US20060059841A1 - Reinforced concrete structure, rebar end anchor therefor and method of manufacturing - Google Patents
Reinforced concrete structure, rebar end anchor therefor and method of manufacturing Download PDFInfo
- Publication number
- US20060059841A1 US20060059841A1 US10/920,991 US92099104A US2006059841A1 US 20060059841 A1 US20060059841 A1 US 20060059841A1 US 92099104 A US92099104 A US 92099104A US 2006059841 A1 US2006059841 A1 US 2006059841A1
- Authority
- US
- United States
- Prior art keywords
- anchor plate
- opening
- rebar
- anchor
- wall portions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/161—Protective caps for the ends of reinforcing bars
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
- E04B1/215—Connections specially adapted therefor comprising metallic plates or parts
Definitions
- Concrete is characterized by high compressive strength and notoriously poor tensile strength.
- this deficiency in the tensile strength of the concrete is obviated by imbedding in the concrete at those points where tensile stress will be encountered, reinforcing bars, typically of steel.
- a section of a reinforced concrete structure terminates at another section, such as at a beam/wall or beam/column intersection, provision must also be made to insure that the ends of the rebars will not pull out of the wall or column when tensile stress is encountered. Conventionally, this was remedied by bending the end of the rebar and perhaps inserting another rebar beneath the bend perpendicularly to the length of the first rebar.
- a joint of this type is congested to begin with and this remedy compounded the congestion, resulting in higher concrete placement costs and possible concrete consolidation problems.
- the rebar ends are provided with a forged head, a very large forging press is required, a substantial portion of the rebar must be preheated for forging with a commensurate expenditure of time and energy, and multiple strikes of the press are required to create the headed end.
- the end plate is a separate part with a threaded opening receiving a threaded end of the rebar, the rebar end must first be upsized through a forging process before the threads are cut into the rebar end. This is necessary to achieve the ultimate strength of the rebar. If the rebar were threaded without upsizing the end, the thread would create a weak point that would reduce the overall tensile strength of the rebar.
- the present invention provides a method of manufacturing an end anchor of superior structural performance but with the expenditure of less energy required than in comparable prior art methods, resulting in cost savings and a unique end anchor product.
- a separate anchor plate is provided, which may be round, square, rectangular or other configuration and through the plate an opening having irregular wall portions is formed.
- Conventional rebar having an effective outer diameter smaller than the size of the opening through the anchor plate is preheated at its end, the heated end inserted into the opening through the plate and then forged onto the plate by upsizing the rebar end and filling the hole through the plate with rebar material to form a mechanical interlock with the irregular wall portions of the opening through the anchor plate.
- an end anchor in accordance with the present invention may be produced in less time and with less energy than comparable processes for forming rebar end anchors.
- the process of forging the rebar into the anchor plate provides the added benefit of upsizing the rebar at the connection.
- This provides a stronger section of rebar at the connection and ensures that the rebar, if subjected to ultimate tensile stress, will break at a location distant from the anchor plate connection. This is an important feature because there are standards that require failure to occur away from the connection. This makes it obvious that the rebar has failed and not the anchor plate-rebar connection.
- FIG. 1 is a perspective view showing a typical beam-column connection utilizing one embodiment of end anchors in accordance with the present invention
- FIG. 2 is a perspective view of an end anchor plate in accordance with the present invention illustrating an opening through the plate having one form of irregularly shaped walls, in this embodiment, taking the form of internal grooves;
- FIG. 3 is an elevational view, partly in section, showing an end of a conventional rebar about to be received in an opening through the anchor plate of FIG. 2 ;
- FIG. 4 is a view similar to FIG. 3 , but illustrating the rebar end after it has been preheated and forged into mechanical interlock with the irregularly shaped walls of the opening through the anchor plate of FIG. 3 ;
- FIG. 5 is a view similar to FIG. 3 , but showing a second embodiment of the invention, wherein the irregularly shaped wall portions of the opening through the anchor plate are formed as a counterbore;
- FIG. 6 illustrates the end of a rebar received in the opening of the anchor plate shown in FIG. 5 after the rebar has been preheated and forged into interlocking engagement with the irregular walls of the anchor plate;
- FIG. 7 is an end view of the anchor plate and forged in place rebar of FIG. 4 ;
- FIG. 8 is a view similar to FIG. 7 but illustrating another embodiment of the present invention, wherein the anchor plate is formed with a square configuration;
- FIG. 9 is a view similar to FIG. 8 , but wherein the anchor plate is rectangular;
- FIG. 10 is a perspective view of another embodiment of anchor plate showing another form of irregularity in the side walls of the opening through the anchor plate designed to be mechanically interlocked with the heated, forged end of a rebar.
- FIG. 1 of the drawings depicts a beam-column connection 10 , which comprises a column 12 , a through beam, consisting of beam segments 14 and 16 and a beam 18 terminating at the connection.
- the intersecting vertical reinforcing bars, as at 20 and the horizontal intersecting bars, as at 22 and their associated ties, as at 24 create a congestion which, in conventional connections of this type is exacerbated by the addition of the rebars projecting from the terminating beam, particularly where the rebars of the terminating beam are bent at substantially right angles and additional rebar inserted in the bend to resist withdrawal.
- a disadvantage of this increased congestion is poor concrete consolidation, higher concrete placement costs and poor in place concrete quality.
- rebar 26 with anchor ends comprising anchor plates, one embodiment of which is shown at 30 and which are attached to the rebar in a method in accordance with the present invention. While the plates 30 shown in FIG. 1 are rectangular, it will be apparent as the description proceeds that the plates may assume other configurations, such as circular and square.
- an anchor plate 32 of round or circular configuration is shown having an opening 34 formed there through.
- the wall portions of the opening 34 are irregular, that is, the wall portion of the opening 34 is not merely a smooth constant diameter surface extending through the anchor plate 32 .
- the wall portions of the opening 34 are, in the embodiment of FIG. 2 , provided with circular grooves 36 .
- the grooves 36 of FIG. 2 comprise a threaded opening, as may also be seen in FIGS. 3 and 4 , it will be apparent the grooves 36 may also be simply a series of parallel circular grooves.
- the outer surface of rebar 37 is provided with deformations 38 which enhance its embedment in the concrete beam 18 .
- the rebars 20 , 22 and 26 are shown as smooth surfaced in FIG. 1 of the drawings, in actuality all of the bars would preferably be provided with deformations such as at 38 as shown in FIG. 3 of the drawings.
- the nominal outer diameter of the rebar 37 is smaller than the opening 34 through the plate 32 . This permits the anchor end 40 of the rebar to be inserted freely into the opening 34 .
- end 40 of the rebar 37 prior to placing the anchor end 40 of the rebar 37 into the opening 34 , end 40 is first heated and then, after it is received in the opening, subjected to an axial force and thus forged into place in mechanical interlocking relationship with the irregular wall portions 36 of the anchor plate 32 .
- the heated end 40 of the rebar 37 is upsized by forging, filling in the irregularities 36 in the opening 34 through the anchor plate 32 with material from the rebar to form a mechanical joint.
- upsizing the rebar ensures that should it encounter ultimate tensile stress, it will break at a point remote from the joint with the anchor plate,
- anchor plate 42 is provided with a counterbored opening 44 having a first portion 46 a second portion 48 and an interconnecting portion 50 . Otherwise, the process of manufacturing the rebar anchor end of FIG. 5 proceeds similarly to that previous described.
- anchor end 52 of rebar 54 is first heated and then, because the nominal diameter of the rebar 54 is smaller than the first portion 46 of the opening 44 through the plate 42 , it is freely received in the opening 44 , after which the heated anchor end 52 is forged to expand outwardly and fill the entire area of the counterbore opening 44 , including, not only the smaller diameter portion 46 , but also the counterbored portion 48 and the interconnecting portion 50 .
- the heated anchor end of the rebar is upsized to fill the opening 44 and form a mechanical joint between the rebar and the anchor plate 42 .
- FIG. 10 of the drawings shows yet another embodiment of anchor plate 60 having an opening 62 there through having irregular wall portions 64 .
- the irregular wall portions 64 take the form of alternating peaks 66 and valleys 68 extending about the entire wall portion of the opening 62 . While not specifically shown, it will be apparent that a mechanical interlock connection is made between the irregularly configured wall portions 64 of the anchor plate 60 in the same manner as the embodiments of FIGS. 4 and 6 .
- a rebar having a nominal diameter smaller than the opening 62 is first heated and then inserted into the opening 62 where it is forged, thereby upsizing the heated end of the rebar and filling all of the spaces around the alternating peaks 66 and valleys 68 to create a mechanical interlock between the rebar and the anchor plate 60 .
- the anchor plate 32 is shown as round, the anchor plate may take various other configurations, including a polygonal shape and more specifically, a rectangular shape as shown at 35 in FIG. 9 of the drawings or a square shape as shown at 33 in FIG. 8 of the drawings. It will also be apparent that the anchor plates 42 and 60 may also assume round, palegamal, rectangular and square shapes, similarly to the embodiment of FIG. 4 of the drawings.
- the present invention provides a method of fastening securely an anchor plate to an standard rebar by forming an irregularly shaped wall portion defining an opening through the anchor plate, heating an end of the rebar, inserting it into the opening in the anchor plate and then forging the heated end of the rebar to upsize it and fill the interstices provided by the irregular wall portions of the opening through the anchor plate, resulting in a secure mechanical interlock between the end of the rebar and the anchor plate.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
- Concrete is characterized by high compressive strength and notoriously poor tensile strength. In a typical reinforced concrete structure this deficiency in the tensile strength of the concrete is obviated by imbedding in the concrete at those points where tensile stress will be encountered, reinforcing bars, typically of steel. Where a section of a reinforced concrete structure terminates at another section, such as at a beam/wall or beam/column intersection, provision must also be made to insure that the ends of the rebars will not pull out of the wall or column when tensile stress is encountered. Conventionally, this was remedied by bending the end of the rebar and perhaps inserting another rebar beneath the bend perpendicularly to the length of the first rebar. Typically, a joint of this type is congested to begin with and this remedy compounded the congestion, resulting in higher concrete placement costs and possible concrete consolidation problems.
- To avoid these problems it is known to provide an enlarged head at the rebar end, either through forging or by welding a plate on the rebar end, or providing a plate with a threaded opening, upsetting the end of the rebar to enlarge its diameter and then threading the enlarged end complementarily to the anchor plate threaded opening and screwing the plate onto the threaded rebar end.
- Where the rebar ends are provided with a forged head, a very large forging press is required, a substantial portion of the rebar must be preheated for forging with a commensurate expenditure of time and energy, and multiple strikes of the press are required to create the headed end. Where the end plate is a separate part with a threaded opening receiving a threaded end of the rebar, the rebar end must first be upsized through a forging process before the threads are cut into the rebar end. This is necessary to achieve the ultimate strength of the rebar. If the rebar were threaded without upsizing the end, the thread would create a weak point that would reduce the overall tensile strength of the rebar.
- As noted above, it is also known to weld an anchor plate to the end of a rebar, typically through an inertia welding process. This approach has the drawbacks of requiring a separate fabricated anchor plate and requiring the upsizing of the rebar end prior to welding, but more importantly, the welding process is subject to various process variables that contribute to quality considerations.
- It will be seen, therefore, that a need exists for a rebar anchorage to reduce congestion at a joint intersection in a reinforced concrete structure, but without the disadvantages noted above with respect to conventional methods of providing an end anchorage for concrete reinforcing bars.
- The present invention provides a method of manufacturing an end anchor of superior structural performance but with the expenditure of less energy required than in comparable prior art methods, resulting in cost savings and a unique end anchor product.
- Specifically, in accordance with the present invention a separate anchor plate is provided, which may be round, square, rectangular or other configuration and through the plate an opening having irregular wall portions is formed. Conventional rebar having an effective outer diameter smaller than the size of the opening through the anchor plate is preheated at its end, the heated end inserted into the opening through the plate and then forged onto the plate by upsizing the rebar end and filling the hole through the plate with rebar material to form a mechanical interlock with the irregular wall portions of the opening through the anchor plate.
- This method permits the use of smaller forging presses than would be required to forge the end of a rebar into an end anchor and requires less heat prior to forging and less strikes of the forging press to complete the assembly. Thus, an end anchor in accordance with the present invention may be produced in less time and with less energy than comparable processes for forming rebar end anchors.
- As a result, the construction of an intersecting joint, such as the termination of a beam into a column or wall in a reinforced concrete structure is greatly facilitated, while conserving the energy and commensurate expense thereof usually associated with end anchors of this type. Therefore, in a typical intersection of this type, where reinforcing bars and associated ties create a congested condition, the necessity of contributing to that congestion by bending the end of the terminating rebar and providing cross rebar members within the bend is avoided but again, without the expense attended to conventional end anchors.
- Additionally, the process of forging the rebar into the anchor plate provides the added benefit of upsizing the rebar at the connection. This provides a stronger section of rebar at the connection and ensures that the rebar, if subjected to ultimate tensile stress, will break at a location distant from the anchor plate connection. This is an important feature because there are standards that require failure to occur away from the connection. This makes it obvious that the rebar has failed and not the anchor plate-rebar connection.
- These and other objects and advantages of the present invention will become apparent from the following description, the accompanying drawings and the appended claims.
- The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and, together with a general description of the invention given above, and the detailed description of the embodiments given below, serve to explain the principles of the invention.
-
FIG. 1 is a perspective view showing a typical beam-column connection utilizing one embodiment of end anchors in accordance with the present invention; -
FIG. 2 is a perspective view of an end anchor plate in accordance with the present invention illustrating an opening through the plate having one form of irregularly shaped walls, in this embodiment, taking the form of internal grooves; -
FIG. 3 is an elevational view, partly in section, showing an end of a conventional rebar about to be received in an opening through the anchor plate ofFIG. 2 ; -
FIG. 4 is a view similar toFIG. 3 , but illustrating the rebar end after it has been preheated and forged into mechanical interlock with the irregularly shaped walls of the opening through the anchor plate ofFIG. 3 ; -
FIG. 5 is a view similar toFIG. 3 , but showing a second embodiment of the invention, wherein the irregularly shaped wall portions of the opening through the anchor plate are formed as a counterbore; -
FIG. 6 illustrates the end of a rebar received in the opening of the anchor plate shown inFIG. 5 after the rebar has been preheated and forged into interlocking engagement with the irregular walls of the anchor plate; -
FIG. 7 is an end view of the anchor plate and forged in place rebar ofFIG. 4 ; -
FIG. 8 is a view similar toFIG. 7 but illustrating another embodiment of the present invention, wherein the anchor plate is formed with a square configuration; -
FIG. 9 is a view similar toFIG. 8 , but wherein the anchor plate is rectangular; and -
FIG. 10 is a perspective view of another embodiment of anchor plate showing another form of irregularity in the side walls of the opening through the anchor plate designed to be mechanically interlocked with the heated, forged end of a rebar. -
FIG. 1 of the drawings depicts a beam-column connection 10, which comprises a column 12, a through beam, consisting ofbeam segments beam 18 terminating at the connection. As will be apparent from inFIG. 1 , the intersecting vertical reinforcing bars, as at 20 and the horizontal intersecting bars, as at 22 and their associated ties, as at 24, create a congestion which, in conventional connections of this type is exacerbated by the addition of the rebars projecting from the terminating beam, particularly where the rebars of the terminating beam are bent at substantially right angles and additional rebar inserted in the bend to resist withdrawal. A disadvantage of this increased congestion is poor concrete consolidation, higher concrete placement costs and poor in place concrete quality. This condition is ameliorated in accordance with the present invention by providingrebar 26 with anchor ends comprising anchor plates, one embodiment of which is shown at 30 and which are attached to the rebar in a method in accordance with the present invention. While theplates 30 shown inFIG. 1 are rectangular, it will be apparent as the description proceeds that the plates may assume other configurations, such as circular and square. - Thus, as seen in
FIG. 2 of the drawings, ananchor plate 32 of round or circular configuration is shown having anopening 34 formed there through. As will be apparent fromFIG. 2 , the wall portions of theopening 34 are irregular, that is, the wall portion of theopening 34 is not merely a smooth constant diameter surface extending through theanchor plate 32. Instead, the wall portions of theopening 34 are, in the embodiment ofFIG. 2 , provided withcircular grooves 36. While thegrooves 36 ofFIG. 2 comprise a threaded opening, as may also be seen inFIGS. 3 and 4 , it will be apparent thegrooves 36 may also be simply a series of parallel circular grooves. - In any case, it will be noted from
FIG. 3 of the drawings that the outer surface of rebar 37 is provided withdeformations 38 which enhance its embedment in theconcrete beam 18. While therebars FIG. 1 of the drawings, in actuality all of the bars would preferably be provided with deformations such as at 38 as shown inFIG. 3 of the drawings. It will also be noted fromFIG. 3 that the nominal outer diameter of the rebar 37 is smaller than the opening 34 through theplate 32. This permits theanchor end 40 of the rebar to be inserted freely into theopening 34. - However, prior to placing the
anchor end 40 of the rebar 37 into theopening 34,end 40 is first heated and then, after it is received in the opening, subjected to an axial force and thus forged into place in mechanical interlocking relationship with theirregular wall portions 36 of theanchor plate 32. In other words, theheated end 40 of the rebar 37 is upsized by forging, filling in theirregularities 36 in theopening 34 through theanchor plate 32 with material from the rebar to form a mechanical joint. As noted above, upsizing the rebar ensures that should it encounter ultimate tensile stress, it will break at a point remote from the joint with the anchor plate, - While the end anchor construction shown in
FIG. 4 of the drawings is formed by forging the heated,anchor end 40 of therebar 26 into thegrooves 36, it is possible to utilize other wall irregularities as depicted inFIG. 5 of the drawings. Here,anchor plate 42 is provided with a counterbored opening 44 having a first portion 46 asecond portion 48 and an interconnectingportion 50. Otherwise, the process of manufacturing the rebar anchor end ofFIG. 5 proceeds similarly to that previous described. Thus,anchor end 52 ofrebar 54 is first heated and then, because the nominal diameter of therebar 54 is smaller than thefirst portion 46 of the opening 44 through theplate 42, it is freely received in the opening 44, after which theheated anchor end 52 is forged to expand outwardly and fill the entire area of the counterbore opening 44, including, not only thesmaller diameter portion 46, but also thecounterbored portion 48 and the interconnectingportion 50. Thus, again the heated anchor end of the rebar is upsized to fill the opening 44 and form a mechanical joint between the rebar and theanchor plate 42. -
FIG. 10 of the drawings shows yet another embodiment of anchor plate 60 having anopening 62 there through havingirregular wall portions 64. In the embodiment ofFIG. 10 theirregular wall portions 64 take the form ofalternating peaks 66 andvalleys 68 extending about the entire wall portion of the opening 62. While not specifically shown, it will be apparent that a mechanical interlock connection is made between the irregularly configuredwall portions 64 of the anchor plate 60 in the same manner as the embodiments ofFIGS. 4 and 6 . That is, a rebar having a nominal diameter smaller than theopening 62 is first heated and then inserted into theopening 62 where it is forged, thereby upsizing the heated end of the rebar and filling all of the spaces around thealternating peaks 66 andvalleys 68 to create a mechanical interlock between the rebar and the anchor plate 60. - While in the embodiment of
FIG. 4 of the drawings, theanchor plate 32 is shown as round, the anchor plate may take various other configurations, including a polygonal shape and more specifically, a rectangular shape as shown at 35 inFIG. 9 of the drawings or a square shape as shown at 33 inFIG. 8 of the drawings. It will also be apparent that theanchor plates 42 and 60 may also assume round, palegamal, rectangular and square shapes, similarly to the embodiment ofFIG. 4 of the drawings. - Regardless of the specific configuration of the anchor plate it will be apparent that the present invention provides a method of fastening securely an anchor plate to an standard rebar by forming an irregularly shaped wall portion defining an opening through the anchor plate, heating an end of the rebar, inserting it into the opening in the anchor plate and then forging the heated end of the rebar to upsize it and fill the interstices provided by the irregular wall portions of the opening through the anchor plate, resulting in a secure mechanical interlock between the end of the rebar and the anchor plate. Thus, the advantages of utilizing an end anchor in place of merely bending the terminal portion of a rebar and inserting a crossing rebar are obtained, but without the expenditure of energy and expense associated with end anchors of this type. While the methods and structures formed thereby described herein constitute preferred embodiments of the invention it is to be understood that the invention is not limited to these precise forms of method and structure formed thereby and that changes may be made therein without departing from the scope of the invention as defined in the appended claims.
Claims (30)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/920,991 US20060059841A1 (en) | 2004-08-18 | 2004-08-18 | Reinforced concrete structure, rebar end anchor therefor and method of manufacturing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/920,991 US20060059841A1 (en) | 2004-08-18 | 2004-08-18 | Reinforced concrete structure, rebar end anchor therefor and method of manufacturing |
Publications (1)
Publication Number | Publication Date |
---|---|
US20060059841A1 true US20060059841A1 (en) | 2006-03-23 |
Family
ID=36072407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/920,991 Abandoned US20060059841A1 (en) | 2004-08-18 | 2004-08-18 | Reinforced concrete structure, rebar end anchor therefor and method of manufacturing |
Country Status (1)
Country | Link |
---|---|
US (1) | US20060059841A1 (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090183369A1 (en) * | 2004-03-30 | 2009-07-23 | Yeou-Fong Li | Method for making a reinforcement device for a concrete structural member, and method for strengthening the concrete structural member |
WO2011005970A1 (en) * | 2009-07-08 | 2011-01-13 | Diversakore Llc | Building structure |
WO2013024208A1 (en) * | 2011-08-18 | 2013-02-21 | Peikko Group Oy | Method for producing a reinforcement system for embedding in flat slabs and a reinforcement system for embedding in flat slabs |
US20130305652A1 (en) * | 2012-05-18 | 2013-11-21 | Neturen Co., Ltd. | Rebar structure and reinforced concrete member |
US20140305295A1 (en) * | 2011-11-07 | 2014-10-16 | Instytut Odlewnictwa | Composite passive armor protection |
US20140345446A1 (en) * | 2011-11-07 | 2014-11-27 | Instytut Odlewnictwa | Composite passive armor protection |
US9062457B2 (en) | 2013-02-11 | 2015-06-23 | Robert Gilling | Assembly and method for anchoring rebar to a mass |
JP2016065379A (en) * | 2014-09-24 | 2016-04-28 | 株式会社大林組 | Connection structure and steel plate |
WO2016071847A1 (en) * | 2014-11-04 | 2016-05-12 | Technip Italy S.P.A. | A joint between beam elements and column elements made of prefabricated reinforced concrete |
JP2017179921A (en) * | 2016-03-30 | 2017-10-05 | 三栄商事株式会社 | Reinforcement anchorage method for foundation beam connection part, reinforcement anchorage structure, and set of reinforcement anchorage device |
US10260225B2 (en) * | 2015-01-05 | 2019-04-16 | Sejong R&D Co., Ltd. | Precast concrete member with prefabricated plate and fixing channels |
USD906094S1 (en) | 2019-01-15 | 2020-12-29 | Peri Formwork Systems, Inc. | Adaptor |
US11603674B1 (en) | 2020-03-19 | 2023-03-14 | Peri Formwork Systems, Inc. | Waler system |
USD984243S1 (en) * | 2019-05-23 | 2023-04-25 | Dan Warren | Brazed rebar gabion façade |
US20230250625A1 (en) * | 2021-01-27 | 2023-08-10 | Hainan University | Beam-column joint of precast concrete column and construction method thereof |
Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US245691A (en) * | 1881-08-16 | alker | ||
US1165514A (en) * | 1915-09-20 | 1915-12-28 | George W Kelly | Brake jaw or fork. |
US1352199A (en) * | 1917-08-20 | 1920-09-07 | Clements Co | Bolt-anchor |
US1688423A (en) * | 1924-12-20 | 1928-10-23 | Rich Tool Company | Method of making valves |
US2928170A (en) * | 1953-04-16 | 1960-03-15 | James A Mclaughlin | Method for making form ties |
US3193857A (en) * | 1961-03-24 | 1965-07-13 | Gen Am Transport | Methods of producing strong threaded anchorages |
US3396567A (en) * | 1964-12-04 | 1968-08-13 | Hasenclever A G Maschf | Apparatus for the heading of conductive workpieces |
US4024688A (en) * | 1971-08-12 | 1977-05-24 | Calini Anthony J | Concrete reinforcing bar extension construction and method |
US4035903A (en) * | 1975-01-23 | 1977-07-19 | Kaiser Aluminum & Chemical Corporation | Method of manufacturing a sacrificial anode rod assembly |
US4214358A (en) * | 1977-03-25 | 1980-07-29 | Commissariat A L'energie Atomique | Method of assembly of two metallic parts |
US4364159A (en) * | 1980-07-14 | 1982-12-21 | Trw Inc. | Method for manufacturing a forged piston with reinforced ring groove |
US4582242A (en) * | 1984-08-17 | 1986-04-15 | Spindler Dietmar E | Method of making formed end metal products |
US4619096A (en) * | 1981-01-15 | 1986-10-28 | Richmond Screw Anchor Co., Inc. | Rebar splicing and anchoring |
US5152118A (en) * | 1990-08-13 | 1992-10-06 | Richmond Screw Anchor Co., Inc. | Couplings for concrete reinforcement bars |
US5479748A (en) * | 1992-01-07 | 1996-01-02 | Siller; Jose L. | Friction connector for anchoring reinforcement tendons in reinforced or pre-stressed concrete girders |
US5672036A (en) * | 1992-05-22 | 1997-09-30 | Unimation, Inc. | Weldable plastic fastener |
US5729952A (en) * | 1995-12-11 | 1998-03-24 | Dahl; Kjell L. | Mechanical rebar couplers |
US5799528A (en) * | 1996-10-18 | 1998-09-01 | Headed Reinforcement Corporation | Manually operated tool for upsetting a steel reinforcement bar |
US6059378A (en) * | 1997-05-01 | 2000-05-09 | Impact Forge, Inc. | Taperlock axle apparatus and flange |
US6286270B1 (en) * | 1998-03-20 | 2001-09-11 | Paul Gruson | Bar anchor and method for reinforcing steel in concrete construction |
US20020189175A1 (en) * | 2001-06-15 | 2002-12-19 | Lancelot Harry B. | End anchors |
US20030000274A1 (en) * | 1998-01-15 | 2003-01-02 | Rainer Buhler | Forging of workpieces |
-
2004
- 2004-08-18 US US10/920,991 patent/US20060059841A1/en not_active Abandoned
Patent Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US245691A (en) * | 1881-08-16 | alker | ||
US1165514A (en) * | 1915-09-20 | 1915-12-28 | George W Kelly | Brake jaw or fork. |
US1352199A (en) * | 1917-08-20 | 1920-09-07 | Clements Co | Bolt-anchor |
US1688423A (en) * | 1924-12-20 | 1928-10-23 | Rich Tool Company | Method of making valves |
US2928170A (en) * | 1953-04-16 | 1960-03-15 | James A Mclaughlin | Method for making form ties |
US3193857A (en) * | 1961-03-24 | 1965-07-13 | Gen Am Transport | Methods of producing strong threaded anchorages |
US3396567A (en) * | 1964-12-04 | 1968-08-13 | Hasenclever A G Maschf | Apparatus for the heading of conductive workpieces |
US4024688A (en) * | 1971-08-12 | 1977-05-24 | Calini Anthony J | Concrete reinforcing bar extension construction and method |
US4035903A (en) * | 1975-01-23 | 1977-07-19 | Kaiser Aluminum & Chemical Corporation | Method of manufacturing a sacrificial anode rod assembly |
US4214358A (en) * | 1977-03-25 | 1980-07-29 | Commissariat A L'energie Atomique | Method of assembly of two metallic parts |
US4364159A (en) * | 1980-07-14 | 1982-12-21 | Trw Inc. | Method for manufacturing a forged piston with reinforced ring groove |
US4619096A (en) * | 1981-01-15 | 1986-10-28 | Richmond Screw Anchor Co., Inc. | Rebar splicing and anchoring |
US4582242A (en) * | 1984-08-17 | 1986-04-15 | Spindler Dietmar E | Method of making formed end metal products |
US5152118A (en) * | 1990-08-13 | 1992-10-06 | Richmond Screw Anchor Co., Inc. | Couplings for concrete reinforcement bars |
US5479748A (en) * | 1992-01-07 | 1996-01-02 | Siller; Jose L. | Friction connector for anchoring reinforcement tendons in reinforced or pre-stressed concrete girders |
US5672036A (en) * | 1992-05-22 | 1997-09-30 | Unimation, Inc. | Weldable plastic fastener |
US5729952A (en) * | 1995-12-11 | 1998-03-24 | Dahl; Kjell L. | Mechanical rebar couplers |
US5799528A (en) * | 1996-10-18 | 1998-09-01 | Headed Reinforcement Corporation | Manually operated tool for upsetting a steel reinforcement bar |
US6059378A (en) * | 1997-05-01 | 2000-05-09 | Impact Forge, Inc. | Taperlock axle apparatus and flange |
US20030000274A1 (en) * | 1998-01-15 | 2003-01-02 | Rainer Buhler | Forging of workpieces |
US6286270B1 (en) * | 1998-03-20 | 2001-09-11 | Paul Gruson | Bar anchor and method for reinforcing steel in concrete construction |
US20020189175A1 (en) * | 2001-06-15 | 2002-12-19 | Lancelot Harry B. | End anchors |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090183369A1 (en) * | 2004-03-30 | 2009-07-23 | Yeou-Fong Li | Method for making a reinforcement device for a concrete structural member, and method for strengthening the concrete structural member |
US7926181B2 (en) * | 2004-03-30 | 2011-04-19 | National Taipei University Of Technology | Method for making a reinforcement device for a concrete structural member, and method for strengthening the concrete structural member |
WO2011005970A1 (en) * | 2009-07-08 | 2011-01-13 | Diversakore Llc | Building structure |
US9988808B2 (en) | 2009-07-08 | 2018-06-05 | Diversakore Llc | Building structure |
WO2013024208A1 (en) * | 2011-08-18 | 2013-02-21 | Peikko Group Oy | Method for producing a reinforcement system for embedding in flat slabs and a reinforcement system for embedding in flat slabs |
US20140305295A1 (en) * | 2011-11-07 | 2014-10-16 | Instytut Odlewnictwa | Composite passive armor protection |
US20140345446A1 (en) * | 2011-11-07 | 2014-11-27 | Instytut Odlewnictwa | Composite passive armor protection |
US9260866B2 (en) * | 2012-05-18 | 2016-02-16 | Neturen Co., Ltd. | Rebar structure and reinforced concrete member |
US9540815B2 (en) | 2012-05-18 | 2017-01-10 | Neturen Co., Ltd. | Rebar structure and reinforced concrete member |
US9562355B2 (en) | 2012-05-18 | 2017-02-07 | Neturen Co., Ltd. | Rebar structure and reinforced concrete member |
US20130305652A1 (en) * | 2012-05-18 | 2013-11-21 | Neturen Co., Ltd. | Rebar structure and reinforced concrete member |
US9062457B2 (en) | 2013-02-11 | 2015-06-23 | Robert Gilling | Assembly and method for anchoring rebar to a mass |
US9506250B2 (en) | 2013-02-11 | 2016-11-29 | Robert Gilling | Assembly for connecting rebar segments |
JP7002182B2 (en) | 2014-09-24 | 2022-01-20 | 株式会社大林組 | Connection structure |
JP2016065379A (en) * | 2014-09-24 | 2016-04-28 | 株式会社大林組 | Connection structure and steel plate |
WO2016071847A1 (en) * | 2014-11-04 | 2016-05-12 | Technip Italy S.P.A. | A joint between beam elements and column elements made of prefabricated reinforced concrete |
EA032453B1 (en) * | 2014-11-04 | 2019-05-31 | Текнип Итали С.П.А. | Joint between beam elements and column elements made of prefabricated reinforced concrete |
US10260225B2 (en) * | 2015-01-05 | 2019-04-16 | Sejong R&D Co., Ltd. | Precast concrete member with prefabricated plate and fixing channels |
JP2017179921A (en) * | 2016-03-30 | 2017-10-05 | 三栄商事株式会社 | Reinforcement anchorage method for foundation beam connection part, reinforcement anchorage structure, and set of reinforcement anchorage device |
USD906094S1 (en) | 2019-01-15 | 2020-12-29 | Peri Formwork Systems, Inc. | Adaptor |
USD984243S1 (en) * | 2019-05-23 | 2023-04-25 | Dan Warren | Brazed rebar gabion façade |
US11603674B1 (en) | 2020-03-19 | 2023-03-14 | Peri Formwork Systems, Inc. | Waler system |
US20230250625A1 (en) * | 2021-01-27 | 2023-08-10 | Hainan University | Beam-column joint of precast concrete column and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20060059841A1 (en) | Reinforced concrete structure, rebar end anchor therefor and method of manufacturing | |
US7802951B2 (en) | Anti-rotational adhesive insert | |
US7171788B2 (en) | Masonry connectors and twist-on hook and method | |
JP6543383B2 (en) | Pile head connection structure | |
JP4072720B2 (en) | Rebar fittings | |
US4584247A (en) | Threading deformed bars | |
AU2013203902C1 (en) | Lifting anchors | |
JP4401379B2 (en) | Manufacturing method for reinforcing bar | |
AU2013203970B2 (en) | Lifting anchors | |
EP0608013B1 (en) | Reinforcement fibre for reinforcing concrete | |
KR20150002715A (en) | Reinforcement assembly and shear reinforcing bars used for reinforced concrete structure | |
JP2011102488A (en) | Screw type reinforcement joint for reinforcements different in diameter, and reinforced structure with the joint | |
US20060144007A1 (en) | Coil bar anchor | |
US20220162858A1 (en) | Rebar Anchoring System and Method | |
JP2014005703A (en) | Connection structure of deformed reinforcing bar using screw type reinforcing bar joint, and continuous footing bar arrangement structure | |
JP3771136B2 (en) | Rebar connecting device and rebar connecting sleeve | |
WO2007009160A1 (en) | Shear connector for use in a concrete and steel structure | |
CN216810636U (en) | Assembled deviation-adjusting high-strength steel bar mechanical connecting device | |
EA001022B1 (en) | Coupling purlin consisting of two or more wooden beams adjoining and overlapping each other longitudinally, as well as fastening element for joining two overlapping end areas of wooden beams for use as a coupling purlin | |
CN215441879U (en) | Prestressed reinforcement structure and precast pile | |
JP2023121246A (en) | Acute angle screw node reinforcement and light-weight joint | |
AU2013203906B2 (en) | Lifting anchors | |
TWI720417B (en) | Positioning joint structure of steel beam column or steel cage or diaphragm wall having infinitely extending connection | |
JP6870019B2 (en) | How to install anchor bolts and anchor bolts | |
CN214498082U (en) | High-efficient anchor of superelevation layer shaped steel concrete column lacing wire and core section of thick bamboo structure thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: DAYTON SUPERIOR CORPORATION, OHIO Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BENNETT, CLIFFORD D.;SCHOFFSTALL, WALTER E.;REEL/FRAME:015706/0694;SIGNING DATES FROM 20040729 TO 20040814 |
|
AS | Assignment |
Owner name: DAYTON SUPERIOR DELAWARE CORPORATION (D/B/A DAYTON Free format text: MERGER;ASSIGNOR:DAYTON SUPERIOR CORPORATION;REEL/FRAME:018635/0732 Effective date: 20061214 |
|
AS | Assignment |
Owner name: GENERAL ELECTRIC CAPITAL CORPORATION, ILLINOIS Free format text: SECURITY AGREEMENT;ASSIGNOR:DAYTON SUPERIOR CORPORATION (A DELAWARE CORPORATION);REEL/FRAME:018934/0578 Effective date: 20070214 |
|
AS | Assignment |
Owner name: GENERAL ELECTRIC CAPITAL CORPORATION, AS ADMINISTR Free format text: SECURITY INTEREST PURSUANT TO THE TERM LOAN CREDIT AGREEMENT;ASSIGNOR:DAYTON SUPERIOR CORPORATION;REEL/FRAME:020593/0629 Effective date: 20080227 Owner name: GENERAL ELECTRIC CAPITAL CORPORATION, AS ADMINISTR Free format text: SECURITY INTEREST PURSUANT TO THE REVOLVING CREDIT AGREEMENT;ASSIGNOR:DAYTON SUPERIOR CORPORATION;REEL/FRAME:020593/0617 Effective date: 20080227 |
|
AS | Assignment |
Owner name: DAYTON SUPERIOR CORPORATION, OHIO Free format text: RELEASE OF SECURITY INTEREST AT REEL/FRAME NO. 18934/0578;ASSIGNOR:GENERAL ELECTRIC CAPITAL CORPORATION;REEL/FRAME:020613/0240 Effective date: 20080303 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |
|
AS | Assignment |
Owner name: GENERAL ELECTRIC CAPITAL CORPORATION, ILLINOIS Free format text: DEBTOR-IN-POSSESSION SECURITY AGREEMENT;ASSIGNOR:DAYTON SUPERIOR CORPORATION;REEL/FRAME:022757/0465 Effective date: 20090529 |
|
AS | Assignment |
Owner name: DAYTON SUPERIOR CORPORATION, OHIO Free format text: RELEASE OF DEBTOR-IN-POSSESSION SECURITY INTEREST RECORDED AT REEL 022757, FRAME 0465;ASSIGNOR:GENERAL ELECTRIC CAPITAL CORPORATION;REEL/FRAME:023419/0989 Effective date: 20091026 Owner name: DAYTON SUPERIOR CORPORATION, OHIO Free format text: RELEASE OF SECURITY INTEREST RECORDED AT REEL 020593 FRAME 0629;ASSIGNOR:GENERAL ELECTRIC CAPITAL CORPORATION;REEL/FRAME:023419/0548 Effective date: 20091026 Owner name: DAYTON SUPERIOR CORPORATION, OHIO Free format text: RELEASE OF SECURITY INTEREST RECORDED AT REEL 020593, FRAME 0617 AND REEL 022354, FRAME 0313;ASSIGNOR:GENERAL ELECTRIC CAPITAL CORPORATION;REEL/FRAME:023419/0560 Effective date: 20091026 |