US1106606A - Process of making firm foundations in the ground for piles, tubed shafts, and the like. - Google Patents

Process of making firm foundations in the ground for piles, tubed shafts, and the like. Download PDF

Info

Publication number
US1106606A
US1106606A US73940212A US1912739402A US1106606A US 1106606 A US1106606 A US 1106606A US 73940212 A US73940212 A US 73940212A US 1912739402 A US1912739402 A US 1912739402A US 1106606 A US1106606 A US 1106606A
Authority
US
United States
Prior art keywords
ground
piles
tubed
shafts
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US73940212A
Inventor
Otto Wilhelmi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INT SIEGWARTBALKENGESELLSCHAFT
INTERNATIONALE SIEGWARTBALKENGESELLSCHAFT
Original Assignee
INT SIEGWARTBALKENGESELLSCHAFT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INT SIEGWARTBALKENGESELLSCHAFT filed Critical INT SIEGWARTBALKENGESELLSCHAFT
Priority to US73940212A priority Critical patent/US1106606A/en
Application granted granted Critical
Publication of US1106606A publication Critical patent/US1106606A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Definitions

  • Patented Aug. 11, 1914 UNITED STATES PATE ToFIiICE.
  • the explosive action may be successively utiliz ed for forming the space for the shaft of the pile itself having one or more enlarged portions.
  • FIG. 1 and 2 are vertical sections showing the formation of a concrete pile before and after employing the process according to this invention
  • Fig. 3 is an elevation showing a finished concrete pile having sev eral enlarged portions
  • Fig. 4 is an elevation partly in section, illustrating a mode of making a concretepile in which the preliminary tube first driven into the ground isleft there as a permanent mold
  • Fig. 7 shows a concrete base on which a ready-made short pile has been sub sequently placed.
  • a hole for the explosive is first formed, said hole being suited to. the dimensions of the pileshaft.
  • the mold for the hole for the explosive the
  • the explosive charge 2 is covered by a quantity of soft or liquid concrete and is then-ignited by means of the fuse 10 and, m consequence of its explosive action, the surrounding ground is forced apart and a hole or cavity 12 is formed, (Fig. 2') into whichthe liquid concrete above it at once rushes or flows.
  • the concrete 'ma then be consolidated in the hole 12 by mold, where the pipe 6 forms a good rein- I forcement, and is firmly embedded in the concrete of the broad base 14 by its ends which are torn into lugs or strips 13 by the explosion,
  • the explosive charge must be protected from premature ignition owing to the concrete mass, which is subsequently filled into the bore hole, or falling stones or the like, and .the column of concrete above the charge must be protected from being severely. pressed upward by the explosion and possibly driven out of the pipe.
  • the explosive charge 2 may be placed in a, cage 15 (Figs. 1 and 5) which is preferably formed of two plates 16, 17 located one above the otherat certain distances apart and haying intermediate side pieces 18.
  • the plates 16, 17 are formed of concrete and the intermediate pieces are constituted by coiled .iron reinforcement 19.
  • the upper plate 16 or 16 restrains the upward pressure.
  • the force of the explosion is mainly directed downward and laterally.
  • the downward pressure compresses the ground below the cage and renders it more stable, and the increased lateral pressure makes a wider hole 12 and a larger base 14 is formed than is the case when the explosion is unrestricted.
  • ⁇ Vhat I claim is 1. A process of making firm pile foundations in the ground, consisting in making a hole in the ground, placing the explosive charge upon the bottom of this hole, filhng the latter with grout, exploding the charge and forming thereby an enlarged recess into which the grout automaticallydescends and fills it.
  • a process of making fi rm pile foundations in the ground consisting in makin a hole in the ground, lining the hole w1th metal tubes, placing an explosive charge upon the bottom of said hole, connecting a protected fuse with said charge, filling the hole with grout, exploding said charge and forming thereby an enlarged recess into in presence of two witnesses.

Description

A 0. WILHELMI.
rnocEss OF MAKING FIRM FQUNDATIONS IN THE GROUND FOR PILES, TUBED SHAPTS,
' AND THE LIKE! APPLICATION PILEDIIDEO. 80, m2.
Patented Aug. 11, 1914 UNITED STATES PATE ToFIiICE.
omo WILHELHI, ortucnmm, swzrznnmnn, kssienon or ONEQHALF 'ro INTER- .NATIONALE .SIEGWARTBALKENGESELLSCHAFT, A FIRM.
Pnocnss' orfntame FIRM roumm'rrons IN THE GROUND non PILES, TUBED To all whom it may concern:
Be it known that I, O'r'ro WILHELMI, a subject of the Emperor of Germany, and residing at "Lucerne, Switzerland, have invented certain new and useful Improvements in Processes of Making Firm Foundations in the Ground for Piles,Tubed Shafts, and. the like, of which the following 1s a specification.
the explosive action may be successively utiliz ed for forming the space for the shaft of the pile itself having one or more enlarged portions. i
T 'The mode of carrying m process into practice will now be describe by way of example with reference to the accompanying drawings, wherein Figures 1 and 2 are vertical sections showing the formation of a concrete pile before and after employing the process according to this invention; Fig. 3 is an elevation showing a finished concrete pile having sev eral enlarged portions; Fig. 4 is an elevation partly in section, illustrating a mode of making a concretepile in which the preliminary tube first driven into the ground isleft there as a permanent mold; Figs. 5 and Gare elevation and longitudinal vertical section, respectively, showing devices by means of which the action of the explosive. can be regulated; Fig. 7 shows a concrete base on which a ready-made short pile has been sub sequently placed.
In maklng the foundations of concrete piles according to this invention, a hole for the explosive is first formed, said hole being suited to. the dimensions of the pileshaft. For this purpose, as shown in Fig. 1, the mold for the hole for the explosive, the
' pipe 9 is driven into the ground, and if it v is to be used again, it is loosened and drawn SHAFTS, THE LIKE.
p pecificatlon of Letters Patent. Application filed December 30, 1912. Serial No. 739,402
Patented Aug. 11, ieia.
so far outthat it'cannot be injured by the explosion. The explosive charge 2 is covered by a quantity of soft or liquid concrete and is then-ignited by means of the fuse 10 and, m consequence of its explosive action, the surrounding ground is forced apart and a hole or cavity 12 is formed, (Fig. 2') into whichthe liquid concrete above it at once rushes or flows. If necessary, the concrete 'ma then be consolidated in the hole 12 by mold, where the pipe 6 forms a good rein- I forcement, and is firmly embedded in the concrete of the broad base 14 by its ends which are torn into lugs or strips 13 by the explosion, The explosive charge must be protected from premature ignition owing to the concrete mass, which is subsequently filled into the bore hole, or falling stones or the like, and .the column of concrete above the charge must be protected from being severely. pressed upward by the explosion and possibly driven out of the pipe. To this end, the explosive charge 2 may be placed in a, cage 15 (Figs. 1 and 5) which is preferably formed of two plates 16, 17 located one above the otherat certain distances apart and haying intermediate side pieces 18. A cage 15, as shown in Fig. 6, of ferro-concrete may also be employed, in which the plates 16, 17 are formed of concrete and the intermediate pieces are constituted by coiled .iron reinforcement 19. The upper plate 16 or 16 restrains the upward pressure. As the explosive charge rests on the ' lower plate 17 or 17 and the sides are wholly or partially open, the force of the explosion is mainly directed downward and laterally. The downward pressure compresses the ground below the cage and renders it more stable, and the increased lateral pressure makes a wider hole 12 and a larger base 14 is formed than is the case when the explosion is unrestricted. As shown in Fig; 7,
i a previously prepared short pile 14' is subsequently placed upon the concrete base 14.
\Vhat I claim is 1. A process of making firm pile foundations in the ground, consisting in making a hole in the ground, placing the explosive charge upon the bottom of this hole, filhng the latter with grout, exploding the charge and forming thereby an enlarged recess into which the grout automaticallydescends and fills it.
2. A process of making fi rm pile foundations in the ground, consisting in makin a hole in the ground, lining the hole w1th metal tubes, placing an explosive charge upon the bottom of said hole, connecting a protected fuse with said charge, filling the hole with grout, exploding said charge and forming thereby an enlarged recess into in presence of two witnesses.
OTTO WILHELM I.
grout automatically descends and Witnesses OHARLOTIE METzNER,' Amman) MEYER.
thereby an enlarged recess into
US73940212A 1912-12-30 1912-12-30 Process of making firm foundations in the ground for piles, tubed shafts, and the like. Expired - Lifetime US1106606A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US73940212A US1106606A (en) 1912-12-30 1912-12-30 Process of making firm foundations in the ground for piles, tubed shafts, and the like.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US73940212A US1106606A (en) 1912-12-30 1912-12-30 Process of making firm foundations in the ground for piles, tubed shafts, and the like.

Publications (1)

Publication Number Publication Date
US1106606A true US1106606A (en) 1914-08-11

Family

ID=3174798

Family Applications (1)

Application Number Title Priority Date Filing Date
US73940212A Expired - Lifetime US1106606A (en) 1912-12-30 1912-12-30 Process of making firm foundations in the ground for piles, tubed shafts, and the like.

Country Status (1)

Country Link
US (1) US1106606A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2449037A (en) * 1945-11-30 1948-09-07 C H C Patent Corp Method of seismic exploration operations
US2558924A (en) * 1945-11-20 1951-07-03 Sun Oil Co Seismographic prospecting apparatus for directing explosive energy
US2797466A (en) * 1951-08-23 1957-07-02 Lidberg Artur Robert Improved mould for moulding concrete poles and the like
US3059436A (en) * 1956-03-19 1962-10-23 Jr George F Hermann Piling
US3216158A (en) * 1963-07-22 1965-11-09 Pneumo Dynamics Corp Impact tool
US3222842A (en) * 1963-01-15 1965-12-14 Harvey Aluminum Inc Method for installing cemented anchors
US3690106A (en) * 1970-02-24 1972-09-12 Dow Chemical Co Method of treating permeable formations
US4230425A (en) * 1979-03-19 1980-10-28 Gusev Vladimir A Method and installation for producing cast-in-situ piles
US4571124A (en) * 1982-11-18 1986-02-18 Sumitomo Cement Co., Ltd. Method of forming cast-in-place concrete pile

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2558924A (en) * 1945-11-20 1951-07-03 Sun Oil Co Seismographic prospecting apparatus for directing explosive energy
US2449037A (en) * 1945-11-30 1948-09-07 C H C Patent Corp Method of seismic exploration operations
US2797466A (en) * 1951-08-23 1957-07-02 Lidberg Artur Robert Improved mould for moulding concrete poles and the like
US3059436A (en) * 1956-03-19 1962-10-23 Jr George F Hermann Piling
US3222842A (en) * 1963-01-15 1965-12-14 Harvey Aluminum Inc Method for installing cemented anchors
US3216158A (en) * 1963-07-22 1965-11-09 Pneumo Dynamics Corp Impact tool
US3690106A (en) * 1970-02-24 1972-09-12 Dow Chemical Co Method of treating permeable formations
US4230425A (en) * 1979-03-19 1980-10-28 Gusev Vladimir A Method and installation for producing cast-in-situ piles
US4571124A (en) * 1982-11-18 1986-02-18 Sumitomo Cement Co., Ltd. Method of forming cast-in-place concrete pile

Similar Documents

Publication Publication Date Title
US3779025A (en) Pile installation
US4060994A (en) Process for providing a foundation pile for alternating compressive and tractive stresses and a pile thus provided
US1106606A (en) Process of making firm foundations in the ground for piles, tubed shafts, and the like.
US4293242A (en) Piles
US3685302A (en) Method for forming expanded base piles for uplift loads
US3512365A (en) Method of forming a pile in situ
RU2344230C2 (en) Method of ground anchor installation and associated device
US3913337A (en) Piling
US887175A (en) Method of forming foundations.
US3971227A (en) Installation of expanded base piles
US1794892A (en) Forming piles
US794971A (en) Foundation.
US3113436A (en) Bulb pile
AU2016239986B2 (en) Construction element for creating a tunnel, tunnel comprising such an element and methods for constructing such an element and such a tunnel
US3309878A (en) Method of forming piles
US1157444A (en) Method of placing and driving concrete piles.
US1775217A (en) Method of making piles in place
US996688A (en) Concrete pile.
US3543524A (en) Thin-walled pile with closure plug
US2332168A (en) Concrete pile and method of sinking it
US2789419A (en) Method for forming reinforced foundation piles with an enlarged base
US2438729A (en) Concrete pile with bulb at lower end
US1213441A (en) Method of making concrete or reinforced-concrete (ferroconcrete) piles.
US1178531A (en) Driven concrete pile.
US791927A (en) Method of making foundations in water-logged ground.