US20120324823A1 - Operating method of a factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers - Google Patents

Operating method of a factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers Download PDF

Info

Publication number
US20120324823A1
US20120324823A1 US13/601,109 US201213601109A US2012324823A1 US 20120324823 A1 US20120324823 A1 US 20120324823A1 US 201213601109 A US201213601109 A US 201213601109A US 2012324823 A1 US2012324823 A1 US 2012324823A1
Authority
US
United States
Prior art keywords
factory
voussoirs
station
mold
concreting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/601,109
Inventor
Miguel Angel Fernández Gómez
José Emilio Jimeno Chueca
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inneo Torres SL
Original Assignee
Inneo Torres SL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=43587548&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=US20120324823(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Inneo Torres SL filed Critical Inneo Torres SL
Priority to US13/601,109 priority Critical patent/US20120324823A1/en
Assigned to INNEO TORRES S.L. reassignment INNEO TORRES S.L. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FERNANDEZ GOMEZ, MIGUEL ANGEL, JIMENO CHUECA, JOSE EMILIO
Publication of US20120324823A1 publication Critical patent/US20120324823A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • B28B15/002Mobile plants, e.g. on vehicles or on boats
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability
    • E04B1/3404Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability supported by masts or tower-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/242Safety or protective measures preventing damage to building parts or finishing work during construction for temporarily covering the whole worksite, e.g. building, trench
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/28Safety or protective measures preventing damage to building parts or finishing work during construction against unfavourable weather influence
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2230/00Manufacture
    • F05B2230/20Manufacture essentially without removing material
    • F05B2230/21Manufacture essentially without removing material by casting
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/30Wind power
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/20Climate change mitigation technologies for sector-wide applications using renewable energy

Definitions

  • the present invention relates to a factory for the molding manufacture of precast concrete voussoirs (wedge-shaped panels) for the construction of wind generator support towers, to the concrete voussoirs manufactured by molding in said factory, and to a wind generator support tower at least partially constructed by concrete voussoirs manufactured by molding in said factory, as well as to the operating method of said factory.
  • the state of the art in the field of the invention generally presents large and expensive facilities which are essentially immobile in the sense that they are built with a view to a permanent site, so in addition to the fact that building and dismantling them can be equally expensive and tedious, building them causes structural changes in the location terrain that are extremely difficult if not impossible to reverse, even after being dismantled, i.e., they have a substantial environmental impact.
  • the road transport of large voussoirs from the facility to the point of erection of the pertinent towers is an always complicated task with certain risks, entailing a problem especially in territories with very strict regulations concerning the road transport of large-sized parts.
  • transporting voussoirs of more than 20 meters in length involves a number of additional legal requirements so in practice, manufacturers normally limit the longitudinal dimension of the voussoirs they produce precisely to said length of 20 meters.
  • the object of the present invention is, therefore, a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers enabling the reduction of the drawbacks derived from handling the manufactured voussoirs even in the event that they are large and heavy, without precisely limiting neither the size nor the weight of the voussoirs to be manufactured and limiting the environmental impacts.
  • a first aspect of the present invention is a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, using passive steel or rebar-like elements, as well as active pre-stressing steel, with or without sheath, concrete and finishing accessories, the factory including hoisting means and concreting means, the factory also including:
  • a factory is thus provided for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, having structural features which allow placing the factory in a place of origin in a disassembled state in initial units that are smaller than the voussoirs to be manufactured, taking said initial units to a building site close to the point of delivery or assembly of the voussoirs to be manufactured, assembling the factory at said building site starting from said initial units, manufacturing the pertinent voussoirs by means of the factory in the assembled state, disassembling the factory at said building site until the factory is in a disassembled state in final units that are smaller than the manufactured voussoirs, and taking said final units to a place of destination, leaving said building site in basically the same conditions as before the assembly of the factory at said building site, i.e., with an essentially nil environmental impact.
  • Said place of destination can logically be said place of origin from the start, or it can be a different building site.
  • the manufacture can thus take place at a building site that is so close to the point of delivery or assembly of the voussoirs that the drawbacks derived from handling said voussoirs even in the case of them being large and heavy are considerably reduced.
  • the manufacture can take place at a building site that is so close to the point of delivery or assembly of the voussoirs that road transport is avoided, as are the aforementioned drawbacks, the dimensions of the voussoirs to be manufactured then being limited by the load capacity of the hoisting means, which is usually greater than the road transport means which are typically used in the state of the art.
  • the factory can include (pre-tensioned reinforcement and/or post-tensioned reinforcement) pre-stressing performance means, which will preferably be arranged in said concreting station or in said conditioning station.
  • hoisting means without foundations and/or the concreting means can be mobile.
  • the hoisting means can comprise one or more boom crane trucks or one or more gantries on wheels (optionally self-propelled) and/or the concreting means can comprise one or more concrete mixer trucks or one or more pieces of concrete distribution equipment, including pumping equipment.
  • said concrete slab is formed on site in a single part.
  • the concrete slab will preferably have a thickness of 15 cm at the least and preferably of 25 cm at the most.
  • a second aspect of the present invention is a concrete voussoir intended for the construction of wind generator support towers, manufactured in said factory.
  • a third aspect of the present invention is a wind generator support tower at least partially constructed by concrete voussoirs manufactured in said factory.
  • FIG. 1 schematically shows the layout of a first embodiment of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers according to the present invention
  • FIG. 2 schematically shows a front view of FIG. 1 ;
  • FIG. 3 schematically shows the layout of a second embodiment of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers according to the present invention.
  • FIG. 4 schematically shows a front view of FIG. 3 .
  • FIGS. 1 and 2 show a first embodiment of a factory 10 for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, according to the present invention, at a building site.
  • the factory 10 comprises at one end an entrance 12 for rebar-like elements, followed in an essentially linear manner in series by an reinforcing station 14 , a concreting station 16 , a conditioning station 18 and a stocking station 20 .
  • each frame 22 is arranged longitudinally in the direction of the production line, in two lines of two frames 22 and one line of one frame 22 parallel to one another.
  • Said frames 22 receive rebar-like elements from said entrance 12 .
  • Said rebar-like elements are then attached to make cages.
  • Said reinforcing station 14 can optionally comprise welding means for attaching the rebar-like elements to one another, although said cages will preferably be made by tying the rebar-like elements to one another in a manner that is known in the state of the art.
  • said concreting station 16 six steam setting molds 24 are arranged longitudinally in the direction of the production line, in two lines of three molds 24 each. Said molds 24 are divided into four portions attached to one another by fixing means (not shown).
  • Said molds 24 receive the cages made in said reinforcing station 14 , and concrete is subsequently poured into the molds 24 , the poured concrete is left to set and the set parts 38 (in this case, semi-finished voussoirs intended for the construction of wind generator support towers) are finally extracted from said molds 24 .
  • corrugated sheaths intended to be embedded in a predetermined manner in the concrete once it is poured into said mold 24 will also be arranged in said reinforcing stations 14 or in said concreting station 16 , such sheaths being suitable for a subsequent assembly of the voussoirs.
  • said concreting station 16 can comprise pre-tensioned reinforcement pre-stressing means, including pre-stressing tendons, which are arranged in the mold and are tensioned before the pouring and setting of the concrete, and pre-stressing performance means, which will tension said pre-stressing tendons.
  • each of said molds 24 includes a main mold body, a counter mold and a steam setting canvas (neither shown nor described in detail as it is part of the state of the art).
  • the concreting means comprise a concrete mixer 26 which, once assembled, is arranged in a stationary manner, laterally with respect to said concreting station 16 (said concrete mixer 26 could also be arranged in and be part of the actual concreting station 16 ).
  • the concrete will therefore be poured into each mold 24 from said concrete mixer 26 , in this embodiment by means of preferably self-propelled dispensing carriages 40 which are also part of said concreting means.
  • tubular or semi-tubular conduits can be used (not shown in the figures).
  • Said conditioning station 18 is shown with four semi-finished voussoirs 38 which were brought from the concreting station 16 , once extracted from said molds 24 .
  • the semi-finished voussoirs 38 can receive a finishing (polishing and/or painting and/or lacquering, etc.). Furthermore, in said conditioning station 18 , the semi-finished voussoirs 38 can be provided with the appropriate finishing accessories, for example with eye bolts or any other means of attachment to other voussoirs. The material necessary for the finishing enters said conditioning station 18 laterally with respect to said factory 10 .
  • Said reinforcing station 14 , said concreting station 16 and said conditioning station 18 make up the operational section of said factory 10 .
  • Said operational section 14 , 16 , 18 is established on a concrete slab 28 that is 20 cm thick.
  • said stocking station 20 has a plurality of finished voussoirs 32 stored in an orderly fashion, prepared for delivery.
  • the factory 10 includes hoisting means made up of two gantries 30 the rails 42 of which are fixed directly to said concrete slab 28 and of five self-propelled gantries 30 ′ on wheels.
  • an asphalted area 34 is arranged laterally and contiguous to said operational section 14 , 16 , 18 .
  • the factory 10 further comprises a folding or modular canopy or stationary roof 36 extending above the entire operational section 14 , 16 , 18 and a portion of the asphalted area 34 to simply improve working conditions for the operators.
  • FIGS. 3 and 4 show a second embodiment of a factory 100 for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, according to the present invention, at a building site.
  • the factory 100 comprises two reinforcing stations 114 and a concreting station 116 , both elongated in the direction of the production line, parallel to one another, followed in an essentially linear manner in series by a conditioning station 118 and a stocking station 120 .
  • each of said reinforcing stations 114 three frames 122 are arranged longitudinally in the direction of the production line. Said frames 122 receive rebar-like elements laterally with respect to said factory 100 . Said rebar-like elements are then attached to make cages.
  • said reinforcing stations 114 can comprise welding means for attaching the rebar-like elements to one another, although said cages will preferably be made by tying the rebar-like elements to one another in a manner that is known in the state of the art.
  • said concreting station 116 six steam setting molds 124 are arranged longitudinally in the direction of the production line, in two lines of three molds 124 each. Said molds 124 are divided into four portions attached to one another by fixing means (not shown).
  • Said molds 124 receive the cages made in said reinforcing station 114 , and concrete is subsequently poured into the molds 124 , the poured concrete is left to set and the set parts 138 (in this case, semi-finished voussoirs intended for the construction of wind generator support towers) are finally extracted from said molds 124 .
  • each of said molds 124 includes a main mold body, a counter mold and a steam setting canvas (neither shown nor described in detail as it is part of the state of the art).
  • said reinforcing stations 114 are parallel with said concreting station 116 such that said concreting station 116 is located between said reinforcing stations 114 .
  • This factory 100 comprises completely moveable concreting means specifically consisting of two concrete mixer trucks 126 moving laterally with respect to said reinforcing stations 114 . The concrete will then be poured directly from said concrete mixer trucks 126 into each mold 124 .
  • corrugated sheaths intended for being embedded in a predetermined manner in the concrete once it is poured into said mold 124 will also be arranged in said reinforcing stations 114 or in said concreting station 116 , such sheaths being suitable for a subsequent assembly of the voussoirs.
  • said reinforcing stations 114 or said concreting station 116 can comprise pre-tensioned reinforcement pre-stressing means, including sheathed pre-stressing tendons, which are arranged in the mold before the pouring and setting of the concrete and will be tensioned after the pouring and setting of the concrete, and pre-stressing performance means, which will tension said pre-stressing tendons.
  • Said conditioning station 118 is shown with two semi-finished voussoirs 138 which were brought from the concreting station 116 once extracted from said molds 124 .
  • the semi-finished voussoirs 138 can receive a finishing (polishing and/or painting and/or lacquering, etc.). Furthermore, in said conditioning station 118 , the semi-finished voussoirs 138 can be provided with the appropriate finishing accessories, for example with eye bolts or any other means of attachment to other voussoirs. The material necessary for the finishing enters said conditioning station 118 laterally with respect to said factory 100 .
  • said pre-stressing performance means will preferably be arranged in said conditioning station 118 .
  • Said reinforcing station 114 , said concreting station 116 and said conditioning station 118 make up the operational section of said factory 100 .
  • Said operational section 114 , 116 , 118 is established on a concrete slab 128 that is 20 cm thick.
  • said stocking station 120 has a plurality of finished voussoirs 132 stored in an orderly fashion, prepared for delivery and subsequent assembly.
  • the factory 100 includes hoisting means made up of two boom crane trucks 130 moving laterally with respect to said operational section 114 , 116 , 118 .
  • the factory 100 comprises two moveable roofs 136 to simply improve the working conditions for the operators.
  • Said moveable roofs 136 slide in the direction of the production line in respective straight contiguous parallel paths of said operational section 114 , 116 , 118 , on rails 134 formed directly in said concrete slab 128 .
  • each moveable roof 136 has an extension in the direction of said rails 134 essentially equal to the length of a mold 124 .
  • the reinforcing station(s), the concreting station(s), the conditioning station(s) and the stocking station(s) will be arranged in any direction and relative position, preferably such that the contour of the factory adapts to the available surface at the building site.
  • the frames in the reinforcing station(s), the molds in the concreting station(s), the semi-finished voussoirs in the conditioning station(s) and the finished voussoirs in the stocking station(s) will be arranged in any number, direction and position, preferably such that the contour of the factory adapts to the available surface at the building site.
  • the frames in the reinforcing station(s) and the molds in the concreting station(s) will have the dimensions (width, length, curve, etc.) suited to the manufacture to be obtained. All this is obviously done such that the predetermined yield requirements are met.
  • the factory comprises one or more roofs, whether they are stationary or moveable, they can be sized and arranged in any manner suited to the configuration of the factory.
  • the supplies such as the rebar-like elements and the conditioning material can enter the factory in the manner that is likewise most suited to the configuration of the factory.
  • the supplies such as the rebar-like elements and the conditioning material can enter through entrances located at the beginning and at the end of the production lines if the factories are basically elongated in the direction of the production lines.
  • rebar-like element is intended to mean any solid reinforcing steel-type body, reinforcement, reinforcing steel, smooth bar, corrugated bar, steel cord, strand, etc. used in the art such that it is embedded in the concrete part to give improved properties to the part against tensile stresses.

Abstract

An operating method of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers by placing the factory in a place of origin in a disassembled state in initial units that are smaller than the voussoirs to be manufactured, taking the initial units to a building site close to the point of delivery of the voussoirs to be manufactured, assembling the factory at the building site starting from the initial units, manufacturing the pertinent voussoirs by means of the factory in the assembled state, disassembling the factory at the building site until the factory is in a disassembled state in final units that are smaller than the manufactured voussoirs, and taking the final units to a place of destination leaving the building site in basically the same conditions as before assembling the factory at the building site.

Description

    REFERENCE TO RELATED APPLICATION
  • This application is a division of U.S. patent application Ser. No. 12/956,175, filed Nov. 30, 2010, which claims priority to Spanish Patent Application No. P200902259, filed Nov. 30, 2009. The disclosures of U.S. patent application Ser. No. 12/956,175 and Spanish Patent Application No. P200902259 are incorporated herein by reference.
  • FIELD OF THE INVENTION
  • The present invention relates to a factory for the molding manufacture of precast concrete voussoirs (wedge-shaped panels) for the construction of wind generator support towers, to the concrete voussoirs manufactured by molding in said factory, and to a wind generator support tower at least partially constructed by concrete voussoirs manufactured by molding in said factory, as well as to the operating method of said factory.
  • BACKGROUND OF THE INVENTION
  • Making at least one portion of wind generator towers using precast concrete voussoirs instead of metal parts has been known for a relatively short time.
  • This practice enables obtaining wind generator support towers with better mechanical strength properties. However, for practical design reasons, at least some of the precast concrete voussoirs intended for the construction of wind generator support towers must be extraordinarily large and heavy.
  • Due to the relative newness of the practice of using precast concrete voussoirs instead of metal parts for making at least one portion of wind generator towers as was previously mentioned, there are virtually no factories dedicated to the manufacture of parts of this type. In the state of the art there are, however, large precast facilities which do not manufacture parts of this type but rather others with their own characteristics but they are potentially capable of manufacturing parts of this type with the pertinent adjustments. These large facilities include large load capacity gantry cranes or bridge cranes extending substantially along the entire production line, first handling raw material and then precast parts to a stocking area in which are stored said parts. Said gantry cranes or bridge cranes are supported, as a last resort, on foundations of either the support columns of the roof of the facility in the case of bridge cranes or on their own support columns in the case of gantry cranes.
  • Therefore, the state of the art in the field of the invention generally presents large and expensive facilities which are essentially immobile in the sense that they are built with a view to a permanent site, so in addition to the fact that building and dismantling them can be equally expensive and tedious, building them causes structural changes in the location terrain that are extremely difficult if not impossible to reverse, even after being dismantled, i.e., they have a substantial environmental impact.
  • Furthermore, if the parts were precast concrete voussoirs for making at least some of the wind generator towers, once the voussoirs are precast in the facility, clear drawbacks would arise in terms of handling large and heavy voussoirs.
  • For example, the road transport of large voussoirs from the facility to the point of erection of the pertinent towers, in addition to involving an elevated cost, is an always complicated task with certain risks, entailing a problem especially in territories with very strict regulations concerning the road transport of large-sized parts. By way of example, in Spain, in particular, transporting voussoirs of more than 20 meters in length involves a number of additional legal requirements so in practice, manufacturers normally limit the longitudinal dimension of the voussoirs they produce precisely to said length of 20 meters. Likewise, in practice manufacturers usually limit the transverse dimension of the voussoirs they manufacture to a width of 5 meters for similar reasons. Additionally, those complications are accentuated because they are heavy items.
  • In other countries, the regulation can be even more restrictive and limit the dimensions of the voussoirs to smaller sizes or require more permits and authorizations. Obviously, in addition to regulatory and permit issues, in less developed countries with less advanced road systems practical transport problems can arise which could even be insurmountable.
  • Therefore, there is a need to improve the system of molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers such that the drawbacks derived from handling the manufactured voussoirs even in the event that they are large, precisely without limiting the size or the weight of the voussoirs to be manufactured and limiting the environmental impacts, are reduced.
  • SUMMARY OF THE INVENTION
  • The object of the present invention is, therefore, a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers enabling the reduction of the drawbacks derived from handling the manufactured voussoirs even in the event that they are large and heavy, without precisely limiting neither the size nor the weight of the voussoirs to be manufactured and limiting the environmental impacts.
  • More specifically, a first aspect of the present invention is a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, using passive steel or rebar-like elements, as well as active pre-stressing steel, with or without sheath, concrete and finishing accessories, the factory including hoisting means and concreting means, the factory also including:
      • at least one reinforcing station, with at least one frame, for preparing cores of rebar-like elements called cages,
      • at least one concreting station, with at least one mold including a main mold body, a counter mold and a protective canvas for the steam setting, for the application of one of said cages in said mold, the concreting of said mold, the setting of said concrete in said mold and the extraction of the set part (semi-finished voussoir) from said mold,
      • at least one conditioning station for the finishing of said semi-finished voussoir and/or the application of finishing accessories to said semi-finished voussoir, and
      • at least one stocking area for the storage of finished voussoirs;
      • wherein the base of said reinforcing station, said concreting station and said conditioning station comprises a concrete slab formed directly on compacted terrain, i.e., without foundations, anchors or the like to the compacted terrain, said hoisting means are hoisting means without foundations, said mold body is divided into at least two portions attached to one another by fixing means, and said counter mold is divided into at least two portions attached to one another by fixing means.
  • A factory is thus provided for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, having structural features which allow placing the factory in a place of origin in a disassembled state in initial units that are smaller than the voussoirs to be manufactured, taking said initial units to a building site close to the point of delivery or assembly of the voussoirs to be manufactured, assembling the factory at said building site starting from said initial units, manufacturing the pertinent voussoirs by means of the factory in the assembled state, disassembling the factory at said building site until the factory is in a disassembled state in final units that are smaller than the manufactured voussoirs, and taking said final units to a place of destination, leaving said building site in basically the same conditions as before the assembly of the factory at said building site, i.e., with an essentially nil environmental impact.
  • Said place of destination can logically be said place of origin from the start, or it can be a different building site.
  • The manufacture can thus take place at a building site that is so close to the point of delivery or assembly of the voussoirs that the drawbacks derived from handling said voussoirs even in the case of them being large and heavy are considerably reduced.
  • In fact, the manufacture can take place at a building site that is so close to the point of delivery or assembly of the voussoirs that road transport is avoided, as are the aforementioned drawbacks, the dimensions of the voussoirs to be manufactured then being limited by the load capacity of the hoisting means, which is usually greater than the road transport means which are typically used in the state of the art.
  • Additionally, the factory can include (pre-tensioned reinforcement and/or post-tensioned reinforcement) pre-stressing performance means, which will preferably be arranged in said concreting station or in said conditioning station.
  • Optionally, all or part of the hoisting means without foundations and/or the concreting means can be mobile. For example, the hoisting means can comprise one or more boom crane trucks or one or more gantries on wheels (optionally self-propelled) and/or the concreting means can comprise one or more concrete mixer trucks or one or more pieces of concrete distribution equipment, including pumping equipment.
  • Preferably, said concrete slab is formed on site in a single part.
  • In any case, the concrete slab will preferably have a thickness of 15 cm at the least and preferably of 25 cm at the most.
  • A second aspect of the present invention is a concrete voussoir intended for the construction of wind generator support towers, manufactured in said factory.
  • Finally, a third aspect of the present invention is a wind generator support tower at least partially constructed by concrete voussoirs manufactured in said factory.
  • Various other objects, advantages and features of the present invention will become readily apparent to those of ordinary skill in the art, and the novel features will be particularly pointed out in the appended claims.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The following detailed description, given by way of example and not intended to limit the present invention solely thereto, will best be appreciated in conjunction with the accompanying drawings, wherein like reference numerals denote like elements and parts, in which:
  • FIG. 1 schematically shows the layout of a first embodiment of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers according to the present invention;
  • FIG. 2 schematically shows a front view of FIG. 1;
  • FIG. 3 schematically shows the layout of a second embodiment of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers according to the present invention; and
  • FIG. 4 schematically shows a front view of FIG. 3.
  • DETAILED DESCRIPTION OF THE PRESENT INVENTION
  • Referring to FIGS. 1 and 2, they show a first embodiment of a factory 10 for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, according to the present invention, at a building site.
  • The factory 10 comprises at one end an entrance 12 for rebar-like elements, followed in an essentially linear manner in series by an reinforcing station 14, a concreting station 16, a conditioning station 18 and a stocking station 20.
  • In said reinforcing station 14, five frames 22 are arranged longitudinally in the direction of the production line, in two lines of two frames 22 and one line of one frame 22 parallel to one another. Said frames 22 receive rebar-like elements from said entrance 12. Said rebar-like elements are then attached to make cages. Said reinforcing station 14 can optionally comprise welding means for attaching the rebar-like elements to one another, although said cages will preferably be made by tying the rebar-like elements to one another in a manner that is known in the state of the art.
  • In said concreting station 16 six steam setting molds 24 are arranged longitudinally in the direction of the production line, in two lines of three molds 24 each. Said molds 24 are divided into four portions attached to one another by fixing means (not shown).
  • Said molds 24 receive the cages made in said reinforcing station 14, and concrete is subsequently poured into the molds 24, the poured concrete is left to set and the set parts 38 (in this case, semi-finished voussoirs intended for the construction of wind generator support towers) are finally extracted from said molds 24.
  • Optionally, corrugated sheaths intended to be embedded in a predetermined manner in the concrete once it is poured into said mold 24 will also be arranged in said reinforcing stations 14 or in said concreting station 16, such sheaths being suitable for a subsequent assembly of the voussoirs.
  • Optionally, in a manner known in the art said concreting station 16 can comprise pre-tensioned reinforcement pre-stressing means, including pre-stressing tendons, which are arranged in the mold and are tensioned before the pouring and setting of the concrete, and pre-stressing performance means, which will tension said pre-stressing tendons.
  • For the molding, each of said molds 24 includes a main mold body, a counter mold and a steam setting canvas (neither shown nor described in detail as it is part of the state of the art).
  • The concreting means comprise a concrete mixer 26 which, once assembled, is arranged in a stationary manner, laterally with respect to said concreting station 16 (said concrete mixer 26 could also be arranged in and be part of the actual concreting station 16). The concrete will therefore be poured into each mold 24 from said concrete mixer 26, in this embodiment by means of preferably self-propelled dispensing carriages 40 which are also part of said concreting means. As an alternative or as a complement to said dispensing carriages 40, tubular or semi-tubular conduits can be used (not shown in the figures).
  • Said conditioning station 18 is shown with four semi-finished voussoirs 38 which were brought from the concreting station 16, once extracted from said molds 24.
  • In said conditioning station 18, the semi-finished voussoirs 38 can receive a finishing (polishing and/or painting and/or lacquering, etc.). Furthermore, in said conditioning station 18, the semi-finished voussoirs 38 can be provided with the appropriate finishing accessories, for example with eye bolts or any other means of attachment to other voussoirs. The material necessary for the finishing enters said conditioning station 18 laterally with respect to said factory 10.
  • Said reinforcing station 14, said concreting station 16 and said conditioning station 18 make up the operational section of said factory 10. Said operational section 14, 16, 18 is established on a concrete slab 28 that is 20 cm thick.
  • Finally, said stocking station 20 has a plurality of finished voussoirs 32 stored in an orderly fashion, prepared for delivery.
  • The factory 10 includes hoisting means made up of two gantries 30 the rails 42 of which are fixed directly to said concrete slab 28 and of five self-propelled gantries 30′ on wheels.
  • Additionally, in the present embodiment, an asphalted area 34 is arranged laterally and contiguous to said operational section 14, 16, 18. The factory 10 further comprises a folding or modular canopy or stationary roof 36 extending above the entire operational section 14, 16, 18 and a portion of the asphalted area 34 to simply improve working conditions for the operators.
  • Now referring to FIGS. 3 and 4, they show a second embodiment of a factory 100 for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, according to the present invention, at a building site.
  • The factory 100 comprises two reinforcing stations 114 and a concreting station 116, both elongated in the direction of the production line, parallel to one another, followed in an essentially linear manner in series by a conditioning station 118 and a stocking station 120.
  • In each of said reinforcing stations 114 three frames 122 are arranged longitudinally in the direction of the production line. Said frames 122 receive rebar-like elements laterally with respect to said factory 100. Said rebar-like elements are then attached to make cages. Optionally, as in the first embodiment discussed above, said reinforcing stations 114 can comprise welding means for attaching the rebar-like elements to one another, although said cages will preferably be made by tying the rebar-like elements to one another in a manner that is known in the state of the art.
  • In said concreting station 116 six steam setting molds 124 are arranged longitudinally in the direction of the production line, in two lines of three molds 124 each. Said molds 124 are divided into four portions attached to one another by fixing means (not shown).
  • Said molds 124 receive the cages made in said reinforcing station 114, and concrete is subsequently poured into the molds 124, the poured concrete is left to set and the set parts 138 (in this case, semi-finished voussoirs intended for the construction of wind generator support towers) are finally extracted from said molds 124.
  • For the molding, each of said molds 124 includes a main mold body, a counter mold and a steam setting canvas (neither shown nor described in detail as it is part of the state of the art).
  • As can be seen in FIGS. 3 and 4, in this embodiment said reinforcing stations 114 are parallel with said concreting station 116 such that said concreting station 116 is located between said reinforcing stations 114.
  • This factory 100 comprises completely moveable concreting means specifically consisting of two concrete mixer trucks 126 moving laterally with respect to said reinforcing stations 114. The concrete will then be poured directly from said concrete mixer trucks 126 into each mold 124.
  • Optionally, corrugated sheaths intended for being embedded in a predetermined manner in the concrete once it is poured into said mold 124 will also be arranged in said reinforcing stations 114 or in said concreting station 116, such sheaths being suitable for a subsequent assembly of the voussoirs.
  • Optionally, in a manner known in the art said reinforcing stations 114 or said concreting station 116 can comprise pre-tensioned reinforcement pre-stressing means, including sheathed pre-stressing tendons, which are arranged in the mold before the pouring and setting of the concrete and will be tensioned after the pouring and setting of the concrete, and pre-stressing performance means, which will tension said pre-stressing tendons.
  • Said conditioning station 118 is shown with two semi-finished voussoirs 138 which were brought from the concreting station 116 once extracted from said molds 124.
  • In said conditioning station 118, the semi-finished voussoirs 138 can receive a finishing (polishing and/or painting and/or lacquering, etc.). Furthermore, in said conditioning station 118, the semi-finished voussoirs 138 can be provided with the appropriate finishing accessories, for example with eye bolts or any other means of attachment to other voussoirs. The material necessary for the finishing enters said conditioning station 118 laterally with respect to said factory 100.
  • As an alternative to what has been described above, said pre-stressing performance means will preferably be arranged in said conditioning station 118.
  • Said reinforcing station 114, said concreting station 116 and said conditioning station 118 make up the operational section of said factory 100. Said operational section 114, 116, 118 is established on a concrete slab 128 that is 20 cm thick.
  • Finally, said stocking station 120 has a plurality of finished voussoirs 132 stored in an orderly fashion, prepared for delivery and subsequent assembly.
  • The factory 100 includes hoisting means made up of two boom crane trucks 130 moving laterally with respect to said operational section 114, 116, 118.
  • Additionally, in the present embodiment, the factory 100 comprises two moveable roofs 136 to simply improve the working conditions for the operators. Said moveable roofs 136 slide in the direction of the production line in respective straight contiguous parallel paths of said operational section 114, 116, 118, on rails 134 formed directly in said concrete slab 128. In the present embodiment, each moveable roof 136 has an extension in the direction of said rails 134 essentially equal to the length of a mold 124.
  • Naturally, the principle of the invention remaining the same, the embodiment details can be greatly varied with respect to those described and illustrated herein simply by way of non-limiting example, without thereby departing from the scope of protection defined by the attached claims.
  • Basically, the reinforcing station(s), the concreting station(s), the conditioning station(s) and the stocking station(s) will be arranged in any direction and relative position, preferably such that the contour of the factory adapts to the available surface at the building site. Likewise, the frames in the reinforcing station(s), the molds in the concreting station(s), the semi-finished voussoirs in the conditioning station(s) and the finished voussoirs in the stocking station(s) will be arranged in any number, direction and position, preferably such that the contour of the factory adapts to the available surface at the building site. Furthermore, the frames in the reinforcing station(s) and the molds in the concreting station(s) will have the dimensions (width, length, curve, etc.) suited to the manufacture to be obtained. All this is obviously done such that the predetermined yield requirements are met.
  • Likewise, if the factory comprises one or more roofs, whether they are stationary or moveable, they can be sized and arranged in any manner suited to the configuration of the factory.
  • Of course two or more factories according to the present invention can be paired or matched up to form a single manufacturing unit without thereby departing from the scope of the invention.
  • Furthermore, the supplies such as the rebar-like elements and the conditioning material can enter the factory in the manner that is likewise most suited to the configuration of the factory. For example, in the case mentioned above of a manufacturing unit formed by several factories according to the invention matched up to one another, it may be appropriate for most of the supplies to enter through entrances located at the beginning and at the end of the production lines if the factories are basically elongated in the direction of the production lines.
  • Finally, it must be understood that as it is used herein the term “rebar-like element” is intended to mean any solid reinforcing steel-type body, reinforcement, reinforcing steel, smooth bar, corrugated bar, steel cord, strand, etc. used in the art such that it is embedded in the concrete part to give improved properties to the part against tensile stresses.
  • The present invention has been described in the context of a number of embodiments and examples thereof. It is to be understood, however, that other expedients known to those skilled in the art or disclosed herein may be employed without departing from the spirit of the invention.
  • Therefore, it is intended that the appended claims be interpreted as including the embodiments described herein, the alternatives mentioned above, and all equivalents thereto.

Claims (15)

1. An operating method of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers, comprising the steps of:
placing the factory in a place of origin in a disassembled state in initial units that are smaller than the voussoirs to be manufactured,
taking said initial units to a building site close to the point of delivery of the voussoirs to be manufactured,
assembling the factory at said building site starting from said initial units,
manufacturing the pertinent voussoirs by means of the factory in the assembled state,
disassembling the factory at said building site until the factory is in a disassembled state in final units that are smaller than the manufactured voussoirs, and
taking said final units to a place of destination leaving said building site in basically the same conditions as before assembling the factory at said building site.
2. The method according to claim 1, wherein said place of destination is said place of origin.
3. The method according to claim 1, wherein said place of destination is another building site.
4. The method according to claim 1, further comprising providing the factory having:
at least one reinforcing station, with at least one frame, for preparing cages,
at least one concreting station, with at least one steam setting mold including a main mold body, a counter mold and a steam setting canvas, for the application of one of said cages in said mold, the concreting of said mold, the setting of said concrete in said mold and the extraction of the set part (semi-finished voussoir) from said mold,
at least one conditioning station for the finishing of said semi-finished voussoir and/or the application of finishing accessories to said semi-finished voussoir, and
at least one stocking area for the storage of finished voussoirs;
wherein the base of said reinforcing station, said concreting station and said conditioning station comprises a concrete slab formed directly on compacted terrain, without foundations, anchors or the like to the compacted terrain, in that said hoisting means are hoisting means without foundations, in that said mold body is divided into at least two portions attached to one another by fixing means, and in that said counter mold is divided into at least two portions attached to one another by fixing means.
5. The method according to claim 4, wherein the factory has pre-stressing means, including pre-stressing performance means and pre-stressing tendons.
6. The method according to claim 5, wherein said pre-stressing performance means are arranged in said concreting station in the case of pre-tensioned reinforcement or in said conditioning station in the case of post-tensioned reinforcement.
7. The method according to claim 4, wherein all or a portion of said hoisting means without foundations are moveable and/or all or a portion of said concreting means are moveable.
8. The method according to claim 7, wherein said hoisting means comprise one or more boom crane trucks and/or one or more gantries on rails and/or one or more gantries on wheels.
9. The method according to claim 8, wherein at least one of said gantries on rails and/or at least one of said gantries on wheels are self-propelled.
10. The method according to claim 7, wherein said concreting means comprise one or more concrete mixer trucks or pieces of concrete distributing equipment, including pumping equipment.
11. The method according to claim 4, wherein said concrete slab is formed on site in a single part.
12. The method according to claim 4, wherein said concrete slab preferably has a thickness of 15 cm at the least and preferably 25 cm at the most.
13. The method according to claim 4, wherein the factory further has at least one folding or modular canopy or stationary roof at least partially covering said reinforcing station and/or said concreting station and/or said conditioning station.
14. The method according to claim 4, wherein the factory further has at least one moveable roof at least partially covering said reinforcing station, said concreting station and said conditioning station.
15. The method according to claim 14, wherein said moveable roof slides in the direction of the production line on rails formed directly in said concrete slab and has an extension in the direction of said rails essentially equal to the length of a mold.
US13/601,109 2009-11-30 2012-08-31 Operating method of a factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers Abandoned US20120324823A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/601,109 US20120324823A1 (en) 2009-11-30 2012-08-31 Operating method of a factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
ES200902259A ES2371960B1 (en) 2009-11-30 2009-11-30 FACTORY FOR THE PRODUCTION BY MOLDING OF PREFABRICATED CONCRETE DOVELAS FOR THE CONSTRUCTION OF AIRLINER SUPPORT TOWERS.
ESP200902259 2009-11-30
US12/956,175 US20110127691A1 (en) 2009-11-30 2010-11-30 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers
US13/601,109 US20120324823A1 (en) 2009-11-30 2012-08-31 Operating method of a factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US12/956,175 Division US20110127691A1 (en) 2009-11-30 2010-11-30 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers

Publications (1)

Publication Number Publication Date
US20120324823A1 true US20120324823A1 (en) 2012-12-27

Family

ID=43587548

Family Applications (2)

Application Number Title Priority Date Filing Date
US12/956,175 Abandoned US20110127691A1 (en) 2009-11-30 2010-11-30 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers
US13/601,109 Abandoned US20120324823A1 (en) 2009-11-30 2012-08-31 Operating method of a factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US12/956,175 Abandoned US20110127691A1 (en) 2009-11-30 2010-11-30 Factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers

Country Status (20)

Country Link
US (2) US20110127691A1 (en)
EP (1) EP2507021A1 (en)
JP (1) JP2013512132A (en)
KR (1) KR20140015636A (en)
CN (1) CN102695590A (en)
AR (1) AR081705A1 (en)
AU (1) AU2010246534B2 (en)
BR (1) BRPI1004888B1 (en)
CA (1) CA2781979A1 (en)
CL (1) CL2012001390A1 (en)
CO (1) CO6541619A2 (en)
DE (1) DE202010018643U1 (en)
ES (1) ES2371960B1 (en)
MA (1) MA33831B1 (en)
MX (1) MX2012006151A (en)
NZ (1) NZ600538A (en)
UA (1) UA106401C2 (en)
UY (1) UY33067A (en)
WO (1) WO2011063983A1 (en)
ZA (1) ZA201203981B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2939809A1 (en) * 2014-04-30 2015-11-04 Acciona Windpower S.a. Portable facility for the manufacture of prefabricated concrete elements for concrete towers

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2460392B1 (en) * 2012-02-07 2015-07-21 Inneo Torres, S.L. STORAGE STRUCTURE OF CONSTRUCTION MODULES OF AIRPORT SUPPLIER TOWERS, PROCEDURE USING STRUCTURE AND INSTALLATION RESULTING FROM SUCH PROCEDURE
ES2472306B1 (en) * 2012-12-27 2015-06-02 Acciona Windpower, S.A. Mold for the manufacture of precast concrete
ES2565518B1 (en) * 2014-09-17 2016-12-27 Pacadar S.A. Method for the manufacture of tubular concrete segments and for the erection of towers by means of said tubular segments
CN104723449B (en) * 2015-02-12 2017-08-18 沈阳卫德住宅工业化科技有限公司 A kind of automatic assembly line of building industrialization concrete prefabricated element
CN106223708A (en) * 2016-08-31 2016-12-14 山东电力建设第工程公司 Scheme had bad luck by a kind of inner steel cylinder of chimney barrel sheet material
ES2688842A1 (en) * 2017-05-03 2018-11-07 Universidad De Valladolid SUPPORT FOR DOUBLE TRANSPORTATION AND TRANSPORTATION (Machine-translation by Google Translate, not legally binding)
EP3845354A3 (en) 2019-12-10 2021-09-15 Wobben Properties GmbH Method of manufacturing segments for a tower, prestressed segment, tower ring, tower, wind turbine and prestressing device
CN113306002A (en) * 2021-05-28 2021-08-27 中铁四局集团第三建设有限公司 Layout construction method and application of prefabricated bridge prefabricated part production base

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7832087B2 (en) * 2006-10-11 2010-11-16 The Mattamy Corporation Housing manufacturing system

Family Cites Families (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3014598A (en) * 1958-05-20 1961-12-26 Concrete Conduit Corp Mold positioner for concrete-molding plant
US3254914A (en) * 1965-05-26 1966-06-07 Vindale Corp Mobile home underframe construction
DE1771807A1 (en) * 1968-07-13 1972-03-02 Klaus Schneider Process and plant for the production of concrete blocks
US3552072A (en) * 1968-10-11 1971-01-05 James P O Connell Method and apparatus for housing an enclosed area with aero-trussed structures
US3534512A (en) * 1969-03-13 1970-10-20 William Ballas Collapsible shelter
US3659986A (en) * 1970-03-16 1972-05-02 Nathan L Gelbman Apparatus for making concrete products
US3994060A (en) * 1971-10-01 1976-11-30 Lely Cornelis V D Methods and production lines for the manufacture of prefabricated buildings
JPS4965981A (en) * 1972-10-30 1974-06-26
GB1446853A (en) * 1972-12-08 1976-08-18 Dobie C H Gantry cranes
US3925679A (en) * 1973-09-21 1975-12-09 Westinghouse Electric Corp Modular operating centers and methods of building same for use in electric power generating plants and other industrial and commercial plants, processes and systems
US3963395A (en) * 1974-02-25 1976-06-15 Automated Construction Industries, Inc. Mass production line for fabricating structural building members
US4005972A (en) * 1975-04-04 1977-02-01 Bearingwall Systems Inc. Invertible apparatus for molding a concrete panel
JPS5421415A (en) * 1977-07-19 1979-02-17 Mitsubishi Heavy Ind Ltd Barge for making iron reinforced concrete products
US4175361A (en) * 1977-10-13 1979-11-27 Kiyomitsu Tanaka Openable canopy housing
JPS5527231A (en) * 1978-08-18 1980-02-27 Nikken Kogaku Kk Preparation of concrete block
DE2939472A1 (en) * 1979-09-28 1981-04-09 G.A. Pfleiderer GmbH & Co KG, 8430 Neumarkt Concrete column with prestressed rods - also has after stressing rods wedged in anchor plate with screw holes
ES278419Y (en) 1984-03-26 1985-05-16 Tecmacon, S.A. METALLIC STRUCTURE FOR THE ATTACHMENT OF PANELS, IN THE CONSTRUCTION OF PREFABRICATED UNITS.
JPH027854Y2 (en) * 1985-02-13 1990-02-26
FR2589500B1 (en) * 1985-11-06 1988-01-08 Leurent Ghislain COVERABLE STRUCTURE OF ANY PLACE, IN PARTICULAR OF A POOL
FR2669259A1 (en) * 1990-11-21 1992-05-22 Tuyaux Bonna Process for the manufacture of prefabricated arch units
US5398472A (en) * 1993-02-19 1995-03-21 The Shandel Group Fiber-bale composite structural system and method
ES1043906Y (en) 1998-07-28 2000-07-16 Blanco Baeza Fernando MODULAR Kiosk PERFECTED FOR URBAN SERVICE.
JP3120980B2 (en) * 1999-10-29 2000-12-25 普 山田 Concrete unit manufacturing equipment
JP2001322115A (en) * 2000-05-17 2001-11-20 Shimizu Corp Site factory facility
JP3603957B2 (en) * 2001-09-06 2004-12-22 株式会社沖創建設 On-site manufacturing method for PC members
EP1629160A1 (en) * 2003-05-02 2006-03-01 David W. Powell A structure and method for prefabricated construction
EP1669503A1 (en) 2003-08-20 2006-06-14 Incoribe, S.L. Building construction method and modular shuttering method
US20050252123A1 (en) * 2004-05-14 2005-11-17 Karen Colonias Construction connector anchor cage system
FR2872843B1 (en) * 2004-07-12 2006-10-06 Electricite De France METHOD FOR CONSTRUCTING A LONGITUDINAL MATERIAL IN CONCRETE, TUBULAR ELEMENT FOR ITS USE AND MATT OBTAINED
US20070079565A1 (en) * 2005-07-25 2007-04-12 Bahram Bahramian Light weight sandwich panels
JP4746959B2 (en) * 2005-10-26 2011-08-10 株式会社竹中工務店 Tower structure
US20090145073A1 (en) * 2006-03-06 2009-06-11 Ichiro Takeshima Architectural Structure, Structural Unit and Method for Constructing the Same
US20080022609A1 (en) * 2006-07-28 2008-01-31 Bit Technologies Limited Mobile manufacturing plants for producing prefab elements
CN200952187Y (en) * 2006-09-07 2007-09-26 张兴汉 Assembling building structural components
JP2008101363A (en) * 2006-10-18 2008-05-01 Oriental Shiraishi Corp Columnar structure, its construction method, and concrete panel
DE102006051045A1 (en) * 2006-10-30 2008-05-08 Erich Kastner Device for manufacturing elements from hardenable casting mass, preferably at building site places, has transportable container that is designed inside for regulation and withdrawal of movable equipment relevant for manufacturing of element
SE531076C2 (en) * 2007-04-12 2008-12-09 Ingenjoers Hebe Ab Fa Plant for the production of concrete
WO2009056898A1 (en) * 2007-11-02 2009-05-07 Alejandro Cortina-Cordero Post-tensioned concrete tower for wind turbines
WO2009099360A1 (en) * 2008-02-05 2009-08-13 Telefonaktiebolaget L M Ericsson (Publ) Method of making hollow concrete elements
DE102008016828A1 (en) * 2008-04-01 2009-10-15 Wobben, Aloys Process for producing precast concrete parts

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7832087B2 (en) * 2006-10-11 2010-11-16 The Mattamy Corporation Housing manufacturing system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2939809A1 (en) * 2014-04-30 2015-11-04 Acciona Windpower S.a. Portable facility for the manufacture of prefabricated concrete elements for concrete towers

Also Published As

Publication number Publication date
ZA201203981B (en) 2013-08-28
BRPI1004888A2 (en) 2013-03-19
DE202010018643U1 (en) 2020-10-30
NZ600538A (en) 2014-06-27
ES2371960B1 (en) 2012-11-19
US20110127691A1 (en) 2011-06-02
WO2011063983A1 (en) 2011-06-03
MX2012006151A (en) 2012-08-23
AU2010246534B2 (en) 2014-01-09
CO6541619A2 (en) 2012-10-16
KR20140015636A (en) 2014-02-06
BRPI1004888B1 (en) 2017-02-14
AR081705A1 (en) 2012-10-17
UY33067A (en) 2011-06-30
CL2012001390A1 (en) 2013-07-12
MA33831B1 (en) 2012-12-03
CA2781979A1 (en) 2011-06-03
CN102695590A (en) 2012-09-26
EP2507021A1 (en) 2012-10-10
UA106401C2 (en) 2014-08-26
AU2010246534A1 (en) 2011-06-16
JP2013512132A (en) 2013-04-11
ES2371960A1 (en) 2012-01-12

Similar Documents

Publication Publication Date Title
US20120324823A1 (en) Operating method of a factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers
US10513858B2 (en) Construction process of structures with empty segments and construction system of structures with empty segments
US8713892B2 (en) Method for assembling shell segments for forming tower sections of a hybrid wind turbine tower
EP4035963A1 (en) Modular enclosed transportation structure and integrated track assembly
KR101230049B1 (en) Incremental launching apparatus for launching concrete slab for bridge using form and rail, and constructing method for the same
JP4391539B2 (en) Hollow floor slab unit for assembling bridge, hollow floor slab for assembling bridge, and construction method of hollow floor slab bridge
EP3118453A1 (en) Wind towers construction system
JP5261296B2 (en) Building construction method
KR101223753B1 (en) Incremental launching apparatus for launching concrete slab of tunnel type for composite bridge, and constructing method for the same
CN107109836A (en) Collapsible precast construction
AU2023219854A1 (en) Reinforcing framework and slab design
EP3403798B1 (en) Mobile structure and procedure for the prefabrication of desirably prestressed concrete bars
KR20110122967A (en) Apparatus for making box girder for bridge and a method for manufacturing box girder for bridge using this apparatus
KR20180054526A (en) Round lamp structure for vehicle entry and exit with stress distribution type precast frame
US20220372777A1 (en) Printer apparatus for creating a concrete support structure for a passenger transport system
EP2939809B1 (en) Portable facility for the manufacture of prefabricated concrete elements for concrete towers
JP2009281141A (en) Hollow floor slab unit for prefabricated bridge, hollow floor slab for prefabricated bridge, and construction method of hollow floor slab bridge
CN205894308U (en) Workshop stand embedded iron structure
KR101151344B1 (en) Paper formwork
CN113863151A (en) Steel box tied arch bridge construction method
CN116289606A (en) Method for installing climbing type working platform outside building
KR20180129256A (en) Incremental launching apparatus having spreader beam assembly for controlling bearing stress of hydraulic jack, and method for the same
JP2018184724A (en) Construction method of culvert
EP2466009A2 (en) Track on a series of piers

Legal Events

Date Code Title Description
AS Assignment

Owner name: INNEO TORRES S.L., SPAIN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:FERNANDEZ GOMEZ, MIGUEL ANGEL;JIMENO CHUECA, JOSE EMILIO;REEL/FRAME:028883/0378

Effective date: 20101217

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION