US20030042322A1 - Double sleeper for getrac A3 fixed track - Google Patents

Double sleeper for getrac A3 fixed track Download PDF

Info

Publication number
US20030042322A1
US20030042322A1 US10/210,773 US21077302A US2003042322A1 US 20030042322 A1 US20030042322 A1 US 20030042322A1 US 21077302 A US21077302 A US 21077302A US 2003042322 A1 US2003042322 A1 US 2003042322A1
Authority
US
United States
Prior art keywords
railroad tie
asphalt
double
cavity
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US10/210,773
Other versions
US6764022B2 (en
Inventor
Winfried Mohr
Gerhard Berns
Gundolf Spitzner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pcm Railone AG
National Technology and Engineering Solutions of Sandia LLC
Original Assignee
Pfleiderer Infrastrukturtechnick GmbH and Co KG
Sandia Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pfleiderer Infrastrukturtechnick GmbH and Co KG, Sandia Corp filed Critical Pfleiderer Infrastrukturtechnick GmbH and Co KG
Assigned to PFLEIDERER INFRASTRUKTURTECHNIK GMBH & CO. KG reassignment PFLEIDERER INFRASTRUKTURTECHNIK GMBH & CO. KG ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BERNS, GERHARD, MOHR, WINFRIED, SPITZNER, GUNDOLF
Assigned to SANDIA CORPORATION reassignment SANDIA CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: OSBOURN, GORDON C.
Publication of US20030042322A1 publication Critical patent/US20030042322A1/en
Application granted granted Critical
Publication of US6764022B2 publication Critical patent/US6764022B2/en
Assigned to RAIL.ONE GMBH reassignment RAIL.ONE GMBH ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: PFLEIDERER INFRASTRUKTURTECHNIK GMBH & CO. KG
Assigned to PCM RAIL.ONE AG reassignment PCM RAIL.ONE AG CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: PCM RAIL.ONE GMBH
Assigned to PCM RAIL.ONE GMBH reassignment PCM RAIL.ONE GMBH MERGER AND CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: PCM GERMANY GMBH, PCM RAIL.ONE GMBH, RAIL.ONE GMBH
Assigned to PCM RAIL.ONE AG reassignment PCM RAIL.ONE AG CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE STREET ADDRESS PREVIOUSLY RECORDED ON REEL 048548 FRAME 0528. ASSIGNOR(S) HEREBY CONFIRMS THE NAME CHANGE. Assignors: PCM RAIL.ONE GMBH
Adjusted expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/007Ballastless track, e.g. concrete slab trackway, or with asphalt layers with interlocking means to withstand horizontal forces
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/28Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone
    • E01B3/32Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone with armouring or reinforcement
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001Track with ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/13Dowels for slabs, sleepers or rail-fixings

Definitions

  • the invention relates to a railroad tie of compact design for a fixed track with an overlay of asphalt of the Getrac construction with a dowel stone, which is inserted in a recess on the underside and which, reaching over the railroad tie and protruding downward, engages a cavity pocket of the asphalt track.
  • the railroad tie of compact design is formed as a double railroad tie, between which and the adjacent railroad tie there is only a small gap, which enables a curve to be laid, and which, in the region of the dowel on the underside, is provided with lateral constrictions for filling the cavity pockets subsequently.
  • double railroad ties are employed pursuant to the invention, the width of which is such, that they in each case form only a narrow gap with the neighboring railroad tie.
  • the cavity pockets of the asphalt track Due to the lateral constrictions in the region of the dowel stone, which are unusual in the case of double sleepers laid on track ballast, the cavity pockets of the asphalt track, which are in the region of these constrictions, are exposed at least at the outer edge, so that, in spite of almost the complete coverage of the asphalt track by the double railroad ties, the cavity pockets of the asphalt track can still be filled subsequently and, with that, the dowel stones, engaging therein, can be anchored.
  • the inventive use of the special double railroad ties also has the advantage that, due to the great weight of the railroad ties, the load on the dowel stone in the transverse and longitudinal directions is less, since the weight of the railroad ties alone largely absorbs the direct transfer of forces as a carriage passes over the railroad ties.
  • the inventive double railroad tie in the region of the pocket accommodating the dowel stone with a cavity of low height, which extends over the whole width and also over a greater length than does the recess for the dowel stone.
  • This cavity prevents the railroad tie being supported precisely in the middle and, with that, also the danger of breakage.
  • air can escape through this gap while the cavity pocket of the asphalt track is being filled, so that this filling can take place more quickly and more uniformly.
  • FIG. 1 shows a section through a fixed track with a partially broken open railroad tie of compact design, constructed as a double railroad tie,
  • FIG. 2 shows a plan view of the track of FIG. 1
  • FIG. 3 shows a section through the double railroad tie along the line III-III of FIG. 2.
  • FIG. 1 The construction of a fixed track with an asphalt overlay of the Getrac A3 construction can be seen best in FIG. 1.
  • the lower supporting layer 1 on which two differently constructed asphalt layers 2 and 3 are applied, can be recognized here.
  • a nonwovens fabric 6 is disposed between the upper asphalt layer 3 and the inventive railroad tie 4 of compact design, which is constructed pursuant to the invention as a double railroad tie so that there is only a small gap between it and the neighboring railroad tie.
  • the inventive, double railroad tie is provided with a dowel stone 7 , which is held with the help of an elastic ring bearing 8 in a recess 9 on the underside of the railroad tie.
  • This dowel stone engages a larger cavity pocket 10 of the asphalt layer 3 , the exact position, occupied by this cavity pocket, resulting only during the adjustment of the track grid. For this reason, the cavity pocket 10 is also constructed larger. After the adjustment, this cavity pocket 10 is once again filled with asphalt. For this purpose, the cavity pocket 10 must, of course, be open at the top. Pursuant to the invention, this is achieved owing to the fact that the double railroad tie is provided in the region of the dowel stone 7 with lateral constrictions 11 and 12 , as a result of which the cavity pocket 10 is open at its upper ends, so that the subsequent filling of the cavity pockets 10 , after the adjustment of the railroad ties 4 , is assured in spite of the otherwise almost complete coverage of the asphalt track 3 .
  • the double railroad tie 4 is provided on the underside with a continuous depression 13 of low height, which extends over the whole width. On the one hand, this prevents the railroad tie being supported in the center and, with that, prevents the danger of breakage. On the other hand, while the cavity pockets 10 are being filled with asphalt, air can escape through this gap 13 , which is open towards of the side in the region of the pockets 11 and 12 , so that the filling can take place more rapidly and more uniformly without blow-hole sites.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Road Paving Structures (AREA)
  • Handcart (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Toys (AREA)
  • Bearings For Parts Moving Linearly (AREA)
  • Piles And Underground Anchors (AREA)
  • Filtration Of Liquid (AREA)

Abstract

A railroad tie of compact design for a fixed track with an overlay of asphalt of the Getrac A3 construction with a dowel stone, which is inserted in a recess and which, reaching over the railroad tie and protruding downward, engages a cavity pocket of the asphalt track. The railroad tie is constructed as a double railroad tie, which forms only a narrow gap with the adjacent railroad tie in order to make radial laying (curve) possible and which is provided in the region of the dowel stone on the underside with lateral constrictions, so that the cavity pockets can be filled subsequently.

Description

  • The invention relates to a railroad tie of compact design for a fixed track with an overlay of asphalt of the Getrac construction with a dowel stone, which is inserted in a recess on the underside and which, reaching over the railroad tie and protruding downward, engages a cavity pocket of the asphalt track. [0001]
  • In the case of railroad ties of compact design for fixed tracks of Getrac construction, a very high surface pressure results when normal railroad ties are used. As a consequence, over time, the railroad tie is pressed more and more into the asphalt, so that the height adjustment of the cast track is lost. In the case of the Getrac system, the cavity pocket of the asphalt track is to be filled after the railroad ties or a premanufactured track grid are aligned, in order to anchor the dowel stone, since, after all, the cavity pocket must be constructed larger initially in order to be able to compensate for manufacturing and laying tolerances. This, however, presupposes, in turn, that the cavity pocket protrudes somewhat laterally beyond the railroad tie, as clean casting can otherwise not take place. [0002]
  • It is therefore an object of the invention to configure a railroad tie of compact design for a fixed track with an overlay of asphalt of the Getrac construction in such a manner, that less surface pressure is present and, nevertheless, it is possible to fill the cavity pockets of the asphalt track after the railroad ties are aligned. [0003]
  • Pursuant to the invention, this objective is accomplished owing to the fact that the railroad tie of compact design is formed as a double railroad tie, between which and the adjacent railroad tie there is only a small gap, which enables a curve to be laid, and which, in the region of the dowel on the underside, is provided with lateral constrictions for filling the cavity pockets subsequently. [0004]
  • Instead of the normal, wide railroad ties of compact design previously used, double railroad ties are employed pursuant to the invention, the width of which is such, that they in each case form only a narrow gap with the neighboring railroad tie. By these means, the surface pressure evidently becomes very much less and the danger of sinkage into the asphalt does not exist here. Due to the lateral constrictions in the region of the dowel stone, which are unusual in the case of double sleepers laid on track ballast, the cavity pockets of the asphalt track, which are in the region of these constrictions, are exposed at least at the outer edge, so that, in spite of almost the complete coverage of the asphalt track by the double railroad ties, the cavity pockets of the asphalt track can still be filled subsequently and, with that, the dowel stones, engaging therein, can be anchored. [0005]
  • Moreover, the inventive use of the special double railroad ties also has the advantage that, due to the great weight of the railroad ties, the load on the dowel stone in the transverse and longitudinal directions is less, since the weight of the railroad ties alone largely absorbs the direct transfer of forces as a carriage passes over the railroad ties. [0006]
  • Moreover, it is also within the scope of the invention to provide the inventive double railroad tie in the region of the pocket accommodating the dowel stone with a cavity of low height, which extends over the whole width and also over a greater length than does the recess for the dowel stone. This cavity prevents the railroad tie being supported precisely in the middle and, with that, also the danger of breakage. Moreover, due to this gap, air can escape through this gap while the cavity pocket of the asphalt track is being filled, so that this filling can take place more quickly and more uniformly.[0007]
  • Further advantages, distinguishing features and details of the intervention arise out of the following description of an example and the drawing, in which [0008]
  • FIG. 1 shows a section through a fixed track with a partially broken open railroad tie of compact design, constructed as a double railroad tie, [0009]
  • FIG. 2 shows a plan view of the track of FIG. 1 and [0010]
  • FIG. 3 shows a section through the double railroad tie along the line III-III of FIG. 2.[0011]
  • The construction of a fixed track with an asphalt overlay of the Getrac A3 construction can be seen best in FIG. 1. The lower supporting [0012] layer 1, on which two differently constructed asphalt layers 2 and 3 are applied, can be recognized here. For fastening the rails 5, a nonwovens fabric 6 is disposed between the upper asphalt layer 3 and the inventive railroad tie 4 of compact design, which is constructed pursuant to the invention as a double railroad tie so that there is only a small gap between it and the neighboring railroad tie. As is customary in the case of fixed tracks of the Getrac A3 construction, the inventive, double railroad tie is provided with a dowel stone 7, which is held with the help of an elastic ring bearing 8 in a recess 9 on the underside of the railroad tie. This dowel stone engages a larger cavity pocket 10 of the asphalt layer 3, the exact position, occupied by this cavity pocket, resulting only during the adjustment of the track grid. For this reason, the cavity pocket 10 is also constructed larger. After the adjustment, this cavity pocket 10 is once again filled with asphalt. For this purpose, the cavity pocket 10 must, of course, be open at the top. Pursuant to the invention, this is achieved owing to the fact that the double railroad tie is provided in the region of the dowel stone 7 with lateral constrictions 11 and 12, as a result of which the cavity pocket 10 is open at its upper ends, so that the subsequent filling of the cavity pockets 10, after the adjustment of the railroad ties 4, is assured in spite of the otherwise almost complete coverage of the asphalt track 3.
  • In the region of the [0013] constrictions 11 and 12, the double railroad tie 4 is provided on the underside with a continuous depression 13 of low height, which extends over the whole width. On the one hand, this prevents the railroad tie being supported in the center and, with that, prevents the danger of breakage. On the other hand, while the cavity pockets 10 are being filled with asphalt, air can escape through this gap 13, which is open towards of the side in the region of the pockets 11 and 12, so that the filling can take place more rapidly and more uniformly without blow-hole sites.

Claims (3)

1. A railroad tie of compact design for a fixed track with an overlay of asphalt of the Getrac A3 construction with a dowel stone, which is inserted in a recess on the underside and which, reaching over the railroad tie and protruding downward, engages a cavity pocket of the asphalt track, wherein the railroad tie is constructed as a double railroad tie at (4), which forms only a narrow gap with the adjacent railroad tie in order to make radial laying (curve) possible and which is provided in the region of the dowel stone (7) on the underside with lateral constrictions (11, 12), so that the cavity pockets (10) can be filled subsequently.
2. The double railroad tie of claim 1, wherein the dowel stone (7) is held by means of an elastic ring bearing (8) in the recess (9).
3. The double railroad tie of claims 1 or 2, wherein the railroad tie is provided in the region of the lateral constrictions (11, 12) on the underside with a cavity (13) of low height, which is continuous over the width.
US10/210,773 2001-09-04 2002-08-01 Double sleeper for Getrac A3 fixed track Expired - Lifetime US6764022B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE10143298.4-25 2001-09-04
DE10143298 2001-09-04
DE10143298 2001-09-04

Publications (2)

Publication Number Publication Date
US20030042322A1 true US20030042322A1 (en) 2003-03-06
US6764022B2 US6764022B2 (en) 2004-07-20

Family

ID=7697654

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/210,773 Expired - Lifetime US6764022B2 (en) 2001-09-04 2002-08-01 Double sleeper for Getrac A3 fixed track

Country Status (13)

Country Link
US (1) US6764022B2 (en)
EP (1) EP1288371B1 (en)
JP (1) JP2003074001A (en)
KR (1) KR100556182B1 (en)
CN (1) CN1234939C (en)
AT (1) ATE354696T1 (en)
CA (1) CA2398416C (en)
DE (2) DE50209523D1 (en)
DK (1) DK1288371T3 (en)
ES (1) ES2281477T3 (en)
PT (1) PT1288371E (en)
SI (1) SI1288371T1 (en)
TW (1) TWI221868B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160083911A1 (en) * 2013-05-17 2016-03-24 Railone Gmbh Concrete sleeper and solid carriageway

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2882070B1 (en) * 2005-02-16 2007-06-29 Systra Sa WORK FOR RAILWAY
KR100704991B1 (en) * 2005-12-07 2007-04-09 한국철도기술연구원 Double width sleeper for paved track
ITMI20091435A1 (en) * 2009-08-06 2011-02-07 Fronema S R L RAIL SUPPORT SYSTEM WITH SHOCK ABSORBER FIXING ELEMENTS
DE102012000028A1 (en) 2012-01-03 2013-07-04 Rail.One Gmbh Fixed carriageway
ES2526840B1 (en) * 2013-04-18 2015-12-15 Idvia 2020 Horizonte 2020, S.L. RAILWAY ROAD IN BITUMINOUS PLATE AND PROCEDURE FOR EXECUTION OF SUCH VIA
KR101596862B1 (en) 2013-05-06 2016-02-26 한국철도기술연구원 Track having shear reinforcing apparatus and the construction method therefor
KR101625829B1 (en) * 2015-08-13 2016-06-02 한국철도기술연구원 Direct fastened asphalt track using each wide sleeper and concrete slab panel having geotextile and horizontal-vertical movement restraining apparatus, and construction method for the same
KR101634127B1 (en) * 2015-08-13 2016-06-29 한국철도기술연구원 Apparatus for restraining horizontal-vertical movement of wide sleeper and slab panel, and construction method for the same
CZ306897B6 (en) 2016-01-26 2017-08-30 Jan Eisenreich A railway or tramway track
HUP1800227A2 (en) 2018-06-27 2019-12-30 Robert Csepke Sleeper
CN108660867B (en) * 2018-07-26 2024-04-12 铁科腾跃科技有限公司 Composite polyurethane sleeper pad and preparation method thereof
CN111270569A (en) * 2020-02-10 2020-06-12 中国铁道科学研究院集团有限公司铁道建筑研究所 High-speed railway roadbed structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH077223Y2 (en) * 1989-10-06 1995-02-22 日産自動車株式会社 Resin part mounting structure
DE4409653A1 (en) * 1994-03-21 1995-09-28 Wayss & Freytag Ag Solid track for rail vehicle
DE4421985A1 (en) 1994-03-21 1996-01-04 Wayss & Freytag Ag Solid track for rail vehicle
ES2066748T3 (en) * 1993-08-02 1998-04-01 Wayss & Freytag Ag FIRM ROAD FOR TRAFFIC ON LANES.
JPH1023389A (en) * 1996-07-05 1998-01-23 Matsushita Electric Ind Co Ltd Image descramble circuit
DE19957223A1 (en) * 1999-11-27 2001-06-21 Pfleiderer Infrastrukturt Gmbh Plate sleepers for railway tracks has raised rail supports of ribs with steep sides, rising above a flat plate
DE10023389A1 (en) * 2000-05-12 2001-11-29 Pfleiderer Infrastrukturt Gmbh Reinforced concrete rail sleeper surmounts cross arms both sides reinforced parallel to rail with summated arm lengths less than sleeper interval.

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160083911A1 (en) * 2013-05-17 2016-03-24 Railone Gmbh Concrete sleeper and solid carriageway

Also Published As

Publication number Publication date
CA2398416A1 (en) 2003-03-04
PT1288371E (en) 2007-05-31
TWI221868B (en) 2004-10-11
US6764022B2 (en) 2004-07-20
CN1407176A (en) 2003-04-02
ATE354696T1 (en) 2007-03-15
KR100556182B1 (en) 2006-03-06
SI1288371T1 (en) 2007-08-31
CN1234939C (en) 2006-01-04
JP2003074001A (en) 2003-03-12
EP1288371A3 (en) 2004-01-02
EP1288371A2 (en) 2003-03-05
DK1288371T3 (en) 2007-05-21
EP1288371B1 (en) 2007-02-21
DE50209523D1 (en) 2007-04-05
KR20030020830A (en) 2003-03-10
DE20213667U1 (en) 2002-11-21
CA2398416C (en) 2006-10-03
ES2281477T3 (en) 2007-10-01

Similar Documents

Publication Publication Date Title
CA2398416C (en) Wide sleeper for getrac a3 fixed track
US4905896A (en) Railroad roadway for high speed rail-mounted vehicles
BR102013031183B1 (en) method for converting ballasted track into slab track
CN206308555U (en) A kind of novel embedded rail system of subway
US5312038A (en) Drainage system for a railroad superstructure for supporting sleepers
CA2276799C (en) Base structure of a turnout
RU2249642C2 (en) Track section support
HU210631B (en) Railway body
AU770816B2 (en) Electrically insulating rail pad
EP1274901B1 (en) Railway comprising successive sleepers
WO2008143547A1 (en) Rail fastening and a rail pad
RU2415987C2 (en) Track for bridges and tunnels
RU2003112620A (en) BRACKET OF THE WAY
RU2254407C1 (en) Internal rail fastening
US1888287A (en) Ferro-concrete railway sleeper
KR102583148B1 (en) Segmented sleepers for railway turnouts
US1066085A (en) Rail-support.
JP7171461B2 (en) iron sleepers
US819081A (en) Concrete road-bed for railways.
US738940A (en) Railroad-tie.
US1661702A (en) Track-bed construction and arrangement
CN205662787U (en) High bearing track sleeper
US1475429A (en) Built-up tie
US803751A (en) Composite railroad-tie.
US1210122A (en) Concrete tie.

Legal Events

Date Code Title Description
AS Assignment

Owner name: PFLEIDERER INFRASTRUKTURTECHNIK GMBH & CO. KG, GER

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MOHR, WINFRIED;BERNS, GERHARD;SPITZNER, GUNDOLF;REEL/FRAME:013361/0962

Effective date: 20020916

AS Assignment

Owner name: SANDIA CORPORATION, NEW MEXICO

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:OSBOURN, GORDON C.;REEL/FRAME:013700/0848

Effective date: 20020725

STCF Information on status: patent grant

Free format text: PATENTED CASE

AS Assignment

Owner name: RAIL.ONE GMBH, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:PFLEIDERER INFRASTRUKTURTECHNIK GMBH & CO. KG;REEL/FRAME:019304/0456

Effective date: 20070314

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

FPAY Fee payment

Year of fee payment: 12

AS Assignment

Owner name: PCM RAIL.ONE AG, GERMANY

Free format text: CHANGE OF NAME;ASSIGNOR:PCM RAIL.ONE GMBH;REEL/FRAME:048548/0528

Effective date: 20150615

Owner name: PCM RAIL.ONE GMBH, GERMANY

Free format text: MERGER AND CHANGE OF NAME;ASSIGNORS:RAIL.ONE GMBH;PCM GERMANY GMBH;PCM RAIL.ONE GMBH;REEL/FRAME:050409/0494

Effective date: 20130718

AS Assignment

Owner name: PCM RAIL.ONE AG, GERMANY

Free format text: CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE STREET ADDRESS PREVIOUSLY RECORDED ON REEL 048548 FRAME 0528. ASSIGNOR(S) HEREBY CONFIRMS THE NAME CHANGE;ASSIGNOR:PCM RAIL.ONE GMBH;REEL/FRAME:049809/0680

Effective date: 20150615