US20070022934A1 - Shallow water mooring system using synthetic mooring lines - Google Patents

Shallow water mooring system using synthetic mooring lines Download PDF

Info

Publication number
US20070022934A1
US20070022934A1 US11/459,025 US45902506A US2007022934A1 US 20070022934 A1 US20070022934 A1 US 20070022934A1 US 45902506 A US45902506 A US 45902506A US 2007022934 A1 US2007022934 A1 US 2007022934A1
Authority
US
United States
Prior art keywords
mooring
shallow water
seabed
line
mooring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/459,025
Inventor
James Lee
Jim Li
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Delphi Acquisition Holding I BV
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US11/459,025 priority Critical patent/US20070022934A1/en
Publication of US20070022934A1 publication Critical patent/US20070022934A1/en
Assigned to DELPHI ACQUISITION HOLDING I B.V. reassignment DELPHI ACQUISITION HOLDING I B.V. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: LEE, JAMES JUN, LI, JIM JIANXUN
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C11/00Equipment for dwelling or working underwater; Means for searching for underwater objects
    • B63C11/02Divers' equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/20Adaptations of chains, ropes, hawsers, or the like, or of parts thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/20Adaptations of chains, ropes, hawsers, or the like, or of parts thereof
    • B63B2021/206Weights attached to mooring lines or chains, or the like; Arrangements thereof

Definitions

  • the invention relates generally to a shallow water mooring system.
  • Mooring systems utilizing steel wire and steel chains for offshore moored floating vessels have been used for many years. Most vessels are large ones and most of them in moderate or deepwater applications, deeper than 200 feet.
  • the gravity induced catenary shape of the mooring line provides the basic restoring force as the offsets occur when the vessel under environmental loading such as winds, waves and currents.
  • an embedded anchor or a pile is utilized to fix the mooring line to seabed.
  • the catenary shape of the mooring line makes the mooring line lateral stiffness much softer and more flexible comparing to a straight line axial stiffness of steel wires or steel chains.
  • FIG. 1 illustrates one conventional chain-wire-chain mooring line system for an offshore moored floating barge 10 .
  • the upper portion of the chains 11 connects to a chain stopper 12 at barge deck 13 .
  • the middle portion of mooring line is a steel wire 14 .
  • the bottom portion of chains 15 touches seabed 16 and connects to an embedded anchor pile 17 .
  • Non-steel synthetic mooring lines mostly referred to Polyester lines
  • Polyester lines have been accepted recently by offshore industry.
  • Two deepwater Spar platforms “Mad Dog” in 4,200 foot water depth and “Red Hawks” in 5,300 foot water depth, have employed Polyester lines as mooring lines and both were installed in Gulf of Mexico in 2004.
  • the chain-Polyester-chain configuration mooring line is much lighter and much more flexible than steel chain-wire-chain configuration.
  • the Polyester line provides its restoring force mostly from its axial stiffness, not from the gravity induced catenary shape like the conventional steel mooring line.
  • the Polyester portion of the line can not laid on the seabed to be exposed to mud or sands for an extended time.
  • the mud or sands could get into between fibers to cause wearing damage to the Polyester lines.
  • this restriction can be easily satisfied.
  • the bottom section of the chain could be designed so that the portion of Polyester line will not touch the seabed at all time. In shallow water applications, this restriction is very difficult to be satisfied because of the shallow water depth.
  • a shallow water mooring system for large offshore floating vessel applications utilizes synthetic nonsteel lines and at least one elevation means selected from a submerged tower structure, or at least one buoyant object.
  • FIG. 1 shows a prior art chain-wire-chain mooring system.
  • FIG. 2 shows a mooring system according to one embodiment of the invention.
  • FIG. 3 is a side view of a mooring system according to one embodiment of the invention.
  • FIG. 2 illustrates the plan view of one embodiment of a mooring system.
  • the barge 10 is moored by 12 mooring lines in three groups.
  • a submerged tripod anchoring tower 18 is served as an elevated anchor at seabed connected to the bottom portion of chains 15 .
  • FIG. 3 illustrates the side view of the preferred embodiments of the mooring system.
  • the upper portion of the chains 11 connects to a chain stopper 12 at barge deck 13 .
  • the middle portion of mooring line is Polyester line 19 in two sections. Between the sections, a buoy 20 is attached with a tri-plate 21 to connect both Polyester sections 19 and the buoy 20 .
  • the bottom portion of chains 15 connects to the elevated anchoring tower 18 .
  • Three piles 22 are driven into the seabed through the three leg sleeves 23 of the tripod anchoring tower 18 . Grouted connections are applied to the connections between the piles 22 and the sleeves 23 .
  • the length of the Polyester line for each mooring line should depend on the required stiffness. The longer of the line, the more flexible of the Polyester line.
  • the size of the Polyester line should depend on the required line tension strength based on dynamic mooring analysis. The height of elevated anchoring tower and the size of the buoy should be based on the mooring analysis results to keep the Polyester line off the seabed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Revetment (AREA)

Abstract

A shallow water mooring system applies to offshore industry for oil and gas exploration, and production. This mooring system employs non-steel synthetic lines to provide the desired flexibility for shallow water mooring system applications. Piled submerged towers at seabed serve as elevated anchors to keep the whole synthetic mooring lines off the seabed under environmental loading conditions. Other buoyant means such as a buoy is also utilized to further help the synthetic mooring lines off the seabed during their service life.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims priority to U.S. Provisional Application No. 60/595,682, “SHALLOW WATER MOORING SYSTEM USING SYNTHETIC MOORING LINES,” filed Jul. 21, 2005, and hereby incorporated by reference.
  • BACKGROUND OF INVENTION
  • 1. Field of the Invention
  • The invention relates generally to a shallow water mooring system.
  • 2. Background Art
  • Mooring systems utilizing steel wire and steel chains for offshore moored floating vessels have been used for many years. Most vessels are large ones and most of them in moderate or deepwater applications, deeper than 200 feet.
  • In deepwater mooring system applications, the gravity induced catenary shape of the mooring line provides the basic restoring force as the offsets occur when the vessel under environmental loading such as winds, waves and currents. At the end of the mooring line at seabed, an embedded anchor or a pile is utilized to fix the mooring line to seabed. The catenary shape of the mooring line makes the mooring line lateral stiffness much softer and more flexible comparing to a straight line axial stiffness of steel wires or steel chains.
  • In a typical chain-wire-chain configuration with an embedded anchor or an installed pile anchor at seabed, a portion of the chains is laid on the seabed in normal conditions. When a large vessel offset occurs, this portion of chains could be lifted off the seabed to add to catenary shape of the mooring line. However, under any design conditions, this catenary mooring line can not be allowed to be a straight line or near a straight line by increasing the line tension, because the line stiffness could be increased significantly under a straight line configuration.
  • FIG. 1 illustrates one conventional chain-wire-chain mooring line system for an offshore moored floating barge 10. The upper portion of the chains 11 connects to a chain stopper 12 at barge deck 13. The middle portion of mooring line is a steel wire 14. The bottom portion of chains 15 touches seabed 16 and connects to an embedded anchor pile 17.
  • In a shallow water application such as water depth less than 200 feet, the catenary shape of a conventional chain-wirechain mooring line is very limited and the system becomes ineffective. The line could be easily becomes a straight line as the vessel offset occurs and line tension increases. The sudden increase in line stiffness and associated the sudden increase in line tension could be very dangerous to the mooring system. Conventional method to improve the system is to use a long distance heavy chains on the seabed or to add clump weights to the chains on the seabed.
  • As the water depth gets shallower and shallower, the catenary mooring systems become less and less effective. The cost of the extended length of the chains laid at seabed and the required clump weights becomes very expensive.
  • Non-steel synthetic mooring lines, mostly referred to Polyester lines, have been accepted recently by offshore industry. Two deepwater Spar platforms, “Mad Dog” in 4,200 foot water depth and “Red Hawks” in 5,300 foot water depth, have employed Polyester lines as mooring lines and both were installed in Gulf of Mexico in 2004. The chain-Polyester-chain configuration mooring line is much lighter and much more flexible than steel chain-wire-chain configuration. In installed condition, the Polyester line provides its restoring force mostly from its axial stiffness, not from the gravity induced catenary shape like the conventional steel mooring line.
  • In the application of Polyester mooring lines, there is one restriction to be imposed: the Polyester portion of the line can not laid on the seabed to be exposed to mud or sands for an extended time. The mud or sands could get into between fibers to cause wearing damage to the Polyester lines. For deepwater applications, this restriction can be easily satisfied. The bottom section of the chain could be designed so that the portion of Polyester line will not touch the seabed at all time. In shallow water applications, this restriction is very difficult to be satisfied because of the shallow water depth.
  • SUMMARY OF INVENTION
  • In one embodiment, a shallow water mooring system for large offshore floating vessel applications is disclosed. The mooring system utilizes synthetic nonsteel lines and at least one elevation means selected from a submerged tower structure, or at least one buoyant object.
  • Other aspects and advantages of the invention will be apparent from the following description and the appended claims.
  • BRIEF DESCRIPTION OF DRAWINGS
  • FIG. 1 shows a prior art chain-wire-chain mooring system.
  • FIG. 2 shows a mooring system according to one embodiment of the invention.
  • FIG. 3 is a side view of a mooring system according to one embodiment of the invention.
  • DETAILED DESCRIPTION
  • FIG. 2 illustrates the plan view of one embodiment of a mooring system. The barge 10 is moored by 12 mooring lines in three groups. A submerged tripod anchoring tower 18 is served as an elevated anchor at seabed connected to the bottom portion of chains 15.
  • FIG. 3 illustrates the side view of the preferred embodiments of the mooring system. The upper portion of the chains 11 connects to a chain stopper 12 at barge deck 13. The middle portion of mooring line is Polyester line 19 in two sections. Between the sections, a buoy 20 is attached with a tri-plate 21 to connect both Polyester sections 19 and the buoy 20. The bottom portion of chains 15 connects to the elevated anchoring tower 18. Three piles 22 are driven into the seabed through the three leg sleeves 23 of the tripod anchoring tower 18. Grouted connections are applied to the connections between the piles 22 and the sleeves 23.
  • The length of the Polyester line for each mooring line should depend on the required stiffness. The longer of the line, the more flexible of the Polyester line. The size of the Polyester line should depend on the required line tension strength based on dynamic mooring analysis. The height of elevated anchoring tower and the size of the buoy should be based on the mooring analysis results to keep the Polyester line off the seabed.
  • While the invention has been described with respect to a limited number of embodiments, those skilled in the art, having benefit of this disclosure, will appreciate that other embodiments can be devised which do not depart from the scope of the invention as disclosed herein. Accordingly, the scope of the invention should be limited only by the attached claims.

Claims (7)

1. A shallow water mooring system for a large offshore floating vessel application (>300′ in vessel length) in a water depth range between 20 feet and 200 feet utilizing synthetic nonsteel lines and at least one elevation means selected from (1) the use of a submerged tower structure fixed at seabed to serve as an elevated anchor which will allow the bottom end of a mooring line connection to be at least 5 feet above seabed, and (2) the use of at least one buoyant object disposed at at least one point along the length of the synthetic line.
2. The shallow water mooring system of claim 1 where said synthetic mooring line comprises a Polyester line.
3. The shallow water mooring system of claim 1 wherein said submerged tower structure is a piled structure fixed to the seabed.
4. The shallow water mooring system of claim 1 wherein said submerged tower structure at least partially protrudes above a surface of the water.
5. The shallow water mooring system of claim 1 wherein said submerged tower structure is a gravity-based structure fixed to the seabed.
6. The shallow water mooring system of claim 1 wherein said at least one buoyant object comprises at least one buoy disposed at at least one point along the length of the mooring line.
7. The shallow water mooring system of claim 1 wherein said at least one buoyant object comprises at least one buoyant foam disposed along the length of the mooring line.
US11/459,025 2005-07-27 2006-07-21 Shallow water mooring system using synthetic mooring lines Abandoned US20070022934A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/459,025 US20070022934A1 (en) 2005-07-27 2006-07-21 Shallow water mooring system using synthetic mooring lines

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US59568205P 2005-07-27 2005-07-27
US11/459,025 US20070022934A1 (en) 2005-07-27 2006-07-21 Shallow water mooring system using synthetic mooring lines

Publications (1)

Publication Number Publication Date
US20070022934A1 true US20070022934A1 (en) 2007-02-01

Family

ID=37692896

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/459,025 Abandoned US20070022934A1 (en) 2005-07-27 2006-07-21 Shallow water mooring system using synthetic mooring lines

Country Status (1)

Country Link
US (1) US20070022934A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120067267A1 (en) * 2010-02-03 2012-03-22 Viking Moorings As Improved device and method for forming an anchor spread
NO331841B1 (en) * 2010-11-10 2012-04-16 Viking Moorings As Improved equipment and method for anchor spreading
NO337756B1 (en) * 2014-01-17 2016-06-13 Connect Lng As A transmission structure, transmission system and method for transferring a fluid and / or electrical power between a floating structure and a floating or non-floating facility
CN107054568A (en) * 2017-06-12 2017-08-18 三海洋重工有限公司 Shallow water anchoring system and barge
RU2695993C1 (en) * 2018-09-25 2019-07-30 Акционерное общество "НИИ измерительных приборов - Новосибирский завод имени Коминтерна" /АО "НПО НИИИП-НЗиК"/ Method of interference compensation (versions) and radar station for its implementation
EP4393808A1 (en) * 2022-12-28 2024-07-03 TotalEnergies OneTech Mooring system for floating structure and installation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5855178A (en) * 1996-03-13 1999-01-05 Aker Marine, Inc. Taut leg mooring system
US6309269B1 (en) * 1997-10-09 2001-10-30 Aker Marine, Inc. Variable buoyancy buoy for mooring mobile offshore drilling units
US20020162496A1 (en) * 2001-05-01 2002-11-07 Beato Christopher Louis Tender with hawser lines
US20030161690A1 (en) * 2000-07-20 2003-08-28 Breivik Kare G. Offshore loading or production system for dynamically positioned ships
US6901818B1 (en) * 2002-12-05 2005-06-07 Maxwell C. Cheung Tension measuring device for mooring line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5855178A (en) * 1996-03-13 1999-01-05 Aker Marine, Inc. Taut leg mooring system
US6309269B1 (en) * 1997-10-09 2001-10-30 Aker Marine, Inc. Variable buoyancy buoy for mooring mobile offshore drilling units
US20030161690A1 (en) * 2000-07-20 2003-08-28 Breivik Kare G. Offshore loading or production system for dynamically positioned ships
US20020162496A1 (en) * 2001-05-01 2002-11-07 Beato Christopher Louis Tender with hawser lines
US6901818B1 (en) * 2002-12-05 2005-06-07 Maxwell C. Cheung Tension measuring device for mooring line

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120067267A1 (en) * 2010-02-03 2012-03-22 Viking Moorings As Improved device and method for forming an anchor spread
US8418641B2 (en) * 2010-02-03 2013-04-16 Viking Moorings As Device and method for forming an anchor spread
NO331841B1 (en) * 2010-11-10 2012-04-16 Viking Moorings As Improved equipment and method for anchor spreading
NO20101589A1 (en) * 2010-11-10 2012-04-16 Viking Moorings As Improved equipment and procedure for anchor spreading
NO337756B1 (en) * 2014-01-17 2016-06-13 Connect Lng As A transmission structure, transmission system and method for transferring a fluid and / or electrical power between a floating structure and a floating or non-floating facility
US10532796B2 (en) 2014-01-17 2020-01-14 Connect Lng As Transfer structure, a transfer system and a method for transferring LNG and/or electric power
CN107054568A (en) * 2017-06-12 2017-08-18 三海洋重工有限公司 Shallow water anchoring system and barge
RU2695993C1 (en) * 2018-09-25 2019-07-30 Акционерное общество "НИИ измерительных приборов - Новосибирский завод имени Коминтерна" /АО "НПО НИИИП-НЗиК"/ Method of interference compensation (versions) and radar station for its implementation
EP4393808A1 (en) * 2022-12-28 2024-07-03 TotalEnergies OneTech Mooring system for floating structure and installation method

Similar Documents

Publication Publication Date Title
US5615977A (en) Flexible/rigid riser system
RU2185994C2 (en) Ship anchoring system
US8251005B2 (en) Spar structures
US8562256B2 (en) Floating system connected to an underwater line structure and methods of use
US20050158126A1 (en) Flexible riser system
US5893334A (en) Method and apparatus for mooring floating storage vessels
US5979353A (en) Production/platform mooring configuration
US20070022934A1 (en) Shallow water mooring system using synthetic mooring lines
US5873395A (en) Method for mooring floating storage vessels
US20060056918A1 (en) Riser system connecting two fixed underwater installations to a floating surface unit
US20140205383A1 (en) Jack-up drilling unit with tension legs
AU2011327938B2 (en) Riser support
US6779949B2 (en) Device for transferring a fluid between at least two floating supports
US20080089745A1 (en) Method And Device For Connecting A Riser To A Target Structure
US20070212170A1 (en) Method and apparatus for reducing set-down of a tension leg platform
US9315245B2 (en) Offshore system
KR102128795B1 (en) Floater and assembly for mooring floater
GB2562977B (en) Upgrading subsea foundations of mooring systems
US20020067956A1 (en) Offshore platform for hydrocarbon production and storage
US20040161303A1 (en) Catenary anchor leg mooring system
US20030143034A1 (en) Shallow water riser system
Finn et al. The Guyed Tower as a Platform for Integrated Drilling and Production Operations
WO2002044011A2 (en) Offshor platform for hydrocarbon production and storage

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION

AS Assignment

Owner name: DELPHI ACQUISITION HOLDING I B.V., NETHERLANDS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LEE, JAMES JUN;LI, JIM JIANXUN;REEL/FRAME:022728/0233

Effective date: 20090416