US20080179416A1 - Modulation control of a hydronic heating system - Google Patents

Modulation control of a hydronic heating system Download PDF

Info

Publication number
US20080179416A1
US20080179416A1 US11/949,314 US94931407A US2008179416A1 US 20080179416 A1 US20080179416 A1 US 20080179416A1 US 94931407 A US94931407 A US 94931407A US 2008179416 A1 US2008179416 A1 US 2008179416A1
Authority
US
United States
Prior art keywords
boilers
boiler
heating system
condensing
hydronic heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/949,314
Other languages
English (en)
Inventor
David E. Johnson
William A. Steinmeyer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Thermodynamic Process Control LLC
Original Assignee
Johnson David E
Steinmeyer William A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/627,739 external-priority patent/US7658335B2/en
Application filed by Johnson David E, Steinmeyer William A filed Critical Johnson David E
Priority to US11/949,314 priority Critical patent/US20080179416A1/en
Priority to EP08713951A priority patent/EP2109740A4/de
Priority to CA002676014A priority patent/CA2676014A1/en
Priority to PCT/US2008/051846 priority patent/WO2008091970A2/en
Publication of US20080179416A1 publication Critical patent/US20080179416A1/en
Assigned to THERMODYNAMIC PROCESS CONTROL, LLC reassignment THERMODYNAMIC PROCESS CONTROL, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: JOHNSON, DAVID E., JR., STEINMEYER, WILLIAM A.
Assigned to THERMODYNAMIC PROCESS CONTROL, LLC reassignment THERMODYNAMIC PROCESS CONTROL, LLC NUNC PRO TUNC ASSIGNMENT (SEE DOCUMENT FOR DETAILS). Assignors: JOHNSON, DAVID E., JR., STEINMEYER, WILLIAM A.
Priority to US13/603,227 priority patent/US9863646B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D12/00Other central heating systems
    • F24D12/02Other central heating systems having more than one heat source
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K17/00Using steam or condensate extracted or exhausted from steam engine plant
    • F01K17/02Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating
    • F24D19/1012Arrangement or mounting of control or safety devices for water heating systems for central heating by regulating the speed of a pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/04Gas or oil fired boiler
    • F24D2200/043More than one gas or oil fired boiler
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Definitions

  • the present disclosure generally relates to modulation control of various systems utilizing one or more energy sources for a particular purposes, such as, for example, systems utilizing natural gas, oil, coal, gasoline, steam, water and/or electricity for purposes of providing heating, cooling, pumping, current output and/or mechanical energy.
  • the present invention specifically relates to a load based modulation control of such systems.
  • thermonic heating systems are used in buildings to supply heat via hot water that is circulated by a pump.
  • One type of traditionally common heating system utilizes non-condensing boilers in which a portion of the input heat is lost via the boiler flue.
  • a more modern type of heating system increases overall efficiency by employing condensing boilers.
  • a condensing boiler recovers a large amount of heat from exhaust gases that would otherwise be lost via the flue.
  • the temperature of the gases exiting the flue may be reduced from a range of 300° F.-450° F. to a range of 90° F.-130° F.
  • FIG. 1 is a schematic and block diagram of an embodiment of the present disclosure, illustrating a hybrid heating system having two boilers.
  • FIG. 2 is a schematic and block diagram of an embodiment of the present disclosure, illustrating a hybrid heating system having four boilers.
  • FIG. 3 is a schematic and block diagram of the main control circuit used in a heating system constructed in accordance with an embodiment of this disclosure.
  • FIG. 4 is a schematic and block diagram of condensing boiler control circuitry used in a heating system constructed in accordance with an embodiment of this disclosure.
  • FIG. 5 is a schematic and block diagram of non-condensing boiler control circuitry used in a heating system constructed in accordance with an embodiment of this disclosure.
  • FIG. 6 is a schematic and block diagram of a pH measurement control circuit used in a heating system constructed in accordance with an embodiment of this disclosure.
  • FIG. 7 is a schematic and block diagram illustrating a number of temperature sensor circuits, as well as a user interface circuit used in a heating system constructed in accordance with an embodiment of this disclosure.
  • FIG. 8 is a flowchart representative of a process modulation algorithm in accordance with an embodiment of this disclosure.
  • FIG. 9 is a flowchart representative of a rate-of-change modulation scheme in accordance with an embodiment of this disclosure.
  • FIG. 10 is a schematic and block diagram of a single system controller for a plurality of devices constructed in accordance with an embodiment of this disclosure.
  • FIG. 11 is a schematic and block diagram of a system administrator and corresponding device controllers for a plurality of devices constructed in accordance with an embodiment of this disclosure.
  • a hydronic (i.e., hot water) heating system 20 that includes boilers 21 and 22 for heating water that is circulated in order to heat a building.
  • Boilers 21 and 22 may both be condensing or non-condensing boilers, or one boiler may be a condensing boiler while the other is a non-condensing boiler.
  • Boilers 21 and 22 are respectively associated with pumps 23 and 24 that act to provide circulation of the heated water throughout the building.
  • Controller 36 is operably connected to boilers 21 and 22 via connectors 42 and 43 respectively.
  • Connectors 42 and 43 are illustratively shown as being a cable or wire, but connectors 42 and 43 , as well as other connectors described and shown herein, may take the form of an apparatus or functionality consistent with any technology known to those skilled in the art and appropriate for the purpose and application described (e.g., wireless transmission technology).
  • Controller 36 provides signals that control the operation of boilers 21 and 22 , including the operation of their respective boiler pumps 23 and 24 .
  • a temperature sensor 25 is located to measure the water temperature in boiler inlet or return water line 27 of boiler 21 . Temperature sensor 25 is operably connected to controller 36 via connector 32 .
  • Temperature sensor 26 is located to measure the water temperature in outlet or system supply water line 28 of boiler 21 and is operably connected to controller 36 via connector 33 .
  • a temperature sensor 29 is located to measure the water temperature in inlet or return water line 31 of boiler 22 . Temperature sensor 29 is operably connected to controller 36 via connector 34 . Temperature sensor 30 is located to measure the water temperature in outlet or system supply water line 32 of boiler 22 and is operably connected to controller 36 via connector 35 .
  • Water lines 27 , 28 , 31 and 32 are connected to the main circulating water line 37 that circulates heated water through heat transmission devices 18 and 19 (e.g., heat exchangers, radiators, or air handlers) located at various points throughout the building to heat the building.
  • heat transmission devices 18 and 19 e.g., heat exchangers, radiators, or air handlers
  • Auxiliary pumps 38 and 39 are connected to main water line 37 to assist the water flow. Pumps 38 and 39 are connected via connectors 40 and 41 , respectively, to controller 36 to provide control of pumps 38 and 39 .
  • Water flow direction in heating system 20 is indicated by arrows 95 in FIG. 1 .
  • Additional temperature sensors 44 , 45 , and 46 are located along main water line 37 to measure the temperature of the water at that location, and return the temperature data via data lines 47 , 48 , and 49 , respectively, to controller 36 , although it is understood that temperature data may be returned in a non-wired manner, e.g., wireless transmission, as would be known to those skilled in the art.
  • Sensor 44 is illustratively shown as being located in the vicinity of the outgoing heated water from boilers 21 and 22 , respectively.
  • Sensor 45 is illustratively shown as being located in between boilers 21 and 22 to measure water temperature in the return portion of main water line 37 .
  • Sensor 46 is illustratively shown as being located in the return water flow from heat transmission devices 18 and 19 to boilers 21 and 22 .
  • An outside air temperature sensor 50 is connected to controller 36 via data line 51 to provide measurements of outside air temperature to controller 36 of heating system 20 .
  • Air temperature sensors 80 and 81 are illustratively shown as being connected to controller 36 via connectors 82 and 83 , respectively. Air temperature sensors 80 and 81 are illustratively located in rooms or areas of the building to be heated, and provide data to controller 36 regarding the ambient temperature of those rooms or areas.
  • Dampers 52 and 53 are illustratively shown as being controlled via connectors 54 and 55 , respectively, by controller 36 for controlling outside air flow to boilers 21 and 22 , respectively, in order to provide free air make-up to boilers 21 and 22 .
  • Flow valves 56 , 57 , 58 , and 62 are illustratively shown as being connected to and controlled by controller 36 via connectors 59 , 60 , 61 , and 63 , respectively.
  • the rate and quantity of soft or conditioned water supplied to flush by-pass or sidestream water line 64 via incoming water line 70 is controlled by way of flow valves 57 and 58 .
  • Water is drained from main water line 37 via drain line 17 by way of flow valves 56 and 58 .
  • pH meter 67 measures the pH of the water within main water line 37 .
  • Main valve 75 is located within main water line 37 and is illustratively shown as being connected to controller 36 by connector 76 to force water flow through sidestream water line 64 .
  • Connector 71 connects pH meter 67 to controller 36 .
  • Flow measuring device 65 is mounted to main water line 37 and provides flow data via connector 66 to controller 36 .
  • a user interface 90 e.g., computer input screen, is illustratively shown as being connected to controller 36 by way of connector 91 .
  • FIG. 1 is illustrative in nature and is not limited to any specific number of boilers, any particular piping arrangement of the various water lines, valves, sensors or controls shown in the drawings, which will in operation depend upon particular building requirements.
  • Heating system 120 illustratively includes non-condensing boilers 121 and 122 and condensing boilers 123 and 124 connected to a main water circulation line 147 by inlet or boiler return water lines 126 , 127 , 128 , and 129 , respectively and outlet or system supply water lines 130 , 131 , 132 , and 133 , respectively.
  • Boilers 121 , 122 , 123 , and 124 are respectively associated with pumps 134 , 135 , 136 , and 137 which are mounted on the boiler return water lines 126 , 127 , 128 , and 129 , respectively.
  • Heating system 120 of FIG. 2 includes temperature sensors 138 , 140 , 142 , and 144 mounted on the outlet or system supply water lines 130 , 131 , 132 , and 133 , respectively, and temperature sensors 139 , 141 , 143 , and 145 mounted on the inlet or return water lines 126 , 127 , 128 , and 129 , respectively.
  • Boilers 121 , 122 , 123 , and 124 are operably connected to controller 146 via connectors 221 , 222 , 223 , and 224 , respectively.
  • Pumps 134 , 135 , 136 , and 137 are operably connected to controller 146 via connectors 234 , 235 , 236 , and 237 , respectively.
  • Temperature sensors 138 , 139 , 140 , 141 , 142 , 143 , 144 , and 145 are operably connected to a controller 146 via connectors 238 , 239 , 240 , 241 , 242 , 243 , 244 , and 245 , respectively. While FIG.
  • control and sensor data may be communicated via various network interfaces and protocols including parallel or serial data buses, Ethernet, Bluetooth, IEEE standard control interfaces, or other computer or data networks that are known to those of ordinary skill in the art both now and as may be developed in the future.
  • Boilers 121 , 122 , 123 , and 124 include air dampers 148 , 149 , 150 , and 151 , which are also operably connected to controller 146 via connectors 248 , 249 , 250 , and 251 , respectively.
  • Controller 146 may independently control the operation of air dampers 148 , 149 , 150 , and 151 via switching or control signals, e.g., digital signals, sent to dampers 148 , 149 , 150 , and 151 via connectors 248 , 249 , 250 , and 251 to control the outside or free air make-up to boilers 121 , 122 , 123 , and 124 , respectively.
  • Auxiliary pumps 152 and 153 pump or circulate water through secondary water line 154 of main water line 147 and are operated by controller 146 via connectors 252 and 253 , respectively.
  • Auxiliary pumps 155 and 156 pump or circulate water through secondary water line 157 and are operated by controller 146 via connectors 255 and 256 , respectively.
  • Water flow direction through system 120 is illustratively shown by arrows 200 .
  • Valves 167 and 170 are connected to and controlled by controller 146 via connectors 267 and 270 , respectively, to provide soft or conditioned water via inlet line 168 to flush sidestream 185 as necessary to maintain the calibration of pH meter 172 .
  • Controller 146 is also operably connected to sidestream valves 166 and 169 via connectors 266 and 269 , respectively, to control the flow of water from main water line 147 to a pH measurement sidestream water line 185 .
  • a pH meter 172 is provided to measure the pH of the water circulating throughout system 120 . pH meter 172 is shown as being mounted in pH measurement sidestream 185 and operably connected to controller 146 via connector 272 .
  • Main valve 165 is mounted within main water line 147 and is also operably connected to controller 146 via connector 265 . Controller 146 operates main valve 165 to force the flow of water through pH measurement sidestream 185 .
  • a weak acid pump 195 and a weak base pump 196 are illustratively shown as being coupled into main water line 147 . Acid pump 195 and base pump 196 are shown as being operably connected to controller 146 via connectors 295 and 296 , respectively. Controlling the pH of the water circulating through main water line 147 is important to prevent premature failure or wear with respect to the components of heating system 120 due to overly acidic or basic water.
  • Temperature sensors 160 , 161 , and 162 are mounted to main water line 147 to measure the temperature of the circulating water at various locations along main water line 147 .
  • Sensors 160 , 161 , and 162 are shown as being operably connected to controller 146 via connectors 260 , 261 , and 262 , respectively.
  • a flow measuring device 163 is shown as being mounted on main water line 147 to provide water flow information to controller 146 via connector 263 .
  • An outdoor air temperature sensor 164 is mounted outside the building and is operably connected to controller 146 via connector 264 .
  • Air temperature sensors 180 and 181 are located in rooms or areas of the building and are also operably connected to controller 146 via connectors 280 and 281 , respectively, to provide information with respect to the ambient temperature of the rooms or areas in which the sensors are located.
  • FIG. 2 illustratively shows heat transmission devices 201 and 202 located within system 120 .
  • Devices 120 may be end user heat distribution apparatus, such as radiators, heat exchangers, or air handlers, for only a few examples.
  • a user interface device 190 is also operably connected to controller 146 via connector 290 to allow a user of heating system 120 to select or change various input criteria, e.g., desired room temperature, or the manner in which heating system 120 is operated.
  • User interface device 190 also provides a means for information regarding the status or condition of the components of system 120 to be communicated to the user.
  • main water line 37 shown in FIG. 1 and main water line 147 shown in FIG. 2 locates the condensing boilers 123 and 124 upstream from the non-condensing boilers 121 and 122 such that during the time the condensing boilers are enabled, their operation will pre-heat the water flowing to the non-condensing boilers, thereby increasing the efficiency of the non-condensing boilers and acting to prevent the non-condensing boilers from condensing, thereby protecting the non-condensing boilers from the detrimental effects of condensation.
  • FIGS. 3-7 which, for example only, illustrate elements of a hydronic heating system that includes two condensing and two non-condensing boilers in an arrangement such as that shown in FIG. 2 .
  • FIG. 2 Reference will therefore be made primarily to FIG. 2 , although it is understood that the principles of operation to be described apply equally to heating systems having different numbers of boilers, including but not limited to the system of FIG. 1 .
  • FIG. 3 illustrates the presence of a main system controller and its associated input and output signals and functions.
  • FIG. 4 illustrates the presence of a condensing boiler controller and its associated input and output signals and functions.
  • FIG. 5 illustrates a non-condensing boiler controller with its associated input and output signals and functions, and
  • FIG. 6 illustrates a pH measurement controller and its associated input and output signals and functions. It is understood that While separate or individual controllers can of course be used, a unitary controller, such as controller 36 or 146 , may comprise the functionality of each of the controller elements shown in FIGS. 3-6 in the physical embodiment of a single device. Therefore, for purposes of simplifying the following explanation, each of the controller devices in FIGS. 3-6 will be identified by reference number 146 . Additionally, while FIGS.
  • FIG. 7 may illustrate elements that contain language that suggests a function or type of information, that element may be identified by a reference number that corresponds to the physical device shown in FIG. 2 that performs such function or provides such information.
  • FIG. 7 illustrates a representation of the functionality within heating system 120 of user interface 190 as well as a number of representative temperature sensors, e.g., sensors 160 , 164 , 180 , and 181 .
  • each boiler 121 - 124 e.g., condensing or non-condensing
  • Minimum and maximum return and supply temperatures for each of boilers 121 - 124 will be inputted by the user as well.
  • the outdoor air temperature switch point i.e., the temperature above which a condensing-type boiler is initially selected, may also be provided to system 120 via user interface device 190 .
  • controller 146 Using data provided by interface device 190 , and the outdoor air temperature provided by sensor 164 via connector 264 , controller 146 will enable at least one of pumps 134 - 137 via their respective connectors 234 - 237 .
  • controller 146 After a user defined delay (e.g., 1 to 10 minutes), a flow reading using flow sensor 163 in the main water line 147 will be taken. Using this flow data provided via connector 263 , as well as other initializing data, controller 146 calculates an initial building heating load for system 120 . Based on this calculated load and the outdoor air temperature switch point, controller 146 will determine which type of boiler (e.g., condensing or non-condensing) to initially enable. For example, if the outdoor air temperature calls for a condensing boiler and there is more than one condensing boiler available in system 120 , then the first boiler selected can be based on which one has accumulated the least hours of operation.
  • a type of boiler e.g., condensing or non-condensing
  • controller 146 may also select for operation the boiler having an output that is most closely matched to the building load. If the condition should exist that a particular boiler is in an alarm state (i.e., the boiler is not working properly), controller 146 will not enable that boiler until the condition causing the alarm is remedied. For purposes of this example, condensing boiler 124 is initially enabled by controller 146 via connector 224 .
  • the building heating load After an initial period of low fire output of boiler 124 , the building heating load will be recalculated to obtain a real-time heating load. This low fire time delay, e.g., 30 minutes, is used to ensure that the initial calculated heating load is accurate so as to avoid overshooting the desired building temperature by overfiring the initially enabled or fired boiler or boilers. If the recalculated heating load indicates that heat is still required, the initially enabled boiler 124 will thereafter by operated in its normal or real-time mode, e.g., via proportional-integral-derivative (PID) control, by controller 146 via connector 224 .
  • PID proportional-integral-derivative
  • controller 146 The operation of the PID mode of controller 146 will be constantly monitored. If controller 146 causes the output of boiler 124 to remain above a user defined output percentage (e.g., 25%-100%) for a given user defined time period (e.g., 5-60 minutes), then a second boiler, e.g., condensing boiler 123 , will be enabled via connector 223 and controller 146 will split the real time heating load between the two enabled boilers 124 and 123 in a manner that operates both boilers as efficiently as possible. The heating load distribution between boilers 124 and 123 is monitored often (e.g., once per second) to ensure boilers 124 and 123 continue to be operated as efficiently as possible.
  • a user defined output percentage e.g., 25%-100%
  • a second boiler e.g., condensing boiler 123
  • boilers 124 and 123 have been operating at a user defined maximum output for a user defined period of time and a user defined heating load percentage (e.g., 1-10%) has not been reached, a non-condensing boiler, e.g., boiler 122 will then be enabled by an enabling signal via connector 222 .
  • a non-condensing boiler e.g., boiler 122 will then be enabled by an enabling signal via connector 222 .
  • non-condensing boiler 122 Once non-condensing boiler 122 has been enabled, condensing boilers 124 and 123 , that are still enabled, will be reset to cover that portion of the heating load that still allows non-condensing boiler 122 to maintain its minimum recommended return water temperature. Non-condensing boiler 122 will operate under PID control to cover the balance of the heating load. Should the heating load increase, the non-condensing boilers will follow the same sequencing control described above to enable and control additional non-condensing boilers, e.g., boiler 121 , and boiler pumps, e.g., pump 134 .
  • additional non-condensing boilers e.g., boiler 121
  • boiler pumps e.g., pump 134
  • building zone temperatures will be polled by network temperature devices, e.g., sensors 180 and 181 , to determine if the output (i.e., supply temperature) of system 120 is meeting the heating load. Based on this information, boiler reset temperatures will be increased to supply more heat if needed, decreased to increase efficiency of boiler operation, or left the same.
  • This polling enables controller 146 to know how much energy has been used to heat the building and, based on the calculated heating load, enable only the boiler or boilers needed to most efficiently meet the remaining heating load.
  • condensing boilers 124 and 123 will be shut down by controller 146 by signals provided via connectors 224 and 223 , respectively.
  • Condensing boilers 124 and 123 will be enabled again only if the return water temperature of non-condensing boilers 121 and 122 (if enabled) falls below a user defined limit (e.g., 130° F.) and remains there for more than a user defined period of time (e.g., 5-30 minutes), or if the outdoor air temperature rises above the condensing/non-condensing switch point, or if all the non-condensing boilers, in this case boilers 121 and 122 , are operating at a user defined maximum output for a user defined period of time (e.g., 15-60 minutes) and have failed to adequately satisfy the heating load.
  • a non-condensing boiler will be shut down by controller 146 .
  • Boiler operating regulations require that a boiler must be shut down at least once every 24 hours.
  • system 120 operates such that each boiler 121 - 124 is shut down at least once every six hours.
  • This process allows controller 146 to regularly compare hours of accumulated operation and enable or fire the boiler of a given type with the least operating hours first. If the heating load of the building is determined to be less than the minimum operating range of all the available boilers 121 - 124 on system 120 , controller 146 will select and enable the boiler having the lowest operating range. This functionality of controller 146 will help to eliminate as much as possible the efficiency losses and significant wear effects of short cycling on boilers 121 - 124 .
  • any condensing boilers e.g., boiler 123 or 124
  • any condensing boilers e.g., boiler 123 or 124
  • the total load will then be assigned to the running non-condensing boiler and the reset of the supply or output temperature will be defined by an equation having a slope which is designated for non-condensing boilers.
  • the inlet and outlet temperature difference i.e., ⁇ T
  • ⁇ T is a user defined value (e.g., 10° F.-45° F. or within the boiler manufacturer's limits) that can be selected via user interface device 190 .
  • This ⁇ T measured by temperature sensors 144 and 145 for boiler 124 , for example, is maintained to the extent possible via operation of controller 146 by providing control signals to the variable frequency drives of the boiler's respective pump, e.g., pump 137 in the above example.
  • Pump 137 will then be modulated or operated to increase or decrease water flow so as to maintain the measured ⁇ T with the user selected value.
  • the pumps can put out less water at higher temperatures, thereby increasing boiler efficiency.
  • system 120 provides microprocessor control of differing types of boilers in a heating system through the use of a variety of sensor inputs to optimally sequence and operate each boiler in the heating system to maximize efficiency of the boilers.
  • the system is suitable for controlling multiple boilers of different sizes and of different types within the same heating system. By calculating real time heating load and using that information to select and operate boilers, efficiency losses and detrimental effects on equipment life due to short-cycling of boilers are prevented or eliminated.
  • the system disclosed herein effectively prevents non-condensing boilers from condensing while condensing boilers are allowed to condense.
  • the system offers the ability to reset and control both condensing and non-condensing boilers on the same system. With two unique and user definable reset temperature slopes, both types of boilers can be utilized seamlessly.
  • FIGS. 3-6 were described in the context of implementing a PID version of a process modulation algorithm of the present invention for purposes of controlling a hybrid boiler system.
  • the process modulation algorithm is applicable to many types of systems including, but not limited too, systems employing devices using energy sources (e.g., natural gas, oil, coal, gasoline, steam, water and electricity) for any purpose (e.g., heating, cooling, pumping, current output and mechanical energy).
  • energy sources e.g., natural gas, oil, coal, gasoline, steam, water and electricity
  • any purpose e.g., heating, cooling, pumping, current output and mechanical energy.
  • a description will now be provided herein of a flowchart 300 representative of the process modulation algorithm as shown in FIG. 8 and a description of a flowchart 400 representative of the rate-of-change modulation version of the process modulation algorithm as shown in FIG. 9 .
  • a stage S 302 of flowchart 300 encompasses a system load calculation that is dependent upon one or more operational conditions (e.g., temperature, pressure, power consumption, motion, etc.) of an applicable system (e.g., heating, cooling, pumping, current output and mechanical energy).
  • operational conditions e.g., temperature, pressure, power consumption, motion, etc.
  • an applicable system e.g., heating, cooling, pumping, current output and mechanical energy.
  • the following equations [1] and [2] can be utilized for purposes of calculating a system load for the hybrid heating system that is dependent upon a set-point temperature of the hybrid heating system:
  • L is a calculated system load (BTU/H) for the hybrid heating system
  • T SP is the set-point temperature (° F.) of the hybrid heating system
  • T S is the supply water temperature (° F.) of the hybrid heating system
  • T R is the return water temperature (° F.) of the hybrid heating system
  • GPM is the number of gallons per minute flowing through the hybrid heating system past a flow sense point
  • WLG is the pounds of water per gallon within the hybrid heating system
  • MPH is the minutes per hour the hybrid heating system is expected to be operational for an hour time period
  • CTL is a condensing temperature limit (° F.) of the hybrid heating system.
  • Equation [1] is utilized for fall condensing operations and for non-condensing operations whereby the return water temperature T R is equal to or greater than the condensing temperature limit CTL.
  • equation [2] is utilized for non-condensing operations whereby the return water temperature T R is less than the condensing temperature limit CTL.
  • a hybrid heating system can be switched between condensing operations and non-condensing operations based on a comparison of the outdoor air temperature to a switch temperature point whereby condensing operations primarily occur above the switch temperature point and non-condensing operations primarily occur below the switch temperature point.
  • a determination of the set-point temperature is also dependent upon whether the hybrid heating system is in condensing operations or non-condensing operations.
  • a condensing reset temperature slope is derived from a graph of a water temperature range and output air temperature range for the condensing boiler(s). For this slope, one endpoint is plotted as the maximum water temperature/minimum outdoor air temperature and the other endpoint is plotted as the minimum water temperature/maximum outdoor air temperature whereby the set-point temperature is the water temperature on the slope corresponding to a sensed outdoor air temperature.
  • a non-condensing reset temperature slope is derived from a graph of a water temperature range and output air temperature range for the non-condensing boiler(s).
  • one endpoint is plotted as the maximum water temperature/minimum outdoor air temperature and the other endpoint is plotted as the minimum water temperature/maximum outdoor air temperature whereby the set-point temperature is the water temperature on the slope corresponding to a sensed outdoor air temperature.
  • a stage S 304 of flowchart 300 encompasses a device load assignment that is dependent upon the output capacities of the device(s) (e.g., boilers, chillers, pumps, dampers, etc.) of the applicable system (e.g., heating, cooling, pumping, current output and mechanical energy).
  • the device(s) e.g., boilers, chillers, pumps, dampers, etc.
  • the applicable system e.g., heating, cooling, pumping, current output and mechanical energy.
  • the following equations [3] and [4] can be utilized for purposes of assigning a device load for each boiler Y of a total of X enabled boilers of the hybrid heating system:
  • BY IL is a load assignment (BTU/H) for a particular boiler Y
  • OY MAX is the maximum output (BTU/H) for a particular boiler Y
  • ⁇ OX MAX is a summation of all maximum outputs (BTU/H) for the enabled boilers X
  • OY MIN is the minimum output (BTU/H) for a particular boiler Y
  • ⁇ OX MIN is a summation of all minimum outputs (BTU/H) for the enabled boilers X
  • L is the previously calculated system load (BTU/H) for the hybrid heating system.
  • Equation [3] is utilized whenever all of the control signal(s) (e.g., analog or digital, voltage or current) of the enabled boiler(s) X are to be modulated as subsequently described herein.
  • equation [4] is utilized whenever less than all of the control signal(s) (e.g., analog or digital, voltage or current) of the enabled boiler(s) X are to be modulated as subsequently described herein.
  • the determination of which boiler(s) to enable at any given moment is a function of the operational state of the system (i.e., condensing or non-condensing) as well as the operational state of each boiler in terms of at least an online/offline status of the boiler, and an operational time status of the boiler.
  • Stages S 302 and S 304 are initially executed prior to the conclusion of the low fire time delay of the hybrid heating system and thereafter are continually executed on a periodic basis to maintain a dynamic efficient control of the hybrid heating system.
  • a stage S 306 of flowchart 300 encompasses a device output error calculation that is based on a comparison of an assigned device load and a device output for each enabled device (e.g., boiler, chiller, pump, damper, etc.) of the applicable system (e.g., heating, cooling, pumping, current output and mechanical energy).
  • a device output error calculation that is based on a comparison of an assigned device load and a device output for each enabled device (e.g., boiler, chiller, pump, damper, etc.) of the applicable system (e.g., heating, cooling, pumping, current output and mechanical energy).
  • the following equations [5]-[10] can be utilized for purposes of calculating a device output error for each enabled boiler of the hybrid heating system:
  • O BY ( V CON ⁇ V MIN )*(( OY MAX ⁇ OY MIN )/( V MAX ⁇ V MIN ))+ OY MIN [9]
  • BY SP is the boiler output set-point temperature (BTU/H) for a particular boiler Y
  • BY IL is the previously calculated load assignment (BTU/H) for a particular boiler Y
  • BY HL is a high limit for the boiler output set-point temperature BY SP .
  • BY LL is a low limit for the boiler output set-point temperature BY SP .
  • OY MAX is the maximum output (BTU/H) for a particular boiler Y
  • OY MIN is the minimum output (BTU/H) for a particular boiler Y
  • DB is a deadband based on an output percentage factor OPF of a particular boiler Y whereby the output percentage factor OPF can be designed to range from 1 to 100,
  • O BY is a calculated heat output (BTU/H) for a particular boiler Y
  • V CON is an analog control voltage signal for a particular boiler Y that controls the fire level of that boiler Y
  • V MAX is a maximum of the analog control voltage signal V CON (e.g., 10 volts),
  • V MIN is a minimum of the analog control voltage signal V CON (e.g., 0 volts)
  • E Y is the calculated error for a particular boiler Y.
  • equations [5]-[10] can be executed during the low fire time delay of the hybrid heating system, it is only essential for equations [5]-[8] to be executed or processed during the flow fire time delay and all of the equations [5]-[10] to be executed continually on a periodic basis upon completion of the low fire time delay.
  • the boiler output set-point temperature BY SP is a function of the calculated load assignment BY IL that can dynamically vary between the low limit BY LL and the high limit BY HL .
  • the purpose of utilizing the deadband DB to establish the low limit BY LL and the high limit BY HL is to limit the dynamic variable nature of the calculated load assignment BY IL .
  • the output percentage factor OPF is preferably 1 for stage S 306 .
  • control voltage signal V CON is modulated in the appropriate positive or negative direction based on the calculated error E Y in accordance with stage S 308 of flowchart 300 .
  • stage S 308 encompasses a modulation of an output of a device (e.g., boiler, chiller, pump, damper, etc.) based on the calculated device output error in accordance with a modulation scheme chosen for an applicable system (e.g., heating, cooling, pumping, current output and mechanical energy).
  • a modulation scheme chosen for an applicable system e.g., heating, cooling, pumping, current output and mechanical energy.
  • a modulation of an output of an enabled boiler based on a calculated device output error of that enabled boiler is in accordance with PID modulation scheme previously described herein.
  • the chose modulation scheme is a rate-of-change modulation scheme as represented by the flowchart 400 shown in FIG. 9 .
  • a stage S 402 of flowchart 400 encompasses a calculation of a modulation control variable.
  • a modulation control variable For example, in the context of a hybrid heating system including one or more condensing boilers and one or more non-condensing boilers, the following equations [11]-[17] can be utilized for purposes of calculating the modulation control variable:
  • CV Y is the modulation control variable for a particular boiler Y that varies between a low limit CV LL and a high limit CV HL (initially equal to low limit CV LL upon the enablement of the boiler),
  • E Y is the calculated error for a particular boiler Y
  • ADCF is an analog-to-digital conversion factor corresponding to a number bit states of a digital analog voltage signal AN Y divided by the maximum voltage V MAX for the analog control voltage signal V CON .
  • the purpose of utilizing the deadband DB to control the calculation for the modulation control variable CV Y is to limit the dynamic variable nature of the calculated error E Y , which is a function of the dynamic variable nature of calculated load assignment BY IL .
  • the output percentage factor OPF is preferably 1 for stage S 402 .
  • AN Y is the digital conversion of the analog control voltage signal V CON that will be further explained subsequently herein.
  • the output percentage factor OPF for deadband DB is 50 for the oversaturation protection of the modulation control variable CV Y .
  • a stage S 404 of flowchart 400 encompasses a calculation of a control signal for each enable device (e.g., boiler, chiller, pump, damper, etc.) of the applicable system (e.g., heating, cooling, pumping, current output and mechanical energy) as a function of the previously calculated modulation control variable CV Y .
  • the following equations [19]-[21] can be utilized for purposes of calculating an unbiased digital control voltage signal AN Y of Z bits (e.g., 12 bits):
  • R PG1 ( V G *10* B E )/( OY MAX /1000)/10 [22]
  • R PG1 is the base biased ramp down variable for a particular boiler Y
  • V G is the water volume of a particular boiler Y in gallons
  • B E is a maximum rated efficiency of a particular boiler Y
  • OY MAX is the maximum output (BTU/H) for a particular boiler Y
  • R PG2 is the amplified biased ramp down variable for a particular boiler Y.
  • the output percentage factor OPF for deadband DB is 5 for the biased ramp down of digital control voltage signal AN Y .
  • TPGVY is a timer gate preset value
  • PA is a process acceleration scale value
  • TGF is a time gate factor inversely correlated to a chosen output percentage factor OPF for deadband DB.
  • the inverse correlation of the timer gate factor TGF and the output percentage factor OPF is a function of the timing specification of the timer gate and one or more designed output percentage factors OPF for deadband DB.
  • the following table illustrates an inverse correlation designed output percentage factors to a timer gate factor TGF in terms of the number times per second the timer gate should allow for a calculation of the digital control voltage signal AN Y :
  • Equation [28] The benefit of equation [28] is as the calculated error E Y of stage 306 decreases, the rate-of-change of the modulation of the digital control voltage signal AN Y is decelerated in view of a corresponding increase in the timer gate preset value TPGVY. Conversely, as the calculated error E Y of stage 306 increases, the rate-of-change of the modulation of the digital control voltage signal AN Y is accelerated in view of a corresponding decrease in the timer gate preset value TPGVY.
  • flowchart 400 is designed to execute digital calculations of the modulation control variable and digital control voltage signal and thus the requirement for equations [16] and [17]. Those having ordinary skill in the art will appreciate that, in order to drive an analog circuit of a boiler, the digital control voltage signal has to be converted back into the analog control voltage signal.
  • FIG. 10 illustrates a system controller 500 for implementing flowcharts 300 ( FIG. 8) and 400 ( FIG. 9 ) via a wireline or wireless network with an X number of devices 600 of any type (e.g., boilers, chillers, pumps, dampers, etc.).
  • FIG. 10 illustrates a system controller 500 for implementing flowcharts 300 ( FIG. 8) and 400 ( FIG. 9 ) via a wireline or wireless network with an X number of devices 600 of any type (e.g., boilers, chillers, pumps, dampers, etc.).
  • FIG. 10 illustrates a system controller 500 for implementing flowcharts 300 ( FIG. 8) and 400 ( FIG. 9 ) via a wireline or wireless network with an X number of devices 600 of any type (e.g., boilers, chillers, pumps, dampers, etc.).
  • FIG. 10 illustrates a system controller 500 for implementing flowcharts 300 ( FIG. 8) and 400 ( FIG. 9 ) via a wireline or wireless
  • FIG. 11 illustrates a system administrator 501 for executing stages S 302 and S 304 of flowchart 300 ( FIG. 8 ) via a wireline or wireless network to device controllers 502 for executing stages S 306 and S 308 of flowchart 300 as well as flowchart 400 ( FIG. 9 ) on behalf of devices 600 (e.g., boilers, chillers, pumps, dampers, etc.).
  • devices 600 e.g., boilers, chillers, pumps, dampers, etc.
  • administrator 501 can partially or entirely execute stage S 306 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)
US11/949,314 2007-01-26 2007-12-03 Modulation control of a hydronic heating system Abandoned US20080179416A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US11/949,314 US20080179416A1 (en) 2007-01-26 2007-12-03 Modulation control of a hydronic heating system
EP08713951A EP2109740A4 (de) 2007-01-26 2008-01-24 Modulationssteuerung eines hydronic-erwärmungssystems
CA002676014A CA2676014A1 (en) 2007-01-26 2008-01-24 Modulation control of a hydronic heating system
PCT/US2008/051846 WO2008091970A2 (en) 2007-01-26 2008-01-24 Modulation control of a hydronic heating system
US13/603,227 US9863646B2 (en) 2007-01-26 2012-09-04 Modulation control of hydronic systems

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/627,739 US7658335B2 (en) 2007-01-26 2007-01-26 Hydronic heating system
US11/949,314 US20080179416A1 (en) 2007-01-26 2007-12-03 Modulation control of a hydronic heating system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US11/627,739 Continuation-In-Part US7658335B2 (en) 2007-01-26 2007-01-26 Hydronic heating system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US13/603,227 Continuation-In-Part US9863646B2 (en) 2007-01-26 2012-09-04 Modulation control of hydronic systems

Publications (1)

Publication Number Publication Date
US20080179416A1 true US20080179416A1 (en) 2008-07-31

Family

ID=39645154

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/949,314 Abandoned US20080179416A1 (en) 2007-01-26 2007-12-03 Modulation control of a hydronic heating system

Country Status (4)

Country Link
US (1) US20080179416A1 (de)
EP (1) EP2109740A4 (de)
CA (1) CA2676014A1 (de)
WO (1) WO2008091970A2 (de)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080216771A1 (en) * 2007-03-09 2008-09-11 Lochinvar Corporation Control System For Modulating Water Heater
US20090188985A1 (en) * 2008-01-30 2009-07-30 Scharing Michael G Combined chiller and boiler HVAC system in a single outdoor operating unit
US20100006042A1 (en) * 2008-07-10 2010-01-14 Pitonyak Michael T Optimizing multiple boiler plant systems with mixed condensing and non-condensing boilers
EP2151578A1 (de) 2008-08-04 2010-02-10 Grundfos Management A/S Umwälzpumpenaggregat
US20110290470A1 (en) * 2009-02-18 2011-12-01 Uponor Innovation Ab Controlling under surface heating/cooling
US20120027625A1 (en) * 2010-07-30 2012-02-02 Grundfos Management A/S Pump system
US20120090341A1 (en) * 2010-10-14 2012-04-19 Takagi Industrial Co., Ltd. Water heater and control method therefor
US20120160472A1 (en) * 2010-10-21 2012-06-28 Kim Si-Hwan Method for controlling a parallel operation of a multi-water heater
US20130056543A1 (en) * 2010-03-17 2013-03-07 I.V.A.R. S.P.A. Method and apparatus for regulating the temperature of a plurality of rooms in a building
US20150369547A1 (en) * 2012-04-03 2015-12-24 Solarlogic, Llc Energy measurement system for fluid systems
US9477242B2 (en) 2011-10-21 2016-10-25 Cleaver-Brooks, Inc. System and method of controlling condensing and non-condensing boiler firing rates
US20180058704A1 (en) * 2016-08-24 2018-03-01 Iot Cloud Technologies Inc. Hydronic Boiler Control System with Weather Anticipation
US10465919B2 (en) 2015-07-28 2019-11-05 B2 Products Ltd. Modular track wiring assembly for a hydronic system
US10859275B2 (en) * 2007-01-26 2020-12-08 Thermodynamic Process Control, Llc Modulation control of hydronic systems
US11149964B2 (en) * 2018-02-08 2021-10-19 Grundfos Holding A/S Flow control module and method for controlling the flow in a hydronic system
US11226135B2 (en) 2018-05-15 2022-01-18 Gas Technology Institute Control apparatus and method for combination space and water heating

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2470958A (en) * 2009-06-12 2010-12-15 Martin Howes Heating system comprising a wireless control system
DE102016205028A1 (de) 2016-03-24 2017-09-28 Viessmann Werke Gmbh & Co Kg Verfahren zum Steuern einer multivalenten Energieversorgungsanlage
DE102016205030A1 (de) 2016-03-24 2017-09-28 Viessmann Werke Gmbh & Co Kg Verfahren zum Steuern einer multivalenten Energieversorgungsanlage
DE102016205036B4 (de) 2016-03-24 2018-12-13 Viessmann Werke Gmbh & Co Kg Verfahren zum Steuern einer Energieversorgungsanlage
DE102016205033A1 (de) 2016-03-24 2017-09-28 Viessmann Werke Gmbh & Co Kg Vorrichtung und Verfahren zum Konfigurieren einer multivalenten Energieversorgungsanlage
DE102016205035A1 (de) 2016-03-24 2017-09-28 Viessmann Werke Gmbh & Co Kg Verfahren zum Steuern einer multivalenten Energieversorgungsanlage
WO2018027346A1 (zh) * 2016-08-06 2018-02-15 吴鹏 锅炉的温度提醒方法及系统

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2780206A (en) * 1953-06-23 1957-02-05 Vapor Heating Corp Multiple boiler control system
US3144991A (en) * 1963-02-05 1964-08-18 Henry F Marchant Hot water heating system having a wide range temperature equalizer control
US3421691A (en) * 1966-08-02 1969-01-14 American Standard Inc Boiler temperature modulating control
US3555251A (en) * 1967-12-06 1971-01-12 Honeywell Inc Optimizing system for a plurality of temperature conditioning apparatuses
US3576177A (en) * 1969-11-10 1971-04-27 Raypak Inc Multiple-boiler temperature control system having boiler sequencing, reverse order firing, and individual boiler modulation with outdoor temperature reset
US4637349A (en) * 1983-07-07 1987-01-20 E.S.G. Controls, Ltd. Boiler cycling controller
US4694783A (en) * 1987-01-09 1987-09-22 Cleer Jr Clarence W Multiple boiler heating system with improved venting and heat reclamation
US4860696A (en) * 1986-12-08 1989-08-29 Ebara Corporation Apparatus for controlling boiler system
US4864972A (en) * 1987-06-08 1989-09-12 Batey John E Boiler optimization for multiple boiler heating plants
US5042431A (en) * 1990-04-09 1991-08-27 Heat Timer Corporation Multiple boiler control system and method of operation
US5172654A (en) * 1992-02-10 1992-12-22 Century Controls, Inc. Microprocessor-based boiler controller
US5452687A (en) * 1994-05-23 1995-09-26 Century Controls, Inc. Microprocessor-based boiler sequencer
US5655710A (en) * 1994-09-02 1997-08-12 Miura Co., Ltd. Method for controlling operated-units count of fluid heating units
US5692676A (en) * 1996-08-28 1997-12-02 Walker; Robert Method and apparatus for saving energy in circulating hot water heating systems
US5747342A (en) * 1995-10-31 1998-05-05 Calgon Corporation Methods and apparatus for monitoring and controlling PH phosphate and sodium to phosphate ratio in boiler systems operating with captive alkalinity
US6062485A (en) * 1998-04-22 2000-05-16 Erie Manufacturing Company Radiant heating system reset control
US6299071B1 (en) * 1999-06-19 2001-10-09 Stadler Viega, Llc Hydronic heating with continuous circulation
US6480803B1 (en) * 2000-12-22 2002-11-12 Carrier Corporation Load shedding thermostat
US20050230490A1 (en) * 2004-03-25 2005-10-20 Pouchak Michael A Multi-stage boiler staging and modulation control methods and controllers
US20070235550A1 (en) * 2004-02-20 2007-10-11 Martin Donath Determination of the Connected Heating Load of a Building
US20080179415A1 (en) * 2007-01-26 2008-07-31 Johnson David E Hydronic heating system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2906557C2 (de) * 1979-02-17 1984-07-12 Joh. Vaillant Gmbh U. Co, 5630 Remscheid Verfahren und Vorrichtung zum Regeln einer Heizungsanlage mit zwei Wärmequellen
US4502626A (en) * 1980-05-16 1985-03-05 Gas Research Institute Combustion product condensing water heater
CH667717A5 (de) * 1985-04-23 1988-10-31 Landis & Gyr Ag Verfahren zur leistungsmaessig gesteuerten inbetriebnahme bzw. abschaltung von heizkesseln.
DE102004038768B4 (de) * 2003-10-20 2008-03-06 Vertrieb und Großhandel von Heizungs-, Sanitär- und Elektroerzeugnissen Wärmeversorgungsanlage mit mindestens zwei Wärmeerzeugern für eine Heizungsanlage und einer Einrichtung zur Warmwassererzeugung und Verfahren zur verbrauchsabhängigen Steuerung der Wärmeerzeuger

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2780206A (en) * 1953-06-23 1957-02-05 Vapor Heating Corp Multiple boiler control system
US3144991A (en) * 1963-02-05 1964-08-18 Henry F Marchant Hot water heating system having a wide range temperature equalizer control
US3421691A (en) * 1966-08-02 1969-01-14 American Standard Inc Boiler temperature modulating control
US3555251A (en) * 1967-12-06 1971-01-12 Honeywell Inc Optimizing system for a plurality of temperature conditioning apparatuses
US3576177A (en) * 1969-11-10 1971-04-27 Raypak Inc Multiple-boiler temperature control system having boiler sequencing, reverse order firing, and individual boiler modulation with outdoor temperature reset
US4637349A (en) * 1983-07-07 1987-01-20 E.S.G. Controls, Ltd. Boiler cycling controller
US4860696A (en) * 1986-12-08 1989-08-29 Ebara Corporation Apparatus for controlling boiler system
US4694783A (en) * 1987-01-09 1987-09-22 Cleer Jr Clarence W Multiple boiler heating system with improved venting and heat reclamation
US4864972A (en) * 1987-06-08 1989-09-12 Batey John E Boiler optimization for multiple boiler heating plants
US5042431A (en) * 1990-04-09 1991-08-27 Heat Timer Corporation Multiple boiler control system and method of operation
US5172654A (en) * 1992-02-10 1992-12-22 Century Controls, Inc. Microprocessor-based boiler controller
US5452687A (en) * 1994-05-23 1995-09-26 Century Controls, Inc. Microprocessor-based boiler sequencer
US5655710A (en) * 1994-09-02 1997-08-12 Miura Co., Ltd. Method for controlling operated-units count of fluid heating units
US5747342A (en) * 1995-10-31 1998-05-05 Calgon Corporation Methods and apparatus for monitoring and controlling PH phosphate and sodium to phosphate ratio in boiler systems operating with captive alkalinity
US5692676A (en) * 1996-08-28 1997-12-02 Walker; Robert Method and apparatus for saving energy in circulating hot water heating systems
US6062485A (en) * 1998-04-22 2000-05-16 Erie Manufacturing Company Radiant heating system reset control
US6299071B1 (en) * 1999-06-19 2001-10-09 Stadler Viega, Llc Hydronic heating with continuous circulation
US6480803B1 (en) * 2000-12-22 2002-11-12 Carrier Corporation Load shedding thermostat
US20070235550A1 (en) * 2004-02-20 2007-10-11 Martin Donath Determination of the Connected Heating Load of a Building
US20050230490A1 (en) * 2004-03-25 2005-10-20 Pouchak Michael A Multi-stage boiler staging and modulation control methods and controllers
US20080179415A1 (en) * 2007-01-26 2008-07-31 Johnson David E Hydronic heating system

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10859275B2 (en) * 2007-01-26 2020-12-08 Thermodynamic Process Control, Llc Modulation control of hydronic systems
US10955169B2 (en) * 2007-03-09 2021-03-23 Lochinvar, Llc Control system for modulating water heater
US20090064944A1 (en) * 2007-03-09 2009-03-12 Lochinvar Corporation Control System For Modulating Water Heater
US7506617B2 (en) * 2007-03-09 2009-03-24 Lochinvar Corporation Control system for modulating water heater
US20100004786A1 (en) * 2007-03-09 2010-01-07 Lochinvar Corporation Control System For Modulating Water Heater
US9097431B2 (en) * 2007-03-09 2015-08-04 Lochinvar, Llc Control system for modulating water heater
US20080216771A1 (en) * 2007-03-09 2008-09-11 Lochinvar Corporation Control System For Modulating Water Heater
US20120204816A1 (en) * 2007-03-09 2012-08-16 Lochinvar, Llc Control System For Modulating Water Heater
US10247446B2 (en) 2007-03-09 2019-04-02 Lochinvar, Llc Control system for modulating water heater
US8186313B2 (en) * 2007-03-09 2012-05-29 Lochinvar, Llc Control system for modulating water heater
US8186312B2 (en) * 2007-03-09 2012-05-29 Lochinvar, Llc Control system for modulating water heater
US20090188985A1 (en) * 2008-01-30 2009-07-30 Scharing Michael G Combined chiller and boiler HVAC system in a single outdoor operating unit
US20100006042A1 (en) * 2008-07-10 2010-01-14 Pitonyak Michael T Optimizing multiple boiler plant systems with mixed condensing and non-condensing boilers
US8479689B2 (en) * 2008-07-10 2013-07-09 Heat-Timer Corporation Optimizing multiple boiler plant systems with mixed condensing and non-condensing boilers
CN102119278A (zh) * 2008-08-04 2011-07-06 格伦德福斯管理联合股份公司 循环泵组
US20110135515A1 (en) * 2008-08-04 2011-06-09 Grundfos Management A/S Circulating pump unit
WO2010015318A3 (de) * 2008-08-04 2010-04-01 Grundfos Management A/S Umwälzpumpenaggregat
WO2010015318A2 (de) * 2008-08-04 2010-02-11 Grundfos Management A/S Umwälzpumpenaggregat
EP2151578A1 (de) 2008-08-04 2010-02-10 Grundfos Management A/S Umwälzpumpenaggregat
US8920130B2 (en) 2008-08-04 2014-12-30 Grundfos Management A/S Circulating pump unit with communication interface
EA023342B1 (ru) * 2008-08-04 2016-05-31 Грундфос Менеджмент А/С Циркуляционный насосный агрегат
US20110290470A1 (en) * 2009-02-18 2011-12-01 Uponor Innovation Ab Controlling under surface heating/cooling
US20130056543A1 (en) * 2010-03-17 2013-03-07 I.V.A.R. S.P.A. Method and apparatus for regulating the temperature of a plurality of rooms in a building
US9069363B2 (en) * 2010-03-17 2015-06-30 I.V.A.R. S.P.A. Method and apparatus for regulating the temperature of a plurality of rooms in a building
US9360018B2 (en) * 2010-07-30 2016-06-07 Grundfos Management A/S Pump system
US20120027625A1 (en) * 2010-07-30 2012-02-02 Grundfos Management A/S Pump system
US20120090341A1 (en) * 2010-10-14 2012-04-19 Takagi Industrial Co., Ltd. Water heater and control method therefor
US9182159B2 (en) * 2010-10-14 2015-11-10 Purpose Company Limited Water heater and control method therefor
US9513018B2 (en) * 2010-10-21 2016-12-06 Kyungdong One Corporation Method for controlling a parallel operation of a multi-water heater
US20120160472A1 (en) * 2010-10-21 2012-06-28 Kim Si-Hwan Method for controlling a parallel operation of a multi-water heater
US9477242B2 (en) 2011-10-21 2016-10-25 Cleaver-Brooks, Inc. System and method of controlling condensing and non-condensing boiler firing rates
US10288300B2 (en) 2011-10-21 2019-05-14 Cleaver-Brooks, Inc. System and method of controlling condensing and non-condensing boiler firing rates
US20150369547A1 (en) * 2012-04-03 2015-12-24 Solarlogic, Llc Energy measurement system for fluid systems
US10465919B2 (en) 2015-07-28 2019-11-05 B2 Products Ltd. Modular track wiring assembly for a hydronic system
US10527295B2 (en) * 2016-08-24 2020-01-07 Iot Cloud Technologies Inc. Hydronic boiler control system with weather anticipation
US20180058704A1 (en) * 2016-08-24 2018-03-01 Iot Cloud Technologies Inc. Hydronic Boiler Control System with Weather Anticipation
US11149964B2 (en) * 2018-02-08 2021-10-19 Grundfos Holding A/S Flow control module and method for controlling the flow in a hydronic system
US11226135B2 (en) 2018-05-15 2022-01-18 Gas Technology Institute Control apparatus and method for combination space and water heating

Also Published As

Publication number Publication date
WO2008091970A2 (en) 2008-07-31
WO2008091970A8 (en) 2008-09-25
WO2008091970A3 (en) 2008-11-13
CA2676014A1 (en) 2008-07-31
EP2109740A2 (de) 2009-10-21
EP2109740A4 (de) 2012-02-08

Similar Documents

Publication Publication Date Title
US20080179416A1 (en) Modulation control of a hydronic heating system
US7658335B2 (en) Hydronic heating system
US9863646B2 (en) Modulation control of hydronic systems
US10859275B2 (en) Modulation control of hydronic systems
US10288300B2 (en) System and method of controlling condensing and non-condensing boiler firing rates
US8175752B2 (en) Control system methods for networked water heaters
US7819334B2 (en) Multi-stage boiler staging and modulation control methods and controllers
CA2910244C (en) System and apparatus for integrated hvacr and other energy efficiency and demand response
US8965584B2 (en) Masterless control system methods for networked water heaters
CN105393182B (zh) 用于自动控制循环工作的havc和r设备的控制器以及使用该控制器的系统和方法
US9500376B2 (en) Fluid heating system, fluid heating method, fluid heating control system, control apparatus, and control method
US20170219219A1 (en) Demand based hvac (heating, ventilation, air conditioning) control
WO2011127553A1 (en) Retro-fit energy exchange system for transparent incorporation into a plurality of existing energy transfer systems
US11156371B2 (en) Networked boilers and control method
EP1496316A1 (de) Klimaanlage und verfahren zur steuerung einer klimaanlage
KR101961565B1 (ko) 난방 캐스케이드 시스템의 최적 작동 대수 운전 제어방법
JP5825338B2 (ja) 給湯制御システム
JP3550336B2 (ja) 冷暖房システム
CN212777944U (zh) 具有互联网传送、诊断及管理功能的热泵热水器
JP7451066B2 (ja) 空調用熱源制御システム及び空調用熱源制御方法
SE540972C2 (en) Methods, devices and system for controlling a heating network
CN113623723B (zh) 空调系统及空调系统的控制方法
US11708988B2 (en) Control of heat exchange
CN108469103B (zh) 空调水泵控制方法
CA2338902A1 (en) Virtual conservation devices

Legal Events

Date Code Title Description
AS Assignment

Owner name: THERMODYNAMIC PROCESS CONTROL, LLC,INDIANA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:JOHNSON, DAVID E., JR.;STEINMEYER, WILLIAM A.;REEL/FRAME:023910/0679

Effective date: 20100125

AS Assignment

Owner name: THERMODYNAMIC PROCESS CONTROL, LLC,INDIANA

Free format text: NUNC PRO TUNC ASSIGNMENT;ASSIGNORS:JOHNSON, DAVID E., JR.;STEINMEYER, WILLIAM A.;REEL/FRAME:024161/0459

Effective date: 20100329

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION