US20140299375A1 - Method of conditioning a wall of a bore section - Google Patents
Method of conditioning a wall of a bore section Download PDFInfo
- Publication number
- US20140299375A1 US20140299375A1 US14/122,395 US201214122395A US2014299375A1 US 20140299375 A1 US20140299375 A1 US 20140299375A1 US 201214122395 A US201214122395 A US 201214122395A US 2014299375 A1 US2014299375 A1 US 2014299375A1
- Authority
- US
- United States
- Prior art keywords
- drill head
- wall
- conditioned
- formation
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 32
- 230000003750 conditioning effect Effects 0.000 title claims description 4
- 239000012530 fluid Substances 0.000 claims abstract description 86
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 76
- 230000001143 conditioned effect Effects 0.000 claims abstract description 49
- 239000000463 material Substances 0.000 claims abstract description 25
- 239000013307 optical fiber Substances 0.000 claims abstract description 20
- 230000003287 optical effect Effects 0.000 claims description 17
- 238000002347 injection Methods 0.000 claims description 11
- 239000007924 injection Substances 0.000 claims description 11
- 230000001678 irradiating effect Effects 0.000 claims description 3
- 230000005540 biological transmission Effects 0.000 claims description 2
- 239000000835 fiber Substances 0.000 claims description 2
- 230000001939 inductive effect Effects 0.000 claims description 2
- 239000007789 gas Substances 0.000 claims 15
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 claims 4
- 229910052757 nitrogen Inorganic materials 0.000 claims 2
- 229910052756 noble gas Inorganic materials 0.000 claims 2
- 239000011324 bead Substances 0.000 claims 1
- 230000000149 penetrating effect Effects 0.000 claims 1
- 238000005755 formation reaction Methods 0.000 description 55
- 238000003860 storage Methods 0.000 description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000004891 communication Methods 0.000 description 5
- 238000005553 drilling Methods 0.000 description 5
- 239000004568 cement Substances 0.000 description 4
- 239000007788 liquid Substances 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 239000011435 rock Substances 0.000 description 4
- 230000008878 coupling Effects 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 229930195733 hydrocarbon Natural products 0.000 description 3
- 150000002430 hydrocarbons Chemical class 0.000 description 3
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 239000013505 freshwater Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 230000004913 activation Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000002706 hydrostatic effect Effects 0.000 description 1
- 230000004941 influx Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000001050 lubricating effect Effects 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000000377 silicon dioxide Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/14—Drilling by use of heat, e.g. flame drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/025—Consolidation of loose sand or the like round the wells without excessively decreasing the permeability thereof
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01M—CATCHING, TRAPPING OR SCARING OF ANIMALS; APPARATUS FOR THE DESTRUCTION OF NOXIOUS ANIMALS OR NOXIOUS PLANTS
- A01M1/00—Stationary means for catching or killing insects
- A01M1/02—Stationary means for catching or killing insects with devices or substances, e.g. food, pheronones attracting the insects
- A01M1/04—Attracting insects by using illumination or colours
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01M—CATCHING, TRAPPING OR SCARING OF ANIMALS; APPARATUS FOR THE DESTRUCTION OF NOXIOUS ANIMALS OR NOXIOUS PLANTS
- A01M1/00—Stationary means for catching or killing insects
- A01M1/22—Killing insects by electric means
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
- E21B21/085—Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/138—Plastering the borehole wall; Injecting into the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/116—Gun or shaped-charge perforators
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/14—Drilling by use of heat, e.g. flame drilling
- E21B7/15—Drilling by use of heat, e.g. flame drilling of electrically generated heat
Definitions
- the present invention relates to wells drilled to recover fluids from geologic formations.
- a borehole system is drilled into the earth's crust to penetrate subsurface geologic formations bearing a fluid, such as water, oil or gas, to facilitate the production of the fluid to the surface.
- a borehole system may comprise a single bore surrounded by a bore wall or, alternately, it may comprise a primary bore having one or more intersecting lateral bores surrounded, along with the primary bore, by the bore wall.
- a borehole system may be bored in the earth's crust using mechanical drilling rigs at the earth's surface to rotate a drill bit at a leading end of a drill string extending from the rig.
- Some rigs rotate the entire drill string, which may comprise a plurality of segments or stands of drill pipe threadedly coupled to form the drill string.
- the drill string can be made up by adding segments as the drill string is extended deeper into the earth's crust or laid down by removing segments as the drill string is withdrawn from the earth's crust. The rotation of the drill string and the drill bit at the leading end of the drill string, while urging the drill bit against the end of the portion of the borehole system to be extended to break apart rock engaged by the drill bit.
- a drill string may comprise a mud motor proximal the leading end and hydraulically powered by fluid provided through the center of the drill string to rotate a drill bit coupled to the mud motor to break apart the rock engaged by the drill bit. Drill cuttings are removed from the portion of the bore to be extended by circulating working fluid down the drill string and back to the earth's surface through the annulus between the drill string and the wall of the bore.
- Laser drilling may include the removal of debris resulting from the drilling process by circulating fluid into and from the portion of the borehole system being extended.
- a laser path between the drill head and a portion of the wall to be irradiated using the drill head must be cleared of laser obstructing materials so that the laser light can impinge on the portion of the wall to be irradiated by the laser.
- Still other methods for extending a borehole system include the use of a high-pressure jet to mechanically fracture rock within a fluid path adjacent to a liquid jet at the leading end of a drill string.
- High-pressure jet drilling may include the removal of debris resulting from the drilling process by circulating fluid into and from the portion of the borehole system being extended.
- the jet path between the liquid jet and the portion of the bore wall to be jet blasted should be as short as possible to impart a maximum amount of liquid kinetic energy on the portion of the wall to be jet blasted.
- a completed borehole system generally comprises a non-productive portion, into which no fluids enter from adjacent geologic formations, and a productive portion of the borehole system having a plurality of bore sections into which fluids may enter from adjacent geologic formations. It is important to prevent undesirable fluids from entering the borehole system and also to cause desirable fluids to enter the borehole by providing a flow passageway.
- a drilled borehole system to obtain fresh water should be isolated from penetrated geologic formations bearing brackish or salty water in favor of producing water from penetrated geologic formations bearing fresh water.
- a borehole system drilled to obtain oil or gas should be isolated from penetrated geologic formations bearing water in favor of producing oil or gas from penetrated geologic formations bearing oil or gas.
- bore sections in a productive portion of the borehole may be lined or cased with a pipe called casing, then the casing is cemented in place within the bore by circulating cement into a casing/bore annulus.
- the casing and the cement liner can then be perforated with a perforating tool to establish fluid communication between the formation adjacent to the perforations and the interior of the bore.
- a productive portion of a bore may be packed with fine gravel to promote the flow of fluid from adjacent geologic formations into the bore while preventing entrained particles, or the productive portion of the bore may be lined or cased with a previously perforated liner to provide structural support against bore collapse while facilitating a flow of formation fluids into the bore section for production to the earth's surface.
- the present invention provides a method comprising providing an umbilical having a plurality of optical fibers, a gas supply conduit and a leading end connected to a drill head, introducing the drill head into a surface end of a borehole system drilled into the earth's crust, positioning the drill head within a portion of the borehole system in a geologic formation in which a fluid resides, introducing a volume of gas through the gas conduit into the portion of the borehole system to displace laser obstructing materials therefrom, transmitting laser light through the plurality of optical fibers to the drill head, impinging laser light on a portion of the bore wall to be conditioned to melt at least a component of the formation material along the portion of the bore wall, providing an underbalanced pressure at the portion of the bore wall to be conditioned, and inducing a flow of the fluid from the formation across the portion of the wall and into the borehole system as the melted component solidifies, wherein the flow of fluid across the solidifying component of the portion of the wall to be conditioned creates inter
- Another embodiment of the invention provides a method of conditioning a portion of a wall of a borehole system comprising disposing a drill head into the borehole system, positioning the drill head proximal to the portion of the wall to be conditioned, injecting a gas to displace laser obstructing material from a laser path intermediate the drill head and the portion of the wall to be conditioned, irradiating the portion of the wall using laser light emitted from the drill head to melt at least a component of the wall opposite the laser path from the drill head, providing an underbalanced pressure at the portion of the wall to be conditioned, and drawing a formation fluid residing in the formation across the portion of the wall to be conditioned as the component of the formation solidifies to create passageways within the wall for the flow of the fluid from the formation into the borehole system.
- FIG. 1 is a schematic illustrating a system of the present invention.
- FIG. 2 is an enlarged perspective view of an alternative spool that can be used to store an umbilical of a system of the present invention.
- FIG. 3 is an enlarged top view of a second alternative spool that can be used to store an umbilical of a system of the present invention.
- FIG. 4 is a perspective view of a drill head that can be used to implement an aspect of the system of the present invention.
- FIG. 5 is an enlarged partial section view of a drill head that can be used to implement as aspect of the system of the present invention.
- FIG. 6 is an elevation view of a portion of a borehole system comprising a single lateral bore intersecting a primary bore at a window in a casing installed within the primary bore.
- FIG. 7 is an elevation view of the portion of a borehole system of FIG. 6 after a guide tool is disposed in the primary bore to guide the drill head through the casing window into the lateral bore to condition the wall of the lateral bore.
- FIG. 8 is the elevation view of FIG. 6 after the system of the present invention is used to create a congealed permeable liner along the wall of the lateral bore.
- FIG. 9 is an enlarged view of a portion of the lateral bore of FIG. 8 wherein the system of the present invention has been used to condition the liner with connected cavities to facilitate flow of formation fluid from the formation and into the lateral bore for production to the surface through the primary bore.
- One embodiment of the present invention provides an umbilical for positioning a drill head connected to a leading end of the umbilical within a borehole system.
- the umbilical includes a gas conduit and a plurality of optically transmitting fibers to supply gas and laser light to the drill head, respectively.
- the umbilical may be stored on and fed from a reel, spool or other storage device into the borehole system.
- the reel, spool or other storage device on which the umbilical may be wound or coiled facilitates transportation of the umbilical to and from the surface location of the borehole system.
- the storage device may include a rotatable fluid coupling coupled to a surface end of the gas conduit of the umbilical to facilitate the flow of gas from a gas source on the earth's surface to a surface end of the gas conduit.
- the storage device may include a rotatable fluid coupling coupled to a surface end of the optical fibers of the umbilical to facilitate the transmission of laser light from a laser generator on the earth's surface to a surface end of the optical fibers.
- the rotatable couplings accommodate rotary movement of the storage device on which the umbilical relative to the earth's surface and enable a continuous supply of gas and/or laser light without unwanted twisting or binding of the umbilical.
- the umbilical comprises a leading end to which a drill head is connected, for being introduced into the borehole system.
- the reel can be rotated to feed out the umbilical to the borehole system in an amount sufficient to position the drill head at the leading end of the umbilical proximal a portion of a wall of the borehole system to be conditioned using the drill head.
- the drill head can, in one embodiment, comprise one or more gas injection ports strategically located on the drill head to introduce gas to displace laser obstructing materials, such as working fluid or other fluids and debris, from the laser path.
- the laser path is the path through which the laser light emitted from the drill head will beam to impinge on the portion of the wall of the bore to be conditioned using the drill head.
- the drill head further comprises one or more optical elements optically coupled to a leading end of the plurality of optical fibers to focus and condition the laser light transmitted from the surface for providing the maximum impact on the portion of the wall of the bore to be conditioned using the drill head.
- the optical elements may comprise lenses housed in the drill head and optically coupled to a leading end of optical fibers extending from the leading end of the umbilical into the drill head.
- the optical elements may be housed, for example, at an end of the drill head generally opposite the connected end of the drill head, and the optical elements may be protected using a transparent protective member through which emitted laser light may pass to impinge upon the bore wall.
- An embodiment of the invention provides an underbalanced pressure to the portion of the wall to be conditioned by deploying a seal coupled to the drill head, or to the umbilical at a position spaced apart from the drill head, to expand upon deployment to seal off an annulus between the drill head (or the umbilical) to which the seal is connected and the wall of the bore.
- the deployment of the seal isolates the portion of the bore to be conditioned from working fluid, produced fluid or other laser obstructing material in the bore through which the umbilical is extended.
- the seal is an inflatable member, and the deployment of the seal may be implemented by remotely opening a valve fluidically coupled between the gas conduit and the seal to inflate the seal using gas provided through the gas conduit.
- the seal may be retracted from a deployed configuration by remotely opening a second valve coupled to release the gas from the inflated seal to the bore.
- a first valve coupled to selectively introduce gas from the gas conduit to the seal to inflate the seal
- a second valve coupled to selectively release gas from the seal to the bore
- a single remotely controllable three-way valve having a first selectable position to establish communication between the gas conduit and the seal to inflate the seal and a second selectable position to establish communication between the inflated seal and the bore.
- An embodiment of the invention includes providing an underbalanced pressure to the portion of the bore to be conditioned to facilitate the flow of fluid from the formation and into the bore as components of the wall of the bore congeal after being melted by application of laser light.
- the underbalanced pressure is provided by artificially lifting a column of working fluid in the bore by injection of gas. It will be understood that, as the injected volume of gas migrates toward the surface end of the bore, it expands as it encounters decreasing pressure thereby displacing working fluid from the bore at the surface and decreasing the pressure at the portion of the bore to be conditioned.
- Other embodiments of the method include swabbing the bore by removing material from the surface end of the bore.
- a bore may be swabbed to provide an underbalanced pressure by introducing gas or low-density liquid into the bore, even at a shallow depth relative to the portion of the bore to be conditioned, to displace a more dense fluid and to thereby alter the hydrostatic pressure provided by the fluid in the borehole system to the portion of the wall to be conditioned using the method of the present invention.
- FIG. 1 is a schematic illustrating an aspect of the system 10 of the present invention.
- a borehole 90 is drilled into the earth's crust 11 so that a portion 17 of the borehole 90 penetrates a geologic formation 19 bearing a fluid medium such as, for example, hydrocarbons.
- the system 10 comprises a coiled tubing unit at the surface 15 having a source of pressurized gas 12 fluidically coupled through a gas leader 13 to a gas conduit (not shown) within an umbilical 34 , a portable electric generator 14 electrically coupled through a power supply leader 18 to power a laser light generator 16 that is, in turn, optically coupled through a laser leader 26 to a plurality of optical fibers 47 (not shown in FIG. 1 ) within the umbilical 34 .
- the system further comprises a wellhead 25 sealing the surface end 91 of the borehole 90 through which the umbilical 34 is received into the borehole 90 , a working fluid tank 20 coupled through a working fluid leader 22 to the wellhead 25 to enable the introduction and removal of working fluid 21 into and from an annulus 24 between the umbilical 34 and the wall 94 of the borehole 90 .
- the system further comprises a spool 30 on which an extended length of umbilical 34 may be stored, and a coiled tubing unit guide support 27 to support an umbilical guide 38 having a plurality of rolling elements 37 therein to reduce friction of movement of the umbilical 34 into and from the wellhead 25 and the borehole 90 .
- the system 10 and the coiled tubing unit thereof further comprise a drill head 50 connected at a connected end 36 to the umbilical 34 and positionable within the borehole 90 by letting out and reeling in the umbilical 34 from and onto the spool 30 .
- the system 10 comprises the spool 30 that is rotatable on an axle (not shown in FIG. 1 ) using a motor and related gears (not shown) to control the position of the drill head 50 by letting out and reeling in the umbilical 34 thereon.
- the spool 30 has been reeled out to provide sufficient umbilical 34 through the wellhead 25 to position the drill head 50 adjacent to a portion of the wall to be conditioned 92 , which is a small portion of the wall 94 of the borehole 90 that is adjacent the drill head 50 .
- the drill head 50 comprises a deployable circumferential seal 54 that, upon deployment, seals the annulus between the exterior surface of the drill head 50 and the wall 94 of the borehole 90 in which the drill head 50 is positioned.
- FIG. 2 is a perspective view of an alternative umbilical storage spool 32 A that can be used to store an umbilical 34 of a system of the present invention by coiling the umbilical 34 against the interior wall 33 of the spool 32 A. After a portion of the interior wall 33 is covered with outer coils 42 of the umbilical 34 , additional, smaller coils can be disposed within the initial, outer coils 42 for additional storage capacity.
- FIG. 3 is a top view of a second alternative umbilical spool 32 B that can be used to store an umbilical 34 of a system of the present invention by wrapping coils 44 around an exterior wall 41 of a center post 38 of the spool 34 B. After a portion of the exterior wall 41 is covered with coils 44 of the umbilical 34 , additional, larger coils can be disposed about the initial, inner coil 40 for additional storage capacity.
- FIG. 4 is an enlarged perspective view of the drill head 50 of FIG. 1 that can be used to implement an aspect of the system of the present invention.
- the drill head 50 of FIG. 4 comprises a plurality of optical elements 45 optically coupled to a plurality of elongate optical fibers 47 that optically conduct laser light (not shown in FIG. 4 ) provided from the laser light source 16 (not shown in FIG. 4 ) through the laser leader 26 (not shown in FIG. 4 ) to a surface end of the optical fibers 47 (not shown in FIG. 4 ).
- the optical elements 45 in the drill head 50 of FIG. 4 are disposed in a generally concentric pattern within a leading end 56 of the drill head. It will be understood that the optical elements may be disposed in a number of various patterns or positions within the drill head 50 .
- the drill head of FIG. 4 further comprises a plurality of gas injection ports 46 disposed within the leading end 56 of the drill head 50 and positioned to inject gas into a portion of the borehole system having a wall to be conditioned by laser light (not shown) emitted from the optical elements 45 .
- the gas injection ports 46 are disposed within the interior of the concentric pattern of the optical elements 45 . It will be understood that the gas injection ports 46 can be disposed in a number of various patterns or positions within the drill head 50 .
- the drill head 50 of FIG. 4 further comprises a deployable seal 54 around the exterior surface 59 of the drill head 50 .
- the deployable seal 54 is illustrated in FIG.
- the drill head 50 of FIG. 4 in the deployed mode to seal an annulus between a wall of a bore (not shown) in which the drill head 50 of FIG. 4 may be positioned and the exterior surface 59 of the drill head 50 to facilitate the displacement of laser obstructing materials from the portion of a bore system to be conditioned using the system of the present invention.
- the drill head 50 of FIG. 4 further comprises one or more relief ports 57 into which laser obstructing materials may be displaced and through which laser obstructing materials may be removed from the portion of a borehole to be conditioned using the system of the present invention.
- the drill head 50 of FIG. 4 may be positioned within a portion of a bore to be conditioned thereby, the deployable seal 54 may be deployed to engage a wall of a portion of the bore to seal an annulus between the exterior surface 59 of the drill head 50 and the wall of the bore.
- Gas provided to the drill head through a gas conduit 49 within an umbilical 34 used to position the drill head 50 is injected into a portion of the bore proximal to the leading end 56 of the drill head 50 to displace laser obstructing materials, such as working fluid, formation fluid or a mixture thereof, from the portion of the bore through the relief port 57 .
- laser obstructing materials such as working fluid, formation fluid or a mixture thereof
- the displaced laser obstructing material and the gas injected through the gas injection ports 46 to displace the laser obstructing material are moved towards the surface and beyond the seal 54 through material conduits 48 within the drill head 50 .
- the material conduits 48 may empty into the portion of the annulus (not shown) between the surface and the seal 54 or, alternately, the umbilical 34 may comprise an additional conduit through which the displaced laser obstructing material and the displacing gas stream may be delivered to the surface.
- FIG. 5 is an enlarged partial section view of the drill head 50 that can be used to implement a system of the present invention positioned within a bore 90 to condition a portion 92 of the wall 94 of the bore 90 within a geologic formation 19 bearing the fluid medium to be recovered.
- the drill head 50 of FIG. 5 comprises a case 65 having an exterior surface 59 , relief ports 57 through the case 65 and connected to exit ports 58 opposite a deployable seal 54 around the case 65 through relief conduits 53 , a plurality of optical fibers 47 within the case 65 and optically coupled to optical elements 45 housed in a generally concentric pattern at a leading end 56 of the drill head 50 to irradiate the wall portion 92 with laser light 52 upon activation.
- the drill head 50 of FIG. 5 further comprises a pair of gas conduits 49 to provide gas to gas injection ports 46 (not shown in FIG. 5 ) for displacing laser obstructing material from a laser path 17 proximal the leading end 56 of the drill head 50 .
- the drill head 50 of FIG. 5 further comprises a gas lateral 64 to receive gas from a gas conduit 49 upon opening of the seal gas valve 63 and to deliver the gas to the deployable seal 54 to deploy the seal to the sealing mode shown in FIG. 5 .
- the drill head 50 of FIG. 5 further comprises a deflation stem 60 having a seal deflation valve 61 to relieve gas pressure within the deployable seal 54 to restore the deployable seal 54 to a retracted mode (not shown in FIG. 5 ).
- a borehole system may comprise a single bore without intersecting laterals or, alternately, a borehole system may comprise a primary bore having one or more interesting lateral bores.
- the system of the present invention may be used to condition a portion of a wall of a single bore without intersecting laterals, to condition a portion of a wall of a lateral bore that intersects a primary bore.
- tools exist, such as guide tools and whipstocks, to guide the drill head 50 of the system of the present invention into a lateral bore intersecting a primary bore in a borehole system.
- FIG. 6 is an elevation view of a portion of a borehole system comprising a lateral bore 72 intersecting a primary bore 90 at a window 84 in a casing 82 installed within the primary bore 90 and cemented into place using cement 80 .
- the lateral bore 72 of FIG. 6 has an initial section 70 and a plurality of bends 73 indicating that the lateral bore 72 is bored using a tool steered to penetrate and drain formation fluid from a geologic formation 19 .
- FIG. 7 is an elevation view of the portion of a borehole system of FIG. 6 after a guide tool 98 is disposed in the primary bore 90 to guide the drill head 50 (not shown in FIG. 7 ) through the casing window 84 and into the lateral bore 72 to condition a portion of a wall 94 of the lateral bore 72 to better drain the adjacent geologic formation 19 .
- the guide tool 98 has shoes 96 to grip the casing 82 , and an inclined surface 97 thereon to deflect a drill head 50 (not shown in FIG. 7 ) into the window 84 milled in the casing 82 and the cement liner 80 .
- the size, length and diameter of the drill head 50 (not shown) to be positioned in the lateral bore 72 , an angle of the inclined surface 97 , the configuration of the guide tool 98 , the size of the window 84 and an angle of intersection 99 of the initial section 70 of the lateral bore 72 are among factors to be considered in conditioning a portion of a wall 94 of a bore 72 in accordance with the present invention.
- FIG. 8 is the elevation view of FIG. 6 after the system of the present invention is used to create a congealed permeable liner 79 along a portion of a wall 94 of a lateral bore 72 intersecting a primary bore 90 .
- the liner 79 is conditioned, using the drill head 50 (not shown) and an underbalanced pressure to facilitate the flow of formation fluid residing in the formation 19 into the lateral bore 72 through a plurality of fluid passages 88 through the liner 79 .
- the liner 79 comprises one or more components of the formation 19 melted by laser light and congealed to form the liner.
- the formation 19 may be sandstone, and the component melted by exposure to the laser light may be silica, which congeals after melting to form the liner 79 .
- the fluid passages 88 through the liner 79 are formed by physical reaction of the formation fluid, moved from the formation to the bore as a result of the underbalanced pressure, with the congealing formation components.
- formation fluid components such as water or hydrocarbons will, upon exposure to the hot, congealing formation components along the wall 94 of the lateral bore 72 , expand within a matrix of congealing formation components resulting in small cavities (not shown in FIG. 8 ) within the liner 79 , as illustrated in FIG. 9 .
- FIG. 9 is an enlarged view of a portion of the lateral bore 72 of FIG. 8 wherein the system of the present invention has been used to condition the liner 79 formed along the wall of the conditioned bore section with a plurality of cavities 93 .
- Many of the cavities 93 are fluidically connected to adjacent cavities 93 to create fluid passageways 88 to facilitate the flow of fluid from the formation 19 adjacent to the lateral bore 72 through the liner 79 and into the lateral bore 72 for production in the direction of arrow 75 to the surface through the primary bore 90 .
- a factor affecting the size of cavities 93 formed in the liner 79 along the conditioned bore section depends on the pressure imbalance between the pressure of the fluid residing in the formation 19 and the lower and underbalanced pressure in the lateral bore 72 .
- a slightly underbalanced pressure i.e., when the pressure within the lateral bore 72 is only slightly less than the pressure of the fluid residing in the formation 19 adjacent to the lateral bore 72 ) existing during the interval of time in which the liner 79 congeals will result in the formation of fewer cavities 93 in the liner 79 and an overall lower flow capacity of formation fluid across the congealed liner 79 and into the lateral bore 72 .
- a more underbalanced pressure i.e., when the pressure in the lateral bore 72 is substantially less than the pressure of the fluid residing in the formation 19 adjacent to the lateral bore 72 ) existing during the interval of time in which the liner 79 congeals will result in the formation of more cavities 93 in the liner 79 and an overall greater flow capacity of formation fluid across the congealed liner 79 and into the lateral bore 72 .
- sections of the borehole system conditioned using the present invention may be customized by manipulation of the underbalanced pressure.
- a balanced or overbalanced pressure may be provided to substantially isolate a conditioned section of the borehole system from fluid residing in the formation adjacent thereto
- a slightly underbalanced pressure may be provided for a restrained amount of fluid communication between the conditioned section of the borehole system and the fluid residing in the formation adjacent thereto
- a substantially underbalanced pressure may be provided for a generous amount of fluid communication between the conditioned section of the borehole system and the fluid residing in the formation adjacent thereto.
- a deployable seal is coupled to the drill head or to the umbilical at a position spaced apart from the drill head.
- the seal is deployable to isolate the portion of the borehole system adjacent to the portion of the wall to be conditioned from the remainder of the borehole system so that an underbalanced pressure can be provided to promote the flow of formation fluid across the solidifying component of the formation proximal to the borehole.
- the system and method of the present invention can be used to condition a portion of the bore wall of an existing borehole system to modify a drainage profile of the borehole system.
- the system can be used to isolate or to impair fluid drainage into the borehole system in a first location by using the drill head during an overbalanced condition to create a substantially impermeable sleeve, and the system can be used to promote fluid drainage into the borehole system in a second location by using the drill head during an underbalanced condition to create a permeable sleeve with fluid passageways.
- the system and method of the present invention can provide for the customization of a borehole system to selectively drain portions of the borehole system adjacent to geologic formations with favorable fluid contents, such as hydrocarbons, and to selectively prevent the drainage of portions of the borehole system adjacent to geologic formations with unfavorable fluid contents, such as water.
- working fluid refers to a fluid introduced into the borehole for the purpose of lubricating the borehole system to facilitate the smooth insertion, positioning and removal of the apparatus comprising the drill head, for the purpose of hydrostatically opposing or balancing formation pressure to minimize the potential for well control problems due to an unwanted and unexpected influx of formation fluids into the bore.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Pest Control & Pesticides (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Insects & Arthropods (AREA)
- Wood Science & Technology (AREA)
- Zoology (AREA)
- Environmental Sciences (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Laser Beam Processing (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
A method to condition a portion of a wall surrounding a borehole section drilled in a formation fluid-bearing formation comprising locally injecting a gas to displace working fluid from a laser path adjacent a drill head, providing an underbalanced pressure at the portion of the borehole section to be conditioned, impinging laser light on the portion of the wall to be conditioned to melt a component of the formation material in the portion of the bore wall to be conditioned, and drawing fluid from the formation through the solidifying component of the material to create fluid flow passageways to facilitate the flow of fluid from the formation into the borehole section. Injected gas may be provided to the drill head through a conduit within an umbilical that includes a plurality of optical fibers to transmit laser light to the drill head.
Description
- This application depends from and claims priority to International PCT/US2012/039767 filed on May 26, 2012, which claims priority to Hungarian Application No.: P1100276 filed on May 30, 2011.
- 1. Field of the Invention
- The present invention relates to wells drilled to recover fluids from geologic formations.
- 2. Background of the Related Art
- Borehole systems are drilled into the earth's crust to penetrate subsurface geologic formations bearing a fluid, such as water, oil or gas, to facilitate the production of the fluid to the surface. A borehole system may comprise a single bore surrounded by a bore wall or, alternately, it may comprise a primary bore having one or more intersecting lateral bores surrounded, along with the primary bore, by the bore wall.
- A borehole system may be bored in the earth's crust using mechanical drilling rigs at the earth's surface to rotate a drill bit at a leading end of a drill string extending from the rig. Some rigs rotate the entire drill string, which may comprise a plurality of segments or stands of drill pipe threadedly coupled to form the drill string. The drill string can be made up by adding segments as the drill string is extended deeper into the earth's crust or laid down by removing segments as the drill string is withdrawn from the earth's crust. The rotation of the drill string and the drill bit at the leading end of the drill string, while urging the drill bit against the end of the portion of the borehole system to be extended to break apart rock engaged by the drill bit. Alternately, a drill string may comprise a mud motor proximal the leading end and hydraulically powered by fluid provided through the center of the drill string to rotate a drill bit coupled to the mud motor to break apart the rock engaged by the drill bit. Drill cuttings are removed from the portion of the bore to be extended by circulating working fluid down the drill string and back to the earth's surface through the annulus between the drill string and the wall of the bore.
- Other methods for extending a borehole system include the use of high-power laser light to melt components of rock within a laser path adjacent to a drill head at the leading end of a drill string. Laser drilling may include the removal of debris resulting from the drilling process by circulating fluid into and from the portion of the borehole system being extended. A laser path between the drill head and a portion of the wall to be irradiated using the drill head must be cleared of laser obstructing materials so that the laser light can impinge on the portion of the wall to be irradiated by the laser.
- Still other methods for extending a borehole system include the use of a high-pressure jet to mechanically fracture rock within a fluid path adjacent to a liquid jet at the leading end of a drill string. High-pressure jet drilling may include the removal of debris resulting from the drilling process by circulating fluid into and from the portion of the borehole system being extended. For best results, the jet path between the liquid jet and the portion of the bore wall to be jet blasted should be as short as possible to impart a maximum amount of liquid kinetic energy on the portion of the wall to be jet blasted.
- A completed borehole system generally comprises a non-productive portion, into which no fluids enter from adjacent geologic formations, and a productive portion of the borehole system having a plurality of bore sections into which fluids may enter from adjacent geologic formations. It is important to prevent undesirable fluids from entering the borehole system and also to cause desirable fluids to enter the borehole by providing a flow passageway. For example, a drilled borehole system to obtain fresh water should be isolated from penetrated geologic formations bearing brackish or salty water in favor of producing water from penetrated geologic formations bearing fresh water. In another example, a borehole system drilled to obtain oil or gas should be isolated from penetrated geologic formations bearing water in favor of producing oil or gas from penetrated geologic formations bearing oil or gas.
- To achieve this end in conventional borehole systems, bore sections in a productive portion of the borehole may be lined or cased with a pipe called casing, then the casing is cemented in place within the bore by circulating cement into a casing/bore annulus. The casing and the cement liner can then be perforated with a perforating tool to establish fluid communication between the formation adjacent to the perforations and the interior of the bore. Alternately, or in addition to perforating, a productive portion of a bore may be packed with fine gravel to promote the flow of fluid from adjacent geologic formations into the bore while preventing entrained particles, or the productive portion of the bore may be lined or cased with a previously perforated liner to provide structural support against bore collapse while facilitating a flow of formation fluids into the bore section for production to the earth's surface.
- The present invention provides a method comprising providing an umbilical having a plurality of optical fibers, a gas supply conduit and a leading end connected to a drill head, introducing the drill head into a surface end of a borehole system drilled into the earth's crust, positioning the drill head within a portion of the borehole system in a geologic formation in which a fluid resides, introducing a volume of gas through the gas conduit into the portion of the borehole system to displace laser obstructing materials therefrom, transmitting laser light through the plurality of optical fibers to the drill head, impinging laser light on a portion of the bore wall to be conditioned to melt at least a component of the formation material along the portion of the bore wall, providing an underbalanced pressure at the portion of the bore wall to be conditioned, and inducing a flow of the fluid from the formation across the portion of the wall and into the borehole system as the melted component solidifies, wherein the flow of fluid across the solidifying component of the portion of the wall to be conditioned creates interconnected cavities, or fluid flow passages, through which fluid may flow from the formation into the borehole system.
- Another embodiment of the invention provides a method of conditioning a portion of a wall of a borehole system comprising disposing a drill head into the borehole system, positioning the drill head proximal to the portion of the wall to be conditioned, injecting a gas to displace laser obstructing material from a laser path intermediate the drill head and the portion of the wall to be conditioned, irradiating the portion of the wall using laser light emitted from the drill head to melt at least a component of the wall opposite the laser path from the drill head, providing an underbalanced pressure at the portion of the wall to be conditioned, and drawing a formation fluid residing in the formation across the portion of the wall to be conditioned as the component of the formation solidifies to create passageways within the wall for the flow of the fluid from the formation into the borehole system.
-
FIG. 1 is a schematic illustrating a system of the present invention. -
FIG. 2 is an enlarged perspective view of an alternative spool that can be used to store an umbilical of a system of the present invention. -
FIG. 3 is an enlarged top view of a second alternative spool that can be used to store an umbilical of a system of the present invention. -
FIG. 4 is a perspective view of a drill head that can be used to implement an aspect of the system of the present invention. -
FIG. 5 is an enlarged partial section view of a drill head that can be used to implement as aspect of the system of the present invention. -
FIG. 6 is an elevation view of a portion of a borehole system comprising a single lateral bore intersecting a primary bore at a window in a casing installed within the primary bore. -
FIG. 7 is an elevation view of the portion of a borehole system ofFIG. 6 after a guide tool is disposed in the primary bore to guide the drill head through the casing window into the lateral bore to condition the wall of the lateral bore. -
FIG. 8 is the elevation view ofFIG. 6 after the system of the present invention is used to create a congealed permeable liner along the wall of the lateral bore. -
FIG. 9 is an enlarged view of a portion of the lateral bore ofFIG. 8 wherein the system of the present invention has been used to condition the liner with connected cavities to facilitate flow of formation fluid from the formation and into the lateral bore for production to the surface through the primary bore. - One embodiment of the present invention provides an umbilical for positioning a drill head connected to a leading end of the umbilical within a borehole system. The umbilical includes a gas conduit and a plurality of optically transmitting fibers to supply gas and laser light to the drill head, respectively. The umbilical may be stored on and fed from a reel, spool or other storage device into the borehole system. The reel, spool or other storage device on which the umbilical may be wound or coiled facilitates transportation of the umbilical to and from the surface location of the borehole system. The storage device may include a rotatable fluid coupling coupled to a surface end of the gas conduit of the umbilical to facilitate the flow of gas from a gas source on the earth's surface to a surface end of the gas conduit. Similarly, the storage device may include a rotatable fluid coupling coupled to a surface end of the optical fibers of the umbilical to facilitate the transmission of laser light from a laser generator on the earth's surface to a surface end of the optical fibers. The rotatable couplings accommodate rotary movement of the storage device on which the umbilical relative to the earth's surface and enable a continuous supply of gas and/or laser light without unwanted twisting or binding of the umbilical.
- The umbilical comprises a leading end to which a drill head is connected, for being introduced into the borehole system. The reel can be rotated to feed out the umbilical to the borehole system in an amount sufficient to position the drill head at the leading end of the umbilical proximal a portion of a wall of the borehole system to be conditioned using the drill head. The drill head can, in one embodiment, comprise one or more gas injection ports strategically located on the drill head to introduce gas to displace laser obstructing materials, such as working fluid or other fluids and debris, from the laser path. The laser path, as that term is used herein, is the path through which the laser light emitted from the drill head will beam to impinge on the portion of the wall of the bore to be conditioned using the drill head.
- The drill head further comprises one or more optical elements optically coupled to a leading end of the plurality of optical fibers to focus and condition the laser light transmitted from the surface for providing the maximum impact on the portion of the wall of the bore to be conditioned using the drill head. The optical elements may comprise lenses housed in the drill head and optically coupled to a leading end of optical fibers extending from the leading end of the umbilical into the drill head. The optical elements may be housed, for example, at an end of the drill head generally opposite the connected end of the drill head, and the optical elements may be protected using a transparent protective member through which emitted laser light may pass to impinge upon the bore wall.
- An embodiment of the invention provides an underbalanced pressure to the portion of the wall to be conditioned by deploying a seal coupled to the drill head, or to the umbilical at a position spaced apart from the drill head, to expand upon deployment to seal off an annulus between the drill head (or the umbilical) to which the seal is connected and the wall of the bore. The deployment of the seal isolates the portion of the bore to be conditioned from working fluid, produced fluid or other laser obstructing material in the bore through which the umbilical is extended. In one embodiment, the seal is an inflatable member, and the deployment of the seal may be implemented by remotely opening a valve fluidically coupled between the gas conduit and the seal to inflate the seal using gas provided through the gas conduit. In a second embodiment, the seal may be retracted from a deployed configuration by remotely opening a second valve coupled to release the gas from the inflated seal to the bore. In another embodiment, a first valve, coupled to selectively introduce gas from the gas conduit to the seal to inflate the seal, and a second valve, coupled to selectively release gas from the seal to the bore, may be replaced using a single remotely controllable three-way valve having a first selectable position to establish communication between the gas conduit and the seal to inflate the seal and a second selectable position to establish communication between the inflated seal and the bore.
- An embodiment of the invention includes providing an underbalanced pressure to the portion of the bore to be conditioned to facilitate the flow of fluid from the formation and into the bore as components of the wall of the bore congeal after being melted by application of laser light. In one embodiment, the underbalanced pressure is provided by artificially lifting a column of working fluid in the bore by injection of gas. It will be understood that, as the injected volume of gas migrates toward the surface end of the bore, it expands as it encounters decreasing pressure thereby displacing working fluid from the bore at the surface and decreasing the pressure at the portion of the bore to be conditioned. Other embodiments of the method include swabbing the bore by removing material from the surface end of the bore. For example, but not by way of limitation, a bore may be swabbed to provide an underbalanced pressure by introducing gas or low-density liquid into the bore, even at a shallow depth relative to the portion of the bore to be conditioned, to displace a more dense fluid and to thereby alter the hydrostatic pressure provided by the fluid in the borehole system to the portion of the wall to be conditioned using the method of the present invention.
-
FIG. 1 is a schematic illustrating an aspect of thesystem 10 of the present invention. Aborehole 90 is drilled into the earth'scrust 11 so that aportion 17 of theborehole 90 penetrates ageologic formation 19 bearing a fluid medium such as, for example, hydrocarbons. Thesystem 10 comprises a coiled tubing unit at thesurface 15 having a source ofpressurized gas 12 fluidically coupled through agas leader 13 to a gas conduit (not shown) within an umbilical 34, a portableelectric generator 14 electrically coupled through apower supply leader 18 to power alaser light generator 16 that is, in turn, optically coupled through alaser leader 26 to a plurality of optical fibers 47 (not shown inFIG. 1 ) within the umbilical 34. Thesystem 10 ofFIG. 1 further comprises awellhead 25 sealing thesurface end 91 of the borehole 90 through which the umbilical 34 is received into theborehole 90, a workingfluid tank 20 coupled through a workingfluid leader 22 to thewellhead 25 to enable the introduction and removal of workingfluid 21 into and from anannulus 24 between the umbilical 34 and thewall 94 of theborehole 90. The system further comprises aspool 30 on which an extended length of umbilical 34 may be stored, and a coiled tubingunit guide support 27 to support anumbilical guide 38 having a plurality of rollingelements 37 therein to reduce friction of movement of the umbilical 34 into and from thewellhead 25 and theborehole 90. Thesystem 10 and the coiled tubing unit thereof further comprise adrill head 50 connected at aconnected end 36 to the umbilical 34 and positionable within theborehole 90 by letting out and reeling in the umbilical 34 from and onto thespool 30. - The
system 10 comprises thespool 30 that is rotatable on an axle (not shown inFIG. 1 ) using a motor and related gears (not shown) to control the position of thedrill head 50 by letting out and reeling in the umbilical 34 thereon. InFIG. 1 , thespool 30 has been reeled out to provide sufficient umbilical 34 through thewellhead 25 to position thedrill head 50 adjacent to a portion of the wall to be conditioned 92, which is a small portion of thewall 94 of the borehole 90 that is adjacent thedrill head 50. Thedrill head 50 comprises a deployablecircumferential seal 54 that, upon deployment, seals the annulus between the exterior surface of thedrill head 50 and thewall 94 of the borehole 90 in which thedrill head 50 is positioned. -
FIG. 2 is a perspective view of an alternativeumbilical storage spool 32A that can be used to store an umbilical 34 of a system of the present invention by coiling the umbilical 34 against theinterior wall 33 of thespool 32A. After a portion of theinterior wall 33 is covered withouter coils 42 of the umbilical 34, additional, smaller coils can be disposed within the initial,outer coils 42 for additional storage capacity.FIG. 3 is a top view of a second alternativeumbilical spool 32B that can be used to store an umbilical 34 of a system of the present invention by wrappingcoils 44 around anexterior wall 41 of acenter post 38 of the spool 34B. After a portion of theexterior wall 41 is covered withcoils 44 of the umbilical 34, additional, larger coils can be disposed about the initial,inner coil 40 for additional storage capacity. -
FIG. 4 is an enlarged perspective view of thedrill head 50 ofFIG. 1 that can be used to implement an aspect of the system of the present invention. Thedrill head 50 ofFIG. 4 comprises a plurality ofoptical elements 45 optically coupled to a plurality of elongateoptical fibers 47 that optically conduct laser light (not shown inFIG. 4 ) provided from the laser light source 16 (not shown inFIG. 4 ) through the laser leader 26 (not shown inFIG. 4 ) to a surface end of the optical fibers 47 (not shown inFIG. 4 ). Theoptical elements 45 in thedrill head 50 ofFIG. 4 are disposed in a generally concentric pattern within a leadingend 56 of the drill head. It will be understood that the optical elements may be disposed in a number of various patterns or positions within thedrill head 50. - The drill head of
FIG. 4 further comprises a plurality ofgas injection ports 46 disposed within the leadingend 56 of thedrill head 50 and positioned to inject gas into a portion of the borehole system having a wall to be conditioned by laser light (not shown) emitted from theoptical elements 45. In thedrill head 50 ofFIG. 4 , thegas injection ports 46 are disposed within the interior of the concentric pattern of theoptical elements 45. It will be understood that thegas injection ports 46 can be disposed in a number of various patterns or positions within thedrill head 50. Thedrill head 50 ofFIG. 4 further comprises adeployable seal 54 around theexterior surface 59 of thedrill head 50. Thedeployable seal 54 is illustrated inFIG. 4 in the deployed mode to seal an annulus between a wall of a bore (not shown) in which thedrill head 50 ofFIG. 4 may be positioned and theexterior surface 59 of thedrill head 50 to facilitate the displacement of laser obstructing materials from the portion of a bore system to be conditioned using the system of the present invention. Thedrill head 50 ofFIG. 4 further comprises one ormore relief ports 57 into which laser obstructing materials may be displaced and through which laser obstructing materials may be removed from the portion of a borehole to be conditioned using the system of the present invention. - For example, but not by way of limitation, the
drill head 50 ofFIG. 4 may be positioned within a portion of a bore to be conditioned thereby, thedeployable seal 54 may be deployed to engage a wall of a portion of the bore to seal an annulus between theexterior surface 59 of thedrill head 50 and the wall of the bore. Gas provided to the drill head through agas conduit 49 within an umbilical 34 used to position thedrill head 50 is injected into a portion of the bore proximal to theleading end 56 of thedrill head 50 to displace laser obstructing materials, such as working fluid, formation fluid or a mixture thereof, from the portion of the bore through therelief port 57. In thedrill head 50 ofFIG. 4 , the displaced laser obstructing material and the gas injected through thegas injection ports 46 to displace the laser obstructing material are moved towards the surface and beyond theseal 54 throughmaterial conduits 48 within thedrill head 50. Thematerial conduits 48 may empty into the portion of the annulus (not shown) between the surface and theseal 54 or, alternately, the umbilical 34 may comprise an additional conduit through which the displaced laser obstructing material and the displacing gas stream may be delivered to the surface. -
FIG. 5 is an enlarged partial section view of thedrill head 50 that can be used to implement a system of the present invention positioned within abore 90 to condition aportion 92 of thewall 94 of thebore 90 within ageologic formation 19 bearing the fluid medium to be recovered. Thedrill head 50 ofFIG. 5 comprises acase 65 having anexterior surface 59,relief ports 57 through thecase 65 and connected to exitports 58 opposite adeployable seal 54 around thecase 65 throughrelief conduits 53, a plurality ofoptical fibers 47 within thecase 65 and optically coupled tooptical elements 45 housed in a generally concentric pattern at aleading end 56 of thedrill head 50 to irradiate thewall portion 92 withlaser light 52 upon activation. Thedrill head 50 ofFIG. 5 further comprises a pair ofgas conduits 49 to provide gas to gas injection ports 46 (not shown inFIG. 5 ) for displacing laser obstructing material from alaser path 17 proximal the leadingend 56 of thedrill head 50. Thedrill head 50 ofFIG. 5 further comprises agas lateral 64 to receive gas from agas conduit 49 upon opening of theseal gas valve 63 and to deliver the gas to thedeployable seal 54 to deploy the seal to the sealing mode shown inFIG. 5 . Thedrill head 50 ofFIG. 5 further comprises adeflation stem 60 having aseal deflation valve 61 to relieve gas pressure within thedeployable seal 54 to restore thedeployable seal 54 to a retracted mode (not shown inFIG. 5 ). - It will be understood that a borehole system may comprise a single bore without intersecting laterals or, alternately, a borehole system may comprise a primary bore having one or more interesting lateral bores. The system of the present invention may be used to condition a portion of a wall of a single bore without intersecting laterals, to condition a portion of a wall of a lateral bore that intersects a primary bore. It will be further understood that tools exist, such as guide tools and whipstocks, to guide the
drill head 50 of the system of the present invention into a lateral bore intersecting a primary bore in a borehole system. -
FIG. 6 is an elevation view of a portion of a borehole system comprising a lateral bore 72 intersecting aprimary bore 90 at awindow 84 in acasing 82 installed within theprimary bore 90 and cemented intoplace using cement 80. The lateral bore 72 ofFIG. 6 has aninitial section 70 and a plurality ofbends 73 indicating that the lateral bore 72 is bored using a tool steered to penetrate and drain formation fluid from ageologic formation 19. -
FIG. 7 is an elevation view of the portion of a borehole system ofFIG. 6 after aguide tool 98 is disposed in the primary bore 90 to guide the drill head 50 (not shown inFIG. 7 ) through thecasing window 84 and into the lateral bore 72 to condition a portion of awall 94 of the lateral bore 72 to better drain the adjacentgeologic formation 19. Theguide tool 98 hasshoes 96 to grip thecasing 82, and aninclined surface 97 thereon to deflect a drill head 50 (not shown inFIG. 7 ) into thewindow 84 milled in thecasing 82 and thecement liner 80. It will be understood that the size, length and diameter of the drill head 50 (not shown) to be positioned in the lateral bore 72, an angle of theinclined surface 97, the configuration of theguide tool 98, the size of thewindow 84 and an angle ofintersection 99 of theinitial section 70 of the lateral bore 72 are among factors to be considered in conditioning a portion of awall 94 of abore 72 in accordance with the present invention. -
FIG. 8 is the elevation view ofFIG. 6 after the system of the present invention is used to create a congealedpermeable liner 79 along a portion of awall 94 of a lateral bore 72 intersecting aprimary bore 90. Theliner 79 is conditioned, using the drill head 50 (not shown) and an underbalanced pressure to facilitate the flow of formation fluid residing in theformation 19 into the lateral bore 72 through a plurality offluid passages 88 through theliner 79. Theliner 79 comprises one or more components of theformation 19 melted by laser light and congealed to form the liner. For example, but not by way of limitation, theformation 19 may be sandstone, and the component melted by exposure to the laser light may be silica, which congeals after melting to form theliner 79. Thefluid passages 88 through theliner 79 are formed by physical reaction of the formation fluid, moved from the formation to the bore as a result of the underbalanced pressure, with the congealing formation components. For example, formation fluid components such as water or hydrocarbons will, upon exposure to the hot, congealing formation components along thewall 94 of the lateral bore 72, expand within a matrix of congealing formation components resulting in small cavities (not shown inFIG. 8 ) within theliner 79, as illustrated inFIG. 9 . -
FIG. 9 is an enlarged view of a portion of the lateral bore 72 ofFIG. 8 wherein the system of the present invention has been used to condition theliner 79 formed along the wall of the conditioned bore section with a plurality ofcavities 93. Many of thecavities 93 are fluidically connected toadjacent cavities 93 to createfluid passageways 88 to facilitate the flow of fluid from theformation 19 adjacent to the lateral bore 72 through theliner 79 and into the lateral bore 72 for production in the direction ofarrow 75 to the surface through theprimary bore 90. A factor affecting the size ofcavities 93 formed in theliner 79 along the conditioned bore section depends on the pressure imbalance between the pressure of the fluid residing in theformation 19 and the lower and underbalanced pressure in the lateral bore 72. A slightly underbalanced pressure (i.e., when the pressure within the lateral bore 72 is only slightly less than the pressure of the fluid residing in theformation 19 adjacent to the lateral bore 72) existing during the interval of time in which theliner 79 congeals will result in the formation offewer cavities 93 in theliner 79 and an overall lower flow capacity of formation fluid across the congealedliner 79 and into the lateral bore 72. A more underbalanced pressure (i.e., when the pressure in the lateral bore 72 is substantially less than the pressure of the fluid residing in theformation 19 adjacent to the lateral bore 72) existing during the interval of time in which theliner 79 congeals will result in the formation ofmore cavities 93 in theliner 79 and an overall greater flow capacity of formation fluid across the congealedliner 79 and into the lateral bore 72. - It will be understood that sections of the borehole system conditioned using the present invention may be customized by manipulation of the underbalanced pressure. For example, but not by way of limitation, a balanced or overbalanced pressure may be provided to substantially isolate a conditioned section of the borehole system from fluid residing in the formation adjacent thereto, a slightly underbalanced pressure may be provided for a restrained amount of fluid communication between the conditioned section of the borehole system and the fluid residing in the formation adjacent thereto, and a substantially underbalanced pressure may be provided for a generous amount of fluid communication between the conditioned section of the borehole system and the fluid residing in the formation adjacent thereto.
- In one embodiment of the method of the present invention, a deployable seal is coupled to the drill head or to the umbilical at a position spaced apart from the drill head. The seal is deployable to isolate the portion of the borehole system adjacent to the portion of the wall to be conditioned from the remainder of the borehole system so that an underbalanced pressure can be provided to promote the flow of formation fluid across the solidifying component of the formation proximal to the borehole.
- It will be understood that the system and method of the present invention can be used to condition a portion of the bore wall of an existing borehole system to modify a drainage profile of the borehole system. For example, but not by way of limitation, the system can be used to isolate or to impair fluid drainage into the borehole system in a first location by using the drill head during an overbalanced condition to create a substantially impermeable sleeve, and the system can be used to promote fluid drainage into the borehole system in a second location by using the drill head during an underbalanced condition to create a permeable sleeve with fluid passageways. In this manner, the system and method of the present invention can provide for the customization of a borehole system to selectively drain portions of the borehole system adjacent to geologic formations with favorable fluid contents, such as hydrocarbons, and to selectively prevent the drainage of portions of the borehole system adjacent to geologic formations with unfavorable fluid contents, such as water.
- The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term “working fluid” refers to a fluid introduced into the borehole for the purpose of lubricating the borehole system to facilitate the smooth insertion, positioning and removal of the apparatus comprising the drill head, for the purpose of hydrostatically opposing or balancing formation pressure to minimize the potential for well control problems due to an unwanted and unexpected influx of formation fluids into the bore.
- As used herein, the singular forms “a”, “an” and “the” are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms “comprises” and/or “comprising,” when used in this specification, specify the presence of stated features, integers, steps, operations, elements, components and/or groups, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof. The terms “preferably,” “preferred,” “prefer,” “optionally,” “may,” and similar terms are used to indicate that an item, condition or step being referred to is an optional (not required) feature of the invention.
- The corresponding structures, materials, acts, and equivalents of all means or steps plus function elements in the claims below are intended to include any structure, material, or act for performing the function in combination with other claimed elements as specifically claimed. The description of the present invention has been presented for purposes of illustration and description, but it is not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the invention. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.
Claims (19)
1. A method comprising:
providing an umbilical having a plurality of optical fibers, a gas conduit and a leading end connected to a drill head;
introducing the drill head through a surface end of a borehole system drilled in the earth's crust:
positioning the drill head within a bore section of the borehbole system penetrating a geologic formation in which a formation fluid resides;
introducing a volume of gas through the gas conduit into a portion of the bore section to be conditioned to displace laser obstructing materials;
transmitting laser light through the plurality of optical fibers to the drill head;
impinging laser light on a portion of the wall of the bore section to be conditioned to melt at least a component of the formation material of the wall;
providing an underbalanced pressure at the portion of the wall to be conditioned; and
inducing a flow of the formation fluid from the formation across the portion of the wall to be conditioned and into the bore section as the melted component of the formation material solidifies;
wherein the flow of formation fluid across the solidifying component of the portion of the wall to be conditioned creates formation fluid flow passages through which the formation fluid may flow from the formation into the bore section.
2. The method of claim 1 wherein the gas is one of nitrogen, a noble gas, and a combination thereof.
3. The method of claim 1 wherein providing an underbalanced pressure at the portion of the wall to be conditioned comprises:
reducing the average density of a working fluid circulated into the borehole system.
4. The method of claim 3 wherein reducing the average density of the working fluid circulated into the borehole system comprises:
introducing a low density fluid into the borehole system through a working fluid conduit within at least a portion of a length of the umbilical.
5. The method of claim 1 wherein providing the underbalanced pressure at the portion of the wall to be conditioned comprises:
reducing the volume of a working fluid disposed within the borehole system to hydrostatically balance formation pressure.
6. The method of claim 1 wherein providing the underbalanced pressure at the portion of the wall to be conditioned comprises:
deploying a seal on the drill head to isolate the portion of the wall to be conditioned from a remaining portion of the borehole system.
7. The method of claim 1 wherein the drill head connected to the leading end of the umbilical comprises:
at least one gas injection port connected to the gas conduit.
8. The method of claim 1 wherein the drill head connected to the leading end of the umbilical comprises:
at least one optical element optically connected to the plurality of optical fibers.
9. The method of claim 8 wherein the drill head connected to the leading end of the umbilical comprises:
a plurality of optical elements optically connected to the plurality of transmission fibers.
10. The method of claim 7 wherein the drill bead connected to the leading end of the umbilical comprises:
at least one optical element optically connected to the plurality of optical fibers.
11. A method of conditioning a portion of a wall of a bore section of a borehole system comprising:
disposing a drill head into the bore section of the borehole system;
positioning the drill head within the bore section and proximal to the portion of the wall to be conditioned;
injecting a gas into the bore section to displace laser obstructing material from a laser path intermediate the drill head and the portion of the wall to be conditioned;
irradiating the portion of the wall to be conditioned using laser light emitted from the drill head to melt at least a component of the wall opposite the laser path from the drill head;
providing an underbalanced pressure at the portion of the wall to be conditioned; and
drawing a formation fluid residing in the formation across the portion of the wall to be conditioned and into the bore section as the melted component of the wall solidifies to create passageways within the portion of the wall of the bore section for the flow of the formation fluid from the formation into the bore section.
12. The method of claim 11 wherein the gas is one of nitrogen, a noble gas, and a combination thereof.
13. The method of claim 11 wherein providing the underbalanced pressure at the portion of the wall to be conditioned comprises:
reducing the volume of working fluid disposed within the borehole system.
14. The method of claim 11 further comprising:
providing an umbilical having a plurality of optical fibers, a gas conduit and a leading end connected to the drill head;
connecting the gas conduit to a gas injection port in the drill head;
optically connecting the plurality of optical fibers to a plurality of optical elements in the drill head; and
deploying a seal on the drill head to isolate the portion of the wall to be conditioned from a remaining portion of the borehole system.
15. The method of claim 14 wherein irradiating the portion of the wall using laser light emitted from the apparatus to melt at least a component of the formation adjacent to the drill head comprises:
transmitting laser light through the plurality of optical fibers to the optical elements in the drill head; and
emitting laser light from the drill head through the laser path onto the portion of the wall to be conditioned.
16. The method of claim 11 wherein the drill head connected to the leading end of the umbilical comprises:
at least one gas injection port connected to the gas conduit.
17. The method of claim 11 wherein the drill head connected to the leading end of the umbilical comprises:
an optical element optically coupled to the plurality of optical fibers.
18. The method of claim 17 wherein the drill head connected to the leading end of the umbilical comprises:
a plurality of optical elements optically coupled to the plurality of optical fibers.
19. The method of claim 17 wherein the drill head connected to the leading end of the umbilical comprises:
at least one gas injection port connected to the gas conduit.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
HUP1100276 | 2011-05-30 | ||
HU1100276A HU229944B1 (en) | 2011-05-30 | 2011-05-30 | Method for ensuring of admission material into a bore hole |
PCT/US2012/039767 WO2012166677A2 (en) | 2011-05-30 | 2012-05-26 | A method of conditioning a wall of a bore section |
Publications (1)
Publication Number | Publication Date |
---|---|
US20140299375A1 true US20140299375A1 (en) | 2014-10-09 |
Family
ID=89990298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/122,395 Abandoned US20140299375A1 (en) | 2011-05-30 | 2012-05-26 | Method of conditioning a wall of a bore section |
Country Status (9)
Country | Link |
---|---|
US (1) | US20140299375A1 (en) |
EP (1) | EP2737173A2 (en) |
CN (1) | CN103764944A (en) |
AU (1) | AU2012262391A1 (en) |
BR (1) | BR112013030934A2 (en) |
CA (1) | CA2837592A1 (en) |
EA (1) | EA201301286A1 (en) |
HU (1) | HU229944B1 (en) |
WO (1) | WO2012166677A2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120255774A1 (en) * | 2008-08-20 | 2012-10-11 | Grubb Daryl L | High power laser-mechanical drilling bit and methods of use |
US20140158425A1 (en) * | 2011-07-15 | 2014-06-12 | Sld Enhanced Recovery, Inc. | Apparatus and system to remove debris from a laser-extended bore section |
US20140305635A1 (en) * | 2012-09-04 | 2014-10-16 | Alexander Petrovich Linetskiy | Method For Developing Oil And Gas Fields Using High-Power Laser Radiation For More Complete Oil And Gas Extraction |
US9903171B2 (en) | 2012-09-04 | 2018-02-27 | Alexander Petrovich Linetskiy | Method for developing oil and gas fields using high-power laser radiation for more complete oil and gas extraction |
US10941618B2 (en) * | 2018-10-10 | 2021-03-09 | Saudi Arabian Oil Company | High power laser completion drilling tool and methods for upstream subsurface applications |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10941644B2 (en) | 2018-02-20 | 2021-03-09 | Saudi Arabian Oil Company | Downhole well integrity reconstruction in the hydrocarbon industry |
US10641079B2 (en) | 2018-05-08 | 2020-05-05 | Saudi Arabian Oil Company | Solidifying filler material for well-integrity issues |
US10662728B2 (en) * | 2018-07-09 | 2020-05-26 | Saudi Arabian Oil Company | Method and apparatus for stuck pipe mitigation |
CN109322618B (en) * | 2018-10-19 | 2020-04-07 | 成都科盛石油科技有限公司 | Method for completing drilling of heterogeneous shale gas well reservoir section |
US11187068B2 (en) | 2019-01-31 | 2021-11-30 | Saudi Arabian Oil Company | Downhole tools for controlled fracture initiation and stimulation |
US11125075B1 (en) | 2020-03-25 | 2021-09-21 | Saudi Arabian Oil Company | Wellbore fluid level monitoring system |
US11414963B2 (en) | 2020-03-25 | 2022-08-16 | Saudi Arabian Oil Company | Wellbore fluid level monitoring system |
US11280178B2 (en) | 2020-03-25 | 2022-03-22 | Saudi Arabian Oil Company | Wellbore fluid level monitoring system |
US11414985B2 (en) | 2020-05-28 | 2022-08-16 | Saudi Arabian Oil Company | Measuring wellbore cross-sections using downhole caliper tools |
US11414984B2 (en) | 2020-05-28 | 2022-08-16 | Saudi Arabian Oil Company | Measuring wellbore cross-sections using downhole caliper tools |
US11631884B2 (en) | 2020-06-02 | 2023-04-18 | Saudi Arabian Oil Company | Electrolyte structure for a high-temperature, high-pressure lithium battery |
US11391104B2 (en) | 2020-06-03 | 2022-07-19 | Saudi Arabian Oil Company | Freeing a stuck pipe from a wellbore |
US11149510B1 (en) | 2020-06-03 | 2021-10-19 | Saudi Arabian Oil Company | Freeing a stuck pipe from a wellbore |
US11719089B2 (en) | 2020-07-15 | 2023-08-08 | Saudi Arabian Oil Company | Analysis of drilling slurry solids by image processing |
US11255130B2 (en) | 2020-07-22 | 2022-02-22 | Saudi Arabian Oil Company | Sensing drill bit wear under downhole conditions |
US11506044B2 (en) | 2020-07-23 | 2022-11-22 | Saudi Arabian Oil Company | Automatic analysis of drill string dynamics |
US11867008B2 (en) | 2020-11-05 | 2024-01-09 | Saudi Arabian Oil Company | System and methods for the measurement of drilling mud flow in real-time |
US11434714B2 (en) | 2021-01-04 | 2022-09-06 | Saudi Arabian Oil Company | Adjustable seal for sealing a fluid flow at a wellhead |
CN114799221A (en) * | 2021-01-11 | 2022-07-29 | 中国石油天然气集团有限公司 | Well drilling and wall building system and well drilling and wall building method |
US11697991B2 (en) | 2021-01-13 | 2023-07-11 | Saudi Arabian Oil Company | Rig sensor testing and calibration |
US11572752B2 (en) | 2021-02-24 | 2023-02-07 | Saudi Arabian Oil Company | Downhole cable deployment |
US11727555B2 (en) | 2021-02-25 | 2023-08-15 | Saudi Arabian Oil Company | Rig power system efficiency optimization through image processing |
US11846151B2 (en) | 2021-03-09 | 2023-12-19 | Saudi Arabian Oil Company | Repairing a cased wellbore |
US11619097B2 (en) | 2021-05-24 | 2023-04-04 | Saudi Arabian Oil Company | System and method for laser downhole extended sensing |
US11725504B2 (en) | 2021-05-24 | 2023-08-15 | Saudi Arabian Oil Company | Contactless real-time 3D mapping of surface equipment |
US11624265B1 (en) | 2021-11-12 | 2023-04-11 | Saudi Arabian Oil Company | Cutting pipes in wellbores using downhole autonomous jet cutting tools |
US11867012B2 (en) | 2021-12-06 | 2024-01-09 | Saudi Arabian Oil Company | Gauge cutter and sampler apparatus |
US11954800B2 (en) | 2021-12-14 | 2024-04-09 | Saudi Arabian Oil Company | Converting borehole images into three dimensional structures for numerical modeling and simulation applications |
US11739616B1 (en) | 2022-06-02 | 2023-08-29 | Saudi Arabian Oil Company | Forming perforation tunnels in a subterranean formation |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040244970A1 (en) * | 2003-06-09 | 2004-12-09 | Halliburton Energy Services, Inc. | Determination of thermal properties of a formation |
US20120118568A1 (en) * | 2010-11-11 | 2012-05-17 | Halliburton Energy Services, Inc. | Method and apparatus for wellbore perforation |
US8464794B2 (en) * | 2009-06-29 | 2013-06-18 | Halliburton Energy Services, Inc. | Wellbore laser operations |
US20150129203A1 (en) * | 2008-08-20 | 2015-05-14 | Foro Energy, Inc. | High power laser hydraulic fracturing, stimulation, tools systems and methods |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4090572A (en) * | 1976-09-03 | 1978-05-23 | Nygaard-Welch-Rushing Partnership | Method and apparatus for laser treatment of geological formations |
US6280000B1 (en) * | 1998-11-20 | 2001-08-28 | Joseph A. Zupanick | Method for production of gas from a coal seam using intersecting well bores |
US6851488B2 (en) * | 2003-04-04 | 2005-02-08 | Gas Technology Institute | Laser liner creation apparatus and method |
US6880646B2 (en) * | 2003-04-16 | 2005-04-19 | Gas Technology Institute | Laser wellbore completion apparatus and method |
US7571771B2 (en) * | 2005-05-31 | 2009-08-11 | Cdx Gas, Llc | Cavity well system |
CN101942962B (en) * | 2010-08-16 | 2012-11-14 | 中国石油天然气集团公司 | Well drilling method of through tubing of gas lift under-balanced coiled tubing |
-
2011
- 2011-05-30 HU HU1100276A patent/HU229944B1/en not_active IP Right Cessation
-
2012
- 2012-05-26 WO PCT/US2012/039767 patent/WO2012166677A2/en active Application Filing
- 2012-05-26 EP EP12726981.9A patent/EP2737173A2/en not_active Withdrawn
- 2012-05-26 CN CN201280036123.XA patent/CN103764944A/en active Pending
- 2012-05-26 US US14/122,395 patent/US20140299375A1/en not_active Abandoned
- 2012-05-26 AU AU2012262391A patent/AU2012262391A1/en not_active Abandoned
- 2012-05-26 EA EA201301286A patent/EA201301286A1/en unknown
- 2012-05-26 BR BR112013030934A patent/BR112013030934A2/en not_active IP Right Cessation
- 2012-05-26 CA CA2837592A patent/CA2837592A1/en not_active Abandoned
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040244970A1 (en) * | 2003-06-09 | 2004-12-09 | Halliburton Energy Services, Inc. | Determination of thermal properties of a formation |
US20150129203A1 (en) * | 2008-08-20 | 2015-05-14 | Foro Energy, Inc. | High power laser hydraulic fracturing, stimulation, tools systems and methods |
US8464794B2 (en) * | 2009-06-29 | 2013-06-18 | Halliburton Energy Services, Inc. | Wellbore laser operations |
US20120118568A1 (en) * | 2010-11-11 | 2012-05-17 | Halliburton Energy Services, Inc. | Method and apparatus for wellbore perforation |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120255774A1 (en) * | 2008-08-20 | 2012-10-11 | Grubb Daryl L | High power laser-mechanical drilling bit and methods of use |
US9562395B2 (en) * | 2008-08-20 | 2017-02-07 | Foro Energy, Inc. | High power laser-mechanical drilling bit and methods of use |
US20140158425A1 (en) * | 2011-07-15 | 2014-06-12 | Sld Enhanced Recovery, Inc. | Apparatus and system to remove debris from a laser-extended bore section |
US20140305635A1 (en) * | 2012-09-04 | 2014-10-16 | Alexander Petrovich Linetskiy | Method For Developing Oil And Gas Fields Using High-Power Laser Radiation For More Complete Oil And Gas Extraction |
US9677339B2 (en) * | 2012-09-04 | 2017-06-13 | Alexander Petrovich Linetskiy | Method for developing oil and gas fields using high-power laser radiation for more complete oil and gas extraction |
US9903171B2 (en) | 2012-09-04 | 2018-02-27 | Alexander Petrovich Linetskiy | Method for developing oil and gas fields using high-power laser radiation for more complete oil and gas extraction |
US10941618B2 (en) * | 2018-10-10 | 2021-03-09 | Saudi Arabian Oil Company | High power laser completion drilling tool and methods for upstream subsurface applications |
US11359438B2 (en) * | 2018-10-10 | 2022-06-14 | Saudi Arabian Oil Company | High power laser completion drilling tool and methods for upstream subsurface applications |
Also Published As
Publication number | Publication date |
---|---|
HUP1100276A2 (en) | 2013-01-28 |
WO2012166677A3 (en) | 2013-06-27 |
CN103764944A (en) | 2014-04-30 |
EP2737173A2 (en) | 2014-06-04 |
CA2837592A1 (en) | 2012-12-06 |
EA201301286A1 (en) | 2014-05-30 |
AU2012262391A1 (en) | 2013-12-12 |
WO2012166677A2 (en) | 2012-12-06 |
HU229944B1 (en) | 2015-03-02 |
BR112013030934A2 (en) | 2016-12-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20140299375A1 (en) | Method of conditioning a wall of a bore section | |
US11761265B2 (en) | High power laser perforating and laser fracturing tools and methods of use | |
US20200232309A1 (en) | High power laser hydraulic fracturing, stimulation, tools systems and methods | |
US10683740B2 (en) | Method of avoiding frac hits during formation stimulation | |
RU2320840C2 (en) | Well drilling method | |
CN106460491B (en) | The method for forming multilateral well | |
PL196155B1 (en) | Method and apparatus for stimulation of multiple formation intervals | |
US20190162060A1 (en) | Ported Casing Collar For Downhole Operations, And Method For Accessing A Formation | |
CN102084081B (en) | Hydraulic drilling method with penetration control | |
CA2841959C (en) | An apparatus and system to remove debris from a laser-extended bore section | |
US11466545B2 (en) | Guide sub for multilateral junction | |
CA3088313A1 (en) | Ported casing collar for downhole operations, and method for accessing a formation | |
NO20190372A1 (en) | A hole forming tool | |
US9957766B2 (en) | High power laser iris cutters | |
EA040106B1 (en) | DEVICE AND METHOD FOR PERFORING A WELL FORMATION |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SLD ENHANCED RECOVERY, INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BOZSO, TAMAS;BOZSO, ROBERT;REEL/FRAME:031678/0835 Effective date: 20131126 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE |