US193865A - Improvement in methods of repairing structures with beton or concrete - Google Patents
Improvement in methods of repairing structures with beton or concrete Download PDFInfo
- Publication number
- US193865A US193865A US193865DA US193865A US 193865 A US193865 A US 193865A US 193865D A US193865D A US 193865DA US 193865 A US193865 A US 193865A
- Authority
- US
- United States
- Prior art keywords
- beton
- concrete
- improvement
- methods
- structures
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000004567 concrete Substances 0.000 title description 7
- 238000000034 method Methods 0.000 title description 7
- 239000000463 material Substances 0.000 description 4
- 239000004575 stone Substances 0.000 description 4
- 239000002184 metal Substances 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- ODINCKMPIJJUCX-UHFFFAOYSA-N Calcium oxide Chemical compound [Ca]=O ODINCKMPIJJUCX-UHFFFAOYSA-N 0.000 description 2
- 239000011449 brick Substances 0.000 description 2
- 238000011049 filling Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 1
- 235000011941 Tilia x europaea Nutrition 0.000 description 1
- 235000012255 calcium oxide Nutrition 0.000 description 1
- 239000000292 calcium oxide Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000009514 concussion Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000002542 deteriorative effect Effects 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 239000004571 lime Substances 0.000 description 1
- 239000013521 mastic Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000003647 oxidation Effects 0.000 description 1
- 238000007254 oxidation reaction Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
Definitions
- JOHN J. GOODRIDGE, JR, OF NEW YORK, N. Y.
- This invention relates to the repairing
- the material to which the beton is to be applied should first be carefully cleaned, the joints thoroughly raked out, and all loose fragments removed. It should then be washed with a mixture of lime and water and a small quantity of cement. This assists the beton in forming a bond. Care should be -taken that no unslaked lime gets into the work. Molds of wood or metal, or a wall of masonry, is then placed, and firmly fastened and braced, at a distance from the old structure or material, decided upon as the proper thickness of the beton. The mold is then filled with beton, layer by layer, and thoroughly rammed and forced into all joints, crevices, irregularities, and inequalities of surface. This process is continued until the beton is carried as high as necessary. After the beton has set, which will be in from two to ten days, the molds may be removed.
- Figure 1 shows a retaining-wall, A, thrust out of alignment by the bank B.
- the beton mass 0 is joined to the wall A in the manner described, and A and 0 form a wall which is stable, and capable of supporting the thrust ofthe bank.
- Fig.2 shows an arch,A, strengthened by the beton lining B.
- a mold is placedin the arch, and at a proper distance from it. The space between the arch and mold is then carefully filled with beton. This attaches itself to the arch and fills all joints and irregularities, so that water cannot get between it and the old structure.
- a new structure may be made by first placing a lining of beton and then placing the stone or other material upon that.
- FIG. 3 shows the method of replacing a foundation, A being the tower-wall or pier, (.l the foundation which is to be replaced, and D afirm soil or rock below, to which it is desirable to transfer the Weight.
- A being the tower-wall or pier, (.l the foundation which is to be replaced, and D afirm soil or rock below, to which it is desirable to transfer the Weight.
- the buttress B should first be made of beton. Section 1 of 0 is then removed and replaced with beton; next, section 3, and so alternately. Then return to 2 and 4; or they may be taken in regular order if time is allowed between each replacement for the beton to harden. In this manner any structure or its foundation may be replaced, section by section.
- the beton completely filling the space occupied by the material removed, prevents any settling, and allows the structure to be used for the purposes for which it was constructed during the time occupied by its repair. If the surface of a structure is deteriorating, or not strong enough, from any cause, or if water, getting inside, separates its component parts, ashappens particularly in river piers and abutments, it may be entirely incased in beton and its whole surface covered.
- GEO G. SooFIELD, HOWARD EARLE.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Description
c. GOODR-IDGE, Ir. METHOD OF REPAIRING STRUCTURES WITH vBE'ION 0R CONCRETE.
No 193,865, Patented'Aug. 7,1877.
In wanton- UNITED STATES PATENT OFFIoE.
JOHN (J. GOODRIDGE, JR, OF NEW YORK, N. Y.
IMPROVEMENT IN METHODS OF REPAIRING STRUCTURES WITH BETON 0R CONCRETE.
Specification forming part of Letters Patent No. 193.865, dated August 7, 1877; application filed March 21, 1877.
To all whom it may concern:
Be it known that I, JOHN (J. GOODRIDGE, Jr., of the city of New York, and State of New York, have invented a new and useful Method of Repairing Structures with Beton or Con crete; and I hereby declare that the following is a full and exact description thereof, reference being made to the plate which accompanies and. forms part of this specification.
This invention relates to the repairing,
' strengthening, replacing, protection, and preservation of structures formed wholly or in part of stone, brick, metal, or of rock, in its natural position by the employment of beton or concrete. Repairs may become necessary from imperfect construction, disintegration, oxidation, friction, pressure, or concussion.
The material to which the beton is to be applied should first be carefully cleaned, the joints thoroughly raked out, and all loose fragments removed. It should then be washed with a mixture of lime and water and a small quantity of cement. This assists the beton in forming a bond. Care should be -taken that no unslaked lime gets into the work. Molds of wood or metal, or a wall of masonry, is then placed, and firmly fastened and braced, at a distance from the old structure or material, decided upon as the proper thickness of the beton. The mold is then filled with beton, layer by layer, and thoroughly rammed and forced into all joints, crevices, irregularities, and inequalities of surface. This process is continued until the beton is carried as high as necessary. After the beton has set, which will be in from two to ten days, the molds may be removed.
Figure 1 shows a retaining-wall, A, thrust out of alignment by the bank B. The beton mass 0 is joined to the wall A in the manner described, and A and 0 form a wall which is stable, and capable of supporting the thrust ofthe bank. Fig.2 shows an arch,A, strengthened by the beton lining B. A mold is placedin the arch, and at a proper distance from it. The space between the arch and mold is then carefully filled with beton. This attaches itself to the arch and fills all joints and irregularities, so that water cannot get between it and the old structure. A new structure may be made by first placing a lining of beton and then placing the stone or other material upon that. When the top of an arch to be repaired is accessible it may be uncovered, all old fill ing removed, and the beton placed upon the old structure, using it as a mold. Fig. 3 shows the method of replacing a foundation, A being the tower-wall or pier, (.l the foundation which is to be replaced, and D afirm soil or rock below, to which it is desirable to transfer the Weight. Should the old foundation 0 be very uncertain, the buttress B should first be made of beton. Section 1 of 0 is then removed and replaced with beton; next, section 3, and so alternately. Then return to 2 and 4; or they may be taken in regular order if time is allowed between each replacement for the beton to harden. In this manner any structure or its foundation may be replaced, section by section. The beton, completely filling the space occupied by the material removed, prevents any settling, and allows the structure to be used for the purposes for which it was constructed during the time occupied by its repair. If the surface of a structure is deteriorating, or not strong enough, from any cause, or if water, getting inside, separates its component parts, ashappens particularly in river piers and abutments, it may be entirely incased in beton and its whole surface covered.
1 do not claim as new the building of new structures entirely of beton or concrete, or the backing ,of new structures having a stone face, or of plastering of masonry by means of trowels and floats, as is done in mastic work.
What I claim, and desire to secure by Lettess Patent, is-
The withindescribed method of repairing and replacing structures formed wholly or in part of stone, brick, or metal, or rock in its natural position, by the employment of beton or concrete, substantially in the manner set forth.
JOHN C. GOODRIDGE, JR. Witnesses:
GEO. G. SooFIELD, HOWARD EARLE.
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US193865A true US193865A (en) | 1877-08-07 |
Family
ID=2263271
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US193865D Expired - Lifetime US193865A (en) | Improvement in methods of repairing structures with beton or concrete |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US193865A (en) |
-
0
- US US193865D patent/US193865A/en not_active Expired - Lifetime
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Richardson | Supervision of Concrete Construction 2 | |
| KR102620833B1 (en) | Composite concrete structures that can capture carbon dioxide | |
| US571225A (en) | Concrete bridge | |
| DE19643175A1 (en) | Reconstruction method for stacks of e.g. water pipes | |
| US1063672A (en) | Process of constructing sewers, aqueducts, &c. | |
| US400996A (en) | Half to gustave j | |
| US984491A (en) | Method of constructing concrete buildings. | |
| Das et al. | Study on causes of cracks and its preventive measures in concrete structures of CCEM building, Raipur | |
| US2227228A (en) | Method of building walls and floors | |
| US705156A (en) | Artificial-stone facing. | |
| US317337A (en) | goodridge | |
| US2208082A (en) | Expansion joint filling | |
| US305243A (en) | Brick walk or pavement | |
| US568673A (en) | Concrete bridge | |
| US317338A (en) | goodridg-e | |
| Brachaczek et al. | Renovating the surface overflows of a water dam | |
| US67366A (en) | haerold smith | |
| US1087813A (en) | Wall construction for houses and other buildings. | |
| US1066020A (en) | Bonded concrete construction. | |
| NGONG et al. | APPENDIX C–GENERAL SPECIFICATIONS | |
| Senka | Repair and Strengthening of Reinforced Concrete Structures | |
| US319575A (en) | John gkant | |
| US204347A (en) | Improvement in bridge-tiles for fire-proof buildings | |
| US271234A (en) | gqodridge | |
| GB270041A (en) | Improvements in and relating to concrete linings for shafts, wells and other shaft-like structures |