US11131170B2 - Electrical submersible pump completion in a lateral well - Google Patents

Electrical submersible pump completion in a lateral well Download PDF

Info

Publication number
US11131170B2
US11131170B2 US16/587,512 US201916587512A US11131170B2 US 11131170 B2 US11131170 B2 US 11131170B2 US 201916587512 A US201916587512 A US 201916587512A US 11131170 B2 US11131170 B2 US 11131170B2
Authority
US
United States
Prior art keywords
esp
wellbore portion
hydrocarbons
vertical
junction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
US16/587,512
Other versions
US20210095550A1 (en
Inventor
Khaled Alsunnary
Ahmed Alkhalifah
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Saudi Arabian Oil Co
Original Assignee
Saudi Arabian Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Saudi Arabian Oil Co filed Critical Saudi Arabian Oil Co
Priority to US16/587,512 priority Critical patent/US11131170B2/en
Assigned to SAUDI ARABIAN OIL COMPANY reassignment SAUDI ARABIAN OIL COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ALKHALIFAH, AHMED, ALSUNNARY, KHALED
Priority to PCT/US2020/053389 priority patent/WO2021067348A1/en
Publication of US20210095550A1 publication Critical patent/US20210095550A1/en
Application granted granted Critical
Publication of US11131170B2 publication Critical patent/US11131170B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/128Adaptation of pump systems with down-hole electric drives
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0035Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches

Definitions

  • This disclosure relates to wellbore formation and completion.
  • Hydrocarbons trapped in subsurface hydrocarbon reservoirs are produced (that is, raised to the surface) through wellbores from the surface to the subsurface hydrocarbon reservoirs.
  • the hydrocarbons for example, oil, natural gas, or combinations of them
  • formation pressure which drives the flow of the hydrocarbons through the wellbore to the surface.
  • secondary recovery operations are implemented to produce the hydrocarbons.
  • ESP electrical submersible pump
  • the ESP is disposed at a downhole location in the wellbore. When operated, the ESP draws the hydrocarbons from the downhole location and drives them towards the surface.
  • ESP completion process The process of installing the ESP at the downhole location is called an ESP completion process and the ESP installed at the downhole location is called an ESP completion.
  • Conventional ESP consists of pump (stages that rotate to push the fluid up), seal (to protect the motor from the wellbore fluid), and motor, respectively.
  • This disclosure describes technologies relating to installing an ESP completion in a lateral well.
  • An electrical submersible pump is installed in a wellbore that includes a vertical wellbore portion and a lateral wellbore portion that is connected to the vertical wellbore portion at a junction.
  • the ESP is installed in the vertical wellbore portion downhole of the junction.
  • the lateral wellbore portion extends to a subsurface hydrocarbon reservoir carrying hydrocarbons. Using the ESP, at least a portion of the hydrocarbons is produced through the lateral wellbore portion.
  • An aspect combinable with any other aspect can include the following features.
  • the ESP can draw at least the portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion and into the vertical wellbore portion.
  • the ESP can drive at least the portion of the hydrocarbons drawn into the vertical wellbore portion in an uphole direction towards a surface.
  • the vertical wellbore can be cased.
  • a portion of the lateral wellbore portion can be cased.
  • An aspect combinable with any other aspect can include the following features.
  • An entirety of the vertical wellbore portion, including a downhole end of the vertical wellbore portion, can be cased.
  • An aspect combinable with any other aspect can include the following features.
  • the ESP To draw at least the portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion and into the vertical wellbore portion, the ESP generates a low-pressure region within the vertical wellbore portion.
  • the low-pressure region has a lower pressure compared to the lateral wellbore portion.
  • At least the portion of the hydrocarbons is drawn into the low-pressure region within the vertical wellbore portion.
  • the ESP includes a motor and pump.
  • the pump inlet is configured to receive at least the portion of the hydrocarbons to be flowed by the ESP.
  • the motor is configured to drive the ESP.
  • the motor is installed uphole of the pump inlet.
  • a production tubing is installed uphole of the ESP.
  • the production tubing fluidically couples to the ESP and extends to the surface.
  • the ESP flows at least the portion of the hydrocarbons through the production tubing.
  • An aspect combinable with any other aspect can include the following features.
  • An annulus is defined between an outer surface of the production tubing and an inner wall of the wellbore uphole of the junction. The annulus is sealed.
  • a wellbore is formed extending from a surface of the Earth towards a subsurface hydrocarbon reservoir carrying hydrocarbons.
  • the wellbore is split into a vertical wellbore portion and a lateral wellbore portion deviating from the vertical wellbore portion.
  • An ESP is installed in the vertical wellbore portion downhole of the junction. Using the ESP, at least a portion of the hydrocarbons is produced through the lateral wellbore portion.
  • An aspect combinable with any other aspect can include the following features.
  • the ESP produces at least a portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion into the vertical wellbore portion and from the vertical wellbore portion in an uphole direction towards the surface.
  • the vertical wellbore portion is cased, and a portion of the lateral wellbore portion is cased.
  • An aspect combinable with any other aspect can include the following features.
  • the entirety of the vertical wellbore portion, including a downhole end of the vertical wellbore portion, is cased.
  • An aspect combinable with any other aspect can include one or more of the following features.
  • the ESP draws at least the portion of the hydrocarbons into a low-pressure region within the vertical wellbore portion downhole of the junction.
  • the ESP includes a motor and a pump inlet.
  • the pump inlet is configured to receive at least a portion of the hydrocarbons to be flowed by the ESP.
  • the motor is configured to drive the ESP.
  • the motor is installed uphole of the pump inlet.
  • a production tubing is installed uphole of the ESP.
  • the production tubing is fluidically coupled to the ESP and extends to the surface.
  • the ESP flows at least a portion of the hydrocarbons through the production tubing.
  • An aspect combinable with any other aspect can include one or more of the following features.
  • An annulus is defined between an outer surface of the production tubing and an inner wall of the wellbore uphole of the junction. The annulus is sealed.
  • a wellbore extending from a surface of the Earth is formed towards a subsurface hydrocarbon reservoir carrying hydrocarbons.
  • the wellbore is split into a vertical wellbore portion and a lateral wellbore portion deviating from the vertical wellbore portion.
  • An ESP is installed in the vertical wellbore portion downhole of the junction. Using the ESP, at least a portion of the hydrocarbons is produced through the lateral wellbore portion.
  • a production tubing fluidically coupled to the ESP is installed uphole of the ESP and extends to the surface. At least the portion of the hydrocarbons is produced through the production tubing.
  • the production tubing defines an annulus between an outer wall of the production tubing and an inner wall of the wellbore.
  • the annulus is sealed uphole of the junction.
  • An aspect combinable with any other aspect can include one or more of the following features.
  • a packer is installed uphole of the junction sealing the annulus.
  • FIG. 1A is a schematic of an example of an ESP completion.
  • FIG. 1B is a schematic of an example of an ESP included in the ESP completion of FIG. 1A .
  • FIG. 2 is a flow chart of an example of a process.
  • This disclosure describes well completion in a lateral wellbore.
  • the ESP is typically installed above the junction/window from which the lateral well extends into the formation.
  • the ESP is installed within the lateral well.
  • a vertical well is drilled below the junction/window, and the ESP is lowered vertically into the vertical well and installed below the junction/window.
  • production fluid for example, hydrocarbons from a subsurface hydrocarbon reservoir
  • the ESP draws the fluid and pumps it in an uphole direction.
  • the electrostatic head for the ESP decreases. Therefore, the ESP operates at a higher efficiency.
  • the well completion specifically, lowering the ESP into a vertical well, is easier than installing the ESP in the lateral well.
  • Implementing the ESP completion described here can maximize ESP performance and prolong ESP running life.
  • lowering the ESP inlet prevents the possibility of separating gas downhole.
  • FIG. 1A is a schematic of an example of an ESP completion.
  • a wellbore 102 is drilled from a surface 101 of the Earth into a subterranean zone 100 that has a subsurface hydrocarbon reservoir with trapped hydrocarbons.
  • the subterranean zone 100 can include a formation, multiple formations, or a portion of a formation.
  • the wellbore 102 includes a vertical wellbore portion 104 and a lateral wellbore portion 106 that is connected to the vertical wellbore portion 104 at a junction 108 .
  • the vertical wellbore portion 104 is formed by drilling a pilot or rat hole from a downhole end of the wellbore 102 .
  • the vertical wellbore portion 104 extends into and terminates in the subsurface hydrocarbon reservoir.
  • the portion needs to be long enough to accommodate the length of the ESP which is typically around 100′-120′.
  • the lateral wellbore portion 106 is formed, for example, drilled using a whipstock, from a side wall of the vertical wellbore portion 104 .
  • the location on the vertical wellbore portion 104 from which the lateral wellbore portion 106 extends forms the junction 108 .
  • the lateral wellbore portion 106 can connect the wellbore 102 to an open horizontal well 112 formed within the subsurface hydrocarbon reservoir. Hydrocarbons in the reservoir can flow through the horizontal well 112 into the lateral wellbore portion 106 and then into the wellbore 102 .
  • the horizontal well 112 extends through the subsurface hydrocarbon reservoir.
  • a depth of a downhole end of the vertical wellbore portion 104 from the surface 101 of the Earth is greater than a depth of the horizontal well 112 from the surface 101 of the
  • An ESP 110 can be installed in the vertical wellbore portion 104 to draw the hydrocarbons from the horizontal well 112 .
  • the ESP 110 is installed in the vertical wellbore portion 104 downhole of the junction 108 .
  • a depth of the ESP 110 from the surface 101 of the Earth is greater than the depth of the horizontal well 112 .
  • FIG. 1B is a schematic of an example of the ESP 110 included in the ESP completion of FIG. 1A .
  • the ESP 110 includes a pump inlet 114 through which fluid is received, a motor 116 uphole of the pump inlet 114 to drive the pump 118 , and pump 118 uphole of the motor 116 .
  • the ESP 110 installed in the vertical wellbore portion 104 as described here, at least a portion of the hydrocarbons in the subsurface hydrocarbon reservoir are produced through the lateral wellbore portion 106 by operating the ESP 110 .
  • the ESP 110 draws the hydrocarbons from the subsurface hydrocarbon reservoir through the horizontal well 112 into the lateral wellbore portion 106 .
  • the ESP 110 continues to draw the hydrocarbons from the lateral wellbore portion 106 through the junction 108 in a downhole direction into the vertical portion 104 .
  • the produced hydrocarbons flow to and accumulate in a downhole end of the vertical wellbore portion 104 .
  • the ESP 110 draws the hydrocarbons into the pump inlet 114 and drives the hydrocarbons in an uphole direction towards the surface 101 . In this manner, the hydrocarbons are produced through the horizontal well 112 .
  • the pump inlet 114 , the motor 116 , and the pump 118 can be installed within a shroud (not shown). The shroud causes the hydrocarbons drawn through the pump inlet 114 to flow past the motor 116 , thereby cooling the motor 116 .
  • a distance between the pump inlet 114 and the downhole end of the vertical wellbore portion 104 is reduced to minimize the height of the fluid column to be drawn by the ESP 110 .
  • the distance can range between 60′ and 150′. for the, you can go up to
  • the entirety of the ESP 110 is installed downhole of the junction 108 at a distance from the downhole end of the vertical wellbore portion 104 that reduces (or minimizes) the height of the fluid column to be drawn by the ESP 110 .
  • Operation of the ESP 110 downhole of the junction 108 and in the vertical wellbore portion 104 generates a low-pressure region downhole of the ESP 110 in the vertical wellbore portion 104 .
  • the low-pressure region has a lower pressure compared to the lateral wellbore portion 106 .
  • the hydrocarbons in the horizontal well 112 are drawn into the low-pressure region within the vertical wellbore portion 104 . From this location, the ESP 110 drives the hydrocarbons towards the surface 101 .
  • a production tubing 120 is installed uphole of the ESP 110 in the wellbore 102 .
  • the production tubing 120 is fluidically coupled to the ESP 110 , for example, at an uphole end of the ESP 110 , and extends to the surface 101 .
  • the ESP 110 drives the hydrocarbons accumulated at the downhole end of the vertical wellbore portion 104 towards the surface 101 through the production tubing 120 .
  • an annulus defined between an outer surface of the production tubing 120 and an inner wall of the wellbore 102 uphole of the junction 108 is sealed.
  • a packer 122 is installed in the annulus uphole of the junction 108 , thereby sealing the annulus. Sealing the annulus uphole of the junction 108 ensures that the hydrocarbons flow from the horizontal well 112 downhole toward the pump inlet 114 of the ESP 110 . Sealing the annulus also maintains the low-pressure region generated by the ESP 110 near the downhole end of the vertical wellbore portion 104 .
  • the vertical wellbore portion 104 and at least a portion of the lateral wellbore portion 106 can be cased.
  • the entirety of the vertical wellbore portion 104 , including the downhole end of the vertical wellbore portion 104 can be cased.
  • FIG. 2B is a flow chart of an example of a process 200 .
  • Some portions of the process 200 are directed to completing the wellbore 102 using the ESP completion described in this disclosure. Some portions of the process 200 are directed to producing hydrocarbons through the wellbore 102 using the ESP completion described here.
  • a wellbore is formed extending from the surface of the Earth towards a subsurface hydrocarbon reservoir carrying hydrocarbons.
  • the wellbore is split into a vertical wellbore portion and a lateral wellbore portion deviating from the vertical wellbore portion. The vertical wellbore portion and the lateral wellbore portion meet at a junction in the wellbore.
  • an ESP is installed in the vertical wellbore portion downhole of the junction.
  • at least a portion of the hydrocarbons in the hydrocarbon reservoir are produced through the lateral wellbore portion.
  • the lateral wellbore portion connects to a horizontal well extending into the subsurface hydrocarbon reservoir.
  • the hydrocarbons from the subsurface hydrocarbon reservoir are produced through the horizontal well, through the lateral wellbore portion into the vertical wellbore portion, and from the vertical wellbore portion in an uphole direction toward the surface.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

Electrical submersible pump (ESP) completion in a lateral wellbore includes an ESP installed in a wellbore that includes a vertical wellbore portion and a lateral wellbore portion that is connected to the vertical wellbore portion at a junction. The ESP is installed in the vertical wellbore portion downhole of the junction. The lateral wellbore portion extends to a subsurface hydrocarbon reservoir carrying hydrocarbons. Using the ESP, at least a portion of the hydrocarbons is produced through the lateral wellbore portion.

Description

TECHNICAL FIELD
This disclosure relates to wellbore formation and completion.
BACKGROUND
Hydrocarbons trapped in subsurface hydrocarbon reservoirs are produced (that is, raised to the surface) through wellbores from the surface to the subsurface hydrocarbon reservoirs. During primary recovery operations, the hydrocarbons (for example, oil, natural gas, or combinations of them) are trapped under pressure (called formation pressure) which drives the flow of the hydrocarbons through the wellbore to the surface. Over time, the formation pressure drops. In such instances, secondary recovery operations are implemented to produce the hydrocarbons. Implementing an electrical submersible pump (ESP) is an example of a secondary recovery operation. In such an operation, the ESP is disposed at a downhole location in the wellbore. When operated, the ESP draws the hydrocarbons from the downhole location and drives them towards the surface. The process of installing the ESP at the downhole location is called an ESP completion process and the ESP installed at the downhole location is called an ESP completion. Conventional ESP consists of pump (stages that rotate to push the fluid up), seal (to protect the motor from the wellbore fluid), and motor, respectively.
SUMMARY
This disclosure describes technologies relating to installing an ESP completion in a lateral well.
Certain aspects of the subject matter described here can be implemented as a method. An electrical submersible pump (ESP) is installed in a wellbore that includes a vertical wellbore portion and a lateral wellbore portion that is connected to the vertical wellbore portion at a junction. The ESP is installed in the vertical wellbore portion downhole of the junction. The lateral wellbore portion extends to a subsurface hydrocarbon reservoir carrying hydrocarbons. Using the ESP, at least a portion of the hydrocarbons is produced through the lateral wellbore portion.
An aspect combinable with any other aspect can include the following features. To produce at least the portion of the hydrocarbons through the lateral wellbore portion, the ESP can draw at least the portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion and into the vertical wellbore portion. The ESP can drive at least the portion of the hydrocarbons drawn into the vertical wellbore portion in an uphole direction towards a surface.
An aspect combinable with any other aspect can include the following features. The vertical wellbore can be cased. A portion of the lateral wellbore portion can be cased.
An aspect combinable with any other aspect can include the following features. An entirety of the vertical wellbore portion, including a downhole end of the vertical wellbore portion, can be cased.
An aspect combinable with any other aspect can include the following features. To draw at least the portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion and into the vertical wellbore portion, the ESP generates a low-pressure region within the vertical wellbore portion. The low-pressure region has a lower pressure compared to the lateral wellbore portion. At least the portion of the hydrocarbons is drawn into the low-pressure region within the vertical wellbore portion.
An aspect combinable with any other aspect can include the following features. The ESP includes a motor and pump. The pump inlet is configured to receive at least the portion of the hydrocarbons to be flowed by the ESP. The motor is configured to drive the ESP. The motor is installed uphole of the pump inlet.
An aspect combinable with any other aspect can include the following features. A production tubing is installed uphole of the ESP. The production tubing fluidically couples to the ESP and extends to the surface. To produce at least the portion of the hydrocarbons through the lateral wellbore portion, the ESP flows at least the portion of the hydrocarbons through the production tubing.
An aspect combinable with any other aspect can include the following features. An annulus is defined between an outer surface of the production tubing and an inner wall of the wellbore uphole of the junction. The annulus is sealed.
Certain aspects of the subject matter described can be implemented as a method. A wellbore is formed extending from a surface of the Earth towards a subsurface hydrocarbon reservoir carrying hydrocarbons. At a junction at the downhole location, the wellbore is split into a vertical wellbore portion and a lateral wellbore portion deviating from the vertical wellbore portion. An ESP is installed in the vertical wellbore portion downhole of the junction. Using the ESP, at least a portion of the hydrocarbons is produced through the lateral wellbore portion.
An aspect combinable with any other aspect can include the following features. To produce at least the portion of the hydrocarbons through the lateral wellbore portion, the ESP produces at least a portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion into the vertical wellbore portion and from the vertical wellbore portion in an uphole direction towards the surface.
An aspect combinable with any other aspect can include the following features. The vertical wellbore portion is cased, and a portion of the lateral wellbore portion is cased.
An aspect combinable with any other aspect can include the following features. To case the vertical wellbore portion, the entirety of the vertical wellbore portion, including a downhole end of the vertical wellbore portion, is cased.
An aspect combinable with any other aspect can include one or more of the following features. To produce at least the portion of the hydrocarbons through the lateral wellbore portion, the ESP draws at least the portion of the hydrocarbons into a low-pressure region within the vertical wellbore portion downhole of the junction.
An aspect combinable with any other aspect can include one or more of the following features. The ESP includes a motor and a pump inlet. The pump inlet is configured to receive at least a portion of the hydrocarbons to be flowed by the ESP. The motor is configured to drive the ESP. The motor is installed uphole of the pump inlet.
An aspect combinable with any other aspect can include one or more of the following features. A production tubing is installed uphole of the ESP. The production tubing is fluidically coupled to the ESP and extends to the surface. To produce at least the portion of the hydrocarbons through the lateral wellbore portion, the ESP flows at least a portion of the hydrocarbons through the production tubing.
An aspect combinable with any other aspect can include one or more of the following features. An annulus is defined between an outer surface of the production tubing and an inner wall of the wellbore uphole of the junction. The annulus is sealed.
Certain aspects of the subject matter described can be implemented as a method. A wellbore extending from a surface of the Earth is formed towards a subsurface hydrocarbon reservoir carrying hydrocarbons. At a junction at a downhole location, the wellbore is split into a vertical wellbore portion and a lateral wellbore portion deviating from the vertical wellbore portion. An ESP is installed in the vertical wellbore portion downhole of the junction. Using the ESP, at least a portion of the hydrocarbons is produced through the lateral wellbore portion.
An aspect combinable with any other aspect can include one or more of the following features. A production tubing fluidically coupled to the ESP is installed uphole of the ESP and extends to the surface. At least the portion of the hydrocarbons is produced through the production tubing.
An aspect combinable with any other aspect can include one or more of the following features. The production tubing defines an annulus between an outer wall of the production tubing and an inner wall of the wellbore. The annulus is sealed uphole of the junction.
An aspect combinable with any other aspect can include one or more of the following features. To seal the junction uphole of the ESP, a packer is installed uphole of the junction sealing the annulus.
The details of one or more implementations of the subject matter described in this specification are set forth in the accompanying drawings and the description below. Other features, aspects, and advantages of the subject matter will become apparent from the description, the drawings, and the claims.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1A is a schematic of an example of an ESP completion.
FIG. 1B is a schematic of an example of an ESP included in the ESP completion of FIG. 1A.
FIG. 2 is a flow chart of an example of a process.
Like reference numbers and designations in the various drawings indicate like elements.
DETAILED DESCRIPTION
This disclosure describes well completion in a lateral wellbore. In a lateral wellbore, the ESP is typically installed above the junction/window from which the lateral well extends into the formation. Alternatively, the ESP is installed within the lateral well. In this disclosure, a vertical well is drilled below the junction/window, and the ESP is lowered vertically into the vertical well and installed below the junction/window. During production, production fluid (for example, hydrocarbons from a subsurface hydrocarbon reservoir) from the lateral well flows to the junction and the downhole into the vertical well. From the vertical well, the ESP draws the fluid and pumps it in an uphole direction. By this arrangement, the electrostatic head for the ESP (that is, the volume of fluid from the ESP inlet to the bottom of the well) decreases. Therefore, the ESP operates at a higher efficiency. Also, the well completion, specifically, lowering the ESP into a vertical well, is easier than installing the ESP in the lateral well. Implementing the ESP completion described here can maximize ESP performance and prolong ESP running life. Moreover, lowering the ESP inlet prevents the possibility of separating gas downhole.
FIG. 1A is a schematic of an example of an ESP completion. As shown in FIG. 1A, a wellbore 102 is drilled from a surface 101 of the Earth into a subterranean zone 100 that has a subsurface hydrocarbon reservoir with trapped hydrocarbons. The subterranean zone 100 can include a formation, multiple formations, or a portion of a formation. The wellbore 102 includes a vertical wellbore portion 104 and a lateral wellbore portion 106 that is connected to the vertical wellbore portion 104 at a junction 108. In some implementations, the vertical wellbore portion 104 is formed by drilling a pilot or rat hole from a downhole end of the wellbore 102. For example, the vertical wellbore portion 104 extends into and terminates in the subsurface hydrocarbon reservoir. The portion needs to be long enough to accommodate the length of the ESP which is typically around 100′-120′. The lateral wellbore portion 106 is formed, for example, drilled using a whipstock, from a side wall of the vertical wellbore portion 104. The location on the vertical wellbore portion 104 from which the lateral wellbore portion 106 extends forms the junction 108. The lateral wellbore portion 106 can connect the wellbore 102 to an open horizontal well 112 formed within the subsurface hydrocarbon reservoir. Hydrocarbons in the reservoir can flow through the horizontal well 112 into the lateral wellbore portion 106 and then into the wellbore 102. The horizontal well 112 extends through the subsurface hydrocarbon reservoir. A depth of a downhole end of the vertical wellbore portion 104 from the surface 101 of the Earth is greater than a depth of the horizontal well 112 from the surface 101 of the Earth.
An ESP 110 can be installed in the vertical wellbore portion 104 to draw the hydrocarbons from the horizontal well 112. The ESP 110 is installed in the vertical wellbore portion 104 downhole of the junction 108. A depth of the ESP 110 from the surface 101 of the Earth is greater than the depth of the horizontal well 112.
FIG. 1B is a schematic of an example of the ESP 110 included in the ESP completion of FIG. 1A. The ESP 110 includes a pump inlet 114 through which fluid is received, a motor 116 uphole of the pump inlet 114 to drive the pump 118, and pump 118 uphole of the motor 116. With the ESP 110 installed in the vertical wellbore portion 104 as described here, at least a portion of the hydrocarbons in the subsurface hydrocarbon reservoir are produced through the lateral wellbore portion 106 by operating the ESP 110. In particular, the ESP 110 draws the hydrocarbons from the subsurface hydrocarbon reservoir through the horizontal well 112 into the lateral wellbore portion 106. The ESP 110 continues to draw the hydrocarbons from the lateral wellbore portion 106 through the junction 108 in a downhole direction into the vertical portion 104. The produced hydrocarbons flow to and accumulate in a downhole end of the vertical wellbore portion 104. From the downhole end of the vertical wellbore portion 104, the ESP 110 draws the hydrocarbons into the pump inlet 114 and drives the hydrocarbons in an uphole direction towards the surface 101. In this manner, the hydrocarbons are produced through the horizontal well 112. In some implementations, the pump inlet 114, the motor 116, and the pump 118 can be installed within a shroud (not shown). The shroud causes the hydrocarbons drawn through the pump inlet 114 to flow past the motor 116, thereby cooling the motor 116.
By implementing the ESP 110 as described in this disclosure, a distance between the pump inlet 114 and the downhole end of the vertical wellbore portion 104 is reduced to minimize the height of the fluid column to be drawn by the ESP 110. For example, the distance can range between 60′ and 150′. for the, you can go up to In general, the entirety of the ESP 110 is installed downhole of the junction 108 at a distance from the downhole end of the vertical wellbore portion 104 that reduces (or minimizes) the height of the fluid column to be drawn by the ESP 110.
Operation of the ESP 110 downhole of the junction 108 and in the vertical wellbore portion 104 generates a low-pressure region downhole of the ESP 110 in the vertical wellbore portion 104. The low-pressure region has a lower pressure compared to the lateral wellbore portion 106. The hydrocarbons in the horizontal well 112 are drawn into the low-pressure region within the vertical wellbore portion 104. From this location, the ESP 110 drives the hydrocarbons towards the surface 101. To do so, in some implementations, a production tubing 120 is installed uphole of the ESP 110 in the wellbore 102. The production tubing 120 is fluidically coupled to the ESP 110, for example, at an uphole end of the ESP 110, and extends to the surface 101. The ESP 110 drives the hydrocarbons accumulated at the downhole end of the vertical wellbore portion 104 towards the surface 101 through the production tubing 120.
In some implementations, an annulus defined between an outer surface of the production tubing 120 and an inner wall of the wellbore 102 uphole of the junction 108 is sealed. For example, a packer 122 is installed in the annulus uphole of the junction 108, thereby sealing the annulus. Sealing the annulus uphole of the junction 108 ensures that the hydrocarbons flow from the horizontal well 112 downhole toward the pump inlet 114 of the ESP 110. Sealing the annulus also maintains the low-pressure region generated by the ESP 110 near the downhole end of the vertical wellbore portion 104.
In some implementations, the vertical wellbore portion 104 and at least a portion of the lateral wellbore portion 106 can be cased. For example, the entirety of the vertical wellbore portion 104, including the downhole end of the vertical wellbore portion 104, can be cased. No hydrocarbons flow from the subsurface reservoir directly into the vertical wellbore portion 104. That is, there are no perforations in the casing of the vertical wellbore portion 104 to allow hydrocarbons from the subsurface hydrocarbon reservoir to flow directly into the vertical wellbore portion 104.
FIG. 2B is a flow chart of an example of a process 200. Some portions of the process 200 are directed to completing the wellbore 102 using the ESP completion described in this disclosure. Some portions of the process 200 are directed to producing hydrocarbons through the wellbore 102 using the ESP completion described here. At 202, a wellbore is formed extending from the surface of the Earth towards a subsurface hydrocarbon reservoir carrying hydrocarbons. At 204, the wellbore is split into a vertical wellbore portion and a lateral wellbore portion deviating from the vertical wellbore portion. The vertical wellbore portion and the lateral wellbore portion meet at a junction in the wellbore. At 206, an ESP is installed in the vertical wellbore portion downhole of the junction. At 208, using the ESP, at least a portion of the hydrocarbons in the hydrocarbon reservoir are produced through the lateral wellbore portion. As described earlier, the lateral wellbore portion connects to a horizontal well extending into the subsurface hydrocarbon reservoir. The hydrocarbons from the subsurface hydrocarbon reservoir are produced through the horizontal well, through the lateral wellbore portion into the vertical wellbore portion, and from the vertical wellbore portion in an uphole direction toward the surface.
Thus, particular implementations of the subject matter have been described. Other implementations are within the scope of the following claims.

Claims (19)

The invention claimed is:
1. A method comprising:
installing an electrical submersible pump (ESP) in a wellbore comprising a vertical wellbore portion and a lateral wellbore portion that is connected to the vertical wellbore portion at a junction, the ESP installed in the vertical wellbore portion downhole of the junction, the lateral wellbore portion extending to a subsurface hydrocarbon reservoir carrying hydrocarbons;
installing a packer in an annulus uphole of the junction, thereby sealing the annulus uphole of the junction to promote that fluids flowing from the lateral wellbore portion flow downhole toward a pump inlet of the ESP, wherein the annulus is defined between an outer surface of production tubing and an inner wall of the wellbore uphole of the junction; and
producing, using the ESP, at least a portion of the hydrocarbons carried by the subsurface hydrocarbon reservoir through the lateral wellbore portion, wherein producing comprises drawing, by the ESP, at least the portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion and into the vertical wellbore portion, wherein no hydrocarbons flow from the subsurface hydrocarbon reservoir directly into the vertical wellbore portion, and wherein the vertical wellbore portion downhole of the junction comprises a lower pressure compared to the lateral wellbore portion.
2. The method of claim 1, wherein producing, using the ESP, at least the portion of the hydrocarbons through the lateral wellbore portion comprises driving, by the ESP, at least the portion of the hydrocarbons drawn into the vertical wellbore portion in an uphole direction through the production tubing towards a surface.
3. The method of claim 2, comprising:
casing the vertical wellbore portion to give the no hydrocarbons flow from the subsurface hydrocarbon reservoir directly into the vertical wellbore portion; and
casing a portion of the lateral wellbore portion.
4. The method of claim 3, wherein casing the vertical wellbore portion comprises casing an entirety of the vertical wellbore portion including a downhole end of the vertical wellbore portion.
5. The method of claim 2, wherein drawing, by the ESP, at least the portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion and into the vertical wellbore portion comprises generating, by the ESP, a low pressure region within the vertical wellbore portion, the low pressure region having the lower pressure compared to the lateral wellbore portion, wherein at least the portion of the hydrocarbons is drawn into the low pressure region within the vertical wellbore portion, and wherein there are no perforations in casing of the vertical wellbore portion.
6. The method of claim 1, wherein the ESP comprises a motor and the pump inlet, the pump inlet configured to receive at least the portion of the hydrocarbons to be flowed by the ESP, the motor configured to drive the ESP, wherein installing the ESP in the wellbore downhole of the junction comprises installing the motor uphole of the pump inlet.
7. The method of claim 1, comprising:
installing the production tubing uphole of the ESP, the production tubing fluidically coupled to the ESP and extending to the surface, wherein producing, using the ESP, at least the portion of the hydrocarbons through the lateral wellbore portion comprises flowing at least the portion of the hydrocarbons through the production tubing; and
promoting, via the sealing of the annulus with the packer, fluid flow from the lateral wellbore portion in a downhole direction toward the pump inlet, wherein the inner wall of the wellbore uphole of the junction is casing; and
maintaining, via the sealing of the annulus with the packer, a low pressure region within the vertical wellbore portion, the low pressure region having the lower pressure compared to the lateral wellbore portion.
8. The method of claim 7, comprising installing casing along an entirety of the vertical wellbore portion including across an end at which the vertical wellbore portion terminates, wherein the inner wall of the wellbore uphole of the junction comprises the casing.
9. A method comprising:
forming a wellbore extending from a surface of the Earth towards a subsurface hydrocarbon reservoir carrying hydrocarbons;
at a junction at a downhole location, splitting the wellbore into a vertical wellbore portion and a lateral wellbore portion deviating from the vertical wellbore portion;
installing an electrical submersible pump (ESP) in the vertical wellbore portion downhole of the junction;
installing a packer in an annulus uphole of the junction, thereby sealing the annulus uphole of the junction to promote that fluids flowing from the lateral wellbore portion flow downhole toward a pump inlet of the ESP, wherein the annulus is defined between an outer surface of production tubing and an inner wall of the wellbore uphole of the junction; and
producing, using the ESP, at least a portion of the hydrocarbons through the lateral wellbore portion, wherein producing comprises drawing, by the ESP, at least the portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion and into the vertical wellbore portion, wherein no hydrocarbons flow from the subsurface hydrocarbon reservoir directly into the vertical wellbore portion, and wherein the vertical wellbore portion downhole of the junction comprises a lower pressure compared to the lateral wellbore portion.
10. The method of claim 9, wherein producing, using the ESP, at least the portion of the hydrocarbons through the lateral wellbore portion comprises producing at least the portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion into the vertical wellbore portion and, from the vertical wellbore portion, in an uphole direction towards the surface.
11. The method of claim 10, further comprising:
casing the vertical wellbore portion, wherein there are no perforations in casing of the vertical wellbore portion, and wherein the inner wall of the wellbore uphole of the junction comprises the casing; and
casing a portion of the lateral wellbore portion.
12. The method of claim 11, wherein casing the vertical wellbore portion comprises casing an entirety of the vertical wellbore portion including a downhole end of the vertical wellbore portion, and wherein sealing the annulus maintains a low pressure region in the vertical wellbore portion, the low pressure region comprising the lower pressure compared to the lateral wellbore portion.
13. The method of claim 9, wherein the ESP comprises a motor and a pump inlet, the pump inlet configured to receive at least the portion of the hydrocarbons to be flowed by the ESP, the motor configured to drive the ESP, wherein installing the ESP in the wellbore downhole of the junction comprises installing the motor uphole of the pump inlet.
14. The method of claim 9, comprising installing the production tubing uphole of the ESP, the production tubing fluidically coupled to the ESP and extending to the surface, wherein producing, using the ESP, at least the portion of the hydrocarbons through the lateral wellbore portion comprises flowing at least the portion of the hydrocarbons through the production tubing.
15. The method of claim 14, comprising installing casing along an entirety of the vertical wellbore portion including across a terminating end of the vertical wellbore portion.
16. A method comprising:
forming a wellbore extending from a surface of the Earth towards a subsurface hydrocarbon reservoir carrying hydrocarbons;
at a junction at a downhole location, splitting the wellbore into a vertical wellbore portion and a lateral wellbore portion deviating from the vertical wellbore portion;
installing an electrical submersible pump (ESP) in the vertical wellbore portion downhole of the junction;
installing a packer in an annulus uphole of the junction, thereby sealing the annulus uphole of the junction to promote that fluids flowing from the lateral wellbore portion flow downhole toward a pump inlet of the ESP, wherein the annulus is defined between an outer surface of production tubing and an inner wall of the wellbore uphole of the junction; and
producing, using the ESP, at least a portion of the hydrocarbons through the lateral wellbore portion, wherein producing comprises drawing, by the ESP, at least the portion of the hydrocarbons from the subsurface hydrocarbon reservoir through the lateral wellbore portion and into the vertical wellbore portion, wherein the vertical wellbore portion downhole of the junction comprises a low pressure region having a lower pressure compared to the lateral wellbore portion, wherein there are no perforations in casing of the vertical wellbore portion, and wherein no hydrocarbons flow from the subsurface hydrocarbon reservoir directly into the vertical wellbore portion.
17. The method of claim 16, comprising installing the production tubing fluidically coupled to the ESP, the production tubing installed uphole of the ESP and extending to the surface, wherein at least the portion of the hydrocarbons is produced through the production tubing, wherein the ESP comprises the pump inlet that receives at least the portion of the hydrocarbons pumped by the ESP and a motor that the drives the ESP, and wherein the motor is uphole of the pump inlet.
18. The method of claim 17, comprising installing casing along an entirety of the vertical wellbore portion including across a terminating end of the vertical wellbore portion.
19. The method of claim 18, wherein sealing the annulus uphole of the junction maintains the low pressure region.
US16/587,512 2019-09-30 2019-09-30 Electrical submersible pump completion in a lateral well Active US11131170B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US16/587,512 US11131170B2 (en) 2019-09-30 2019-09-30 Electrical submersible pump completion in a lateral well
PCT/US2020/053389 WO2021067348A1 (en) 2019-09-30 2020-09-30 Electrical submersible pump completion in a lateral well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US16/587,512 US11131170B2 (en) 2019-09-30 2019-09-30 Electrical submersible pump completion in a lateral well

Publications (2)

Publication Number Publication Date
US20210095550A1 US20210095550A1 (en) 2021-04-01
US11131170B2 true US11131170B2 (en) 2021-09-28

Family

ID=73020279

Family Applications (1)

Application Number Title Priority Date Filing Date
US16/587,512 Active US11131170B2 (en) 2019-09-30 2019-09-30 Electrical submersible pump completion in a lateral well

Country Status (2)

Country Link
US (1) US11131170B2 (en)
WO (1) WO2021067348A1 (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998040603A2 (en) 1997-03-12 1998-09-17 Baker Hughes Incorporated Apparatus and methods for generating energy utilizing downhole processed fuel
US6119780A (en) * 1997-12-11 2000-09-19 Camco International, Inc. Wellbore fluid recovery system and method
US6923275B2 (en) * 2001-01-29 2005-08-02 Robert Gardes Multi seam coal bed/methane dewatering and depressurizing production system
US8316942B2 (en) * 2009-07-31 2012-11-27 Baker Hughes Incorporated ESP for perforated sumps in horizontal well applications
US20130068453A1 (en) 2011-09-20 2013-03-21 Saudi Arabian Oil Company Dual purpose observation and production well
US9322250B2 (en) * 2013-08-15 2016-04-26 Baker Hughes Incorporated System for gas hydrate production and method thereof
US9598943B2 (en) * 2013-11-15 2017-03-21 Ge Oil & Gas Esp, Inc. Distributed lift systems for oil and gas extraction
WO2018005910A1 (en) 2016-06-30 2018-01-04 Saudi Arabian Oil Company Downhole separation efficiency technology to produce wells through a single string
US20190226303A1 (en) * 2016-07-06 2019-07-25 Aker Solutions As Subsea methane production assembly

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998040603A2 (en) 1997-03-12 1998-09-17 Baker Hughes Incorporated Apparatus and methods for generating energy utilizing downhole processed fuel
US6119780A (en) * 1997-12-11 2000-09-19 Camco International, Inc. Wellbore fluid recovery system and method
US6923275B2 (en) * 2001-01-29 2005-08-02 Robert Gardes Multi seam coal bed/methane dewatering and depressurizing production system
US8316942B2 (en) * 2009-07-31 2012-11-27 Baker Hughes Incorporated ESP for perforated sumps in horizontal well applications
US20130068453A1 (en) 2011-09-20 2013-03-21 Saudi Arabian Oil Company Dual purpose observation and production well
US9322250B2 (en) * 2013-08-15 2016-04-26 Baker Hughes Incorporated System for gas hydrate production and method thereof
US9598943B2 (en) * 2013-11-15 2017-03-21 Ge Oil & Gas Esp, Inc. Distributed lift systems for oil and gas extraction
WO2018005910A1 (en) 2016-06-30 2018-01-04 Saudi Arabian Oil Company Downhole separation efficiency technology to produce wells through a single string
US20190226303A1 (en) * 2016-07-06 2019-07-25 Aker Solutions As Subsea methane production assembly

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PCT International Search Report and Written Opinion in International Appln. No. PCT/US2020/053389, dated Dec. 18, 2020, 13 pages.

Also Published As

Publication number Publication date
US20210095550A1 (en) 2021-04-01
WO2021067348A1 (en) 2021-04-08

Similar Documents

Publication Publication Date Title
US6237691B1 (en) Method and apparatus for increasing fluid recovery from a subterranean formation
US8006756B2 (en) Gas assisted downhole pump
US5402851A (en) Horizontal drilling method for hydrocarbon recovery
CA2665035C (en) A method and apparatus for separating downhole oil and water and reinjecting separated water
CA2607683A1 (en) Inverted electrical submersible pump completion to maintain fluid segregation and ensure motor cooling in dual-stream well
US20020121376A1 (en) Well completion with cable inside a tubing and gas venting through the tubing
US20040129427A1 (en) Downhole pump
US10989026B2 (en) Electrical submersible pump with gas venting system
US20120125625A1 (en) System and method for intermittent gas lift
US6854518B1 (en) Method and apparatus for enhancing production from an oil and/or gas well
US20150167652A1 (en) Submersible pumping system and method
WO2016019427A1 (en) A well system
US20060169458A1 (en) Pumping system and method for recovering fluid from a well
US6666269B1 (en) Method and apparatus for producing fluid from a well and for limiting accumulation of sediments in the well
US9587470B2 (en) Acoustic artificial lift system for gas production well deliquification
US11131170B2 (en) Electrical submersible pump completion in a lateral well
US20110203792A1 (en) System, method and assembly for wellbore maintenance operations
EP3612713B1 (en) Dual-walled coiled tubing with downhole flow actuated pump
US11905803B2 (en) Dual well, dual pump production
WO2016200847A1 (en) Dual artificial lift system
RU2288349C2 (en) Method for finishing a methane-coal well

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

AS Assignment

Owner name: SAUDI ARABIAN OIL COMPANY, SAUDI ARABIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ALSUNNARY, KHALED;ALKHALIFAH, AHMED;REEL/FRAME:050652/0405

Effective date: 20190930

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED

STCF Information on status: patent grant

Free format text: PATENTED CASE