US20070251611A1 - Method for producing martensitic stainless steel tubes - Google Patents

Method for producing martensitic stainless steel tubes Download PDF

Info

Publication number
US20070251611A1
US20070251611A1 US11/723,622 US72362207A US2007251611A1 US 20070251611 A1 US20070251611 A1 US 20070251611A1 US 72362207 A US72362207 A US 72362207A US 2007251611 A1 US2007251611 A1 US 2007251611A1
Authority
US
United States
Prior art keywords
stainless steel
martensitic stainless
content
steel tubes
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/723,622
Inventor
Takateru Inage
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Assigned to SUMITOMO METAL INDUSTRIES, LTD. reassignment SUMITOMO METAL INDUSTRIES, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: INAGE, TAKATERU
Publication of US20070251611A1 publication Critical patent/US20070251611A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/10Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B23/00Tube-rolling not restricted to methods provided for in only one of groups B21B17/00, B21B19/00, B21B21/00, e.g. combined processes planetary tube rolling, auxiliary arrangements, e.g. lubricating, special tube blanks, continuous casting combined with tube rolling
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B17/00Tube-rolling by rollers of which the axes are arranged essentially perpendicular to the axis of the work, e.g. "axial" tube-rolling
    • B21B17/02Tube-rolling by rollers of which the axes are arranged essentially perpendicular to the axis of the work, e.g. "axial" tube-rolling with mandrel, i.e. the mandrel rod contacts the rolled tube over the rod length
    • B21B17/04Tube-rolling by rollers of which the axes are arranged essentially perpendicular to the axis of the work, e.g. "axial" tube-rolling with mandrel, i.e. the mandrel rod contacts the rolled tube over the rod length in a continuous process
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B17/00Tube-rolling by rollers of which the axes are arranged essentially perpendicular to the axis of the work, e.g. "axial" tube-rolling
    • B21B17/14Tube-rolling by rollers of which the axes are arranged essentially perpendicular to the axis of the work, e.g. "axial" tube-rolling without mandrel, e.g. stretch-reducing mills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B19/00Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work
    • B21B19/02Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work the axes of the rollers being arranged essentially diagonally to the axis of the work, e.g. "cross" tube-rolling ; Diescher mills, Stiefel disc piercers or Stiefel rotary piercers
    • B21B19/04Rolling basic material of solid, i.e. non-hollow, structure; Piercing, e.g. rotary piercing mills

Definitions

  • the present invention relates to a method for producing martensitic stainless steel tubes and pipe(hereinafter, referred to as simply “tube(s)”) for use in oil wells and so forth by which cracking due to delayed fracture can be suppressed and inner-surface flaw generation can be prevented.
  • Martensitic stainless steel tubes made of API standard 13% Cr containing about 13 mass % of chromium (Cr), for instance, are required to have yield strength of not less than 80 ksi (552 MPa) and to be provided with reasonable hot workability, so that they generally contain as much as about 0.2 mass % of C (carbon). Owing to such high Cr and C contents, the tubes as hot worked have a martensitic microstructure with a high hardness, so that they are low in toughness.
  • API standard 13% Cr containing about 13 mass % of chromium (Cr) are required to have yield strength of not less than 80 ksi (552 MPa) and to be provided with reasonable hot workability, so that they generally contain as much as about 0.2 mass % of C (carbon). Owing to such high Cr and C contents, the tubes as hot worked have a martensitic microstructure with a high hardness, so that they are low in toughness.
  • impact-receiving portions affected portions thereof subjected to processing by an impact load or static load (hereinafter sometimes referred to as “impact-receiving portions”) during the period from tube-making stage to heat treatment may be cracked due to delayed fracture in some instances. For that reason, in transporting and storing steel tubes, it is necessary to take measures such that the stacking height for steel tubes is restricted and, further, reduce the stand-by time between the tube-making stage and heat treatment.
  • Japanese Patent Application Publication No. 2004-43935 discloses martensitic stainless steel seamless tubes and a method of production thereof while stipulating the effective dissolved carbon content, effective dissolved nitrogen content, Cr equivalent and S content so that delayed fracture may hardly occur in impact-receiving portions and the generation of inner-surface flaws may be suppressed.
  • the technology disclosed in the publication cited above still requires that the time from the tube-making process to heat treatment be reduced.
  • the problem of seasoning cracking which occurs when the period from the hot tube-making process to heat treatment exceeds one week, has not yet been solved.
  • the present invention which has been made in view of the problems discussed above, has for its object to provide a method for producing martensitic stainless steel tubes by which seasoning cracking due to delayed fracture is suppressed even when martensitic stainless steel tubes having a C content of about 0.2 mass % are left lying for over one week after hot tube-making until heat treatment and by which the generation of inner-surface flaws can also be prevented.
  • the present inventor made investigations to find out appropriate ranges of chemical compositions of billets for inhibiting impact-receiving portions from cracking due to delayed fracture and preventing the generation of inner-surface flaws as well as to find out proper temperature conditions for soaking tubing materials as pierced-and-rolled and a proper condition of section area reduction rate at a final rolling stage and, as a result, made the following findings (a) to (c). Based on such findings, the present invention has been completed.
  • a C content For preventing delayed fracture in impact-receiving portions by virtue of solid solution strengthening of martensitic stainless steel tubes after tube-making, it is necessary for a C content to be not more than 0.22 mass % and for a N content to be not more than 0.05 mass.
  • the C content is set to not less than 0.15 mass % and, for improving the hot workability to thereby inhibit the generation of inner-surface flaws, it is necessary that the content of N, which is an austenite stabilizing element, is set to not less than 0.01 mass %.
  • a Mn content is required to be 0.10-1.00 mass % so as to secure steel strength, deoxidizing effects and hot workability.
  • the gist of the present invention which has been completed based on the findings mentioned above, resides in processes for producing martensitic stainless steel tubes as given below under (1) to (4).
  • a method for producing martensitic stainless steel tubes comprising the steps of: using a billet made of a steel containing, in mass %, C: 0.15-0.22%, Si: 0.1-1.0%, Mn: 0.10-1.00%, Cr: 12.00-14.00%, N: 0.01-0.05%, P: not more than 0.020% and S: not more than 0.010%, the balance being Fe and impurities; subjecting said billet to a piecing-and-rolling process, followed by an elongation- rolling further, thus resulting in yielding a tubing material; and soaking the resulting tubing material and subjecting the same to a final rolling process under such conditions that the reheating temperature T (° C.) in soaking prior to the final rolling process and the section area reduction rate R (%) in the final rolling satisfy the relation represented by the inequality (1) given below: T> 44.4 ⁇ ln ( R )+821 (1) (2)
  • said billet may be made of a steel containing, in mass %, C: 0.15-0.22%
  • said billet may be made of the steel further containing, in lieu of part of Fe, at least one of Ni: not more than 0.5% and Cu: not more than 0.25%, each in mass %.
  • said billet may be made of the steel further containing, in lieu of part of Fe, at least one of Al: not more than 0.1% and Ca: not more than 0.0050%, each in mass %.
  • the hot working method for producing seamless tubes comprises the steps of: piercing-and-rolling wherein a hole or bore is made in the central part of a solid billet; elongation-rolling wherein mainly wall thickness reduction of the tubing material obtained by the piercing-rolling process; and sizing-rolling wherein the outside diameter of the tubing material is reduced to a desired finish size.
  • FIG. 1 illustrates an example of the production process according to the Mannesmann tube making process for producing seamless tubes in a hot working condition.
  • a solid billet 1 heated to a predetermined temperature is fed to a piercer rolling mill 3 for piercing-and-rolling rolling thereon to give a tubing material 2 .
  • the tubing material 2 is fed to a subsequent mandrel mill (elongation-rolling mill) 4 for elongation-rolling.
  • the tubing material 2 is cooled concurrently with elongation-rolling by means of a mandrel bar 4 b inserted in the tubing material and by means of rolling rolls 4 r , the rolling rolls controlling and adjusting the outside diameter of the tubing material. Accordingly, the tubing material 2 is then fed to a reheating furnace 5 and soaked at a predetermined reheating temperature. Thereafter, the tubing material 2 is fed to a stretch reducer 6 and undergoes final rolling, including sizing, shape correction and polishing, by means of rolling rolls 6 r.
  • final rolling (stage) means rolling to a specified diameter by means of a stretch reducer and/or a sizer, for instance.
  • the “section area reduction rate R (%) in final rolling” means the value calculated according to the equation (2) given below.
  • R (%) ⁇ ( Sin ⁇ Sout )/ Sin ⁇ 100 (2)
  • Sin represents a cross-sectional area of tube before final rolling and Sout is a cross-sectional area of tube after final rolling.
  • the method of the present invention is useful as the one by which martensitic stainless steel tubes for use in oil wells, among others, can be produced without confronting with any restraint in transporting and storing steel tubes and in the processing steps from tube making to heat treatment.
  • FIG. 1 is a drawing illustrating an example of the production process according to the Mannesmann tube-making process of seamless steel tubes in a hot working condition.
  • FIG. 2 is a drawing showing the influences of the section area reduction rate and the reheating temperature on the evaluation of steel tubes in terms of inner-surface flaws and cracking due to delayed fracture.
  • the present invention relates to a method for producing martensitic stainless steel tubes which comprises the steps of: using a billet made of a steel containing C: 0.15-0.22%, Si: 0.1-1.0%, Mn: 0.10-1.00%, Cr: 12.00-14.00%, N: 0.01-0.05%, P: not more than 0.020% and S: not more than 0.010%, the balance being Fe and impurities; subjecting said billet to piercing-and-rolling, followed by further elongation-rolling; and soaking the resultant tubing material and subjecting the same to final rolling under such conditions that the reheating temperature T (° C.) in soaking prior to final rolling and the section area reduction rate R (%) in final rolling satisfy the relation represented by the inequality (1) given hereinabove.
  • the method of the invention is described in more detail.
  • C is an element which brings about, similarly to N, solid solution strengthening of the steel tube just after tube making, namely, for the tube formed by hot rolling and not subjected to heat treatment.
  • the C content For inhibiting delayed fracture in impact-receiving portions by virtue of solid solution strengthening, it is necessary for the C content to be not more than 0.22%.
  • an excessive lowering of C content makes it impossible to maintain a proper level of strength after heat treatment.
  • C since C is an austenite-forming element, an excessive reduction in C content leads to ⁇ ferrite formation, possibly resulting in the generation of inner-surface seam defects after tube making.
  • it is necessary that the C content is set to not less than 0.15%.
  • a more preferred C content range is 0.18% to 0.21%.
  • Si is an element producing a deoxidizing effect for steel. For obtaining such effect, it is necessary for the Si content is set to not less than 0.1%. At high Si content levels exceeding 1.0%, however, toughness is deteriorated. For such reasons, the Si content range of 0.1-1.0% is considered appropriate. When priority is given to securing of toughness, the Si content is preferably set to not more than 0.75%. Amore preferred Si content range is 0.20-0.35%.
  • Mn is an element having a strength-improving effect for steel and, like Si, having a deoxidizing effect. Further, it immobilizes S in steel as MnS, producing a hot workability-improving effect. For obtaining those effects, it is necessary for the Mn content to be not less than 0.10%. However, at high content levels exceeding 1.00%, toughness is deteriorated. For the above reasons, the Mn content range of 0.10-1.00% is considered appropriate.
  • Cr constitutes a basic component having a corrosion resistance-improving effect for steel.
  • the Cr content is not less than 12.00%, pitting resistance and crevice corrosion resistance are improved and corrosion resistance in a CO 2 atmosphere is markedly improved.
  • ⁇ ferrite is readily formed during working at high temperatures since Cr is a ferrite-forming element; as a result, the hot workability is impaired.
  • the addition of an excessive amount of Cr results in an increase in production cost.
  • the Cr content range of 12.00-14.00% is considered appropriate.
  • a more preferred Cr content range is 12.40-13.10%.
  • N is an austenite-stabilizing element and is effective in improving the hot workability of steel and preventing the generation of inner-surface flaws. For obtaining those effects, it is necessary for the N content to be not less than 0.01%. High N content levels exceeding 0.05%, however, induce the delayed fracture of impact-receiving portions. Therefore, the N content range of 0.01-0.05% is considered appropriate. The N content is more preferably 0.02-0.035%.
  • P is an impurity element in steel. At high P content levels, toughness of products after heat treatment lowers and, therefore, the upper limit to the content thereof is set to 0.020%. It is preferred that the P content is as low as possible.
  • S is an impurity element reducing the hot workability of steel when the content thereof is high and, therefore, the allowable upper limit to the content thereof is set to 0.010%. It is preferred that the S content is as low as possible, more preferably not more than 0.003%.
  • V, Ti, Nb and B are One or more of V, Ti, Nb and B:
  • These elements may or may not be contained in steel. When contained, these elements produce an effect of inhibiting delayed fracture in impact-receiving portions. For obtaining such effect, it is preferred that one or more of these elements be contained in the steel. As for the contents thereof, a content of not less than 0.005% is preferred for each of V, Ti and Nb, and a content of not less than 0.0005% is preferred for B.
  • the content of these elements is preferably not more than 0.200% and, for B, the content thereof is preferably set to not more than 0.0100%.
  • Ni and Cu are One or more of Ni and Cu:
  • These elements may or may not be contained in steel. When one or more of them are contained, they produce an effect of improving the hot workability and corrosion resistance of the steel.
  • Ni When contained in the steel, Ni produces an effect of improving the hot workability of steel since Ni is an austenite-stabilizing element. For obtaining that effect, the Ni content is preferably not less than 0.001%. On the other hand, at excessively high content levels, the sulfide stress corrosion cracking resistance decreases. Therefore, the content thereof is preferably set to not more than 0.5%.
  • Cu is a corrosion resistance-improving element and is an austenite-stabilizing element and, therefore, when contained in steel, it produces an effect of improving the hot workability of steel.
  • the content thereof is preferably not less than 0.001%.
  • Cu is a low-melting-point metal and, when the content thereof is excessive, the hot workability is decreased on the contrary. Therefore, the content thereof is preferably set to not more than 0.25%.
  • These elements may or may not be contained in steel. When contained, they are effective in inhibiting the generation of outside-surface seam defects and/or preventing the hot workability from decreasing.
  • Al When Al is contained in steel, it effectively acts as a steel deoxidizing agent and also has an effect of inhibiting the generation of outside-surface seam defects. For obtaining such effects, the content thereof is preferably not less than 0.001%. On the other hand, an excessive content thereof leads to a decrease in cleanliness of steel or non-metallic inclusion levels and further causes an immersion nozzle clogging in continuous casting. Therefore, the Al content is preferably set to not more than 0.1%.
  • Ca When contained in steel, Ca unites with S in steel and produces an effect of preventing the hot workability from decreasing due to grain boundary segregation of S. For obtaining those effects, the content thereof is preferably set to not. less than 0.0001%. On the other hand, an excessive content of Ca causes the generation of macro-streak flaws and, therefore, the content thereof is preferably set to not more than 0.0050%.
  • Billets each having a chemical composition of steel comprising the components within the respective appropriate ranges mentioned above and an outside diameter of 190 mm were subjected to piercing-rolling, followed by elongation-rolling.
  • the thus-obtained tubing material were soaked at various reheating temperatures T (° C.) and subjected to final rolling while the section area reduction rate R (%) was varied.
  • the steel tubes thus produced were subjected to fundamental testing for examining the occurrence of cracking due to delayed fracture and the generation of inner-surface flaws. In part of the fundamental testing, the testing was carried out also using billets in which the N content and/or Mn content in steel deviate from the respective appropriate ranges.
  • the section area reduction rate R (%) means the section area reduction rate in final rolling and each value shown was calculated according to the formula (2) given below.
  • R (%) ⁇ ( Sin ⁇ Sout )/ Sin ⁇ 100 (2)
  • Sin represents the cross-sectional area of the steel tube before final rolling and Sout represents the cross-sectional area of the steel tube after final rolling.
  • test results were evaluated according to the evaluation criteria given below, and the evaluation results are shown in the column under the heading “Results evaluation” in the above Table.
  • Drop weight test specimens 250 mm in length, were collected from the steel tubes after production, a block weight having a tip radius of curvature of 90 mm and a mass of 150 kg was dropped on the specimens from a height of 0.2 m (i.e. an impact load of 294 J was given thereto) to cause deformation, and the presence or absence of cracks was checked by visual inspection and UST. Then, when there was no crack generation after 1 week, the mark ⁇ was given and, when no crack generation was observed after 3 days, the mark ⁇ was given. When crack generation was observed after 3 days, the mark x was given.
  • FIG. 2 is a graphic representation of the influences of the section area reduction rate and reheating temperature on the overall rating in terms of the steel tube inner-surface flaw and delayed fracture cracking development ratings.
  • billets varied in chemical composition of steel and having an outside diameter of 190 mm were subjected to piercing-and-rolling, soaking of thus-produced tubing material at various reheating temperatures T (° C.) and subjecting the same to final rolling while varying the section area reduction rate R (%), and the steel tubes after tube making were examined for the occurrence of delayed fracture cracking and for the generation of inner-surface flaws.
  • test results were evaluated according to the same evaluation criteria as those used in the above-mentioned fundamental testing.
  • Test Nos. B1-B4, B9, B10, B14, B15, B19, B20, B24, B25, B29, B30, B34, B35, B39 and B40 are Inventive Examples which respectively satisfy the chemical composition range requirements specified by the present invention.
  • Test Nos. B5-B8 are Comparative Examples in which the N content or Mn content does not meet the content range requirement established by the invention, and Test Nos. B11-B13, B16-B18, B21-B23, B26-B28, B31-B33 and B36-B38 are Comparative Examples in which the relation between the section area reduction rate R and the reheating temperature T does not satisfy the relation defined by the formula (1) given hereinabove.
  • the steel tube production method of the invention can inhibit the cracking due to delayed fracture and prevent the generation of inner-surface flaws in impact-receiving portions of tubes made of martensitic stainless steel such as 13% Cr by optimizing the chemical composition of steel for billets and the relation between the soaking temperature for tubing materials as pierced-and-rolled and the section area reduction rate in final rolling. Therefore, the method of the invention can be applied widely in the field of production of martensitic stainless steel tubes for use in oil wells and so forth as a method by which high-quality steel tubes can be produced without any particular restraint in transporting and storing steel tubes and in the processing steps from tube making to heat treatment.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Heat Treatment Of Steel (AREA)

Abstract

Martensitic stainless steel tubes are produced by optimizing the chemical composition of steel for billets (C: 0.15-0.22%, Si: 0.1-1.0%, Mn: 0.10-1.00%, Cr: 12.00-14.00%, N: 0.01-0.05%, P: not more than 0.020% and S: not more than 0.010%) and the relation between the soaking temperature for pierced-and-rolled tubing material and the section area reduction rate in final rolling. By this method, delayed fracture cracking in impact-receiving portions of tubes in martensitic stainless steel s such as 13% Cr tubes can be inhibited and the generation of inner-surface flaws can be prevented.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The present invention relates to a method for producing martensitic stainless steel tubes and pipe(hereinafter, referred to as simply “tube(s)”) for use in oil wells and so forth by which cracking due to delayed fracture can be suppressed and inner-surface flaw generation can be prevented.
  • 2. Description of the Related Art
  • Martensitic stainless steel tubes made of API standard 13% Cr containing about 13 mass % of chromium (Cr), for instance, are required to have yield strength of not less than 80 ksi (552 MPa) and to be provided with reasonable hot workability, so that they generally contain as much as about 0.2 mass % of C (carbon). Owing to such high Cr and C contents, the tubes as hot worked have a martensitic microstructure with a high hardness, so that they are low in toughness.
  • Therefore, when tubes are produced according to the conventional chemical compositions of steel and production method, affected portions thereof subjected to processing by an impact load or static load (hereinafter sometimes referred to as “impact-receiving portions”) during the period from tube-making stage to heat treatment may be cracked due to delayed fracture in some instances. For that reason, in transporting and storing steel tubes, it is necessary to take measures such that the stacking height for steel tubes is restricted and, further, reduce the stand-by time between the tube-making stage and heat treatment.
  • The restraints as to steel tube transportation and storage as mentioned above make it necessary to secure a large storage space in view of the restricted stacking height and, for carrying out heat treatment within a limited period of time following the tube-making process, it becomes necessary to adjust the steps from the tube-making process to heat treatment; thus, a number of difficulties arise throughout the whole tube manufacturing process.
  • Japanese Patent Application Publication No. 2004-43935 discloses martensitic stainless steel seamless tubes and a method of production thereof while stipulating the effective dissolved carbon content, effective dissolved nitrogen content, Cr equivalent and S content so that delayed fracture may hardly occur in impact-receiving portions and the generation of inner-surface flaws may be suppressed. However, even the technology disclosed in the publication cited above still requires that the time from the tube-making process to heat treatment be reduced. In particular, the problem of seasoning cracking, which occurs when the period from the hot tube-making process to heat treatment exceeds one week, has not yet been solved.
  • SUMMARY OF THE INVENTION
  • The present invention, which has been made in view of the problems discussed above, has for its object to provide a method for producing martensitic stainless steel tubes by which seasoning cracking due to delayed fracture is suppressed even when martensitic stainless steel tubes having a C content of about 0.2 mass % are left lying for over one week after hot tube-making until heat treatment and by which the generation of inner-surface flaws can also be prevented.
  • To solve the problems mentioned above, the present inventor made investigations to find out appropriate ranges of chemical compositions of billets for inhibiting impact-receiving portions from cracking due to delayed fracture and preventing the generation of inner-surface flaws as well as to find out proper temperature conditions for soaking tubing materials as pierced-and-rolled and a proper condition of section area reduction rate at a final rolling stage and, as a result, made the following findings (a) to (c). Based on such findings, the present invention has been completed.
  • (a) For preventing delayed fracture in impact-receiving portions by virtue of solid solution strengthening of martensitic stainless steel tubes after tube-making, it is necessary for a C content to be not more than 0.22 mass % and for a N content to be not more than 0.05 mass. For suppressing the generation of inner-surface flaws due to δ ferrite after tube-making, it is necessary that the C content is set to not less than 0.15 mass % and, for improving the hot workability to thereby inhibit the generation of inner-surface flaws, it is necessary that the content of N, which is an austenite stabilizing element, is set to not less than 0.01 mass %. A Mn content is required to be 0.10-1.00 mass % so as to secure steel strength, deoxidizing effects and hot workability.
  • (b) Further, when the steel contains at least one element selected from a group consisting of not more than 0.200% of V, not more than 0.200% of Nb, not more than 0.200% of Ti and not more than 0.0100% of B, each in mass %, a further effect of inhibiting delayed fracture in impact-receiving portions is exhibited, which is preferable.
  • (c) In order to inhibit cracking due to delayed fracture in impact-receiving portions and to prevent the generation of inner-surface flaws, it is necessary to adjust the reheating temperature T (° C.) in soaking tubing materials as obtained by piecing-and- rolling of billets having such chemical compositions as given under (a) and (b) and the section area reduction rate R (%) at a final rolling stage so that the relation represented by the inequality given below is satisfied.
    T>44.4×ln(R)+821  (1)
  • The gist of the present invention, which has been completed based on the findings mentioned above, resides in processes for producing martensitic stainless steel tubes as given below under (1) to (4).
  • (1) A method for producing martensitic stainless steel tubes, comprising the steps of: using a billet made of a steel containing, in mass %, C: 0.15-0.22%, Si: 0.1-1.0%, Mn: 0.10-1.00%, Cr: 12.00-14.00%, N: 0.01-0.05%, P: not more than 0.020% and S: not more than 0.010%, the balance being Fe and impurities; subjecting said billet to a piecing-and-rolling process, followed by an elongation- rolling further, thus resulting in yielding a tubing material; and soaking the resulting tubing material and subjecting the same to a final rolling process under such conditions that the reheating temperature T (° C.) in soaking prior to the final rolling process and the section area reduction rate R (%) in the final rolling satisfy the relation represented by the inequality (1) given below:
    T>44.4×ln(R)+821  (1)
    (2) In the method for producing martensitic stainless steel tubes as set forth above under (1), said billet may be made of the steel further containing, in lieu of part of Fe, at least one of V: not more than 0.200%, Nb: not more than 0.200%, Ti: not more than 0.200% and B: not more than 0.0100%, each in mass %.
    (3) In the method for producing martensitic stainless steel tubes as set forth above under (1) or (2), said billet may be made of the steel further containing, in lieu of part of Fe, at least one of Ni: not more than 0.5% and Cu: not more than 0.25%, each in mass %.
    (4) In the method for producing martensitic stainless steel tubes as set forth above under any of (1) to (3), said billet may be made of the steel further containing, in lieu of part of Fe, at least one of Al: not more than 0.1% and Ca: not more than 0.0050%, each in mass %.
  • The hot working method for producing seamless tubes comprises the steps of: piercing-and-rolling wherein a hole or bore is made in the central part of a solid billet; elongation-rolling wherein mainly wall thickness reduction of the tubing material obtained by the piercing-rolling process; and sizing-rolling wherein the outside diameter of the tubing material is reduced to a desired finish size.
  • FIG. 1 illustrates an example of the production process according to the Mannesmann tube making process for producing seamless tubes in a hot working condition. In this tube-making process, a solid billet 1 heated to a predetermined temperature is fed to a piercer rolling mill 3 for piercing-and-rolling rolling thereon to give a tubing material 2. Then, the tubing material 2 is fed to a subsequent mandrel mill (elongation-rolling mill) 4 for elongation-rolling. On the occasion of elongation-rolling at the mandrel mill 4, the tubing material 2 is cooled concurrently with elongation-rolling by means of a mandrel bar 4 b inserted in the tubing material and by means of rolling rolls 4 r, the rolling rolls controlling and adjusting the outside diameter of the tubing material. Accordingly, the tubing material 2 is then fed to a reheating furnace 5 and soaked at a predetermined reheating temperature. Thereafter, the tubing material 2 is fed to a stretch reducer 6 and undergoes final rolling, including sizing, shape correction and polishing, by means of rolling rolls 6 r.
  • The term “final rolling (stage)” as used herein means rolling to a specified diameter by means of a stretch reducer and/or a sizer, for instance.
  • The “section area reduction rate R (%) in final rolling” means the value calculated according to the equation (2) given below.
    R(%)={(Sin−Sout)/Sin}×100  (2)
  • Here, Sin represents a cross-sectional area of tube before final rolling and Sout is a cross-sectional area of tube after final rolling.
  • In the following description, the phrase “in mass %” for expressing each content of chemical compositions is written simply as “%”.
  • According to the tube-making process of the invention, by virtue of optimizing chemical compositions of the steel for billets and the relation between the soaking temperature for the tubing material as pierced-and-rolled and the section area reduction rate in final rolling, it becomes possible to inhibit cracking due to delayed fracture in impact-receiving portions of tubes made of martensitic stainless steel such as 13% Cr and, at the same time, prevent the generation of inner-surface flaws therein. Therefore, the method of the present invention is useful as the one by which martensitic stainless steel tubes for use in oil wells, among others, can be produced without confronting with any restraint in transporting and storing steel tubes and in the processing steps from tube making to heat treatment.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a drawing illustrating an example of the production process according to the Mannesmann tube-making process of seamless steel tubes in a hot working condition.
  • FIG. 2 is a drawing showing the influences of the section area reduction rate and the reheating temperature on the evaluation of steel tubes in terms of inner-surface flaws and cracking due to delayed fracture.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • As described hereinabove, the present invention relates to a method for producing martensitic stainless steel tubes which comprises the steps of: using a billet made of a steel containing C: 0.15-0.22%, Si: 0.1-1.0%, Mn: 0.10-1.00%, Cr: 12.00-14.00%, N: 0.01-0.05%, P: not more than 0.020% and S: not more than 0.010%, the balance being Fe and impurities; subjecting said billet to piercing-and-rolling, followed by further elongation-rolling; and soaking the resultant tubing material and subjecting the same to final rolling under such conditions that the reheating temperature T (° C.) in soaking prior to final rolling and the section area reduction rate R (%) in final rolling satisfy the relation represented by the inequality (1) given hereinabove. In the following, the method of the invention is described in more detail.
  • (1) Chemical Compositions of Steel Tubes
  • The reasons why the chemical compositions of the martensitic stainless steel tubes according to the invention have been defined as described hereinabove and the preferred content ranges for the respective elements are now described.
  • C: 0.15-0.22%
  • C is an element which brings about, similarly to N, solid solution strengthening of the steel tube just after tube making, namely, for the tube formed by hot rolling and not subjected to heat treatment. For inhibiting delayed fracture in impact-receiving portions by virtue of solid solution strengthening, it is necessary for the C content to be not more than 0.22%. However, an excessive lowering of C content makes it impossible to maintain a proper level of strength after heat treatment. Further, since C is an austenite-forming element, an excessive reduction in C content leads to δ ferrite formation, possibly resulting in the generation of inner-surface seam defects after tube making. For the reasons mentioned above, it is necessary that the C content is set to not less than 0.15%. A more preferred C content range is 0.18% to 0.21%.
  • Si: 0.1-1.0%
  • Si is an element producing a deoxidizing effect for steel. For obtaining such effect, it is necessary for the Si content is set to not less than 0.1%. At high Si content levels exceeding 1.0%, however, toughness is deteriorated. For such reasons, the Si content range of 0.1-1.0% is considered appropriate. When priority is given to securing of toughness, the Si content is preferably set to not more than 0.75%. Amore preferred Si content range is 0.20-0.35%.
  • Mn: 0.10-1.00%
  • Mn is an element having a strength-improving effect for steel and, like Si, having a deoxidizing effect. Further, it immobilizes S in steel as MnS, producing a hot workability-improving effect. For obtaining those effects, it is necessary for the Mn content to be not less than 0.10%. However, at high content levels exceeding 1.00%, toughness is deteriorated. For the above reasons, the Mn content range of 0.10-1.00% is considered appropriate.
  • Cr: 12.00-14.00%
  • Cr constitutes a basic component having a corrosion resistance-improving effect for steel. In particular, when the Cr content is not less than 12.00%, pitting resistance and crevice corrosion resistance are improved and corrosion resistance in a CO2 atmosphere is markedly improved. On the other hand, at high Cr content levels exceeding 14.00%, δ ferrite is readily formed during working at high temperatures since Cr is a ferrite-forming element; as a result, the hot workability is impaired. In addition, the addition of an excessive amount of Cr results in an increase in production cost. For the above reasons, the Cr content range of 12.00-14.00% is considered appropriate. A more preferred Cr content range is 12.40-13.10%.
  • N: 0.01-0.05%
  • N is an austenite-stabilizing element and is effective in improving the hot workability of steel and preventing the generation of inner-surface flaws. For obtaining those effects, it is necessary for the N content to be not less than 0.01%. High N content levels exceeding 0.05%, however, induce the delayed fracture of impact-receiving portions. Therefore, the N content range of 0.01-0.05% is considered appropriate. The N content is more preferably 0.02-0.035%.
  • P: not more than 0.020%
  • P is an impurity element in steel. At high P content levels, toughness of products after heat treatment lowers and, therefore, the upper limit to the content thereof is set to 0.020%. It is preferred that the P content is as low as possible.
  • S: not more than 0.010%
  • S is an impurity element reducing the hot workability of steel when the content thereof is high and, therefore, the allowable upper limit to the content thereof is set to 0.010%. It is preferred that the S content is as low as possible, more preferably not more than 0.003%.
  • One or more of V, Ti, Nb and B:
  • These elements may or may not be contained in steel. When contained, these elements produce an effect of inhibiting delayed fracture in impact-receiving portions. For obtaining such effect, it is preferred that one or more of these elements be contained in the steel. As for the contents thereof, a content of not less than 0.005% is preferred for each of V, Ti and Nb, and a content of not less than 0.0005% is preferred for B.
  • On the other hand, when the content of these elements is excessive, the increased hardness resulting from nitride formation after heat treatment causes deterioration in corrosion resistance and/or decreases in toughness and induces fluctuations in strength as well. Therefore, for V, Ti and Nb, the content of each of them is preferably not more than 0.200% and, for B, the content thereof is preferably set to not more than 0.0100%.
  • One or more of Ni and Cu:
  • These elements may or may not be contained in steel. When one or more of them are contained, they produce an effect of improving the hot workability and corrosion resistance of the steel.
  • Ni: When contained in the steel, Ni produces an effect of improving the hot workability of steel since Ni is an austenite-stabilizing element. For obtaining that effect, the Ni content is preferably not less than 0.001%. On the other hand, at excessively high content levels, the sulfide stress corrosion cracking resistance decreases. Therefore, the content thereof is preferably set to not more than 0.5%.
  • Cu: Cu is a corrosion resistance-improving element and is an austenite-stabilizing element and, therefore, when contained in steel, it produces an effect of improving the hot workability of steel. For obtaining such effect, the content thereof is preferably not less than 0.001%. On the other hand, Cu is a low-melting-point metal and, when the content thereof is excessive, the hot workability is decreased on the contrary. Therefore, the content thereof is preferably set to not more than 0.25%.
  • one or more of Al and Ca:
  • These elements may or may not be contained in steel. When contained, they are effective in inhibiting the generation of outside-surface seam defects and/or preventing the hot workability from decreasing.
  • Al: When Al is contained in steel, it effectively acts as a steel deoxidizing agent and also has an effect of inhibiting the generation of outside-surface seam defects. For obtaining such effects, the content thereof is preferably not less than 0.001%. On the other hand, an excessive content thereof leads to a decrease in cleanliness of steel or non-metallic inclusion levels and further causes an immersion nozzle clogging in continuous casting. Therefore, the Al content is preferably set to not more than 0.1%.
  • Ca: When contained in steel, Ca unites with S in steel and produces an effect of preventing the hot workability from decreasing due to grain boundary segregation of S. For obtaining those effects, the content thereof is preferably set to not. less than 0.0001%. On the other hand, an excessive content of Ca causes the generation of macro-streak flaws and, therefore, the content thereof is preferably set to not more than 0.0050%.
  • (2) Relation Between the Reheating Temperature in Soaking and the Section Area Reduction Rate in Final Rolling
  • Billets each having a chemical composition of steel comprising the components within the respective appropriate ranges mentioned above and an outside diameter of 190 mm were subjected to piercing-rolling, followed by elongation-rolling. The thus-obtained tubing material were soaked at various reheating temperatures T (° C.) and subjected to final rolling while the section area reduction rate R (%) was varied. The steel tubes thus produced were subjected to fundamental testing for examining the occurrence of cracking due to delayed fracture and the generation of inner-surface flaws. In part of the fundamental testing, the testing was carried out also using billets in which the N content and/or Mn content in steel deviate from the respective appropriate ranges.
  • In piercing-rolling, a two-roll inclined rolling mill having conical rolls was used, and the angle of inclination was 12-15° and the crossing angle was 10°.
  • The chemical compositions of steel for billets, steel tube production conditions and test results are summarized in Table 1.
    TABLE 1
    Production conditions Results evaluation
    Extent of Reheating Inner
    Steel composition reduction in temperature T surface Crack Overall
    Test No. N(%) Mn(%) area R (%) (° C.) flaw rating rating rating
    A1 0.030 0.250 65.0 980 X X
    A2 0.030 0.250 65.0 990 X X
    A3 0.030 0.250 65.0 1000 Δ Δ
    A4 0.030 0.250 65.0 1010
    AS 0.030 0.250 65.0 1020
    A6 0.030 0.250 55.5 970 X X
    A7 0.030 0.250 55.5 980 X X
    A8 0.030 0.250 55.5 990 Δ Δ
    A9 0.030 0.250 55.5 1000
    A10 0.030 0.250 55.5 1010
    A11 0.030 0.250 43.4 960 X X
    A12 0.030 0.250 43.4 970 X X
    A13 0.030 0.250 43.4 980 Δ Δ
    A14 0.030 0.250 43.4 990
    A15 0.030 0.250 43.4 1000
    A16 0.030 0.250 30.9 950 X X
    A17 0.030 0.250 30.9 960 X X
    A18 0.030 0.250 30.9 970 Δ Δ
    A19 0.030 0.250 30.9 980
    A20 0.030 0.250 30.9 990
    A21 0.030 0.250 21.3 930 X X
    A22 0.030 0.250 21.3 940 X X
    A23 0.030 0.250 21.3 950 Δ Δ
    A24 0.030 0.250 21.3 960
    A25 0.030 0.250 21.3 970
    A26 0.030 0.250 5.3 870 X X
    A27 0.030 0.250 5.3 880 X X
    A28 0.030 0.250 5.3 890 Δ Δ
    A29 0.030 0.250 5.3 900
    A30 0.030 0.250 5.3 910
    A31 *0.009 0.250 55.5 1000 X X
    A32 0.010 0.250 55.5 1000
    A33 0.030 0.250 55.5 1000
    A34 0.050 0.250 55.5 1000
    A35 *0.060 0.250 55.5 1000 Δ Δ
    A36 0.030 *0.080 55.5 1000 X X
    A37 0.030 0.100 55.5 1000
    A38 0.030 0.500 55.5 1000
    A39 0.030 1.000 55.5 1000
    A40 0.030 *1.050 55.5 1000 Δ Δ

    Note:

    The mark * indicates that the relevant content is outside the range speficied by the present invention.
  • In Table 1, the section area reduction rate R (%) means the section area reduction rate in final rolling and each value shown was calculated according to the formula (2) given below.
    R(%)={(Sin−Sout)/Sin}×100  (2)
  • In the above formula, Sin represents the cross-sectional area of the steel tube before final rolling and Sout represents the cross-sectional area of the steel tube after final rolling.
  • The test results were evaluated according to the evaluation criteria given below, and the evaluation results are shown in the column under the heading “Results evaluation” in the above Table.
  • Inner-surface Flaw Rating:
  • Not less than 50 lengths of steel tubes having a length of 10-12.5 m were produced and examined for the generation of inner-surface flaws by visual inspection and ultrasonic testing (UST). The mark ∘ was given when the inner surface flaw incidence rate was not more than 3% and, when the inner surface flaw incidence rate exceeded 3%, the mark x was given.
  • Crack Rating:
  • Drop weight test specimens, 250 mm in length, were collected from the steel tubes after production, a block weight having a tip radius of curvature of 90 mm and a mass of 150 kg was dropped on the specimens from a height of 0.2 m (i.e. an impact load of 294 J was given thereto) to cause deformation, and the presence or absence of cracks was checked by visual inspection and UST. Then, when there was no crack generation after 1 week, the mark ∘ was given and, when no crack generation was observed after 3 days, the mark Δ was given. When crack generation was observed after 3 days, the mark x was given.
  • Overall Rating:
  • Out of the above-mentioned inner-surface flaw evaluation and crack evaluation results, the poorest rating among all constitutes the overall evaluation result.
  • Further, out of the test results shown above in Table 1, the results of those tests in which the N and Mn contents in steel were within the respective appropriate ranges specified in claim 1 were used to collate the influences of the section area reduction rate and reheating temperature on the overall rating in terms of the inner-surface flaw and delayed fracture cracking.
  • FIG. 2 is a graphic representation of the influences of the section area reduction rate and reheating temperature on the overall rating in terms of the steel tube inner-surface flaw and delayed fracture cracking development ratings.
  • Based on the results shown in Table 1 and FIG. 2, a borderline between the cases where the overall rating was ∘ and the cases where the overall rating was Δ or x was determined in terms of a relation between the section area reduction rate R (%) in final rolling and the reheating temperature T (° C.) in soaking. As a result, the following formula (3) was obtained.
    T=44.4×Ln(R)+821  (3)
  • From the relation represented by the above formula (3), it was revealed that for inhibiting the delayed fracture cracking in impact-receiving portions and preventing the generation of inner-surface flaws, it is necessary to adjust the reheating temperature T (° C.) in soaking the tubing material obtained by piercing-and-rolling and the section area reduction rate R (%) in final rolling so that they satisfy the relation represented by the above equation (1).
  • In test numbers A31 and A35 in which the N content in steel was outside the appropriate range and in test numbers A36 and A40 in which the Mn content was outside the appropriate range, inner-surface flaws or cracking generated and the overall rating was Δ or x.
  • EXAMPLES
  • For confirming the effects of the martensitic stainless steel tube production method according to the invention, a steel tube production test was carried out as described below, and the results were evaluated.
  • In the same manner as the fundamental testing described above, billets varied in chemical composition of steel and having an outside diameter of 190 mm were subjected to piercing-and-rolling, soaking of thus-produced tubing material at various reheating temperatures T (° C.) and subjecting the same to final rolling while varying the section area reduction rate R (%), and the steel tubes after tube making were examined for the occurrence of delayed fracture cracking and for the generation of inner-surface flaws.
  • In piercing-and-rolling, a two-roll inclined rolling mill having conical rolls, and the angle of inclination was 12-15° and the crossing angle was 10°.
  • The chemical compositions of steel for billets, steel tube production conditions and test results are summarized in Table 2 and Table 3.
    TABLE 2
    Chemical composition (in mass %, the balance being Fe and impurities)
    Test No. C Si P S Cr Ni Cu V Al Nb Ti B Ca Mn N
    B1 0.20 0.24 0.014 0.0005 12.46 0.002 0.460 0.010
    B2 0.20 0.23 0.013 0.0008 12.44 0.003 0.470 0.050
    B3 0.19 0.23 0.014 0.0005 12.42 0.003 0.100 0.032
    B4 0.21 0.29 0.013 0.0006 12.57 0.003 1.000 0.032
    B5 0.22 0.25 0.014 0.0006 12.63 0.003 0.470 *0.008
    B6 0.19 0.25 0.014 0.0005 12.43 0.004 0.470 *0.053
    B7 0.20 0.23 0.013 0.0006 12.44 0.002 *0.070 0.031
    B8 0.18 0.23 0.014 0.0006 12.52 0.002 *1.050 0.032
    B9 0.20 0.24 0.013 0.0005 12.48 0.002 0.005 0.470 0.030
    B10 0.20 0.26 0.011 0.0007 12.43 0.003 0.001 0.0004 0.450 0.029
    B11 0.19 0.24 0.013 0.0006 12.47 0.110 0.010 0.003 0.001 0.0007 0.480 0.029
    B12 0.19 0.24 0.013 0.0006 12.47 0.110 0.010 0.003 0.001 0.0007 0.480 0.029
    B13 0.19 0.24 0.013 0.0006 12.47 0.110 0.010 0.003 0.001 0.0007 0.480 0.029
    B14 0.19 0.24 0.013 0.0006 12.47 0.110 0.010 0.003 0.001 0.0007 0.480 0.029
    B15 0.19 0.24 0.013 0.0006 12.47 0.110 0.010 0.003 0.001 0.0007 0.480 0.029
    B16 0.21 0.23 0.013 0.0005 12.55 0.130 0.010 0.002 0.001 0.002 0.0008 0.480 0.030
    B17 0.21 0.23 0.013 0.0005 12.55 0.130 0.010 0.002 0.001 0.002 0.0008 0.480 0.030
    B18 0.21 0.23 0.013 0.0005 12.55 0.130 0.010 0.002 0.001 0.002 0.0008 0.480 0.030
    B19 0.21 0.23 0.013 0.0005 12.55 0.130 0.010 0.002 0.001 0.002 0.0008 0.480 0.030
    B20 0.21 0.23 0.013 0.0005 12.55 0.130 0.010 0.002 0.001 0.002 0.0008 0.480 0.030
    B21 0.18 0.23 0.013 0.0005 12.52 0.110 0.010 0.070 0.002 0.0006 0.570 0.030
    B22 0.18 0.23 0.013 0.0005 12.52 0.110 0.010 0.070 0.002 0.0006 0.570 0.030
    B23 0.18 0.23 0.013 0.0005 12.52 0.110 0.010 0.070 0.002 0.0006 0.570 0.030
    B24 0.18 0.23 0.013 0.0005 12.52 0.110 0.010 0.070 0.002 0.0006 0.570 0.030
    B25 0.18 0.23 0.013 0.0005 12.52 0.110 0.010 0.070 0.002 0.0006 0.570 0.030
    B26 0.19 0.24 0.014 0.0006 12.50 0.130 0.020 0.001 0.002 0.002 0.0003 0.460 0.029
    B27 0.19 0.24 0.014 0.0006 12.50 0.130 0.020 0.001 0.002 0.002 0.0003 0.460 0.029
    B28 0.19 0.24 0.014 0.0006 12.50 0.130 0.020 0.001 0.002 0.002 0.0003 0.460 0.029
    B29 0.19 0.24 0.014 0.0006 12.50 0.130 0.020 0.001 0.002 0.002 0.0003 0.460 0.029
    B30 0.19 0.24 0.014 0.0006 12.50 0.130 0.020 0.001 0.002 0.002 0.0003 0.460 0.029
    B31 0.20 0.24 0.015 0.0009 12.59 0.080 0.020 0.002 0.002 0.001 0.0009 0.480 0.026
    B32 0.20 0.24 0.015 0.0009 12.59 0.080 0.020 0.002 0.002 0.001 0.0009 0.480 0.026
    B33 0.20 0.24 0.015 0.0009 12.59 0.080 0.020 0.002 0.002 0.001 0.0009 0.480 0.026
    B34 0.20 0.24 0.015 0.0009 12.59 0.080 0.020 0.002 0.002 0.001 0.0009 0.480 0.026
    B35 0.20 0.24 0.015 0.0009 12.59 0.080 0.020 0.002 0.002 0.001 0.0009 0.480 0.026
    B36 0.19 0.23 0.012 0.0005 12.50 0.010 0.010 0.070 0.002 0.002 0.0004 0.590 0.031
    B37 0.19 0.23 0.012 0.0005 12.50 0.010 0.010 0.070 0.002 0.002 0.0004 0.590 0.031
    B38 0.19 0.23 0.012 0.0005 12.50 0.010 0.010 0.070 0.002 0.002 0.0004 0.590 0.031
    B39 0.19 0.23 0.012 0.0005 12.50 0.010 0.010 0.070 0.002 0.002 0.0004 0.590 0.031
    B40 0.19 0.23 0.012 0.0005 12.50 0.010 0.010 0.070 0.002 0.002 0.0004 0.590 0.031

    Note:

    The mark * indicates that the relevant content is outside the range specified by the present invention.
  • TABLE 3
    Production conditions Results evaluation
    Section area Reheating Value of Inner
    Test reduction temperature right side of Crack surfacae Overall
    No. rate R (%) T (° C.) equation (1) rating flaw rating rating Distinction Remarks
    B1 21.3 1,000 957 Inventive example
    B2 21.3 1,000 957 Inventive example
    B3 21.3 1,000 957 Inventive example
    B4 21.3 1,000 957 Inventive example
    85 21.3 1,000 957 X X Comparative example Inner surface flaw generation
    due to decreased hot workability
    B6 21.3 1,000 957 X X Comparative example Cracking due to decreased
    delayed fracture resistance
    B7 21.3 1,000 957 X X Comparative example Inner surface flaw generation
    due to decreased hot workability
    B8 21.3 1,000 957 X X Comparative example Cracking due to deteriorated
    toughness
    B9 21.3 1,000 957 Inventive example
    B10 21.3 1,000 957 Inventive example
    B11 65.0 *980 1,006 X X Comparative example
    B12 65.0 *990 1,006 X X Comparative example
    B13 65.0 *1000 1,006 Δ Δ Comparative example
    B14 65.0 1,010 1,006 Inventive example
    B15 65.0 1,020 1,006 Inventive example
    B16 55.5 *970 999 X X Comparative example
    B17 55.5 *980 999 X X Comparative example
    B18 55.5 *990 999 Δ Δ Comparative example
    B19 55.5 1,000 999 Inventive example
    B20 55.5 1,010 999 Inventive example
    B21 43.4 *960 988 X X Comparative example
    B22 43.4 *970 988 X X Comparative example
    B23 43.4 *980 988 Δ Δ Comparative example
    B24 43.4 990 988 Inventive example
    B25 43.4 1,000 988 Inventive example
    B26 30.9 *950 973 X X Comparative example
    B27 30.9 *960 973 X X Comparative example
    B28 30.9 *970 973 Δ Δ Comparative example
    B29 30.9 980 973 Inventive example
    B30 30.9 990 973 Inventive example
    B31 21.3 *930 957 X X Comparative example
    B32 21.3 *940 957 X X Comparative example
    B33 21.3 *950 957 Δ Δ Comparative example
    B34 21.3 960 957 Inventive example
    B35 21.3 970 957 Inventive example
    B36 5.3 *870 895 X X Comparative example
    B37 5.3 *880 895 X X Comparative example
    B38 5.3 *890 895 Δ Δ Comparative example
    B39 5.3 900 895 Inventive example
    B40 5.3 910 895 Inventive example

    Note:

    The mark * indicates that the relevant content is outside the range specified by the present invention.
  • The test results were evaluated according to the same evaluation criteria as those used in the above-mentioned fundamental testing.
  • Test Nos. B1-B4, B9, B10, B14, B15, B19, B20, B24, B25, B29, B30, B34, B35, B39 and B40 are Inventive Examples which respectively satisfy the chemical composition range requirements specified by the present invention. Test Nos. B5-B8 are Comparative Examples in which the N content or Mn content does not meet the content range requirement established by the invention, and Test Nos. B11-B13, B16-B18, B21-B23, B26-B28, B31-B33 and B36-B38 are Comparative Examples in which the relation between the section area reduction rate R and the reheating temperature T does not satisfy the relation defined by the formula (1) given hereinabove.
  • In the above-mentioned examples according to the invention, neither delayed fracture cracking after tube making nor inner-surface flaw generation occurred and, thus, steel tubes of good quality were obtained. In Test Nos. B9, B10, B14, B15, B19, B20, B24, B25, B29, B30, B34, B35, B39 and B40, in particular, which are Inventive Examples and in which the chemical compositions each contained one or more of V, Ti, Nb and B, or one or more of Ni and Cu, or one or more of Al and Ca, the delayed fracture resistance performance and hot workability, among others, were much better.
  • On the contrary, in Test Nos. of Comparative Example B5-B8, in which the N content or Mn content in the chemical composition of steel failed to meet the range requirement established by the invention, inner-surface flaw generation due to a decrease in hot workability, cracking due to a decrease in delayed fracture resistance and cracking due to a decrease in toughness were observed and the steel tubes obtained were poor in quality. In Test Nos. of Comparative Example B11-B13, B16-B18, B21-B23, B26-B28, B31-B33 and B36-B38, delayed fracture cracking and/or inner-surface flaws were generated respectively and the steel tubes obtained were poor in performance.
  • As described hereinabove, the steel tube production method of the invention can inhibit the cracking due to delayed fracture and prevent the generation of inner-surface flaws in impact-receiving portions of tubes made of martensitic stainless steel such as 13% Cr by optimizing the chemical composition of steel for billets and the relation between the soaking temperature for tubing materials as pierced-and-rolled and the section area reduction rate in final rolling. Therefore, the method of the invention can be applied widely in the field of production of martensitic stainless steel tubes for use in oil wells and so forth as a method by which high-quality steel tubes can be produced without any particular restraint in transporting and storing steel tubes and in the processing steps from tube making to heat treatment.

Claims (8)

1. A method for producing martensitic stainless steel tubes, comprising the steps of:
using a billet having a chemical composition containing C: 0.15-0.22%, Si: 0.1-1.0%, Mn: 0.10-1.00%, Cr: 12.00-14.00%, N: 0.01-0.05%, P: not more than 0.020% and S: not more than 0.010%, each in mass %, the balance being Fe and impurities;
subjecting said billet to piercing-and-rolling, followed by further elongation-rolling, thus yielding a tubing material; and
soaking thus-obtained tubing material and subjecting the same to final rolling under such conditions that a reheating temperature T (° C.) in soaking prior to the final rolling and a section area reduction rate R (%) in final rolling satisfy the relation represented by an inequality formula (1) given below:

T>44.4×ln(R)+821  (1).
2. The method for producing martensitic stainless steel tubes as set forth in claim 1, wherein the chemical composition of said billet includes, in lieu of a part of Fe, one or more of V: not more than 0.200%, Nb: not more than 0.200%, Ti: not more than 0.200% and B: not more than 0.0100%, each in mass %.
3. The method for producing martensitic stainless steel tubes as set forth in claim 1, wherein the chemical composition of said billet further includes, in lieu of part of Fe, one or more of Ni: not more than 0.5% and Cu: not more than 0.25%, each in mass %.
4. The method for producing martensitic stainless steel tubes as set forth in claim 2, wherein the chemical composition of said billet further includes, in lieu of part of Fe, one or more of Ni: not more than 0.5% and Cu: not more than 0.25%, each in mass %.
5. The method for producing martensitic stainless steel tubes as set forth in claim 1, wherein the chemical composition of said billet further included, in lieu of part of Fe, one or more of Al: not more than 0.1% and Ca: not more than 0.0050%, each in mass %.
6. The method for producing martensitic stainless steel tubes as set forth in claim 2, wherein the chemical composition of said billet further includes, in lieu of part of Fe, one or more of Al: not more than 0.1% and Ca: not more than 0.0050%, each in mass %.
7. The method for producing martensitic stainless steel tubes as set forth in claim 3, wherein the chemical composition of said billet further includes, in lieu of part of Fe, one or more of Al: not more than 0.1% and Ca: not more than 0.0050%, each in mass %.
8. The method for producing martensitic stainless steel tubes as set forth in claim 4, wherein the chemical composition of said billet further includes, in lieu of part of Fe, one or more of Al: not more than 0.1% and Ca: not more than 0.0050%, each in mass %.
US11/723,622 2006-03-22 2007-03-21 Method for producing martensitic stainless steel tubes Abandoned US20070251611A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2006079131A JP5011770B2 (en) 2006-03-22 2006-03-22 Method for producing martensitic stainless steel pipe
JP2006-079131 2006-03-22

Publications (1)

Publication Number Publication Date
US20070251611A1 true US20070251611A1 (en) 2007-11-01

Family

ID=38629325

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/723,622 Abandoned US20070251611A1 (en) 2006-03-22 2007-03-21 Method for producing martensitic stainless steel tubes

Country Status (3)

Country Link
US (1) US20070251611A1 (en)
JP (1) JP5011770B2 (en)
CN (1) CN101041882A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170165729A1 (en) * 2014-07-31 2017-06-15 Sms Innse S.P.A. Compact plant for rolling seamless tubes
US20170173650A1 (en) * 2014-07-31 2017-06-22 Sms Innse S.P.A. Combined apparatus for rolling seamless tubes

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6686951B2 (en) * 2017-03-27 2020-04-22 Jfeスチール株式会社 Evaluation method for brittle crack propagation arresting performance of thick steel plate
US20210198764A1 (en) * 2018-05-25 2021-07-01 Jfe Steel Corporation Martensitic stainless steel seamless pipe for oil country tubular goods, and method for manufacturing same
CN110643895B (en) * 2018-06-27 2021-05-14 宝山钢铁股份有限公司 Martensitic stainless steel oil casing and manufacturing method thereof
CN111270129A (en) * 2018-12-05 2020-06-12 兴化市聚鑫不锈钢有限公司 Novel alloy wear-resistant material for mine hydraulic equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030066580A1 (en) * 2001-08-29 2003-04-10 Kawasaki Steel Corporation Method for making high-strength high-toughness martensitic stainless steel seamless pipe

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2979604B2 (en) * 1990-08-31 1999-11-15 住友金属工業株式会社 Manufacturing method of martensitic stainless steel seamless tube
JP2707839B2 (en) * 1990-12-25 1998-02-04 住友金属工業株式会社 Martensitic seamless steel pipe and its manufacturing method
JP3937964B2 (en) * 2001-08-29 2007-06-27 Jfeスチール株式会社 High strength and high toughness martensitic stainless steel seamless pipe manufacturing method
JP2003105441A (en) * 2001-09-28 2003-04-09 Kawasaki Steel Corp METHOD FOR MANUFACTURING SEAMLESS TUBE OF 13 Cr MARTENSITIC STAINLESS STEEL HAVING HIGH STRENGTH AND HIGH TOUGHNESS
JP4126979B2 (en) * 2002-07-15 2008-07-30 住友金属工業株式会社 Martensitic stainless steel seamless pipe and its manufacturing method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030066580A1 (en) * 2001-08-29 2003-04-10 Kawasaki Steel Corporation Method for making high-strength high-toughness martensitic stainless steel seamless pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170165729A1 (en) * 2014-07-31 2017-06-15 Sms Innse S.P.A. Compact plant for rolling seamless tubes
US20170173650A1 (en) * 2014-07-31 2017-06-22 Sms Innse S.P.A. Combined apparatus for rolling seamless tubes

Also Published As

Publication number Publication date
JP2007254799A (en) 2007-10-04
JP5011770B2 (en) 2012-08-29
CN101041882A (en) 2007-09-26

Similar Documents

Publication Publication Date Title
JP4632000B2 (en) Seamless steel pipe manufacturing method
EP3395991B1 (en) High strength seamless stainless steel pipe for oil wells and manufacturing method therefor
US8701455B2 (en) Method for manufacturing a high alloy pipe
EP2309014A1 (en) Thick, high tensile-strength hot-rolled steel sheets with excellent low temperature toughness and manufacturing method therefor
WO2013011791A1 (en) Low-yield-ratio high-strength hot-rolled steel plate with excellent low-temperature toughness and process for producing same
US20070251611A1 (en) Method for producing martensitic stainless steel tubes
ZA200500365B (en) Martensitic stainless steel seamless pipe and a manufacturing method thereof
US20010001966A1 (en) Martensitic stainless steel for seamless steel pipe
US20220018007A1 (en) Duplex stainless steel seamless pipe and method for manufacturing same
JP4867088B2 (en) Manufacturing method of high Cr seamless steel pipe
WO2017149571A1 (en) Low-alloy, high-strength seamless steel pipe for oil well
EP1867737B1 (en) Method for producing martensitic stainless steel
EP3342894A1 (en) Stainless steel pipe and method for producing same
JP6806291B1 (en) Seamless steel pipe with excellent sulfuric acid dew point corrosion resistance and its manufacturing method
EP2835439B1 (en) Hollow seamless pipe for high-strength spring
WO2009119570A1 (en) Uoe steel tube for linepipes and process for production thereof
WO2021005959A1 (en) Seamless steel tube having excellent sulfuric-acid dew-point corrosion resistance, and manufacturing method for same
JP6225795B2 (en) Manufacturing method of thick high-strength seamless steel pipe for line pipe with excellent resistance to sulfide stress corrosion cracking
JP6152929B1 (en) Low alloy high strength seamless steel pipe for oil wells
US7686897B2 (en) Martensitic stainless steel seamless pipe and a manufacturing method thereof
JP2000313941A (en) Seamless tube of martensitic stainless steel excellent in surface quality
JP3456468B2 (en) Martensitic stainless steel seamless steel pipe with excellent machinability and hot workability
CA2600580C (en) Martensitic stainless steel seamless pipe and a manufacturing method thereof
JP2000313942A (en) Seamless tube of martensitic stainless steel excellent in surface quality

Legal Events

Date Code Title Description
AS Assignment

Owner name: SUMITOMO METAL INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:INAGE, TAKATERU;REEL/FRAME:019653/0359

Effective date: 20070406

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION