US20090123235A1 - Outer pipe sleeve for a sea floor mooring pile - Google Patents
Outer pipe sleeve for a sea floor mooring pile Download PDFInfo
- Publication number
- US20090123235A1 US20090123235A1 US11/937,206 US93720607A US2009123235A1 US 20090123235 A1 US20090123235 A1 US 20090123235A1 US 93720607 A US93720607 A US 93720607A US 2009123235 A1 US2009123235 A1 US 2009123235A1
- Authority
- US
- United States
- Prior art keywords
- pile
- sleeve
- padeye
- sea floor
- rings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 230000008878 coupling Effects 0.000 claims abstract description 31
- 238000010168 coupling process Methods 0.000 claims abstract description 31
- 238000005859 coupling reaction Methods 0.000 claims abstract description 31
- 238000000034 method Methods 0.000 claims abstract description 22
- 238000004873 anchoring Methods 0.000 claims abstract description 9
- 239000000463 material Substances 0.000 claims description 10
- 230000000153 supplemental effect Effects 0.000 claims description 7
- 238000009434 installation Methods 0.000 abstract description 13
- 238000013461 design Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000011161 development Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000035515 penetration Effects 0.000 description 2
- 230000000737 periodic effect Effects 0.000 description 2
- 239000003208 petroleum Substances 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/26—Anchors securing to bed
- B63B21/27—Anchors securing to bed by suction
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
Definitions
- the disclosure relates to pile anchor systems and methods, and particularly to pile anchor systems and methods for offshore petroleum structures, such as floating structures, drilling or production risers, and other marine structures.
- the pile is generally a tubular element that is installed into seabed deposits that form the sea floor.
- various methods can be used to install the pile into the sea floor. At great depths, it may be problematic to use a pile-driving hammer or other equipment to install the pile.
- FIG. 1 is a cross-sectional schematic diagram of a pile installed into a sea floor.
- the suction pile, pile 2 may be installed in the sea floor 4 .
- the pile 2 includes a top 6 , sometimes known as a “pile cap,” attached to tubular sides 8 , and is open at the bottom 10 .
- the top 6 can include a valve 12 that gives access to the interior volume 11 of the pile 2 between the sides 8 and the top 6 .
- the pile 2 further includes a padeye 14 .
- the padeye 14 generally is a reinforced section used to attach an anchor line or other coupling member 16 to a structure (not shown) that may need mooring or otherwise securing.
- the installation technique generally includes locating the pile 2 in an appropriate location and lowering the pile into the sea floor 4 with cables. Typical the pile will penetrate under its own weight into the seafloor deposits until the resistance from the seabed deposits equals the self weight. Water can then be pumped out of the pile through the value 12 to create a differential pressure in the volume 11 with a net downward force to push the pile to a desired depth of full penetration.
- the pile 2 can have different configurations. Some piles may include external fins that extend outwardly from the side. Other piles can include internal baffles or stiffening members that, for example, can be selectively depressurized to position the piles at different angles relative to the sea floor. Some designs have hemispherical tops. Other piles include groups of suction piles coupled together to form an assembly.
- a suction pile, driven pile or any other tubular structure penetrated into the seabed to support or resist loads is referred to generally herein as a pile.
- Piles can become damaged, worn, or otherwise degraded.
- the pile is either removed, or abandoned, and another pile is installed at another location near the first pile.
- the sea floor 4 has been disturbed and the shear resistance around the installed pile may be significantly reduced.
- the sea floor deposits 4 may require several months of consolidation and recovery after a pile is installed to provide full strength to the anchoring of the pile in the sea floor deposits.
- the present disclosure provides an improved system and method for increasing an anchoring force on a pile.
- the concepts regarding the pile can apply whether the pile capacity has been degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile.
- a sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile.
- the sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured.
- the sleeve may comprise a tubular sleeve or include an assembly of rings coupled together with at least one or more longitudinal members. An pile sleeve assembly with rings spaced a distance away from each other can help reduce the installation friction on the sleeve, as it is installed into the sea floor.
- the disclosure provides a method for rehabilitating an existing pile installed into a sea floor, comprising: positioning a pile sleeve having a padeye; allowing the pile sleeve to be lowered over the pile; and securing the sleeve to the pile.
- the disclosure also provides a rehabilitation system for a subsea an existing pile, installed into a sea floor, the system comprising: a sleeve having a outer shell forming an interior volume and at least partially open on a bottom of the sleeve; a padeye coupled to the sleeve, the padeye having a section of material coupled to the sleeve with an opening disposed through the material; and the sleeve being adapted to be inserted over a pile.
- This disclosure in addition provides a rehabilitation system of transferring new or additional loading on the existing pile at a point either at the top, bottom or any selected location between the top and bottom of the pile sleeve system.
- FIG. 1 is a cross-sectional schematic diagram of a suction pile installed into a sea floor.
- FIG. 2 is a cross-sectional schematic diagram of a system for supporting a pile sleeve installed in a sea floor.
- FIG. 3A is a cross-sectional schematic view of the sleeve system with a supplementary support system.
- FIG. 3B is a cross-sectional schematic view of an alternative supplementary support system.
- FIG. 3C is a plan schematic view of the supplementary support system.
- FIG. 4 is a perspective schematic view of another embodiment of the sleeve.
- FIG. 5 is a side schematic view of an alternative embodiment of the sleeve shown in FIG. 4 .
- FIG. 6 is a top schematic view of a lower ring shown in FIG. 5 .
- FIG. 7 is a top schematic view of an upper ring shown in FIG. 5 .
- FIG. 8 is a perspective schematic view of another embodiment of the sleeve.
- FIG. 2 is a cross-sectional schematic diagram of a system for supporting a pile installed in a sea floor.
- the pile 2 having a padeye 14 , is installed at least partially in a sea floor 4 . Due to degraded conditions, additional loading, or other circumstances, the pile 2 may not be suitable for supporting an intended load.
- a sleeve 20 can be installed over the pile 2 to provide additional support for the load.
- the sleeve generally includes a sleeve cap 26 as a top of the sleeve coupled to an outer shell 28 with at least a partially open bottom 30 to form an interior volume 31 .
- the sleeve 10 may generally include a padeye ring 22 , which may be integral with or separate from an upper portion of the sleeve 20 .
- the padeye ring 22 generally includes a sleeve padeye 24 coupled thereto.
- the pile, sleeve, and rings are shown having a circular cross-section. However, it is to be understood that other geometric cross-sections can be used and are contemplated, including square, rectangular, octagonal, hexagonal, elliptical, and other cross-sectional shapes as may be appropriate.
- annular space 32 formed between the exterior of the pile 2 and the interior of the sleeve 20 can be filled with grout, if desired.
- the sleeve 20 can be secured to the pile 2 by a number of methods known to those with ordinary skill in the art. For example, depending on the angle of force exerted on the sleeve, and frictional forces between the sleeve and the pile 2 and/or sea floor 4 , the sleeve may be self-securing to the pile. The frictional forces between the sleeve and the pile, or even the sleeve and the sea floor materials, may “lock” the sleeve to the pile, so that relative vertical movement is restrained. In other circumstances, the sleeve may be secured by grouting, adhesives, or other chemical/mechanical means.
- a locking system 34 can include welding the sleeve to the pile, inserting a pin through an opening in the sleeve and/or pile, using a threaded nut, or other means.
- the sleeve cap 26 can be at least partially open to allow a portion of the pile to extend through the sleeve 20 to lock the sleeve to the pile.
- the sleeve may be used to rehabilitate the degraded pile by proving a new coupling location with a new padeye for the coupling member. Further, the sleeve can be used to expand the effective surface area of the pile to provide greater resistance in the sea floor and greater ability to support loads from the coupling member on the pile that without the sleeve.
- a coupling member 36 can be coupled to the sleeve padeye 24 .
- the coupling member 36 can be coupled to a structure 38 such as a tension leg platform, semi-submersible platform, or other structures as may be appropriately moored or otherwise secured to a pile.
- the coupling member can include, without limitation, cables, chains, and other anchor lines, such as in catenary or taut-line applications, known to those with ordinary skill in the art.
- FIG. 3A is a cross-sectional schematic view of the sleeve system with a supplementary support system.
- FIG. 3B is a cross-sectional schematic view of an alternative supplementary support system.
- FIG. 3C is a top schematic view of the supplementary support system.
- the figures will be described in conjunction with each other. Elements with similar numbers as described above are similarly used herein.
- the pile 2 is installed in the sea floor 4 .
- a sleeve 20 is installed and coupled with the pile 2 .
- a coupling member 36 is coupled between the sleeve 20 and a structure 38 .
- the support provided by the pile 2 may be inadequate for the particular load on the coupling member 36 , even with a sleeve 20 .
- other support structures may be used.
- a supplemental pile 40 may be installed at some desired distance from the pile 2 .
- a coupling member 44 can be used with the supplemental pile 40 , such as in a lower portion of the pile 40 , to provide the additional support to the pile 2 with the sleeve 20 .
- the sleeve 20 can include an additional padeye 43 that provides a coupling location for the coupling member 44 from the sleeve 20 to the pile 40 .
- the coupling member 44 disposed between the sleeve 20 and the pile 40 could be aligned in an opposite direction from the coupling member 36 disposed between the pile 2 and the structure 38 .
- such supplementary support structures will be positioned at a non-zero angle “ ⁇ ” relative to the coupling member 36 , as shown in FIG. 3C , and advantageously between about 90° to about 270°.
- a coupling member 46 may be coupled between the sleeve 20 and the sleeve 42 .
- an anchoring member 48 may be used as an alternative to the supplemental pile 40 .
- the anchoring member 48 may be a structure embedded into the sea floor and generally shaped to provide greater resistance in at least one direction than another.
- the anchoring member 48 can provide resistance to movement of the pile 2 and the sleeve 20 caused by a force from the coupling member 36 .
- the sleeve 20 may include an additional padeye 43 to couple a coupling member 46 between the sleeve 20 and the anchoring member 48 .
- piles 42 A, 42 B shown in FIG. 3C can be installed at some non-zero angle, such as angles ⁇ A and ⁇ B, respectively.
- One or more padeyes 43 A and 43 B, respectively, can be used to couple one or more coupling members to the pile 2 and/or sleeve 20 .
- FIG. 4 is a perspective schematic view of another embodiment of the sleeve.
- the sleeve 20 can include an assembly of two or more rings coupled together with one or more longitudinal members. It is believed that the assembly of the sleeve shown in FIG. 4 is lighter in weight than a correspondingly sized solid outer shell sleeve. The assembly may also provide less friction due to less surface area, as the sleeve is installed over the pile, in surrounding layers of material in the sea floor 4 .
- the sleeve 20 can include an upper sleeve ring 50 and a lower sleeve ring 52 with at least one longitudinal member 56 coupled therebetween.
- the longitudinal member 56 generally extends outward from the rings by a portion of the longitudinal member 56 , herein termed an extension portion 58 .
- the extension portion 58 can include fins, webs portions of formed structures, and so forth.
- more than one longitudinal member may be used to support the rings around the sleeve perimeter. For example, three longitudinal members are shown, but the number of longitudinal members can vary from one to many.
- the longitudinal member 56 may further include a pointed end to help facilitate installation in the sea floor 4 shown in FIG. 2 .
- the longitudinal member may also assist in maintaining rotational alignment as the sleeve is embedded in the sea floor 4 materials.
- the longitudinal member 56 has sufficient strength to avoid undue bending of the sleeve 20 at least during installation, so that the sleeve will not bind on the pile 2 as it is installed.
- the sleeve 20 can include an intermediate sleeve ring 54 .
- the intermediate sleeve ring 54 can further assist in maintaining alignment and avoiding buckling of the assembly at least during installation of the sleeve on the pile.
- a top 60 of the sleeve 20 may be at least partially open. In general, the top is used to limit the amount of travel of the sleeve downward over the piles.
- the lower sleeve ring 52 generally includes a padeye 24 .
- the padeye 24 is formed of a section 64 that extends radially outward relative to a longitudinal axis 57 that passes through an inner portion of the rings.
- the padeye generally has an opening 66 formed therethrough, generally used to couple the coupling member 36 thereto, shown in FIG. 2 .
- the padeye can further include a padeye clearance portion 62 that is open to the internal portion of the ring 52 .
- the padeye clearance portion 62 can be sufficiently sized, so that the ring 52 can be installed over the original padeye 14 of the pile 2 , such as shown in FIG. 2 .
- the one or more rings 50 , 52 , 54 are generally spaced a distance from each other in the sleeve 20 , shown in FIG. 4 .
- the rings 50 , 54 can be separated by a spacing 68
- the rings 54 , 52 can be separated by a spacing 70 .
- the spacing, and absence of ring material in the spacing may provide less friction between the sleeve 20 and the layers of material in the sea floor 4 through which the sleeve is installed.
- FIG. 5 is a side schematic view of an alternative embodiment of the sleeve shown in FIG. 4 .
- FIG. 6 is a top schematic view of a lower ring shown in FIG. 5 .
- FIG. 7 is a top schematic view of an upper ring shown in FIG. 5 .
- the sleeve 20 can include a number of rings, such as rings 50 , 52 and 54 , coupled together with one or more longitudinal members 56 .
- the spacings 68 , 70 between the rings can provide openings to the subsea conditions, and to the sea floor material.
- a sleeve padeye 24 extends radially outward from the sleeve 20 and is generally coupled to the lower sleeve ring 52 .
- the padeye 24 includes a section 64 and an opening 66 extending therethrough.
- the lower ring 52 can be extended outwardly relative to the pile 2 with a padeye extension 74 to a suitable radial location for the padeye 24 to be coupled thereto.
- the pile 2 relative to the ring 52 is shown for reference, but it is understood that other variations are possible and contemplated. In some embodiments, it may be conducive to couple a longitudinal member 56 to the extension 74 on one or both sides of the padeye 24 .
- the upper ring 50 shown disposed about the pile 2 for reference, can include an extension 76 disposed radially outward from the pile.
- the extension 76 can provide support for the one or more longitudinal members extending to the ring 52 and aligned therewith.
- FIG. 8 is a perspective schematic view of another embodiment of the sleeve.
- the sleeve 20 may be completely enclosed, with the exception of the base which is open, should suction pressure be required to drive the sleeve to depth on the pile 2 .
- the sleeve 20 can be used to rehabilitate a pile 2 that is installed into the sea floor 4 .
- the pile would be investigated for a variety of conditions of the pile and a determination made of any degradation that would significant impact the ability of the pile to support a load, or otherwise indicate that the installation of a sleeve is appropriate. Based on that determination, the sleeve could be installed over the pile.
- the sleeve 20 is positioned adjacent to the pile 2 , if the pile was already installed into the sea floor 4 .
- the sleeve padeye 24 is aligned with the pile padeye 24 , and the sleeve is allowed to be lowered over the pile.
- the sleeve can be driven over the pile or lowered over the pile through its own weight.
- the sleeve is maintained in rotational alignment with the pile, so that the sleeve padeye is in a similar position as a pile padeye after installation. The sleeve then becomes a substitute for the purpose of the pile without necessitating installing a new pile to replace the former pile.
- grouting may be installed between the sleeve and the pile.
- the coupling member can be coupled to the sleeve padeye generally prior to installation over the pile, or, in some circumstances, after installation. If desirable or necessary, the sleeve can be locked to the pile.
- Coupled may include any method or device for securing, binding, bonding, fastening, attaching, joining, inserting therein, forming thereon or therein, communicating, or otherwise associating, for example, mechanically, magnetically, electrically, chemically, directly or indirectly with intermediate elements, one or more pieces of members together and may further include without limitation integrally forming one functional member with another in a unity fashion.
- the coupling may occur in any direction, including rotationally.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present disclosure provides an improved system and method for increasing an anchoring force on a pile. The concepts regarding the pile can apply whether the pile is degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile. A sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile. The sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured. The sleeve may also include an assembly of rings coupled together with at least one longitudinal member. The assembly with the rings spaced a distance away from each other may help reduce an installation friction on the sleeve, as it is installed into the sea floor.
Description
- Not applicable.
- Not applicable.
- Not applicable.
- Not applicable.
- 1. Field
- The disclosure relates to pile anchor systems and methods, and particularly to pile anchor systems and methods for offshore petroleum structures, such as floating structures, drilling or production risers, and other marine structures.
- 2. Description of Related Art
- Often marine structures used in offshore petroleum industry are moored to a pile that is anchored to a sea floor. The pile is generally a tubular element that is installed into seabed deposits that form the sea floor. Depending on the depth of the sea at a given location, various methods can be used to install the pile into the sea floor. At great depths, it may be problematic to use a pile-driving hammer or other equipment to install the pile.
- A type of pile, known as a suction pile, is particularly suitable for deep water development. Generally, a suction pile is a tubular element with a closed top and open bottom that is installed vertically into the sea floor by self weight penetration and suction pressure.
FIG. 1 is a cross-sectional schematic diagram of a pile installed into a sea floor. The suction pile,pile 2, may be installed in thesea floor 4. Thepile 2 includes atop 6, sometimes known as a “pile cap,” attached totubular sides 8, and is open at thebottom 10. Thetop 6 can include avalve 12 that gives access to theinterior volume 11 of thepile 2 between thesides 8 and thetop 6. Thepile 2 further includes apadeye 14. Thepadeye 14 generally is a reinforced section used to attach an anchor line orother coupling member 16 to a structure (not shown) that may need mooring or otherwise securing. The installation technique generally includes locating thepile 2 in an appropriate location and lowering the pile into thesea floor 4 with cables. Typical the pile will penetrate under its own weight into the seafloor deposits until the resistance from the seabed deposits equals the self weight. Water can then be pumped out of the pile through thevalue 12 to create a differential pressure in thevolume 11 with a net downward force to push the pile to a desired depth of full penetration. - The
pile 2 can have different configurations. Some piles may include external fins that extend outwardly from the side. Other piles can include internal baffles or stiffening members that, for example, can be selectively depressurized to position the piles at different angles relative to the sea floor. Some designs have hemispherical tops. Other piles include groups of suction piles coupled together to form an assembly. - A suction pile, driven pile or any other tubular structure penetrated into the seabed to support or resist loads is referred to generally herein as a pile.
- Piles can become damaged, worn, or otherwise degraded. Presently, when such piles degraded, the pile is either removed, or abandoned, and another pile is installed at another location near the first pile. In general it is considered that after the initial installation of a pile, the
sea floor 4 has been disturbed and the shear resistance around the installed pile may be significantly reduced. Typically, thesea floor deposits 4 may require several months of consolidation and recovery after a pile is installed to provide full strength to the anchoring of the pile in the sea floor deposits. - Further, there are times in which an existing pile may be in a satisfactory condition, but may require to resist additional structural loads from a new design load case or change in design. These new design load cases may overstress or be beyond the capacity of the existing pile. Typically, the solution has therefore been to install an additional pile to provide further support or replace the existing pile. However, the new solution still has the disadvantage of not providing full support until some later time, when the disturbed layers on the
sea floor 4 can consolidate around the pile. - Therefore, there remains a need to provide additional support to a pile either in a degraded condition or to provide additional support to extend the capacity of the existing pile.
- The present disclosure provides an improved system and method for increasing an anchoring force on a pile. The concepts regarding the pile can apply whether the pile capacity has been degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile. A sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile. The sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured. The sleeve may comprise a tubular sleeve or include an assembly of rings coupled together with at least one or more longitudinal members. An pile sleeve assembly with rings spaced a distance away from each other can help reduce the installation friction on the sleeve, as it is installed into the sea floor.
- The disclosure provides a method for rehabilitating an existing pile installed into a sea floor, comprising: positioning a pile sleeve having a padeye; allowing the pile sleeve to be lowered over the pile; and securing the sleeve to the pile.
- The disclosure also provides a rehabilitation system for a subsea an existing pile, installed into a sea floor, the system comprising: a sleeve having a outer shell forming an interior volume and at least partially open on a bottom of the sleeve; a padeye coupled to the sleeve, the padeye having a section of material coupled to the sleeve with an opening disposed through the material; and the sleeve being adapted to be inserted over a pile.
- This disclosure in addition provides a rehabilitation system of transferring new or additional loading on the existing pile at a point either at the top, bottom or any selected location between the top and bottom of the pile sleeve system.
- While the concepts disclosed herein are susceptible to various modifications and alternative forms, only a few specific embodiments have been shown by way of example in the drawings and are described in detail below. The figures and detailed descriptions of these specific embodiments are not intended to limit the breadth or scope of the inventive concepts or the appended claims in any manner. Rather, the figures and detailed written descriptions are provided to illustrate the inventive concepts to a person of ordinary skill in the art as required by 35 U.S.C. §112.
-
FIG. 1 is a cross-sectional schematic diagram of a suction pile installed into a sea floor. -
FIG. 2 is a cross-sectional schematic diagram of a system for supporting a pile sleeve installed in a sea floor. -
FIG. 3A is a cross-sectional schematic view of the sleeve system with a supplementary support system. -
FIG. 3B is a cross-sectional schematic view of an alternative supplementary support system. -
FIG. 3C is a plan schematic view of the supplementary support system. -
FIG. 4 is a perspective schematic view of another embodiment of the sleeve. -
FIG. 5 is a side schematic view of an alternative embodiment of the sleeve shown inFIG. 4 . -
FIG. 6 is a top schematic view of a lower ring shown inFIG. 5 . -
FIG. 7 is a top schematic view of an upper ring shown inFIG. 5 . -
FIG. 8 is a perspective schematic view of another embodiment of the sleeve. - One or more illustrative embodiments of the concepts disclosed herein are presented below. For the sake of clarity, not all features of an actual implementation are described or shown in this application. It is understood that in the development of an actual embodiment, numerous implementation-specific decisions must be made to achieve the developer's goals, such as compliance with system-related, business-related and other constraints, which vary by implementation and from time to time. While a developer's efforts might be complex and time-consuming, such efforts would be, nevertheless, a routine undertaking for those of ordinary skill in the art having benefit of this disclosure.
-
FIG. 2 is a cross-sectional schematic diagram of a system for supporting a pile installed in a sea floor. Thepile 2, having apadeye 14, is installed at least partially in asea floor 4. Due to degraded conditions, additional loading, or other circumstances, thepile 2 may not be suitable for supporting an intended load. Asleeve 20 can be installed over thepile 2 to provide additional support for the load. - The sleeve generally includes a
sleeve cap 26 as a top of the sleeve coupled to anouter shell 28 with at least a partially open bottom 30 to form aninterior volume 31. Thesleeve 10 may generally include apadeye ring 22, which may be integral with or separate from an upper portion of thesleeve 20. Thepadeye ring 22 generally includes asleeve padeye 24 coupled thereto. The pile, sleeve, and rings are shown having a circular cross-section. However, it is to be understood that other geometric cross-sections can be used and are contemplated, including square, rectangular, octagonal, hexagonal, elliptical, and other cross-sectional shapes as may be appropriate. Such shapes are included within the term “tubular,” “rings,” “annular,” and other shape-referencing terms used herein. Anyannular space 32 formed between the exterior of thepile 2 and the interior of thesleeve 20 can be filled with grout, if desired. - The
sleeve 20 can be secured to thepile 2 by a number of methods known to those with ordinary skill in the art. For example, depending on the angle of force exerted on the sleeve, and frictional forces between the sleeve and thepile 2 and/orsea floor 4, the sleeve may be self-securing to the pile. The frictional forces between the sleeve and the pile, or even the sleeve and the sea floor materials, may “lock” the sleeve to the pile, so that relative vertical movement is restrained. In other circumstances, the sleeve may be secured by grouting, adhesives, or other chemical/mechanical means. Still further, alocking system 34 can include welding the sleeve to the pile, inserting a pin through an opening in the sleeve and/or pile, using a threaded nut, or other means. Thus, in at least one embodiment, thesleeve cap 26 can be at least partially open to allow a portion of the pile to extend through thesleeve 20 to lock the sleeve to the pile. - The sleeve may be used to rehabilitate the degraded pile by proving a new coupling location with a new padeye for the coupling member. Further, the sleeve can be used to expand the effective surface area of the pile to provide greater resistance in the sea floor and greater ability to support loads from the coupling member on the pile that without the sleeve.
- A
coupling member 36 can be coupled to thesleeve padeye 24. Thecoupling member 36 can be coupled to astructure 38 such as a tension leg platform, semi-submersible platform, or other structures as may be appropriately moored or otherwise secured to a pile. The coupling member can include, without limitation, cables, chains, and other anchor lines, such as in catenary or taut-line applications, known to those with ordinary skill in the art. -
FIG. 3A is a cross-sectional schematic view of the sleeve system with a supplementary support system.FIG. 3B is a cross-sectional schematic view of an alternative supplementary support system.FIG. 3C is a top schematic view of the supplementary support system. The figures will be described in conjunction with each other. Elements with similar numbers as described above are similarly used herein. Generally, thepile 2 is installed in thesea floor 4. Asleeve 20 is installed and coupled with thepile 2. Acoupling member 36 is coupled between thesleeve 20 and astructure 38. - In some instances, the support provided by the
pile 2 may be inadequate for the particular load on thecoupling member 36, even with asleeve 20. To supplement the stability of thepile 2 to provide additional loading, other support structures may be used. - To add the supplementary support, a
supplemental pile 40 may be installed at some desired distance from thepile 2. In at least one embodiment, acoupling member 44 can be used with thesupplemental pile 40, such as in a lower portion of thepile 40, to provide the additional support to thepile 2 with thesleeve 20. Thesleeve 20 can include anadditional padeye 43 that provides a coupling location for thecoupling member 44 from thesleeve 20 to thepile 40. Thecoupling member 44 disposed between thesleeve 20 and thepile 40 could be aligned in an opposite direction from thecoupling member 36 disposed between thepile 2 and thestructure 38. Generally, such supplementary support structures will be positioned at a non-zero angle “α” relative to thecoupling member 36, as shown inFIG. 3C , and advantageously between about 90° to about 270°. Alternatively or in addition thereto, if asleeve 42 is installed on thepile 40, acoupling member 46 may be coupled between thesleeve 20 and thesleeve 42. - As shown in
FIG. 3B , an anchoringmember 48 may be used as an alternative to thesupplemental pile 40. The anchoringmember 48 may be a structure embedded into the sea floor and generally shaped to provide greater resistance in at least one direction than another. The anchoringmember 48 can provide resistance to movement of thepile 2 and thesleeve 20 caused by a force from thecoupling member 36. Thesleeve 20 may include anadditional padeye 43 to couple acoupling member 46 between thesleeve 20 and the anchoringmember 48. - If additional piles are installed such as
piles FIG. 3C , then the piles can be installed at some non-zero angle, such as angles αA and αB, respectively. One ormore padeyes pile 2 and/orsleeve 20. -
FIG. 4 is a perspective schematic view of another embodiment of the sleeve. Thesleeve 20 can include an assembly of two or more rings coupled together with one or more longitudinal members. It is believed that the assembly of the sleeve shown inFIG. 4 is lighter in weight than a correspondingly sized solid outer shell sleeve. The assembly may also provide less friction due to less surface area, as the sleeve is installed over the pile, in surrounding layers of material in thesea floor 4. - More specifically, the
sleeve 20 can include anupper sleeve ring 50 and alower sleeve ring 52 with at least onelongitudinal member 56 coupled therebetween. Thelongitudinal member 56 generally extends outward from the rings by a portion of thelongitudinal member 56, herein termed anextension portion 58. Theextension portion 58 can include fins, webs portions of formed structures, and so forth. Generally, more than one longitudinal member may be used to support the rings around the sleeve perimeter. For example, three longitudinal members are shown, but the number of longitudinal members can vary from one to many. Thelongitudinal member 56 may further include a pointed end to help facilitate installation in thesea floor 4 shown inFIG. 2 . Further, the longitudinal member may also assist in maintaining rotational alignment as the sleeve is embedded in thesea floor 4 materials. In general, thelongitudinal member 56 has sufficient strength to avoid undue bending of thesleeve 20 at least during installation, so that the sleeve will not bind on thepile 2 as it is installed. Further, thesleeve 20 can include anintermediate sleeve ring 54. Theintermediate sleeve ring 54 can further assist in maintaining alignment and avoiding buckling of the assembly at least during installation of the sleeve on the pile. A top 60 of thesleeve 20 may be at least partially open. In general, the top is used to limit the amount of travel of the sleeve downward over the piles. - The
lower sleeve ring 52 generally includes apadeye 24. Thepadeye 24 is formed of asection 64 that extends radially outward relative to alongitudinal axis 57 that passes through an inner portion of the rings. The padeye generally has anopening 66 formed therethrough, generally used to couple thecoupling member 36 thereto, shown inFIG. 2 . In some embodiments, the padeye can further include apadeye clearance portion 62 that is open to the internal portion of thering 52. Thepadeye clearance portion 62 can be sufficiently sized, so that thering 52 can be installed over theoriginal padeye 14 of thepile 2, such as shown inFIG. 2 . - The one or
more rings sleeve 20, shown inFIG. 4 . For example, therings spacing 68, and therings spacing 70. The spacing, and absence of ring material in the spacing, may provide less friction between thesleeve 20 and the layers of material in thesea floor 4 through which the sleeve is installed. -
FIG. 5 is a side schematic view of an alternative embodiment of the sleeve shown inFIG. 4 .FIG. 6 is a top schematic view of a lower ring shown inFIG. 5 .FIG. 7 is a top schematic view of an upper ring shown inFIG. 5 . The drawings will be described in conjunction with each other. Similar elements as described above will be used herein. Generally, thesleeve 20 can include a number of rings, such asrings longitudinal members 56. Thespacings sleeve padeye 24 extends radially outward from thesleeve 20 and is generally coupled to thelower sleeve ring 52. Thepadeye 24 includes asection 64 and anopening 66 extending therethrough. - As shown in
FIG. 6 , thelower ring 52 can be extended outwardly relative to thepile 2 with apadeye extension 74 to a suitable radial location for thepadeye 24 to be coupled thereto. Thepile 2 relative to thering 52 is shown for reference, but it is understood that other variations are possible and contemplated. In some embodiments, it may be conducive to couple alongitudinal member 56 to theextension 74 on one or both sides of thepadeye 24. - As shown in
FIG. 7 , theupper ring 50, shown disposed about thepile 2 for reference, can include anextension 76 disposed radially outward from the pile. Theextension 76 can provide support for the one or more longitudinal members extending to thering 52 and aligned therewith. -
FIG. 8 is a perspective schematic view of another embodiment of the sleeve. In some instances, thesleeve 20 may be completely enclosed, with the exception of the base which is open, should suction pressure be required to drive the sleeve to depth on thepile 2. - In operation, the
sleeve 20 can be used to rehabilitate apile 2 that is installed into thesea floor 4. Generally, the pile would be investigated for a variety of conditions of the pile and a determination made of any degradation that would significant impact the ability of the pile to support a load, or otherwise indicate that the installation of a sleeve is appropriate. Based on that determination, the sleeve could be installed over the pile. - Generally, the
sleeve 20 is positioned adjacent to thepile 2, if the pile was already installed into thesea floor 4. Thesleeve padeye 24 is aligned with thepile padeye 24, and the sleeve is allowed to be lowered over the pile. The sleeve can be driven over the pile or lowered over the pile through its own weight. In general, the sleeve is maintained in rotational alignment with the pile, so that the sleeve padeye is in a similar position as a pile padeye after installation. The sleeve then becomes a substitute for the purpose of the pile without necessitating installing a new pile to replace the former pile. If desired, grouting may be installed between the sleeve and the pile. The coupling member can be coupled to the sleeve padeye generally prior to installation over the pile, or, in some circumstances, after installation. If desirable or necessary, the sleeve can be locked to the pile. - In some circumstances, it may be desirable to pre-install the
sleeve 20 on thepile 2 prior to installation of the pile into thesea floor 4, such as in a new installation. Such circumstances are envisioned and encompassed with the scope of the present claims and disclosure. For example, it is foreseen that periodic replacements of the pile may be appropriate and a preinstalled sleeve may be easier to replace on a periodic basis starting with the preinstalled sleeve. - The systems and methods herein have been described in the context of various embodiments and not every embodiment has been described. Apparent modifications and alterations to the described embodiments are available to those of ordinary skill in the art. The disclosed and undisclosed embodiments are not intended to limit or restrict the scope or applicability of the concepts of the Applicants, but rather, in conformity with the patent laws, Applicants intend to protect all such modifications and improvements to the full extent that such falls within the scope or range of equivalent of the following claims.
- The various methods and embodiments of the concept may be included in combination with each other to produce variations of the disclosed methods and embodiments, as would be understood by those with ordinary skill in the art, given the understanding provided herein. Also, various aspects of the embodiments could be used in conjunction with each other to accomplish the understood goals of the disclosure. Also, the directions such as “top,” “bottom,” “left,” “right,” “upper,” “lower,” and other directions and orientations are described herein for clarity in reference to the figures and are not to be limiting of the actual device or system or use of the device or system. Unless the context requires otherwise, the word “comprise” or variations such as “comprises” or “comprising,” should be understood to imply the inclusion of at least the stated element or step or group of elements or steps or equivalents thereof, and not the exclusion of a greater numerical quantity or any other element or step or group of elements or steps or equivalents thereof Discussion of singular elements may include plural elements and vice-versa. References to at least one item followed by a reference to the item may include one or more items. The device or system may be used in a number of directions and orientations. The term “coupled,” “coupling,” “coupler,” and like terms are used broadly herein and may include any method or device for securing, binding, bonding, fastening, attaching, joining, inserting therein, forming thereon or therein, communicating, or otherwise associating, for example, mechanically, magnetically, electrically, chemically, directly or indirectly with intermediate elements, one or more pieces of members together and may further include without limitation integrally forming one functional member with another in a unity fashion. The coupling may occur in any direction, including rotationally.
- The order of steps may occur in a variety of sequences unless otherwise specifically limited. The various steps described herein may be combined with other steps, interlineated with the stated steps, and/or split into multiple steps. Additionally, the headings herein are for the convenience of the reader and are not intended to limit the scope of the concept. Other and further embodiments utilizing one or more aspects of the concepts described above may be devised without departing from the spirit of Applicants' disclosure. For example, other types of piles could be used and some piles could have different types of padeyes or even no padeyes. Other variations are contemplated given the teachings of the disclosure herein.
- Further, any references mentioned in the application for this patent, as well as all references listed in the information disclosure originally filed with the application, are hereby incorporated by reference in their entirety to the extent such may be deemed essential to support the enabling of the concept. However, to the extent statements might be considered inconsistent with the patenting of the concept, such statements are expressly not meant to be considered as made by the Applicant(s).
Claims (19)
1. A method for rehabilitating a pile installed, or partially installed into a sea floor, comprising:
positioning a pile sleeve having a padeye;
allowing the pile sleeve to be lowered over the pile; and
securing the sleeve to the pile.
2. The method of claim 1 , wherein the pile comprises a padeye and further comprising:
aligning the sleeve padeye with the pile padeye prior to installing the sleeve over the pile; and
maintaining alignment as the sleeve is lowered over the pile.
3. The method of claim 1 , wherein maintaining alignment as the sleeve is lowered over the pile comprises guiding the sleeve into the sea floor with at least one longitudinal member extending outward from the sleeve.
4. The method of claim 1 , wherein the pile is installed or partially installed into a sea floor prior to installing the sleeve over the pile.
5. The method of claim 1 , further comprising installing the sleeve over the pile prior to installing the pile at least partially into the sea floor.
6. The method of claim 1 , further comprising:
investigating a condition of an existing pile installed or partially installed in the sea floor;
determining a degraded condition; and
installing the sleeve over the pile based on determining the degraded condition.
7. The method of claim 1 , further comprising:
installing a supplemental pile; and
coupling the supplemental pile to the sleeve at a non-zero angle relative to the coupling member between the structure and the sleeve padeye.
8. The method of claim 1 , further comprising:
installing an anchoring member; and
coupling the anchoring member to the sleeve at a non-zero angle relative to the coupling member between the structure and the sleeve padeye.
9. The method of claim 1 , further comprising locking the sleeve to the pile.
10. The method of claim 1 , wherein the pile comprises a suction pile.
11. A rehabilitation system for a subsea pile, the pile to be adapted being installed or partially installed into a sea floor, the system comprising:
a sleeve having a outer shell forming an interior volume and at least partially open on a bottom of the sleeve;
a padeye coupled to the sleeve, the padeye having a section of material coupled to the sleeve with an opening disposed through the material; and
the sleeve being adapted to be inserted over a pile.
12. The system of claim 11 , wherein the sleeve comprises an assembly of at least two rings coupled together with at least one longitudinal member, the rings being spaced apart from each other.
13. The system of claim 12 , wherein the longitudinal member extends outward from the rings and is adapted to guide the sleeve in rotational alignment to the existing pile.
14. The system of claim 12 , further comprising one or more intermediate rings coupled between the two rings and longitudinally spaced apart from each of the two rings.
15. The system of claim 12 , wherein the sleeve comprises at least two longitudinal members spaced about a periphery of the rings.
16. The system of claim 11 , wherein the sleeve comprises an extended padeye having an opening extending radially from an inner portion of the ring, the opening sized to extend around an existing padeye on the existing pile.
17. The system of claim 11 , wherein the sleeve comprises a top being at least partially open, the top comprising a locking system adapted to couple the sleeve to the pile.
18. The system of claim 11 , further comprising at least one secondary padeye disposed on the sleeve and rotationally located at a non-zero angle relative to the padeye of the sleeve.
19. The system of claim 18 , wherein the secondary padeye is coupled to an anchor, a supplemental pile, or a combination thereof 20. The system of claim 11 , further comprising a supplemental pile coupled to the sleeve.
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/937,206 US20090123235A1 (en) | 2007-11-08 | 2007-11-08 | Outer pipe sleeve for a sea floor mooring pile |
MYPI2010002104A MY154526A (en) | 2007-11-08 | 2008-11-07 | Outer pipe sleeve for sea floor mooring pile |
EP08847107A EP2220329A1 (en) | 2007-11-08 | 2008-11-07 | Outer pipe sleeve for sea floor mooring pile |
US12/741,853 US8465229B2 (en) | 2007-11-08 | 2008-11-07 | Outer pipe sleeve for sea floor mooring pile |
BRPI0819167A BRPI0819167A2 (en) | 2007-11-08 | 2008-11-07 | method for rehabilitating an installed or partially installed pile at the bottom of the sea; and an underwater pile rehabilitation system |
PCT/EP2008/065099 WO2009060049A1 (en) | 2007-11-08 | 2008-11-07 | Outer pipe sleeve for sea floor mooring pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/937,206 US20090123235A1 (en) | 2007-11-08 | 2007-11-08 | Outer pipe sleeve for a sea floor mooring pile |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/741,853 Continuation-In-Part US8465229B2 (en) | 2007-11-08 | 2008-11-07 | Outer pipe sleeve for sea floor mooring pile |
Publications (1)
Publication Number | Publication Date |
---|---|
US20090123235A1 true US20090123235A1 (en) | 2009-05-14 |
Family
ID=40349922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/937,206 Abandoned US20090123235A1 (en) | 2007-11-08 | 2007-11-08 | Outer pipe sleeve for a sea floor mooring pile |
Country Status (5)
Country | Link |
---|---|
US (1) | US20090123235A1 (en) |
EP (1) | EP2220329A1 (en) |
BR (1) | BRPI0819167A2 (en) |
MY (1) | MY154526A (en) |
WO (1) | WO2009060049A1 (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101185031B1 (en) | 2010-06-23 | 2012-09-21 | 한국건설기술연구원 | Suction Anchor Pile with Propellent Device, and Installation Method of Suction Anchor Pile using the Propellent Device |
US20130239866A1 (en) * | 2011-09-09 | 2013-09-19 | Horton Wison Deepwater, Inc. | Conductor Bend Restrictor |
US20130259581A1 (en) * | 2012-01-19 | 2013-10-03 | Hydrochina Huadong Engineering Corporation | Grouting Cabin Structure of a Grouted Connection in a Foundation of an Offshore Wind Turbine Generator |
KR101439759B1 (en) | 2013-03-29 | 2014-09-15 | 주식회사 포스코건설 | Mooring anchor fixing method using suction pile |
WO2014204107A1 (en) * | 2013-06-18 | 2014-12-24 | 한국해양과학기술원 | Multi-suction-pile anchor and flat plate anchor having suction piles |
GB2551379A (en) * | 2016-06-16 | 2017-12-20 | Acergy France SAS | Upgrading subsea foundations of mooring systems |
KR20190073162A (en) * | 2017-12-18 | 2019-06-26 | 대우조선해양 주식회사 | Gravity type suction anchor and its installation method |
US20200062348A1 (en) * | 2018-08-21 | 2020-02-27 | Exxonmobil Upstream Research Company | Reducing Trenching at Mooring Lines |
US20200071902A1 (en) * | 2018-08-30 | 2020-03-05 | Exxonmobil Upstream Research Company | Integrated Pile Anchor Reinforcement Systems |
US10870965B2 (en) * | 2018-08-30 | 2020-12-22 | Exxonmobil Upstream Research Company | Mat incorporated pile anchor reinforcement systems |
US20220106793A1 (en) * | 2020-10-05 | 2022-04-07 | Rrd Eng Llc | Padeye, Connections, and Mooring Solution for Concrete Anchors |
CN114319320A (en) * | 2021-12-29 | 2022-04-12 | 中交二航局第二工程有限公司 | Temporary pier steel pipe pile and floating installation method thereof |
CN114954786A (en) * | 2022-06-14 | 2022-08-30 | 上海交通大学 | Torpedo anchor with telescopic anchor plate and mounting method thereof |
US20230024467A1 (en) * | 2021-07-26 | 2023-01-26 | Vicinay Mooring Connectors, S.A. | Anchor device for anchoring a floating structure to the seabed and installation method of the anchor device |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
MY180518A (en) * | 2014-04-03 | 2020-12-01 | Univ Nanyang Tech | Method for installing a multi-section suction caisson |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3411473A (en) * | 1966-12-19 | 1968-11-19 | Texaco Inc | Deepwater anchor |
US4023374A (en) * | 1975-11-21 | 1977-05-17 | Symons Corporation | Repair sleeve for a marine pile and method of applying the same |
US4270480A (en) * | 1977-11-14 | 1981-06-02 | The Secretary Of State For Industry In Her Britannic Majesty's Government Of The United Kingdom Of Great Britain And Northern Ireland | Pinned suction anchors |
US4351624A (en) * | 1979-10-15 | 1982-09-28 | Barber Ronald A | File and jacket construction method and apparatus |
US5435667A (en) * | 1986-02-20 | 1995-07-25 | Slickbar Products Corp. | Protection of piles |
US5706863A (en) * | 1995-09-22 | 1998-01-13 | Premiere, Inc. | Pipe section having padeye attachments |
US6082283A (en) * | 1996-10-09 | 2000-07-04 | Coflexip Stena Offshore Limited | Marine mooring system |
US6203248B1 (en) * | 2000-02-03 | 2001-03-20 | Atwood Oceanics, Inc. | Sliding-resistant bottom-founded offshore structures |
US6227138B1 (en) * | 1996-02-21 | 2001-05-08 | Den Norske Stats Oljeselskap A.S. | System for anchoring ships |
US6481932B1 (en) * | 1999-11-18 | 2002-11-19 | Suction Pile Technology B.V. | Marine structure |
US6488446B1 (en) * | 1998-04-02 | 2002-12-03 | Suction Pile Technology Bv | Marine structure |
US6719496B1 (en) * | 1997-11-01 | 2004-04-13 | Shell Oil Company | ROV installed suction piles |
US6955503B1 (en) * | 2003-10-21 | 2005-10-18 | Shivers Iii Robert Magee | Method for salvaging offshore jackets |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2108556B (en) * | 1981-10-31 | 1985-02-20 | Webco Ind Rubber Ltd | Protective device for piles |
US4464083A (en) * | 1982-08-25 | 1984-08-07 | Wathey John G | Ice guard for protecting pilings |
AUPO666597A0 (en) * | 1997-05-07 | 1997-05-29 | Amog Technologies Pty Ltd | Repair of tubular structural members |
AU2003215519A1 (en) * | 2002-03-01 | 2003-09-16 | Mt Hojgaard A/S | Seal for use between two facing cylindrical surfaces and a method for mounting a sleeve on a pile element |
EA007215B1 (en) * | 2003-03-04 | 2006-08-25 | Эксонмобил Апстрим Рисерч Компани | Anchor installation system |
US7287935B1 (en) * | 2003-07-16 | 2007-10-30 | Gehring Donald H | Tendon assembly for mooring offshore structure |
GB0426025D0 (en) * | 2004-11-26 | 2004-12-29 | Screwfast Foundations Ltd | A pile sleeve and a method of pile installation |
-
2007
- 2007-11-08 US US11/937,206 patent/US20090123235A1/en not_active Abandoned
-
2008
- 2008-11-07 EP EP08847107A patent/EP2220329A1/en not_active Withdrawn
- 2008-11-07 MY MYPI2010002104A patent/MY154526A/en unknown
- 2008-11-07 WO PCT/EP2008/065099 patent/WO2009060049A1/en active Application Filing
- 2008-11-07 BR BRPI0819167A patent/BRPI0819167A2/en not_active Application Discontinuation
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3411473A (en) * | 1966-12-19 | 1968-11-19 | Texaco Inc | Deepwater anchor |
US4023374A (en) * | 1975-11-21 | 1977-05-17 | Symons Corporation | Repair sleeve for a marine pile and method of applying the same |
US4270480A (en) * | 1977-11-14 | 1981-06-02 | The Secretary Of State For Industry In Her Britannic Majesty's Government Of The United Kingdom Of Great Britain And Northern Ireland | Pinned suction anchors |
US4351624A (en) * | 1979-10-15 | 1982-09-28 | Barber Ronald A | File and jacket construction method and apparatus |
US5435667A (en) * | 1986-02-20 | 1995-07-25 | Slickbar Products Corp. | Protection of piles |
US5706863A (en) * | 1995-09-22 | 1998-01-13 | Premiere, Inc. | Pipe section having padeye attachments |
US6332500B1 (en) * | 1996-02-21 | 2001-12-25 | Den Norske Stats Oljeselskap A. S. | Anchor system for the transfer of fluids |
US6227138B1 (en) * | 1996-02-21 | 2001-05-08 | Den Norske Stats Oljeselskap A.S. | System for anchoring ships |
US6082283A (en) * | 1996-10-09 | 2000-07-04 | Coflexip Stena Offshore Limited | Marine mooring system |
US6719496B1 (en) * | 1997-11-01 | 2004-04-13 | Shell Oil Company | ROV installed suction piles |
US6488446B1 (en) * | 1998-04-02 | 2002-12-03 | Suction Pile Technology Bv | Marine structure |
US6481932B1 (en) * | 1999-11-18 | 2002-11-19 | Suction Pile Technology B.V. | Marine structure |
US6203248B1 (en) * | 2000-02-03 | 2001-03-20 | Atwood Oceanics, Inc. | Sliding-resistant bottom-founded offshore structures |
US6955503B1 (en) * | 2003-10-21 | 2005-10-18 | Shivers Iii Robert Magee | Method for salvaging offshore jackets |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101185031B1 (en) | 2010-06-23 | 2012-09-21 | 한국건설기술연구원 | Suction Anchor Pile with Propellent Device, and Installation Method of Suction Anchor Pile using the Propellent Device |
US20130239866A1 (en) * | 2011-09-09 | 2013-09-19 | Horton Wison Deepwater, Inc. | Conductor Bend Restrictor |
US9109725B2 (en) * | 2011-09-09 | 2015-08-18 | Horton Wison Deepwater, Inc. | Conductor bend restrictor |
US20130259581A1 (en) * | 2012-01-19 | 2013-10-03 | Hydrochina Huadong Engineering Corporation | Grouting Cabin Structure of a Grouted Connection in a Foundation of an Offshore Wind Turbine Generator |
US8757933B2 (en) * | 2012-01-19 | 2014-06-24 | Hydrochina Hangzhou Engineering Corp | Grouting cabin structure of a grouted connection in a foundation of an offshore wind turbine generator |
KR101439759B1 (en) | 2013-03-29 | 2014-09-15 | 주식회사 포스코건설 | Mooring anchor fixing method using suction pile |
WO2014204107A1 (en) * | 2013-06-18 | 2014-12-24 | 한국해양과학기술원 | Multi-suction-pile anchor and flat plate anchor having suction piles |
US9428876B2 (en) | 2013-06-18 | 2016-08-30 | Korea Institute Of Ocean Science & Technology | Multi-suction-pile anchor and flat plate anchor having suction piles |
GB2551379A (en) * | 2016-06-16 | 2017-12-20 | Acergy France SAS | Upgrading subsea foundations of mooring systems |
WO2017216638A1 (en) * | 2016-06-16 | 2017-12-21 | Acergy France SAS | Upgrading subsea foundations of mooring systems |
GB2551379B (en) * | 2016-06-16 | 2018-12-12 | Acergy France SAS | Upgrading subsea foundations of mooring systems |
US20190352878A1 (en) * | 2016-06-16 | 2019-11-21 | Acergy France SAS | Upgrading Subsea Foundations of Mooring Systems |
US10760241B2 (en) | 2016-06-16 | 2020-09-01 | Acergy France SAS | Upgrading subsea foundations of mooring systems |
AU2017283742B2 (en) * | 2016-06-16 | 2022-12-08 | Acergy France SAS | Upgrading subsea foundations of mooring systems |
KR20190073162A (en) * | 2017-12-18 | 2019-06-26 | 대우조선해양 주식회사 | Gravity type suction anchor and its installation method |
KR102455887B1 (en) * | 2017-12-18 | 2022-10-18 | 대우조선해양 주식회사 | Gravity type suction anchor |
US20200062348A1 (en) * | 2018-08-21 | 2020-02-27 | Exxonmobil Upstream Research Company | Reducing Trenching at Mooring Lines |
US10894581B2 (en) * | 2018-08-21 | 2021-01-19 | Exxonmobil Upstream Research Company | Reducing trenching at mooring lines |
US20200071902A1 (en) * | 2018-08-30 | 2020-03-05 | Exxonmobil Upstream Research Company | Integrated Pile Anchor Reinforcement Systems |
US10870965B2 (en) * | 2018-08-30 | 2020-12-22 | Exxonmobil Upstream Research Company | Mat incorporated pile anchor reinforcement systems |
US10865538B2 (en) * | 2018-08-30 | 2020-12-15 | Exxonmobil Upstream Research Company | Integrated pile anchor reinforcement systems |
US20220106793A1 (en) * | 2020-10-05 | 2022-04-07 | Rrd Eng Llc | Padeye, Connections, and Mooring Solution for Concrete Anchors |
WO2022074563A1 (en) * | 2020-10-05 | 2022-04-14 | Rrd Engineering, Llc Dba The Floating Wind Technology Company | Padeye configured to be attached to a suction anchor |
US12098550B2 (en) * | 2020-10-05 | 2024-09-24 | The Floating Wind Technology Company, Llc | Padeye, connections, and mooring solution for concrete anchors |
US20230024467A1 (en) * | 2021-07-26 | 2023-01-26 | Vicinay Mooring Connectors, S.A. | Anchor device for anchoring a floating structure to the seabed and installation method of the anchor device |
US12012178B2 (en) * | 2021-07-26 | 2024-06-18 | Vicinay Mooring Connectors, S.A. | Anchor device for anchoring a floating structure to the seabed and installation method of the anchor device |
CN114319320A (en) * | 2021-12-29 | 2022-04-12 | 中交二航局第二工程有限公司 | Temporary pier steel pipe pile and floating installation method thereof |
CN114954786A (en) * | 2022-06-14 | 2022-08-30 | 上海交通大学 | Torpedo anchor with telescopic anchor plate and mounting method thereof |
Also Published As
Publication number | Publication date |
---|---|
EP2220329A1 (en) | 2010-08-25 |
MY154526A (en) | 2015-06-30 |
BRPI0819167A2 (en) | 2017-05-02 |
WO2009060049A1 (en) | 2009-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20090123235A1 (en) | Outer pipe sleeve for a sea floor mooring pile | |
JP6173533B2 (en) | Subsea anchoring system and method | |
US7527455B2 (en) | Anchor installation system | |
US8465229B2 (en) | Outer pipe sleeve for sea floor mooring pile | |
US6910831B2 (en) | Method for installing a pile anchor | |
GB2364728A (en) | A method of forming a pile whilst simultaneously drilling | |
US10870965B2 (en) | Mat incorporated pile anchor reinforcement systems | |
CA2684496C (en) | Modular concrete substructures | |
GB2473733A (en) | A method of forming and installing a J-tube system | |
US10865538B2 (en) | Integrated pile anchor reinforcement systems | |
US7140319B2 (en) | Pile anchor with external vanes | |
US20070022934A1 (en) | Shallow water mooring system using synthetic mooring lines | |
US8821071B2 (en) | Conical piled monopod | |
US5114276A (en) | Apparatus and method for mooring a floating vessel | |
CA2513534A1 (en) | Pile anchor with external vanes | |
CA2825930C (en) | Method and system for installing subsea well trees | |
EP4323680A1 (en) | Seabed foundations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: TECHNIP FRANCE, FRANCE Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MACONOCHIE, ALASDAIR;OLIPHANT, JOHN;THOMAS, PIERRE-ARMAND;REEL/FRAME:020094/0606;SIGNING DATES FROM 20071018 TO 20071026 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |