US791927A - Method of making foundations in water-logged ground. - Google Patents

Method of making foundations in water-logged ground. Download PDF

Info

Publication number
US791927A
US791927A US20781404A US1904207814A US791927A US 791927 A US791927 A US 791927A US 20781404 A US20781404 A US 20781404A US 1904207814 A US1904207814 A US 1904207814A US 791927 A US791927 A US 791927A
Authority
US
United States
Prior art keywords
ground
ram
foundations
clay
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US20781404A
Inventor
Francois Jean Marie Monnier-Ducastel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US20781404A priority Critical patent/US791927A/en
Application granted granted Critical
Publication of US791927A publication Critical patent/US791927A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Definitions

  • WITNESSES Jam/@ mma/ML ATTORNEYS No. 791,927. PATENTED JUNE 6,1905.
  • rlhe object of this invention is to improve the method of forming foundations for bridges and the like where the foundations are in submerged, marshy, or wet ground and to do away with the necessity of caisson-work by forming shafts the walls of which are rendered impervious to moisture as said shaft is sunk.
  • I use a ram or pile which I drop repeatedly in the line of the shaft to be formed, said ram being so formed as to compress the soft earth downwardly and laterally.
  • I/Vhen a certain depth of shaft has been formed, I supply the wall of that depth with an impervious sheath.
  • this may be done, one by letting into the shaft a pipe of ferroconcrete and another (the preferred manner) by placing within the shaft from time to time clay which as it is compressed laterally will be incorporated with the already-compressed walls and form an impervious sheath. Then such a shaft has been sunk to solid ground, it is filled with beton, cement, or other suitable foundation material.
  • the perforating-ram is allowed to drop with a free fall from a suitable height above the ground, and then when it has penetrated to from 1.50 meters to two meters the excavation which it has made is filled with clay. This clay is then rammed downward and laterally by the ramming-ram, which is also allowed to drop with a free fall.
  • the excavation produced by the ramming is iilled once or twice more, and each time the clay which penetrates into the surrounding soil is vigorously compressed, and it formsl a lining for the walls of the excavation obtained over a considerable surface.
  • the perforating-ram is then again operated, which is allowed to drop in order to deepen the said excavation from 1.50 meters to two meters, and clay is again thrown into the bottom of the bore-hole or well, so as to lill up the hollow obtained. It is again rammed with the ramming-ram and clay is again thrown in one or more times, as was hereinbefore mentioned, and the operation is continued, always increasing gradually the depth of the well or hole.
  • a fresh charge of materials is then introduced, which is followed by a series of two, three, or four blows with the ramming-ram, and thus in succession until the ground-level is reached.
  • the ramming is more or less intense-that is to say, according as the series of blows is composed of one or a larger numberthe materials are expelled with greater or less force in all directions, forcing in front of them the clay as well as the ground itself.
  • Fig. l of the accompanying drawings represents four pillars or piles A B C I), obtained by repeating four times the operations hereinbefore indicated. Although they represent the foundations of a bridge-p" le for a river, they would be exactly the same if they were arranged in accessible ground-that is to say, not under water.
  • the pillars might be combined with metallic strengtheners or binders 4, which would allow the points of support of a whole series of foundations to be interconnected, ai d even such foundations to be connected with abridge or other construction, if ferroconcrete be employed, so as to constitute a sort of monolith.
  • the binders or strengthening-pieces4 are arranged in a loop with a view to allowing the passage of the rams.
  • the materials forced down by the ramming-ram are thus automatically and practically caused to force the said armature or strengthening-pieces I toward the center part of the pillar or pier.
  • a pile or framing apron 5, of ferroconcrete connects the foundations of the bridgepier in lthe manner hereinbefore mentioned and that in addition the armatures or strengthening-pieces I of each pillar or pier are prolonged into the columns a Z2 c of the bridge and into the butti-ess or ice-breaker CZ, which is also of ferroconcrete, in order to form an indivisible whole.
  • Fig. 3 of the drawings shows a modification of the system of foundations.
  • the protecting-sheath 1 is replaced by a cylinder 6, of ferroconcrete, formed of several parts fitting' one in the other and starting from the ground-level.
  • one or more of the pipes are gradually engaged in the ground by lowering thern some centimeters after a certain number of strokes of the perforating-ram, which bores first a hole in advance.
  • the hole is widened a little, so as to form a dish for receiving the end of the pipe, the hollow of which is then filled upwith beton or more economically even with sand.
  • Pipes of ferroconcrete may be constructed to resist all internal pressures produced by the compression of the materials under the load.
  • Another modification of the system consists in the combination of the two arrangements previously mentioned.
  • This second modification is shown in the pile or pillar B, Fig. 1 of the drawings.
  • the lower part of the foundation is surrounded with a protective sheath 2, of clay; butfrom a certain height the materials constituting the pillar are compressed in a cylinder 7 of ferroconcrete.
  • this pipe is preferably arranged opposite the part of the foundation which is in contact with the water; but it may be prolonged beneath the ground and occupy any suitable place, as would be done, for that matter, for a foundation in an accessible ground.
  • This second modification will allow the coffer-dam l, hereinbefore mentioned, to be entirely dispensed with in certain cases.
  • This appliance is constituted by a hollow conical trunk in two parts 8 and 9 of the form indicated in the drawings, j oined together along a diametral plane and adapted to pivot easily on a strong unitingshaft 10, which serves at the same time for the attachment to the suspension-rod 11.
  • 12 is a notch utilized for opening the perforator.
  • 13 is a catch movable on an axis 1-Lwhich, engaging under a projection 15, holds the parts 8 and 9 together. I/Vhen in use, the ram is lifted by the pile-driving machine and the pawl disengages it in order to allow it to drop with a free fall.
  • the pile-driver or ram On reaching the ground the pile-driver or ram by its cutting edge 16 cuts olf a piece of the soil, like a hollow punch, which it brings up with it. Brought to the surface the ram is opened after the catch 13 has been released by inserting a wedge in the notch 12 and causing the parts 8 and 9 to pivot on their aXis 10. The earth is removed and the operation recommenced. It will, however, be noticed that the conical external form of the ram always enables it to compress the ground laterally in its fall, and consequently to act in a similar manner to the solid rammer at present employed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

No. 791,927. PATENTED JUNE 6, 1905 E. J. M. MONNIER-DUGASTEL. y METHOD 0E MAKING EOUNDATIONS IN WATER LOGGED GROUND.
APPLICATION FILED MAY 13, 1904.
3 SHEETS-SHEET 1.
WITNESSES Jam/@ mma/ML ATTORNEYS No. 791,927. PATENTED JUNE 6,1905. E. J. M. MONNIER-DUCASTEL.. METHOD OF MAKING IOUNDATIONS IN WATER LOGGED GROUND.
APPLIGATION FILED MAY 13, 1904.
. 3 SHEETS-SHEET 2.
INVENTOR Mvvvvvvvvvvvwvvv`dvvvvxvvvvvvvv ATToRNEv No.- 791,927. PATENTED JUNE 6, 1905.
1 E. J. M. MONNIER-DUCASTEL. METHOD OE MAKING EOUNDATIONS IN WATER LOGGED GROUND.
APPLICATION FILED MAY 13,1904.
3 SHEETS-SHEET 3.
- lNVENTo www. J/mw/W-Amm ATTORNEYS UNITED STATES Patented June 6, 1905.
PATENT EETCE.
METHOD 0F MAKING FOUNDATIONS IN WATER-LOGGED GROUND.
SPECIFICATION forming part of Letters Patent No. 791,927, dated J une 6, 1905.
Application led May 13, 1904. Serial No. 207,814.
T0 @ZZ whom it *may concern:
Be it known that I, FRANCOIS JEAN MARIE MONNIER-DUCASTEL, engineer, a citizen of the Republic of France, and a resident of Paris, France, have invented an Improved Method of Making Foundations in Compressible, Loose, or Tater-Logged Ground, of Which the following' is a specification.
rlhe object of this invention is to improve the method of forming foundations for bridges and the like where the foundations are in submerged, marshy, or wet ground and to do away with the necessity of caisson-work by forming shafts the walls of which are rendered impervious to moisture as said shaft is sunk.
In carrying out this invention I use a ram or pile which I drop repeatedly in the line of the shaft to be formed, said ram being so formed as to compress the soft earth downwardly and laterally. I/Vhen a certain depth of shaft has been formed, I supply the wall of that depth with an impervious sheath. There are two ways in which this may be done, one by letting into the shaft a pipe of ferroconcrete and another (the preferred manner) by placing within the shaft from time to time clay which as it is compressed laterally will be incorporated with the already-compressed walls and form an impervious sheath. Then such a shaft has been sunk to solid ground, it is filled with beton, cement, or other suitable foundation material.
In the following description of the method applied to the two cases mentioned reference will be made to the accompanying drawings, in which- Figure l is a longitudinal section of the foundations of a river-bridge pier or pile; Fig. 2, a corresponding horizontal projection; Fig. 3, a vertical section of a foundation in a ground which is exposed at low water and which constitutes a modification of the system; Fig. 4, a similar view of another modiiication in course of erection; Fig. 5, a vertical section of the special perforating-ram employed for this kind of work, and Figs. 6 and 7 are partial details of this appliance.
In order to make foundations in rivers, a light coHer-dam 1 is placed, first of all, round the point where these foundations are to be made, Figs. l and 2, which coffer-dam need not be made water-tight, seeing that the interior inclosure is then filled up with mold or ordinary earth, excluding sand, gravel, or shingle, up to a suflcient height a. (See Fig. 1.) By operating' thus the water is expelled from the said inclosure and an actual platform or island of solid earth is created, on which platform the perforating and ramming rams are conveyed, as well as a pile-driving mechanism, which apparatus may be cornpared with similar apparatus hitherto employed for converting compressible ground into resistant ground. The machine being brought into the desired position, the perforating-ram is allowed to drop with a free fall from a suitable height above the ground, and then when it has penetrated to from 1.50 meters to two meters the excavation which it has made is filled with clay. This clay is then rammed downward and laterally by the ramming-ram, which is also allowed to drop with a free fall. The excavation produced by the ramming is iilled once or twice more, and each time the clay which penetrates into the surrounding soil is vigorously compressed, and it formsl a lining for the walls of the excavation obtained over a considerable surface. The perforating-ram is then again operated, which is allowed to drop in order to deepen the said excavation from 1.50 meters to two meters, and clay is again thrown into the bottom of the bore-hole or well, so as to lill up the hollow obtained. It is again rammed with the ramming-ram and clay is again thrown in one or more times, as was hereinbefore mentioned, and the operation is continued, always increasing gradually the depth of the well or hole. By operating thus by successive boi-ings of 1.50 meters to two meters and by each time forming a lining or tight sheath 2, due to the ramrning of the clay, solid ground is obtained. Naturally the further we descend the force of the ramrning is progressively increased, so as to render the protecting-sheath 2 more resistant as the pressure of water increases. This increase in the force of the ramming is obtained by increasing the height of the fall and increasing the quantity of clay rammed in each time. When solid ground has been reached, an excavation is made therein by some blows of the perforating-ram, and a small quantity of cement or hard material mixed with mortar is placed at the bottom of the hole formed and then the ramming-ram is again allowed to drop. This latter by its irnpetus at the moment of the shock forces the materials into the surrounding ground both downwardly as well as laterally. A fresh charge of materials is then introduced, which is followed by a series of two, three, or four blows with the ramming-ram, and thus in succession until the ground-level is reached. According as the ramming is more or less intense-that is to say, according as the series of blows is composed of one or a larger numberthe materials are expelled with greater or less force in all directions, forcing in front of them the clay as well as the ground itself.
W'hen the wet ground in which the foundations are to be made is accessible dry-shod, it is evident that it is absolutely needless to construct a coffer-dam as hereinbefore specified. An excavation is produced by means of a perforating-ram and is filled with clay. It is then rammed, deepened, and the operation recommenced in the manner hereinbefore indicated. In both cases the system of foundations considered allows of masonry columns or pillars 3 being' obtained, which, bearing largely on solid ground and being anchored therein at the same time, have a diameter proportionate to the ramming. It is therefore possible to graduate at will, according to the loads and constructions to be supported, the section of pressure and resistance of the pillars.
If the construction extends according to a given drawing or even according to a fixed foundation or projection, it sufiices to judiciously arrange a certain number of pillars, thus forming a series of columns which directly transmit the pressure to the solid ground. Fig. l of the accompanying drawings represents four pillars or piles A B C I), obtained by repeating four times the operations hereinbefore indicated. Although they represent the foundations of a bridge-p" le for a river, they would be exactly the same if they were arranged in accessible ground-that is to say, not under water. Evidently, if thought well, the pillars might be combined with metallic strengtheners or binders 4, which would allow the points of support of a whole series of foundations to be interconnected, ai d even such foundations to be connected with abridge or other construction, if ferroconcrete be employed, so as to constitute a sort of monolith.
lIt will be noticed that the binders or strengthening-pieces4 are arranged in a loop with a view to allowing the passage of the rams. The materials forced down by the ramming-ram are thus automatically and practically caused to force the said armature or strengthening-pieces I toward the center part of the pillar or pier.
In Fig. l of the drawings it maybe seen that a pile or framing apron 5, of ferroconcrete, connects the foundations of the bridgepier in lthe manner hereinbefore mentioned and that in addition the armatures or strengthening-pieces I of each pillar or pier are prolonged into the columns a Z2 c of the bridge and into the butti-ess or ice-breaker CZ, which is also of ferroconcrete, in order to form an indivisible whole.
Fig. 3 of the drawings shows a modification of the system of foundations. In this arrangement the protecting-sheath 1 is replaced by a cylinder 6, of ferroconcrete, formed of several parts fitting' one in the other and starting from the ground-level. In order to employ this modification, one or more of the pipes are gradually engaged in the ground by lowering thern some centimeters after a certain number of strokes of the perforating-ram, which bores first a hole in advance. When resistant or firm ground is reached, the hole is widened a little, so as to form a dish for receiving the end of the pipe, the hollow of which is then filled upwith beton or more economically even with sand. Pipes of ferroconcrete may be constructed to resist all internal pressures produced by the compression of the materials under the load.
Another modification of the system consists in the combination of the two arrangements previously mentioned. This second modification is shown in the pile or pillar B, Fig. 1 of the drawings. The lower part of the foundation is surrounded with a protective sheath 2, of clay; butfrom a certain height the materials constituting the pillar are compressed in a cylinder 7 of ferroconcrete. In the case of a bridge this pipe is preferably arranged opposite the part of the foundation which is in contact with the water; but it may be prolonged beneath the ground and occupy any suitable place, as would be done, for that matter, for a foundation in an accessible ground. This second modification will allow the coffer-dam l, hereinbefore mentioned, to be entirely dispensed with in certain cases. In fact, for foundations in a river cylinders 7 (see Fig. 4) of ferroconcrete or of unstrengthened concrete, which are embedded in the bed of the river to a certain depth, would be of sufficient height to emerge above the water-level and of suiiicient diameter to allow one, two, three, or a larger number of pillars or piles to be bored and rammed in the interior of same. After having filled up the support-base and removed the water contained in the cylinder clay is applied internally to its base, which, forming a joint, insures tightness betweenthe pipe and the bed of the river. The perforation of the soil and the ramming down of one or more piles is then operated, and then the interior of the pipe 7 is in its turn filled up and rammed down. In this case of course the bell will be mounted IOO IOS
IIO
on a pontoon or a temporary bridge suitably arranged.
Hitherto only conical perforating-rams and ovoid ramming-rams have been employed for the mechanical compression of the ground. The perforating-ram at present employed, which is solid, has great drawbacks when it is necessary to employ it in incompressible and wet ground, in which case, in fact, the operation is a long one, and it is only possible to displace the incompressible layer by a series of repeated falls or drops. In order to obviate these drawbacks, a perforating-ram of special construction is employed for this improved system of foundations which considerably accelerates the work. Figs. 5 to 7 represent this improved perforating ram. This appliance is constituted by a hollow conical trunk in two parts 8 and 9 of the form indicated in the drawings, j oined together along a diametral plane and adapted to pivot easily on a strong unitingshaft 10, which serves at the same time for the attachment to the suspension-rod 11. 12 is a notch utilized for opening the perforator. 13 is a catch movable on an axis 1-Lwhich, engaging under a projection 15, holds the parts 8 and 9 together. I/Vhen in use, the ram is lifted by the pile-driving machine and the pawl disengages it in order to allow it to drop with a free fall. On reaching the ground the pile-driver or ram by its cutting edge 16 cuts olf a piece of the soil, like a hollow punch, which it brings up with it. Brought to the surface the ram is opened after the catch 13 has been released by inserting a wedge in the notch 12 and causing the parts 8 and 9 to pivot on their aXis 10. The earth is removed and the operation recommenced. It will, however, be noticed that the conical external form of the ram always enables it to compress the ground laterally in its fall, and consequently to act in a similar manner to the solid rammer at present employed.
I claim as my invention-- 1. The herein-described method of forming foundations in wet or marshy ground, consisting in sinking' a shaft by repeated blows of a ram, compressing the displaced material downwardly and laterally by said blows, providing an impervious sheath for the shaft formed, from timeto time as its formation progresses, and then filling in the shaft with foundation material.
2. The herein-described method of forming foundations in wet or marshy ground, consisting in sinking a shaft by repeated blows of a ram, filling in the opening made with clay, compressing' said clay to form an impervious wall to said shaft and repeating said operation until a shaft of the desired length is secured, and then filling in with foundation material.
8. Theherein-described method of forming foundations, consisting in forming a shaft of the required depth of greater area at the base than at the top, forming an impervious clay wall by filling said shaft from time to time during its construction with clay and expanding said clay laterally and then filling said shaft with foundation material.
11. The herein-described method of forming foundations, consisting in placing a pipe of sufhcient dimension over the space in which the foundation is to be, forming a shaft below said pipe with repeated blows of a ram adapted to force the material downwardly and laterally and from time to time inserting clay in the path of the ram, that said clay will be forced laterally to form an impervious sheath for the shaft and then filling' the shaft with foundation material.
5. The herein-described method of forming foundations in wet or marshy ground, consisting in sinking a shaft by repeated blows of a ram, filling in the opening made with clay, compressing said clay to form an impervious wall to said shaft, cutting through non-compressible strata encountered by the ram with the ram itself, and repeating said ramming and cutting operations until a shaft of the desired length is secured, and then filling in with foundation material.
In testimony whereof I have signed my name to this specification in the presence of two subscribing witnesses.
FRANCOIS JEAN MARIE MONNIER-DUGASTEL.
lvitnesses:
ANTONIUS MoN'rmLHETz, HANsoN C. COXE.
US20781404A 1904-05-13 1904-05-13 Method of making foundations in water-logged ground. Expired - Lifetime US791927A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US20781404A US791927A (en) 1904-05-13 1904-05-13 Method of making foundations in water-logged ground.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US20781404A US791927A (en) 1904-05-13 1904-05-13 Method of making foundations in water-logged ground.

Publications (1)

Publication Number Publication Date
US791927A true US791927A (en) 1905-06-06

Family

ID=2860416

Family Applications (1)

Application Number Title Priority Date Filing Date
US20781404A Expired - Lifetime US791927A (en) 1904-05-13 1904-05-13 Method of making foundations in water-logged ground.

Country Status (1)

Country Link
US (1) US791927A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4273475A (en) * 1976-09-22 1981-06-16 Raymond International Inc. Load supporting structure
EP0233981A2 (en) * 1986-02-21 1987-09-02 J.D. Neuhaus GmbH & Co. Manual control valve for pneumatical device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4273475A (en) * 1976-09-22 1981-06-16 Raymond International Inc. Load supporting structure
EP0233981A2 (en) * 1986-02-21 1987-09-02 J.D. Neuhaus GmbH & Co. Manual control valve for pneumatical device
EP0233981A3 (en) * 1986-02-21 1988-12-14 J.D. Neuhaus GmbH & Co. Manual control valve for pneumatical device

Similar Documents

Publication Publication Date Title
EP1157169B1 (en) Short aggregate pier techniques
CN100532733C (en) Diving casting cast-in-place pile construction method for constructing in scree layer and sand layer
CN105040692A (en) Construction method of precast concrete pile body carrier pile
CN104404956A (en) Construction method for pedestal piles
US3913337A (en) Piling
US791927A (en) Method of making foundations in water-logged ground.
US4199277A (en) Piling
US2317016A (en) Bridge foundation and method of making same
US3299644A (en) Underpinning system and method of constructing same
US3429129A (en) Method for producing foundations for columns and the like
US738346A (en) Structure in or adjacent to waterways.
US1665796A (en) Method of providing and placing piers
US2468265A (en) Foundation
Broms Design and construction of anchored and strutted sheet pile walls in soft clay
US1644572A (en) Ant ville
US1505238A (en) Breakwater-wall construction
US922106A (en) System of foundations for compressible, submerged, or moist ground.
US2608830A (en) Foundation structure
US957844A (en) Constructing foundations of buildings.
Pinto et al. Ground improvement solutions at Sana Vasco da Gama Royal Hotel
Lutenegger Uplift tests on shallow cast-in-place enlarged base pedestal foundations in clay
SU996626A1 (en) Method of constracting a cast-in-place pile
RU2351711C1 (en) Method for manufacture of bored pile from slags in rolled wells