US20120037334A1 - Method for the production of a multiplicity of structural parts comprised, in particular, of titanium aluminide and device for carrying out the same - Google Patents

Method for the production of a multiplicity of structural parts comprised, in particular, of titanium aluminide and device for carrying out the same Download PDF

Info

Publication number
US20120037334A1
US20120037334A1 US13/280,581 US201113280581A US2012037334A1 US 20120037334 A1 US20120037334 A1 US 20120037334A1 US 201113280581 A US201113280581 A US 201113280581A US 2012037334 A1 US2012037334 A1 US 2012037334A1
Authority
US
United States
Prior art keywords
shell mold
crucible
casting
shell
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/280,581
Inventor
Pavel Seserko
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US13/280,581 priority Critical patent/US20120037334A1/en
Publication of US20120037334A1 publication Critical patent/US20120037334A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D23/00Casting processes not provided for in groups B22D1/00 - B22D21/00
    • B22D23/006Casting by filling the mould through rotation of the mould together with a molten metal holding recipient, about a common axis

Definitions

  • the invention relates, on the one hand, to a method for the production of a multiplicity of structural parts comprised, in particular, of titanium aluminide, in which a melt of the material of which the structural parts are to be comprised is introduced into shell molds, which are reproductively negative with respect to the structural parts, and these, after the solidification of the melt, are removed.
  • Typical structural parts, which are produced according to such method are, for example, turbine buckets or wheels for turbochargers.
  • the procedure in principle, is as follows. As large a number of shell molds as possible is combined into a tree, in that, first, a positive mold of wax is produced, which reproduces the individual structural parts as well as also the infeed channels.
  • the negative mold serves for generating a multishell mold of ceramic, which includes a central inlet connecting piece and with which a number of structural parts, corresponding to the number of individual shell molds in the multishell mold, can be generated in one casting.
  • To fill these multishell molds a relatively large quantity of material is melted and introduced into the multishell mold.
  • the invention therefore addresses the problem of providing a casting method, which is above all suitable for the production of structural parts of intermetallic compounds and which, moreover, makes possible the cost-effective mass production of structural parts independently of the particular material utilized.
  • the invention provides that the shell molds are supplied individually to a casting apparatus at a predetermined work cycle and that the melts are in each instance generated at the required time and concurrently at the same work cycle from a size corresponding to an ingot in that quantity which is required for filling a shell mold.
  • the invention consequently becomes distinct from the concept of simultaneously casting a multiplicity of structural parts and moves to a single piece line concept, in which the shell molds are filled out at a clocked rate, wherein the particular melt quantity is made available at such time.
  • the melt can reach the shell mold on a short path, such that partial solidification cannot even occur on the path to the shell mold.
  • the reject rates are thereby considerably decreased.
  • the shell molds Since the shell molds must only reproduce the structural part and not the infeed channels to the shell mold, the consumption of ceramic or of the casting materials is markedly reduced, such that here also a reduction of the cost of the piece number can be expected.
  • the recommended clock time of the facility should be approximately 1 minute or less per structural part. According to the invention this is possible since:
  • the invention preferably provides that the crucibles are only of the appropriate size.
  • Such crucibles which are comprised of a low quantity of crucible material, can be rapidly heated, such that here also no unnecessary energy waste occurs.
  • the crucibles are preferably used only once, such that possibly occurring contaminations are not transferred to the next melt.
  • the invention therefore provides that the melt is not poured in a jet, but rather is plunged into the shell mold.
  • the shell mold is placed upside down onto the margin of the crucible tilled with the melt, such that the crucible and shell mold enclose a common cavity, and that subsequently the arrangement of crucible and shell mold is rotated about a horizontal axis by more than 90°, preferably by 180°.
  • the molten material plunges or falls into the shell mold, wherein the melt by its own weight and the absorbed free-fall energy reaches the shell mold with active force and neatly fills even the smallest outformings in the shell mold.
  • the shell molds can be implemented as lost shell molds, which are supplied at a clocked rate to the casting apparatus and removed again after they have been filled.
  • Such shell molds are preferably comprised of a ceramic.
  • the shell molds as two-part permanent molds. This lends itself especially when the solidification occurs relatively rapidly, quasi at the predetermined clock of the casting apparatus. In this case, after the solidification, the permanent mold only needs to be opened such that the solidified structural part falls out. Should the solidification take more time than a possible work cycle, two or three permanent molds can also be used alternately.
  • the invention further relates to a device for carrying out the previously described method.
  • the device is characterized thereby that it is comprised of a casting chamber, in which a crucible with molten material and a shell mold are made available at a clocked rate, which, furthermore, includes a casting means in order to join crucible and shell mold such, that the shell mold after its inversion rests on the crucible margin, and which is cable of tilting the crucible together with the shell mold about a horizontal axis by more than 90°, preferably by 180°.
  • crucible and shell mold are “married” to one another in the casting chamber, subsequently inverted, such that the melt is transferred to the shell mold, and subsequently separated again. It is critical that the process is repeated at a clocked rate, such that a multiplicity of structural parts can be generated in a process which is constant and identical. Since the process itself is very simple and functions in relatively simple manner, breakdowns in the sequence are not to be expected.
  • the invention provides that the casting chamber is directly preceded by a melting chamber, into which a crucible, provided in each instance with an ingot, is introduced at a clocked rate and exposed to a melting energy which melts the ingot.
  • a melting chamber into which a crucible, provided in each instance with an ingot, is introduced at a clocked rate and exposed to a melting energy which melts the ingot.
  • the crucible is transferred from the melting chamber into the casting chamber and can be joined with the shell mold in the previously described manner.
  • an induction heater is preferably provided, which is provided in the melting chamber and into which the crucibles are immersed at a clocked rate.
  • the casting chamber in this case includes an infeed means by means of which the shell molds are supplied at a clocked rate.
  • the shell molds can also be provided in the casting chamber.
  • the casting chamber can be laid out as a vacuum chamber, which in this case is provided with appropriate locks.
  • the casting means can be provided with a heating means, with which the crucible and/or shell molds are heated until the casting.
  • FIG. 1 a fundamental depiction of a facility with which the method according to the invention can be carried out
  • FIG. 2 the joining of the crucible with a shell mold in a holder.
  • FIG. 1 Firstly, reference is made to FIG. 1 .
  • the center of the facility is formed by a casting chamber 1 , which optionally includes a vacuum connection 2 such that the pouring takes place under vacuum.
  • a casting chamber 1 which optionally includes a vacuum connection 2 such that the pouring takes place under vacuum.
  • a further lock 5 Through this casting chamber 1 pass shell molds 3 in one direction at a clocked rate, which molds are supplied on the one side to the casting chamber 1 via a lock 4 , and, on the other side, are fed out via a further lock 5 .
  • Transversely thereto crucibles 6 are guided through the casting chamber 1 , wherein the crucibles 6 filled with an ingot are supplied to the casting chamber 1 via a third lock 7 , which simultaneously serves as melting chamber, and via a fourth lock 9 are removed from the casting chamber 1 after they have been emptied.
  • the first lock 4 for shell molds can also be implemented as a heating chamber in order to preheat the shell molds.
  • Melting the material in the melting chamber 7 preferably takes place by means of an induction heater, which is not further shown here, which, however, is part of prior art and is generally known to a person of skill in the art.
  • Shell molds 3 and crucibles 6 are transported on transport sections, each of which work at a clocked rate.
  • one crucible 6 and one shell mold 3 each are brought together in the manner shown in FIG. 2 .
  • robots or manipulation apparatus not further shown here, are available, which set the shell mold 3 after inversion onto a crucible 6 , such that a common cavity 10 is formed.
  • the melt 11 In the crucible 6 is located the melt 11 , which is precisely sufficient to fill the shell mold 3 .
  • the shell mold 3 is herein precisely of such size as to reproduce the structural part.
  • An infeed channel 12 is kept as short as possible.
  • a frame 15 which is indicated schematically in FIG. 2 and which includes projections 16 , 17 which, on the one side, are stayed on the head of the shell mold 3 or on the bottom of the crucible 6 .
  • the frame 15 is optionally provided with heating coils 18 which are disposed around the crucible 6 as well as also around the shell mold 3 and which are intended to hold the arrangement at a suitable casting temperature.
  • the frame 15 is rotated about a horizontal axis 20 , which, for example, extends through the connection between shell mold 3 and crucible 6 . After a rapid rotation about 180°, the shell mold 3 is disposed beneath the crucible 6 , such that the melt 11 plunges into the shell mold 3 .
  • the manipulation means subsequently separates the emptied crucible 6 and the filled shell mold 3 and transports these through the second or fourth lock 5 , 9 out of the casting chamber 1 , such that in the next cycle a new shell mold 3 and a new crucible 6 can be introduced into the casting chamber 1 for filling out the shell mold.
  • a permanent shell mold can also be utilized, which is preferably of two parts.
  • an opening with a lock through which opening the solidified structural part can fall after the shell mold 3 is opened.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacture And Refinement Of Metals (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)
  • Crucibles And Fluidized-Bed Furnaces (AREA)
  • Powder Metallurgy (AREA)
  • Catalysts (AREA)
  • Continuous Casting (AREA)
  • Manufacture Of Alloys Or Alloy Compounds (AREA)
  • Inorganic Compounds Of Heavy Metals (AREA)

Abstract

The invention relates to a method and to a device for carrying out this method, during which the shell molds are filled with a melt, a clocked manner, the respectively required amount of melt being currently provided at the same time. The casting process ensues by marrying the crucible which is filled with a melt with a shell mold so that the crucible and shell mold form a common cavity and this arrangement is subsequently titled 180° C. so that the melt falls into the shell mold.

Description

  • The invention relates, on the one hand, to a method for the production of a multiplicity of structural parts comprised, in particular, of titanium aluminide, in which a melt of the material of which the structural parts are to be comprised is introduced into shell molds, which are reproductively negative with respect to the structural parts, and these, after the solidification of the melt, are removed. Typical structural parts, which are produced according to such method, are, for example, turbine buckets or wheels for turbochargers.
  • The procedure, in principle, is as follows. As large a number of shell molds as possible is combined into a tree, in that, first, a positive mold of wax is produced, which reproduces the individual structural parts as well as also the infeed channels. The negative mold serves for generating a multishell mold of ceramic, which includes a central inlet connecting piece and with which a number of structural parts, corresponding to the number of individual shell molds in the multishell mold, can be generated in one casting. To fill these multishell molds a relatively large quantity of material is melted and introduced into the multishell mold.
  • This procedure is highly time-consuming and personnel-intensive, since the negative mold must be created manually. Furthermore, a large quantity of ceramic is required for the production of the multishell mold, since such not only needs to reproduce the individual structural parts but also the infeeds. In addition, more casting material is required for filling the multishell mold than is needed for the structural parts themselves, since a portion of the casting material also fills the infeeds. This fraction is lost, which leads to a corresponding increase in the expense of the structural parts, especially in the case of expensive materials such as TiAl.
  • Such an approach is furthermore not suitable for all materials since certain materials already partially solidify on their way through the channels to the individual shell molds. This applies in particular to so-called intermetallic compounds, such as, for example, titanium aluminide, this material, however, being preferred precisely for said structural parts, since it is highly heat-resistant, stable and yet especially light [weight].
  • The invention therefore addresses the problem of providing a casting method, which is above all suitable for the production of structural parts of intermetallic compounds and which, moreover, makes possible the cost-effective mass production of structural parts independently of the particular material utilized.
  • For the solution of the problem the invention provides that the shell molds are supplied individually to a casting apparatus at a predetermined work cycle and that the melts are in each instance generated at the required time and concurrently at the same work cycle from a size corresponding to an ingot in that quantity which is required for filling a shell mold.
  • The invention consequently becomes distinct from the concept of simultaneously casting a multiplicity of structural parts and moves to a single piece line concept, in which the shell molds are filled out at a clocked rate, wherein the particular melt quantity is made available at such time.
  • In this concept the melt can reach the shell mold on a short path, such that partial solidification cannot even occur on the path to the shell mold. The reject rates are thereby considerably decreased.
  • Since the structural parts are produced according to the invention at a clocked rate, quality controls on the individual structural parts can also be performed at a clocked rate and can optionally also be automated, such that the process overall can be better managed and controlled.
  • Since the shell molds must only reproduce the structural part and not the infeed channels to the shell mold, the consumption of ceramic or of the casting materials is markedly reduced, such that here also a reduction of the cost of the piece number can be expected.
  • The recommended clock time of the facility should be approximately 1 minute or less per structural part. According to the invention this is possible since:
    • 1. the structural parts are cast and worked individually,
    • 2. the quantity of material required in each instance corresponds to the volume of the structural part and, consequently, short melting times are realized,
    • 3. a facility for carrying out the method can be built compactly and, consequently, the melt reaches the shell mold on a short path,
    • 4. pouring and solidification occur rapidly, such that only minor reactions of the casting material (in particular TiAl) with the ceramic of the shell mold occur, and
    • 5. the chambers of the facility have small volumes and therewith
    • 6. with the pouring under vacuum short evacuation times are realized.
  • Since, as explained, the particular quantity of melt is provided concurrently at the required time, the invention preferably provides that the crucibles are only of the appropriate size. Such crucibles, which are comprised of a low quantity of crucible material, can be rapidly heated, such that here also no unnecessary energy waste occurs. The crucibles are preferably used only once, such that possibly occurring contaminations are not transferred to the next melt.
  • Especially in the case of intermetallic compounds it is critical that the pouring process is carried out relatively rapidly. The invention therefore provides that the melt is not poured in a jet, but rather is plunged into the shell mold. For this purpose the shell mold is placed upside down onto the margin of the crucible tilled with the melt, such that the crucible and shell mold enclose a common cavity, and that subsequently the arrangement of crucible and shell mold is rotated about a horizontal axis by more than 90°, preferably by 180°.
  • If the rotational movement is carried out rapidly, the molten material plunges or falls into the shell mold, wherein the melt by its own weight and the absorbed free-fall energy reaches the shell mold with active force and neatly fills even the smallest outformings in the shell mold.
  • Since for the plunging only a negligibly short time is required, solidification only sets in after the material is completely within the shell mold.
  • The shell molds can be implemented as lost shell molds, which are supplied at a clocked rate to the casting apparatus and removed again after they have been filled. Such shell molds, as stated above, are preferably comprised of a ceramic.
  • However, it is also possible to consider implementing the shell molds as two-part permanent molds. This lends itself especially when the solidification occurs relatively rapidly, quasi at the predetermined clock of the casting apparatus. In this case, after the solidification, the permanent mold only needs to be opened such that the solidified structural part falls out. Should the solidification take more time than a possible work cycle, two or three permanent molds can also be used alternately.
  • The invention further relates to a device for carrying out the previously described method. The device is characterized thereby that it is comprised of a casting chamber, in which a crucible with molten material and a shell mold are made available at a clocked rate, which, furthermore, includes a casting means in order to join crucible and shell mold such, that the shell mold after its inversion rests on the crucible margin, and which is cable of tilting the crucible together with the shell mold about a horizontal axis by more than 90°, preferably by 180°.
  • Consequently, with the aid of the casting means crucible and shell mold are “married” to one another in the casting chamber, subsequently inverted, such that the melt is transferred to the shell mold, and subsequently separated again. It is critical that the process is repeated at a clocked rate, such that a multiplicity of structural parts can be generated in a process which is constant and identical. Since the process itself is very simple and functions in relatively simple manner, breakdowns in the sequence are not to be expected.
  • In order for the casting material to be kept in the molten state for only a relatively short time, the invention provides that the casting chamber is directly preceded by a melting chamber, into which a crucible, provided in each instance with an ingot, is introduced at a clocked rate and exposed to a melting energy which melts the ingot. As soon as the material is in molten form, the crucible is transferred from the melting chamber into the casting chamber and can be joined with the shell mold in the previously described manner. To melt the ingot, an induction heater is preferably provided, which is provided in the melting chamber and into which the crucibles are immersed at a clocked rate.
  • As already stated, the shell molds can be lost molds. The casting chamber in this case includes an infeed means by means of which the shell molds are supplied at a clocked rate. In the casting chamber, alternatively, one or more two-part permanent shell molds can also be provided.
  • To prevent contamination of the melt, the casting chamber can be laid out as a vacuum chamber, which in this case is provided with appropriate locks.
  • To avoid solidification of the material before the inversion, the casting means can be provided with a heating means, with which the crucible and/or shell molds are heated until the casting.
  • In the following, the invention will be explained in further detail with reference to an embodiment example. In the figures depict:
  • FIG. 1 a fundamental depiction of a facility with which the method according to the invention can be carried out,
  • FIG. 2 the joining of the crucible with a shell mold in a holder.
  • Firstly, reference is made to FIG. 1.
  • The center of the facility is formed by a casting chamber 1, which optionally includes a vacuum connection 2 such that the pouring takes place under vacuum. Through this casting chamber 1 pass shell molds 3 in one direction at a clocked rate, which molds are supplied on the one side to the casting chamber 1 via a lock 4, and, on the other side, are fed out via a further lock 5. Transversely thereto crucibles 6 are guided through the casting chamber 1, wherein the crucibles 6 filled with an ingot are supplied to the casting chamber 1 via a third lock 7, which simultaneously serves as melting chamber, and via a fourth lock 9 are removed from the casting chamber 1 after they have been emptied. The first lock 4 for shell molds can also be implemented as a heating chamber in order to preheat the shell molds.
  • Melting the material in the melting chamber 7 preferably takes place by means of an induction heater, which is not further shown here, which, however, is part of prior art and is generally known to a person of skill in the art. Shell molds 3 and crucibles 6 are transported on transport sections, each of which work at a clocked rate.
  • In the casting chamber 1 one crucible 6 and one shell mold 3 each are brought together in the manner shown in FIG. 2. For this purpose, robots or manipulation apparatus, not further shown here, are available, which set the shell mold 3 after inversion onto a crucible 6, such that a common cavity 10 is formed. In the crucible 6 is located the melt 11, which is precisely sufficient to fill the shell mold 3. The shell mold 3 is herein precisely of such size as to reproduce the structural part. An infeed channel 12 is kept as short as possible.
  • On the shell mold 3 is only provided an offset 13 with a step 14, which just extends beyond the margin of the crucible 6. If necessary, clamps can be provided in order to hold crucible 6 and shell mold 3 firmly together. Suitable for this purpose is, for example, a frame 15, which is indicated schematically in FIG. 2 and which includes projections 16, 17 which, on the one side, are stayed on the head of the shell mold 3 or on the bottom of the crucible 6.
  • The frame 15 is optionally provided with heating coils 18 which are disposed around the crucible 6 as well as also around the shell mold 3 and which are intended to hold the arrangement at a suitable casting temperature.
  • To fill the shell mold 3, the frame 15 is rotated about a horizontal axis 20, which, for example, extends through the connection between shell mold 3 and crucible 6. After a rapid rotation about 180°, the shell mold 3 is disposed beneath the crucible 6, such that the melt 11 plunges into the shell mold 3.
  • The manipulation means subsequently separates the emptied crucible 6 and the filled shell mold 3 and transports these through the second or fourth lock 5, 9 out of the casting chamber 1, such that in the next cycle a new shell mold 3 and a new crucible 6 can be introduced into the casting chamber 1 for filling out the shell mold.
  • Alternatively to the use of a lost shell mold, a permanent shell mold can also be utilized, which is preferably of two parts. In this case at the bottom of the casting chamber 1 is located an opening with a lock, through which opening the solidified structural part can fall after the shell mold 3 is opened.
  • LIST OF REFERENCE NUMBERS
    • 1 Casting chamber
    • 2 Vacuum closure
    • 3 Shell mold
    • 4 Infeed lock
    • 5 Lock
    • 6 Crucible
    • 7 Melting chamber
    • 9 Lock
    • 10 Cavity
    • 11 Melt
    • 12 Infeed channel
    • 13 Offset
    • 14 Step
    • 15 Frame
    • 16, 17 Projection
    • 18 Heating coil
    • 20 Axis

Claims (8)

1-15. (canceled)
16. A device for performing the method as claimed in claim 16, comprising of a casting chamber, in which a crucible with molten material and a shell mold are made available at a clocked rate, wherein a casting means is disposed in the casting chamber, wherein the casting means is capable of joining the crucible and the shell mold such that the shell mold after inversion rests on the margin of the crucible, and which is additionally capable of tilting the shell mold joined with the crucible about a horizontal axis by more than 90E.
17. The device as claimed in claim 16, wherein the casting chamber is preceded by a melting chamber, into which the crucibles filled with an ingot are introduced at a clocked rate and are exposed to an energy source which melts the ingot in the crucible.
18. The device as claimed in claim 16, wherein the melting chamber is provided with an induction heater.
19. The device as claimed in claim 16, wherein the shell mold is a lost mold which is supplied at a clocked rate to the casting chamber via an infeed means.
20. The device as claimed in claim 16, wherein the shell mold is a two-part shell mold which is disposed in the casting chamber.
21. A device as claimed in claim 16, wherein the casting chamber is a vacuum chamber which includes a vacuum connection to which a vacuum facility is connected.
22. A device as claimed in claim 16, wherein the casting means is provided with a heater.
US13/280,581 2005-04-07 2011-10-25 Method for the production of a multiplicity of structural parts comprised, in particular, of titanium aluminide and device for carrying out the same Abandoned US20120037334A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/280,581 US20120037334A1 (en) 2005-04-07 2011-10-25 Method for the production of a multiplicity of structural parts comprised, in particular, of titanium aluminide and device for carrying out the same

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
DE102005015862.5 2005-04-07
DE102005015862A DE102005015862A1 (en) 2005-04-07 2005-04-07 Method for producing a plurality of components, in particular of titanium aluminide, and apparatus for carrying out this method
PCT/DE2006/000616 WO2006105780A2 (en) 2005-04-07 2006-04-06 Method for producing a multitude of components made of, in particular, titanium aluminide, and device for carrying out this method
US88798307A 2007-12-18 2007-12-18
US13/280,581 US20120037334A1 (en) 2005-04-07 2011-10-25 Method for the production of a multiplicity of structural parts comprised, in particular, of titanium aluminide and device for carrying out the same

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
US11/887,983 Division US8042599B2 (en) 2005-04-07 2006-04-06 Method for producing a multitude of components made of, in particular, titanium aluminide, and device for carrying out this method
PCT/DE2006/000616 Division WO2006105780A2 (en) 2005-04-07 2006-04-06 Method for producing a multitude of components made of, in particular, titanium aluminide, and device for carrying out this method

Publications (1)

Publication Number Publication Date
US20120037334A1 true US20120037334A1 (en) 2012-02-16

Family

ID=36930408

Family Applications (2)

Application Number Title Priority Date Filing Date
US11/887,983 Active 2026-11-29 US8042599B2 (en) 2005-04-07 2006-04-06 Method for producing a multitude of components made of, in particular, titanium aluminide, and device for carrying out this method
US13/280,581 Abandoned US20120037334A1 (en) 2005-04-07 2011-10-25 Method for the production of a multiplicity of structural parts comprised, in particular, of titanium aluminide and device for carrying out the same

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US11/887,983 Active 2026-11-29 US8042599B2 (en) 2005-04-07 2006-04-06 Method for producing a multitude of components made of, in particular, titanium aluminide, and device for carrying out this method

Country Status (9)

Country Link
US (2) US8042599B2 (en)
EP (1) EP1877212B1 (en)
JP (1) JP4495770B2 (en)
AT (1) ATE470522T1 (en)
DE (3) DE102005015862A1 (en)
ES (1) ES2346999T3 (en)
PL (1) PL1877212T3 (en)
SI (1) SI1877212T1 (en)
WO (1) WO2006105780A2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8245759B2 (en) 2008-06-06 2012-08-21 GM Global Technology Operations LLC Ladle for molten metal
US8858697B2 (en) 2011-10-28 2014-10-14 General Electric Company Mold compositions
US9011205B2 (en) 2012-02-15 2015-04-21 General Electric Company Titanium aluminide article with improved surface finish
US8932518B2 (en) 2012-02-29 2015-01-13 General Electric Company Mold and facecoat compositions
US8906292B2 (en) 2012-07-27 2014-12-09 General Electric Company Crucible and facecoat compositions
US8708033B2 (en) 2012-08-29 2014-04-29 General Electric Company Calcium titanate containing mold compositions and methods for casting titanium and titanium aluminide alloys
US8992824B2 (en) 2012-12-04 2015-03-31 General Electric Company Crucible and extrinsic facecoat compositions
US9592548B2 (en) 2013-01-29 2017-03-14 General Electric Company Calcium hexaluminate-containing mold and facecoat compositions and methods for casting titanium and titanium aluminide alloys
US9192983B2 (en) 2013-11-26 2015-11-24 General Electric Company Silicon carbide-containing mold and facecoat compositions and methods for casting titanium and titanium aluminide alloys
US9511417B2 (en) 2013-11-26 2016-12-06 General Electric Company Silicon carbide-containing mold and facecoat compositions and methods for casting titanium and titanium aluminide alloys
US10391547B2 (en) 2014-06-04 2019-08-27 General Electric Company Casting mold of grading with silicon carbide

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3237247A (en) * 1963-11-08 1966-03-01 Budd Co Rotational casting apparatus
US5287910A (en) * 1992-09-11 1994-02-22 Howmet Corporation Permanent mold casting of reactive melt
US5334232A (en) * 1990-07-09 1994-08-02 British Telecommunications Public Limited Company Method for the preparation of halide glass articles
US5704413A (en) * 1993-11-30 1998-01-06 Honda Giken Kogyo Kabushiki Kaisha Rotary-mold gravity casting process
US5819837A (en) * 1996-03-01 1998-10-13 Ald Vacuum Technologies Gmbh Process and apparatus for melting and casting of metals in a mold
US20030234095A1 (en) * 2002-06-24 2003-12-25 Denken Co., Ltd. Apparatus for casting dental prosthesis

Family Cites Families (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB633946A (en) 1947-02-10 1949-12-30 Hocking Lothar Norman Improvements in the casting of metals and alloys
GB842158A (en) * 1957-05-07 1960-07-20 Misco Prec Casting Company Process of casting titanium and related metal and alloys and apparatus therefor
US3989088A (en) * 1975-12-29 1976-11-02 Ipco Hospital Supply Corporation (Whaledent International Division) Casting machine and improved control circuit for operation
DE2651842A1 (en) * 1976-11-13 1978-05-24 Degussa Dental casting vessel - contg. heated crucible and mould with heated reservoir to feed mould cavity and eliminate shrinkage cavities
DE2921192C2 (en) * 1979-05-25 1986-02-06 Deutsche Gold- Und Silber-Scheideanstalt Vormals Roessler, 6000 Frankfurt Casting device, in particular vacuum pressure casting device for dental technology
JP2595534B2 (en) * 1987-04-30 1997-04-02 大同特殊鋼株式会社 Method for producing Ti-A alloy castings
IN170880B (en) * 1987-05-07 1992-06-06 Metal Casting Tech
JPH0433768A (en) * 1990-05-25 1992-02-05 Sumitomo Light Metal Ind Ltd Method for casting aluminide
AT399513B (en) * 1990-10-05 1995-05-26 Boehler Edelstahl METHOD AND DEVICE FOR PRODUCING METALLIC ALLOYS FOR PRE-MATERIALS, COMPONENTS, WORKPIECES OR THE LIKE OF TITANIUM-ALUMINUM BASE ALLOYS
EP0530968A1 (en) * 1991-08-29 1993-03-10 General Electric Company Method for directional solidification casting of a titanium aluminide
JP3125394B2 (en) * 1991-12-06 2001-01-15 日本鋼管株式会社 Casting method of titanium-aluminum alloy casting
JP2813764B2 (en) * 1992-03-13 1998-10-22 工業技術院長 Gas pressure casting of active metals
DE4215194C2 (en) * 1992-05-08 1995-06-29 Abb Patent Gmbh Highly heat-resistant material
US5299619A (en) * 1992-12-30 1994-04-05 Hitchiner Manufacturing Co., Inc. Method and apparatus for making intermetallic castings
DE59507205D1 (en) * 1994-06-09 1999-12-16 Ald Vacuum Techn Gmbh Process for producing castings from reactive metals and reusable mold for carrying out the process
JPH08176810A (en) * 1994-12-27 1996-07-09 Kobe Steel Ltd Production of aluminum-high melting point metal alloy ingot and target material
DE19716440C1 (en) * 1997-04-19 1998-08-13 Walter Notar Apparatus for casting metal materials
DE19808552A1 (en) * 1998-02-06 1999-08-12 Herbst Bremer Goldschlaegerei Casting unit for production of dental castings
JP4245212B2 (en) * 1998-12-14 2009-03-25 株式会社デンケン Inverted pressure casting method and apparatus for dental technician
DE10057308A1 (en) * 2000-11-17 2002-05-23 Buehler Druckguss Ag Uzwil Production of highly loaded parts made from titanium materials used as parts for motor racing cars comprises pressure deforming, heating using slugs and casting under pressure in molds
DE10120493C1 (en) * 2001-04-26 2002-07-25 Ald Vacuum Techn Ag Production of precision cast parts comprises filling casting molds made from a ceramic material and a distributor channel with a melt while rotating the casting wheel
JP2003266166A (en) * 2002-03-13 2003-09-24 Daido Steel Co Ltd Top-pouring ingot-making apparatus for high melting point active metal
PT103018A (en) * 2003-09-12 2005-03-31 Univ Do Minho PROCESS FOR OBTAINING FISH IN G-TIAI BY FOUNDATION
JP4326923B2 (en) * 2003-11-28 2009-09-09 学校法人愛知学院 Rotary hot water casting equipment
DE102004002956A1 (en) * 2004-01-21 2005-08-11 Mtu Aero Engines Gmbh Method for producing cast components

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3237247A (en) * 1963-11-08 1966-03-01 Budd Co Rotational casting apparatus
US5334232A (en) * 1990-07-09 1994-08-02 British Telecommunications Public Limited Company Method for the preparation of halide glass articles
US5287910A (en) * 1992-09-11 1994-02-22 Howmet Corporation Permanent mold casting of reactive melt
US5704413A (en) * 1993-11-30 1998-01-06 Honda Giken Kogyo Kabushiki Kaisha Rotary-mold gravity casting process
US5819837A (en) * 1996-03-01 1998-10-13 Ald Vacuum Technologies Gmbh Process and apparatus for melting and casting of metals in a mold
US20030234095A1 (en) * 2002-06-24 2003-12-25 Denken Co., Ltd. Apparatus for casting dental prosthesis

Also Published As

Publication number Publication date
DE112006000844A5 (en) 2008-01-10
DE102005015862A1 (en) 2006-10-12
JP2008534287A (en) 2008-08-28
ES2346999T3 (en) 2010-10-22
WO2006105780A2 (en) 2006-10-12
PL1877212T3 (en) 2010-11-30
SI1877212T1 (en) 2010-10-29
ATE470522T1 (en) 2010-06-15
US8042599B2 (en) 2011-10-25
WO2006105780A3 (en) 2007-03-29
JP4495770B2 (en) 2010-07-07
US20090050284A1 (en) 2009-02-26
EP1877212A2 (en) 2008-01-16
EP1877212B1 (en) 2010-06-09
DE502006007171D1 (en) 2010-07-22

Similar Documents

Publication Publication Date Title
US8042599B2 (en) Method for producing a multitude of components made of, in particular, titanium aluminide, and device for carrying out this method
KR910006182B1 (en) Method of and apparatus for casting
JP4903310B2 (en) Equipment for producing cast parts
AU642248B2 (en) Casting of dental metals
JP6435332B2 (en) Can manufacturing method by hot isostatic pressing (HIP)
CN103170577A (en) Induction stirred, ultrasonically modified investment castings and apparatus for producing
JP4275195B2 (en) Precision casting method and casting equipment
JP2014205192A (en) Vacuum or air casting using induction heating hot topping
EP0387107A2 (en) Method and apparatus for casting a metal
EP0941789B1 (en) Process and installation for casting light alloy pieces
JP2017512138A (en) Formation of composite components
US3818974A (en) Centrifugal vacuum casting apparatus
CN104439202B (en) System used for casting alloy and method for machining casting
GB1281195A (en) A method of welding together, by aluminothermy with reactive preheating, terminal portions of two members
MX2007002351A (en) Method and device for casting molten metal.
JPH0225701B2 (en)
US3771586A (en) Apparatus for continuous casting of directionally solidified articles
CN108127101A (en) A kind of large thin-wall aluminium alloy castings plaster casting method
CN216912065U (en) Combined melting and pouring furnace installation
JP2002514508A (en) Investment casting apparatus using injection cup storage and casting method therefor
US20070277952A1 (en) Rapid localized directional solidification of liquid or semi-solid material contained by media mold
JPH0335865A (en) Method and apparatus for precision casting
TW201738389A (en) Unit cell titanium casting
JP3887579B2 (en) Metal gas generation method and metal gas generation apparatus in reduction casting method
JP4448628B2 (en) Aluminum casting method with casting mold

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION