US1376889A - Lake or pond - Google Patents

Lake or pond Download PDF

Info

Publication number
US1376889A
US1376889A US340145A US34014519A US1376889A US 1376889 A US1376889 A US 1376889A US 340145 A US340145 A US 340145A US 34014519 A US34014519 A US 34014519A US 1376889 A US1376889 A US 1376889A
Authority
US
United States
Prior art keywords
water
dam
lake
course
conduit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US340145A
Inventor
James B Kirby
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US340145A priority Critical patent/US1376889A/en
Application granted granted Critical
Publication of US1376889A publication Critical patent/US1376889A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/08Details, e.g. gates, screens
    • E02B5/082Closures

Definitions

  • This invention relates to lakes or ponds and especially to those of the artificial type as frequently constructed for bathing or landscape purposes, for fish-preserves, duckponds, ice-formation, and the like.
  • the customary mode of creating such a pond artificially is to build a dam across a narrow valley and permit the run-off water to collect in the basin so formed up to a height determined by a suitable spill-way, all of the water falling into or running down the valley passing through this lake and over the spill-way.
  • Ihe objects of the present invention are the provision of a new and improved construction for artificial lakes whereby the first cost can be greatly decreased, the life ofthe lake greatly prolonged, the fouling of the water nearly or quite prevented, and the deposition of sediment completely avoided; the provision of new and improved means for keeping offensive material from finding its way into such a lake; the provision of means for permitting food fish to enter the lake while preventing the cultivated fish therein from escaping; while fur ther objects and advantages of the invention will become apparent as the description proceeds.
  • FIG. 2 is a top plan view of the dam shown in Fig. 1; Figs. 3 and 4 are vertical sectional views correspondin to the lines 3- 3 and L-4 of Fig. 2; andIigs. 5 and 6 are perspective views of other artificial lakes showing modified embodiments of my invention.
  • the essence of my invention consists in permittingthe entrance into the lake of only the fair-weather amount of water from the tributary streams, and side-tracking the storm water through an independent channel, thus avoiding the entrance of the polluted water into the lake and also avoiding the necessity of constructing the spill-way of asize and character to withstand thefiow of such a large volume of water.
  • the dam can frequently consist merely of a dirt-fill without any stone or concrete construction whatever;
  • a thin con crete plate will serve the temporary purpose without necessitating the solidity of construction required for a continuous overpour of water.
  • the saving in the cost of such a fill over that of a concrete dam is ordinarilyv several'times the cost of the conduit or by-pass channel.
  • conduit 5 Communicating withthe space between the dams 3 and 4 is a conduit 5 which leads to a place of suitable discharge, and is made of a size to accommodate the entire inflow of the stream 2' under flood conditions.
  • this conduit is merely laidon the ground along thebottom of the valley before the lake is created, its upper end" connected .to the dam 3 so as to carry away the usual water flow, and the lower end subsequently bridged by an ordinary earthfill as shownin Fig. 6.
  • apertures 8 In the dam 3, outside of the limits of the auxiliary dam 4, are formed one or more apertures 8 of a size to take the normal fairweather flow of the tributary stream. These apertures are generally located at a point above the level of the lake 1 and below the top of the auxiliary dam 4. This normal flow being of clear water, the water in the main lake will be kept replenished and purified at all times. Upon any rise of the tributary: stream, however, the apertures 8-8 will be unable to carry the overload, wherefore the water will rise behind the main dam until it overflows the auxiliary dam and escapes by way of the conduit 5, carrying with it the main part of the sediment and mud which accompanies storm water.
  • the lower dam is preferably higher than the upper dam so that under flood conditions the latter can be submerged and all water escape through the conduit 5.
  • the main dam is indicated at 3, while 19 represents a buttress which forms one side of the canal and runs into the embankment 13.
  • the auxiliary dam is shown at i being here of the same-height as the main dam but havin an opening 20 therein at a point below the top of the main dam, while the latter has an aperture 8 therein at a still lower level for the passage of the normal water supply from the tributary stream 2?.
  • the overflow pipe is shown at 12 and delivers into the canal 5 at a lower point.
  • the auxiliary dam 4* consists merely of the upturned end of the conduit 5, located at any suitable point behind the main dam 3 and suficie'ntly below the top thereof so as not to permit the latter to be overflowed.
  • the main dam is here shown as formed with the fair water opening 8' at a point below the main lake level so as to avoid any danger of its stoppage by ice.
  • a pair of dams'spaced along a water-course and a by-pass conduit extending from the upper dam to a point below the lower dam, said conduit opening into the water-course at its upper end at a level between that of the lake and the top of the uppermost dam, and said uppermost dam having an opening therethrough below the inlet mouth of said conduit suiiicient to eceive the normal fair weather flow of water in said water-course, and means for preventing fish from passing through said ll ll an opening therethrough sufficient to 7 accommodate the fair WQiltllBlfiflOWYOfWatGI in said water-course, said conduitjopening into the water-course above said upper dam at a level'above that ofgsaid overflow and also above that of the opening in the upper,
  • bypass conduit opening into the water-course ata point above the upper dam at a level between th-atof the lake and the top of such upper dam and said upper dam having an opening therethrough below the inlet mouth of said by-pass channel sufficient to receive the normal fair weather flow of water in said water-course and means for preventing fish from passing through said opening up stream, while permitting them to pass through down stream.
  • a pair of dams spaced along a water-course and a by-pass conduit extending from a point above the upper dam i to a point below the lower dam, there being an overflow past the lower dam at a level be low the top of either dam, and the upper dam having an opening 'therethrough sufficient to accommodate the fair weather flow of waterin sald water-course, Sa1d conduit openmg into the water course above said upper dam at a level above that of said'overfiow and also above that of the opening in the upper dam, and means for automatically stopping the flow through said opening during the time that water is flowing through said conduit.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Description

J. B. KIRBY.
LAKE OR' POND APPLICATION FILED NOV. 24, 1919.
Patented May 3, 1921.
2 SHEETS-SHEET lf/ 4/ M W55? a Z J n J. B. KIRBY, LAKE 0R PONDJ APPLICATION FILED NOV124 19 19. v 1,376,889, I Patented May 3, 1921.
.2 SHEETS-SHEET 2.
vireo stares JAMES B. KIRBY, OF.CLEVELA1\TD, OHIO.
LAKE OR POND.
Specification of Letters Patent.
Patented May 3,1921.-
Application filed November 24, 1919. Serial No. 340,145.
T all whom it may concern Be it known that I, JAMES B. KIRBY, a
' citizen of the United States, residing at Cleveland, in the county of Cuyahoga' and State of Ohio, have invented a certain new and useful Improvement in Lakes or Ponds, of which the following is a full, clear, and exact description, reference being had to the accompanying drawings.
This invention relates to lakes or ponds and especially to those of the artificial type as frequently constructed for bathing or landscape purposes, for fish-preserves, duckponds, ice-formation, and the like. The customary mode of creating such a pond artificially is to build a dam across a narrow valley and permit the run-off water to collect in the basin so formed up to a height determined by a suitable spill-way, all of the water falling into or running down the valley passing through this lake and over the spill-way. Owing to the mud and detritus which washes into such lakes at flood seasons or after heavy rains, the same become rapidly polluted withva soft muck which is extremely unpleasant for bathing, inimical to the better kinds of fish, and often fills up the lake in a short time.
Ihe objects of the present invention are the provision of a new and improved construction for artificial lakes whereby the first cost can be greatly decreased, the life ofthe lake greatly prolonged, the fouling of the water nearly or quite prevented, and the deposition of sediment completely avoided; the provision of new and improved means for keeping offensive material from finding its way into such a lake; the provision of means for permitting food fish to enter the lake while preventing the cultivated fish therein from escaping; while fur ther objects and advantages of the invention will become apparent as the description proceeds.
In the drawings accompanying and forming a part of this application, have illustrated certain embodiments of my said invention although it will be understood that these are intended to be illustrative only of my general idea since the particular physical structure in which it is embodied mayvary greatly and will, in fact, be seldom alike in two instances. In these drawings Figure 1 is a view of the head of an artificial lake embodying my improvement,
showing one of the feeding streams and the means forcontrolling the same; 'Fig. 2 is a top plan view of the dam shown in Fig. 1; Figs. 3 and 4 are vertical sectional views correspondin to the lines 3- 3 and L-4 of Fig. 2; andIigs. 5 and 6 are perspective views of other artificial lakes showing modified embodiments of my invention.
The essence of my invention consists in permittingthe entrance into the lake of only the fair-weather amount of water from the tributary streams, and side-tracking the storm water through an independent channel, thus avoiding the entrance of the polluted water into the lake and also avoiding the necessity of constructing the spill-way of asize and character to withstand thefiow of such a large volume of water. Indeed by employing my invention, the dam can frequently consist merely of a dirt-fill without any stone or concrete construction whatever;
or if, for reasons of safety, it is desired to provide for emergency overflow, a thin con crete plate will serve the temporary purpose without necessitating the solidity of construction required for a continuous overpour of water. The saving in the cost of such a fill over that of a concrete dam is ordinarilyv several'times the cost of the conduit or by-pass channel.
. I Describing first by reference characters the features illustrated in the first four.
Communicating withthe space between the dams 3 and 4 is a conduit 5 which leads to a place of suitable discharge, and is made of a size to accommodate the entire inflow of the stream 2' under flood conditions. Ordinarily this conduit is merely laidon the ground along thebottom of the valley before the lake is created, its upper end" connected .to the dam 3 so as to carry away the usual water flow, and the lower end subsequently bridged by an ordinary earthfill as shownin Fig. 6.
In the dam 3, outside of the limits of the auxiliary dam 4, are formed one or more apertures 8 of a size to take the normal fairweather flow of the tributary stream. These apertures are generally located at a point above the level of the lake 1 and below the top of the auxiliary dam 4. This normal flow being of clear water, the water in the main lake will be kept replenished and purified at all times. Upon any rise of the tributary: stream, however, the apertures 8-8 will be unable to carry the overload, wherefore the water will rise behind the main dam until it overflows the auxiliary dam and escapes by way of the conduit 5, carrying with it the main part of the sediment and mud which accompanies storm water.
Owing to the fact that such storms are frequently of short duration and the water quickly becomes clear it is seldom necessary to close the apertures 8 during this period owing to their small size as compared with the entire run-off; but in cases where the storm-water condition is long continued or wherein the condition of the soil is such that streams become muddy even upon a small rise, I provide suitable valves 9 for the same,
' operated by floats 10 in such wise as to obstruct the apertures upon any rise of the water above the top of the secondary dam 4.
The normal overflow of the lake 1 is taken care of very simply by means of an overflow pipe 12 passing through or near the fill 13, and ordinarily need be made very little larger than enough to dispose of the normal; however, in order to accommodate any overplus such as might occur by reason of a heavy shower draining directly into the lake rather than through its tributaries, I
have in Figs. 1, 2 and 4.- shown the face of the dam 3 as provided with'an auxiliary outflow opening .15 located slightly above the normal level of the lake and opening into the space defined between the two dams. It is entirely feasible, structurally, to accommodate the entire overflow of the lake in this way, provided only that some means he employed to distribute the inflowing water to a point sufficiently distant to produce a proper circulation of the water in the pond. The lower dam is preferably higher than the upper dam so that under flood conditions the latter can be submerged and all water escape through the conduit 5.
I have shown the aperture 15 as provided with bars 16 to prevent the escape of fish from the lake 1, and have shown the apertures 8 8 as-provided with teeth 17 for the same purpose, the latter being located below these apertures and projecting horizontally through the stream so as to prevent fish from leaping the current without preventing minnows from entering the lake.
a particularly convenient arrangement when the valley makes a sudden turn. in this case, the main dam is indicated at 3, while 19 represents a buttress which forms one side of the canal and runs into the embankment 13. The auxiliary dam is shown at i being here of the same-height as the main dam but havin an opening 20 therein at a point below the top of the main dam, while the latter has an aperture 8 therein at a still lower level for the passage of the normal water supply from the tributary stream 2?. The overflow pipe is shown at 12 and delivers into the canal 5 at a lower point.
In the embodiment shown in Fig. 6 the auxiliary dam 4* consists merely of the upturned end of the conduit 5, located at any suitable point behind the main dam 3 and suficie'ntly below the top thereof so as not to permit the latter to be overflowed. The main dam is here shown as formed with the fair water opening 8' at a point below the main lake level so as to avoid any danger of its stoppage by ice.
It will be understood that my invention is capable of embodiment in a great number of physical structures and I do not confine my self in any way except as specified in the claims hereto annexed.
Having thus described my invention, what I claim is 1. In combination, a pair of dams spaced along an open water-course, a conduit communicating with said water-course and extending thence to a point below the lower dam, means for permitting the flow past the upper darn of the amount of water ordinarily flowing in said water-course in fair-weather, and means for diverting into said conduit all water in excess of such fair weather amount.
.2. In combination, a pair of dams'spaced along a water-course and a by-pass conduit extending from the upper dam to a point below the lower dam, said conduit opening into the water-course at its upper end at a level between that of the lake and the top of the uppermost dam, and said uppermost dam having an opening therethrough below the inlet mouth of said conduit suiiicient to eceive the normal fair weather flow of water in said water-course, and means for preventing fish from passing through said ll ll an opening therethrough sufficient to 7 accommodate the fair WQiltllBlfiflOWYOfWatGI in said water-course, said conduitjopening into the water-course above said upper dam at a level'above that ofgsaid overflow and also above that of the opening in the upper,
4. In combination, a pair of dams spaced along a water-course, and a conduit inde pendent of said water-course extending from the upper dam to a point below the lower dam, there being an overflow past the lower dam at a level below the top of either dam, and the upper dam having an opening therethrough sufiicient to accommodate the fair weather flow of water in said water course at a level above that of said overflow, said conduit opening into the water-course above said upper dam at a level above that of said opening and below the top of the dam.
5. The combination with an artificial lake havin a tributar water-course of a dam across said water-course above said lake, there being a passageway for water from said tributary to said lake past said dam and located at a level below its top, said passageway being of a capacity to accommodate the normal water flow in said tributary and a conduit independent of said lake communieating with said tributary at a level between the top of the dam and the level of the first passageway and discharging at a point outside of said lake and having a capacity sufficiently great to accommodate the stormwater flow in said tributary.
6. The combination of an artificial lake having a tributary water-course, of a dam across said water-course above the lake, there being a passageway from said tributary to said lake located at a level below the top of said damand having a capacity substantially equal to the clear-weather flowv 7. In combination, a pair of dams spaced along a water-course and a bypass conduit extending from the upper dam-tea point below the lower dam, there belng an overflow past the lower dam at a level below the top of either dam and the upper dam having an opening therethrough at a level above that of said overflow sufficient to accommodate fair-weather flow of water in said'watercourse, and a plurality of spaced rods or wires located beneath the discharge mouth of said opening and traversing the stream which flows therethrough, said by-pass conduit opening into the water-course above said upper dam at a level above that of said opening and below the top of the dam.
8. The combination with an artificial lake havingyan' open tributary water-course; of
means for permitting the admission-intosaid lake of the normal fa r-weather amountof I water from said water-course, and means for- .automatlcally diverting all flow through sald water-course 1n excess of s'uch-amount-prior to itsreaching said lake and for discharging,
lower dam, said bypass conduit opening into the water-course ata point above the upper dam at a level between th-atof the lake and the top of such upper dam and said upper dam having an opening therethrough below the inlet mouth of said by-pass channel sufficient to receive the normal fair weather flow of water in said water-course and means for preventing fish from passing through said opening up stream, while permitting them to pass through down stream.
11. In combination, a pair of dams spaced along a water-course, and a by-pass conduit extending from a point above the upper dam i to a point below the lower dam, there being an overflow past the lower dam at a level be low the top of either dam, and the upper dam having an opening 'therethrough sufficient to accommodate the fair weather flow of waterin sald water-course, Sa1d conduit openmg into the water course above said upper dam at a level above that of said'overfiow and also above that of the opening in the upper dam, and means for automatically stopping the flow through said opening during the time that water is flowing through said conduit.
12. In combination, a pair of dams spaced along a water-course and a by-pass conduit communicating withsaid water course above the upper dam and leading to a point below the lower dam, there being an overflow past the lower dam ata level below the top of either dam and the upper dam having an opening therethrough at a level abovethat of said overflow sufficient to accommodate the fair weather flow-of water in said watercourse, means for preventing fish passing through said overflow in either direction, and means for preventing fish from passing upstream through said opening.
13. The method of maintaining pure the sists in permitting the entrance into the lake from said stream of only the fair Weather amount of water flowing therein, and diverting out of said tributary prior to reaching saidlake all Water in excess of that amount.
7 14. The method of producing a clear Water artificial lake Which consists in constructing spaced dams across a Water-course, permitting only the fair Weather amount of water to flow past the upper dam, and diverting all Water in excess of that amount past both 10 dams. o
In testimony whereof, I hereunto afiix my signature.
JAMES B. KIRBY.
US340145A 1919-11-24 1919-11-24 Lake or pond Expired - Lifetime US1376889A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US340145A US1376889A (en) 1919-11-24 1919-11-24 Lake or pond

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US340145A US1376889A (en) 1919-11-24 1919-11-24 Lake or pond

Publications (1)

Publication Number Publication Date
US1376889A true US1376889A (en) 1921-05-03

Family

ID=23332079

Family Applications (1)

Application Number Title Priority Date Filing Date
US340145A Expired - Lifetime US1376889A (en) 1919-11-24 1919-11-24 Lake or pond

Country Status (1)

Country Link
US (1) US1376889A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2672982A (en) * 1950-12-01 1954-03-23 Way Alben Warren Solids retention apparatus for streams
US6588370B1 (en) * 2001-10-03 2003-07-08 The United States Of America As Represented By The Secretary Of The Interior Labyrinth weir and pool fishway
US20040200766A1 (en) * 2003-04-09 2004-10-14 Patrick Paul H. Porous dike intake structure for fish diversion
US20170002532A1 (en) * 2013-12-04 2017-01-05 Jiangxi Province Fenghe Yingzao Group Co., Ltd. Method for river/lake level regulation and water conservancy system
US10415202B2 (en) * 2017-08-14 2019-09-17 Nanjing Hydraulic Research Institute Method for controlling the gate based on the habitat requirement for fish overwintering in rives

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2672982A (en) * 1950-12-01 1954-03-23 Way Alben Warren Solids retention apparatus for streams
US6588370B1 (en) * 2001-10-03 2003-07-08 The United States Of America As Represented By The Secretary Of The Interior Labyrinth weir and pool fishway
US20040200766A1 (en) * 2003-04-09 2004-10-14 Patrick Paul H. Porous dike intake structure for fish diversion
US6955759B2 (en) * 2003-04-09 2005-10-18 Kinectrics Inc. Porous dike intake structure for fish diversion
US20170002532A1 (en) * 2013-12-04 2017-01-05 Jiangxi Province Fenghe Yingzao Group Co., Ltd. Method for river/lake level regulation and water conservancy system
US9915048B2 (en) * 2013-12-04 2018-03-13 Fenghe Yingzao Group, Inc. Method for river/lake level regulation and water conservancy system
US10415202B2 (en) * 2017-08-14 2019-09-17 Nanjing Hydraulic Research Institute Method for controlling the gate based on the habitat requirement for fish overwintering in rives

Similar Documents

Publication Publication Date Title
JP5737675B2 (en) Sabo weir
KR100592975B1 (en) Fish way block
US1376889A (en) Lake or pond
US3492822A (en) Tidal flushing system
KR102259684B1 (en) Water collecting type fish way having water pressure reduction function
US3293862A (en) Overflow fishway
JPH07150598A (en) River surface flowing water intake construction method by combining fishway
JPH05179631A (en) Dam structure
US2082694A (en) Silt collector for reservoirs
JPS5816202B2 (en) Automatic selection wastewater desalination equipment
US2094892A (en) Fishway
RU65061U1 (en) WATER RESISTANCE PROTECTION SYSTEM
CN109113033A (en) Prevent silt from entering the built-in draining pump submerged floating sediment trapping bank of intake
DE340981C (en) Device for generating water power from mountain streams and other smaller watercourses
US2463808A (en) Flushing system for water storage basins
SU935554A1 (en) Method for controlling glacial mud streams
RU2769468C1 (en) Shipping channel of the hydropower unit
JPS6328979Y2 (en)
KR20050004456A (en) Floodgate System with Water Weight
KR20180108355A (en) fish way possessed of water conveyance line
JP3075109B2 (en) Water intake structure from storage structure to fishway
Mardjono et al. The Advantages of Dry Dam as Flood Control in the Urban Area
SU635168A1 (en) Water intake for steep canals
SU83153A1 (en) Dam intake
JP2003221861A (en) Regulating pondage combined with drain