US20140137507A1 - Method for the production of wind turbine tower segments and wind turbine tower - Google Patents

Method for the production of wind turbine tower segments and wind turbine tower Download PDF

Info

Publication number
US20140137507A1
US20140137507A1 US14/114,767 US201214114767A US2014137507A1 US 20140137507 A1 US20140137507 A1 US 20140137507A1 US 201214114767 A US201214114767 A US 201214114767A US 2014137507 A1 US2014137507 A1 US 2014137507A1
Authority
US
United States
Prior art keywords
steel plates
steel
cutting
wind turbine
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/114,767
Inventor
Lars Heltoft
Steen Kirkegaard Jensen
Anders Nygaard Rasmussen
Henrik Stiesdal
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Assigned to SIEMENS WIND POWER A/S reassignment SIEMENS WIND POWER A/S ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: Jensen, Steen Kirkegaard, HELTOFT, LARS, STIESDAL, HENRIK, Rasmussen, Anders Nygaard
Assigned to SIEMENS AKTIENGESELLSCHAFT reassignment SIEMENS AKTIENGESELLSCHAFT ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: SIEMENS WIND POWER A/S
Publication of US20140137507A1 publication Critical patent/US20140137507A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49616Structural member making
    • Y10T29/49623Static structure, e.g., a building component
    • Y10T29/49631Columnar member

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)
  • Laser Beam Processing (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)

Abstract

A method is provided for the production of tower segments, which are used to assemble a wind turbine tower. The method includes providing a sheet steel, cutting the sheet steel into a plurality of steel plates, cutting at least one opening in the plurality of steel plates, and bending the steel plates into a desired shape. The steps are performed in a continuous process, such that the steel plates move from one step in the production to the next.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application is the US National Stage of International Application No. PCT/EP2012/059044, filed May 15, 2012 and claims the benefit thereof. The International Application claims the benefits of European application No. 11166239.1 EP filed May 16, 2011. All of the applications are incorporated by reference herein in their entirety.
  • FIELD OF INVENTION
  • The present invention relates to a method for the production of wind turbine tower segments and a wind turbine tower assembled from tower segment produced by this method.
  • BACKGROUND OF INVENTION
  • It is known to build towers for wind turbines as steel towers. Those towers are constructed with tower segments. The tower segments are manufactured at a production site, which is remote from the wind turbine site.
  • They are transported to the site where the tower will be erected. They are attached or assembled there to build up the wind turbine tower or an element of this tower.
  • It is known to build towers for wind turbines as constructions with a mainly circular perimeter, but it is also known to build towers which are polyangular.
  • US 2008 0256892 describes a wind energy tower with a load-bearing tower wall, which has a circulating outer periphery and consists of a plurality of wall sections, which each one have one centre section and two border section running in the longitudinal direction of the tower, which are provided with a plurality of connection bores, wherein the surface defined by the border sections run along the outer periphery or in a constant distance to the same, and the connection bores are aligned transversely to the outer periphery.
  • It is also known, to build a wind turbine tower with a diameter or outer dimensions, which vary from the bottom of the tower to the top of the tower. For this type of tower the tower segments used for different heights have different dimensions.
  • The disadvantage is that the steel plates in different heights of a tower need a different shape and a different processing. This is often done in a manual process which is time- and work-intensive and even expensive.
  • SUMMARY OF INVENTION
  • The aim of the invention is therefore to provide a method for the production of wind turbine towers that allows a quicker production that is less expensive and a wind turbine tower that is assembled quicker and less expensive.
  • The aim is reached by the features of the independent claims. Preferred embodiments of the invention are described in the dependent claims.
  • According to the invention the method for the production of tower segments, which are used to assemble a wind turbine tower, comprises the steps to provide a sheet steel, to cut the sheet steel into a number of steel plates, to cut at least one opening in the number of steel plates and to bend the steel plates into a desired shape. Thus all steps necessary to achieve a tower segment of a wind turbine tower in the desired state of production can be performed. Thus individual treatment of each steel plate is possible. Thus steel plates of different shape can be produced in one process. Thus towers with differing dimensions and/or variations in the facilities can be assembled from these tower segments.
  • According to the invention a wind turbine tower comprises the segments being manufactured according to the method invented.
  • Preferably the sheet steel is provided in a rolled manner from a coil. Thus the steel is cut in plates with the required length from a long strip of steel. Thus there is less material cut away and left over then with standard sized sheet steel plates. Thus material is saved.
  • Preferably the sheet steel is provided as a precut sheet steel plate. Thus the width of the sheet steel has the dimension required. Thus there is less material cut away and left over. Thus material is saved.
  • Preferably the sheet steel is provided as pre-bent steel plate. Thus the plates are at least partially formed in the desired shape before fed into the production process. Thus time and machinery is saved in the production process.
  • Preferably the steps are performed in a production process. Thus the process requires a minimum of transporting lifting and handling of the steel plates.
  • Preferably the steps are performed in a continuous process. Thus the steel plates move from one step in the production to the next. Thus no transportation and/or storage is needed for the steel plates between the steps in the process. Thus storage space is saved and time and personnel to transport and store the steel plates is saved.
  • Preferably the steps are performed in a machine-based process. Thus no manual handling of the plates has to be done. Thus time and personnel is saved.
  • Preferably the additional step of performing a surface treatment on the steel plates is performed. Thus all steps that have to be performed to the plates to achieve steel plates in the right state to assemble the tower can be performed in one process. Thus no additional treatment is necessary.
  • Preferably the surface treatment is a sandblasting of the surface, a painting of the surface, a lacquering of the surface, a roughening of the surface, a pre-mounting of equipment, which needs to the connected with the surface, and/or cutting of threads into the surface.
  • Preferably the step of cutting the sheet steel into a number of steel plates is performed by mechanical cutting means, laser cutting means, plasma cutting means and/or flame cutting means.
  • Preferably the step of cutting the opening in the steel plates is performed by punching, drilling, laser cutting, plasma cutting, cut bolt-holes, door-openings and/or openings for ventilation or windows. Thus all kind of openings, holes and/or cavities can be added to the steel plates. Thus an individual design for every single steel plate can be performed.
  • Preferably an additional processing step is performed for shaping the steel plate to achieve a different thickness or width. Thus a different size or thickness of the steel plates can be achieved in comparison to the sheet steel in the beginning of the process. Thus an individual thickness or width of the single steel plates can be achieved.
  • Preferably a number of bended steel plates are connected to assemble a ring-shaped tower element.
  • Preferably the connection of the steel plates is done by using the openings for threaded or bolted connections. Thus no additional step to add connecting means is necessary.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The invention is shown in more detail by help of figures.
  • The figures show preferred configurations and do not limit the scope of the invention.
  • FIG. 1 shows a production process for a wind turbine tower segment according to the invention,
  • FIG. 2 shows a steel plate produced by the method claimed,
  • FIG. 3 shows various shapes of steel plates produced by the method claimed.
  • DETAILED DESCRIPTION OF INVENTION
  • FIG. 1 shows a production process for a wind turbine tower segment according to the invention. The sheet steel 1 is provided in a rolled manner on a coil 2. The sheet steel 1 is unrolled and flattened out by the help of rollers 8. The sheet steel 1 is therefore moved forward by driving means 3.
  • The coil 2 of sheet steel 1 is provided in the right width. One example of such is a width of 2.07 m and with a steel plate thickness of 17.1 mm. To get steel plates 9 with the desired length the sheet steel 1 from the coil 2 is cut by cutting means 4.
  • The cutting means 4 are means for mechanical cutting, laser cutting, plasma cutting or flame cutting.
  • In another step in the process the steel plate 9 is processed by surface processing means 7 and rollers 5.
  • The surface processing means 7 are e.g. means for sandblasting, painting, lacquering, pre-mounting, threads cutting or dimension measurement for quality ensurance.
  • The rollers 5 are processing means for shaping the steel plate 9 like rolling it, to achieve a different thickness or width, or to form it by bending. The steel plate 9 is moved forward by driving means 3.
  • Thereafter another step of the production method is shown. In this step the steel plate 9 is also moved forward by driving means 3 and is processed by processing means 6. The processing means 6 are processing means for punching, drilling, laser cutting or plasma cutting to cut holes, door-openings or openings for ventilation or windows.
  • FIG. 2 shows a steel plate 9 produced by the method claimed. After being processed the steel plate 9 show e.g. holes 10 cut into the steel plate 9 or a bend 11 to shape the steel plate 9.
  • FIG. 3 shows various shapes of steel plates 9 produced by the method claimed. After being processed the steel plate 9 might be shaped by being bent 12 to be prepared as a segment for poly-angular tower. The steel plate might also be curved 13 to be prepared as a tower segment for a round or oval tower.

Claims (14)

1-15. (canceled)
16. A method for the production of tower segments, which are used to assemble a wind turbine tower, the method comprising the steps of:
providing a sheet steel,
cutting the sheet steel into a plurality of steel plates,
cutting at least one opening in the plurality of steel plates,
bending the steel plates into a desired shape,
wherein the steps are performed in a continuous process, wherein the steel plates move from one step in the production to the next.
17. The method according to claim 16, wherein the sheet steel is provided in a rolled manner from a coil.
18. The method according to claim 16, wherein the sheet steel is provided as a precut sheet steel plate.
19. The method according to claim 18, wherein the sheet steel is provided as pre-bent steel plate.
20. The method according to claim 16, wherein the steps are performed in a machine-based process.
21. The method according to claim 16, further comprising performing a surface treatment on the steel plates.
22. The method according to claim 21, wherein the surface treatment comprises sandblasting of the surface, or a painting of the surface, or a lacquering of the surface, or a roughening of the surface, or a pre-mounting of equipment, which needs to the connected with the surface, or cutting of threads into the surface, or combinations thereof.
23. The method according to claim 16, wherein the step of cutting the sheet steel into the plurality of steel plates is performed by mechanical cutting means, or laser cutting means, or plasma cutting means, or flame cutting means, combinations thereof.
24. The method according to claim 16, wherein the step of cutting the opening in the steel plates is performed by punching, drilling, laser cutting and/or plasma cutting to cut bolt-holes, door-openings, openings for ventilation and/or windows.
25. The method according to claim 16, further comprising performing an additional processing step for shaping the steel plate to achieve a different thickness or width.
26. The method according to claim 16, further comprising connecting a plurality of bended steel plates to assemble a ring-shaped tower element.
27. The method according to claim 16, wherein the connection of the steel plates is done by using the openings for threaded or bolted connections.
28. A Wind turbine tower, comprising:
a segment being manufactured according to the method of claim 16.
US14/114,767 2011-05-16 2012-05-15 Method for the production of wind turbine tower segments and wind turbine tower Abandoned US20140137507A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP11166239.1 2011-05-16
EP11166239A EP2525079A1 (en) 2011-05-16 2011-05-16 Method for the production of wind turbine tower segments and wind turbine tower
PCT/EP2012/059044 WO2012156414A2 (en) 2011-05-16 2012-05-15 Method for the production of wind turbine tower segments and wind turbine tower

Publications (1)

Publication Number Publication Date
US20140137507A1 true US20140137507A1 (en) 2014-05-22

Family

ID=46124352

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/114,767 Abandoned US20140137507A1 (en) 2011-05-16 2012-05-15 Method for the production of wind turbine tower segments and wind turbine tower

Country Status (4)

Country Link
US (1) US20140137507A1 (en)
EP (1) EP2525079A1 (en)
CN (1) CN103534482B (en)
WO (1) WO2012156414A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150204102A1 (en) * 2010-07-13 2015-07-23 Andresen Towers A/S Method of assembling a tubular building structure by using screw sockets

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103008974A (en) * 2012-12-04 2013-04-03 哈尔滨飞机工业集团有限责任公司 Processing method of stainless steel packaging plate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010018839A1 (en) * 1998-01-27 2001-09-06 Miller Robert E. Apparatus for forming tapered spiral tubes
WO2003083236A1 (en) * 2002-04-03 2003-10-09 Meir Silber A lattice tower disguised as a monopole
WO2004083633A1 (en) * 2003-03-19 2004-09-30 Vestas Wind Systems A/S Method of constructing large towers for wind turbines
WO2006050723A1 (en) * 2004-11-10 2006-05-18 Vestas Wind Systems A/S A tower part for a wind turbine, an aperture cover system, a method for manufacturing a tower part and uses hereof
WO2010055535A1 (en) * 2008-11-17 2010-05-20 Tecnopali Group S.P.A. Tubular tower and construction procedure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1019953C2 (en) * 2002-02-12 2002-12-19 Mecal Applied Mechanics B V Prefabricated tower or mast, as well as a method for joining and / or re-tensioning segments that must form a single structure, as well as a method for building a tower or mast consisting of segments.
DE102007018025A1 (en) 2007-04-17 2008-10-23 Nordex Energy Gmbh Wind turbine tower
ES2611162T3 (en) * 2007-10-09 2017-05-05 Jeffrey O. Willis Tower structure and assembly procedure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010018839A1 (en) * 1998-01-27 2001-09-06 Miller Robert E. Apparatus for forming tapered spiral tubes
WO2003083236A1 (en) * 2002-04-03 2003-10-09 Meir Silber A lattice tower disguised as a monopole
WO2004083633A1 (en) * 2003-03-19 2004-09-30 Vestas Wind Systems A/S Method of constructing large towers for wind turbines
WO2006050723A1 (en) * 2004-11-10 2006-05-18 Vestas Wind Systems A/S A tower part for a wind turbine, an aperture cover system, a method for manufacturing a tower part and uses hereof
WO2010055535A1 (en) * 2008-11-17 2010-05-20 Tecnopali Group S.P.A. Tubular tower and construction procedure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150204102A1 (en) * 2010-07-13 2015-07-23 Andresen Towers A/S Method of assembling a tubular building structure by using screw sockets
US9175494B2 (en) * 2010-07-13 2015-11-03 Andresen Towers A/S Method of assembling a tubular building structure by using screw sockets

Also Published As

Publication number Publication date
CN103534482A (en) 2014-01-22
EP2525079A1 (en) 2012-11-21
CN103534482B (en) 2017-03-01
WO2012156414A3 (en) 2013-04-04
WO2012156414A2 (en) 2012-11-22

Similar Documents

Publication Publication Date Title
EP2701859B1 (en) Tower production method
US9200468B2 (en) Wind energy plant tower
US10233662B2 (en) Strut linkage for a steel construction, and steel construction having a strut linkage
US9249597B2 (en) Tower construction
EP3314076B1 (en) Tower consisting of segments and method for producing a segment of a tower
CA2519277A1 (en) Method of constructing large towers for wind turbines
WO2014070084A2 (en) Platform and methods for assembling and mounting in wind tower
US20140137507A1 (en) Method for the production of wind turbine tower segments and wind turbine tower
WO2008056244A3 (en) Beam for a co-ordinate measuring machine, method for its production, and measuring machine provided with said beam
EP4074858A4 (en) Hot-rolled h-beam steel based on special-shaped billet rolling and forming, and manufacturing method therefor
WO2010054804A3 (en) Device and method for producing tubas
WO2015169968A1 (en) Reinforcement of an access-way to a tower
EP2692967A2 (en) Method for erecting a steel tower of a wind energy plant and tower made of steel for a wind energy plant
US11802401B2 (en) Structural support member with swaged female interface
EP3118453A1 (en) Wind towers construction system
US20120137623A1 (en) Wind turbine tower section and method of assembling a wind turbine tower
CN102815487A (en) C-shaped beam section, dual-C cohering beam, goods shelf and method for manufacturing cohering beam
US20220280990A1 (en) Method for producing a tower segment and tower segment
JP6694842B2 (en) Roll-formed plate, its manufacturing method and manufacturing equipment line
CN110695271A (en) Special-shaped ring and machining equipment and machining method thereof
EP3843913A1 (en) Method for producing a polyhedral helical tube and polyhedral helical tube produced thereby
CN114633078B (en) Method for manufacturing metal corrugated pipe
RU2554420C1 (en) Ventilation device
EP2594348A1 (en) Method of manufacturing door frame for wind tower
US20130125605A1 (en) Method of manufacturing door frame for wind tower

Legal Events

Date Code Title Description
AS Assignment

Owner name: SIEMENS WIND POWER A/S, DENMARK

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HELTOFT, LARS;JENSEN, STEEN KIRKEGAARD;RASMUSSEN, ANDERS NYGAARD;AND OTHERS;SIGNING DATES FROM 20130918 TO 20140305;REEL/FRAME:032644/0498

Owner name: SIEMENS AKTIENGESELLSCHAFT, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SIEMENS WIND POWER A/S;REEL/FRAME:032644/0567

Effective date: 20140307

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION