US1887630A - Method and device for the production of piles of concrete and the like - Google Patents

Method and device for the production of piles of concrete and the like Download PDF

Info

Publication number
US1887630A
US1887630A US567170A US56717031A US1887630A US 1887630 A US1887630 A US 1887630A US 567170 A US567170 A US 567170A US 56717031 A US56717031 A US 56717031A US 1887630 A US1887630 A US 1887630A
Authority
US
United States
Prior art keywords
concrete
column
rammer
tube
lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US567170A
Inventor
Frankignoul Edgard
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Compagnie Internationale des Pieux Armes Frankignoui SA
Original Assignee
Frankignoul Pieux Armes
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US233445A external-priority patent/US1830651A/en
Application filed by Frankignoul Pieux Armes filed Critical Frankignoul Pieux Armes
Priority to US567170A priority Critical patent/US1887630A/en
Application granted granted Critical
Publication of US1887630A publication Critical patent/US1887630A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts

Definitions

  • the present invention relates to'a method and device for enabling rapid and economical production of piles of concrete or of s1milar materials which are completely com-,
  • the 111 lining or tubing is provided, when driving iii the system into the ground,-with the necessary equipment for concreting, that is to say, the rammer.
  • the rammer After concreting the rammer and the lining are alternately raised by fractions of the height of the pile whichis being constructed.
  • the lining is raised whilst the rammer, which, was previously raised, carries out its ramming face.
  • the rammer after sinking the lining, may serve for forcing into the ground the closing device for the lining or the point of sinking, and for sinking the lining by pressing the utter portion of the rammer, which formsan anvil, upon the upper portion of the lining upon which it rests.
  • the rammer is actuated by a steam or compressed air hammer or by a simple fall.
  • this reserve is formed by using only the space which is left free in the interior of the body of the rammer, whilst according to the principal application said reserve is formed by utilizing the space left free between the lining and the body of the rammer concurrently with a space left free in the interior of the body of the rammer.
  • the concrete is introduced into the reserve by a mouthpiece provided at the upper end of the tube or lining.
  • the invention provides that the raising of the rammer is elfected in such a manner that it is possible to allow the monkeyt'o strike upon its upper end or anvil when it is raised in such a manner as tocause the mass of concrete contained in the reserve to be shaken,
  • igure 6 shows a construction of the device in accordance with the invention.
  • Figure 7 v s a section on the lineiVII'VII of Figuretij" tion of the device shown in Figure 6.
  • Figure 1 shows the positionof the parts at the moment when the sinking into the ground is to commence.
  • the tube 1 bears on the point 2. On this rests the rammer 4 of which. the upper part is connected to an anvil3 adapted to receive the blows from a monkey, arranged above this 7 and illustrated diagrammatically at This anvil rests on the upper end of thetube 1.
  • the monkey is, for example, a steam or compressed air actuated monkeyor is sim ply a monkey having a free fall.
  • Figure 3 illustrates this phaseof the operation. The-partsbeing this position,th e
  • FIG. 8 shows a modification of construc temporarily as also the movement
  • the tube 1 is little by little extracted from the ground by means of a winch.
  • the top of the tube gradually approaches the anvil 3 which. is subjected to a downward movement under the action of the monkey.
  • the hollow, column t formed as a tube serves as a reservoir of concrete. 7
  • the lower portion of the hollow column forming a reservoir is provided with an opening, which is formed under a cap fitted on this column and provided with a hole of which the section has a reduced portion 28. Said opening is arranged in such a manner that during ramming of the concrete this will not fiow'back into the interior of the ram, the concrete in the orifice forming a sufliciently compact closure.
  • This hopper 22 is provided with a portion 23 engaging with the interior of the column at and closing a slot '24 provided along one of the sides of the column so as to permit of relative movements with the tube 1 in spite of the provision of the hopper 22.
  • This hopper also serves to support a member 25 of which the lowerportion '29 is shaped as an elephants paw and serves to discharge the concrete when the column 4 is raised relatively to the lining'l.
  • the reservoir formed in the interior of the column-ram 4.- is supplied from a concrete reservoir formed above the'anvil 3 by an extension 26 of the tube 1. This extension forms the mouthpiece into which the concrete is poured.
  • the anvil 3 is provided with an opening 27 9 P forthe passage of the concrete.
  • Device for the'driving andi construc tion of piles of concrete and like materials moulded in the soil comprising a driving point, a hollow column whoselower end serves as a rammer and which is constricted interiorly near its bottom said column'resting during the driving work with its lower end upon the driving point and furnished at its upper “its end "with an anvil which receives the impact of a hammer, a tube which during the driving work engages with its lower end upon the driving point and is subjected at its top end to the action of the'anvil, a space forming a storage space for concreteprovided interiorly of the column forming the rammer, means serving for the introduction of concrete into the column and means for causing the falling of part of the concrete contained in the columnunderneath the rammer while the latter is being raised.
  • Device for the driving and construction of piles of concrete and like materials moulded in the soil comprising a driving point, a hollow column the lower part of which serves as a rammer and which is constricted interiorly, near its bottom, the said column bearing during the driving work with its lower end upon the driving point and furnished at its top end with an anvil which receives the shock of a hammer, a shaft lining which during the driving work engages with its a lower end on .the driving point and is subjected at its top end to the action of the hammer, a storage space provided in the interior of the column forming the rammer, means for the introduction of concrete into the column and a pusher adapted to said means and serving to force the concrete towards the bottom underneath the rammer when the column is raised with relation to the shaft lining.
  • Device for the driving and construction of piles of concrete and like materials moulded in the soil comprising a driving point, a hollow column the lower part of which serves as a rammer and which is constricted interiorly near its bottom, the said column bearing during the driving work with its lower end upon the driving point and furnishing at its top end with an anvil which receives the shock of a hammer, a shaft lining which during the driving work engages with its lower end on the driving point and is subjected at its top end to the action of the hammer, a first concrete storage space provided around the hammer in a tube extending above the anvil, a

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

E. FRANKIGNOUL- 1,887,630 umnon AND DEVICE FOR THE PRODUCTION oF FILES of CONCRETE AND THELIKE Nov. 15, 1932.
Original @Fued Nov 15, 1927' 2.Sheets-Sheet 1 mvzumn EDGARD FRANKIGNOUL mmwa,
I ATTORNEYS Nov. 15, 1932.
FRANKIGNOUL 1,887,630
METHOD AND DEVICE FOR THE PRODUCTION OF FILES OF CONCRETE AND THE LIKE Original Filed Nov 15. 192'! ZSheets-Sheet 2.
i l nnnn l ATTORNEYS Patented Nov. 15, 1932 r PATENT. omen EDGARD FRANKIGNQUL, 0 BRUSSELS, BELGIUM, ASSlGNOR, TQ COMZP'AGNIE riv'rEn- I ,NATIONALE n s rrEux AEMEs EEANKIGNOU SOCIETE AnoNY E, 0E LIEGE, I
BELGIUM v imrnon AND DEVICE on THE rnonucrroiv 0E rILEs 07F 'coNcItETE AnnsrriE LIKE original application filed November l5, 1927, Serial No. 233,445, and in Belgium November 30, 1926. llivided and this application filed 'Gctober 6, 1931, Serial No. 567,170.
The present invention relates to'a method and device for enabling rapid and economical production of piles of concrete or of s1milar materials which are completely com-,
@pressed or rammed along the whole length of the pile, and is a divisional application of my principal application No. 233,445 filed in U. S. A. on November 15,1927.
According to said principal application the 111 lining or tubing is provided, when driving iii the system into the ground,-with the necessary equipment for concreting, that is to say, the rammer. After concreting the rammer and the lining are alternately raised by fractions of the height of the pile whichis being constructed. The lining is raised whilst the rammer, which, was previously raised, carries out its ramming face.
The rammer, after sinking the lining, may serve for forcing into the ground the closing device for the lining or the point of sinking, and for sinking the lining by pressing the utter portion of the rammer, which formsan anvil, upon the upper portion of the lining upon which it rests. The rammer is actuated by a steam or compressed air hammer or by a simple fall.
After concreting, the space left free in the lining under the rammer after each raising of thelatter is filled automatically with concrete obtained from a reserve formed in the lining itself. 1 V p Accordingto the present invention this reserve is formed by using only the space which is left free in the interior of the body of the rammer, whilst according to the principal application said reserve is formed by utilizing the space left free between the lining and the body of the rammer concurrently with a space left free in the interior of the body of the rammer.
The concrete is introduced into the reserve by a mouthpiece provided at the upper end of the tube or lining. v
The invention provides that the raising of the rammer is elfected in such a manner that it is possible to allow the monkeyt'o strike upon its upper end or anvil when it is raised in such a manner as tocause the mass of concrete contained in the reserve to be shaken,
this massin some cases being too compact in T i i order to allow it to'fiow. l h For effecting the disaggregation of theconcrete enclosed and to accelerateits descent during the raising of the rammerw there is proneed a member which'is connectedin the lining and pressing'out the concrete when the rammer'is raised. i Theiaccompanying drawings illustrate by way of example, and not by way of limitation, various forms of construction ofthe in vention. There are shown Var'ous modifications'of carry' g out the invention. Inthese drawings: Q t Figures 1 to {5 illustrate diagrammatically various phases in the production of a pile.
igure 6 shows a construction of the device in accordance with the invention.
Figure 7 v s a section on the lineiVII'VII ofFiguretij" tion of the device shown in Figure 6.
,Figure 1 shows the positionof the parts at the moment when the sinking into the ground is to commence.
The tube 1 bears on the point 2. On this rests the rammer 4 of which. the upper part is connected to an anvil3 adapted to receive the blows from a monkey, arranged above this 7 and illustrated diagrammatically at This anvil rests on the upper end of thetube 1. 1 The monkey is, for example, a steam or compressed air actuated monkeyor is sim ply a monkey having a free fall.
The point 2,the tube 1 and the column or rammer 4 are sunk simultaneouslyin such a manner as to occupy the position illustrated in Figure 2.. Concrete is then'introduced by the mouth 6 of the tube 1 into the space forming the reserve and formed by the an nular space 19 contained between the tube 1 and the column forming the rannner 4. For the purpose of ramming, the rammer-is raised to a-height which may varyfor example from.50 cms. to'2 meters. The concrete is then supplied so as to occupy the complete section of the tube 1 .andfor the .whole height under the rammer. 1
Figure 3 illustrates this phaseof the operation. The-partsbeing this position,th e
. p 7 Figure 8 showsa modification of construc temporarily as also the movement At the same time as the operation of ramming proceeds, the tube 1 is little by little extracted from the ground by means of a winch. The top of the tube gradually approaches the anvil 3 which. is subjected to a downward movement under the action of the monkey.
Figure slshows this phase'of the operation.
Soon the column 4: and the tube 1 assume a position relatively near that which they occupy in the case of Figure 2 after sinking; the operation of the monkey is then stopped of the tube 1. The column forming the rammer e as also the anvil?) and the monkey 5 which are connected together are then again raised in such a manner as to enableafresh quantity of concrete to pass downwardly underneath the column-rammer e.
'It is possible when the column-rammer 4 has been raised to give a few strokes of'the monkey so as to shake the system which is for the purpose of disaggregating the concrete in the annular space which is left free between the tube 1 and the column e and thus to produce its flow to the bottom'of the tube 1 under the rammer 4.
The operation then continues as above described whilst simultaneously producing a downward movement of the column 4 under .the. action of the monkey and an upward movement of the tube 1 which thus meets the anvil of the column 14.
- In the method ofconstruction' illustrated inthe drawing the point 2 which may be of concrete is left in the ground.
As shown in Figures 6 and 7, the hollow, column t formed as a tube, serves as a reservoir of concrete. 7
The lower portion of the hollow column forming a reservoir is provided with an opening, which is formed under a cap fitted on this column and provided with a hole of which the section has a reduced portion 28. Said opening is arranged in such a manner that during ramming of the concrete this will not fiow'back into the interior of the ram, the concrete in the orifice forming a sufliciently compact closure.
This may be broken'when lifting the ram by a flow of the monkey on the latter in such a manner asto produce the disaggregation of the mass of concrete contained in the ram, thus exposing the lower opening in'the ram so as to allow a fresh charge of concrete to pass out. 7
"At the upper end of the tube or lining 1 there is fitted a hopper 22 serving to conduct the concrete into the interior of the columnram 1.
This hopper 22 is provided with a portion 23 engaging with the interior of the column at and closing a slot '24 provided along one of the sides of the column so as to permit of relative movements with the tube 1 in spite of the provision of the hopper 22.
This hopper also serves to support a member 25 of which the lowerportion '29 is shaped as an elephants paw and serves to discharge the concrete when the column 4 is raised relatively to the lining'l.
In the case of Figure 8, the reservoir formed in the interior of the column-ram 4.- is supplied from a concrete reservoir formed above the'anvil 3 by an extension 26 of the tube 1. This extension forms the mouthpiece into which the concrete is poured.
The anvil 3 is provided with an opening 27 9 P forthe passage of the concrete. v
' It will be understood that the relative length oft-he tube 1 and of the column 4 may be modified according to the circumstances in such a manner that when the anvil '8 secured to the column t bears upon the tube 1, the lower portion of the said column 4: may be either above the lower portion'of the tube 1, or below 01:11.1. the same level.
I declare that what I claim is:
1. Device for the'driving andi construc tion of piles of concrete and like materials moulded in the soil comprising a driving point, a hollow column whoselower end serves as a rammer and which is constricted interiorly near its bottom said column'resting during the driving work with its lower end upon the driving point and furnished at its upper "its end "with an anvil which receives the impact of a hammer, a tube which during the driving work engages with its lower end upon the driving point and is subjected at its top end to the action of the'anvil, a space forming a storage space for concreteprovided interiorly of the column forming the rammer, means serving for the introduction of concrete into the column and means for causing the falling of part of the concrete contained in the columnunderneath the rammer while the latter is being raised.
2. Device for the driving and construction of piles of concrete and like materials moulded in the soil comprising a driving point, a hollow column the lower part of which serves as a rammer and which is constricted interiorly near its bottom, the said column bearing during the driving work with its lower end upon the driving point and furnished at its top end with an anvil which receives the shock of a hammer, a shaft lining which durper for the introduction of concrete into said column, a mouth-piece of the said hopper passing through a longitudinal slot formed in the wall of the column constituting the rainmer so as to allow relative movements of said column and shaft lining and means for causing the concrete contained in the column to drop underneath the rammer during the rising of the latter.
3. Device for the driving and construction of piles of concrete and like materials moulded in the soil comprising a driving point, a hollow column the lower part of which serves as a rammer and which is constricted interiorly, near its bottom, the said column bearing during the driving work with its lower end upon the driving point and furnished at its top end with an anvil which receives the shock of a hammer, a shaft lining which during the driving work engages with its a lower end on .the driving point and is subjected at its top end to the action of the hammer, a storage space provided in the interior of the column forming the rammer, means for the introduction of concrete into the column and a pusher adapted to said means and serving to force the concrete towards the bottom underneath the rammer when the column is raised with relation to the shaft lining.
4. Device for the driving and construction of piles of concrete and like materials moulded in the soil comprising a driving point, a hollow column the lower part of which serves as a rammer and which is constricted interiorly near its bottom, the said column bearing during the driving work with its lower end upon the driving point and furnishing at its top end with an anvil which receives the shock of a hammer, a shaft lining which during the driving work engages with its lower end on the driving point and is subjected at its top end to the action of the hammer, a first concrete storage space provided around the hammer in a tube extending above the anvil, a
second concrete storage space provided in the column below the anvil and a central opening provided in the anvil for the passage of the concrete from said first storage space to said second one during the rising and falling of the hammer.
In testimon whereof I aflix my signature.
E GARD FRANKIGNOUL.
US567170A 1927-11-15 1931-10-06 Method and device for the production of piles of concrete and the like Expired - Lifetime US1887630A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US567170A US1887630A (en) 1927-11-15 1931-10-06 Method and device for the production of piles of concrete and the like

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US233445A US1830651A (en) 1926-11-30 1927-11-15 Device for the production of piles of concrete and the like
US567170A US1887630A (en) 1927-11-15 1931-10-06 Method and device for the production of piles of concrete and the like

Publications (1)

Publication Number Publication Date
US1887630A true US1887630A (en) 1932-11-15

Family

ID=26926931

Family Applications (1)

Application Number Title Priority Date Filing Date
US567170A Expired - Lifetime US1887630A (en) 1927-11-15 1931-10-06 Method and device for the production of piles of concrete and the like

Country Status (1)

Country Link
US (1) US1887630A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4190383A (en) * 1977-01-13 1980-02-26 Pynford Limited Structural element
EP0170503A2 (en) * 1984-07-25 1986-02-05 CEMENTATION PILING & FOUNDATIONS LIMTED Ground treatment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4190383A (en) * 1977-01-13 1980-02-26 Pynford Limited Structural element
EP0170503A2 (en) * 1984-07-25 1986-02-05 CEMENTATION PILING & FOUNDATIONS LIMTED Ground treatment
EP0170503A3 (en) * 1984-07-25 1986-12-30 Cementation Piling & Foundations Limted Ground treatment
US4730954A (en) * 1984-07-25 1988-03-15 Cementation Piling & Foundations Limited Ground treatment

Similar Documents

Publication Publication Date Title
US4730954A (en) Ground treatment
JPS587765B2 (en) Method and apparatus for forming columns of underground fillings
RU2466239C1 (en) Method to manufacture cast-in-place piles
US3823562A (en) Process of production of piles, pile packs, and subterranean pile walls
US1887630A (en) Method and device for the production of piles of concrete and the like
CN106320318A (en) Novel kidney discharging vibration impact device and pile manufacturing method thereof
US1830651A (en) Device for the production of piles of concrete and the like
US3184924A (en) Method of forming concrete pile in situ
US2779161A (en) Method and device for constructing foundation piles in the ground
GB862630A (en) Method of and apparatus for the construction of piles cast in situ from concrete
US887175A (en) Method of forming foundations.
US1978332A (en) Apparatus for forming columns in situ
US1900622A (en) Apparatus for forming concrete piles
US1941812A (en) Machine for the production of a plurality of substantially similar units
US2659208A (en) Drainage pile
US3073124A (en) Method for piles cast-in-situ
US2027511A (en) Method of casting bell-bottom place-piling in soft sandy material
US1792333A (en) Method for concrete piling
US2239610A (en) Jetting apparatus
GB515120A (en) Improved method of and means for forming concrete piles
US2203978A (en) Means and method of shoring bell bottom pile holes
SU1079757A1 (en) Apparatus for constructing cast-in-place shell pile
US1120974A (en) Pile.
US1532711A (en) Method and apparatus for the formation of piling
GB289495A (en) Improvements relating to the construction of concrete piles