US20120085469A1 - Method for manufacturing projection materials for a shot peening - Google Patents

Method for manufacturing projection materials for a shot peening Download PDF

Info

Publication number
US20120085469A1
US20120085469A1 US13/131,566 US200913131566A US2012085469A1 US 20120085469 A1 US20120085469 A1 US 20120085469A1 US 200913131566 A US200913131566 A US 200913131566A US 2012085469 A1 US2012085469 A1 US 2012085469A1
Authority
US
United States
Prior art keywords
tempering
projection materials
materials
shot peening
hardness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/131,566
Inventor
Masahiko Mitsubayashi
Takaaki Kanazawa
Masayuki Ishikawa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sintokogio Ltd
Original Assignee
Sintokogio Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sintokogio Ltd filed Critical Sintokogio Ltd
Assigned to SINTOKOGIO, LTD. reassignment SINTOKOGIO, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ISHIKAWA, MASAYUKI, KANAZAWA, TAKAAKI, MITSUBAYASHI, MASAHIKO
Publication of US20120085469A1 publication Critical patent/US20120085469A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24CABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
    • B24C1/00Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods
    • B24C1/10Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods for compacting surfaces, e.g. shot-peening
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F1/00Metallic powder; Treatment of metallic powder, e.g. to facilitate working or to improve properties
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F9/00Making metallic powder or suspensions thereof
    • B22F9/02Making metallic powder or suspensions thereof using physical processes
    • B22F9/06Making metallic powder or suspensions thereof using physical processes starting from liquid material
    • B22F9/08Making metallic powder or suspensions thereof using physical processes starting from liquid material by casting, e.g. through sieves or in water, by atomising or spraying
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F9/00Making metallic powder or suspensions thereof
    • B22F9/02Making metallic powder or suspensions thereof using physical processes
    • B22F9/06Making metallic powder or suspensions thereof using physical processes starting from liquid material
    • B22F9/08Making metallic powder or suspensions thereof using physical processes starting from liquid material by casting, e.g. through sieves or in water, by atomising or spraying
    • B22F9/082Making metallic powder or suspensions thereof using physical processes starting from liquid material by casting, e.g. through sieves or in water, by atomising or spraying atomising using a fluid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24CABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
    • B24C11/00Selection of abrasive materials or additives for abrasive blasts
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K3/00Materials not provided for elsewhere
    • C09K3/14Anti-slip materials; Abrasives
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/06Surface hardening
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/62Quenching devices
    • C21D1/63Quenching devices for bath quenching
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D7/00Modifying the physical properties of iron or steel by deformation
    • C21D7/02Modifying the physical properties of iron or steel by deformation by cold working
    • C21D7/04Modifying the physical properties of iron or steel by deformation by cold working of the surface
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D7/00Modifying the physical properties of iron or steel by deformation
    • C21D7/02Modifying the physical properties of iron or steel by deformation by cold working
    • C21D7/04Modifying the physical properties of iron or steel by deformation by cold working of the surface
    • C21D7/06Modifying the physical properties of iron or steel by deformation by cold working of the surface by shot-peening or the like
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/36Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for balls; for rollers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F2301/00Metallic composition of the powder or its coating
    • B22F2301/35Iron
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F2303/00Functional details of metal or compound in the powder or product
    • B22F2303/01Main component
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F2998/00Supplementary information concerning processes or compositions relating to powder metallurgy
    • B22F2998/10Processes characterised by the sequence of their steps

Definitions

  • the present invention relates to a method for manufacturing projection materials for a shot peening.
  • a shot peening processing for improving the fatigue strengths of parts e.g., a gear, a shaft, and so on, of an automobile, imparts a compression residual stress on surfaces of the parts by projecting hard particles.
  • the field of shot peening processing has motivated a technique for adjusting and managing the hardness of the projection materials to more stably ensure the quality the projection materials.
  • Patent Literature 1 a method for manufacturing metal shots as disclosed in Patent Literature 1 is known.
  • the method includes the steps of projecting and hitting shots having a hardness that is the same as or more than that of the metal shots to be manufactured to project to the surface of the metal shots, so as to cause a localized rise of the high temperature near the surface layer of the metal shots to a temperature more than a predetermined temperature and rapidly cooling the metal shots to improve the fatigue strength.
  • the hardness of the surface of the metal shots can be improved. Further, while repeating the step of projecting the shots against the metal shots, the temperature of the metal shots is increased above the predetermined temperature thereby resulting in a quenching of the heat. It also results in an effect of tempering the metal shots when the temperature is decreased to below the predetermined temperature. Thus, the toughness of the metal shots can also be improved.
  • One object of the present invention is to provide a method for manufacturing projection materials for shot peening, to achieve a sufficiently high hardness with a lower cost for the materials.
  • the method of claim 1 is a method for manufacturing projection materials for shot peening, the method comprising the following steps: quenching the projection materials by rapidly cooling them; tempering the projection materials at a predetermined temperature of the tempering; work hardening the projection materials by imparting a stress on them; wherein steel is used as the raw material for the projection materials.
  • the predetermined temperature of the tempering be set as within the range of from 130° C. or more to 230° C. or less.
  • the predetermined temperature of the tempering be set within the range of from 160° C. or more to 230° C. or less.
  • FIG. 1 illustrates the type of usage of the projection materials for shot peening of the present invention.
  • FIG. 2 is a flowchart of the process for manufacturing the projection materials for shot peening of the present invention.
  • FIG. 3 is a schematic diagram of the quenching process of the present invention.
  • FIG. 4 is a schematic diagram of the tempering process of the present invention.
  • FIG. 5 is a schematic diagram of the work hardening process of the present invention.
  • FIG. 6 illustrates the relationships between the tempering temperatures, the hardness after the tempering process, and the hardness after the work hardening process, when the tempering temperatures are varied in the tempering process.
  • FIG. 7 illustrates the values of the compression residual stresses that are imparted on the workpieces to be shot peened, when the shot peening processes are carried out using the projection materials that are manufactured by the process for manufacturing the projection materials for shot peening of the present invention.
  • FIG. 7 also illustrates reference projection materials for a comparison.
  • the projection materials 1 of the present invention will be explained with reference to FIG. 1 .
  • the projection materials 1 are shot particles of steel having a predetermined particle size.
  • the projection materials 1 are projected by an apparatus for shot peening 2 to a target component 3 such that the projection materials 1 collide with the target component 3 to impart a compression residual stress to the surface of the target component 3 so as to improve its fatigue strength.
  • the apparatus for shot peening 2 is configured to project the projection materials 1 by, for instance, the centrifugal force caused by compressed air or rotary blades.
  • the apparatus for shot peening 2 projects the projection materials 1 at a predetermined velocity at the target component 3 , located at a position a predetermined distance from the apparatus for shot peening 2 .
  • the target component 3 is a workpiece to be shot peening by the projection materials 1 .
  • the projection materials 1 are projected at and collide with the target component 3 by means of the apparatus for shot peening 2 such that compression residual stress is imparted on the surface of it.
  • the target component 3 includes, but is not limited to, for instance, a component of an automobile such as a gear or a shaft.
  • the process 810 for manufacturing the projection materials includes a quenching process S 20 , a tempering process S 30 , and a work hardening process S 40 .
  • the quenching process S 20 is a process of thermal treatment using “a water atomization” in which steel materials as raw materials to constitute the projection materials are sprayed into water in a molten phase (or molten-metal phase), to obtain quenching granular particles, each having a predetermined diameter.
  • the steel material having a quenching property is used as materials to be granulated.
  • This steel is sprayed into water in a molten phase, i.e., the molten steel having an austenite structure such that the molten steel can be quenched (“quenching”) and become a martensite structure.
  • the steel material to constitute the projection materials 1 is formed as granular particles 4 , each having a predetermined particle-diameter throughout the quenching process S 20 . The hardness of them is enhanced by the quenching. Further, the toughness of the granular particles 4 is degraded.
  • the quenching process S 20 is not limited to the process with the water atomization, but it may instead be a process to obtain quenched granular particles using the molten-metal materials such as gas atomization and disk atomization, or a quenching process that is carried out by a rapid quenching.
  • the tempering process S 30 is a thermal treatment in which the granular particles 4 formed by the quenching process S 20 are heated in a heating furnace 5 for a predetermined period, and then are slowly cooled.
  • the quenched granular particles 4 are tempered by heating them in the heating furnace 5 , which can be controlled to maintain a constant predetermined temperature in the furnace (from 130° C. or more to 230° C. or less, more preferably, from 160° C. or more to 230° C. or less), and for a predetermined period.
  • Such tempering using a relatively low temperature causes a condition in which the residual austenite structure (“the residual austenite”) that still remains without a martensite transformation during the quenching process also still remains after the tempering. Further, the tempering process S 30 enhances the toughness of the granular materials 4 that once have been degraded by the quenched process 520 .
  • the tempering process 530 is not limited to the process to heat the granular particles in the heating furnace 5 , but it may instead be a process in which the tempering is carried out at a predetermined temperature. In view of achieving the sufficient toughness of the granular particles 4 and thus the projection materials 1 to ensure their sufficient fatigue life, it is desirable that the tempering be carried out at a temperature that is the same as or above the temperature (130° C.) to obtain a sufficient effect from the tempering.
  • the work hardening process S 40 is a modifying treatment in which the granular particles 4 that have been tempered by the tempering process S 30 are repeatedly projected at a target material 7 using the apparatus for shot peening 6 , to enhance the harnesses of the granular particles 4 .
  • the granular particles 4 that have been tempered are projected at the target material 7 . It has a hardness that is the same as or above that of the granular particles 4 , using the apparatus for shot peening 6 under the predetermined projection-conditions such as the predetermined velocity and the predetermined distance such that the granular particles 4 collide with the target material 7 , to hardening treat the surface of each granular particle 4 .
  • the residual austenite within each granular particle 4 is modified and caused to form a martensite formation such that the hardness of each granular particle 4 can be further enhanced.
  • granular particles 4 can be obtained that have been sufficiently modified and thus hardened.
  • the projection conditions such as the predetermined velocity and the predetermined distance in the work hardening process S 40 can be appropriately varied based on such data as the particle size and the mass of each granular particle 4 .
  • the work hardening process S 40 is not limited to the process to impart impact forces on the granular particles 4 by projecting them to collide with the target material 7 using the apparatus for shot peening, but it may instead be a process in which the granular particles 4 have plastic deformations and harden by applying a predetermined stress thereon.
  • the granular particles 4 that undergo the quenching process S 20 , the tempering process S 30 , and the work hardening process S 40 , in this order, as above described, are used as the projection materials 1 to be projected at the target components 3 and to collide with it using the apparatus for shot peening 2 in the shot peening process.
  • the process S 10 for manufacturing the projection materials uses steel materials having quenching properties as the raw materials.
  • the quenching process S 20 forms the granular particles 4 that have been quenched by the water atomization.
  • the tempering process 530 then quench-anneals the granular particles 4 by heating them in the heating furnace 5 at the predetermined temperature and for the predetermined period.
  • the work hardening process S 40 then projects the granular particles 4 , at and collide with, the target material 7 using the apparatus for shot peening 6 such that the granular particles 4 are modified and hardened by applying the stress thereon to induce the plastic formation.
  • a sufficiently high-hardness of the projection materials 1 can be achieved, while their costs are lowered.
  • the lateral axis indicates the tempering temperature (° C.) and the longitudinal axis indicates the hardness (Hv).
  • FIG. 6 illustrates the relationships between the tempering temperatures T, the hardness H 1 of the granular particles 4 after the tempering process, and the hardness H 2 of the granular particles 4 after the work hardening process, when the tempering temperatures are varied in the tempering process S 30 .
  • FIG. 6 illustrates the results of the hardness H 1 after the tempering process and hardness H 2 after the work hardening process measured by means of adequate measuring equipment for specimens B 1 through B 5 .
  • the tempering process is applied on all specimens B 1 through B 5 . They are made from steel and are granulized using the water atomization such that each granular particle has a mean granular diameter of 70 ⁇ m.
  • Specimens B 1 through B 5 are treated by the tempering process at a different temperatures for each specimen (B 1 : 150° C., B 2 : 180° C., B 3 : 230° C., B 4 : 250° C., and B 5 : 290° C.).
  • All specimens B 1 through B 5 are appropriately treated by the work hardening process using an apparatus for shot peening of an air-pressure type.
  • the projection conditions are as follows: 0.12 MPa for the air-pressure, 1.3 m 3 /min for the flow rate, 2.2 kg/min for the weight of the projection materials, SK3 quenching for the material of the target, and 15 mm for the distance of the projection.
  • the hardness of all specimens B 1 through B 5 can be improved by the work hardening process after the tempering process. This is because specimens B 1 through B 5 cause plastic deformations by applying stresses to them so as to harden them, in this process. The residual austenite within the specimens B 1 through B 5 during the tempering process is modified and induced to form a martensite formation in the work hardening process.
  • specimens B 4 and B 5 are tempered at the conventional range of the tempering temperatures (from 250° C. or more to 290° C. or less), the hardness H 1 after the tempering process is on the order of Hv 650 to Hv 700, and the hardness H 2 after the work hardening process is on the order of Hv 700 to Hv 800.
  • fray specimens B 1 , B 2 , and B 3 those are tempered at the range of the tempering temperatures (from 130° C. or more to 230° C.
  • the hardness H 1 after the tempering process is on the order of about Hv 650 to Hv 800, and the hardness H 2 after the work hardening process is Hv 850 or more, such that high hardness are achieved.
  • Hv 850 which is a significantly high hardness for projection materials made of the steel
  • Hv 950 can be achieved for specimens B 1 and B 2 . This is because by enhancing the hardness by the work hardening process, as well as by enhancing the hardness by tempering at a relative low-temperature such that a large amount of the austenite structure still remains after the tempering process, this residual austenite is modified and induces the martensite formation in the work hardening process.
  • the hardness after the work hardening process has a tendency to increase, if the temperature is as low as the tempering temperature T.
  • the tempering process it is necessary that the tempering process be carried out at 130° C. or more. Further, in view of ensuring the repeated use as projection materials 1 , it is desirable that the tempering is carried out at a temperature of 160° C. or more.
  • the present invention employs a preferable range of the tempering temperature of 230° C. or less to ensure achieving Hv 850 or more (i.e., “the high hardness” in the specification), as the hardness H 2 after the work hardening process, in the tempering process S 30 .
  • the tempering temperature in the tempering process S 30 can be selected based on the desired hardness of the projection materials 1 manufactured by the manufacturing process S 10 for manufacturing the projection materials. (For instance, if one wishes to obtain the desired hardness of Hv 950 or more, the tempering temperature is 130° C. to 180° C.) In other words, the hardness of the projection materials 1 can be adjusted by controlling the tempering temperature in the tempering process S 30 .
  • the lateral axis indicates the depth ( ⁇ m) from the surface of the target component 3
  • the longitudinal axis indicates the compressed residual stress (MPa).
  • FIG. 7 illustrates the results measured of the compressed residual stress that is imparted to the target component 3 and are measured under the conditions that are shown in Table 3, when projection materials E 1 through E 4 , which are shown in Table 1, are projected at the target component 3 , using the apparatus for shot peening 2 , under the projection conditions shown in Table 2.
  • the projection materials E 1 are manufactured by the manufacturing process S 10 for manufacturing the projection materials of the present invention.
  • the tempering temperature in the tempering process S 30 is 180° C.
  • the projection materials E 2 are manufactured by the manufacturing process 510 used in the present invention with the tempering temperature in the tempering process S 30 being as 230° C.
  • the projection materials E 2 are made of ceramic that has a high hardness.
  • the projection materials E 4 are made of steel. They have been treated only by the quenching and the tempering, and not by the work hardening process.
  • one case in which the projection materials E 1 are used indicates the value of the compressed residual stress that equals that of the case in which the projection materials E 3 are used. Namely, it will be understood that when steel having a relative low-cost is used it can improve the fatigue strength to equal that of the ceramic projection materials that have a relatively high cost, about two times over the cost of the steel projection materials.
  • projection materials E 2 (see FIG. 6 ), whose hardness is lower than that on an order of Hv 950 of the projection materials E 1 , but still is of a high hardness an as order of Hv 850 are used.
  • a comparison with the projection materials E 1 indicates that the imparted value of the compressed residual stress is somewhat less than that of the projection materials E 1 .
  • the projection materials E 2 thus do not achieve the merit of work hardening that equals those of projection materials E 1 and E 3 .
  • projection materials E 2 can be imparted with a sufficiently large-value for the compressed residual stress, namely, about 1.5 times that of the projection materials E 4 .
  • the projection materials E 2 provide an advantage that is substantially the same as that of the projection materials E 1 .
  • A is important to know the projected quantities of the projection materials based on, e.g., the number of shot-particles. If a predetermined projected quantity of the projection materials to achieve the desired fatigue strength is set, and if the projected quantity of the projection materials, in the shot peening process, has still not been achieved, it is determined that the desired fatigue strength has not been obtained.
  • the number of shot particles of the steel projection materials E 1 , E 2 , and E 4 can be readily counted by, e.g., an appropriate magnetometer, to measure the magnetisms of the magnetized shot particles.
  • the ceramic projection materials, such as E 3 it is difficult to count the number of shot particles, and thus specialized measurement-equipment to allow such a counting is necessary.
  • the projection materials E 1 are composed of a steel that is a relatively low cost material, they can achieve an enhanced fatigue-strength that is substantially same as that of the ceramic projection materials E 3 , and they can also advantageously and readily control the qualities in the shot peening process.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Heat Treatment Of Articles (AREA)
  • Powder Metallurgy (AREA)
  • Manufacture Of Metal Powder And Suspensions Thereof (AREA)
  • Heat Treatments In General, Especially Conveying And Cooling (AREA)

Abstract

Provided is a method for manufacturing a blasting material for shot peening with which a reliably high level of hardness can be achieved while preventing an increase in the material cost. Quenchable steel is used as a material in a blasting material manufacturing step (S10). After granules (4) which are quenched by means of a water atomization method are formed in a quenching step (S20), the granules (4) are tempered inside a heating furnace (5) at a prescribed temperature (from 130-230° C., and preferably from 160-230° C.) For a prescribed amount of time in a tempering step (S30). A work hardening treatment is applied in a work hardening step (S40) wherein the granules (4) are blasted/bombarded onto a target material (7) to apply stress to the granules (4) using an apparatus for shot peening (6).

Description

  • The present invention relates to a method for manufacturing projection materials for a shot peening.
  • BACKGROUND OF THE INVENTION
  • Conventionally, it is well known that a shot peening processing for improving the fatigue strengths of parts, e.g., a gear, a shaft, and so on, of an automobile, imparts a compression residual stress on surfaces of the parts by projecting hard particles.
  • In recent years, a need for a light automobile has caused a request for downsizing its parts such that a further improvement of the fatigue strength of the parts has become necessary. Therefore, the field of shot peening processing has provided motivation for finding a technique to manufacture projection materials having a higher hardness.
  • Further, the field of shot peening processing has motivated a technique for adjusting and managing the hardness of the projection materials to more stably ensure the quality the projection materials.
  • Although, e.g., a ceramic, an amorphous metal, and a WC composition metal, as projection materials having a high hardness are available and are used, the costs of these material are impractically high.
  • Further, with only quenching and tempering exemplified as techniques to improve the hardness of a steel material whose cost is relatively lower, there is a limit to how much the material will harden, and thus it is difficult to make the material hard.
  • Conventionally, to solve the above problem, a method for manufacturing metal shots as disclosed in Patent Literature 1 is known. The method includes the steps of projecting and hitting shots having a hardness that is the same as or more than that of the metal shots to be manufactured to project to the surface of the metal shots, so as to cause a localized rise of the high temperature near the surface layer of the metal shots to a temperature more than a predetermined temperature and rapidly cooling the metal shots to improve the fatigue strength.
  • With this method disclosed in Patent Literature 1, the hardness of the surface of the metal shots can be improved. Further, while repeating the step of projecting the shots against the metal shots, the temperature of the metal shots is increased above the predetermined temperature thereby resulting in a quenching of the heat. It also results in an effect of tempering the metal shots when the temperature is decreased to below the predetermined temperature. Thus, the toughness of the metal shots can also be improved.
  • However, repeating the step of projecting the shots against the metal shots often involves improving the toughness of the metal shots. Therefore, because the toughness of all the metal shots is insufficiently controlled, there is a disadvantage in that the above method is unsuitable to a stable control of mass-produced metal shots. Further, it is difficult to achieve a sufficiently high hardness using low-cost materials when the method, e.g., as disclosed in Patent Literature 1, is applied.
    • [PATENT LITERATURE 1] Japanese Patent Laid-open Publication No. Tokkaihei 8[1996]-3633
    DISCLOSURE OF THE INVENTION The Problem to be Solved by the Invention
  • One object of the present invention is to provide a method for manufacturing projection materials for shot peening, to achieve a sufficiently high hardness with a lower cost for the materials.
  • The Means to Solve the Problem
  • The method of claim 1 is a method for manufacturing projection materials for shot peening, the method comprising the following steps: quenching the projection materials by rapidly cooling them; tempering the projection materials at a predetermined temperature of the tempering; work hardening the projection materials by imparting a stress on them; wherein steel is used as the raw material for the projection materials.
  • It is preferable, as recited in claim 2, that the predetermined temperature of the tempering be set as within the range of from 130° C. or more to 230° C. or less.
  • It is preferable, as recited in claim 3, that the predetermined temperature of the tempering be set within the range of from 160° C. or more to 230° C. or less.
  • The Advantages of the Invention
  • With the present invention, a sufficiently high hardness can be achieved, while the costs of the materials is lowered.
  • The above characteristics and others, and the advantages, will be further clarified by the following detailed explanation. It refers to the contained drawings.
  • BRIEF DESCRIPTION OF THE FIGURES
  • FIG. 1 illustrates the type of usage of the projection materials for shot peening of the present invention.
  • FIG. 2 is a flowchart of the process for manufacturing the projection materials for shot peening of the present invention.
  • FIG. 3 is a schematic diagram of the quenching process of the present invention.
  • FIG. 4 is a schematic diagram of the tempering process of the present invention.
  • FIG. 5 is a schematic diagram of the work hardening process of the present invention.
  • FIG. 6 illustrates the relationships between the tempering temperatures, the hardness after the tempering process, and the hardness after the work hardening process, when the tempering temperatures are varied in the tempering process.
  • FIG. 7 illustrates the values of the compression residual stresses that are imparted on the workpieces to be shot peened, when the shot peening processes are carried out using the projection materials that are manufactured by the process for manufacturing the projection materials for shot peening of the present invention. FIG. 7 also illustrates reference projection materials for a comparison.
  • THE BEST MODE TO CARRY OUT THE INVENTION
  • Below the one embodiment of the projection materials for the shot peening process (hereafter, “the projection materials”) 1 of the present invention will be explained with reference to FIG. 1.
  • The projection materials 1 are shot particles of steel having a predetermined particle size. The projection materials 1 are projected by an apparatus for shot peening 2 to a target component 3 such that the projection materials 1 collide with the target component 3 to impart a compression residual stress to the surface of the target component 3 so as to improve its fatigue strength.
  • The apparatus for shot peening 2 is configured to project the projection materials 1 by, for instance, the centrifugal force caused by compressed air or rotary blades. The apparatus for shot peening 2 projects the projection materials 1 at a predetermined velocity at the target component 3, located at a position a predetermined distance from the apparatus for shot peening 2.
  • The target component 3 is a workpiece to be shot peening by the projection materials 1. The projection materials 1 are projected at and collide with the target component 3 by means of the apparatus for shot peening 2 such that compression residual stress is imparted on the surface of it. The target component 3 includes, but is not limited to, for instance, a component of an automobile such as a gear or a shaft.
  • Now a process S10 for manufacturing the projection materials 1 will be explained with reference to FIGS. 2-5.
  • As shown in FIG. 2, the process 810 for manufacturing the projection materials includes a quenching process S20, a tempering process S30, and a work hardening process S40.
  • As shown in FIG. 3, the quenching process S20 is a process of thermal treatment using “a water atomization” in which steel materials as raw materials to constitute the projection materials are sprayed into water in a molten phase (or molten-metal phase), to obtain quenching granular particles, each having a predetermined diameter.
  • In the quenching process S20, the steel material having a quenching property is used as materials to be granulated. This steel is sprayed into water in a molten phase, i.e., the molten steel having an austenite structure such that the molten steel can be quenched (“quenching”) and become a martensite structure. The steel material to constitute the projection materials 1 is formed as granular particles 4, each having a predetermined particle-diameter throughout the quenching process S20. The hardness of them is enhanced by the quenching. Further, the toughness of the granular particles 4 is degraded.
  • The quenching process S20 is not limited to the process with the water atomization, but it may instead be a process to obtain quenched granular particles using the molten-metal materials such as gas atomization and disk atomization, or a quenching process that is carried out by a rapid quenching.
  • As shown in FIG. 4, the tempering process S30 is a thermal treatment in which the granular particles 4 formed by the quenching process S20 are heated in a heating furnace 5 for a predetermined period, and then are slowly cooled.
  • In the tempering process 530, the quenched granular particles 4 are tempered by heating them in the heating furnace 5, which can be controlled to maintain a constant predetermined temperature in the furnace (from 130° C. or more to 230° C. or less, more preferably, from 160° C. or more to 230° C. or less), and for a predetermined period.
  • Such tempering using a relatively low temperature causes a condition in which the residual austenite structure (“the residual austenite”) that still remains without a martensite transformation during the quenching process also still remains after the tempering. Further, the tempering process S30 enhances the toughness of the granular materials 4 that once have been degraded by the quenched process 520.
  • The tempering process 530 is not limited to the process to heat the granular particles in the heating furnace 5, but it may instead be a process in which the tempering is carried out at a predetermined temperature. In view of achieving the sufficient toughness of the granular particles 4 and thus the projection materials 1 to ensure their sufficient fatigue life, it is desirable that the tempering be carried out at a temperature that is the same as or above the temperature (130° C.) to obtain a sufficient effect from the tempering.
  • As shown in FIG. 5, the work hardening process S40 is a modifying treatment in which the granular particles 4 that have been tempered by the tempering process S30 are repeatedly projected at a target material 7 using the apparatus for shot peening 6, to enhance the harnesses of the granular particles 4.
  • In the work hardening process S40, the granular particles 4 that have been tempered are projected at the target material 7. It has a hardness that is the same as or above that of the granular particles 4, using the apparatus for shot peening 6 under the predetermined projection-conditions such as the predetermined velocity and the predetermined distance such that the granular particles 4 collide with the target material 7, to hardening treat the surface of each granular particle 4.
  • In this process, the residual austenite within each granular particle 4 is modified and caused to form a martensite formation such that the hardness of each granular particle 4 can be further enhanced. Repeating the projection of the granular particles 4 a predetermined number of times (or a predetermined period), granular particles 4 can be obtained that have been sufficiently modified and thus hardened.
  • The projection conditions such as the predetermined velocity and the predetermined distance in the work hardening process S40 can be appropriately varied based on such data as the particle size and the mass of each granular particle 4.
  • The work hardening process S40 is not limited to the process to impart impact forces on the granular particles 4 by projecting them to collide with the target material 7 using the apparatus for shot peening, but it may instead be a process in which the granular particles 4 have plastic deformations and harden by applying a predetermined stress thereon.
  • The granular particles 4 that undergo the quenching process S20, the tempering process S30, and the work hardening process S40, in this order, as above described, are used as the projection materials 1 to be projected at the target components 3 and to collide with it using the apparatus for shot peening 2 in the shot peening process.
  • As described above, the process S10 for manufacturing the projection materials uses steel materials having quenching properties as the raw materials. The quenching process S20 forms the granular particles 4 that have been quenched by the water atomization. The tempering process 530 then quench-anneals the granular particles 4 by heating them in the heating furnace 5 at the predetermined temperature and for the predetermined period. The work hardening process S40 then projects the granular particles 4, at and collide with, the target material 7 using the apparatus for shot peening 6 such that the granular particles 4 are modified and hardened by applying the stress thereon to induce the plastic formation. As a result, a sufficiently high-hardness of the projection materials 1 can be achieved, while their costs are lowered.
  • Further, by using the projection materials 1 that have been sufficiently modified and hardened during the work hardening process 540 with the shot peening process, variations in the hardness of the projection materials 1 during the shot peening process can be carried out with stable qualities.
  • Below the transitions in the hardness of the granular materials 4 when the tempering temperature is varied in the tempering process S80 will be explained with reference to FIG. 6. In FIG. 6, the lateral axis indicates the tempering temperature (° C.) and the longitudinal axis indicates the hardness (Hv).
  • FIG. 6 illustrates the relationships between the tempering temperatures T, the hardness H1 of the granular particles 4 after the tempering process, and the hardness H2 of the granular particles 4 after the work hardening process, when the tempering temperatures are varied in the tempering process S30. In particular, FIG. 6 illustrates the results of the hardness H1 after the tempering process and hardness H2 after the work hardening process measured by means of adequate measuring equipment for specimens B1 through B5.
  • These specimens B1 through B5 were treated by the tempering process at different temperatures for the tempering, and were then treated by a work hardening process similar to the work hardening process S40.
  • Below the sequential treatments that are applied to the specimens B1 through B5 are summarized.
  • The tempering process is applied on all specimens B1 through B5. They are made from steel and are granulized using the water atomization such that each granular particle has a mean granular diameter of 70 μm.
  • Specimens B1 through B5 are treated by the tempering process at a different temperatures for each specimen (B1: 150° C., B2: 180° C., B3: 230° C., B4: 250° C., and B5: 290° C.).
  • All specimens B1 through B5 are appropriately treated by the work hardening process using an apparatus for shot peening of an air-pressure type. The projection conditions are as follows: 0.12 MPa for the air-pressure, 1.3 m3/min for the flow rate, 2.2 kg/min for the weight of the projection materials, SK3 quenching for the material of the target, and 15 mm for the distance of the projection.
  • As shown in FIG. 6, the hardness of all specimens B1 through B5 can be improved by the work hardening process after the tempering process. This is because specimens B1 through B5 cause plastic deformations by applying stresses to them so as to harden them, in this process. The residual austenite within the specimens B1 through B5 during the tempering process is modified and induced to form a martensite formation in the work hardening process.
  • As shown in FIG. 6, for specimens B4 and B5, they are tempered at the conventional range of the tempering temperatures (from 250° C. or more to 290° C. or less), the hardness H1 after the tempering process is on the order of Hv 650 to Hv 700, and the hardness H2 after the work hardening process is on the order of Hv 700 to Hv 800. In contrast, fray specimens B1, B2, and B3 those are tempered at the range of the tempering temperatures (from 130° C. or more to 230° C. or less) of the present invention, and the hardness H1 after the tempering process is on the order of about Hv 650 to Hv 800, and the hardness H2 after the work hardening process is Hv 850 or more, such that high hardness are achieved. These results are based on the large or small quantities of the residual austenite within the specimens.
  • Namely, these results are based on high or low temperatures (or large or small degrees) used for the tempering in the tempering process.
  • As described above, for specimens B1, B2, and B3, a hardness of Hv 850, which is a significantly high hardness for projection materials made of the steel, can be achieved. In particular, Hv 950 can be achieved for specimens B1 and B2. This is because by enhancing the hardness by the work hardening process, as well as by enhancing the hardness by tempering at a relative low-temperature such that a large amount of the austenite structure still remains after the tempering process, this residual austenite is modified and induces the martensite formation in the work hardening process.
  • As seen in FIG. 6, the hardness after the work hardening process has a tendency to increase, if the temperature is as low as the tempering temperature T. To achieve the primary advantage that enhances the toughness, however, it is necessary that the tempering process be carried out at 130° C. or more. Further, in view of ensuring the repeated use as projection materials 1, it is desirable that the tempering is carried out at a temperature of 160° C. or more.
  • To this end, the present invention employs a preferable range of the tempering temperature of 230° C. or less to ensure achieving Hv 850 or more (i.e., “the high hardness” in the specification), as the hardness H2 after the work hardening process, in the tempering process S30.
  • Further, the tempering temperature in the tempering process S30 can be selected based on the desired hardness of the projection materials 1 manufactured by the manufacturing process S10 for manufacturing the projection materials. (For instance, if one wishes to obtain the desired hardness of Hv 950 or more, the tempering temperature is 130° C. to 180° C.) In other words, the hardness of the projection materials 1 can be adjusted by controlling the tempering temperature in the tempering process S30.
  • Below an advantage that is gained by projecting the projection materials 1 manufactured by the manufacturing process S10 of the present invention at the target component 3 using the apparatus for shot peening 2 will be explained in reference to FIG. 7. In FIG. 7, the lateral axis indicates the depth (μm) from the surface of the target component 3, and the longitudinal axis indicates the compressed residual stress (MPa).
  • FIG. 7 illustrates the results measured of the compressed residual stress that is imparted to the target component 3 and are measured under the conditions that are shown in Table 3, when projection materials E1 through E4, which are shown in Table 1, are projected at the target component 3, using the apparatus for shot peening 2, under the projection conditions shown in Table 2.
  • TABLE 1
    Mean Hardness of the
    granular-diameters projection
    Materials (μm) Materials
    E1: Steel (tempering at 180° C.) 70 Hv 950
    E2: Steel (tempering at 230° C.) 70 Hv 850
    E3: Ceramic (Zirconium) 70 Hv 1,000
    E4: Steel (untreated by the 70 Hv 650
    work hardening process)
  • As shown in Table 1, the projection materials E1 are manufactured by the manufacturing process S10 for manufacturing the projection materials of the present invention. The tempering temperature in the tempering process S30 is 180° C. The projection materials E2 are manufactured by the manufacturing process 510 used in the present invention with the tempering temperature in the tempering process S30 being as 230° C. The projection materials E2 are made of ceramic that has a high hardness. The projection materials E4 are made of steel. They have been treated only by the quenching and the tempering, and not by the work hardening process.
  • TABLE 2
    Employed Equipment Machine apparatus for shot peening of
    Air-pressure type
    Air Pressure 0.2 MPa
    Mixing Ratio 2
    Target Material SCM420 Carburized, Quenched, and
    Tempered Material
    Distance of Projection 150 mm
  • TABLE 3
    Equipment to measure compressed residual stress: PSPC
    (position-sensitive proportional counter) X-ray stress analyzer
    (manufactured by Rigaku Corporation)
    X-ray Cr—Kα
    Voltage of Tube 40 kV
    Current of Tube 20 mA
    Method of Measurement Parallel and Inclined (at 0°, 15°, 30°,
    and 45°)
    Diffraction Plane AFe(211)
    Diffraction Angle 156.4°
    Stress Constant −318 MPa/degee
    Field Measured Field of 2φ
    Depth Measured Adjustment by Electropolishing
  • As shown in FIG. 7, one case in which the projection materials E1 are used indicates the value of the compressed residual stress that equals that of the case in which the projection materials E3 are used. Namely, it will be understood that when steel having a relative low-cost is used it can improve the fatigue strength to equal that of the ceramic projection materials that have a relatively high cost, about two times over the cost of the steel projection materials.
  • This is because a large quantity of the residual austenite can remain by tempering the projection materials with a range of relatively low temperatures, in the tempering process S30. Namely, because the residual austenite is modified caused to form a martensite formation during the work hardening process S40, the hardening is caused by the transition of the metal structure, as well as being caused by plastic deformations by imparting stresses to the projection materials.
  • Further, another case in which projection materials E2 (see FIG. 6), whose hardness is lower than that on an order of Hv 950 of the projection materials E1, but still is of a high hardness an as order of Hv 850 are used. A comparison with the projection materials E1 indicates that the imparted value of the compressed residual stress is somewhat less than that of the projection materials E1. The projection materials E2 thus do not achieve the merit of work hardening that equals those of projection materials E1 and E3. However, in comparison with projection materials E4, projection materials E2 can be imparted with a sufficiently large-value for the compressed residual stress, namely, about 1.5 times that of the projection materials E4. Clearly, the projection materials E2 provide an advantage that is substantially the same as that of the projection materials E1.
  • In view of ensuring the quality of the target component 3, A is important to know the projected quantities of the projection materials based on, e.g., the number of shot-particles. If a predetermined projected quantity of the projection materials to achieve the desired fatigue strength is set, and if the projected quantity of the projection materials, in the shot peening process, has still not been achieved, it is determined that the desired fatigue strength has not been obtained.
  • To this end, the number of shot particles of the steel projection materials E1, E2, and E4 can be readily counted by, e.g., an appropriate magnetometer, to measure the magnetisms of the magnetized shot particles. In contrast, for the ceramic projection materials, such as E3, it is difficult to count the number of shot particles, and thus specialized measurement-equipment to allow such a counting is necessary.
  • Therefore, although the projection materials E1 are composed of a steel that is a relatively low cost material, they can achieve an enhanced fatigue-strength that is substantially same as that of the ceramic projection materials E3, and they can also advantageously and readily control the qualities in the shot peening process.
  • Although the specified embodiments of the present invention have been explained, it will be understood that they are not intended to limit the scope of the present invention. Those skilled in the art will understand that various variations and modifications may be made without departing from the spirit and scope of the invention.
  • The use of any and all examples, or exemplary language (e.g., “such as”) provided herein, is intended merely to better illuminate the invention, and does limit the scope of the invention, unless otherwise claimed.

Claims (3)

1. A method for manufacturing projection materials for a shot peening, the method comprising the steps of
quenching the projection materials by rapidly cooling them;
tempering the projection materials at a predetermined temperature for the tempering;
work hardening the projection materials by imparting a stress on them;
wherein the steel is used as raw materials for the projection materials.
2. The method recited in claim 1, wherein the predetermined temperature of the tempering is to be set within a range of from 130° C. or more to 280° C. or less.
3. The method recited in claim 1, wherein the predetermined temperature of the tempering is to be set within a range of from 160° C. or more to 230° C. or less.
US13/131,566 2008-11-26 2009-11-24 Method for manufacturing projection materials for a shot peening Abandoned US20120085469A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2008301718 2008-11-26
JP2008301718A JP5381045B2 (en) 2008-11-26 2008-11-26 Method for producing shot peening projection material
PCT/JP2009/069794 WO2010061816A1 (en) 2008-11-26 2009-11-24 Method for manufacturing blasting material for shot-peening

Publications (1)

Publication Number Publication Date
US20120085469A1 true US20120085469A1 (en) 2012-04-12

Family

ID=42225690

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/131,566 Abandoned US20120085469A1 (en) 2008-11-26 2009-11-24 Method for manufacturing projection materials for a shot peening

Country Status (8)

Country Link
US (1) US20120085469A1 (en)
EP (1) EP2363243B1 (en)
JP (1) JP5381045B2 (en)
KR (1) KR101482619B1 (en)
CN (1) CN102264512B (en)
BR (1) BRPI0920963B1 (en)
PL (1) PL2363243T3 (en)
WO (1) WO2010061816A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114473887A (en) * 2022-02-14 2022-05-13 良启金属南通有限公司 Shot blasting material and shot blasting device suitable for shot blasting material

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102049520A (en) * 2010-11-29 2011-05-11 南陵鹏程机械制造有限公司 Extraction method of environment-friendly and energy-saving steel grit
KR101273076B1 (en) 2011-09-29 2013-06-10 에스엘 주식회사 Double reflecting structure
CN103045830B (en) * 2013-01-15 2015-01-07 西安交通大学 Surface shot blasting process for improving high temperature steam oxidization resistance of high-chromium austenite steel
JP5723942B2 (en) * 2013-09-18 2015-05-27 株式会社不二機販 Surface treatment method for powdered metal materials
FR3029438B1 (en) * 2014-12-05 2019-06-21 Winoa METHOD FOR MANUFACTURING SCRATCHES COMPRISING THERMO-CHEMICAL TREATMENT OF SUPERFICIAL ENRICHMENT OF CARBON GRANULES
KR101828288B1 (en) * 2016-12-23 2018-02-12 주식회사 포스코 Shot ball and manufacturing method threrof
JP7107327B2 (en) * 2019-01-16 2022-07-27 Jfeスチール株式会社 Press-molded product manufacturing method and press-molded product
CN111168577A (en) * 2020-01-14 2020-05-19 诸暨市领诚信息技术有限公司 Surface treatment method for copper processing product material

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040140017A1 (en) * 2000-11-09 2004-07-22 Branagan Daniel J. Hard metallic materials

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB729704A (en) * 1953-03-18 1955-05-11 Fischer Ag Georg Improvements in or relating to metallic blasting agents
JP2619339B2 (en) * 1990-03-30 1997-06-11 トヨタ自動車株式会社 Manufacturing method of iron-based shot grains
JP3379824B2 (en) * 1994-06-14 2003-02-24 株式会社不二機販 Method of manufacturing surface hardened metal shot
JP2003191166A (en) * 2001-12-26 2003-07-08 Sintokogio Ltd Method for improving metal mold serviceable life and metal mold
JP2005187850A (en) * 2003-12-24 2005-07-14 Sanyo Special Steel Co Ltd Method for producing high strength machine component
JP2005256143A (en) * 2004-03-15 2005-09-22 Sanyo Special Steel Co Ltd Method for producing high surface pressure component using hyper-eutectoid steel
JP4710577B2 (en) * 2005-12-05 2011-06-29 セイコーエプソン株式会社 Powder for grinding, method for producing powder for grinding and grinding method
JP2007239880A (en) * 2006-03-08 2007-09-20 Ntn Corp Power transmission shaft and its manufacturing method
US20100322816A1 (en) * 2008-02-28 2010-12-23 Yuji Kobayashi Raw material for shot-peening materials, finished wire, method of manufacturing shot-peening materials, and shot-peening materials

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040140017A1 (en) * 2000-11-09 2004-07-22 Branagan Daniel J. Hard metallic materials

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114473887A (en) * 2022-02-14 2022-05-13 良启金属南通有限公司 Shot blasting material and shot blasting device suitable for shot blasting material

Also Published As

Publication number Publication date
JP2010125548A (en) 2010-06-10
EP2363243A4 (en) 2014-10-15
KR20110099105A (en) 2011-09-06
BRPI0920963B1 (en) 2020-10-13
CN102264512B (en) 2015-06-17
EP2363243B1 (en) 2015-09-02
EP2363243A1 (en) 2011-09-07
BRPI0920963A2 (en) 2017-07-11
JP5381045B2 (en) 2014-01-08
WO2010061816A1 (en) 2010-06-03
KR101482619B1 (en) 2015-01-14
PL2363243T3 (en) 2015-12-31
CN102264512A (en) 2011-11-30

Similar Documents

Publication Publication Date Title
US20120085469A1 (en) Method for manufacturing projection materials for a shot peening
US8151613B2 (en) Method for shot peening
Soyama et al. Fatigue strength improvement of gears using cavitation shotless peening
Wang et al. Effect of shot peening on the microstructure of laser hardened 17-4PH
JP2014519557A (en) Surface treatment of metal parts
JPH1029160A (en) Highly hard metal product shot peening method and highly hard metal product
Da Silva et al. Influence of retained austenite on short fatigue crack growth and wear resistance of case carburized steel
JP6658772B2 (en) Cast steel projectile
Avcu et al. Dry sliding wear behaviour of shot peened TI6AL4V alloys at different peening times
US10883152B2 (en) Dynamically impacting method for simultaneously peening and film-forming on substrate as bombarded by metallic glass particles
Sawada Effect of young’s modulus of shot peening media on surface modification behavior by micro shot peening
JP2001079766A (en) Projection material for shot peening
JPH02228448A (en) High strength and high toughness steel shot
JPH08267167A (en) Production of cast iron gear
Gao et al. Influence of mechanical surface treatments on fatigue property of 30CrMnSiNi2A steel
JPH0360977A (en) Metallic grain for shot machining
Tosha Effect of shot peening on surface texture and surface integrity
JPS597325B2 (en) Method of manufacturing cast steel shot
JP5790656B2 (en) Shot peening method
Krylova et al. The Properties of Nonvacuum Electron Beam Melted Composite Coating after Thermal Treatment
Zhang et al. Comparison of the effects of induction heating composite shot peening and conventional shot peening on residual stress, microhardness, and microstructure of 20CrMnTi gear steel
Harada et al. Effect of microshot peening on residual stress of high-toughness spring steel
CN108220819A (en) A kind of Super-high Manganese antifriction alloy steel panel
Harada et al. Effect of shot peening on surface chracteristics of carbon steel with different heat treatments
JP2004122332A (en) Shot-peening method

Legal Events

Date Code Title Description
AS Assignment

Owner name: SINTOKOGIO, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MITSUBAYASHI, MASAHIKO;KANAZAWA, TAKAAKI;ISHIKAWA, MASAYUKI;REEL/FRAME:027441/0597

Effective date: 20110417

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION