US20030140463A1 - Tube clamp - Google Patents

Tube clamp Download PDF

Info

Publication number
US20030140463A1
US20030140463A1 US10/055,984 US5598402A US2003140463A1 US 20030140463 A1 US20030140463 A1 US 20030140463A1 US 5598402 A US5598402 A US 5598402A US 2003140463 A1 US2003140463 A1 US 2003140463A1
Authority
US
United States
Prior art keywords
lug
binding strap
tube clamp
screw bolt
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US10/055,984
Other versions
US6594869B1 (en
Inventor
Dian-Tai Chen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US10/055,984 priority Critical patent/US6594869B1/en
Priority to DE20201660U priority patent/DE20201660U1/en
Application granted granted Critical
Publication of US6594869B1 publication Critical patent/US6594869B1/en
Publication of US20030140463A1 publication Critical patent/US20030140463A1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L33/00Arrangements for connecting hoses to rigid members; Rigid hose connectors, i.e. single members engaging both hoses
    • F16L33/02Hose-clips
    • F16L33/04Hose-clips tightened by tangentially-arranged threaded pin and nut
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L33/00Arrangements for connecting hoses to rigid members; Rigid hose connectors, i.e. single members engaging both hoses
    • F16L33/02Hose-clips
    • F16L33/04Hose-clips tightened by tangentially-arranged threaded pin and nut
    • F16L33/06Hose-clips tightened by tangentially-arranged threaded pin and nut in which the threaded pin is rigid with the hose-encircling member
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L33/00Arrangements for connecting hoses to rigid members; Rigid hose connectors, i.e. single members engaging both hoses
    • F16L33/02Hose-clips
    • F16L33/08Hose-clips in which a worm coacts with a part of the hose-encircling member that is toothed like a worm-wheel
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T24/00Buckles, buttons, clasps, etc.
    • Y10T24/14Bale and package ties, hose clamps
    • Y10T24/1412Bale and package ties, hose clamps with tighteners
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T24/00Buckles, buttons, clasps, etc.
    • Y10T24/14Bale and package ties, hose clamps
    • Y10T24/1412Bale and package ties, hose clamps with tighteners
    • Y10T24/1418Self-locking [dead center or snap action]
    • Y10T24/142Adjustable girth
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T24/00Buckles, buttons, clasps, etc.
    • Y10T24/14Bale and package ties, hose clamps
    • Y10T24/1412Bale and package ties, hose clamps with tighteners
    • Y10T24/1427Worm and tooth
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T24/00Buckles, buttons, clasps, etc.
    • Y10T24/14Bale and package ties, hose clamps
    • Y10T24/1412Bale and package ties, hose clamps with tighteners
    • Y10T24/1441Tangential screw
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T24/00Buckles, buttons, clasps, etc.
    • Y10T24/14Bale and package ties, hose clamps
    • Y10T24/1498Plastic band

Definitions

  • the present invention relates to a tube clamp for securing a flexible tubular member, for example, a hose to a rigid tubular member, and more particularly to such a tube clamp, which is inexpensive to manufacture and easy to use.
  • FIGS. 1, 2A, and 2 B show a tube clamp according to the prior art.
  • This structure of tube clamp comprises a transversely grooved metal binding strap 1 having an opening 3 at its one end, namely, the lead end, a screw holder 4 fastened to the opening 3 of the binding strap 1 by its integrated clamping plates 5 , and a screw 7 mounted in the screw holder 4 and turned to move the tail end of the binding strap 1 over its lead end in tightening up the tube clamp.
  • the screw 7 has threads meshed with transverse grooves 2 of the binding strap 1 .
  • the clamping plates 5 have a respective protruded mounting flange 6 fastened to the periphery of the opening 3 . This structure of tube clamp is not satisfactory in function.
  • FIGS. 3 and 4 show another structure of tube clamp according to the prior art.
  • the tube clamp comprises a metal binding strap 10 , the metal binding strap 10 having two end scrolls 11 at the ends thereof, each scroll 11 having the free end H welded to the outer surface of the metal binding strap 10 and two holes 12 aligned at two sides, two metal reinforcing barrels 13 respectively inserted into the scrolls 11 , each metal reinforcing barrel 13 having two through holes 130 in alignment with the holes 12 of the corresponding scroll 11 , a smoothly arched metal reinforcing plate 16 attached to the scrolls 11 at the inner side, the metal reinforcing plate 16 having two locating flanges 160 respectively stopped at two sides of the scrolls 11 , a screw bolt 14 inserted through the holes 12 of the scrolls 11 and the holes 130 of the metal reinforcing barrels 13 , and a nut 15 threaded onto the screw bolt 14 .
  • This structure of tube clamp still has numerous drawbacks.
  • One drawback of this structure of tube clamp is its complicated fabrication process.
  • Another drawback of this structure of tube clamp is its high manufacturing cost.
  • Still another drawback of this structure of tube clamp is its complicated installation procedure.
  • the parts of the aforesaid two prior art designs are made of metal, they are heavy and may injure the skin when touched. When exposed to the weather, the metal parts will be covered with rust soon.
  • the present invention has been accomplished to provide a tube clamp, which eliminates the aforesaid drawbacks. It is one object of the present invention to provide a tube clamp, which is durable in use. It is another object of the present invention to provide a tube clamp, which is inexpensive to manufacture.
  • the tube clamp comprises a binding strap injection-molded from high strength plastics, the binding strap having two lugs at two ends, and a smoothly arched rib-reinforced extension bearing flange forwardly extended from the first leg and adapted for supporting the second lug and guide movement of the second lug toward the first lug, and a screw bolt inserted through a through hole in the first lug and threaded into a screw hole in the second lug and screwed up with a nut to fix the tube clamp to the workpiece.
  • the second lug is detachably selectively fastened to longitudinally spaced hook holes in the second end of the binding strap by a hook joint.
  • FIG. 1 is an exploded view of a tube clamp constructed according to the prior art.
  • FIG. 2A is a sectional assembly view in an enlarged scale of the tube clamp shown on FIG. 1.
  • FIG. 2B is a schematic drawing showing breakdown of the metal clamping plates of the binding strap of the tube clamp shown on FIG. 1.
  • FIG. 3 is an exploded view of another structure of tube clamp constructed according to the prior art.
  • FIG. 4 is a sectional assembly view of the tube clamp shown on FIG. 3.
  • FIG. 5A is an exploded view of a tube clamp constructed according to one embodiment of the present invention.
  • FIG. 5B is a perspective view of part “a” of the tube clamp shown on FIG. 5A.
  • FIG. 6A is a sectional assembly view of the tube clamp shown on FIG. 5A.
  • FIG. 6B is a sectional view taken along line A-A of FIG> 6 A.
  • FIG. 7 is a sectional view of an alternate form of the present invention, showing two nuts mounted on the screw bolt.
  • FIG. 8 is a sectional view of another alternate form of the present invention, showing a different design of the screw bolt.
  • FIG. 9A is an exploded view of still another alternate form of the tube clamp according to the present invention.
  • FIG. 9B is a sectional assembly view of the tube clamp shown on FIG. 9A.
  • a tube clamp in accordance with one embodiment of the present invention is shown comprised of a binding strap 20 , a screw bolt 25 , and a nut 26 .
  • the binding strap 20 is injection-molded from high strength plastics, comprising a first lug 21 substantially perpendicularly extended from the first end thereof, a through hole 210 extended through front and back sides of the first lug 21 , a second lug 22 substantially perpendicularly extended from the second end thereof, a screw hole 220 extended through front and back sides of the second lug 22 , a smoothly arched extension bearing flange 23 forwardly extended from the root of the first leg 21 and adapted for supporting the second lug 22 , and two reinforcing ribs 24 perpendicularly extended along two sides of the smoothly arched extension bearing flange 23 and adapted to guide movement of the second lug 22 with the second end of the binding strap 20 on the extension bearing flange 23 toward the first lug 21 .
  • the binding strap 20 is attached to the workpiece (not shown), and then the screw bolt 25 is inserted through the through hole 210 of the first lug 21 and threaded into the screw hole 220 of the second lug 22 , and then the nut 26 is threaded onto the screw bolt 25 to fasten up the tube clamp.
  • the binding strap 20 is injection-molded from high strength plastics. Because the binding strap 20 is injection-molded from high strength plastics, it is rustless, easy and inexpensive to manufacture. During installation, the plastic binding strap 20 fits the periphery of the workpiece perfectly. Furthermore, the reinforcing ribs 24 reinforces the structural strength of the binding strap 20 , and guides the second lug 22 toward the first lug 21 smoothly during installation of the tube clamp.
  • FIG. 7 shows an alternate form of the tube clamp according to the present invention.
  • a screw rod 250 is used instead of the aforesaid screw bolt 25 , and two nuts 26 are respectively threaded onto the screw rod 250 and stopped at the first lug 21 and the second lug 22 at two opposite sides.
  • FIG. 8 shows another alternate form of the tube clamp according to the present invention.
  • the screw bolt referenced by 251 , has a handle 252 at its one end through which the screw bolt 251 can conveniently be fastened up with the hands without a tool.
  • FIGS. 9A and 9B show still another alternate form of the tube clamp according to the present invention.
  • the tube clamp is comprised of a binding strap 20 injection-molded from high strength plastics, a screw bolt 25 , and a nut 26 .
  • the binding strap 20 comprises a first lug 21 substantially perpendicularly extended from the first end thereof, a through hole 210 extended through front and back sides of the first lug 21 , and a second lug 27 detachably fastened to the second end thereof.
  • the second end of the binding strap 20 has two longitudinal rows of hook holes 201 .
  • the second lug 27 has a screw hole 270 through the front and back sides thereof, and two bottom hooks 271 selectively hooked in the hook holes 201 .
  • the binding strap 20 When in use, the binding strap 20 is attached to the workpiece (not shown), and then the second lug 27 is selectively fastened to the hook holes 201 , and then the screw bolt 25 is inserted through the through hole 210 of the first lug 21 and threaded into the screw hole 270 of the second lug 27 , and then the nut 26 is threaded onto the screw bolt 25 to fasten tight the tube clamp.
  • FIGS. 5 ⁇ 9 A prototype of tube clamp has been constructed with the features of FIGS. 5 ⁇ 9 .
  • the tube clamp functions smoothly to provide all of the features discussed earlier.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

A tube clamp is constructed to include a binding strap injection-molded from high strength plastics, the binding strap having two lugs at two ends, and a smoothly arched rib-reinforced extension bearing flange forwardly extended from the first leg and adapted for supporting the second lug and guide movement of the second lug toward the first lug, a screw bolt inserted through a through hole in the first lug and threaded into a screw hole in the second lug and screwed up with a nut to fix the tube clamp to the workpiece.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention [0001]
  • The present invention relates to a tube clamp for securing a flexible tubular member, for example, a hose to a rigid tubular member, and more particularly to such a tube clamp, which is inexpensive to manufacture and easy to use. [0002]
  • 2. Description of the Related Art [0003]
  • FIGS. 1, 2A, and [0004] 2B show a tube clamp according to the prior art. This structure of tube clamp comprises a transversely grooved metal binding strap 1 having an opening 3 at its one end, namely, the lead end, a screw holder 4 fastened to the opening 3 of the binding strap 1 by its integrated clamping plates 5, and a screw 7 mounted in the screw holder 4 and turned to move the tail end of the binding strap 1 over its lead end in tightening up the tube clamp. The screw 7 has threads meshed with transverse grooves 2 of the binding strap 1. The clamping plates 5 have a respective protruded mounting flange 6 fastened to the periphery of the opening 3. This structure of tube clamp is not satisfactory in function. One drawback of this structure of tube clamp is that the clamping plates 5 of the screw holder 4 tend to be forced away from the binding strap 1 when the tube clamp excessively tightened. Another drawback of this structure of tube clamp is that the formation of the transverse grooves 2 of the binding strap 1 weakens the structural strength of the binding strap 1. Still another drawback of this structure of tube clamp is that the screw 7 tends to be disengaged from the transverse grooves 2 of the binding strap 1 when the tube clamp excessively tightened.
  • FIGS. 3 and 4 show another structure of tube clamp according to the prior art. According to this design, the tube clamp comprises a metal [0005] binding strap 10, the metal binding strap 10 having two end scrolls 11 at the ends thereof, each scroll 11 having the free end H welded to the outer surface of the metal binding strap 10 and two holes 12 aligned at two sides, two metal reinforcing barrels 13 respectively inserted into the scrolls 11, each metal reinforcing barrel 13 having two through holes 130 in alignment with the holes 12 of the corresponding scroll 11, a smoothly arched metal reinforcing plate 16 attached to the scrolls 11 at the inner side, the metal reinforcing plate 16 having two locating flanges 160 respectively stopped at two sides of the scrolls 11, a screw bolt 14 inserted through the holes 12 of the scrolls 11 and the holes 130 of the metal reinforcing barrels 13, and a nut 15 threaded onto the screw bolt 14. This structure of tube clamp still has numerous drawbacks. One drawback of this structure of tube clamp is its complicated fabrication process. Another drawback of this structure of tube clamp is its high manufacturing cost. Still another drawback of this structure of tube clamp is its complicated installation procedure. Furthermore, because the parts of the aforesaid two prior art designs are made of metal, they are heavy and may injure the skin when touched. When exposed to the weather, the metal parts will be covered with rust soon.
  • SUMMARY OF THE INVENTION
  • The present invention has been accomplished to provide a tube clamp, which eliminates the aforesaid drawbacks. It is one object of the present invention to provide a tube clamp, which is durable in use. It is another object of the present invention to provide a tube clamp, which is inexpensive to manufacture. According to one embodiment of the present invention, the tube clamp comprises a binding strap injection-molded from high strength plastics, the binding strap having two lugs at two ends, and a smoothly arched rib-reinforced extension bearing flange forwardly extended from the first leg and adapted for supporting the second lug and guide movement of the second lug toward the first lug, and a screw bolt inserted through a through hole in the first lug and threaded into a screw hole in the second lug and screwed up with a nut to fix the tube clamp to the workpiece. According to a second embodiment of the present invention, the second lug is detachably selectively fastened to longitudinally spaced hook holes in the second end of the binding strap by a hook joint.[0006]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is an exploded view of a tube clamp constructed according to the prior art. [0007]
  • FIG. 2A is a sectional assembly view in an enlarged scale of the tube clamp shown on FIG. 1. [0008]
  • FIG. 2B is a schematic drawing showing breakdown of the metal clamping plates of the binding strap of the tube clamp shown on FIG. 1. [0009]
  • FIG. 3 is an exploded view of another structure of tube clamp constructed according to the prior art. [0010]
  • FIG. 4 is a sectional assembly view of the tube clamp shown on FIG. 3. [0011]
  • FIG. 5A is an exploded view of a tube clamp constructed according to one embodiment of the present invention. [0012]
  • FIG. 5B is a perspective view of part “a” of the tube clamp shown on FIG. 5A. [0013]
  • FIG. 6A is a sectional assembly view of the tube clamp shown on FIG. 5A. [0014]
  • FIG. 6B is a sectional view taken along line A-A of FIG>[0015] 6A.
  • FIG. 7 is a sectional view of an alternate form of the present invention, showing two nuts mounted on the screw bolt. [0016]
  • FIG. 8 is a sectional view of another alternate form of the present invention, showing a different design of the screw bolt. [0017]
  • FIG. 9A is an exploded view of still another alternate form of the tube clamp according to the present invention. [0018]
  • FIG. 9B is a sectional assembly view of the tube clamp shown on FIG. 9A.[0019]
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
  • Referring to FIGS. 5 and 5A, a tube clamp in accordance with one embodiment of the present invention is shown comprised of a binding [0020] strap 20, a screw bolt 25, and a nut 26. The binding strap 20 is injection-molded from high strength plastics, comprising a first lug 21 substantially perpendicularly extended from the first end thereof, a through hole 210 extended through front and back sides of the first lug 21, a second lug 22 substantially perpendicularly extended from the second end thereof, a screw hole 220 extended through front and back sides of the second lug 22, a smoothly arched extension bearing flange 23 forwardly extended from the root of the first leg 21 and adapted for supporting the second lug 22, and two reinforcing ribs 24 perpendicularly extended along two sides of the smoothly arched extension bearing flange 23 and adapted to guide movement of the second lug 22 with the second end of the binding strap 20 on the extension bearing flange 23 toward the first lug 21.
  • Referring to FIGS. 6A and 6B and FIG. 5 again, during installation, the [0021] binding strap 20 is attached to the workpiece (not shown), and then the screw bolt 25 is inserted through the through hole 210 of the first lug 21 and threaded into the screw hole 220 of the second lug 22, and then the nut 26 is threaded onto the screw bolt 25 to fasten up the tube clamp.
  • As indicated above, the [0022] binding strap 20 is injection-molded from high strength plastics. Because the binding strap 20 is injection-molded from high strength plastics, it is rustless, easy and inexpensive to manufacture. During installation, the plastic binding strap 20 fits the periphery of the workpiece perfectly. Furthermore, the reinforcing ribs 24 reinforces the structural strength of the binding strap 20, and guides the second lug 22 toward the first lug 21 smoothly during installation of the tube clamp.
  • FIG. 7 shows an alternate form of the tube clamp according to the present invention. According to this embodiment, a [0023] screw rod 250 is used instead of the aforesaid screw bolt 25, and two nuts 26 are respectively threaded onto the screw rod 250 and stopped at the first lug 21 and the second lug 22 at two opposite sides.
  • FIG. 8 shows another alternate form of the tube clamp according to the present invention. According to this embodiment, the screw bolt, referenced by [0024] 251, has a handle 252 at its one end through which the screw bolt 251 can conveniently be fastened up with the hands without a tool.
  • FIGS. 9A and 9B show still another alternate form of the tube clamp according to the present invention. According to this embodiment, the tube clamp is comprised of a [0025] binding strap 20 injection-molded from high strength plastics, a screw bolt 25, and a nut 26. The binding strap 20 comprises a first lug 21 substantially perpendicularly extended from the first end thereof, a through hole 210 extended through front and back sides of the first lug 21, and a second lug 27 detachably fastened to the second end thereof. The second end of the binding strap 20 has two longitudinal rows of hook holes 201. The second lug 27 has a screw hole 270 through the front and back sides thereof, and two bottom hooks 271 selectively hooked in the hook holes 201. When in use, the binding strap 20 is attached to the workpiece (not shown), and then the second lug 27 is selectively fastened to the hook holes 201, and then the screw bolt 25 is inserted through the through hole 210 of the first lug 21 and threaded into the screw hole 270 of the second lug 27, and then the nut 26 is threaded onto the screw bolt 25 to fasten tight the tube clamp.
  • A prototype of tube clamp has been constructed with the features of FIGS. [0026] 5˜9. The tube clamp functions smoothly to provide all of the features discussed earlier.
  • Although particular embodiments of the invention have been described in detail for purposes of illustration, various modifications and enhancements may be made without departing from the spirit and scope of the invention. Accordingly, the invention is not to be limited except as by the appended claims. [0027]

Claims (2)

What the invention claimed is:
1. A tube clamp comprising a binding strap adapted for attaching to the connection area of two tubular members being inserted one into the other, a screw bolt mounted in said binding strap, and a nut threaded onto said screw bolt to fasten tight said binding strap, wherein said binding strap is injection-molded from high strength plastics comprising a first end, a second end, a first lug connected to said first end, said first lug having a through hole, which receives said screw bolt, a second lug connected to said second end, said second lug having a screw hole, which receives said screw bolt, a smoothly arched extension bearing flange forwardly extended from said first leg and adapted for supporting the second end of said binding strap, and two reinforcing ribs perpendicularly extended along two sides of said smoothly arched extension bearing flange and adapted to guide movement of said second lug with the second end of said binding strap on said extension bearing flange toward said first lug.
2. The tube clamp as claimed in claim 1, wherein said second end of said binding strap comprises longitudinally spaced hook holes; said second lug is detachably fastened to the second end of said binding strap, having at least one bottom hook selectively hooked in the hook holes in said second end of said binding strap.
US10/055,984 2002-01-28 2002-01-28 Tube clamp Expired - Fee Related US6594869B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US10/055,984 US6594869B1 (en) 2002-01-28 2002-01-28 Tube clamp
DE20201660U DE20201660U1 (en) 2002-01-28 2002-02-04 hose clamp

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/055,984 US6594869B1 (en) 2002-01-28 2002-01-28 Tube clamp
DE20201660U DE20201660U1 (en) 2002-01-28 2002-02-04 hose clamp

Publications (2)

Publication Number Publication Date
US6594869B1 US6594869B1 (en) 2003-07-22
US20030140463A1 true US20030140463A1 (en) 2003-07-31

Family

ID=29217105

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/055,984 Expired - Fee Related US6594869B1 (en) 2002-01-28 2002-01-28 Tube clamp

Country Status (2)

Country Link
US (1) US6594869B1 (en)
DE (1) DE20201660U1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009179305A (en) * 2008-02-01 2009-08-13 Kawasaki Heavy Ind Ltd Vehicular clamp device
CN102273396A (en) * 2011-04-26 2011-12-14 宁波大叶园林工业有限公司 Improvement on energy saving sprinkling irrigation timer
CN104590719A (en) * 2015-01-25 2015-05-06 泸县玉流机械制造有限责任公司 Elastic belt
US11142484B2 (en) * 2016-07-20 2021-10-12 Ngk Spark Plug Co., Ltd. Component for semiconductor production device, and production method of component for semiconductor production device

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10214966C1 (en) * 2002-04-04 2003-12-24 Danfoss As Clamp for connecting a cylindrical temperature sensor with a pipe parallel to the axis
US20040016085A1 (en) * 2002-07-23 2004-01-29 Caveney Jack E. Ball lock cable tie having stiffening ribs
US6877894B2 (en) * 2002-09-24 2005-04-12 Siemens Westinghouse Power Corporation Self-aligning apparatus for acoustic thermography
US20060170215A1 (en) * 2002-11-29 2006-08-03 Martin Cousineau Hose clamp
US7712796B2 (en) * 2004-05-14 2010-05-11 Victaulic Company Deformable mechanical pipe coupling
US7523895B1 (en) * 2006-06-01 2009-04-28 Automatic Fire Control, Incorporated Sway brace and method for securing a pipe or conduit against sway
US7726703B2 (en) * 2006-06-07 2010-06-01 Victaulic Company Deformable pipe coupling having multiple radii of curvature
US7516922B1 (en) 2006-11-03 2009-04-14 Automatic Fire Control, Incorporated Sway brace and method for securing a pipe or conduit against sway
DE102006057881C5 (en) * 2006-12-08 2010-07-22 Norma Germany Gmbh Tensionable clamp
US20090083950A1 (en) * 2007-10-01 2009-04-02 Thomas Corogin Clamp
JP4857249B2 (en) * 2007-11-16 2012-01-18 株式会社アルファ Steering lock device
US8070113B1 (en) 2009-03-30 2011-12-06 Automatic Fire Control, Incorporated Sway brace
US9395025B2 (en) * 2010-07-09 2016-07-19 Don Ireland Pipe joint restraint systems
CN101982635A (en) * 2010-10-08 2011-03-02 深圳市华星光电技术有限公司 Floorslab through hole template device and fastening assembly thereof
US9523449B2 (en) 2011-03-22 2016-12-20 Airvac, Inc. Pipe coupling
CN103026946B (en) * 2012-12-13 2014-07-02 宁波大叶园林工业有限公司 Energy-saving type cooling sprayer
CN103070057A (en) * 2012-12-13 2013-05-01 宁波大叶园林工业有限公司 Intelligent sway water sprayer
CA2855396C (en) 2014-06-26 2016-08-02 Le Groupe Dsd Inc. Tubing connector system

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US978619A (en) * 1910-04-08 1910-12-13 Bernard Morgan Hose-coupling.
US1065408A (en) * 1913-04-12 1913-06-24 California Corrugated Culvert Company Joint tightener and spreader for conduits.
US1262413A (en) * 1917-10-04 1918-04-09 Thaddeus F Tyler Hose-clamp.
US1447956A (en) * 1922-08-25 1923-03-13 Blaise George Hose clamp
US1684666A (en) * 1925-06-01 1928-09-18 Frazier Charles Albert Pipe band
US1986748A (en) * 1933-02-23 1935-01-01 Messrs Hunt & Turner Ltd Clip for tubular hose and the like
US2352971A (en) * 1942-04-18 1944-07-04 Carroll W Prochaska Hose clamp
US2579104A (en) * 1945-06-22 1951-12-18 Marman Products Company Inc Clamp
US3737959A (en) * 1971-10-29 1973-06-12 Smith Blair Inc Pipe clamp made of non-cast materials
US4526756A (en) * 1982-05-10 1985-07-02 Evergreen Industries, Inc. Device for interconnecting specimen collecting tubes

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009179305A (en) * 2008-02-01 2009-08-13 Kawasaki Heavy Ind Ltd Vehicular clamp device
CN102273396A (en) * 2011-04-26 2011-12-14 宁波大叶园林工业有限公司 Improvement on energy saving sprinkling irrigation timer
CN104590719A (en) * 2015-01-25 2015-05-06 泸县玉流机械制造有限责任公司 Elastic belt
US11142484B2 (en) * 2016-07-20 2021-10-12 Ngk Spark Plug Co., Ltd. Component for semiconductor production device, and production method of component for semiconductor production device

Also Published As

Publication number Publication date
DE20201660U1 (en) 2002-04-11
US6594869B1 (en) 2003-07-22

Similar Documents

Publication Publication Date Title
US6594869B1 (en) Tube clamp
US8424173B2 (en) Spacer clip
US6834786B2 (en) Pickup bed racks for bicycles and methods
US5504978A (en) Locking clamp assembly
US8066305B2 (en) Adjustable fender
KR101820993B1 (en) A strap-band type connecting device
US4406434A (en) Recreational vehicle drain support
US7712394B2 (en) Handlebar grip
US9834152B2 (en) Load carrier foot
GB2302852A (en) Adjustable clamp for securing an article support member to a roof rack.
US5956817A (en) Structure of tube clamp
US6926242B2 (en) Fixing apparatus
US5626221A (en) Tapered clamp support rod
US5787555A (en) Structure of tube clamp
CA2261318C (en) Gas supply device
US20050052020A1 (en) Assembly for attaching a clamp to a hose
US5345643A (en) Wet mop holder
US20040098843A1 (en) Tube clamp
KR200329381Y1 (en) The coupling of pipe
JP3090751U (en) Structure of the cap
DE102022004491B4 (en) Receiving element for attaching brackets or objects
US11370010B2 (en) Paintless dent removal tool, system and method
US5462195A (en) Device for mounting a handle to a pan body
CN210716318U (en) Lateral anti-seismic pipe bundle
KR200364577Y1 (en) A nut for bracket

Legal Events

Date Code Title Description
REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20070722