Prior art keywords
annular space
particles
channeling
pack
flow control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
US13/514,721
Other languages
English (en)
Inventor
Bailin Pei
Yong Xue
Songmei Zhang
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anton Oilfield Services Group Ltd
Original Assignee
Anton Oilfield Services Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anton Oilfield Services Group Ltd filed Critical Anton Oilfield Services Group Ltd
Publication of US20120318505A1 publication Critical patent/US20120318505A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well

Definitions

  • the present application relates to a flow control method in an oil-gas well exploitation field, and in particular to a sectional flow control method using a flow control filter string in an oil-gas well having a perforated pipe.
  • An oil-gas well generally refers to a production well in the oil-gas field development in a broad sense, including an oil well, a gas well, an injection well and so on.
  • the oil-gas well In the production process of the oil-gas well, due to the heterogeneous characteristic of the oil reservoir, the oil-gas well, regardless of a vertical well or a horizontal well, has to be sealed off and separated into multiple independent zones for production.
  • the oil-gas well production mentioned herein includes the production and injection of the fluid in the oil-gas well production process, for example, injecting water and vapor into the formation in the petroleum exploitation or production process, and injecting chemical agents for improving the oil field recovery ratio, and also includes the injection of acid liquor into the formation in some operation processes, etc.
  • a device for controlling flow rate in sections for example, a flow control filter string
  • a device for separating the production section of the oil-gas well into several flow units along the axial direction of the oil-gas well for example, a packer
  • FIG. 1 is a schematic view illustrating the flow control by using a flow control filter string and a packer in an open hole.
  • reference numeral 1 indicates a borehole wall of the oil-gas well
  • reference numeral 2 indicates a flow control filter string
  • reference numeral 3 indicates an annular space between the flow control filter string and the borehole wall
  • reference numeral 4 indicates a packer hung with the flow control filter string
  • reference numeral 5 indicates a flow control packer.
  • FIG. 1 shows a non-oil-bearing formation, an oil-bearing formation and bottom water under the oil-bearing formation.
  • Various formations are schematically indicated by horizontal lines in FIG. 1 , though the person skilled in the art may understand that these formations may not be horizontal, which depends on the geologic structure of the locality where the oil-gas well is located.
  • the oil-gas well as shown in the figure includes a vertical section and a horizontal section.
  • the horizontal section substantially extends along the oil-bearing formation so as to increase the contact area between the borehole wall and the oil-bearing formation.
  • FIG. 1 illustratively shows two zones having different permeability, i.e.
  • a high permeability zone and a low permeability zone Under the situation without flow control in the oil-gas well (i.e. no packer 5 is provided in FIG. 1 ), since the permeability of the two zones is different, a flow rate of the fluid in the high permeability zone is larger than a flow rate of the fluid in the low permeability zone. In this case, due to the difference between the pressure of the bottom water and the pressure inside the oil-gas well, the bottom water under the oil-bearing formation may firstly pass through the high permeability zone and enter into the oil-gas well, which may cause the decrease of oil and gas and the increase of water in the production of the oil-gas well. This should be avoided in the production.
  • the sectional flow-rate control production in many oil-gas wells is realized as follows.
  • a flow control filter string 2 is lowered into the production section inside the oil-gas well, and the flow control filter string 2 and the packer 5 are used to effectively seal off and partition an annular space between the flow control filter string 2 and the production section inside the oil-gas well, i.e. axial channeling passage of fluid outside the flow control filter string is blocked, thereby realizing a better sectional flow-rate control production.
  • the packer is provided between two zones having different permeability.
  • the packer Since the flow control filter can play a role of flow-rate control, the packer is used to pack off the zones having different permeability so as to perform independent control or sectional control of various zones having different permeability. Therefore, it is possible for the oil-gas well to achieve a good production, and to effectively control the quantity of the bottom water entering into the oil-gas well.
  • the current well completion of the oil-gas well is achieved by running a perforated pipe into an open hole, and an annular space between the perforated pipe and the open hole wall is not sealed by filling cement or other materials between the perforated pipe and the borehole wall.
  • the well completion method has an advantage of the low cost, and a disadvantage that the annular space becomes a passage for fluid channeling, so that it is difficult to realize the sectional flow control in the later production.
  • Each meter of the perforated pipe is provided with several to dozens of holes with a diameter about 10 mm.
  • the perforated pipe is mainly used in the oil-gas well to support the borehole wall and prevent lumps in the well from entering into the perforated pipe so as to ensure that the whole flow passage of the oil-gas well is not blocked by lumps.
  • reference numeral 11 indicates a borehole wall of the oil-gas well
  • reference numeral 12 indicates a perforated pipe
  • reference numeral 13 indicates an annular space between the perforated pipe and the borehole wall
  • reference numeral 14 indicates a packer hung with the perforated pipe
  • reference numeral 15 indicates a flow control filter string
  • reference numeral 16 indicates a flow control filter on the flow control filter string
  • reference numeral 17 indicates a packer provided in the annular space between the flow control filter string and the perforated pipe
  • reference numeral 18 indicates a packer hung with the flow control filter string.
  • a direction of arrows in the figure indicates the fluid channeling direction. As shown in FIG.
  • the fluid in the formation passes through the borehole wall and enters into the annular space between the borehole wall and the perforated pipe, so that the axial channeling is formed in the annular space between the borehole wall and the perforated pipe, and then passes through the flow control filter and enters into the flow control filter string.
  • This axial channeling destroys the pack-off effect of the packer provided between the flow control filter string and the perforated pipe, thus a good water control effect can not be realized.
  • a technical problem to be solved by the present application is to provide a sectional flow control method using a flow control filter string in an oil-gas well having a perforated pipe, in which the annular space between the flow control filter string and the perforated pipe and the annular space between the perforated pipe and the borehole wall are filled with anti-channeling pack-off particles, so as to realize a good pack-off effect, thereby realizing a good sectional flow control production.
  • one embodiment of the present application provides a sectional flow control method in an oil-gas well, wherein the oil-gas well includes a first annular space formed between a borehole wall of the oil-gas well and a perforated pipe, and a second annular space formed between the perforated pipe and a flow control filter string.
  • the perforated pipe is located inside the oil-gas well and extends along an axial direction of the oil-gas well.
  • the flow control filter string is located inside the perforated pipe and extends along the axial direction of the oil-gas well.
  • the method includes the step of: filling anti-channeling pack-off particles into the first annular space and the second annular space such that fluid can flow in a penetration manner in the first annular space and the second annular space filled with the anti-channeling pack-off particles.
  • filling the anti-channeling pack-off particles into the first annular space and the second annular space is performed by injecting particle-carrying fluid with the anti-channeling pack-off particles into the first annular space and the second annular space.
  • the particle-carrying fluid has a density substantially equal to a density of the anti-channeling pack-off particles.
  • the particle-carrying fluid is water or aqueous solution.
  • the anti-channeling pack-off particles are high molecular polymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.8 g/cm 3 to 1.4 g/cm 3 .
  • the anti-channeling pack-off particles are high molecular polymer particles with an average particle size ranging from 0.1 mm to 0.5 mm and a density ranging from 0.94 g/cm 3 to 1.06 g/cm 3 .
  • the anti-channeling pack-off particles are high-density polyethylene particles with an average particle size ranging from 0.1 mm to 0.5 mm and a density ranging from 0.90 g/cm 3 to 0.98 g/cm 3 .
  • the anti-channeling pack-off particles are styrene and divinylbenzene crosslinking copolymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.96 g/cm 3 to 1.06 g/cm 3 .
  • the anti-channeling pack-off particles are polypropylene and polyvinyl chloride high molecular polymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.8 g/cm 3 to 1.2 g/cm 3 .
  • the anti-channeling pack-off particles are filled into the first annular space and the second annular space until the first annular space and the second annular space are substantially full of the anti-channeling pack-off particles, and the first annular space and the second annular space are closed.
  • the oil-gas well is a horizontal well or an inclined well.
  • a difference between a density of the particle-carrying fluid and a density of the anti-channeling pack-off particles is within a range of ⁇ 0.4 g/cm 3 or a range of ⁇ 0.2 g/cm 3 .
  • a sectional flow control system for an oil-gas well including: a first annular space formed between a borehole wall of the oil-gas well and a perforated pipe; a second annular space formed between the perforated pipe and a flow control filter string; and anti-channeling pack-off particles.
  • the perforated pipe is located inside the oil-gas well and extends along an axial direction of the oil-gas well.
  • the flow control filter string is located inside the perforated pipe and extends along the axial direction of the oil-gas well.
  • the anti-channeling pack-off particles are filled in the first annular space and the second annular space such that fluid can flow in a penetration manner in the first annular space and the second annular space filled with the anti-channeling pack-off particles.
  • the first annular space and the second annular space are filled by injecting particle-carrying fluid with the anti-channeling pack-off particles into the first annular space and the second annular space.
  • the particle-carrying fluid has a density substantially equal to a density of the anti-channeling pack-off particles.
  • the particle-carrying fluid is water or aqueous solution.
  • the anti-channeling pack-off particles are high molecular polymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.8 g/cm 3 to 1.4 g/cm 3 .
  • the anti-channeling pack-off particles are high molecular polymer particles with an average particle size ranging from 0.1 mm to 0.5 mm and a density ranging from 0.94 g/cm 3 to 1.06 g/cm 3 .
  • the anti-channeling pack-off particles are high-density polyethylene particles with an average particle size ranging from 0.1 mm to 0.5 mm and a density ranging from 0.90 g/cm 3 to 0.98 g/cm 3 .
  • the anti-channeling pack-off particles are styrene and divinylbenzene crosslinking copolymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.96 g/cm 3 to 1.06 g/cm 3 .
  • the anti-channeling pack-off particles are polypropylene and polyvinyl chloride high molecular polymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.8 g/cm 3 to 1.2 g/cm 3 .
  • the first annular space and the second annular space are substantially full of the anti-channeling pack-off particles, and are closed.
  • the oil-gas well is a horizontal well or an inclined well.
  • a difference between the density of the particle-carrying fluid and the density of the anti-channeling pack-off particles is within a range of ⁇ 0.4 g/cm 3 or a range of 0.2 g/cm 3 .
  • a sectional flow control method using a flow control filter string in an oil-gas well having a perforated pipe wherein the oil-gas well having the perforated pipe includes a borehole wall of the oil-gas well and the perforated pipe running in the oil-gas well, one end of the perforated pipe adjacent to a wellhead is fixedly connected to the borehole wall, and an annular space is formed between the perforated pipe and the borehole wall.
  • the sectional flow control method using a flow control filter string includes the following steps:
  • the particle density mentioned in the present application is the true density of the individual particles, rather than the packing density of the particles.
  • the present application uses water or aqueous solution with a density about 1 g/cm 3 as the particle-carrying fluid to carry anti-channeling pack-off particles, and the present application uses anti-channeling pack-off particles having almost the same density as the particle-carrying fluid, thus the particle-carrying fluid may easily carry the anti-channeling pack-off particles to fill in the annular space between the flow control filter string and the perforated pipe and the annular space between the perforated pipe and the borehole wall.
  • the anti-channeling pack-off particles are accumulated both in the annular space between the flow control filter string and the perforated pipe and in the annular space between the perforated pipe and the borehole wall, so that the annular space between the flow control filter string and the perforated pipe and the annular space between the perforated pipe and the borehole wall are filled with and full of the anti-channeling pack-off particles.
  • a part of the particle-carrying fluid enters into the flow control filter and then flows back to the ground, and another part of the particle-carrying fluid passes through the borehole wall and penetrates into the formation.
  • a well completion structure is formed, in which the annular space between the flow control filter string and the perforated pipe and the annular space between the perforated pipe and the borehole wall are filled with the anti-channeling pack-off particles.
  • the anti-channeling pack-off particles are filled tightly and there is almost no channeling.
  • the oil-gas well may effectively be sealed off and separated into multiple independent zones with combination of the flow control filter string, so as to perform oil-gas well production, realize the object of flow control, and facilitate the flow-rate sectional management, thereby bringing good effects of the oil-gas well production, for example, improving the production efficiency of the oil-gas well.
  • the formation fluid flows in media formed by the accumulation of the anti-channeling pack-off particles in the penetration manner.
  • the penetration resistance is proportional to the penetration distance, and is inversely proportional to the penetration area.
  • the accumulation body of the anti-channeling pack-off particles has a thin thickness, a small section and a long axial length. Accordingly, a channeling resistance of the formation fluid flowing in the anti-channeling pack-off particles along the axial direction of the oil-gas well is very high.
  • the penetration area is big and the penetration distance is short, thus the flow resistance is very small.
  • the resistance flowing in the accumulation body for several meters or tens of meters along the axial direction of the oil-gas well is hundreds times even thousands times more than the resistance flowing in the accumulation body for several centimeters along the radial direction of the oil-gas well. Due to the great difference between the resistance flowing in the accumulation body along the axial direction of the oil-gas well and the resistance flowing in the accumulation body along the radial direction of the oil-gas well, the flow rate flowing in the accumulation body along the axial direction of the oil-gas well is far less than the flow rate flowing in the accumulation body along the radial direction of the oil-gas well under the same pressure difference.
  • the smooth flow of the formation fluid in the accumulation body along the radial direction of the oil-gas well may be ensured, and the flow of the formation fluid along the axial direction of the oil-gas well may be limited, thereby functioning as a packer.
  • the present application provides a convenient and useful sectional flow control method using a flow control filter string in an oil-gas well having a perforated pipe, which may pack off the annular space between the flow control filter string and the perforated pipe and the annular space between the perforated pipe and the borehole wall, thereby having a good pack-off effect, realizing the sectional flow control production well, and satisfying the actual production requirements of the oil field, for example, improving the oil recovery ratio.
  • FIG. 1 is a schematic view illustrating the flow control by using a flow control filter string and a packer in an open hole in the prior art
  • FIG. 2 is a schematic view of a hypothetical state where the flow control technology using the flow control filter string and the packer as shown in FIG. 1 is applied to an oil-gas well having a perforated pipe, the flow control filter string is lowered into the perforated pipe, an annular space between the flow control filter string and the perforated pipe is packed off, while an annular space between the perforated pipe and a borehole wall is not packed off;
  • FIG. 3 is a schematic view of a sectional flow control method using a flow control filter string in an oil-gas well having a perforated pipe according to an embodiment of the present application.
  • FIG. 4 is a schematic view of a well completion structure according to an embodiment of the present application, in which an annular space between the flow control filter string and the perforated pipe and an annular space between the perforated pipe and a borehole wall are both filled with anti-channeling pack-off particles.
  • the present application provides a sectional flow control method using a flow control filter string in an oil-gas well having a perforated pipe.
  • the oil-gas well having the perforated pipe therein includes a borehole wall of the oil-gas well and the perforated pipe running into the oil-gas well.
  • One end of the perforated pipe adjacent to a wellhead is fixedly connected to the borehole wall, and an annular space is formed between the perforated pipe and the borehole wall.
  • the sectional flow control method using the flow control filter string includes the following steps:
  • the particle-carrying fluid carrying the anti-channeling pack-off particles is water or aqueous solution.
  • the anti-channeling pack-off particles may be high molecular polymer particles with a particle size ranging from 0.05 mm to 0.7 mm and a density ranging from 0.8 g/cm 3 to 1.2 g/cm 3 .
  • the anti-channeling pack-off particles may be high molecular polymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.8 g/cm 3 to 1.4 g/cm 3 .
  • the anti-channeling pack-off particles may be high molecular polymer particles with an average particle size ranging from 0.1 mm to 0.5 mm and a density ranging from 0.94 g/cm 3 to 1.06 g/cm 3 .
  • the anti-channeling pack-off particles may be high-density polyethylene particles with an average particle size ranging from 0.1 mm to 0.5 mm and a density ranging from 0.90 g/cm 3 to 0.98 g/cm 3 .
  • the anti-channeling pack-off particles may be styrene and divinylbenzene crosslinking copolymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.96 g/cm 3 to 1.06 g/cm 3 .
  • the anti-channeling pack-off particles may be polypropylene and polyvinyl chloride high molecular polymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.8 g/cm 3 to 1.2 g/cm 3 .
  • the embodiment of the present application provides a sectional flow control method using a flow control filter string in an oil-gas well having a perforated pipe.
  • the oil-gas well structure having the perforated pipe includes a borehole wall 101 of the oil-gas well and a perforated pipe 102 running in the oil-gas well.
  • Each meter of the perforated pipe 102 is provided with multiple small holes. For example, the number of the small holes is 30.
  • the diameter of the small holes is configured to be able to prevent lumps from entering into the perforated pipe 102 , for example 10 mm.
  • a packer 104 hung with the perforated pipe 102 is provided between an upper portion of the perforated pipe 102 and the borehole wall 101 .
  • An annular space 103 is formed between the perforated pipe 102 and the borehole wall 101 .
  • a flow control filter string 105 is run into the perforated pipe 102 via a running string (not shown).
  • a flow control filter 106 is provided on the flow control filter string 105 .
  • a packer 108 hung with the flow control filter string 105 is provided between an upper portion of the flow control filter string 105 and the borehole wall 101 .
  • An annular space 103 is formed between the flow control filter string 105 and the perforated pipe 102 .
  • a particle-carrying fluid 110 carrying the anti-channeling pack-off particles is injected into the annular space 103 between the flow control filter string 105 and the perforated pipe 102 .
  • the particle-carrying fluid 110 carrying the anti-channeling pack-off particles passes through small holes in the perforated pipe 102 and enters into the annular space 111 between the perforated pipe 102 and the borehole wall 101 .
  • the anti-channeling pack-off particles are accumulated both in the annular space 103 between the flow control filter string 105 and the perforated pipe 102 and in the annular space 111 between the perforated pipe 102 and the borehole wall 101 , so that the annular space 103 between the flow control filter string 105 and the perforated pipe 102 and the annular space 111 between the perforated pipe 102 and the borehole wall 101 are filled with and full of the anti-channeling pack-off particles.
  • a part of the particle-carrying fluid penetrates through the flow control filter 106 and enters into the flow control filter string 105 and then flows back to the ground, and another part of the particle-carrying fluid passes through the borehole wall 101 and penetrates into the formation.
  • the direction of arrows in FIG. 3 is the flowing direction of the particle-carrying fluid.
  • the anti-channeling pack-off particles are high-density polyethylene particles with an average particle size ranging from 0.1 mm to 0.5 mm and a density ranging from 0.90 g/cm 3 to 0.98 g/cm 3 .
  • the particle-carrying fluid is water.
  • the packer 108 hung with the flow control filter string 105 is set so as to close both the annular space 103 between the flow control filter string 105 and the perforated pipe 102 and the annular space 111 between the perforated pipe 102 and the borehole wall 101 which are filled with the anti-channeling pack-off particles.
  • the running string (not shown) connected to the flow control filter string 105 is disengaged and a well completion structure is formed.
  • the annular space 103 between the flow control filter string 105 and the perforated pipe 102 and the annular space 111 between the perforated pipe 102 and the borehole wall 101 are filled with the anti-channeling pack-off particles, as shown in FIG. 4 .
  • FIG. 4 In FIG.
  • reference numeral 101 indicates the borehole wall of the oil-gas well
  • reference numeral 102 indicates the perforated pipe
  • reference numeral 104 indicates the packer hung with the perforated pipe
  • reference numeral 105 indicates the flow control filter string
  • reference numeral 106 indicates the flow control filter on the flow control filter string
  • reference numeral 107 indicates the anti-channeling pack-off particles filled the annular space between the flow control filter string and the perforated pipe
  • reference numeral 108 indicates the packer hung with the flow control filter string
  • reference numeral 109 indicates the anti-channeling pack-off particles filled the annular space between the perforated pipe and the borehole wall.
  • the anti-channeling pack-off particles are polypropylene and polyvinyl chloride high molecular polymer particles with an average particle size ranging from 0.1 mm to 0.5 mm and a density being 0.97 g/cm 3 .
  • the anti-channeling pack-off particles are styrene and divinylbenzene crosslinking copolymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.96 g/cm 3 to 1.06 g/cm 3 .
  • water is used to carry the anti-channeling pack-off particles.
  • the density of water is 1 g/cm 3 .
  • the density of the anti-channeling pack-off particles selected in the present application is almost the same as the density of water. Therefore, the water may easily carry the anti-channeling pack-off particles to fill in the annular space 103 between the flow control filter string 105 and the perforated pipe 102 and the annular space 111 between the perforated pipe 102 and the borehole wall 101 .
  • the anti-channeling pack-off particles are accumulated both in the annular space 103 between the flow control filter string 105 and the perforated pipe 102 and in the annular space 111 between the perforated pipe 102 and the borehole wall 101 , so that the annular space 103 between the flow control filter string 105 and the perforated pipe 102 and the annular space 111 between the perforated pipe 102 and the borehole wall 101 are filled with and full of the anti-channeling pack-off particles.
  • a part of the water passes through the flow control filter 106 and enters into the flow control filter string 105 and then flows back to the ground, and another part of the water passes through the borehole wall 101 and penetrates into the formation.
  • annular space 103 between the flow control filter string 105 and the perforated pipe 102 and the annular space 111 between the perforated pipe 102 and the borehole wall 101 are filled with the anti-channeling pack-off particles.
  • the formation fluid flows in media formed by the accumulation of the anti-channeling pack-off particles in a penetration manner.
  • the penetration resistance is proportional to the penetration distance, and is inversely proportional to the penetration area.
  • the accumulation body of the anti-channeling pack-off particles is a medium having a thin thickness, a small section and a long axial length, thus the channeling resistance of the formation fluid flowing in the accumulation body of the anti-channeling pack-off particles along the axial direction of the oil-gas well is very high.
  • the penetration area is big and the penetration distance is short, thus the flow resistance is very small.
  • the resistance flowing in the accumulation body for several meters or tens of meters along the axial direction of the oil-gas well is hundreds times even thousands times more than the resistance flowing in the accumulation body for several centimeters along the radial direction of the oil-gas well. Due to the great difference between the resistance flowing in the accumulation body along the axial direction of the oil-gas well and the resistance flowing in the accumulation body along the radial direction of the oil-gas well, the flow rate flowing in the accumulation body along the axial direction of the oil-gas well is far less than the flow rate flowing in the accumulation body along the radial direction of the oil-gas well under the same pressure difference.
  • the smooth flow of the formation fluid in the accumulation body along the radial direction of the oil-gas well may be ensured, and the flow of the formation fluid along the axial direction of the oil-gas well may be limited, thereby functioning as a packer.
  • the present application provides a convenient and useful sectional flow control method in an oil-gas well having a perforated pipe, which may pack off both the annular space between the flow control filter string and the perforated pipe and the annular space between the perforated pipe and the borehole wall.
  • the sectional flow control production may be realized due to the good pack-off effect, so as to improve the oil recovery ratio and satisfy the actual production requirements of the oil field.
  • the production section referred in the present application is a generalized production section. There may be some non-flowing sections (for example, an interlayer, a sandwich layer and an imperforated interval after the casing cementing) along the length of the production section.
  • non-flowing sections for example, an interlayer, a sandwich layer and an imperforated interval after the casing cementing
  • the flow control filter string in the present application includes filtering sections and blank sections which are arranged alternately.
  • the blank section is a pipe without holes on its wall surface.
  • the anti-channeling pack-off particle ring outside the blank sections plays a major role in preventing the axial channeling.
  • the blank sections are provided in two ways.
  • each filter itself includes a filtering section and blank sections provided at two ends of the filter and provided with screw threads, so that two filters may be connected via the screw threads on the blank sections of the two filters.
  • the blank section is a place for setting the pliers.
  • an additional blank section may be connected between two filters. Under the situation that a relatively long flow control filter string is desired, the flow control filter string may be formed by connecting multiple flow control filters in series.
  • the anti-channeling pack-off particles in the present application is preferably circular.
  • a sectional flow control method using a flow control filter string in an oil-gas well having a perforated pipe wherein the oil-gas well having the perforated pipe includes a borehole wall of the oil-gas well and the perforated pipe running into the oil-gas well, one end of the perforated pipe adjacent to a wellhead is fixedly connected to the borehole wall, and an annular space is formed between the perforated pipe and the borehole wall.
  • the particle-carrying fluid carrying the anti-channeling pack-off particles is water or aqueous solution.
  • the anti-channeling pack-off particles may be high molecular polymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.8 g/cm 3 to 1.4 g/cm 3 .
  • the anti-channeling pack-off particles may be high molecular polymer particles with an average particle size ranging from 0.1 mm to 0.5 mm and a density ranging from 0.94 g/cm 3 to 1.06 g/cm 3 .
  • the anti-channeling pack-off particles may be high-density polyethylene particles with an average particle size ranging from 0.1 mm to 0.5 mm and a density ranging from 0.90 g/cm 3 to 0.98 g/cm 3 .
  • the anti-channeling pack-off particles may be styrene and divinylbenzene crosslinking copolymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.96 g/cm 3 to 1.06 g/cm 3 .
  • the anti-channeling pack-off particles may be polypropylene and polyvinyl chloride high molecular polymer particles with an average particle size ranging from 0.05 mm to 1.0 mm and a density ranging from 0.8 g/cm 3 to 1.2 g/cm 3 .

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Filtering Materials (AREA)
  • Treatment Of Liquids With Adsorbents In General (AREA)
US13/514,721 2009-12-11 2010-12-08 Method and system for segmental flow control in oil-gas well Pending US20120318505A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200910250793.1 2009-12-11
CN200910250793A CN101705810B (zh) 2009-12-11 2009-12-11 一种存在多孔管的油气井的控流过滤器管柱分段控流方法
PCT/CN2010/079550 WO2011069447A1 (zh) 2009-12-11 2010-12-08 油气井的分段控流方法和系统

Publications (1)

Publication Number Publication Date
US20120318505A1 true US20120318505A1 (en) 2012-12-20

Family

ID=42376059

Family Applications (2)

Application Number Title Priority Date Filing Date
US13/514,721 Pending US20120318505A1 (en) 2009-12-11 2010-12-08 Method and system for segmental flow control in oil-gas well
US13/514,743 Active 2033-05-16 US9664014B2 (en) 2009-12-11 2010-12-08 Method and system for segmental flow control in oil-gas well

Family Applications After (1)

Application Number Title Priority Date Filing Date
US13/514,743 Active 2033-05-16 US9664014B2 (en) 2009-12-11 2010-12-08 Method and system for segmental flow control in oil-gas well

Country Status (3)

Country Link
US (2) US20120318505A1 (zh)
CN (1) CN101705810B (zh)
WO (1) WO2011069447A1 (zh)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101705810B (zh) 2009-12-11 2012-09-05 安东石油技术(集团)有限公司 一种存在多孔管的油气井的控流过滤器管柱分段控流方法
CN101705808B (zh) 2009-12-11 2012-05-30 安东石油技术(集团)有限公司 套管外存在窜槽的油气井的控流过滤器管柱分段控流方法
CN101705802B (zh) * 2009-12-11 2013-05-15 安东石油技术(集团)有限公司 一种油气井生产段防窜流封隔颗粒
RU2488686C1 (ru) * 2012-01-10 2013-07-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Способ разобщения и управления выработкой запасов, дренируемых горизонтальной скважиной, и устройство для его осуществления
US10260330B2 (en) 2015-04-29 2019-04-16 General Electric Company Fluid intake for an artificial lift system and method of operating such system
US20180187533A1 (en) * 2017-01-05 2018-07-05 Saudi Arabian Oil Company Hydrocarbon production by fluidically isolating vertical regions of formations
US11326429B2 (en) 2017-10-13 2022-05-10 Abu Dhabi National Oil Company Method and device for producing fluids or gases from a horizontal well
CN111949650A (zh) 2019-05-15 2020-11-17 华为技术有限公司 一种多语言融合查询方法及多模数据库系统
CN110173230A (zh) * 2019-06-06 2019-08-27 安东柏林石油科技(北京)有限公司 防止泥岩层泥产出或窜流的人工井壁、形成方法及完井结构
CN110593862B (zh) * 2019-09-02 2020-09-18 中国石油大学(北京) 优势渗流通道确定方法、装置和计算机设备
CN113833437A (zh) * 2021-09-24 2021-12-24 安东柏林石油科技(北京)有限公司 一种提高井下环空中轴向防窜流能力的方法及结构
CN117489296B (zh) * 2023-12-29 2024-03-22 克拉玛依市白碱滩区(克拉玛依高新区)石油工程现场(中试)实验室 一种井间防窜方法及模拟实验装置

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU738914C (en) * 1997-10-16 2002-04-11 Halliburton Energy Services, Inc. Methods and apparatus for completing wells in unconsolidated subterranean zones
US6478091B1 (en) * 2000-05-04 2002-11-12 Halliburton Energy Services, Inc. Expandable liner and associated methods of regulating fluid flow in a well
CA2554237A1 (en) * 2004-02-12 2005-08-25 Shell Canada Limited Suppressing fluid communication to or from a wellbore
US7413022B2 (en) * 2005-06-01 2008-08-19 Baker Hughes Incorporated Expandable flow control device
US7624802B2 (en) * 2007-03-22 2009-12-01 Hexion Specialty Chemicals, Inc. Low temperature coated particles for use as proppants or in gravel packs, methods for making and using the same
US20090000787A1 (en) 2007-06-27 2009-01-01 Schlumberger Technology Corporation Inflow control device
CN101476455B (zh) * 2008-01-04 2012-04-25 安东石油技术(集团)有限公司 可充填控水筛管及其布设方法
CN201254976Y (zh) * 2008-09-04 2009-06-10 安东石油技术(集团)有限公司 一种新的水平井防砂完井结构
CN101748999B (zh) 2008-12-11 2012-09-05 安东石油技术(集团)有限公司 一种控流筛管
CN101463719B (zh) * 2009-01-21 2012-12-26 安东石油技术(集团)有限公司 一种高效控流筛管的控流装置
CN101705810B (zh) 2009-12-11 2012-09-05 安东石油技术(集团)有限公司 一种存在多孔管的油气井的控流过滤器管柱分段控流方法
CN101705808B (zh) * 2009-12-11 2012-05-30 安东石油技术(集团)有限公司 套管外存在窜槽的油气井的控流过滤器管柱分段控流方法
CN101705809B (zh) * 2009-12-11 2012-12-26 安东石油技术(集团)有限公司 一种存在防砂管油气井的控流过滤器管柱分段控流方法

Also Published As

Publication number Publication date
US9664014B2 (en) 2017-05-30
WO2011069447A1 (zh) 2011-06-16
US20120241168A1 (en) 2012-09-27
CN101705810A (zh) 2010-05-12
CN101705810B (zh) 2012-09-05

Similar Documents

Publication Publication Date Title
US9664014B2 (en) Method and system for segmental flow control in oil-gas well
US9022110B2 (en) Segmental flow-control method for flow-control filter string in oil-gas well and oil-gas well structure
US9151142B2 (en) Segmental flow control method and apparatus for a flow control filter string in an oil-gas well
AU2011341563B2 (en) Wellbore apparatus and methods for multi-zone well completion, production and injection
CA2849253C (en) Fluid filtering device for a wellbore and method for completing a wellbore
WO2011069339A1 (zh) 油气井生产段防窜流封隔颗粒、使用这种颗粒的完井方法及采油方法
WO2021004163A1 (zh) 一种用于同井注采的封隔方法及完井结构
MX2013006301A (es) Filtro para filtracion con grava de canal de flujo alternativo y metodo para completar un sondeo.
CN101975041B (zh) 绕煤层固井方法及装置
WO2021022908A1 (zh) 不改变管柱更换充填层的方法、返排服务装置和完井结构
US10487630B2 (en) High flow injection screen system with sleeves
CN215672154U (zh) 注水井
CN215718697U (zh) 一种管式泵有缆分采测试系统
AU2015284363B2 (en) Injector fill displacement tubes

Legal Events

Date Code Title Description
STPP Information on status: patent application and granting procedure in general

Free format text: MISSASSIGNED APPLICATION NUMBER