US20090159434A1 - System and process for collecting effluents from an electrolytic cell - Google Patents

System and process for collecting effluents from an electrolytic cell Download PDF

Info

Publication number
US20090159434A1
US20090159434A1 US12/296,860 US29686007A US2009159434A1 US 20090159434 A1 US20090159434 A1 US 20090159434A1 US 29686007 A US29686007 A US 29686007A US 2009159434 A1 US2009159434 A1 US 2009159434A1
Authority
US
United States
Prior art keywords
pressurized air
flow
pipe
outlet channel
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/296,860
Other languages
English (en)
Inventor
Guillaume Girault
Philippe Cantin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rio Tinto France SAS
Original Assignee
Aluminium Pechiney SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aluminium Pechiney SA filed Critical Aluminium Pechiney SA
Publication of US20090159434A1 publication Critical patent/US20090159434A1/en
Assigned to ALUMINIUM PECHINEY reassignment ALUMINIUM PECHINEY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GIRAULT, GUILLAUME, CANTIN, PHILIPPE
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J11/00Devices for conducting smoke or fumes, e.g. flues 
    • F23J11/02Devices for conducting smoke or fumes, e.g. flues  for conducting smoke or fumes originating from various locations to the outside, e.g. in locomotive sheds, in garages
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25CPROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
    • C25C3/00Electrolytic production, recovery or refining of metals by electrolysis of melts
    • C25C3/06Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
    • C25C3/22Collecting emitted gases
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B15/00Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area
    • B08B15/002Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area using a central suction system, e.g. for collecting exhaust gases in workshops
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23LSUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
    • F23L17/00Inducing draught; Tops for chimneys or ventilating shafts; Terminals for flues
    • F23L17/16Induction apparatus, e.g. steam jet, acting on combustion products beyond the fire

Definitions

  • the invention relates to the production of aluminium by igneous electrolysis. It more particularly relates to the extraction and treatment of airborne effluents produced by electrolytic cells designed for the production of aluminium.
  • Aluminium metal is produced industrially by igneous electrolysis, i.e. by electrolysis of alumina in solution in a molten cryolite bath using the well-known Hall-Héroult process.
  • a plant for the production of aluminium comprises a plurality of electrolytic cells, typically several hundreds, which are arranged in rows and connected in series.
  • U.S. Pat. No. 6,409,894 in the name of Aluminium Pechiney describes possible arrangements of plants intended for the production of aluminium using electrolytic cells.
  • an electrolytic cell with an effluent extraction system that typically includes a hooding for confining the effluents and a fan for sucking up the effluents.
  • the hooding is linked through a duct network to a chemical treatment installation common to a series of cells.
  • the electrolytic cells need to be tended during operation. For example, worn anodes need to be changed for new ones and the liquid aluminium produced by the cells needs to be regularly tapped.
  • the hooding includes means, such as hoods or doors, for getting access to the inner part of the cells for tending operations.
  • the removal of hoods or the opening of access doors decreases the collection efficiency of the extraction system and lets some effluents escape into the surrounding atmosphere.
  • U.S. Pat. No. 4,668,352 in the name of Aluminium Pechiney discloses a device and a process wherein the suction means automatically go into an increased suction mode when the opening of the hooding is detected. More precisely, the temperature of the gases in the extraction ducts of each cell is continuously measured and the system switches into the increased suction mode when an abrupt temperature drop caused by the opening of the hooding is detected in a duct. The increased suction mode is obtained by actuating a movable shutter or flap.
  • the applicant addressed the problem of finding industrially acceptable alternative means for efficiently increasing the extraction rate of an electrolytic cell.
  • An object of the invention is a system for collecting effluents produced by an electrolytic cell intended for the production of aluminium and for drawing said effluents away from the cell in a flow of gas, said system comprising a hooding to confine the effluents, at least one outlet channel to collect said flow of gas and suction means to draw said flow of gas away from the cell through said at least one outlet channel, said hooding including removable hoods and, optionally, at least one door, to get access to the inside of the hooding, wherein said system further comprises at least one pipe comprising:
  • Another object of the invention is a process for collecting effluents produced by an electrolytic cell intended for the production of aluminium and for drawing said effluents away from the cell in a flow of gas circulating in at least one outlet channel, wherein said process comprises:
  • Pressurized air is typically supplied in said pipe(s) when at least one hood is removed from the cell or when said door is opened.
  • the pressure and flow rate of the pressurized air in said pipe(s) is adjusted according to the actual suction needs.
  • This embodiment of the invention enables tighter control on the needs for pressurized air supply.
  • the invention makes it possible to efficiently vary the rate of the flow of gas in the outlet channel(s) without requiring excessively large pressure or flow rates for the pressurized air.
  • the invention avoids using mechanical parts within the flow of effluents coming out of the cell.
  • the gas flow rate R in the outlet channel(s), i.e. the rate of flow of the effluent-carrying gas coming out of a cell can be increased by a factor between 1.5 and 3 by using a specified pressurized air flow rate Ro, i.e. the rate of flow of the pressurized air blown by the aperture of a pipe in the outlet channel of the cell, that is between 5 and 15% of the normal gas flow rate in the outlet channel(s) and a pressure Po of pressurized air smaller than about 5 bars.
  • a specified pressurized air flow rate Ro i.e. the rate of flow of the pressurized air blown by the aperture of a pipe in the outlet channel of the cell, that is between 5 and 15% of the normal gas flow rate in the outlet channel(s) and a pressure Po of pressurized air smaller than about 5 bars.
  • Said pressure Po may be higher than 5 bars, for example when one uses a compressed air system available in a plant to directly supply said pipe with pressurized air without reducing the pressure of the compressed air supply.
  • Such a variation of the invention simplifies said system and is suited for procedures in which few pipes are being supplied simultaneously or in which a mobile or removable arrangement is used when needed on specified electrolytic cells, for example when an electrolytic cell is being started up after refurbishment of its pot.
  • said pressure Po of pressurized air is preferably between 30 and 300 kPa (i.e., 0.3 to 3 bars),; and more preferably between 70 and 120 kPa (i.e., 0.7 to 1.2 bar).
  • Such a variation of the invention is particularly advantageous for procedures in which the gas flow rate of several electrolytic cells may be boosted simultaneously. Such a variation is especially suited for fixed systems.
  • FIG. 1 illustrates a cross section view of a typical electrolytic cell intended for the production of aluminium.
  • FIG. 2 illustrates the upper part of an electrolytic cell equipped with a system for collecting effluents.
  • FIG. 3 schematically illustrates an arrangement of electrolytic cells that includes a system for collecting effluents and common suction means.
  • FIGS. 4 and 5 schematically illustrate embodiments of an electrolytic cell equipped with a system for collecting effluents according to the invention.
  • FIG. 6 illustrates a possible embodiment of a system according to the invention.
  • FIG. 7 illustrates possible variations of a system according to the invention.
  • An electrolytic cell ( 1 ) designed for the production of aluminium is generally rectangular, with long sides that are typically 10 to 20 meters long and short sides that are typically 3 to 5 meters long and often referred to as ends.
  • an electrolytic cell ( 1 ) comprises a pot ( 2 ) that is usually located below a floor ( 100 ) common to several cells and comprises a steel shell ( 3 ) lined with refractory material ( 4 , 4 ′).
  • the pot ( 2 ) typically includes carbonaceous cathode blocs ( 5 ) that are connected to external electrical conductors ( 7 ) using a cathode bar ( 6 ) made of an electrically conducting material such as steel.
  • the pot ( 2 ) contains a pad of liquid aluminium ( 8 ) and an electrolytic bath ( 9 ).
  • an electrolytic cell ( 1 ) also typically includes a plurality of anodes ( 10 , 10 ′), which are typically made of a carbonaceous material.
  • the anodes ( 10 , 10 ′) are connected to external electrical conductors ( 7 ′) using anode stems ( 11 , 11 ′) sealed in the anodes and secured to common conductors ( 12 , 12 ′) called anode beams using removable connectors.
  • the anodes ( 10 , 10 ′) are partially immersed in the electrolytic bath ( 9 ) and are protected from oxidation by a protecting layer ( 13 ), called a bath crust, that is mostly comprised of alumina and crushed bath.
  • An electrolytic cell ( 1 ) typically further includes one or more alumina feeders that usually include a hopper ( 14 ) for feeding alumina ( 15 ) at specified locations within the cell.
  • the feeders are continuously supplied by an alumina conveyor ( 16 ) that runs along the cell.
  • An electrolytic cell ( 1 ) further includes a hooding ( 20 ) capable of confining effluents produced by the cell ( 1 ).
  • the hooding ( 20 ) includes a plurality of removable hoods ( 21 , 21 ′), which are also called covers, on the long sides of the cell to get access to the inside of the hooding from either of the long sides.
  • An electrolytic cell ( 1 ) typically includes between 10 and 30 hoods ( 21 , 21 ′) on each long side, which are usually arranged side by side.
  • the hoods ( 21 , 21 ′) usually comprise a handle ( 22 , 22 ′) to facilitate their handling.
  • Hoods ( 21 , 21 ′) are usually removed for tending the inside of the cell. Typically, a few hoods ( 21 ′) are removed from one side of the cell when a worn anode ( 10 ′) is to be changed for a new one and put back on the cell when the anode changing operation is completed.
  • the hooding ( 20 ) also includes a door or doors ( 23 ) at one end of the cell to get access to the inside of the hooding from that end.
  • the doors ( 23 ) are typically shutter doors.
  • the doors ( 23 ) are often referred to as tapping doors because they are often used for tapping liquid aluminium out of the cell. This operation is done on a regular basis to remove some of the liquid aluminium ( 8 ) produced by the cell.
  • the hooding ( 20 ) typically further includes longitudinal channels ( 24 , 24 ′) that run along the top of the cell. The flow of effluents circulates within these channels.
  • the hooding ( 20 ) is connected to at least one outlet channel ( 25 ) that is coupled to suction means ( 30 , 31 ).
  • the outlet channel ( 25 ) is typically a duct or a conduit.
  • an intermediate insulating channel ( 26 ) is usually interposed between the outlet channel(s) ( 25 ) and the suction means ( 30 , 31 ).
  • the suction means ( 30 , 31 ) produce a flow of gas that sucks the effluents out of the cell. The flow of gas flows at a rate R.
  • the suction means ( 30 , 31 ) typically include at least one conduit ( 30 ) and at least one fan ( 31 ).
  • the suction conduit(s) ( 30 ) and the fan(s) ( 31 ) may be common to several cells.
  • rows of cells are usually connected to common suctions means ( 30 , 31 ).
  • the cells are seen from above.
  • the normal gas flow rate of a cell depends on the type of cell. For example, the normal gas flow rate typically used for an AP18 type cell of
  • Aluminium Pechiney when operated with a current intensity of about 180 000 Amperes, is about 1.4 Nm 3 /s, while the normal gas flow rate typically used for an AP30 type cell of Aluminium Pechiney, when operated with a current density of about 300 000 Amperes, is about 2.1 5 Nm 3 /s.
  • the effluents comprise a gaseous part (especially containing air, carbon dioxide and fluorinated products, such as hydrogen fluoride) and a solid or “dust” part (containing alumina, electrolytic bath, etc).
  • the effluents are confined by the hooding ( 20 ), captured by suction and treated in the treatment installation(s) ( 40 ) of the plant.
  • the treatment processes usually remove the solid particles contained in the effluents, typically using separation means such as filters or electrostatic precipitators, extract the fluorine contained in the effluents and leave a residual gas fraction containing a negligible amount of solid particles and fluorinated products.
  • the residual gas fraction mainly contains air and carbon dioxide. Treated air is exhausted through a chimney ( 32 ).
  • the flow of gas is usually made to react with compounds, typically sodium carbonate, dissolved in water to form a liquor contained in a wet scrubber.
  • compounds typically sodium carbonate
  • the reacted fluorine comes out of the process in the form of solid compounds, typically CaF2 after reacting the liquor with lime.
  • the flow of gas is made to react with powder alumina in a reactor so as produce fluorinated alumina that is partly or completely re-used to feed electrolytic cells.
  • Treatment installations ( 40 ) typically comprise a bank of treatment units in parallel, each unit usually comprising a reactor and separation means.
  • a system for collecting effluents produced by an electrolytic cell ( 1 ) comprises a hooding ( 20 ) to confine the effluents, at least one outlet channel ( 25 ) to collect and draw the effluents in a flow of gas and suction means ( 30 , 31 ) to draw said flow of gas away from the cell.
  • the system further comprises at least one pipe ( 50 ) for blowing pressurized air into the outlet channel ( 25 ) so as to increase the rate of the flow of gas within the outlet channel ( 25 ).
  • Said pipe ( 50 ) comprises a first end ( 51 ), or “inlet end”, that is directly or indirectly connected to a pressurized air supply ( 53 ) and a second end ( 52 ), or “outlet end”, that is located inside said outlet channel or one of the outlet channels ( 25 ).
  • the pressurized air supply ( 53 ) can supply pressurized air at a specified pressure Po and a specified flow rate Ro.
  • the second end ( 52 ) of the pipe ( 50 ) includes at least one aperture ( 54 ) and is oriented so that pressurized air can be projected through said aperture ( 54 ) in a manner that increases the rate of said flow of gas.
  • said second end ( 52 ) is oriented so that pressurized air is projected substantially along the direction of said flow of gas, as exemplified in FIGS. 4 to 6 .
  • the projected air forms a jet that boosts the gas flow when needed.
  • the dimension of said aperture ( 54 ) is typically between 5 mm 2 and 1300 mm 2 , and more typically between 300 mm 2 and 1000 mm 2 .
  • the aperture ( 54 ) typically has a circular section with a diameter that is typically between 3 and 40 mm, and more typically between 10 and 35 mm.
  • the total surface area of all said apertures ( 54 ) in a given outlet channel ( 25 ) is preferably comprised between 300 and 1300 mm 2 so as to provide enough flow boosting capacity.
  • the second end ( 52 ) of the pipe(s) ( 50 ) may optionally be fitted with a nozzle that forms said aperture ( 54 ) so as to simplify maintenance and changes of pressurized air flow patterns.
  • the rate of flow of pressurized air that is ejected through said aperture ( 54 ) depends on the air pressure Po inside the pipe or pipes ( 50 ) and the size and shape of the aperture ( 54 ). In use, the flow rate is preferably adjusted by varying the air pressure Po.
  • the effluents collecting system may include more than one pipe ( 50 ) for blowing pressurized air into the outlet channel(s) ( 25 ).
  • the system may include several pipes ( 50 ) penetrating in an outlet channel ( 25 ) so that their second end ( 52 ) with an aperture ( 54 ) is located inside the outlet channel ( 25 ).
  • the outlet channel(s) ( 25 ) may be substantially straight, as illustrated in FIG. 4 .
  • the outlet channel(s) ( 25 ) may optionally include a length of duct ( 27 ) with an internal cross section that varies along said length and said second end ( 52 ) may be located within said length of duct.
  • Said length of duct ( 27 ) has an inlet ( 271 ) and an outlet ( 272 ).
  • said length of duct ( 27 ) includes a constriction ( 28 ) between said inlet ( 271 ) and outlet ( 272 ).
  • the inner cross section of the constriction ( 28 ) is smaller than the inner cross section of the inlet ( 271 ) and the inner cross section of the outlet ( 272 ).
  • the length of duct ( 27 ) may include a part having the shape of a Venturi duct.
  • the inner cross section of the length of duct ( 27 ) may vary smoothly between the inlet ( 271 ) and the outlet ( 272 ).
  • FIG. 5 illustrates a variation of this embodiment wherein the outlet channel ( 25 ) comprises a first straight section ( 273 ) with a first inner cross section, a second straight section ( 274 ) with a second inner cross section and a third straight section ( 275 ) with a third inner cross section, and wherein said second cross section is smaller than said first and third cross sections so as to form said constriction ( 28 ).
  • said length of duct ( 27 ) includes a first section ( 276 ) having a truncated-cone shape located between said first ( 273 ) and second ( 274 ) straight sections and a second section ( 277 ) having a truncated-cone shape located between said second ( 274 ) and third ( 275 ) straight sections.
  • the second end ( 52 ) of the pipe ( 50 ) is preferably located in the vicinity of said constriction ( 28 ), typically upstream of a plane ( 29 ) where the section of said constriction ( 28 ) is narrowest as illustrated in FIG. 5 .
  • FIGS. 4 and 5 the cells ( 1 ) are seen from the side.
  • the system may comprise one or more primary outlet channels ( 25 ′, 25 ′′′) merging into a single, main outlet channel ( 25 ′′′).
  • FIG. 6 illustrates possible embodiments of such a variation wherein the system includes two primary channels ( 25 ′, 25 ′′). The cells are seen from above.
  • the second end ( 52 ) of the pipe ( 50 ) is located inside said main outlet channel ( 25 ′′′).
  • FIG. 6(A) the second end ( 52 ) of the pipe ( 50 ) is located inside said main outlet channel ( 25 ′′′).
  • the system comprises a first pipe ( 50 ′) and a second pipe ( 50 ′′), a first end ( 51 ′, 51 ′′) of each pipe being connected to a pressurized air supply ( 53 ), a second end ( 52 ′) of the first pipe ( 50 ′) being located inside one of said primary outlet channels ( 25 ′), a second end ( 52 ′′) of the second pipe ( 50 ′′) being located inside the other one of said primary outlet channels ( 25 ′′).
  • the pressurized air supply ( 53 ) is typically common to both pipes ( 50 ′, 50 ′′) and optionally to a plurality of cells.
  • the system further includes at least one adjustable or removable flow balancing means ( 60 , 60 ′, 61 ) located in said at least one outlet channel ( 25 ) or downstream thereof.
  • Said flow balancing means makes it possible to balance the normal throughput of each cell of a series of cells in a plant.
  • Said flow balancing means is typically located downstream of said at least one aperture ( 54 ) of said at least one pipe ( 50 ).
  • said flow balancing means ( 60 , 60 ′, 61 ) may be located either downstream or upstream of each said intermediate insulating channel ( 26 ).
  • Said flow balancing means is typically selected from diaphragms, shutters and flaps, and may typically be activated by an actuator such as a jack.
  • FIG. 7 illustrates possible embodiments of such variations.
  • the system includes a shutter ( 60 ) located in a part ( 251 ) of the outlet channel that is located downstream of an intermediate insulating channel ( 26 ).
  • Said shutter ( 60 ) may be vertical, as illustrated, or horizontal or oriented in any other direction.
  • the system includes a flap ( 60 ′) located upstream of an intermediate insulating channel ( 26 ).
  • Said flap ( 60 ′) is typically secured to a shaft ( 61 ) so as to enable its swivelling.
  • Said flap ( 60 ′) typically comprises an orifice so as to allow some flow of air when closed.
  • the pipe or pipes ( 50 , 50 ′, 50 ′′) are advantageously connected to the pressurized air supply ( 53 ) through a valve ( 55 , 55 ′, 55 ′′).
  • the valve ( 55 , 55 ′, 55 ′′) enables a specific activation and control of the specified pressure and flow rate in the pipe or pipes ( 50 , 50 ′, 50 ′′).
  • the valve ( 55 , 55 ′, 55 ′′) may be coupled to a regulation system so as to enable automatic control of the specified pressure and flow rate in the pipe or pipes ( 50 , 50 ′, 50 ′′).
  • a valve ( 55 , 55 ′, 55 ′′) may be common to more than one pipe ( 50 , 50 ′, 50 ′′).
  • a pressure reducer may be inserted between said at least one pipe ( 50 , 50 ′, 50 ′′) and said pressurized air supply ( 53 ) so as to make it possible to reduce the pressure to a specified value that is typically between 30 and 300 kPa.
  • a pressure reducer may be inserted between said at least one pipe ( 50 , 50 ′, 50 ′′) and said pressurized air supply ( 53 ) so as to make it possible to reduce the pressure to a specified value that is typically between 30 and 300 kPa.
  • Such an embodiment is particularly suited for use with a compressed-air supply.
  • said pressurized air supply ( 53 ) includes a blower that provides pressurized air directly at a specified pressure, which is typically between 30 and 300 kPa.
  • Said blower may be common to more than one electrolytic cell.
  • a process for collecting effluents advantageously includes connecting the pipe or pipes ( 50 ) of an effluents collecting system according to the invention to a pressurized air supply ( 53 ), activating the suction means ( 30 , 31 ) and supplying pressurized air in said pipe or pipes ( 50 , 50 ′, 50 ′′) at a specified flow rate Ro.
  • the supply of pressurized air in said pipe or pipes ( 50 ) may be activated manually and/or automatically.
  • the latter embodiment may be implemented using temperature and/or pressure sensors.
  • the temperature and/or the pressure of the gas flowing in the outlet channel(s) ( 25 ) may be measured continuously and the supply of pressurized air in said pipe(s) ( 50 ) may be activated manually or automatically when a rapid drop in temperature or pressure is detected.
  • a cell ( 1 ) may be equipped with a probe or sensor for measuring the pressure and/or the temperature of the flow of gas coming out of the cell and the probe or sensor may be connected to monitoring device that displays alerts signals and/or activates the supply of pressurized when temperature or pressure limits are exceeded.
  • the supply of pressurized air is advantageously activated by a control valve ( 55 , 55 ′, 55 ′′) or the like, such as an electrically controlled valves or pneumatically controlled valves.
  • Electrically controlled valves can advantageously be connected to a regulation system that can automatically control and activate them.
  • the process for collecting effluents typically includes opening or removing said flow balancing means so as to ease the flow of gas and thereby further increase the throughput in said at least one outlet channel ( 25 , 25 ′, 25 ′′, 25 ′′′).
  • Said opening or removal of said flow balancing means ( 60 , 60 ′, 61 ) may be done manually or automatically and by activating an actuator.
  • the suction means ( 30 , 31 ) are continuously activated during the electrolysis process and the pressurized air supply ( 53 ) is activated when needed and according to needs.
  • Pressurized air is typically supplied in said pipe or pipes ( 50 ) when at least one hood ( 21 ) is removed from the cell or when a door, usually a tapping door, ( 23 ) is opened.
  • the pressurized air may be supplied in said at least one pipe ( 50 , 50 ′, 50 ′′) when an electrolytic cell ( 1 ) is being started up. This may occur when a new cell is being started or when a refurbished cell is being re-started, typically after changing the refractory lining ( 4 , 4 ′) and cathode blocs ( 5 ) of its shell ( 3 ).
  • the specified pressure Po and flow rate Ro may be selected according to needs, in particular according to the suction needs of the system, which may depend on the size of the orifice created by the removal of hoods or the opening of a door.
  • pressurized air is supplied in said pipe or pipes ( 50 ) at a first specified flow rate Ro 1 , typically by providing a first specified pressure Po 1 , when at least one hood ( 21 ) is removed from the cell and at a second specified flow rate Ro 2 , typically by providing a second specified pressure Po 2 , when a door ( 23 ) is opened.
  • the first specified pressure Po 1 and flow rate Ro 1 are typically higher than the second specified pressure Po 2 and flow rate Ro 2 , respectively, so as to increase the gas flow rate for hoods removal more than for door opening since the removal of hoods usually requires a more important air draft than the opening of a door.
  • the gas flow rate of a cell has a normal value when the pressurized air supply is not activated and at least a first modified value when the pressurized air supply is activated.
  • the gas flow rate of the cell may have a second or more modified values when the pressurized air supply is activated. The modified values are higher than the normal value, thus amounting in an increased flow rate.
  • the normal value for the gas flow rate typically corresponds to the situation when all hoods ( 21 ) are in place
  • the first gas flow rate typically corresponds to the situation when one or more hoods ( 21 ) are removed for changing an anode
  • the second gas flow rate typically corresponds to the situation when a tapping door is opened to remove liquid aluminium from the cell
  • the first modified value is higher than the second modified value, e.g. 2 to 3 times the normal gas flow rate when several hoods are removed for changing an anode and 1.5 to 2 times the normal gas flow rate when a door is opened for tapping liquid aluminium or when an electrolytic cell is being started up with all hoods in place.
  • the ratio Po/P between the pressure Po inside said pipe or pipes 20 ( 50 , 50 ′, 50 ′′) and the pressure P inside the outlet channel or channels ( 25 , 25 ′, 25 ′′, 25 ′′′) where the second end ( 52 , 52 ′, 52 ′′) of the pipe or pipes ( 50 , 50 ′, 50 ′′) is located is preferably selected so as to avoid shock waves and ensure optimal efficiency in regard to sonic conditions.
  • Said specified flow rate Ro is typically between 5 and 15% of said gas flow rate R.
  • the pressure Po inside the pipe(s) is typically smaller than 5 bars although it may in some embodiments be greater than 5 bars.
  • the suction means typically include at least one fan ( 31 ).
  • This fan ( 31 ) provides a normal flow rate in the outlet channel(s) ( 25 , 25 ′, 25 ′′, 25 ′′′).
  • the outlet channel(s) ( 25 , 25 ′, 25 ′′, 25 ′′′) is (are) typically connected to the fan ( 31 ) by a suction conduit ( 30 ).
  • the suction means include a conduit ( 30 ) that is common to at least two electrolytic cells (typically a plurality of electrolytic cells) and is connected to at least one common fan ( 31 ).
  • the fan ( 31 ) is usually located in an installation ( 40 ) for the treatment of said effluents or downstream thereof.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Organic Chemistry (AREA)
  • Metallurgy (AREA)
  • Materials Engineering (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Combustion & Propulsion (AREA)
  • Electrolytic Production Of Metals (AREA)
  • Electrolytic Production Of Non-Metals, Compounds, Apparatuses Therefor (AREA)
  • Cleaning In General (AREA)
US12/296,860 2006-04-11 2007-04-04 System and process for collecting effluents from an electrolytic cell Abandoned US20090159434A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
EP06356042A EP1845175B1 (en) 2006-04-11 2006-04-11 System and process for collecting effluents from an electrolytic cell
EP06356042.9 2006-04-11
PCT/IB2007/001612 WO2007116320A2 (en) 2006-04-11 2007-04-04 System and process for collecting effluents from an electrolytic cell
IBPCT/IB2007/001612 2007-04-04

Publications (1)

Publication Number Publication Date
US20090159434A1 true US20090159434A1 (en) 2009-06-25

Family

ID=36992538

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/296,860 Abandoned US20090159434A1 (en) 2006-04-11 2007-04-04 System and process for collecting effluents from an electrolytic cell

Country Status (16)

Country Link
US (1) US20090159434A1 (pt)
EP (2) EP1845175B1 (pt)
CN (1) CN101460663B (pt)
AR (1) AR060596A1 (pt)
AT (1) ATE498713T1 (pt)
AU (1) AU2007237131B2 (pt)
BR (1) BRPI0710184A2 (pt)
CA (1) CA2649266C (pt)
DE (1) DE602006020112D1 (pt)
ES (1) ES2360871T3 (pt)
MY (1) MY147259A (pt)
NO (1) NO345106B1 (pt)
RU (1) RU2436872C2 (pt)
SI (1) SI1845175T1 (pt)
WO (1) WO2007116320A2 (pt)
ZA (1) ZA200807450B (pt)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110094891A1 (en) * 2008-06-16 2011-04-28 Rio Tinto Alcan International Limited Method of producing aluminium in an electrolysis cell
WO2011089497A1 (en) 2010-01-21 2011-07-28 Alstom Technology Ltd A method of ventilating an aluminium production electrolytic cell
WO2012001491A1 (en) 2010-06-30 2012-01-05 Alstom Technology Ltd Screening device and method of screening
WO2012020188A1 (fr) 2010-08-10 2012-02-16 Solios Environnement Procédé et dispositif de confinement des gaz de cuve dans une cuve d'électrolyse de l'aluminium
EP2469207A1 (en) 2010-12-22 2012-06-27 Alstom Technology Ltd Metallurgical plant gas cleaning system, and method of cleaning an effluent gas
EP2489421A1 (en) 2011-02-18 2012-08-22 Alstom Technology Ltd A wet scrubber for cleaning an effluent gas comprising an inlet gas distributor with a diffusor
EP2489422A1 (en) 2011-02-18 2012-08-22 Alstom Technology Ltd A device and a method of cleaning an effluent gas from an aluminium production electrolytic cell
US20130199939A1 (en) * 2010-09-17 2013-08-08 Alstom Technology, Ltd. Raw gas collection system
EP2660358A2 (en) 2012-05-04 2013-11-06 Alstom Technology Ltd Distribution of recycled electrolytic pot gas
RU2744333C1 (ru) * 2020-02-25 2021-03-05 Общество с ограниченной ответственностью "Объединенная Компания РУСАЛ Инженерно-технологический центр" Система для удаления газов из алюминиевого электролизера

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1035369C2 (nl) * 2008-04-29 2009-10-30 Wilhelmus Anthonius Brabander Inrichting voor het verbeteren van schoorsteentrek.
NL1035667C2 (nl) * 2008-07-04 2009-05-19 Pieter Polderman Injector te plaatsen in of toe te voegen aan een scheeps- of andere schoorsteen teneinde de afvoergassen te versnellen, beter te verdelen en hoger mee te voeren waardoor - zonder de druk in de pijp te beïnvloeden - de overlast van laaghangende rook geminimaliseerd wordt.
EP2248605A1 (en) 2009-05-06 2010-11-10 Danieli Corus BV Apparatus and method for balances removal of gasses from electrolysis cells by suction
IT1394799B1 (it) * 2009-07-10 2012-07-13 Zeca S P A Aspiratore di gas di scarico di autoveicoli
FR2963625B1 (fr) 2010-08-06 2013-02-22 Solios Environnement Installation pour la collecte des gaz d'une pluralite de cuves d'electrolyse et dispositif d'ajustement pour une telle installation
FR2969937A1 (fr) * 2011-01-05 2012-07-06 Zeca S P A Aspirateur de gaz d'echappement de vehicule a moteur
FR3012473A1 (fr) * 2013-10-30 2015-05-01 Rio Tinto Alcan Int Ltd Dispositif d'etancheite pour capot de cellule d'electrolyse
FI126381B (en) * 2014-04-23 2016-11-15 Outotec Finland Oy PROCEDURES AND ARRANGEMENTS FOR COLLECTING AND DISPOSING ACID DIMAGES FROM AN ELECTROLYTIC CELL
FR3037975B1 (fr) * 2015-06-23 2020-10-23 Fives Solios S A Dispositif de suraspiration par effet coanda d’effluents gazeux provenant d’une cuve de production industrielle d’aluminium par electrolyse ignee
RU169432U1 (ru) * 2016-03-01 2017-03-17 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Газосборное укрытие алюминиевого электролизера с обожженными анодами
CN107653462B (zh) * 2017-10-27 2023-06-13 贵阳铝镁设计研究院有限公司 一种铝电解槽焙烧过程沥青烟集气治理方法及装置
NO20190343A1 (en) * 2019-03-14 2020-09-15 Norsk Hydro As Arrangement for collection of hot gas from an electrolysis process, and a method for such gas collection

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2556899A (en) * 1947-03-27 1951-06-12 William W Broussard Gas removing device
US3782074A (en) * 1972-07-21 1974-01-01 Aronetics Inc Process and apparatus for cleansing and pumping contaminated industrial gases using a nozzle having a variable throat area
US4176019A (en) * 1977-03-10 1979-11-27 Ardal Og Sunndal Verk A.S. Process and apparatus for treatment of waste gases
US4668352A (en) * 1984-05-03 1987-05-26 Aluminum Pechiney Process and apparatus for automatic increased suction extraction on electrolysis tanks for the production of aluminum
US5070707A (en) * 1989-10-06 1991-12-10 H. A. Phillips & Co. Shockless system and hot gas valve for refrigeration and air conditioning
US5186793A (en) * 1990-12-31 1993-02-16 Invacare Corporation Oxygen concentrator utilizing electrochemical cell
US20060009147A1 (en) * 2004-07-08 2006-01-12 Institute Of Occupational Safety And Health Push-pull type ventilation hood
US20060289290A1 (en) * 2002-12-18 2006-12-28 Guillaume Girault Electrolytic cell effluent treatment method and device for the production of aluminium

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1161040B (de) * 1961-06-29 1964-01-09 Metallgesellschaft Ag Verfahren zum Reinigen der Abgase von Aluminium-Elektrolyseoefen mit selbstbackenden Anoden unter gleichzeitiger Rueckgewinnung des Fluors
FR2626324B1 (fr) * 1988-01-25 1993-04-09 Paziaud Jacques Procede de mise en mouvement de l'air dans une gaine d'aeration par jets d'air induits et son extension pour d'autres fluides
AT392927B (de) * 1989-03-20 1991-07-10 Scheuch Alois Gmbh Absaugsystem fuer den bereich der holzverarbeitung
FR2740862B1 (fr) * 1995-11-03 1998-01-23 Amphoux Andre Dispositif pour aspirer un fluide gazeux a travers un conduit pour le rejeter a l'exterieur de celui-ci
DE19920058A1 (de) * 1999-05-03 2000-11-09 Esta Apparatebau Absaugvorrichtung und Verfahren zum Betrieb derselben
NO314469B1 (no) * 2001-06-25 2003-03-24 Alstom Technology Ltd Fremgangsmåte og anordning for gasstransport

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2556899A (en) * 1947-03-27 1951-06-12 William W Broussard Gas removing device
US3782074A (en) * 1972-07-21 1974-01-01 Aronetics Inc Process and apparatus for cleansing and pumping contaminated industrial gases using a nozzle having a variable throat area
US4176019A (en) * 1977-03-10 1979-11-27 Ardal Og Sunndal Verk A.S. Process and apparatus for treatment of waste gases
US4668352A (en) * 1984-05-03 1987-05-26 Aluminum Pechiney Process and apparatus for automatic increased suction extraction on electrolysis tanks for the production of aluminum
US5070707A (en) * 1989-10-06 1991-12-10 H. A. Phillips & Co. Shockless system and hot gas valve for refrigeration and air conditioning
US5186793A (en) * 1990-12-31 1993-02-16 Invacare Corporation Oxygen concentrator utilizing electrochemical cell
US20060289290A1 (en) * 2002-12-18 2006-12-28 Guillaume Girault Electrolytic cell effluent treatment method and device for the production of aluminium
US20060009147A1 (en) * 2004-07-08 2006-01-12 Institute Of Occupational Safety And Health Push-pull type ventilation hood

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8961773B2 (en) * 2008-06-16 2015-02-24 Rio Tinto Alcan International Limited Method of producing aluminium in an electrolysis cell
US20110094891A1 (en) * 2008-06-16 2011-04-28 Rio Tinto Alcan International Limited Method of producing aluminium in an electrolysis cell
WO2011089497A1 (en) 2010-01-21 2011-07-28 Alstom Technology Ltd A method of ventilating an aluminium production electrolytic cell
EP2360296A1 (en) 2010-01-21 2011-08-24 Alstom Technology Ltd A method of ventilating an aluminium production electrolytic cell
US9771660B2 (en) 2010-01-21 2017-09-26 General Electric Technology Gmbh Method of ventilating an aluminium production electrolytic cell
US9458545B2 (en) 2010-01-21 2016-10-04 General Electric Technology Ltd Method of ventilating an aluminum production electrolytic cell
EP2458035A1 (en) 2010-01-21 2012-05-30 Alstom Technology Ltd A method of ventilating an aluminium production electrolytic cell
EP2458034A1 (en) 2010-01-21 2012-05-30 Alstom Technology Ltd A method of ventilating an aluminium production electrolytic cell
WO2012001491A1 (en) 2010-06-30 2012-01-05 Alstom Technology Ltd Screening device and method of screening
US9033155B2 (en) 2010-06-30 2015-05-19 Alstom Technology Ltd Screening device and method of screening
FR2963793A1 (fr) * 2010-08-10 2012-02-17 Solios Environnement Procede et dispositif de confinement des gaz de cuve dans une cuve d'electrolyse de l'aluminium
WO2012020188A1 (fr) 2010-08-10 2012-02-16 Solios Environnement Procédé et dispositif de confinement des gaz de cuve dans une cuve d'électrolyse de l'aluminium
DE102011052543A1 (de) 2010-08-10 2012-02-16 Solios Environnement Verfahren und Vorrichtung zum Einschliessen der Wannengase in einer Aluminiumelektrolysewanne
US20130199939A1 (en) * 2010-09-17 2013-08-08 Alstom Technology, Ltd. Raw gas collection system
US9115437B2 (en) * 2010-09-17 2015-08-25 Alstom Technology Ltd Raw gas collection system
EP2469207A1 (en) 2010-12-22 2012-06-27 Alstom Technology Ltd Metallurgical plant gas cleaning system, and method of cleaning an effluent gas
WO2012085634A1 (en) 2010-12-22 2012-06-28 Alstom Technology Ltd Metallurgical plant gas cleaning system, and method of cleaning an effluent gas
US8728420B2 (en) 2011-02-18 2014-05-20 Alstom Technology Ltd Wet scrubber for cleaning an effluent gas
EP2489421A1 (en) 2011-02-18 2012-08-22 Alstom Technology Ltd A wet scrubber for cleaning an effluent gas comprising an inlet gas distributor with a diffusor
WO2012110868A1 (en) 2011-02-18 2012-08-23 Alstom Technology Ltd A device and a method of cleaning an effluent gas from an aluminium production electrolytic cell
US9242203B2 (en) 2011-02-18 2016-01-26 Alstom Technology Ltd Device and a method of cleaning an effluent gas from an aluminium production electrolytic cell
US9375675B2 (en) 2011-02-18 2016-06-28 Alstom Technology Ltd Device and a method of cleaning an effluent gas from an aluminium production electrolytic cell
WO2012110871A1 (en) 2011-02-18 2012-08-23 Alstom Technology Ltd A wet scrubber for cleaning an effluent gas
EP2489422A1 (en) 2011-02-18 2012-08-22 Alstom Technology Ltd A device and a method of cleaning an effluent gas from an aluminium production electrolytic cell
EP2660358A2 (en) 2012-05-04 2013-11-06 Alstom Technology Ltd Distribution of recycled electrolytic pot gas
US9234286B2 (en) 2012-05-04 2016-01-12 Alstom Technology Ltd Recycled pot gas pot distribution
RU2744333C1 (ru) * 2020-02-25 2021-03-05 Общество с ограниченной ответственностью "Объединенная Компания РУСАЛ Инженерно-технологический центр" Система для удаления газов из алюминиевого электролизера

Also Published As

Publication number Publication date
MY147259A (en) 2012-11-14
RU2436872C2 (ru) 2011-12-20
WO2007116320A2 (en) 2007-10-18
DE602006020112D1 (de) 2011-03-31
WO2007116320A3 (en) 2008-09-04
NO20084736L (no) 2009-01-08
EP1845175B1 (en) 2011-02-16
AU2007237131B2 (en) 2011-06-02
SI1845175T1 (sl) 2011-06-30
CA2649266A1 (en) 2007-10-18
EP1845175A1 (en) 2007-10-17
NO345106B1 (no) 2020-09-28
CA2649266C (en) 2013-12-17
EP2007929A2 (en) 2008-12-31
CN101460663B (zh) 2011-11-16
AU2007237131A1 (en) 2007-10-18
AR060596A1 (es) 2008-07-02
BRPI0710184A2 (pt) 2011-08-09
ES2360871T3 (es) 2011-06-09
RU2008144402A (ru) 2010-05-20
CN101460663A (zh) 2009-06-17
ATE498713T1 (de) 2011-03-15
ZA200807450B (en) 2009-12-30

Similar Documents

Publication Publication Date Title
CA2649266C (en) System and process for collecting effluents from an electrolytic cell
AU2009292735B2 (en) A device for collection of hot gas from an electrolysis process, and a method for gas collection with said device
EP2407228B1 (en) Gas cleaning unit and method for cleaning gas
EP2360296B1 (en) A method of ventilating an aluminium production electrolytic cell
AU2014396862B2 (en) Integrated gas treatment
AU594767B2 (en) Process for purifying the gases emitted from the electrolysis pots for the production of aluminum and related equipment
AU2003300608B2 (en) Electrolytic cell effluent treatment method and device for the production of aluminium
EP2431499B1 (en) Raw gas collection system
CA2585225A1 (en) Apparatus for collection and removal of gases from an aluminum reduction cell
EP3938564B1 (en) Arrangement for collection of hot gas from an electrolysis process, and a method for such gas collection
NO20111050A1 (no) Framgangsmate og anordning for inneslutting av cellegasser i en elektrolytisk aluminiumcelle
EP3569301A1 (en) Apparatus and method for controlled alumina supply
JP2018202353A (ja) 集塵機及びそのフィルタ交換方法

Legal Events

Date Code Title Description
AS Assignment

Owner name: ALUMINIUM PECHINEY, FRANCE

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GIRAULT, GUILLAUME;CANTIN, PHILIPPE;SIGNING DATES FROM 20081020 TO 20081022;REEL/FRAME:026093/0229

STCB Information on status: application discontinuation

Free format text: ABANDONED -- AFTER EXAMINER'S ANSWER OR BOARD OF APPEALS DECISION