffolding system

Publications (1)

Publication Number Publication Date
US20150021119A1 true US20150021119A1 (en) 2015-01-22

Family

ID=44906351

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/350,338 Abandoned US20150021119A1 (en) 2011-10-07 2011-10-07 Self-launching movable scaffolding system

Country Status (5)

Country Link
US (1) US20150021119A1 (en)
EP (1) EP2764162A1 (en)
KR (1) KR20140084107A (en)
CN (1) CN103998690A (en)
WO (1) WO2013052017A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735143A (en) * 2016-04-29 2016-07-06 夏玉娟 Bridge deck construction device and bridge deck construction method
CN106149566A (en) * 2016-08-17 2016-11-23 王文龙 Rail rope traction supporting opening/closing system
US20190048282A1 (en) * 2016-02-24 2019-02-14 The Lubrizol Corporation Lubricant Compositions For Direct Injection Engines
CN109972655A (en) * 2018-06-30 2019-07-05 中铁二十二局集团第三工程有限公司 A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form and installation method open
CN114481862A (en) * 2022-01-06 2022-05-13 中国五冶集团有限公司 Movable truss device and construction process
CN115094836A (en) * 2022-06-23 2022-09-23 中国水利水电第八工程局有限公司 Grooving machine and grooving method

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014200443A1 (en) * 2013-06-11 2014-12-18 Nrs Consulting Co., Ltd. Self-launching movable scaffolding system
WO2015034444A1 (en) * 2013-09-06 2015-03-12 Nrs Consulting Co., Ltd. New overhead self-launching launching gantry systems
CN105887690B (en) * 2016-05-05 2017-09-01 中建五局土木工程有限公司 A kind of upstroke movable framework Demolition Construction method in situ
PT109441A (en) 2016-06-08 2017-12-11 Pgpi - Marcas E Patentes S A CIMBRE OR TOP LAUNCHER IN CASE WITH BELT BOTTOM SECTION
CN106149639B (en) * 2016-08-30 2018-02-27 郑州新大方重工科技有限公司 A kind of mobile formwork of single rectangle top opening enclosed type water conservancy aqueduct construction
CN107100086B (en) * 2017-06-20 2023-05-30 山东交通学院 Method and device for passing holes in ultra-wide pier through movable die frame
CN107829374B (en) * 2017-12-13 2023-06-09 中国铁建大桥工程局集团有限公司 Movable formwork for highway prestressed concrete box girder and cantilever construction method
CN108442255B (en) * 2018-05-23 2024-04-19 郑州新大方重工科技有限公司 Movable formwork bridge fabrication machine and construction method for cast-in-situ bridge fabrication
CN110485264B (en) * 2019-08-21 2020-06-02 保利长大工程有限公司 Construction method of central pier large cantilever cover beam
CN111395344A (en) * 2020-03-25 2020-07-10 中国一冶集团有限公司 Reusable secant pile positioning device and construction method
CN114645515B (en) * 2022-03-24 2024-04-12 中国建筑土木建设有限公司 Casting equipment and casting method for concrete segmental box girder
CN117779635B (en) * 2024-02-27 2024-05-14 中铁四局集团有限公司 Cast-in-situ construction method for simple beam movable formwork of steel reinforcement cage integrally lifted and molded

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3571835A (en) * 1967-10-30 1971-03-23 Dyckerhoff & Widmann Ag Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete
US3985480A (en) * 1972-08-18 1976-10-12 Dyckerhoff & Widmann Ag Apparatus for the sectional cantilever construction of bridge girder systems
US4103861A (en) * 1976-02-26 1978-08-01 Dyckerhoff & Widmann Aktiengesellschaft Arrangement for the sectional cantilever projection of multi-panel bridge supporting structures of steel or prestressed concrete
US4497153A (en) * 1981-06-19 1985-02-05 Mueller Eberhard Method and device for erecting building structures such as bridges, using pre-fabricated concrete beams
US5511268A (en) * 1994-08-08 1996-04-30 The United States Of America As Represented By The Secretary Of Commerce Construction of large structures by robotic crane placement of modular bridge sections
US6721985B2 (en) * 1999-04-09 2004-04-20 Mccrary Homer T. Intelligent public transit system using dual-mode vehicles
US7520014B2 (en) * 2005-12-20 2009-04-21 Flatiron Constructors, Inc. Method and apparatus for bridge construction
US8555442B2 (en) * 2010-05-19 2013-10-15 Beijing Wowjoint Machinery Co. Transportation and erection integrated machine with displacement platforms and methods for erecting bridge using the same

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB931622A (en) * 1960-03-11 1963-07-17 Strabag Bau Ag An apparatus for building concrete bridges and the like structures
DE1658587B1 (en) * 1967-10-30 1970-11-05 Dyckerhoff & Widmann Ag Device for producing multi-span supporting structures, in particular bridge superstructures, made of reinforced or prestressed concrete
DE2258657C2 (en) * 1972-11-30 1974-09-26 Dyckerhoff & Widmann Ag, 8000 Muenchen Carrier element for the production of equipment carriers
DE2528114C3 (en) * 1975-06-24 1979-06-28 Philipp Holzmann Ag, 6000 Frankfurt Feed scaffolding for the production of the superstructure of prestressed concrete bridges or similar supporting structures from prefabricated parts
CN2742026Y (en) * 2004-11-20 2005-11-23 秦皇岛市北戴河通联路桥机械有限公司 One gap type top guide beam moving mould frame bridge making machine
CN201003145Y (en) * 2007-02-12 2008-01-09 郑州大方桥梁机械有限公司 Upward and self-walking type mobile die carrier
CN201158801Y (en) * 2007-08-22 2008-12-03 北京联东模板有限公司 Three-stride supporting leg self-shifting type mobile mould frame
CN101864731A (en) * 2010-04-29 2010-10-20 郑州市华中建机有限公司 Mobile framework equipment

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3571835A (en) * 1967-10-30 1971-03-23 Dyckerhoff & Widmann Ag Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete
US3985480A (en) * 1972-08-18 1976-10-12 Dyckerhoff & Widmann Ag Apparatus for the sectional cantilever construction of bridge girder systems
US4103861A (en) * 1976-02-26 1978-08-01 Dyckerhoff & Widmann Aktiengesellschaft Arrangement for the sectional cantilever projection of multi-panel bridge supporting structures of steel or prestressed concrete
US4497153A (en) * 1981-06-19 1985-02-05 Mueller Eberhard Method and device for erecting building structures such as bridges, using pre-fabricated concrete beams
US4630798A (en) * 1981-06-19 1986-12-23 Philipp Holzmann Aktiengesellschaft Method and device for erecting building structures such as bridges, using pre-fabricated concrete beams
US5511268A (en) * 1994-08-08 1996-04-30 The United States Of America As Represented By The Secretary Of Commerce Construction of large structures by robotic crane placement of modular bridge sections
US6721985B2 (en) * 1999-04-09 2004-04-20 Mccrary Homer T. Intelligent public transit system using dual-mode vehicles
US7520014B2 (en) * 2005-12-20 2009-04-21 Flatiron Constructors, Inc. Method and apparatus for bridge construction
US8555442B2 (en) * 2010-05-19 2013-10-15 Beijing Wowjoint Machinery Co. Transportation and erection integrated machine with displacement platforms and methods for erecting bridge using the same

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190048282A1 (en) * 2016-02-24 2019-02-14 The Lubrizol Corporation Lubricant Compositions For Direct Injection Engines
CN105735143A (en) * 2016-04-29 2016-07-06 夏玉娟 Bridge deck construction device and bridge deck construction method
CN107151981A (en) * 2016-04-29 2017-09-12 夏玉娟 Bridge floor constructing device and its construction method
CN106149566A (en) * 2016-08-17 2016-11-23 王文龙 Rail rope traction supporting opening/closing system
CN109972655A (en) * 2018-06-30 2019-07-05 中铁二十二局集团第三工程有限公司 A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form and installation method open
CN114481862A (en) * 2022-01-06 2022-05-13 中国五冶集团有限公司 Movable truss device and construction process
CN115094836A (en) * 2022-06-23 2022-09-23 中国水利水电第八工程局有限公司 Grooving machine and grooving method

Also Published As

Publication number Publication date
WO2013052017A1 (en) 2013-04-11
EP2764162A1 (en) 2014-08-13
KR20140084107A (en) 2014-07-04
CN103998690A (en) 2014-08-20

Similar Documents

Publication Publication Date Title
US20150021119A1 (en) Self-launching movable scaffolding system
WO2014200443A1 (en) Self-launching movable scaffolding system
CN107338727B (en) Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof
CN102121234B (en) Quick construction method of two-tower five-span steel truss girder cable-stayed bridge
CN110042769B (en) Auxiliary span full-cantilever assembling construction method for composite beam cable-stayed bridge
JP6702835B2 (en) Bridge girder erection method for multi span span bridge
JP5047680B2 (en) Construction method of continuous viaduct
AU2009344385B2 (en) Overhead form traveller and method
CN102953337B (en) Bridge construction method
JP5184248B2 (en) Construction method of level crossing
WO2015034444A1 (en) New overhead self-launching launching gantry systems
CN109680614B (en) Method and equipment for quickly transferring ultra-large bridge girder erection machine of assembled steel-concrete combined bridge
CN112160246B (en) Method for installing composite beam
CN112211112A (en) Steel box girder installation method adopting double-guide-girder erection machine on existing bridge
JPH0959932A (en) Construction method of column head of overhanging erection girder bridge
Däbritz Movable scaffolding systems
CN209923791U (en) Workpiece for cross-line construction of formwork suspension casting combined system
CN107237251B (en) A kind of access bridge flat stacking sets up the construction method of interim steel bridge
KR20050100032A (en) Self-moving movable scafolding system
Heggade Segmental precast technology for multi-span bridges (production, transportation and launching)
Ascaso Til et al. Examples of integrating hydraulic equipment into temporary works
CN109930497B (en) Workpiece for line crossing construction of formwork suspension casting combined system and construction process
CN114622488B (en) Section beam water lifting station and section beam lifting method
WO2023216325A1 (en) Bridge erecting method
US20210372059A1 (en) Modular Longitudinal System for Bridge Decks for Double-Track Railways

Legal Events

Date Code Title Description
AS Assignment

Owner name: NRS CONSULTING CO., LTD., THAILAND

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BAE, MARTIN PEDRO;REEL/FRAME:033143/0939

Effective date: 20140508

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION