US20010015091A1 - Method and apparatus for testing hollow pieces for impermeability - Google Patents

Method and apparatus for testing hollow pieces for impermeability Download PDF

Info

Publication number
US20010015091A1
US20010015091A1 US09/727,685 US72768500A US2001015091A1 US 20010015091 A1 US20010015091 A1 US 20010015091A1 US 72768500 A US72768500 A US 72768500A US 2001015091 A1 US2001015091 A1 US 2001015091A1
Authority
US
United States
Prior art keywords
test piece
gas
compensation tank
temperature
negative pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/727,685
Other versions
US6453728B2 (en
Inventor
Martin Messmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MESSMANN ANNEMARIE
Original Assignee
JOSEF MESSMANN GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JOSEF MESSMANN GmbH filed Critical JOSEF MESSMANN GmbH
Assigned to JOSEF MESSMANN GMBH reassignment JOSEF MESSMANN GMBH ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MESSMANN, MARTIN
Publication of US20010015091A1 publication Critical patent/US20010015091A1/en
Application granted granted Critical
Publication of US6453728B2 publication Critical patent/US6453728B2/en
Assigned to MESSMANN, ANNEMARIE reassignment MESSMANN, ANNEMARIE ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: JOSEF MESSMANN GMBH
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • G01M3/28Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds
    • G01M3/2846Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds for tubes

Definitions

  • the invention relates to a method for testing hollow pieces, such as pipes etc. made of concrete, stoneware, casting etc, in terms of their impermeability using a vacuum testing apparatus. Also, the invention relates to an apparatus for implementing the method, consisting of a support for the test piece and a medium for scaling the test piece on both sides. In particular, one of the sealing media is connected with a vacuum pump as well as with instruments for measuring the negative pressure.
  • the invention relies on known testing procedures for pipes made of stoneware, clay, concrete or similar porous materials. These procedures provide that both ends of the pipe are closed off with testing plates equipped with seals. If a negative pressure is created inside the test piece, that is sealed off on both sides, using the connected vacuum pump, it is possible to draw conclusions as to the grade of impermeability of the test piece based on the vacuum drop after the suction has been turned off. These conclusions are unreliable, however, if the internal pressure inside the test piece changes due to temperature variations after the suction is discontinued. Therefore, conducting a useful measurement is only possible once a stationary equilibrium with regard to the temperature has been reached.
  • this objective is achieved by a method for testing hollow test pieces for impermeability.
  • the method comprises the steps of:
  • step A B) maintaining the gas provided in step A at a temperature generally the same as a temperature of an inside wall of a test piece, whereby such gas constitutes temperature-controlled gas;
  • step E monitoring the level of the temperature-controlled gas in the test piece subsequent to step E for a predetermined period.
  • the invention also relates to an apparatus for testing hollow test pieces for impermeability.
  • the apparatus includes a support for supporting a test piece, and two end plates for sealing opposite ends of the test piece.
  • a compensation tank and a vacuum pump are provided.
  • a first conduit arrangement is provided for selectively connecting the vacuum pump with one of the end plates and the compensation tank for creating negative pressure gas selectively in the compensation tank and a test piece.
  • a second conduit arrangement is provided for connecting the compensation tank with one of the end plates for replacing gas in the test piece with gas from the compensation tank.
  • a first pressure measuring device measures pressure of gas in the compensation tank.
  • a temperature measuring device measures temperature of gas in the compensation tank.
  • a second pressure measuring device measures pressure of gas in the test piece.
  • a negative pressure is created inside the compensation tank, and the gas (preferably air) that is inside the tank is maintained at a temperature that corresponds essentially to the temperature of the interior wall of the test piece.
  • the test piece sealed at both ends, is inserted into the vacuum testing apparatus and connected to the compensation tank. Using isolating valves, at least one of the pipes in the circuit is closed off first. Subsequently, by means of the connected vacuum pump a negative pressure that corresponds to the negative pressure in the compensation tank is generated inside the test piece. During this time the connection between test piece and compensation tank remains closed at least on the one side in order to prevent any exchange of air from occurring.
  • the air inside the test piece is then replaced with the temperature-controlled air from inside the compensation tank after a negative pressure has been achieved in the test piece which substantially corresponds to the negative pressure in the compensation tank.
  • the colder air inside the test piece is transported into the compensation tank during this process, causing the warmer air that is present in the compensation tank to be displaced and transferred into the test piece.
  • the connection between the test piece and the compensation tank is shut off once again.
  • the temperature of the air inside the test piece corresponds in good approximation to the wall temperature, which is why a thermal equilibrium has now been achieved.
  • the negative pressure in the test piece is brought to match the negative measuring pressure, and the progression of the pressure level is monitored over a certain measuring period. If the pressure drops below prescribed tolerance limits, the pipe is considered to be leaky and is separated from the rest.
  • a heating device in order to keep the temperature of the air volume that is inside the compensation tank at the same temperature as the inside wall of the test piece.
  • a control unit triggers the heating device.
  • This kind of adjustment utilizes the measured wall temperature as a command variable. Due to the fact that the thermal inertia precludes quick temperature changes in fixed-cycle tests it is sufficient if the temperature of the inside wall of the subsequent pipe, i.e. which is to be tested next, is used as that command variable.
  • a heat-up circuit that can be shut off with a bypass valve and in which the air from the compensation tank circulates during the time it takes to exchange test pieces. The heating device is integrated into this circuit. The heat-up circuit is wired parallel to the test piece.
  • the air that is to be exchanged flows from the compensation tank into the test piece, in particular it enters the test piece in the area of the upper pipe crown. The flow exits in the area of the lower pipe crown.
  • the transfer flow of air from the compensation tank into the test piece enters the latter as an essentially quasi-steady or turbulence-poor displacement flow. It is advantageous to envision these flows also with respect to the compensation tank.
  • the vacuum testing device itself is known in the art, for instance, from DE 43 07 283.6-09, the disclosure of which is incorporated by reference herein. It features a support onto which the test piece is placed in a flat (or standing) position. This test piece is scaled on both sides; in particular, front or end plates pressed against the open pipe ends are envisioned for this step. One of the front plates is connected with a vacuum pump which is used to create a certain negative pressure inside the test piece. A manometer is used for measuring the negative pressure and for monitoring the negative pressure with respect to any pressure changes. These changes become noticeable because air seeps in to the pipe through the porosity [in the wall] and causes a reduction of the negative pressure in relation to the outside pressure.
  • test piece is allocated a compensation tank which is connected to the test piece on both sides via conduits that are equipped with isolating valves.
  • Test piece, compensation tank and conduits form a single, closed air circulation system. Pressure and temperature are monitored at least inside the compensation tank; for this purpose the compensation tank has a pressure measuring device and/or a temperature measuring device.
  • the vacuum pump is connected to one of the conduits rendering a separate implementation for the vacuum connection piece unnecessary.
  • An isolation valve is to be positioned at least in one of the conduits. It is advantageous if each of the two conduits has an isolation valve.
  • a conduit with an isolation valve is to be positioned between the connection point of the vacuum pump and the compensation tank.
  • the test piece and the compensation tank are arranged via connecting lines within a circulation system. It is advantageous to provide a circulating blower in the context of the pipes that form the circulation system for the purpose of transporting the air inside the system and for accelerating the air exchange.
  • a heating device In order to maintain the temperature a heating device is to be placed inside the compensation tank or within the context of the pipes forming the circulation system. To be able to run an air circulation even independent of a positioned test piece, an advantageous further development of the invention envisions a bypass system or heat-up system with a bypass valve. This way it is possible to achieve the necessary temperature in the compensation tank including in the line components for the impermeability determinations even before the start-up of the vacuum testing apparatus.
  • test pieces are coming from an assembly line that is equipped with heating chambers with higher temperatures, the conditions can become reversed: In particular, the air flowing from the compensation tank toward the test piece must be heated to a higher temperature. If the temperature of wall of the compensation tank does not at all or only insufficiently correspond to that of the test piece, it is advantageous to apply thermal insulation on the inside of the compensation tank wall. This eliminates the heat capacity of the walls of the compensation tank. The energy that is required for re-heating is, in this case, generated entirely or in part by the heating device that is arranged in the short circuit.
  • air distribution devices or flow rectifiers are envisioned in the flow entry areas of the test piece and/or of the compensation tank whose purpose consists in ensuring a laminar air flow into the test piece and/or into the compensation tank. These measures allow the smooth introduction of air and consequently improve the air exchange.
  • Suitable for use as air distribution devices or as flow rectifiers of this kind are coaxial air admission devices known from the field of air conditioning technology; other devices serving this purpose are distribution grids or piles of screens, fabric or felt disks that cover up the cross section of the flow entry area.
  • the air has the temperature of the inside wall of the test piece or it is brought to that temperature when the air is transferred from the compensation tank into the test piece.
  • a heating device is envisioned for this purpose which is located in the compensation tank or in the conduit running from the test piece to the compensation tank.
  • the heating device is advantageously activated by way of a temperature control or temperature adjuster whose command variable is the wall temperature taken from the inside wall of the test piece.
  • a temperature control or temperature adjuster whose command variable is the wall temperature taken from the inside wall of the test piece.
  • the temperature of the inside wall of the test piece itself it is also possible to take the inside wall temperature of the subsequent pipe which will be placed into the vacuum testing apparatus next.
  • the considerable heat capacity of the wall and the related heat inertia associated with it allows proceeding in this manner.
  • the advantage of this alternative consists in the fact that the measuring site is more easily accessible.
  • the adjustment is controlled by the inside wall temperature as command variable; the heating device is operated by the actuator of this control circuit, thereby ensuring an optimal temperature
  • the compensation tank is advantageously connected with its two air connections, the circulation blower and the heating device via a bypass line in relation to the re-heating circuit, which can be shut off, that accelerates the energy transfer from the wall of the compensation tank to the air.
  • the compensation tank cools down to an extent that sufficient re-heating of the cooled down air, utilizing the heat capacity of its walls, is no longer ensured after a number of test pieces were examined in fixed cycles, it is necessary and advantageous to integrate a heating device into the secondary re-heating circuit that advantageously becomes part of the temperature control. If the walls of the compensation tank have a temperature that does not at all, or only inadequately, correspond to the wall temperature of the test piece, it is advantageous to apply heat insulation on the inside walls of the compensation tank. It is also advantageous in this context if the amount of energy necessary for the re-heating is produced, in this case entirely or in part, by the heating device that is arranged in the secondary re-heating circuit.
  • FIGS. 1 to 4 The principal aspects of the invention are described in more detail utilizing the embodiments that are illustrated in FIGS. 1 to 4 . Shown are:
  • FIG. 1 Vacuum testing apparatus with test piece and compensation tank and the accompanying instrumentation (schematic depiction):
  • FIG. 2 Vacuum testing apparatus in accordance with FIG. 1; the compensation tank with forced air guiding devices (schematic depiction);
  • FIG. 3 Vacuum testing apparatus in accordance with FIG. 1; test piece and compensation tank with flow rectifier in the entry flow area (schematic depiction;
  • FIG. 4 Vacuum testing apparatus in accordance with FIG. 1; test piece with flow-in at the top and flow-out at the bottom of the test piece (schematic depiction).
  • FIG. 1 shows the test piece 1 , in particular a concrete pipe, that is clamped between the end plates 2 and 3 for the purpose of an impermeability test.
  • the testing construct can also be set up to provide for examination of the test pieces 1 at fixed cycles, with the test pieces resting on a transport device and being transported through the testing construct that is designed as a testing station and as a part of the manufacturing process.
  • the front plate 3 can be attached to a vacuum pump 8 via a tab line that is inserted into the connecting line 18 .
  • the vacuum pump 8 is suitable for adjusting the desired or required testing pressure inside the test piece 1 .
  • a valve 17 is closed, thereby interrupting the connection between test piece 1 and vacuum pump 8 .
  • Any permeability in the walls of the test piece now allows gas (e.g., air) to enter the test piece which reduces the vacuum and consequently causes the pressure to rise.
  • a pressure control device permits monitoring this pressure change, if need be also with remote transmission to a control station where a printout of the result can be generated.
  • a compensation tank 4 is connected to the test piece via the circuit line 19 (containing a circuit valve 15 ), the circuit line 18 , a circuit valve 9 , a circulation blower 10 , a heating device 7 and a connecting line 20 .
  • the compensation tank 4 is initially connected with the vacuum pump 8 via an accessory line 22 and an accessory valve 16 , which causes a negative testing pressure to be generated inside the compensation tank 4 .
  • the circuit valves 15 and 9 remain closed during this step. Once the desired negative pressure is achieved, the accessory valve 16 is closed.
  • blower 10 and, if need be, the heating device 7 as well as accompanying temperature adjustment and temperature measurement instruments are activated; a bypass valve 14 is opened causing gas (e.g., air) to flow into a bypass line 21 .
  • gas e.g., air
  • the cooled-down air warms up to a temperature corresponding to a temperature of an inside wall of the test piece (i.e., a temperature of the inside wall prior to a vacuum being generated in the test piece).
  • equal negative pressures can be established independently in the compensation tank 4 and the test piece 1 , respectively.
  • the circuit valves 9 and 15 are opened (preferably shortly after the bypass valve 14 was closed). Now the circuit blower 10 is activated and transports the air that is present inside the test piece via the circuit line 18 and the connecting line 20 into the compensation tank 4 while simultaneously transporting temperature-controlled air from the compensation tank 4 into the test piece 1 via the circuit line 19 . As soon as this process has been completed, the circuit valves 9 and 15 are closed, resulting in the test piece remaining at the negative testing pressure at thermal equilibrium. Now the test piece is evaluated using measuring technology that is known in the art.
  • the bypass valve 14 can be reopened in order to re-close the re-heating circuit for the compensation tank 4 .
  • the negative pressure is eliminated by activating a ventilation valve (not shown here), and the two front plates 2 and 3 are removed. Now a new test piece 1 can be inserted into the vacuum testing apparatus.
  • Temperature measuring instruments 6 and pressure measuring instruments 5 determine temperature and pressure of the air inside the compensation tank 4 and/or inside the test piece 1 .
  • the installation for measuring the temperature of the inside wall of the pipe and/or the ambient temperature is not shown.
  • This device is envisioned, for example with regard to the inside wall temperature of the test piece, on the end plates as temperature gauges that adhere with spring-like properties against the inside wall of the test piece. If the temperature of the subsequent pipe is used for the testing cycle, the temperature gauge is fitted closely against that pipe's inside wall. These measured values are transmitted as desired values to the temperature control of the heating device in the circuit and/or in the compensation tank.
  • FIG. 2 A modified form of the compensation tank 4 is shown in FIG. 2 wherein flow inserts 13 are provided in the compensation tank 4 , in particular in the flow entry area of the compensation tank 4 .
  • the flow inserts forcibly guide the air entering the compensation tank in a manner limiting any mixing of the entering and exiting air masses.
  • the danger of mixing the air masses could be reduced by providing a conventional flow rectifier 12 in the test piece 1 and/or a flow rectifier 11 in the compensation tank 4 , as illustrated in FIG. 3.
  • the flow rectifiers 11 , 12 shown here could be for example, in the form of felt disks.
  • the rectifiers tend to minimize turbulence, i.e., the air flow that exits from the rectifiers is basically laminar. If this laminar flow is maintained along the entire length of the test piece (or the compensation tank), the result is a flow type known as a turbulence-poor displacement flow which suppresses the mixing phenomena.
  • FIG. 4 shows a variation in which the warmer air is introduced at the upper crown of one end of the test piece, and the cooled-down air exits from the lower crown of the pipe at the opposite end of the test piece.
  • both front pieces 2 and 3 of the test piece 1 are equipped with connection pieces 23 and 24 that are bent in a Z-shape and whose open connection ends in the areas respectively at the upper and lower crowns are aligned parallel to the center axis of the test. Accordingly, the entry flow in the upper pipe area and also the sucking of air from the lower pipe area are possible in a direction parallel to the axis.
  • the compensation tank 4 is equipped with a flow rectifier 11 , allowing for a simple flow that suppresses mixing for the most part.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Examining Or Testing Airtightness (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The impermeability of a test piece, e.g., a pipe made of concrete, clay, stoneware, etc., is tested using negative pressure air. Air in a compensation tank is maintained at negative pressure and also at a temperature that correspond to the temperature of the inside wall of the test piece. Then, the test piece, sealed on both ends, has a negative pressure is generated therein that corresponds to the negative pressure inside the compensation tank. Subsequently, the air inside the test piece is replaced with the temperature-controlled air from inside the compensation tank, and then the negative pressure inside the test piece is adjusted to a predetermined testing level. The progression of the negative pressure over a time period in the test piece is monitored. If the measured negative pressure drops below a prescribed tolerance limit, the pipe is considered too leaky.

Description

    BACKGROUND OF THE INVENTION
  • The invention relates to a method for testing hollow pieces, such as pipes etc. made of concrete, stoneware, casting etc, in terms of their impermeability using a vacuum testing apparatus. Also, the invention relates to an apparatus for implementing the method, consisting of a support for the test piece and a medium for scaling the test piece on both sides. In particular, one of the sealing media is connected with a vacuum pump as well as with instruments for measuring the negative pressure. [0001]
  • The invention relies on known testing procedures for pipes made of stoneware, clay, concrete or similar porous materials. These procedures provide that both ends of the pipe are closed off with testing plates equipped with seals. If a negative pressure is created inside the test piece, that is sealed off on both sides, using the connected vacuum pump, it is possible to draw conclusions as to the grade of impermeability of the test piece based on the vacuum drop after the suction has been turned off. These conclusions are unreliable, however, if the internal pressure inside the test piece changes due to temperature variations after the suction is discontinued. Therefore, conducting a useful measurement is only possible once a stationary equilibrium with regard to the temperature has been reached. [0002]
  • Using methods of this kind is particularly disadvantageous in instances of fixed-cycle manufacturing because the required waiting time period for achieving the temperature equilibrium is too long. This time period is extended in particular by the thermal energy that is used for the adiabatic relaxation of the air while the vacuum is drawn. Another delay is caused by the evaporation of the water remaining in the pores which causes a cooling of the (rest) air content inside the test piece whereby a drop in pressure occurs which simulates an impermeability that does not in fact exist. [0003]
  • OBJECTS AND SUMMARY OF THE INVENTION
  • It is an object of the present invention to provide a class-specific method that accelerates the achieving of the temperature equilibrium, to reduce the testing time in fixed-cycle manufacturing; in addition, it is an object of the present invention to provide a class-specific apparatus for implementing the method that allows safe and undisturbed vacuum testing even in connection with short fixed-cycle times. [0004]
  • According to the invention this objective is achieved by a method for testing hollow test pieces for impermeability. The method comprises the steps of: [0005]
  • A) providing a gas at negative pressure in a compensation tank; [0006]
  • B) maintaining the gas provided in step A at a temperature generally the same as a temperature of an inside wall of a test piece, whereby such gas constitutes temperature-controlled gas; [0007]
  • C) providing a gas at negative pressure in the test piece, which negative pressure is at a level substantially corresponding to a value of the negative pressure of the temperature-controlled gas in the compensation tank; [0008]
  • D) replacing the gas in the test piece with the temperature-controlled gas from the compensation tank; [0009]
  • E) adjusting the negative pressure of the temperature-controlled gas supplied to the test piece in step D to a predetermined level; and [0010]
  • F) monitoring the level of the temperature-controlled gas in the test piece subsequent to step E for a predetermined period. [0011]
  • The invention also relates to an apparatus for testing hollow test pieces for impermeability. The apparatus includes a support for supporting a test piece, and two end plates for sealing opposite ends of the test piece. A compensation tank and a vacuum pump are provided. A first conduit arrangement is provided for selectively connecting the vacuum pump with one of the end plates and the compensation tank for creating negative pressure gas selectively in the compensation tank and a test piece. A second conduit arrangement is provided for connecting the compensation tank with one of the end plates for replacing gas in the test piece with gas from the compensation tank. A first pressure measuring device measures pressure of gas in the compensation tank. A temperature measuring device measures temperature of gas in the compensation tank. A second pressure measuring device measures pressure of gas in the test piece. [0012]
  • For the testing process a negative pressure is created inside the compensation tank, and the gas (preferably air) that is inside the tank is maintained at a temperature that corresponds essentially to the temperature of the interior wall of the test piece. The test piece, sealed at both ends, is inserted into the vacuum testing apparatus and connected to the compensation tank. Using isolating valves, at least one of the pipes in the circuit is closed off first. Subsequently, by means of the connected vacuum pump a negative pressure that corresponds to the negative pressure in the compensation tank is generated inside the test piece. During this time the connection between test piece and compensation tank remains closed at least on the one side in order to prevent any exchange of air from occurring. The air inside the test piece is then replaced with the temperature-controlled air from inside the compensation tank after a negative pressure has been achieved in the test piece which substantially corresponds to the negative pressure in the compensation tank. The colder air inside the test piece is transported into the compensation tank during this process, causing the warmer air that is present in the compensation tank to be displaced and transferred into the test piece. After the volume exchange has been completed, the connection between the test piece and the compensation tank is shut off once again. Now the temperature of the air inside the test piece corresponds in good approximation to the wall temperature, which is why a thermal equilibrium has now been achieved. The negative pressure in the test piece is brought to match the negative measuring pressure, and the progression of the pressure level is monitored over a certain measuring period. If the pressure drops below prescribed tolerance limits, the pipe is considered to be leaky and is separated from the rest. [0013]
  • After the examination is complete a new test piece is inserted into the vacuum testing apparatus; during this step the connection between the test piece and the equilibrium volume stays turned off. Only after this test piece has also been brought to match the negative testing pressure are the two air volumes exchanged in accordance with the way described above. [0014]
  • It is advantageous to employ a heating device in order to keep the temperature of the air volume that is inside the compensation tank at the same temperature as the inside wall of the test piece. In this context it is also advantageous if a control unit triggers the heating device. This kind of adjustment utilizes the measured wall temperature as a command variable. Due to the fact that the thermal inertia precludes quick temperature changes in fixed-cycle tests it is sufficient if the temperature of the inside wall of the subsequent pipe, i.e. which is to be tested next, is used as that command variable. Also, it is advantageous to envision a heat-up circuit that can be shut off with a bypass valve and in which the air from the compensation tank circulates during the time it takes to exchange test pieces. The heating device is integrated into this circuit. The heat-up circuit is wired parallel to the test piece. [0015]
  • During the air exchange it is crucial that any mixing of air be suppressed; consequently, the air is introduced into the test piece and/or into the compensation tank essentially without vibration. According to a further development of the invention the air that is to be exchanged flows from the compensation tank into the test piece, in particular it enters the test piece in the area of the upper pipe crown. The flow exits in the area of the lower pipe crown. In the alternative, the transfer flow of air from the compensation tank into the test piece enters the latter as an essentially quasi-steady or turbulence-poor displacement flow. It is advantageous to envision these flows also with respect to the compensation tank. [0016]
  • Monitoring the progression over time of the negative testing pressure can begin now. The cooled air from the test piece, which was transported into the compensation tank, can now adjust itself or can be adjusted to match the temperature during the length of time of the total duration of the testing cycle that is not needed for the exchange of the air volumes, thereby making that air available for the air exchange that will take place during a subsequent testing cycle. [0017]
  • The vacuum testing device itself is known in the art, for instance, from DE 43 07 283.6-09, the disclosure of which is incorporated by reference herein. It features a support onto which the test piece is placed in a flat (or standing) position. This test piece is scaled on both sides; in particular, front or end plates pressed against the open pipe ends are envisioned for this step. One of the front plates is connected with a vacuum pump which is used to create a certain negative pressure inside the test piece. A manometer is used for measuring the negative pressure and for monitoring the negative pressure with respect to any pressure changes. These changes become noticeable because air seeps in to the pipe through the porosity [in the wall] and causes a reduction of the negative pressure in relation to the outside pressure. [0018]
  • To eliminate the impact of pressure changes due to temperature the test piece is allocated a compensation tank which is connected to the test piece on both sides via conduits that are equipped with isolating valves. Test piece, compensation tank and conduits form a single, closed air circulation system. Pressure and temperature are monitored at least inside the compensation tank; for this purpose the compensation tank has a pressure measuring device and/or a temperature measuring device. The vacuum pump is connected to one of the conduits rendering a separate implementation for the vacuum connection piece unnecessary. An isolation valve is to be positioned at least in one of the conduits. It is advantageous if each of the two conduits has an isolation valve. To be able to adjust the inside pressures of the compensation tank and of the test piece independently of each other, a conduit with an isolation valve is to be positioned between the connection point of the vacuum pump and the compensation tank. In order to exchange the cooled air of the test piece with the re-heated air inside the compensation tank it is advantageous if the test piece and the compensation tank are arranged via connecting lines within a circulation system. It is advantageous to provide a circulating blower in the context of the pipes that form the circulation system for the purpose of transporting the air inside the system and for accelerating the air exchange. [0019]
  • In order to maintain the temperature a heating device is to be placed inside the compensation tank or within the context of the pipes forming the circulation system. To be able to run an air circulation even independent of a positioned test piece, an advantageous further development of the invention envisions a bypass system or heat-up system with a bypass valve. This way it is possible to achieve the necessary temperature in the compensation tank including in the line components for the impermeability determinations even before the start-up of the vacuum testing apparatus. [0020]
  • If the test pieces are coming from an assembly line that is equipped with heating chambers with higher temperatures, the conditions can become reversed: In particular, the air flowing from the compensation tank toward the test piece must be heated to a higher temperature. If the temperature of wall of the compensation tank does not at all or only insufficiently correspond to that of the test piece, it is advantageous to apply thermal insulation on the inside of the compensation tank wall. This eliminates the heat capacity of the walls of the compensation tank. The energy that is required for re-heating is, in this case, generated entirely or in part by the heating device that is arranged in the short circuit. [0021]
  • To suppress the possibility of any mixing of the air that flows into the compensation tank or into the test piece with the air that is already present in the compensation tank or in the test piece air distribution devices or flow rectifiers are envisioned in the flow entry areas of the test piece and/or of the compensation tank whose purpose consists in ensuring a laminar air flow into the test piece and/or into the compensation tank. These measures allow the smooth introduction of air and consequently improve the air exchange. Suitable for use as air distribution devices or as flow rectifiers of this kind are coaxial air admission devices known from the field of air conditioning technology; other devices serving this purpose are distribution grids or piles of screens, fabric or felt disks that cover up the cross section of the flow entry area. In the alternative, it is also possible to envision flow obstacles that force the in-flowing air “to push” the out-flowing air “ahead” on its way inside. [0022]
  • The exchange of air always involves air of different temperatures. It's therefore advantageous to provide the entry point for the warmer air into the test piece in the upper pipe crown area while the colder air exits in the lower pipe crown area, thereby taking advantage of the differences in density of wanner and colder air. Any mixing of inflowing colder air with wanner air that is already present inside the compensation tank should be avoided. Thus, it is advantageous to place the compensation tank in an uptight position with the inflow line attached at the bottom and the circulation line leading to the test piece attached at the top of the tank. In an advantageous embodiment, an air distribution device is arranged in the compensation tank, in particular in the area of the in-flowing colder air, thereby forcing as much as possible a laminar flow directed at the opposite side. In an advantageous embodiment using separating walls air that is on its way into and/or through the compensation tank is forced into a channel which has a smaller cross section intended to reduce the size of the mixing front. [0023]
  • In an advantageous further development the air has the temperature of the inside wall of the test piece or it is brought to that temperature when the air is transferred from the compensation tank into the test piece. A heating device is envisioned for this purpose which is located in the compensation tank or in the conduit running from the test piece to the compensation tank. The heating device is advantageously activated by way of a temperature control or temperature adjuster whose command variable is the wall temperature taken from the inside wall of the test piece. Instead of the temperature of the inside wall of the test piece itself it is also possible to take the inside wall temperature of the subsequent pipe which will be placed into the vacuum testing apparatus next. The considerable heat capacity of the wall and the related heat inertia associated with it allows proceeding in this manner. The advantage of this alternative consists in the fact that the measuring site is more easily accessible. The adjustment is controlled by the inside wall temperature as command variable; the heating device is operated by the actuator of this control circuit, thereby ensuring an optimal temperature adjustment. [0024]
  • During the actual testing, i.e. in the time interval during which the vacuum is measured inside the test piece and any changes thereof over time are monitored for the evaluation of the impermeability of the test piece, it is advantageous to shut off the connecting lines between the test piece and the compensation tank. During this step the cycle is stationary; this is the time when the circulation system is available for re-heating the colder air volume that has flown into the compensation tank. For this purpose the compensation tank is advantageously connected with its two air connections, the circulation blower and the heating device via a bypass line in relation to the re-heating circuit, which can be shut off, that accelerates the energy transfer from the wall of the compensation tank to the air. If the compensation tank cools down to an extent that sufficient re-heating of the cooled down air, utilizing the heat capacity of its walls, is no longer ensured after a number of test pieces were examined in fixed cycles, it is necessary and advantageous to integrate a heating device into the secondary re-heating circuit that advantageously becomes part of the temperature control. If the walls of the compensation tank have a temperature that does not at all, or only inadequately, correspond to the wall temperature of the test piece, it is advantageous to apply heat insulation on the inside walls of the compensation tank. It is also advantageous in this context if the amount of energy necessary for the re-heating is produced, in this case entirely or in part, by the heating device that is arranged in the secondary re-heating circuit. [0025]
  • Due to the fact that the air that is located inside the compensation tank and in its attached re-heating circuit expands during the re-heating process, which causes the adjusted pressure level to change, it is advantageous to provide a connecting line to the vacuum pump equipped with a shut-off device that can be opened briefly in order to effect a pressure release. In this way, it is possible to adjust the compensation tank and the test piece to the same negative pressure level before the actual testing is commenced, and before the connecting lines between compensation tank and test piece are opened. [0026]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The principal aspects of the invention are described in more detail utilizing the embodiments that are illustrated in FIGS. [0027] 1 to 4. Shown are:
  • FIG. 1 : Vacuum testing apparatus with test piece and compensation tank and the accompanying instrumentation (schematic depiction): [0028]
  • FIG. 2: Vacuum testing apparatus in accordance with FIG. 1; the compensation tank with forced air guiding devices (schematic depiction); [0029]
  • FIG. 3: Vacuum testing apparatus in accordance with FIG. 1; test piece and compensation tank with flow rectifier in the entry flow area (schematic depiction; [0030]
  • FIG. 4: Vacuum testing apparatus in accordance with FIG. 1; test piece with flow-in at the top and flow-out at the bottom of the test piece (schematic depiction). [0031]
  • DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS OF THE INVENTION
  • FIG. 1 shows the [0032] test piece 1, in particular a concrete pipe, that is clamped between the end plates 2 and 3 for the purpose of an impermeability test. It goes without saying that these end plates 2 and 3 are part of a whole testing construct (which is not shown here in more detail). The testing construct can also be set up to provide for examination of the test pieces 1 at fixed cycles, with the test pieces resting on a transport device and being transported through the testing construct that is designed as a testing station and as a part of the manufacturing process. The front plate 3 can be attached to a vacuum pump 8 via a tab line that is inserted into the connecting line 18. The vacuum pump 8 is suitable for adjusting the desired or required testing pressure inside the test piece 1. After the desired or required vacuum has been reached, a valve 17 is closed, thereby interrupting the connection between test piece 1 and vacuum pump 8. Any permeability in the walls of the test piece now allows gas (e.g., air) to enter the test piece which reduces the vacuum and consequently causes the pressure to rise. A pressure control device permits monitoring this pressure change, if need be also with remote transmission to a control station where a printout of the result can be generated.
  • A [0033] compensation tank 4 is connected to the test piece via the circuit line 19 (containing a circuit valve 15), the circuit line 18, a circuit valve 9, a circulation blower 10, a heating device 7 and a connecting line 20. At the beginning of an examination of several test pieces the compensation tank 4 is initially connected with the vacuum pump 8 via an accessory line 22 and an accessory valve 16, which causes a negative testing pressure to be generated inside the compensation tank 4. The circuit valves 15 and 9 remain closed during this step. Once the desired negative pressure is achieved, the accessory valve 16 is closed. Then the blower 10 and, if need be, the heating device 7 as well as accompanying temperature adjustment and temperature measurement instruments are activated; a bypass valve 14 is opened causing gas (e.g., air) to flow into a bypass line 21. Now the cooled-down air warms up to a temperature corresponding to a temperature of an inside wall of the test piece (i.e., a temperature of the inside wall prior to a vacuum being generated in the test piece).
  • Thus, equal negative pressures can be established independently in the [0034] compensation tank 4 and the test piece 1, respectively. Once that has occurred, the circuit valves 9 and 15 are opened (preferably shortly after the bypass valve 14 was closed). Now the circuit blower 10 is activated and transports the air that is present inside the test piece via the circuit line 18 and the connecting line 20 into the compensation tank 4 while simultaneously transporting temperature-controlled air from the compensation tank 4 into the test piece 1 via the circuit line 19. As soon as this process has been completed, the circuit valves 9 and 15 are closed, resulting in the test piece remaining at the negative testing pressure at thermal equilibrium. Now the test piece is evaluated using measuring technology that is known in the art. Once the circuit valves 9 and 15 have been closed, the bypass valve 14 can be reopened in order to re-close the re-heating circuit for the compensation tank 4. When the evaluation of the test piece 1 has been completed, the negative pressure is eliminated by activating a ventilation valve (not shown here), and the two front plates 2 and 3 are removed. Now a new test piece 1 can be inserted into the vacuum testing apparatus.
  • Temperature measuring instruments [0035] 6 and pressure measuring instruments 5 determine temperature and pressure of the air inside the compensation tank 4 and/or inside the test piece 1. The installation for measuring the temperature of the inside wall of the pipe and/or the ambient temperature is not shown. This device is envisioned, for example with regard to the inside wall temperature of the test piece, on the end plates as temperature gauges that adhere with spring-like properties against the inside wall of the test piece. If the temperature of the subsequent pipe is used for the testing cycle, the temperature gauge is fitted closely against that pipe's inside wall. These measured values are transmitted as desired values to the temperature control of the heating device in the circuit and/or in the compensation tank.
  • A modified form of the [0036] compensation tank 4 is shown in FIG. 2 wherein flow inserts 13 are provided in the compensation tank 4, in particular in the flow entry area of the compensation tank 4. The flow inserts forcibly guide the air entering the compensation tank in a manner limiting any mixing of the entering and exiting air masses.
  • Alternatively, the danger of mixing the air masses could be reduced by providing a [0037] conventional flow rectifier 12 in the test piece 1 and/or a flow rectifier 11 in the compensation tank 4, as illustrated in FIG. 3. The flow rectifiers 11, 12 shown here could be for example, in the form of felt disks. The rectifiers tend to minimize turbulence, i.e., the air flow that exits from the rectifiers is basically laminar. If this laminar flow is maintained along the entire length of the test piece (or the compensation tank), the result is a flow type known as a turbulence-poor displacement flow which suppresses the mixing phenomena.
  • Finally, FIG. 4 shows a variation in which the warmer air is introduced at the upper crown of one end of the test piece, and the cooled-down air exits from the lower crown of the pipe at the opposite end of the test piece. To accomplish this, both [0038] front pieces 2 and 3 of the test piece 1 are equipped with connection pieces 23 and 24 that are bent in a Z-shape and whose open connection ends in the areas respectively at the upper and lower crowns are aligned parallel to the center axis of the test. Accordingly, the entry flow in the upper pipe area and also the sucking of air from the lower pipe area are possible in a direction parallel to the axis. In this instance the compensation tank 4 is equipped with a flow rectifier 11, allowing for a simple flow that suppresses mixing for the most part.
  • Although the present invention has been described in connection with preferred embodiments of the invention, it will be appreciated by those skilled in the art that additions, modifications, substitutions and deletions not specifically described may be made without departing from the spirit and scope of the invention as defined in the appended claims. [0039]

Claims (18)

What is claimed is:
1. Method for testing hollow test pieces for impermeability, comprising the steps of:
A) providing a gas at negative pressure in a compensation tank;
B) maintaining the gas provided in step A at a temperature generally the same as a temperature of an inside wall of a test piece, whereby such gas constitutes temperature-controlled gas;
C) providing a gas at negative pressure in the test piece, which negative pressure is at a level substantially corresponding to a value of the negative pressure of the temperature-controlled gas in the compensation tank;
D) replacing the gas in the test piece with the temperature-controlled gas from the compensation tank;
E) adjusting the negative pressure of the temperature-controlled gas supplied to the test piece in step D to a predetermined pressure level; and
F) monitoring the level of the temperature-controlled gas in the test piece subsequent to step E for a predetermined period.
2. A method according to
claim 1
wherein step B further comprises heating the gas with a heater to a temperature substantially corresponding to the temperature of the inside wall.
3. The method according to
claim 2
wherein step B further comprises measuring the temperature of the inside wall and automatically controlling actuation of the heater in response to the measured temperature of the inside wall.
4. The method according to
claim 1
wherein step D further comprises introducing the temperature-controlled gas at an upper portion of one end region of the test piece while evacuating gas from the test piece at a lower portion of an opposite end region of the test piece.
5. The method according to
claim 1
wherein step D further comprises causing the temperature-controlled gas to flow into the test piece in a turbulence-poor flow.
6. The method according to
claim 1
wherein step D comprises introducing gas from the test piece into a lower portion of the compensation tank while simultaneously discharging temperature-controlled gas from an upper portion of the compensation tank.
7. The method according to
claim 1
wherein step D further comprises introducing gas from the test piece into the compensation tank as a low vibration flow.
8. The method according to
claim 1
wherein step D further comprises introducing gas from the test piece into the compensation tank as a turbulence-poor flow.
9. The method according to
claim 8
wherein gas flows through the compensation tank as a turbulence-poor flow.
10. The method according to
claim 1
wherein the gas provided in each of steps A and C comprises air.
11. Apparatus for testing hollow test pieces for impermeability comprising:
a support for supporting a test piece;
two end plates for sealing opposite ends of the test piece;
a compensation tank;
a vacuum pump;
a first conduit arrangement for selectively connecting the vacuum pump with one of the end plates and the compensation tank for creating negative pressure gas selectively in the compensation tank and a test piece; and
a second conduit arrangement for connecting the compensation tank with one of the end plates for replacing gas in the test piece with gas from the compensation tank;
a first pressure measuring device for measuring pressure of gas in the compensation tank;
a temperature measuring device for measuring temperature of gas in the compensation tank; and
a second pressure measuring device for measuring pressure of gas in the test piece.
12. Apparatus according to
claim 11
further including an air blower for circulating gas in the first and second conduit arrangements.
13. Apparatus according to
claim 11
further including a heater disposed in the second conduit arrangement, the second conduit arrangement including a valve for communicating gas in the compensation tank selectively with the heater and the one end plate to which the second conduit arrangement is connected.
14. Apparatus according to
claim 11
wherein the second conduit arrangement comprises a conduit leading from the first end plate to the compensation tank and including a shut-off valve therein.
15. Apparatus according to
claim 11
wherein a flow rectifier is disposed in a gas-entry end of the test piece.
16. Apparatus according to
claim 15
wherein the flow rectifier comprises a porous disk.
17. Apparatus according to
claim 11
wherein flow obstacles are disposed in a gas entry-end of the compensation tank.
18. Apparatus according to
claim 11
wherein one of the end plates includes a gas supply pipe for supplying gas at an upper portion of the one end plate, and the other of the end plates includes a gas discharge pipe for discharging gas from a lower portion of the other end plate.
US09/727,685 1999-12-02 2000-12-04 Method and apparatus for testing hollow pieces for impermeability Expired - Fee Related US6453728B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE19957998 1999-12-02
DE19957998A DE19957998C2 (en) 1999-12-02 1999-12-02 Method and device for checking porous pipes or the like for leaks
DE19957998.9 1999-12-02

Publications (2)

Publication Number Publication Date
US20010015091A1 true US20010015091A1 (en) 2001-08-23
US6453728B2 US6453728B2 (en) 2002-09-24

Family

ID=7931112

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/727,685 Expired - Fee Related US6453728B2 (en) 1999-12-02 2000-12-04 Method and apparatus for testing hollow pieces for impermeability

Country Status (4)

Country Link
US (1) US6453728B2 (en)
EP (1) EP1109003B1 (en)
AT (1) ATE269969T1 (en)
DE (2) DE19957998C2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8477040B2 (en) 2011-01-26 2013-07-02 Joseph D Jatcko Method and apparatus for testing the integrity of a tank
CN103234711A (en) * 2013-04-15 2013-08-07 株洲南车时代电气股份有限公司 Device and method for examining sealing performance of rubber hoses
CN104441371A (en) * 2014-11-28 2015-03-25 中科院广州化学有限公司 Pore detection method of blocky porous resin material molded by casting
CN106163366A (en) * 2015-01-26 2016-11-23 奥林巴斯株式会社 Leakage detector and cleaning-sterlizing machine for endoscope
KR102074246B1 (en) * 2018-11-27 2020-03-02 한국가스안전공사 Hydrogen permeability test device for rubber
CN112362551A (en) * 2020-10-29 2021-02-12 中国三峡建设管理有限公司 Indoor convenient determination method and system for permeability of compact rock

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7264020B2 (en) * 2005-06-29 2007-09-04 James Wolk Accessible test fitting for a plumbing system
CN105424331B (en) * 2014-09-18 2019-07-05 中国石油化工股份有限公司 The device and method of the mechanical seal evaluation of cement sheath when for massive hydraulic fracturing

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1436128A (en) * 1973-04-10 1976-05-19 Wirsbo Bruks Ab Testing of tubular material
EP0094533B1 (en) * 1982-05-15 1986-03-12 Fried. Krupp Gesellschaft mit beschränkter Haftung Method for leakage testing of pipes or networks of pipes
DE3828588C1 (en) * 1988-08-23 1989-12-07 Alcatel Hochvakuumtechnik Gmbh, 6980 Wertheim, De
FR2681689B1 (en) * 1991-09-25 1993-11-12 Alcatel Cit GAS LEAK DETECTOR.
DE4307283C2 (en) * 1993-03-08 1996-04-18 Messmann Josef Fa Device for testing porous pipes or the like for leaks and method therefor
JPH06288856A (en) * 1993-03-31 1994-10-18 Natsuku:Kk Method and apparatus for measuring air leak
US5625141A (en) * 1993-06-29 1997-04-29 Varian Associates, Inc. Sealed parts leak testing method and apparatus for helium spectrometer leak detection
US5367797A (en) * 1993-10-25 1994-11-29 Omega Environmental, Inc. Process for testing a vessel
DE4407309A1 (en) * 1994-03-04 1995-09-07 Josef Messmann Fa Dipl Ing Testing porous tubes or similar for leaks
DE4445883A1 (en) * 1994-03-21 1995-09-28 Josef Messmann Fa Dipl Ing Method and device for testing porous pipes or the like for leaks, and method therefor
GB9505815D0 (en) * 1995-03-22 1995-05-10 British Gas Plc Method of testing pipes for leakage
US5616854A (en) * 1995-07-11 1997-04-01 Berg; Paul Apparatus for pneumatically testing pipes for leaks
DE19627922A1 (en) * 1996-07-11 1998-01-15 Leybold Vakuum Gmbh Method and appliance for recovering helium used in leakage tests

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8477040B2 (en) 2011-01-26 2013-07-02 Joseph D Jatcko Method and apparatus for testing the integrity of a tank
CN103234711A (en) * 2013-04-15 2013-08-07 株洲南车时代电气股份有限公司 Device and method for examining sealing performance of rubber hoses
CN104441371A (en) * 2014-11-28 2015-03-25 中科院广州化学有限公司 Pore detection method of blocky porous resin material molded by casting
CN106163366A (en) * 2015-01-26 2016-11-23 奥林巴斯株式会社 Leakage detector and cleaning-sterlizing machine for endoscope
US20170020367A1 (en) * 2015-01-26 2017-01-26 Olympus Corporation Leak tester and endoscope reprocessor
US9820630B2 (en) * 2015-01-26 2017-11-21 Olympus Corporation Leak tester and endoscope reprocessor
KR102074246B1 (en) * 2018-11-27 2020-03-02 한국가스안전공사 Hydrogen permeability test device for rubber
CN112362551A (en) * 2020-10-29 2021-02-12 中国三峡建设管理有限公司 Indoor convenient determination method and system for permeability of compact rock

Also Published As

Publication number Publication date
DE50006880D1 (en) 2004-07-29
DE19957998A1 (en) 2001-06-13
EP1109003B1 (en) 2004-06-23
ATE269969T1 (en) 2004-07-15
EP1109003A3 (en) 2001-11-21
EP1109003A2 (en) 2001-06-20
DE19957998C2 (en) 2001-10-18
US6453728B2 (en) 2002-09-24

Similar Documents

Publication Publication Date Title
US20020044409A1 (en) Display connector for electronic device
US6453728B2 (en) Method and apparatus for testing hollow pieces for impermeability
JP3845055B2 (en) Gas permeability measuring device
WO2022007916A1 (en) Online testing method for integrity of sterilizing filter element
KR20200013489A (en) An energy performance test apparatus and test method which can control accurately the schedules of variable flow rate and variable calorie following the real usage pattern
KR100925776B1 (en) A heat exchanger performance test system for airconditioner
JPS6321442A (en) Automatic bath device
CN210894621U (en) New forms of energy motor's test system
JP2016176867A (en) Leak inspection device and leak inspection method
CN108213639A (en) A kind of soldering oven heat-insulating circulating system
CN216752526U (en) Temperature control unit
CN207231942U (en) Polymeric material aging effect nondestructive detection system
CN210721180U (en) Be applied to constant temperature and humidity experimental apparatus that waste water detected
JPH0241695B2 (en)
CN114126348B (en) Temperature control unit
CN109580126A (en) A kind of integrity detection system and method for freeze dryer filter
CN108254053A (en) A kind of measuring system and its measuring method of refrigerant weight
CN114088383A (en) Life test equipment of mechanical water valve
JPH04116445A (en) Measuring apparatus of young's modulus and internal friction
CN219694473U (en) Valve detection device
JPH1068539A (en) Water level regulator of ice water circulating circuit for ice thermal storage device
CN220750346U (en) Water separator-collector assembly
CN215339738U (en) Gas analyzer
CN106861788A (en) One-driven-several type VOC laboratories freeze control system
RU2164667C2 (en) Plant for stand study of flow characteristics of hydraulic resistances

Legal Events

Date Code Title Description
AS Assignment

Owner name: JOSEF MESSMANN GMBH, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:MESSMANN, MARTIN;REEL/FRAME:011679/0876

Effective date: 20010115

AS Assignment

Owner name: MESSMANN, ANNEMARIE, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JOSEF MESSMANN GMBH;REEL/FRAME:014788/0835

Effective date: 20030924

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20140924